KR20190005504A - Hierarchical project management apparatus - Google Patents

Hierarchical project management apparatus Download PDF

Info

Publication number
KR20190005504A
KR20190005504A KR1020170086249A KR20170086249A KR20190005504A KR 20190005504 A KR20190005504 A KR 20190005504A KR 1020170086249 A KR1020170086249 A KR 1020170086249A KR 20170086249 A KR20170086249 A KR 20170086249A KR 20190005504 A KR20190005504 A KR 20190005504A
Authority
KR
South Korea
Prior art keywords
project
task
business
note
message
Prior art date
Application number
KR1020170086249A
Other languages
Korean (ko)
Other versions
KR102151546B1 (en
Inventor
최재호
Original Assignee
최재호
델타피디에스 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 최재호, 델타피디에스 주식회사 filed Critical 최재호
Priority to KR1020170086249A priority Critical patent/KR102151546B1/en
Priority to JP2017145947A priority patent/JP6576981B2/en
Priority to US15/664,412 priority patent/US20180032956A1/en
Publication of KR20190005504A publication Critical patent/KR20190005504A/en
Application granted granted Critical
Publication of KR102151546B1 publication Critical patent/KR102151546B1/en
Priority to US18/226,586 priority patent/US20230376906A1/en
Priority to US18/226,558 priority patent/US20240005281A1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/101Collaborative creation, e.g. joint development of products or services

Abstract

The present invention relates to a hierarchical project management apparatus which comprises: a memory for storing a macro-management block and a micro-management block having different task evaluation access right; and a processor for controlling association of a tree structure between the macro-management block and the micro-management block. The processor includes the steps of: performing a macro-management process of generating a project and a project message thread associated with the project in the macro-management block, and associating a note object including a container of the task object as a unit task of the project in the project message thread; and a micro-management process of generating a task message thread associated with the note object in the micro-management block, associating the task object with the task message thread, inserting the task object into the micro-management block whenever the task object is generated, and updating the tree structure.

Description

계층적 프로젝트 관리 장치{HIERARCHICAL PROJECT MANAGEMENT APPARATUS}{HIERARCHICAL PROJECT MANAGEMENT APPARATUS}

본 발명은 업무평가조회 기술에 관한 것으로, 보다 상세하게는 계층적으로 수행되는 매크로 및 마이크로 관리 과정을 통해 프로젝트 관리 효율을 증진시킬 수 있는 계층적 프로젝트 관리 장치에 관한 것이다.The present invention relates to a business evaluation inquiry technology, and more particularly, to a hierarchical project management apparatus capable of improving project management efficiency through hierarchical macros and micro management processes.

인터넷 메신저는 사용자들 간의 문자 또는 그래픽을 포함하는 메시지를 전달하는 어플리케이션에 해당하고, 복수의 사용자들에 의해 참여되는 대화방으로 구현될 수 있다. 일 실시예에서, 인터넷 메신저는 모바일 환경(예를 들어, 휴대폰)에서 수행되는 모바일 메신저를 포함할 수 있고, 예를 들어, 카카오톡, 라인, 위챗, 페이스북 메신저를 포함할 수 있다.The Internet instant messenger corresponds to an application for delivering a message including characters or graphics between users, and can be implemented as a chat room participated by a plurality of users. In one embodiment, an Internet messenger may include a mobile messenger performed in a mobile environment (e.g., a mobile phone) and may include, for example, a kakao chat, a line, a wichat, a facebook messenger.

인터넷 메신저를 사용하는 사용자의 수가 급증하면서 모바일 환경에서 사용되는 어플리케이션들도 매우 다양하게 개발되고 있고, 이 중에서 프로젝트 관리 프로그램은 많은 사용자들에 의하여 사용되고 있다.As the number of users using the Internet instant messenger is rapidly increasing, applications used in the mobile environment are being developed in various ways. Among them, the project management program is used by many users.

한국공개특허 제10-2005-0092173호는 모바일 기기에서의 업무 처리를 위한 데이터 입력방법 및 화면 표시방법에 관한 것으로, 행 또는 열에 날짜 또는 할일(To-do list)을 테이블 형태로 디스플레이시키고; 어느 한 날짜가 선택되면 해당 날짜에 해당하는 할일들이 박스 형태로 표시되며, 박스의 좌측 및 우측 끝 박스은 해당 할일의 시작일 및 종료일로 하되, 상기 시작일 및 종료일 박스가 화면에 디스플레이되지 않을 경우에는 화면에 디스플레이된 좌측 및 우측 끝 박스에 시작일 및 종료일에 관한 정보를 각각 표식하고; 상기 박스 내부에 해당 할일에 대한 정보를 표시하며; 그리고 해당 할일에 대해 날짜별로 저장된 내용을 사용자가 조작할 수 있도록, 할일의 완료, 할일의 연기, 할일의 종료, 할일의 진행을 포함하는 선택창을 출력시키는 기술에 대하여 개시한다.Korean Patent Laid-Open No. 10-2005-0092173 relates to a data input method and a screen display method for processing a job on a mobile device, and displays a date or a to-do list in a row or column in a table form; If a date is selected, tasks corresponding to the date are displayed in a box form, and the left and right end boxes of the box are set as the start date and end date of the to-do list. If the start date and end date boxes are not displayed on the screen, Marking the information on the start date and the end date respectively in the displayed left and right end boxes; Displaying information about a corresponding task in the box; A technique for outputting a selection window including a completion of a task, a postponement of a task, an end of a task, and a task is performed so that the user can manipulate the contents stored by date for the task to be performed.

한국등록특허 제10-0663494호는 이동통신 단말기를 이용한 할 일 관리 방법에 관한 것으로, 미리 설정된 시간에 도달하였는지 판단하고, 상기 미리 설정된 시간에 도달하였을 경우 미리 등록된 할 일 항목 중 미완료된 할 일의 항목을 확인하며, 상기 확인결과에 따라 미완료된 할 일의 항목을 디스플레이하는 기술에 대하여 개시한다.Korean Patent Registration No. 10-0663494 relates to a task management method using a mobile communication terminal. It is determined whether a preset time has been reached, and when a predetermined time has been reached, an unfinished task And displays an item of an unfinished task according to the result of the check.

한국공개특허 제10-2005-0092173호 (2005.09.21 공개)Korean Patent Publication No. 10-2005-0092173 (published on September 21, 2005) 한국등록특허 제10-0663494호 (2006.12.22 등록)Korean Registered Patent No. 10-0663494 (registered on December 22, 2006)

본 발명의 일 실시예는 계층적으로 수행되는 매크로 및 마이크로 관리 과정을 통해 프로젝트 관리 효율을 증진시킬 수 있는 계층적 프로젝트 관리 장치를 제공하고자 한다.One embodiment of the present invention is to provide a hierarchical project management apparatus capable of improving project management efficiency through hierarchical macro and micro management processes.

본 발명의 일 실시예는 프로젝트 메시지 쓰레드를 통해 프로젝트 중심의 매크로 관리 과정을 수행하고 업무 메시지 쓰레드를 통해 개별 업무 중심의 마이크로 관리 과정을 수행하여 프로젝트 전체의 효율과 개별 업무 관리의 효율을 모두 증진시킬 수 있는 계층적 프로젝트 관리 장치를 제공하고자 한다.In one embodiment of the present invention, a project-oriented macro management process is performed through a project message thread, and an individual task-oriented micro management process is performed through a task message thread to improve efficiency of an overall project and individual task management And to provide a hierarchical project management device capable of managing the project.

실시예들 중에서, 계층적 프로젝트 관리 장치는 서로 다른 업무평가 접근권을 가지는 매크로 관리 블록 및 마이크로 관리 블록을 저장하는 메모리 및 상기 매크로 관리 블록 및 상기 마이크로 관리 블록 간의 트리 구조 연관성을 제어하는 프로세서를 포함하고, 상기 프로세서는 상기 매크로 관리 블록에 프로젝트 및 상기 프로젝트와 연관된 프로젝트 메시지 쓰레드를 생성하고 상기 프로젝트 메시지 쓰레드에 상기 프로젝트의 단위 업무로서 업무 객체의 컨테이너를 포함하는 노트 객체를 연관시키는 매크로 관리 과정을 수행하는 단계 및 상기 마이크로 관리 블록에 상기 노트 객체와 연관된 업무 메시지 쓰레드를 생성하고 상기 업무 메시지 쓰레드에 상기 업무 객체를 연관시키며 상기 업무 객체가 생성될 때마다 상기 마이크로 관리 블록에 상기 업무 객체를 삽입하여 상기 트리 구조를 갱신하는 마이크로 관리 과정을 수행하는 단계를 포함한다.Among the embodiments, the hierarchical project management apparatus includes a memory for storing a macro management block and a micro management block having different task evaluation access rights, and a processor for controlling the tree structure association between the macro management block and the micro management block , The processor Performing a macro management process of creating a project message thread associated with the project in the macro management block and associating the project message thread with a note object including a container of a task object as a unit task of the project, A task message thread associated with the note object is created in the management block, the task object is associated with the task message thread, the task object is inserted into the micro management block each time the task object is created, and the tree structure is updated And performing a micro management process.

상기 매크로 관리 과정을 수행하는 단계는 상기 프로젝트 메시지 쓰레드에 참여되는 적어도 하나의 사용자 각각에게 상기 프로젝트와 연관된 매크로 및 마이크로 관리 블록에 대한 업무수행 접근권을 부여하는 단계를 포함할 수 있다.The step of performing the macro management process may include granting at least one user participating in the project message thread access to a macro and a micro management block associated with the project.

상기 매크로 관리 과정을 수행하는 단계는 상기 프로젝트 메시지 쓰레드와 연관된 노트 객체의 생성개수를 기초로 상기 프로젝트에 관한 중요성을 결정하고 슈퍼 관리자에게 해당 중요성에 관한 정보를 제공하는 단계를 포함할 수 있다.The step of performing the macro management process may include determining importance of the project based on the number of generated note objects associated with the project message thread and providing the super manager with information about the importance.

상기 매크로 관리 과정을 수행하는 단계는 상기 프로젝트 메시지 쓰레드와 연관된 노트 객체의 생성개수 또는 해당 업무 메시지 쓰레드의 갱신빈도가 특정 기준 이하이면 상기 프로젝트 메시지 쓰레드를 통해 해당 연관된 신규 노트 객체의 생성을 권장하는 노트 객체 생성 권장 메시지를 제공하는 단계를 포함할 수 있다.The step of performing the macro management process may include generating a note object that is associated with the project message thread through the project message thread if the number of generated note objects associated with the project message thread or the update frequency of the corresponding task message thread is below a certain criterion And providing an object creation recommendation message.

상기 매크로 관리 과정을 수행하는 단계는 상기 프로젝트 메시지 쓰레드와 연관된 노트 객체, 멀티미디어 자료 및 첨부파일 중 적어도 하나에 관한 등록개수 및 프로젝트 연관성을 분석하여 시계열로 분석된 프로젝트 성과정보를 생성하는 단계를 포함할 수 있다.The step of performing the macro management process may include generating project performance information analyzed in time series by analyzing a registration number and a project association with respect to at least one of a notebook object, a multimedia object, and an attachment file associated with the project message thread .

상기 매크로 관리 과정을 수행하는 단계는 슈퍼 관리자의 업무평가 접근권을 통해 상기 프로젝트를 평가하는 단계를 포함할 수 있다.The step of performing the macro management process may include the step of evaluating the project through the task evaluation access right of the super administrator.

상기 매크로 관리 과정을 수행하는 단계는 상기 슈퍼 관리자와 연관된 사용자 단말로부터 수신된 평가를 기초로 상기 프로젝트의 정성적 프로젝트평점을 부여하는 단계, 상기 프로젝트와 연관된 노트 객체의 생성개수와 해당 노트 객체를 통해 생성된 업무 객체에 관한 생성횟수, 처리횟수 및 처리기간을 기초로 상기 프로젝트의 정량적 프로젝트평점을 산출하는 단계 및 상기 정성적 프로젝트평점과 정량적 프로젝트평점을 기초로 상기 프로젝트에 관한 종합적인 평가점수를 산출하는 단계를 포함할 수 있다.The step of performing the macro management process may include providing a qualitative project rating of the project based on an evaluation received from a user terminal associated with the super administrator, Calculating a quantitative project rating of the project on the basis of a generation frequency, a processing frequency and a processing period of the generated business object; and calculating a comprehensive evaluation score of the project based on the qualitative project rating and the quantitative project rating .

상기 매크로 관리 과정을 수행하는 단계는 상기 프로젝트가 종료되기 전까지 상기 정량적 프로젝트평점을 특정 주기로 갱신하고, 상기 정량적 프로젝트평점을 향상시키기 위한 특정 프로젝트 활동을 선별하여 상기 프로젝트 메시지 쓰레드를 통해 추천하는 단계를 포함할 수 있다.The step of performing the macro management process may include updating the quantitative project rating to a specific period until the project is terminated, selecting a specific project activity for improving the quantitative project rating, and recommending the selected project activity through the project message thread can do.

상기 매크로 관리 과정을 수행하는 단계는 상기 정량적 프로젝트평점의 산출 기준을 분석하여 노트 객체의 신규 생성, 기 생성된 노트 객체와 연관된 업무 객체의 신규 생성, 기 생성된 업무 객체의 빠른 처리 및 해당 프로젝트 메시지 쓰레드에 처리된 메시지 처리량의 향상 중 하나를 상기 특정 프로젝트 활동으로 결정하는 단계를 포함할 수 있다.The step of performing the macro management process may include analyzing a calculation standard of the quantitative project rating to generate a new note object, a new business object associated with the created note object, a quick processing of the created business object, And determining one of the enhancements to the thread throughput of the message as the particular project activity.

상기 매크로 관리 과정을 수행하는 단계는 상기 노트 객체를 상기 프로젝트 메시지 쓰레드에서 직접적으로 접근될 수 있고 텍스트 메시지 또는 미디어 메시지와 구별되는 독립적인 노트 메시지로서 상기 프로젝트 메시지 쓰레드에 추가하여 상기 노트 객체를 생성하는 단계를 포함할 수 있다.The step of performing the macro management process may include adding the note object to the project message thread as an independent note message that can be accessed directly from the project message thread and distinguished from a text message or a media message to generate the note object Step < / RTI >

상기 매크로 관리 과정을 수행하는 단계는 특정 시간 구간 동안 해당 노트 객체를 통해 생성된 업무 객체 생성횟수 및 해당 업무 메시지 쓰레드에 처리된 메시지 처리량을 기초로 각 노트 객체의 활동성을 산출하고, 가장 높은 활동성을 가지는 노트 객체를 상기 프로젝트의 주요 노트 객체로 결정하는 단계를 포함할 수 있다.The step of performing the macro management process may include calculating the activity of each note object based on the number of times of generating the task object generated through the corresponding note object and the throughput of the message processed in the task message thread during a specific time interval, And determining the note object as a main note object of the project.

상기 마이크로 관리 과정을 수행하는 단계는 상기 노트 객체와 연관되고 업무생성자, 업무처리자 및 업무평점을 포함하는 상기 업무 객체가 생성되면 해당 노트 객체와 연관되며 상기 업무생성자와 업무처리자 간의 업무 메시지 쓰레드를 생성하여 해당 업무 메시지 쓰레드에 상기 업무객체를 메시지 객체로서 연관시키는 단계를 포함할 수 있다.Wherein the step of performing the micro management process comprises generating a task message thread associated with the note object and associated with the note object when the task object including the task creator, And associating the business object as a message object with the business message thread.

상기 마이크로 관리 과정을 수행하는 단계는 처리 단계별 진행상태를 나타내는 업무진행상태를 포함하는 상기 업무 객체의 진행을 수행하고, 최종적으로 상기 업무생성자의 업무평가 접근권을 통해 상기 업무 객체를 평가하는 단계를 포함할 수 있다.The step of performing the micro management process may include a step of performing a progress of the task object including a task progress state indicating a progress state by a process step and finally evaluating the task object through a task evaluation access right of the task creator can do.

상기 마이크로 관리 과정을 수행하는 단계는 상기 업무생성자와 업무처리자 간의 응답 관계로 구현되는 업무 객체 관련 응답을 통해 상기 업무 객체의 업무진행상태를 갱신하는 단계를 포함할 수 있다.The step of performing the micro management process may include a step of updating a business progress state of the business object through a response relating to a business object implemented in a response relation between the business creator and the business processor.

상기 마이크로 관리 과정을 수행하는 단계는 상기 노트 객체와 연관된 업무 메시지 쓰레드를 통해 상기 업무 객체와 연관되고 해당 업무진행상태가 완료될 때까지 특정 반복 기준에 따라 상기 해당 업무진행상태의 완료를 요청하는 리마인드 메시지를 제공하는 단계를 포함할 수 있다.Wherein the performing of the micro management process comprises: associating with the task object through a task message thread associated with the note object and requesting completion of the task progress state according to a specific iteration criterion until the task progress state is completed; And providing a message.

상기 마이크로 관리 과정을 수행하는 단계는 상기 제공된 리마인드 메시지의 제공횟수를 기초로 업무반응속도를 산출하여 상기 업무 객체의 업무평점에 포함시키는 단계를 포함할 수 있다.The step of performing the micro management process may include calculating a response speed based on the number of times of providing the provided remind message and including the response speed in a task rating of the task object.

실시예들 중에서, 기록매체는 계층적 프로젝트 관리 방법에 관한 컴퓨터 프로그램을 기록한 컴퓨터에 의해 실행될 수 있고 컴퓨터 판독 가능하다. 상기 계층적 프로젝트 관리 방법은 매크로 관리 블록에 프로젝트 및 상기 프로젝트와 연관된 프로젝트 메시지 쓰레드를 생성하고 상기 프로젝트 메시지 쓰레드에 상기 프로젝트의 단위 업무로서 업무 객체의 컨테이너를 포함하는 노트 객체를 연관시키는 매크로 관리 과정을 수행하는 기능 및 마이크로 관리 블록에 상기 노트 객체와 연관된 업무 메시지 쓰레드를 생성하고 상기 업무 메시지 쓰레드에 상기 업무 객체를 연관시키며 상기 업무 객체가 생성될 때마다 상기 마이크로 관리 블록에 상기 업무 객체를 삽입하여 상기 트리 구조를 갱신하는 마이크로 관리 과정을 수행하는 기능을 포함한다.Among the embodiments, the recording medium can be executed by a computer recording a computer program relating to a hierarchical project management method, and is computer readable. The hierarchical project management method includes: generating a project message thread associated with a project and a project in a macro management block, and associating a note object including a container of a task object as a unit task of the project with the project message thread; And a micro management block for generating a task message thread associated with the note object, associating the task object with the task message thread, inserting the task object into the micro management block each time the task object is created, And a micro management process for updating the tree structure.

개시된 기술은 다음의 효과를 가질 수 있다. 다만, 특정 실시예가 다음의 효과를 전부 포함하여야 한다거나 다음의 효과만을 포함하여야 한다는 의미는 아니므로, 개시된 기술의 권리범위는 이에 의하여 제한되는 것으로 이해되어서는 아니 될 것이다.The disclosed technique may have the following effects. It is to be understood, however, that the scope of the disclosed technology is not to be construed as limited thereby, as it is not meant to imply that a particular embodiment should include all of the following effects or only the following effects.

본 발명의 일 실시예에 따른 계층적 프로젝트 관리 장치는 계층적으로 수행되는 매크로 및 마이크로 관리 과정을 통해 프로젝트 관리 효율을 증진시킬 수 있다.The hierarchical project management apparatus according to an embodiment of the present invention can improve the project management efficiency through hierarchical macro and micro management processes.

본 발명의 일 실시예에 따른 계층적 프로젝트 관리 장치는 프로젝트 메시지 쓰레드를 통해 프로젝트 중심의 매크로 관리 과정을 수행하고 업무 메시지 쓰레드를 통해 개별 업무 중심의 마이크로 관리 과정을 수행하여 프로젝트 전체의 효율과 개별 업무 관리의 효율을 모두 증진시킬 수 있다.The hierarchical project management apparatus according to an exemplary embodiment of the present invention performs a project-based macro management process through a project message thread and performs an individual task-oriented micro management process through a task message thread, Management efficiency can be improved.

도 1은 본 발명의 일 실시예에 따른 계층적 프로젝트 관리 시스템을 설명하는 도면이다.
도 2는 도 1에 있는 계층적 프로젝트 관리 장치를 나타내는 블록도이다.
도 3은 도 2에 있는 메모리의 자료 구조를 나타내는 도면이다.
도 4는 도 2에 있는 프로세서의 기능 요소를 나타내는 블록도이다.
도 5는 도 2에 있는 프로세서에 의하여 수행되는 계층적 프로젝트 관리 프로시저를 설명하는 흐름도이다.
도 6은 도 1에 있는 계층적 프로젝트 관리 장치가 계층적 프로젝트 관리 데이터를 제공하는 과정의 일 실시예를 나타내는 도면이다.
도 7은 도 1에 있는 계층적 프로젝트 관리 장치가 프로젝트 메시지 쓰레드를 통해 매크로 관리 과정의 수행 결과를 제공하는 과정의 일 실시예를 나타내는 도면이다.
도 8은 도 1에 있는 계층적 프로젝트 관리 장치가 업무 메시지 쓰레드를 통해 마이크로 관리 과정을 수행하는 과정의 일 실시예를 나타내는 도면이다.
도 9는 도 1에 있는 계층적 프로젝트 관리 장치가 사용자 요청에 따른 분석을 수행하는 과정의 일 실시예를 나타내는 도면이다.
FIG. 1 illustrates a hierarchical project management system according to an exemplary embodiment of the present invention. Referring to FIG.
FIG. 2 is a block diagram illustrating the hierarchical project management apparatus of FIG. 1. FIG.
FIG. 3 is a diagram showing a data structure of the memory shown in FIG.
Figure 4 is a block diagram illustrating the functional elements of the processor in Figure 2;
5 is a flow chart illustrating a hierarchical project management procedure performed by the processor in FIG.
6 is a diagram illustrating an exemplary process of providing hierarchical project management data by the hierarchical project management apparatus of FIG.
FIG. 7 is a diagram illustrating an exemplary process of the hierarchical project management apparatus of FIG. 1 providing a result of performing a macro management process through a project message thread.
FIG. 8 is a diagram illustrating an exemplary process of the hierarchical project management apparatus of FIG. 1 performing a micro management process through a task message thread.
FIG. 9 is a diagram illustrating an exemplary process of the hierarchical project management apparatus of FIG. 1 performing analysis according to a user request.

본 발명에 관한 설명은 구조적 내지 기능적 설명을 위한 실시예에 불과하므로, 본 발명의 권리범위는 본문에 설명된 실시예에 의하여 제한되는 것으로 해석되어서는 아니 된다. 즉, 실시예는 다양한 변경이 가능하고 여러 가지 형태를 가질 수 있으므로 본 발명의 권리범위는 기술적 사상을 실현할 수 있는 균등물들을 포함하는 것으로 이해되어야 한다. 또한, 본 발명에서 제시된 목적 또는 효과는 특정 실시예가 이를 전부 포함하여야 한다거나 그러한 효과만을 포함하여야 한다는 의미는 아니므로, 본 발명의 권리범위는 이에 의하여 제한되는 것으로 이해되어서는 아니 될 것이다.The description of the present invention is merely an example for structural or functional explanation, and the scope of the present invention should not be construed as being limited by the embodiments described in the text. That is, the embodiments are to be construed as being variously embodied and having various forms, so that the scope of the present invention should be understood to include equivalents capable of realizing technical ideas. Also, the purpose or effect of the present invention should not be construed as limiting the scope of the present invention, since it does not mean that a specific embodiment should include all or only such effect.

한편, 본 출원에서 서술되는 용어의 의미는 다음과 같이 이해되어야 할 것이다.Meanwhile, the meaning of the terms described in the present application should be understood as follows.

"제1", "제2" 등의 용어는 하나의 구성요소를 다른 구성요소로부터 구별하기 위한 것으로, 이들 용어들에 의해 권리범위가 한정되어서는 아니 된다. 예를 들어, 제1 구성요소는 제2 구성요소로 명명될 수 있고, 유사하게 제2 구성요소도 제1 구성요소로 명명될 수 있다.The terms "first "," second ", and the like are intended to distinguish one element from another, and the scope of the right should not be limited by these terms. For example, the first component may be referred to as a second component, and similarly, the second component may also be referred to as a first component.

어떤 구성요소가 다른 구성요소에 "연결되어"있다고 언급된 때에는, 그 다른 구성요소에 직접적으로 연결될 수도 있지만, 중간에 다른 구성요소가 존재할 수도 있다고 이해되어야 할 것이다. 반면에, 어떤 구성요소가 다른 구성요소에 "직접 연결되어"있다고 언급된 때에는 중간에 다른 구성요소가 존재하지 않는 것으로 이해되어야 할 것이다. 한편, 구성요소들 간의 관계를 설명하는 다른 표현들, 즉 "~사이에"와 "바로 ~사이에" 또는 "~에 이웃하는"과 "~에 직접 이웃하는" 등도 마찬가지로 해석되어야 한다.It is to be understood that when an element is referred to as being "connected" to another element, it may be directly connected to the other element, but there may be other elements in between. On the other hand, when an element is referred to as being "directly connected" to another element, it should be understood that there are no other elements in between. On the other hand, other expressions that describe the relationship between components, such as "between" and "between" or "neighboring to" and "directly adjacent to" should be interpreted as well.

단수의 표현은 문맥상 명백하게 다르게 뜻하지 않는 한 복수의 표현을 포함하는 것으로 이해되어야 하고, "포함하다"또는 "가지다" 등의 용어는 실시된 특징, 숫자, 단계, 동작, 구성요소, 부분품 또는 이들을 조합한 것이 존재함을 지정하려는 것이며, 하나 또는 그 이상의 다른 특징이나 숫자, 단계, 동작, 구성요소, 부분품 또는 이들을 조합한 것들의 존재 또는 부가 가능성을 미리 배제하지 않는 것으로 이해되어야 한다.It is to be understood that the singular " include " or "have" are to be construed as including the stated feature, number, step, operation, It is to be understood that the combination is intended to specify that it does not preclude the presence or addition of one or more other features, integers, steps, operations, elements, components, or combinations thereof.

각 단계들에 있어 식별부호(예를 들어, a, b, c 등)는 설명의 편의를 위하여 사용되는 것으로 식별부호는 각 단계들의 순서를 설명하는 것이 아니며, 각 단계들은 문맥상 명백하게 특정 순서를 기재하지 않는 이상 명기된 순서와 다르게 일어날 수 있다. 즉, 각 단계들은 명기된 순서와 동일하게 일어날 수도 있고 실질적으로 동시에 수행될 수도 있으며 반대의 순서대로 수행될 수도 있다.In each step, the identification code (e.g., a, b, c, etc.) is used for convenience of explanation, the identification code does not describe the order of each step, Unless otherwise stated, it may occur differently from the stated order. That is, each step may occur in the same order as described, may be performed substantially concurrently, or may be performed in reverse order.

본 발명은 컴퓨터가 읽을 수 있는 기록매체에 컴퓨터가 읽을 수 있는 코드로서 구현될 수 있고, 컴퓨터가 읽을 수 있는 기록 매체는 컴퓨터 시스템에 의하여 읽혀질 수 있는 데이터가 저장되는 모든 종류의 기록 장치를 포함한다. 컴퓨터가 읽을 수 있는 기록 매체의 예로는 ROM, RAM, CD-ROM, 자기 테이프, 플로피 디스크, 광 데이터 저장 장치 등이 있다. 또한, 컴퓨터가 읽을 수 있는 기록 매체는 네트워크로 연결된 컴퓨터 시스템에 분산되어, 분산 방식으로 컴퓨터가 읽을 수 있는 코드가 저장되고 실행될 수 있다.The present invention can be embodied as computer-readable code on a computer-readable recording medium, and the computer-readable recording medium includes all kinds of recording devices for storing data that can be read by a computer system . Examples of the computer-readable recording medium include ROM, RAM, CD-ROM, magnetic tape, floppy disk, optical data storage, and the like. In addition, the computer-readable recording medium may be distributed over network-connected computer systems so that computer readable codes can be stored and executed in a distributed manner.

여기서 사용되는 모든 용어들은 다르게 정의되지 않는 한, 본 발명이 속하는 분야에서 통상의 지식을 가진 자에 의해 일반적으로 이해되는 것과 동일한 의미를 가진다. 일반적으로 사용되는 사전에 정의되어 있는 용어들은 관련 기술의 문맥상 가지는 의미와 일치하는 것으로 해석되어야 하며, 본 출원에서 명백하게 정의하지 않는 한 이상적이거나 과도하게 형식적인 의미를 지니는 것으로 해석될 수 없다.All terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs, unless otherwise defined. Commonly used predefined terms should be interpreted to be consistent with the meanings in the context of the related art and can not be interpreted as having ideal or overly formal meaning unless explicitly defined in the present application.

도 1은 본 발명의 일 실시예에 따른 계층적 프로젝트 관리 시스템을 설명하는 도면이다.FIG. 1 illustrates a hierarchical project management system according to an exemplary embodiment of the present invention. Referring to FIG.

도 1을 참조하면, 계층적 프로젝트 관리 시스템(100)은 계층적 프로젝트 관리 장치(110) 및 사용자 단말(120)을 포함하고, 이들은 네트워크를 통해 연결될 수 있다.Referring to FIG. 1, a hierarchical project management system 100 includes a hierarchical project management device 110 and a user terminal 120, which may be connected through a network.

계층적 프로젝트 관리 장치(110)는 사용자 단말(120)과 연결되어 계층적 프로젝트 관리를 수행할 수 있는 컴퓨팅 장치에 해당한다. 일 실시예에서, 계층적 프로젝트 관리 장치(110)는 사용자 단말(120)과 연관된 사용자가 구성원으로서 포함되는 적어도 하나의 구성원 그룹을 관리할 수 있고, 적어도 하나의 사용자 단말(120)을 통해 구성되는 구성원 그룹에서 전송되는 메시지를 그룹화한 메시지 쓰레드를 관리할 수 있다. 일 실시예에서, 메시지 쓰레드는 인터넷 메신저의 대화방으로 구현될 수 있고, 다른 일 실시예에서, 온라인 게시판의 게시글을 통해 구현될 수 있다.The hierarchical project management apparatus 110 corresponds to a computing apparatus connected to the user terminal 120 and capable of performing hierarchical project management. In one embodiment, the hierarchical project management device 110 is capable of managing at least one group of members included as a member of a user associated with the user terminal 120, and configured through at least one user terminal 120 You can manage message threads that group messages sent from member groups. In one embodiment, the message thread may be implemented in a chat room of an Internet messenger, and in another embodiment, via a post of an online bulletin board.

일 실시예에서, 계층적 프로젝트 관리 장치(110)는 사용자 단말(120)에 설치된 프로젝트 관리 메시징 에이전트를 통해 사용자 단말(120)과 연결될 수 있다. 일 실시예에서, 프로젝트 관리 메시징 에이전트는 사용자 단말(120)에 설치되면 사용자 단말(120)의 승인 하에 사용자 단말(120)과 계층적 프로젝트 관리 장치(110)가 네트워크를 통해 연결되어 상호 연동되도록 할 수 있는 소프트웨어인 에이전트 프로그램에 해당한다.In one embodiment, hierarchical project management device 110 may be coupled with user terminal 120 via a project management messaging agent installed in user terminal 120. In one embodiment, when installed in the user terminal 120, the project management messaging agent may be configured to allow the user terminal 120 and the hierarchical project management device 110 to be connected through a network and interact with each other, It is equivalent to an agent program that can be software.

사용자 단말(120)은 계층적 프로젝트 관리 장치(110)와 연결된 컴퓨팅 장치에 해당하고, 예를 들어, 데스크톱, 노트북, 태블릿 PC 또는 스마트폰으로 구현될 수 있다. 일 실시예에서, 제1 사용자 단말(120a)은 모바일 단말에 해당할 수 있고, 계층적 프로젝트 관리 장치(110)와 셀룰러 통신 또는 와이파이 통신을 통해 연결될 수 있다. 다른 일 실시예에서, 제2 사용자 단말(120b)는 데스크톱에 해당할 수 있고, 계층적 프로젝트 관리 장치(110)와 인터넷을 통해 연결될 수 있다.The user terminal 120 corresponds to a computing device connected to the hierarchical project management device 110 and may be implemented, for example, as a desktop, a notebook, a tablet PC, or a smart phone. In one embodiment, the first user terminal 120a may correspond to a mobile terminal and may be connected to the hierarchical project management device 110 via cellular or Wi-Fi communication. In another embodiment, the second user terminal 120b may correspond to a desktop and may be connected to the hierarchical project management device 110 via the Internet.

도 2는 도 1에 있는 계층적 프로젝트 관리 장치를 나타내는 블록도이다.FIG. 2 is a block diagram illustrating the hierarchical project management apparatus of FIG. 1. FIG.

도 2를 참조하면, 계층적 프로젝트 관리 장치(110)는 프로세서(210), 메모리(220), 사용자 입출력부(230) 및 네트워크 입출력부(240)을 포함할 수 있다.Referring to FIG. 2, the hierarchical project management apparatus 110 may include a processor 210, a memory 220, a user input / output unit 230, and a network input / output unit 240.

프로세서(210)는 도 4에 있는 계층적 프로젝트 관리 프로시저를 실행할 수 있는 프로젝트 관리 실행기(212), 프로젝트 관리 실행기에 의하여 읽혀지거나 작성되는 메모리(220)에 있는 매크로 및 마이크로 관리 블록들(222, 224)을 관리할 수 있는 메모리 관리자(214) 및 메모리(220)에 있는 휘발성 메모리와 비휘발성 메모리 간의 동기화 시간을 스케줄할 수 있는 메모리 동기 스케줄러(216)를 포함할 수 있다. 프로세서(210)는 계층적 프로젝트 관리 장치(110)의 동작 전반을 제어할 수 있고, 메모리(220), 사용자 입출력부(230) 및 네트워크 입출력부(240) 간의 데이터 흐름을 제어할 수 있다. 프로세서(210)는 계층적 프로젝트 관리 장치(110)의 CPU(Central Processing Unit)로 구현될 수 있다.Processor 210 includes a project management executor 212 that can execute the hierarchical project management procedure shown in Figure 4, macro and micro management blocks 222 and 222 in memory 220 that are read or written by the project management executor, A memory manager 214 that can manage the volatile memory 224 and a memory sync scheduler 216 that can schedule the synchronization time between the volatile memory and the nonvolatile memory in the memory 220. [ The processor 210 may control the entire operation of the hierarchical project management apparatus 110 and may control data flow between the memory 220, the user input / output unit 230, and the network input / output unit 240. The processor 210 may be implemented as a central processing unit (CPU) of the hierarchical project management apparatus 110.

메모리(220)는 SSD(Solid State Disk) 또는 HDD(Hard Disk Drive)와 같은 비휘발성 메모리로 구현되어 계층적 프로젝트 관리 장치(110)에 필요한 데이터 전반을 저장하는데 사용되는 보조기억장치를 포함할 수 있고, RAM(Random Access Memory)과 같은 휘발성 메모리로 구현된 주기억장치를 포함할 수 있다. 이처럼, 메모리(220)는 휘발성 및 비휘발성 메모리로 구현될 수 있고, 만일 비휘발성 메모리로 구현되면 하이퍼링크를 통해 연결되도록 구현될 수 있다.The memory 220 may include an auxiliary storage device that is implemented as a non-volatile memory such as a solid state disk (SSD) or a hard disk drive (HDD) And a main memory implemented with a volatile memory such as a RAM (Random Access Memory). As such, the memory 220 may be implemented as volatile and non-volatile memory, and may be implemented as a hyper-link if implemented as a non-volatile memory.

메모리(220)는 매크로 관리 블록(222) 및 마이크로 관리 블록(224)을 포함할 수 있다. 이러한 내용은 도 3을 참조하여 보다 상세히 설명하도록 한다.The memory 220 may include a macro management block 222 and a micro management block 224. This will be described in more detail with reference to FIG.

도 3은 도 2에 있는 메모리의 자료 구조를 나타내는 도면이다.FIG. 3 is a diagram showing a data structure of the memory shown in FIG.

메모리(220)는 서로 다른 업무평가 접근권을 가지는 매크로 관리 블록(222) 및 마이크로 관리 블록(224)을 저장할 수 있다. 일 실시예에서, 업무평가 접근권은 해당 관리 블록(매크로 관리 블록(222) 또는 마이크로 관리 블록(224))에 저장되고 업무평가를 위한 업무평가 데이터에 읽기/쓰기를 수행할 수 있는 액세스 권한에 해당하며, 적어도 하나의 특정 사용자에게 부여되면 해당 사용자 정보와 연관되어 저장될 수 있다.The memory 220 may store a macro management block 222 and a micro management block 224 having different task evaluation accesses. In one embodiment, the task evaluation access right is stored in a corresponding management block (macro management block 222 or micro management block 224) and corresponds to an access right that can perform read / write to task evaluation data for task evaluation And may be stored in association with the corresponding user information if it is assigned to at least one specific user.

매크로 관리 블록(222)은 프로젝트 관리 블록(222a), 프로젝트 메시지 쓰레드 관리 블록(222b), 노트 객체 관리 블록(222c), 멀티미디어 자료 관리 블록(222d) 및 첨부파일 관리 블록(222e)을 포함할 수 있다. 프로젝트 관리 블록(222a)에는 프로젝트(Project)(310)가 저장될 수 있고, 프로젝트 메시지 쓰레드 관리 블록(222b)에는 특정 프로젝트(310)에 고유하게 연관된 프로젝트 메시지 쓰레드(Project Message Thread)(320)가 저장될 수 있으며, 노트 객체 관리 블록(222c)에는 해당 프로젝트 메시지 쓰레드(320)와 연관된 적어도 하나의 노트 객체(Note Object)(330)가 저장될 수 있다. 또한, 멀티미디어 자료 관리 블록(222d) 및 첨부파일 관리 블록(222e) 각각에는 해당 프로젝트 메시지 쓰레드(320)와 일대 다로 연관될 수 있는 적어도 하나의 멀티미디어 자료(Multimedia Data) 및 첨부파일(Attatched File) 각각이 저장될 수 있다. 예를 들어, 프로젝트 관리 블록(222a)에 저장된 프로젝트 PJ#1은 해당 프로젝트의 생성에 따라 고유하게 생성된 프로젝트 메시지 쓰레드 PMT #1과 일대 일로 연관될 수 있고, 프로젝트 메시지 쓰레드 관리 블록(222b)에 저장되고 프로젝트 관리 블록(222a)를 통해 접근될 수 있는 프로젝트 메시지 쓰레드 PMT #1은 해당 프로젝트 메시지 쓰레드를 통해 생성된 복수의 노트 객체들 NO#1, NO#2, …, NO#K와 일대 다로 연관될 수 있으며, 노트 객체 관리 블록(222c)에 저장되고 프로젝트 메시지 쓰레드 관리 블록(222b)을 통해 접근될 수 있는 노트 객체 NO#1은 복수의 노트 메시지 쓰레드들 WMT #1, WMT #2, …, WMT #L 및 복수의 업무 객체들 WO #1, WO #2, …, WO #M과 일대 다로 연관될 수 있다. (도 3에서, 표기된 N, K, L, J, H 및 M은 자연수로, 상호 동일하거나 상이한 값을 가질 수 있다)The macro management block 222 may include a project management block 222a, a project message thread management block 222b, a note object management block 222c, a multimedia data management block 222d and an attachment management block 222e have. A project 310 may be stored in the project management block 222a and a project message thread 320 uniquely associated with the specific project 310 may be stored in the project message thread management block 222b And at least one note object 330 associated with the project message thread 320 may be stored in the note object management block 222c. Each of the multimedia data management block 222d and the attached file management block 222e includes at least one multimedia data and an attached file that can be associated with the corresponding project message thread 320 in a one- Can be stored. For example, the project PJ # 1 stored in the project management block 222a may be associated with the project message thread PMT # 1 uniquely generated according to the generation of the project, and may be associated with the project message thread management block 222b A project message thread PMT # 1 that is stored and can be accessed through the project management block 222a includes a plurality of note objects NO # 1, NO # 2, ... , NO # K, and the note object NO # 1, which may be associated with the note object management block 222c and accessed through the project message thread management block 222b, may be associated with a plurality of note message threads WMT # 1, WMT # 2, ... , WMT #L and a plurality of business objects WO # 1, WO # 2, ... , ≪ / RTI > WO # M. (In FIG. 3, the indicated N, K, L, J, H and M are natural numbers and may have the same or different values from each other)

마이크로 관리 블록(224)은 업무 메시지 쓰레드 관리 블록(224a) 및 업무객체 관리 블록(224b)을 포함할 수 있다. 업무 메시지 쓰레드 관리 블록(224a)에는 노트 객체(330), 멀티미디어 자료 또는 첨부파일과 연관된 적어도 하나의 업무 메시지 쓰레드(Work Message Thread)(340)가 저장될 수 있으며, 업무객체 관리 블록(224b)은 노트 객체(330) 또는 업무 메시지 쓰레드(340)와 연관된 적어도 하나의 업무 객체(Work Object)(350)가 저장될 수 있다. 예를 들어, 업무 메시지 쓰레드 관리 블록(224a)에 저장되고 노트 객체(330)와 연관되며 노트 객체 관리 블록(222c)을 통해 접근될 수 있는 업무 메시지 쓰레드 WMT#1은 해당 업무 메시지 쓰레드(340)를 통해 생성된 복수의 업무 객체들 WO#1, WO#1, …, WO#M와 일대 다로 연관될 수 있으며, 업무객체 관리 블록(224c)에 저장되고 업무 메시지 쓰레드 관리 블록(224a)을 통해 접근될 수 있는 복수의 업무 객체들 WO#1, WO#2, …, WO#M 각각은 특정 노트 객체(330), 업무 메시지 쓰레드(340), 멀티미디어 자료 또는 첨부파일과 일대 다로 연관될 수 있다.The micro management block 224 may include a business message thread management block 224a and a business object management block 224b. The business message thread management block 224a may store a note object 330, at least one work message thread 340 associated with multimedia data or an attachment, and the business object management block 224b may store At least one work object 350 associated with the note object 330 or task message thread 340 may be stored. For example, a business message thread WMT # 1 that is stored in the business message thread management block 224a and that is associated with the note object 330 and that can be accessed through the note object management block 222c, A plurality of business objects WO # 1, WO # 1, ... WO # 1, WO # 2,... WO # 1, WO # 2, and WO # M that can be associated with one another in a one-to-many relationship with WO # M and stored in the business object management block 224c and accessed via business message thread management block 224a. , WO # M each may be one to many associated with a particular note object 330, task message thread 340, multimedia material or attachment.

메모리(220)는 사용자 단말(120)과 연관된 사용자 정보와 연관되는 사용자 메모리 영역을 더 포함할 수 있고, 여기에서, 사용자 정보는 사용자의 이름(대화명), 메신저 아이디, 비밀번호, 구성원으로서 소속된 구성원 그룹, 참여 중인 프로젝트 및 업무 평가 포인트 정보 중에서 적어도 하나를 포함할 수 있다.The memory 220 may further include a user memory area associated with user information associated with the user terminal 120, wherein the user information includes a user's name (screen name), a messenger ID, a password, Group, participating project, and task evaluation point information.

사용자 입출력부(230)은 사용자 입력을 수신하기 위한 환경 및 사용자에게 특정 정보(예를 들어, 프로젝트 평가 데이터)를 출력하기 위한 환경을 포함하고, 예를 들어, 마우스, 트랙볼, 터치 패드, 그래픽 태블릿, 스캐너, 터치 스크린, 키보드 또는 포인팅 장치와 같은 어댑터를 포함하는 입력장치 및 모니터 또는 터치스크린과 같은 어댑터를 포함하는 출력장치를 포함할 수 있다. 일 실시예에서, 사용자 입출력부(230)은 원격 접속을 통해 접속되는 컴퓨팅 장치에 해당할 수 있고, 그러한 경우, 계층적 프로젝트 관리 장치(110)는 서버로서 수행될 수 있다.The user input / output unit 230 includes an environment for receiving user input and an environment for outputting specific information (for example, project evaluation data) to the user, and may include a mouse, a trackball, a touchpad, , An input device including an adapter such as a scanner, a touch screen, a keyboard or a pointing device, and an output device including an adapter such as a monitor or touch screen. In one embodiment, the user input and output unit 230 may correspond to a computing device connected via a remote connection, and in such a case, the hierarchical project management device 110 may be implemented as a server.

네트워크 입출력부(240)은 네트워크를 통해 사용자 단말(120)과 연결하기 위한 환경을 포함하고, 예를 들어, LAN(Local Area Network) 통신을 위한 어댑터를 포함할 수 있다The network input / output unit 240 includes an environment for connecting with the user terminal 120 through a network, and may include an adapter for LAN (Local Area Network) communication, for example

도 4는 도 2에 있는 프로세서의 기능 요소를 나타내는 블록도이다.Figure 4 is a block diagram illustrating the functional elements of the processor in Figure 2;

도 4를 참조하면, 프로세서(210)는 매크로 관리 과정 수행부(410), 제어부(420) 및 마이크로 관리 과정 수행부(430)를 포함할 수 있다.Referring to FIG. 4, the processor 210 may include a macro management process execution unit 410, a control unit 420, and a micro management process execution unit 430.

프로세서(210)는 매크로 관리 블록(222) 및 마이크로 관리 블록(224) 간의 트리 구조 연관성을 제어할 수 있다. 앞서 서술한 것처럼, 매크로 관리 블록(222)과 마이크로 관리 블록(224)은 상호 간에 일대 다로 연관된 트리 구조를 가질 수 있고, 프로세서(210)는 이들 간의 연관성을 제어할 수 있다. 일 실시예에서, 프로세서(210)는 특정 프로젝트(310)와 관련하여 해당 연관된 업무 객체(350)의 생성 또는 삭제가 발생되면 매크로 관리 블록(222) 및 마이크로 관리 블록(224) 간의 트리 구조를 재-연관할 수 있다. 예를 들어, 프로세서(210)는 프로젝트 메시지 쓰레드 PMT#1과 연관된 노트 객체 NO#1와 연관된 업무 객체 WO#2이 삭제되면 매크로 관리 블록(222)에 있는 노트 객체 NO#1과 마이크로 관리 블록(224)에 있는 업무 객체 WO#2 간의 연결을 해제시키고 매크로 관리 블록(222) 및 마이크로 관리 블록(224) 간의 트리 구조를 갱신할 수 있다.The processor 210 may control the tree structure association between the macro management block 222 and the micro management block 224. [ As described above, the macro management block 222 and the micro management block 224 may have one-to-many associated tree structures with each other, and the processor 210 may control the association between them. In one embodiment, the processor 210 determines the tree structure between the macro management block 222 and the micro management block 224 when the creation or deletion of the associated business object 350 occurs with respect to the particular project 310 - Can relate. For example, when the task object WO # 2 associated with the note object NO # 1 associated with the project message thread PMT # 1 is deleted, the processor 210 deletes the note object NO # 1 in the macro management block 222 and the micro management block 224, and update the tree structure between the macro management block 222 and the micro management block 224. The macro management block 222 and the micro management block 224 can update the tree structure.

매크로 관리 과정 수행부(410)는 매크로 관리 과정을 수행할 수 있다. 일 실시예에서, 매크로 관리 과정은 효율적인 프로젝트 진행을 목적으로 수행되는 거시적 관점의 관리 과정으로서, 매크로 관리 블록(222)과 연관된 프로젝트(310) , 프로젝트 메시지 쓰레드(320) 및 노트 객체(330)에 관한 생성, 수정 및 삭제를 포함하는 데이터 관리 과정, 프로젝트 진행의 효율성을 높이기 위해 프로젝트 참여 구성원들에게 프로젝트관련 진행의 촉구, 리마인드 및 관련정보 제공을 포함하는 진행 관리 과정 및 프로젝트 전반에 관한 평가를 포함하는 평가 관리 과정 중 적어도 하나를 포함할 수 있다.The macro management process performing unit 410 may perform a macro management process. In one embodiment, the macro management process is a macroscopic management process that is performed for the purpose of efficient project progress. The macro management process includes a project 310, a project message thread 320, and a note object 330 associated with the macro management block 222 Including the creation, modification and deletion of information about the project, including the process of managing the project, including reminders and related information, and evaluating the overall project, And an evaluation management process for evaluating the evaluation results.

보다 구체적으로, 매크로 관리 과정 수행부(410)는 다음과 같은 매크로 관리 과정들을 수행할 수 있다.More specifically, the macro management process execution unit 410 may perform the following macro management processes.

매크로 관리 과정 수행부(410)는 매크로 관리 블록(222)에 프로젝트(310) 및 해당 프로젝트(310)와 연관된 프로젝트 메시지 쓰레드(320)를 생성할 수 있다. 일 실시예에서, 매크로 관리 과정 수행부(410)는 사용자의 프로젝트 생성권을 통해 특정 프로젝트(310) 및 해당 특정 프로젝트(310)와 일대 일로 연관된 프로젝트 메시지 쓰레드(320)를 각각 생성하여 매크로 관리 블록(222)에 저장할 수 있고, 여기에서, 프로젝트 생성권은 적어도 하나의 사용자 모두에게 부여되거나, 또는 슈퍼 관리자와 슈퍼 관리자에 의해 지정된 적어도 하나의 서브 관리자(예를 들어, 팀장)에게 부여될 수 있다.The macro management process execution unit 410 may generate the project 310 and the project message thread 320 associated with the corresponding project 310 in the macro management block 222. In one embodiment, the macro management process execution unit 410 generates a project message thread 320 associated with the specific project 310 and the specific project 310 in a one-to-one relationship through the user's project creation right, Where the project generation right may be granted to at least one user or to at least one sub-manager (e.g., team leader) designated by the super-administrator and the super-administrator .

일 실시예에서, 매크로 관리 과정 수행부(410)는 프로젝트 메시지 쓰레드(320)에 참여되는 적어도 하나의 사용자 각각에게 해당 프로젝트(310)와 연관된 매크로 및 마이크로 관리 블록(222, 224)에 대한 업무수행 접근권을 부여할 수 있다. 예를 들어, 매크로 관리 과정 수행부(410)는 메신저의 프로젝트 대화방으로 구현된 프로젝트 메시지 쓰레드(320)에 참여 중인 사용자에게 해당 프로젝트(310)의 진행과정에 참여할 수 있는 업무수행 접근권을 부여할 수 있고, 해당 사용자가 해당 프로젝트 대화방에서 나가면 해당 업무수행 접근권을 부여하지 않도록 재설정할 수 있다. 매크로 관리 과정 수행부(410)는 사용자의 업무수행 접근권을 통해 해당 프로젝트 메시지 쓰레드(320)와 연관된 적어도 하나의 노트 객체(330)를 생성할 수 있고, 예를 들어, 프로젝트 대화방에 참여한 구성원에게만 해당 프로젝트 대화방를 통해 노트 객체(330)를 생성하거나 기 생성된 노트 객체(330)와 연관된 업무 객체(350)를 생성할 수 있는 업무수행 접근권을 부여할 수 있다.In one embodiment, the macro management process execution unit 410 performs a task for the macros and the micro management blocks 222 and 224 associated with the project 310 to each of at least one user participating in the project message thread 320 Access rights can be granted. For example, the macro management process execution unit 410 may grant a user who is participating in the project message thread 320 implemented in the project chat room of the messenger a work execution right to participate in the process of the corresponding project 310 And if the user leaves the project chat room, it can be reset so as not to grant the right to perform the task. The macro management process performing unit 410 may generate at least one note object 330 associated with the corresponding project message thread 320 through a task execution right of the user and may be provided to only members who participate in the project chat room The user can grant the task execution access right to create the note object 330 through the project chat room or to create the task object 350 associated with the created note object 330. [

매크로 관리 과정 수행부(410)는 프로젝트 메시지 쓰레드(320)에 프로젝트(310)의 단위 업무로서 업무 객체(350)의 컨테이너를 포함하는 노트 객체(330)를 연관시킬 수 있다. 일 실시예에서, 매크로 관리 과정 수행부(410)는 사용자 단말(120)에 설치된 프로젝트 관리 메시징 에이전트(예를 들어, 프로젝트 관리 메신저)에서 프로젝트 메시지 쓰레드(320)를 시각화한 프로젝트 메시지 쓰레드 인터페이스(710)를 통해 사용자 단말(120)로부터 해당 프로젝트(310)에 관한 신규 노트 객체 생성 요청을 수신할 수 있고, 사용자 단말(120)로부터 수신된 노트 정보를 기초로 노트 이름, 노트 내용, 노트 생성자 및 노트 관련자(노트 생성자에 의해 해당 노트 내용에 관한 주요 참여자로서 지정된 적어도 하나의 사용자) 중 적어도 하나를 포함하는 노트 객체(330)를 생성할 수 있다.The macro management process execution unit 410 may associate the project message thread 320 with the note object 330 including the container of the business object 350 as a unit task of the project 310. [ In one embodiment, the macro management process execution unit 410 receives a project message thread interface 710 (e.g., a project management thread) that visualizes a project message thread 320 in a project management messaging agent (e.g., a project management messenger) installed in the user terminal 120 The user can receive a new note object creation request related to the corresponding project 310 from the user terminal 120 through the user terminal 120. Based on the note information received from the user terminal 120, (At least one user designated by the note creator as the main participant with respect to the content of the note).

매크로 관리 과정 수행부(410)는 노트 객체(330)를 해당 프로젝트 메시지 쓰레드(320)에서 직접적으로 접근될 수 있고 텍스트 메시지 또는 미디어 메시지와 구별되는 독립적인 노트 메시지로서 해당 프로젝트 메시지 쓰레드(320)에 추가하여 해당 노트 객체(330)를 생성할 수 있다. 예를 들어, 노트 객체(330) 각각은 메신저의 대화방으로 구현된 프로젝트 메시지 쓰레드(320)에서 해당 대화방에 참여하는 구성원들에 의해 노트 메시지로서 접근될 수 있고, 일반적인 텍스트 메시지에 해당하는 대화 메시지와 사진이나 영상 메시지와 같은 미디어 메시지와 구별되는 노트 메시지 객체에 해당할 수 있다.The macro management process executing unit 410 may access the note object 330 as an independent note message distinguished from the text message or the media message and directly accessible from the corresponding project message thread 320, And the corresponding note object 330 can be generated. For example, each of the note objects 330 can be accessed as a note message by the members participating in the corresponding chat room in the project message thread 320 implemented in the chat room of the messenger, And may correspond to a note message object that is distinguished from a media message such as a picture or video message.

여기에서, 노트 객체(330)는 해당 프로젝트(310)의 단위 업무로서 업무 객체(350)의 컨테이너를 포함한다. 예를 들어, 노트 객체(330)는 자신 또는 자신과 연관된 업무 메시지 쓰레드(340)를 통해 생성되는 업무 객체(350)와 일대 다로 연관된 해당 업무 객체(350)의 상위 노드에 해당할 수 있다.Here, the note object 330 includes a container of the task object 350 as a unit task of the project 310. For example, the note object 330 may correspond to an ancestor of the business object 350 associated with the business object 350, which is generated through the business message thread 340 associated with the business object message.

일 실시예에서, 매크로 관리 과정 수행부(410)는 해당 프로젝트 메시지 쓰레드(320)와 연관된 노트 객체(330)의 생성개수를 기초로 해당 프로젝트(310)에 관한 중요성을 결정하고 슈퍼 관리자에게 해당 프로젝트(310)에 관한 정보를 제공할 수 있다. 예를 들어, 연관된 노트 객체(330)의 생성개수가 제1 기준 범위, 제2 기준 범위 또는 제3 기준 범위에 있는지 여부에 따라 해당 프로젝트(310)의 중요성을 '상', '중', '하' 중에서 하나로 결정할 수 있다. 매크로 관리 과정 수행부(410)는 프로젝트(310) 각각에 관한 중요성 정보를 사용자 단말(120)에 제공하여 사용자 단말(120)이 중요성 높은 특정 프로젝트(310)를 강조하여 시각화하거나 해당 사용자와 연관된 프로젝트 리스트 중 우선적으로 표시하도록 할 수 있다.In one embodiment, the macro management process execution unit 410 determines the importance of the project 310 based on the number of generated note objects 330 associated with the project message thread 320, (310). ≪ / RTI > For example, if the importance of the project 310 is' up ',' middle ',' middle ', or' Can be determined as one. The macro management process execution unit 410 provides importance information on each of the projects 310 to the user terminal 120 to emphasize and visualize a specific project 310 having a high importance, It is possible to preferentially display the list.

매크로 관리 과정 수행부(410)는 특정 프로젝트 메시지 쓰레드(320)와 연관된 노트 객체(330)의 생성개수 또는 해당 업무 메시지 쓰레드(340)의 갱신빈도가 특정 기준 이하이면 해당 프로젝트 메시지 쓰레드(320)를 통해 해당 프로젝트 메시지 쓰레드(320)와 연관된 신규 노트 객체의 생성을 권장하는 노트 객체 생성 권장 메시지를 제공할 수 있다. 예를 들어, 매크로 관리 과정 수행부(410)는 특정 프로젝트(310)와 관련하여 해당 연관된 노트 객체(330)의 기록 수가 부족한 경우, 해당 프로젝트 메시지 쓰레드(320)에 작성이 권장되는 노트 객체(330)의 기준 개수 대비 현재 생성개수에 관한 정보를 제공하여 노트 기록을 촉구하는 노트 객체 생성 권장 메시지를 추가할 수 있다.The macro management process execution unit 410 may execute the corresponding project message thread 320 if the number of generated note objects 330 associated with the specific project message thread 320 or the update frequency of the corresponding task message thread 340 is below a certain standard May provide a note object creation recommendation message that encourages the creation of a new note object associated with the project message thread 320. For example, when the number of records of the related note object 330 is insufficient in relation to a specific project 310, the macro management process performing unit 410 may generate a note object 330 (330) recommended to be written in the project message thread 320 ) To provide a note object creation recommendation message for prompting the user to record a note.

일 실시예에서, 매크로 관리 과정 수행부(410)는 노트 객체 생성 권장 메시지의 제공 여부를 결정하기 위해 프로젝트 생성자로부터 지정된 노트 객체(330)의 기준 개수를 프로젝트 생성일로부터 기간 별로 비례하게 반영할 수 있다. 예를 들어, 매크로 관리 과정 수행부(410)는 프로젝트(310)의 생성일로부터 특정 기준일(예를 들어, 7일) 사이에는 지정된 노트 객체(330)의 기준 개수의 특정 비율 값(예를 들어, 20%)를 적용하여 노트 객체 생성 권장 메시지의 제공 여부를 결정하고, 이후부터는 해당 기준일 간격으로 해당 비율 값 만큼씩 더 상향하여 100%가 될 때까지 이러한 과정을 반복할 수 있다. 이러한 특정 기준일과 특정 비율 값은 사용자의 설정에 따라 조정될 수 있다.In one embodiment, the macro management process execution unit 410 may proportionally reflect the reference number of the note object 330 specified by the project creator from the project creation date to determine whether to provide the note object creation recommendation message have. For example, the macro management process performing unit 410 may calculate a specific ratio value of the reference number of the designated note object 330 (for example, 7 days) from the creation date of the project 310 , 20%) to determine whether or not to provide a note object creation recommendation message. Thereafter, the process can be repeated until the ratio of the note object creation recommendation message is 100%. This specific reference date and specific rate value can be adjusted according to the user's setting.

일 실시예에서, 매크로 관리 과정 수행부(410)는 특정 프로젝트 메시지 쓰레드(320)와 연관된 노트 객체(330)의 개수 및 해당 업무 메시지 쓰레드(340)의 마지막 메시지 처리 시간을 고려하여 하기의 수학식 1을 기초로 해당 프로젝트(310)에 관한 노트 객체 생성 권장 메시지의 제공 여부를 결정할 수 있다. 예를 들어, 매크로 관리 과정 수행부(410)는 특정 프로젝트(310)와 관련하여, ns가 5개로 설정된 경우(ns=5), 연관된 노트 객체(330)의 생성개수가 3개이고(n=3) 해당 노트 객체(330)와 연관된 2개의 업무 메시지 쓰레드(340)들의 마지막 메시지 갱신 시점이 각각 72시간 전과 50시간 전에 해당되면(mavg = 61) 노트 객체 생성 권장 메시지 결정지수(d)를 1.22로 산출하여 노트 생성 권장 메시지의 제공을 결정할 수 있다(여기에서, 해당 결정지수(d)가 1 이상이면 제공하는 것으로, 1 미만이면 제공하지 않는 것으로 결정할 수 있다). 이에 따라, 매크로 관리 과정 수행부(410)는 연관된 노트 객체(330)의 생성개수가 적을 수록, 마지막 메시지 처리 시간이 오래될수록, 활동이 적은 것으로 판단하여 노트 객체 생성 권장 메시지를 제공하는 방향으로 결정할 수 있다.The macro management process execution unit 410 may calculate the number of the note objects 330 associated with the specific project message thread 320 and the last message processing time of the corresponding task message thread 340, 1, it is possible to determine whether or not to provide a note object generation recommendation message for the corresponding project 310. [ For example, when n s is set to 5 (n s = 5), the macro management process performing unit 410 generates 3 (n (n) = 3) If the last message update time of the two task message threads 340 associated with the corresponding note object 330 is 72 hours and 50 hours before (m avg = 61), respectively, Can be determined to be 1.22, and the provision of the note creation recommendation message can be determined (here, it can be determined that the decision index d is not provided if the decision index d is 1 or more and less than 1 is provided). Accordingly, the macro management process performing unit 410 determines that the less active the note object 330, the longer the last message processing time, the less active, and provides the note object creation recommendation message .

[수학식 1][Equation 1]

Figure pat00001
Figure pat00001

(여기에서, ns는 해당 프로젝트(310)에 관해 작성이 권장되는 노트 객체 생성 기준 개수에 해당하고 슈퍼 관리자나 서브 관리자에 의해 설정 및 조정될 수 있으며, n은 해당 프로젝트 메시지 쓰레드(320)와 연관된 노트 객체(330)의 생성개수를 의미하며, mavg는 해당 연관된 업무 메시지 쓰레드(340)의 마지막 메시지 처리 시간의 평균값을 의미함)(Where n s corresponds to the number of note object creation criteria recommended for the project 310 and can be set and adjusted by the super administrator or subadministrator, and n is the number of notes associated with the project message thread 320 Note that m avg represents the average value of the last message processing time of the associated task message thread 340)

일 실시예에서, 매크로 관리 과정 수행부(410)는 노트 객체 생성 권장 메시지에 대한 응답으로서 신규 노트 객체의 즉시 생성 또는 특정 시간 이후의 신규 노트 객체 생성에 관한 예약과 연관된 노트 객체 생성 권장 응답 메시지를 수신할 수 있다. 일 실시예에서, 노트 객체 생성 권장 응답 메시지는 해당 응답을 수행한 응답자에 의해 지정된 특정 시간과 임시 노트명을 포함할 수 있다. 매크로 관리 과정 수행부(410)는 수신된 노트 객체 생성 권장 응답 메시지가 특정 시간 이후의 신규 노트 객체 생성에 관한 예약과 연관되면 해당 특정 시간 이후의 시점에 도달하였을 때 해당 응답자를 노트 생성자로서 포함하고 해당 임시 노트명을 포함하는 노트 객체(330)를 생성하여 해당 업무 메시지 쓰레드(340)에 노트 메시지로서 자동으로 추가할 수 있고, 해당 노트 생성자에게 해당 노트 객체(330)의 작성을 완료할 것을 촉구하는 노트 작성 완료 촉구 메시지를 더 제공할 수 있다. 일 실시예에서, 응답자에 의해 별도의 사용자가 예약 노트 완성자로 지정된 경우에는 해당 별도의 사용자에게 해당 노트 객체(330)의 수정 권한을 부여할 수 있다.In one embodiment, the macro management process execution unit 410 generates a note object creation recommendation response message associated with the instantaneous generation of a new note object or a reservation regarding creation of a new note object after a specific time as a response to the note object creation recommendation message . In one embodiment, the note object creation recommendation response message may include a specific time and a temporary note name specified by the responder that performed the response. When the received note object creation recommendation response message is associated with a reservation for creating a new note object after a specific time, the macro management process execution unit 410 includes the corresponding responder as a note creator when reaching the time point after the specific time It is possible to create a note object 330 including the corresponding temporary note name and automatically add it as a note message to the corresponding task message thread 340 and urging the note creator to complete the creation of the note object 330 The user can further provide a note completion prompt. In an embodiment, when a responder assigns a separate user as a reservation note finisher, the corresponding user can be granted the right to modify the corresponding note object 330. [

매크로 관리 과정 수행부(410)는 해당 프로젝트 메시지 쓰레드(320)와 연관된 노트 객체(330), 멀티미디어 자료 및 첨부파일 중 적어도 하나에 관한 등록개수 및 프로젝트 연관성을 분석하여 시계열로 분석된 프로젝트 성과정보를 생성할 수 있다. 보다 구체적으로, 매크로 관리 과정 수행부(410)는 프로젝트 생성일을 기준으로 시계열로 분할된 적어도 하나의 시간 구간 동안 해당 프로젝트 메시지 쓰레드(320)와 연관되어 생성된 노트 객체(330), 멀티미디어 자료 및 첨부파일의 생성개수, 해당 노트 객체(330)와 연관된 업무 메시지 쓰레드(340)의 메시지 처리량 및 해당 업무 메시지 쓰레드(340)를 통해 생성된 업무 객체(350)의 생성개수와 처리개수(완료 처리된 개수) 중 적어도 하나를 검출하여 해당 시간 구간 동안의 프로젝트 성과정보로 생성할 수 있고, 시계열로 분석되고 각각에 관한 프로젝트 연관성이 포함된 프로젝트 성과정보를 사용자 단말(120)에 제공하여 사용자 단말(120)이 프로젝트 관리 메시징 에이전트를 통해 해당 프로젝트 성과정보를 시계열에 따라 시각화시키도록 할 수 있다. 일 실시예에서, 매크로 관리 과정 수행부(410)는 프로젝트(310) 단위 뿐만 아니라, 노트 객체(330) 단위로 노트 객체(330) 각각에 관해 시계열로 분석된 성과정보를 생성할 수도 있다.The macro management process execution unit 410 analyzes the number of registration and the project association with respect to at least one of the note object 330, the multimedia object, and the attachment file associated with the project message thread 320, Can be generated. More specifically, the macro management process execution unit 410 generates a note object 330, a multimedia object, and a text object created in association with the corresponding project message thread 320 during at least one time period divided in time series on the basis of the project creation date, The message processing amount of the task message thread 340 associated with the corresponding note object 330 and the number of generated and processed tasks of the task object 350 generated through the corresponding task message thread 340 The project performance information including the project relevance related to each of the time series is provided to the user terminal 120 and the user terminal 120 ) This project management messaging agent can be used to visualize the project performance information in time series. In one embodiment, the macro management process execution unit 410 may generate performance information analyzed in time series for each of the note objects 330 in units of the note objects 330 as well as the project 310 units.

일 실시예에서, 매크로 관리 과정 수행부(410)는 프로젝트 메시지 쓰레드(320)에 추가된 노트 객체(330), 멀티미디어 자료 및 첨부파일 각각에 관해 직접 접근을 통한 조회수를 기초로 프로젝트 연관성을 산출할 수 있고, 예를 들어, 프로젝트 참여인원 대비 해당 조회수를 각각에 관한 프로젝트 연관성으로 산출할 수 있다. 다른 일 실시예에서, 매크로 관리 과정 수행부(410)는 노트 객체(330) 각각에 관해 해당 노트 객체(330)와 연관된 업무 객체(350)의 생성개수 및 해당 업무 메시지 쓰레드(340)의 메시지 처리량을 기초로 해당 노트 객체(330)의 프로젝트 연관성을 산출할 수도 있다.In one embodiment, the macro management process execution unit 410 calculates the project relevance based on the number of views obtained by directly accessing the note object 330, the multimedia data, and the attachment file added to the project message thread 320 For example, the number of hits relative to the number of participants in the project can be calculated as the project relevance for each. In another embodiment, the macro management process execution unit 410 determines the number of generated business objects 350 associated with the corresponding note object 330 for each of the note objects 330 and the message processing amount of the corresponding task message thread 340 The project relevance of the note object 330 may be calculated based on the relationship between the note object 330 and the note object 330.

매크로 관리 과정 수행부(410)는 슈퍼 관리자의 업무평가 접근권을 통해 프로젝트(310)를 평가할 수 있다. 일 실시예에서, 매크로 관리 과정 수행부(410)는 프로젝트 메시지 쓰레드(320)에 참여되는 적어도 하나의 사용자 각각을 해당 프로젝트(310)의 실무자 또는 관찰자로 연관시킬 수 있고, 해당 프로젝트 생성자 또는 해당 프로젝트 생성자에 의해 지정된 특정 관찰자에게 해당 프로젝트(310)를 평가하기 위한 슈퍼 관리자로서의 업무평가 접근권을 부여할 수 있다. 예를 들어, 관찰자로 지정된 사용자들 중에서 1명이 해당 프로젝트(310)에 관한 평가자에 해당하는 슈퍼 관리자로 지정되어 해당 평가자에게 슈퍼 관리자의 업무평가 접근권이 부여될 수 있고, 팀원으로 지정된 실무자들 중 1명이 서브 관리자로서의 팀장으로 지정될 수 있으며, 슈퍼 관리자는 평가자로서 해당 프로젝트(310)에 관한 평가를 통해 피평가자로서의 서브 관리자에게 해당 프로젝트(310)의 수행 내용에 대한 프로젝트평점을 부여하도록 할 수 있다.The macro management process performing unit 410 can evaluate the project 310 through the job evaluation access right of the super administrator. In one embodiment, the macro management process execution unit 410 may associate at least one user participating in the project message thread 320 as a practitioner or an observer of the corresponding project 310, A specific observer designated by the creator can be given task evaluation access as a super administrator for evaluating the project 310. [ For example, one of the users designated as observers may be designated as a super administrator corresponding to the evaluator of the project 310, so that the super evaluator can be given access to the work evaluation evaluation, and 1 The supervisor can designate the supervisor as the supervisor as the supervisor and the supervisor as the evaluator can give the project rating of the performance of the project 310 to the supervisor as the evaluator through the evaluation regarding the project 310.

일 실시예에서, 매크로 관리 과정 수행부(410)는 슈퍼 관리자와 연관된 사용자 단말(120)로부터 수신된 해당 프로젝트(310)에 관한 평가를 기초로 해당 프로젝트(310)의 정성적 프로젝트평점을 부여할 수 있다. 예를 들어, 매크로 관리 과정 수행부(410)는 평가의 수행 과정에서, 프로젝트 생성자에 의해 미리 지정된 프로젝트 평가 최대점수를 상한으로 하는 프로젝트 평가점수를 슈퍼 관리자로부터 수신할 수 있다.In one embodiment, the macro management process execution unit 410 assigns a qualitative project rating of the project 310 based on an evaluation of the project 310 received from the user terminal 120 associated with the super administrator . For example, the macro management process performing unit 410 may receive, from the super administrator, a project evaluation score having an upper limit on the project evaluation maximum score predetermined by the project creator in the evaluation process.

일 실시예에서, 매크로 관리 과정 수행부(410)는 해당 프로젝트(310)와 연관된 노트 객체(330)의 생성개수, 해당 노트 객체(330)를 통해 생성된 업무객체의 생성횟수, 처리횟수 및 처리기간을 기초로 해당 프로젝트(310)의 정량적 프로젝트평점을 산출할 수 있다. In one embodiment, the macro management process execution unit 410 may generate the number of generated note objects 330 associated with the corresponding project 310, the number of generated business objects generated through the corresponding note object 330, The quantitative project rating of the project 310 can be calculated based on the period.

일 실시예에서, 매크로 관리 과정 수행부(410)는 해당 프로젝트(310)에 관한 정성적 프로젝트평점과 정량적 프로젝트평점을 기초로 해당 프로젝트(310)에 관한 종합적인 평가점수를 산출할 수 있다. 예를 들어, 매크로 관리 과정 수행부(410)는 해당 정성적 프로젝트평점과 정량적 프로젝트평점을 합산 또는 평균하거나, 가중치에 따라 연산 처리하여 해당 프로젝트(310)에 관한 종합적인 평가점수 산출할 수 있다. 매크로 관리 과정 수행부(410)는 해당 프로젝트(310)에 관한 종합적인 평가점수가 산출되면 해당 종합적인 평가점수를 사용자 단말(120)에 제공하여 해당 프로젝트(310)의 리더인 팀장 또는 해당 프로젝트 참여자 전원이 확인하도록 할 수 있다.In one embodiment, the macro management process execution unit 410 may calculate a comprehensive evaluation score of the project 310 based on the qualitative project rating and the quantitative project rating of the project 310. For example, the macro management process execution unit 410 can calculate a comprehensive evaluation score for the project 310 by summing or averaging the qualitative project scores and the quantitative project scores, or by performing an arithmetic operation according to the weights. The macro management process execution unit 410 provides the comprehensive evaluation score to the user terminal 120 and outputs the overall evaluation score to the team leader who is the leader of the project 310 or the project partner Power can be checked.

일 실시예에서, 매크로 관리 과정 수행부(410)는 프로젝트(310)가 종료되기 전까지 해당 정량적 프로젝트평점을 특정 주기로 갱신하고, 갱신된 정량적 프로젝트평점을 향상시키기 위한 특정 프로젝트 활동을 선별하여 해당 프로젝트 메시지 쓰레드(320)를 통해 추천할 수 있다. 일 실시예에서, 매크로 관리 과정 수행부(410)는 정량적 프로젝트평점의 산출 기준을 분석하여 노트 객체(330)의 신규 생성, 기 생성된 노트 객체(330)와 연관된 업무 객체(350)의 신규 생성, 기 생성된 업무 객체(350)의 빠른 처리 및 해당 프로젝트 메시지 쓰레드(320)에 처리된 메시지 처리량의 향상 중 하나를 상기 특정 프로젝트 활동으로 결정할 수 있다. 예를 들어, 매크로 관리 과정 수행부(410)는 프로젝트(310)가 종료 처리되거나 슈퍼 관리자에 의한 정성적 프로젝트평점을 수신하기 전까지 24시간 주기로 해당 프로젝트(310)의 정량적 프로젝트평점을 갱신할 수 있고, 현재까지 산출된 정량적 프로젝트평점과 관련하여 해당 정량적 프로젝트평점의 산출 기준을 만족하지 못한 특정 활동수치(예를 들어, (i) 노트 객체(330)의 생성개수, (ii) 각 노트 객체(330)와 연관된 업무 객체(350)의 생성개수, (iii) 해당 업무 객체(350)의 업무진행상태 및 (iv) 해당 프로젝트 메시지 쓰레드(320)에 처리된 메시지 처리량 중 하나)을 검출하여 해당 활동수치를 개선하기 위한 특정 프로젝트 활동(예를 들어, (i) 노트 객체(330)의 신규 생성, (ii) 기 생성된 노트 객체(330)와 연관된 업무 객체(350)의 신규 생성, (iii) 기 생성된 업무 객체(350)의 빠른 처리 및 (iv) 해당 프로젝트 메시지 쓰레드(320)를 통한 의사소통 메시지량 증가 중 하나)을 정량적 프로젝트평점을 향상시키기 위한 특정 프로젝트 활동으로 선별할 수 있으며, 해당 특정 프로젝트 활동을 권장하는 프로젝트 활동 권장 메시지를 해당 프로젝트 메시지 쓰레드(320)를 통해 제공할 수 있다.In one embodiment, the macro management process execution unit 410 updates the quantitative project ratings at a specific period until the termination of the project 310, selects specific project activities for improving the updated quantitative project ratings, Thread 320. < / RTI > In one embodiment, the macro management process execution unit 410 analyzes the calculation standard of the quantitative project rating to generate a new of the note object 330, a new creation of the business object 350 associated with the created note object 330 The quick process of the created business object 350 and the improvement of the throughput of the message processed in the corresponding project message thread 320 can be determined as the specific project activity. For example, the macro management process execution unit 410 may update the quantitative project rating of the corresponding project 310 at a 24-hour period until the project 310 is terminated or a qualitative project rating by the super administrator is received (I) the number of generated note objects 330, (ii) the number of generated note objects 330 (i), the number of generated note objects 330 (Iii) a work progress state of the corresponding work object 350 and (iv) a message processing amount processed in the corresponding project message thread 320) (I) creating a new note object 330; (ii) creating a new business object 350 associated with a previously created note object 330; (iii) The generated business object 350 ) And (iv) increasing the amount of communication messages through the project message thread 320) can be selected as specific project activities to improve the quantitative project rating, and a project that recommends the specific project activity An activity recommendation message may be provided through the corresponding project message thread 320.

일 실시예에서, 매크로 관리 과정 수행부(410)는 적어도 하나의 노트 객체(330)에 있는 노트 내용에 관한 정보가 수정되면 해당 프로젝트 메시지 쓰레드(320)에 해당 노트내용 변경 정보 및 해당 노트 객체(330)에 접근하기 위한 접근 링크를 포함하는 알림 메시지를 추가할 수 있다. In one embodiment, the macro management process execution unit 410 may update the corresponding note message contents in the project message thread 320 when the information on the note contents in the at least one note object 330 is modified, 330, < / RTI >

일 실시예에서, 매크로 관리 과정 수행부(410)는 특정 프로젝트 메시지 쓰레드(320)와 연관되지 않은 특정 노트 객체(330), 멀티미디어 파일 및 첨부파일 중 하나의 등록 요청이 수신되면 해당 요청의 특정 노트 객체(330), 멀티미디어 파일 또는 첨부파일을 생성하고, 새로운 프로젝트(310) 및 해당 프로젝트(310)와 연관된 프로젝트 메시지 쓰레드(320)를 생성하여 해당 프로젝트 메시지 쓰레드(320)와 해당 요청의 노트 객체(330), 멀티미디어 파일 또는 첨부파일을 연관시킬 수 있다. 매크로 관리 과정 수행부(410)는 새로운 프로젝트(310)의 생성에 따라 해당 매크로 관리 블록(222) 및 해당 마이크로 관리 블록(224) 간의 트리 구조를 생성하고 상호 간의 연관성을 제어할 수 있다.In one embodiment, the macro management process execution unit 410 receives a registration request of a specific note object 330, a multimedia file, and an attachment file that is not associated with a specific project message thread 320, And generates a new project 310 and a project message thread 320 associated with the new project 310 and a corresponding project message thread 320 to generate a corresponding project message thread 320 and a note object 330), a multimedia file, or an attachment. The macro management process execution unit 410 may generate a tree structure between the macro management block 222 and the micro management block 224 according to the creation of the new project 310 and control the correlation between them.

일 실시예에서, 매크로 관리 과정 수행부(410)는 프로젝트 생성자 또는 슈퍼 관리자에 의하여 해당 프로젝트 메시지 쓰레드(320)를 통해 해당 프로젝트(310)에 대한 종료 처리 요청이 수신되면 해당 프로젝트(310)를 종료 처리하고 해당 프로젝트 메시지 쓰레드(320)를 통한 신규 노트 객체(330)의 생성을 제한할 수 있다.In one embodiment, the macro management process execution unit 410 terminates the corresponding project 310 when a termination processing request for the corresponding project 310 is received by the project creator or the super administrator through the corresponding project message thread 320 And to limit the creation of a new note object 330 through the corresponding project message thread 320.

일 실시예에서, 매크로 관리 과정 수행부(410)는 프로젝트 메시지 쓰레드(320)를 통해 해당 프로젝트 메시지 쓰레드(320)와 종속적으로 연관된 멀티미디어 자료 및 첨부파일 중 적어도 하나가 생성되면 이를 매크로 관리 블록(222)에 저장하고, 해당 프로젝트 메시지 쓰레드(320)에 미디어 메시지 또는 첨부파일 메시지로서 추가할 수 있다.In one embodiment, when at least one of the multimedia data and the attached file, which is related to the corresponding project message thread 320, is generated through the project message thread 320, the macro management process performing unit 410 outputs the macro message to the macro management block 222 And add it to the project message thread 320 as a media message or an attachment file message.

제어부(420)는 프로세서(210)의 동작 전반을 제어할 수 있고, 매크로 관리 과정 수행부(410)와 마이크로 관리 과정 수행부(430) 간의 데이터 흐름을 제어할 수 있다.The control unit 420 may control the overall operation of the processor 210 and may control the data flow between the macro management process performing unit 410 and the micro management process performing unit 430.

마이크로 관리 과정 수행부(430)는 마이크로 관리 과정을 수행할 수 있다. 일 실시예에서, 마이크로 관리 과정은 효율적인 업무 관리를 목적으로 수행되는 미시적 관점의 관리 과정으로서, 마이크로 관리 블록(224)과 연관되고 특정 노트 객체(330), 멀티미디어 자료 또는 첨부파일에 종속적인 업무 메시지 쓰레드(340) 및 업무 객체(350)에 관한 생성, 수정 및 삭제를 포함하는 데이터 관리 과정, 업무 객체(350)에 관한 업무 관리의 효율성을 높이기 위해 관련 구성원들에게 업무관련 진행의 촉구, 리마인드 및 관련정보 제공을 포함하는 진행 관리 과정 및 업무 객체(350)를 포함하는 업무 전반에 관한 평가를 포함하는 평가 관리 과정 중 적어도 하나를 포함할 수 있다.The micro management process performing unit 430 may perform a micro management process. In one embodiment, the micro management process is a micro perspective management process performed for the purpose of efficient business management. It is associated with the micro management block 224 and includes a specific note object 330, a multimedia message, A data management process including creation, modification, and deletion of threads 340 and business objects 350; prompting related members to perform work related remedies, remind, An evaluation management process including an evaluation regarding the overall business including the progress management process including the provision of relevant information and the business object 350. [

보다 구체적으로, 마이크로 관리 과정 수행부(430)는 다음과 같은 마이크로 관리 과정들을 수행할 수 있다.More specifically, the micro management process execution unit 430 may perform the following micro management processes.

마이크로 관리 과정 수행부(430)는 마이크로 관리 블록(224)에 노트 객체(330)와 연관된 업무 메시지 쓰레드(340)를 생성하고 해당 업무 메시지 쓰레드(340)에 업무 객체(350)를 연관시킬 수 있다. 일 실시예에서, 마이크로 관리 과정 수행부(430)는 사용자 단말(120)에 설치된 프로젝트 관리 메시징 에이전트에서 특정 노트 객체(330)에 관해 시각화한 노트 객체 제어 인터페이스(730)를 통해 사용자 단말(120)로부터 해당 노트 객체(330)와 연관된 업무 메시지 쓰레드(340)의 신규 생성 또는 연관된 업무 객체(350)의 신규 생성 요청을 수신할 수 있다. 일 실시예에서, 마이크로 관리 과정 수행부(430)는 사용자 요청을 기반으로 특정 프로젝트 메시지 쓰레드(320)와 연관된 멀티미디어 자료 또는 첨부파일과 연관된 업무 메시지 쓰레드(340)를 생성하고 해당 업무 메시지 쓰레드(340)에 업무 객체(350)를 연관시킬 수도 있다.The micro management process execution unit 430 may create a task message thread 340 associated with the note object 330 in the micro management block 224 and associate the task object 350 with the task message thread 340 . In one embodiment, the micro-management process performing unit 430 may be implemented by the user terminal 120 through a note object control interface 730 visualized with respect to a specific note object 330 at a project management messaging agent installed in the user terminal 120. [ A new creation of the task message thread 340 associated with the corresponding note object 330 or a request to create a new task object 350 associated with the note object. In one embodiment, the micro management process execution unit 430 generates a task message thread 340 associated with a multimedia object or an attached file associated with a specific project message thread 320 based on a user request and transmits the task message thread 340 (E.g., a business object).

마이크로 관리 과정 수행부(430)는 노트 객체(330)와 연관된 업무 메시지 쓰레드(340)의 신규 생성 요청이 수신되면 해당 요청과 연관된 사용자들 간의 새로운 업무 메시지 쓰레드(340)를 생성하여 마이크로 관리 블록(224)에 저장할 수 있다. 마이크로 관리 과정 수행부(430)는 노트 객체(330)와 연관된 업무 객체(350)의 신규 생성 요청이 수신되면 사용자 단말(120)로부터 수신된 업무 정보를 기초로 업무 객체(350)를 생성할 수 있으며, 만일 해당 노트 객체(330)와 연관되고 해당 업무생성자와 업무처리자 간에 기 생성된 대화방이 존재하면 해당 업무 객체(350)를 해당 대화방의 업무 메시지 쓰레드(340)에 메시지 객체로서 추가하고, 만일 존재하지 않으면 새롭게 생성하여 신규 생성된 대화방의 업무 메시지 쓰레드(340)에 추가할 수 있다.The micro management process execution unit 430 generates a new task message thread 340 between the users associated with the request and receives a new task message 340 related to the note object 330 from the micro management block 340 224). The micro management process execution unit 430 may generate the business object 350 based on the task information received from the user terminal 120 upon receipt of a request to create a new task object 350 associated with the note object 330 If there is a chat room associated with the corresponding note object 330 and between the task creator and the task processor, the corresponding task object 350 is added to the task message thread 340 of the corresponding chat room as a message object, If it does not exist, it can be newly created and added to the job message thread 340 of the newly created chat room.

마이크로 관리 과정 수행부(430)는 업무 객체(350)가 생성될 때마다 마이크로 관리 블록(224)에 해당 업무 객체(350)를 삽입하여 해당 트리 구조를 갱신할 수 있다. The micro management process execution unit 430 may update the corresponding tree structure by inserting the corresponding business object 350 into the micro management block 224 every time the business object 350 is created.

마이크로 관리 과정 수행부(430)는 사용자 요청을 기반으로 노트 객체(330)와 연관되고 업무생성자, 업무처리자 및 업무평점을 포함하는 업무객체를 생성할 수 있다. 마이크로 관리 과정 수행부(430)는 업무객체(350)가 생성되면 해당 노트 객체(330)와 연관된 해당 업무생성자와 업무처리자 간의 업무 메시지 쓰레드(340)를 생성하여 해당 업무 메시지 쓰레드(340)에 해당 업무객체(350)를 메시지 객체로서 연관시킬 수 있다. 여기에서, 업무생성자는 해당 업무를 생성한 사용자 단말(120)과 연관된 사용자에 해당하고, 업무처리자는 해당 업무생성자에 의해 해당 업무를 처리하는 대상으로 지정된 사용자에 해당하며, 업무평점은 해당 업무가 완료되면 해당 업무생성자에 의해 평가될 수 있는 평가점수의 최대상한을 의미하는 평가 예약점수와 실제로 평가된 점수를 의미하는 평가점수를 포함할 수 있다. 이에 따라, 일 실시예에서, 업무생성자는 대화방 내에서 업무 메시지로 표현된 업무객체(350)를 통해 업무처리자에게 업무를 지시하거나 평가할 수 있다.The micro management process execution unit 430 may generate a task object associated with the note object 330 based on a user request and including a task creator, a task processor, and a task score. The micro management process execution unit 430 generates a task message thread 340 between a corresponding task creator and a task processor associated with the corresponding note object 330 when the task object 350 is generated, The business object 350 may be associated as a message object. Here, the task creator corresponds to a user associated with the user terminal 120 that created the task, and the task processor corresponds to a user designated as an object to process the task by the task creator. An evaluation reservation score indicating the maximum upper limit of the evaluation score that can be evaluated by the task creator when completed, and an evaluation score indicating the actually evaluated score. Accordingly, in one embodiment, the business creator can direct or evaluate the business to the business operator via the business object 350 represented in the business message in the chat room.

일 실시예에서, 마이크로 관리 과정 수행부(430)는 사용자 단말(120)에 설치된 프로젝트 관리 메시징 에이전트에서 업무 메시지 쓰레드(340)를 시각화한 업무 메시지 쓰레드 인터페이스(800)를 통해 사용자 단말(120)로부터 해당 노트 객체(330)와 연관된 새로운 업무객체 생성 요청을 수신할 수 있고, 사용자 단말(120)로부터 수신된 업무 정보를 기초로 업무 객체(350)를 생성할 수 있으며, 만일 해당 노트 객체(330)와 연관되고 해당 업무생성자와 업무처리자 간에 기 생성된 대화방이 존재하면 해당 업무 객체(350)를 해당 대화방의 업무 메시지 쓰레드(340)에 메시지 객체로서 추가하고, 만일 존재하지 않으면 새롭게 생성하여 신규 생성된 대화방의 업무 메시지 쓰레드(340)에 추가할 수 있다.In one embodiment, the micro management process execution unit 430 receives the task message thread 340 from the user terminal 120 through the task message thread interface 800 that visualizes the task message thread 340 in the project management messaging agent installed in the user terminal 120 It is possible to receive a new task object creation request associated with the corresponding note object 330 and to create a task object 350 based on the task information received from the user terminal 120, And if there is a chat room created between the task creator and the task processor, the corresponding task object 350 is added to the task message thread 340 of the corresponding chat room as a message object. If it is not present, May be added to the chat room job message thread 340.

마이크로 관리 과정 수행부(430)는 처리 단계별 진행상태를 나타내는 업무진행상태를 포함하는 업무 객체(350)의 진행을 수행할 수 있다. 보다 구체적으로, 마이크로 관리 과정 수행부(430)는 업무생성자 및 업무처리자 중 일방에 의한 요청과 다른 일방에 의한 응답을 반영하여 업무처리 다이어그램에 미리 결정된 업무진행상태를 갱신하고 연관된 업무 메시지 쓰레드(340)를 갱신하는 방식으로 업무 객체(350)의 진행을 수행할 수 있다. 일 실시예에서, 업무진행상태는 '새로운', '하는중', '다했음' 및 '확인'을 포함할 수 있다. '새로운'은 업무 객체(350)가 새롭게 생성된 상태를 나타내고, '하는중'은 업무처리자가 해당 업무 객체(350)를 처리중인 상태를 나타내며, '다했음'은 업무처리자가 해당 업무 객체(350)를 완료한 상태로, 업무생성자로부터 업무 완료에 대한 인터랙션을 기다리는 상태를 나타내고, '확인'은 업무생성자가 업무처리자의 완료된 업무 객체(350)를 확인한 상태를 나타낸다.The micro management process performing unit 430 may perform the progress of the task object 350 including the task progress status indicating the progress status by the process step. More specifically, the micro management process execution unit 430 updates a predetermined task progress state in the task processing diagram by reflecting the request by one of the task creator and the task processor and the response by the other, The work object 350 may be updated in the same manner as described above. In one embodiment, the business progress state may include 'new', 'doing', 'done', and 'confirm'. 'New' indicates a state in which the business object 350 is newly created, 'In Progress' indicates a state in which the business processor is processing the business object 350, and 'Finished' indicates that the business process object 350 350 indicates that the task creator has checked the completed task object 350 of the task processor, and 'OK' indicates a status of waiting for the interaction with the task creator from the task creator.

마이크로 관리 과정 수행부(430)는 업무생성자와 업무처리자 간의 응답 관계로 구현되는 업무객체 관련 응답을 통해 해당 업무 객체(350)의 업무진행상태를 갱신할 수 있다. 일 실시예에서, 마이크로 관리 과정 수행부(430)는 프로젝트 관리 메시징 에이전트에 있는 업무 객체(350)에 관한 제어 인터페이스를 통해 업무생성자 또는 업무처리자와 연관된 사용자 단말(120)로부터 업무관련 응답을 수신할 수 있다. 여기에서, 업무객체 관련 응답은 업무생성자 또는 업무처리자와 연관된 사용자 단말(120)에 의해 응답될 수 있는 업무객체에 관한 응답에 해당하고, 일 실시예에서, 해당 업무객체의 현재 업무처리상태에 따라 업무 확인응답, 업무 완료응답 및 업무 평가응답 중에서 적어도 하나를 포함할 수 있다. 예를 들어, 마이크로 관리 과정 수행부(430)는 업무진행상태가 '새로운' 상태에 해당하는 업무 객체(350)에 관해 업무처리자에 해당하는 구성원으로부터 업무 인터랙션을 수신하면 해당 업무진행상태를 다음 진행상태인 '하는중' 상태로 갱신할 수 있다. 마이크로 관리 과정 수행부(430)는 업무객체 관련응답을 수신하면 현재 업무처리상태를 결정하고 연관된 업무 메시지 쓰레드(340)를 갱신할 수 있다.The micro management process execution unit 430 can update the task progress status of the corresponding task object 350 through a task-object related response implemented in a response relationship between the task creator and the task processor. In one embodiment, the micro management process performing unit 430 receives a task related response from the user terminal 120 associated with the task creator or task processor via the control interface on the task object 350 in the project management messaging agent . Here, the business object related response corresponds to a response regarding a business object that can be responded to by a user terminal 120 associated with the business creator or business processor, and in one embodiment, depending on the current business processing state of the business object A task completion response, a task completion response, and a task evaluation response. For example, when the micro management process execution unit 430 receives a task interaction from a member of a task processor regarding the task object 350 corresponding to the 'new' status, Quot; state ". When the micro management process execution unit 430 receives the task object related response, it can determine the current task processing state and update the associated task message thread 340.

마이크로 관리 과정 수행부(430)는 업무 객체(350)의 진행을 수행하여 최종적으로 업무생성자의 업무평가 접근권을 통해 해당 업무 객체(350)를 평가할 수 있다. 일 실시예에서, 마이크로 관리 과정 수행부(430)는 현재 업무진행상태가 '다했음' 상태인 업무 객체(350)에 관해 해당 업무생성자와 연관된 사용자 단말(120)로부터 업무객체 관련응답 중 하나인 업무 평가응답을 수신할 수 있고, 해당 업무 평가응답에 포함되고 해당 업무생성자에 의해 지정된 업무평점을 해당 업무 객체(350)의 업무평점으로 부여할 수 있다. 일 실시예에서, 마이크로 관리 과정 수행부(430)는 해당 프로젝트(310)를 생성한 프로젝트 생성자에 의해 지정된 특정 실무자 또는 해당 업무 객체(350)를 생성한 업무생성자에게 해당 업무 객체(350)를 평가하기 위한 사용자에게 업무생성자로서의 업무평가 접근권을 부여할 수 있고, 업무평가 접근권이 부여된 사용자로부터 해당 업무 객체(350)에 관한 업무처리자의 업무내용을 평가하기 위한 업무평점을 수신할 수 있다.The micro management process execution unit 430 may perform the progress of the task object 350 and finally evaluate the task object 350 through the task evaluation access right of the task creator. In one embodiment, the micro-management process execution unit 430 receives one of the business object related responses from the user terminal 120 associated with the task task creator with respect to the task task 350, May receive the task evaluation response, and may assign the task rating, which is included in the task evaluation response and designated by the task creator, to the task rating of the task object 350. [ In one embodiment, the micro management process execution unit 430 evaluates the corresponding task object 350 to a task executor who created the specific task person or task object 350 designated by the project creator who created the project 310 The user can be granted task evaluation access right as a task creator and receive task ratings for evaluating task contents of the task agent 350 from the user who has been granted task evaluation access right.

마이크로 관리 과정 수행부(430)는 업무 메시지 쓰레드(340)를 통해 업무 객체(350)와 연관되고 해당 업무진행상태가 완료될 때까지 특정 반복 기준에 따라 해당 업무진행상태의 완료를 요청하는 리마인드 메시지를 제공할 수 있다. 보다 구체적으로, 마이크로 관리 과정 수행부(430)는 업무객체 집합에서 미리 설정된 리마인드 조건을 만족하는 적어도 하나의 업무 객체(350)를 검출하여 검출된 업무객체 각각과 연관된 리마인드 메시지를 생성할 수 있고, 생성된 리마인드 메시지를 특정 반복 기준(예를 들어, 12시간 주기로 전송)에 따라 각 업무 객체(350)에서 업무처리자로 지정된 사용자와 연관된 사용자 단말(120)에 제공할 수 있으며, 리마인드 메시지가 제공될 때마다 카운트된 제공횟수를 해당 업무 객체(350)와 연관시켜 저장할 수 있다. 일 실시예에서, 마이크로 관리 과정 수행부(430)는 업무 객체(350)의 업무처리상태 및 업무마감기한을 기초로 특정 반복 기준을 결정하여 해당 기준에 따라 리마인드 메시지를 생성할 수 있다.The micro management process performing unit 430 is associated with the business object 350 through the business message thread 340 and transmits a remind message requesting the completion of the business progress status according to a specific repetition criterion until the business progress status is completed Can be provided. More specifically, the micro management process execution unit 430 may detect at least one business object 350 satisfying a predetermined remind condition in the task object set to generate a remind message associated with each of the detected task objects, The generated remind message may be provided to a user terminal 120 associated with a user designated as a business operator in each business object 350 according to a certain repetition criterion (e.g., transmission in a 12-hour period), and a remind message may be provided The counted number of times of provision may be stored in association with the corresponding business object 350. [ In one embodiment, the micro management process execution unit 430 may determine a specific iteration criterion based on a task processing state and a task deadline of the task object 350 and generate a remind message according to the criterion.

마이크로 관리 과정 수행부(430)는 리마인드 업무객체 집합에 있는 리마인드 업무객체에 관한 리마인드 내용과 리마인드 횟수를 포함하는 리마인드 메시지를 생성하여 해당 리마인드 업무 객체와 연관된 업무처리자, 업무생성자 및 업무 참조자 중에서 적어도 하나에게 제공할 수 있다. 여기에서, 리마인드 내용은 해당 업무 객체(350)에 관한 업무생성자, 업무처리자 및 업무내용, 업무진행상태 및 마감 기한 중에서 적어도 하나에 관한 요약 정보를 포함할 수 있고, 리마인드 횟수는 몇 번째 리마인드에 해당하는지를 나타낸다. 마이크로 관리 과정 수행부(430)는 리마인드 업무객체 별로 리마인드 수행 횟수를 누적 카운트하여 리마인드 횟수에 관해 연산 처리할 수 있다.The micro management process execution unit 430 generates a remind message including the remind contents and the number of reminds related to the remind work object in the remind work object set and generates at least one of the task handler, Can be provided to one. Here, the remind content may include summary information about at least one of task creator, task processor and task content, task progress and deadline for the task object 350, and the number of reminds corresponds to a number of reminders . The micro management process execution unit 430 may accumulate the number of remind processes for each remind task object to calculate the number of remind processes.

일 실시예에서, 마이크로 관리 과정 수행부(430)는 리마인드 메시지를 해당 업무 객체(350)와 연관된 업무 메시지 쓰레드(340)를 통해 제공할 수 있다. 마이크로 관리 과정 수행부(430)는 생성된 리마인드 메시지를 연관된 업무 메시지 쓰레드(360)에 업무 메시지로서 추가하는 방식으로 제공하거나, 해당 수신자와 연관된 사용자 단말(120)에 설치된 메신저의 팝업 기능을 통해 팝업 메시지의 형태로 제공하거나, 해당 메신저 상에서 프로젝트 관리를 제공하는 프로젝트 관리 인터페이스(600)를 통해 리마인드 업무객체에 관한 업무 개요 및 업무객체 접근링크를 포함하는 목록을 제공하는 방식으로 리마인드 서비스를 제공할 수 있다. 일 실시예에서, 마이크로 관리 과정 수행부(430)는 특정 업무 객체(350)와 연관된 리마인드 메시지에 대한 해당 업무 처리자의 응답을 기초로 해당 업무 객체(350)의 업무진행상태를 변경 처리할 수 있다.In one embodiment, the micro management process execution unit 430 may provide a remind message through a business message thread 340 associated with the business object 350. The micro management process execution unit 430 may provide the generated remind message to the associated task message thread 360 as a task message or may provide a pop-up message through the pop-up function of the messenger installed in the user terminal 120, Or provide a list containing task overviews and task object access links for reminded task objects via the project management interface 600 that provides project management on the instant messengers. have. In one embodiment, the micro management process execution unit 430 may change the task progress status of the corresponding task object 350 based on the response of the task manager to the remind message associated with the specific task object 350 .

일 실시예에서, 마이크로 관리 과정 수행부(430)는 업무 객체(350)의 업무진행상태에 따른 마감기한까지의 차이 일수가 특정 조건을 만족하는지 여부를 확인하여 리마인드 긴급성을 판단할 수 있고, 긴급한 것으로 판단되면 해당 업무 객체(350)의 리마인드 메시지 제공 빈도를 증가시킬 수 있다.In one embodiment, the micro management process execution unit 430 may determine whether the difference between the number of days until the deadline based on the work progress of the task object 350 satisfies a specific condition and determine a remind urgency, If it is determined to be urgent, the frequency of provision of the remind message of the corresponding work object 350 can be increased.

마이크로 관리 과정 수행부(430)는 제공된 리마인드 메시지의 제공횟수를 기초로 업무반응속도를 산출하여 해당 업무평점에 포함시킬 수 있다. 여기에서, 업무반응속도는 업무처리자가 몇 번째 리마인드 메시지에 인터랙션하여 업무 객체(350)의 업무진행상태를 변경시키었는지를 나타내고, 산출된 값이 작을수록 해당 업무처리자가 빠르게 인터랙션하여 업무를 처리하였음을 의미할 수 있다. 예를 들어, 리마인드 메시지가 2번 제공된 후 업무처리자가 해당 리마인드 메시지에 응답하여 업무처리상태를 변경하였다면 해당 업무 객체(350)에 관한 업무반응속도는 2로 산출될 수 있다.The micro management process execution unit 430 may calculate the response speed based on the number of provided remind messages and include the response speed in the corresponding task rating. Here, the task response rate indicates whether the task processor interacts with a few remind messages to change the task progress of the task object 350, and the smaller the calculated value, the faster the task processor interacts with the task. . ≪ / RTI > For example, if the task processor has changed the task processing state in response to the corresponding remind message after the provision of the remind message twice, the task response rate of the task object 350 can be calculated to be 2.

마이크로 관리 과정 수행부(430)는 업무 객체(350) 각각에 관해 업무진행상태 별로 업무처리자의 업무반응속도를 산출할 수 있고, 연관된 모든 업무 객체(350)에 관해 해당 업무 처리자의 평균 업무반응속도를 산출할 수 있다. 예를 들어, 마이크로 관리 과정 수행부(430)는 해당 업무 처리자가 연관된 모든 업무 객체(350)에 관해 리마인드 메시지에 총 98회의 인터랙션을 하여 연관된 업무진행상태를 변경하였고 연관된 모든 업무 객체(350)에 관해 업무진행상태 별로 산출된 모든 업무반응속도들을 평균한 값이 2.3인 경우, 평균 업무반응속도를 2.3 @ 98 로 나타낼 수 있다. 일 실시예에서, 마이크로 관리 과정 수행부(430)는 평균 업무반응속도를 개인 별로 산출할 수 있고, 팀 별로 산출할 수도 있다.The micro management process execution unit 430 can calculate the task response speed of the task processor with respect to each task progression state with respect to each task task object 350 and calculate the average task response speed Can be calculated. For example, the micro management process execution unit 430 may perform a total of 98 interactions with the remind message about all the business objects 350 associated with the business processor, thereby changing the associated business process state and notifying all associated business objects 350 If the average of all task response rates calculated for each task progress is 2.3, then the average task response rate can be expressed as 2.3 @ 98. In one embodiment, the micro management process execution unit 430 may calculate an average task response rate for each individual, and may also calculate the average task response rate for each team.

일 실시예에서, 마이크로 관리 과정 수행부(430)는 특정 시간 구간 동안 해당 노트 객체(330)를 통해 생성된 업무 객체(350)의 생성횟수 및 해당 업무 메시지 쓰레드(340)에 처리된 메시지 처리량을 기초로 각 노트 객체(330)의 활동성을 산출하고, 가장 높은 활동성을 가지는 노트 객체(330)를 주요 노트 객체로 결정할 수 있다. 마찬가지로, 매크로 관리 과정 수행부(410)는 주요 노트 객체에 관한 정보를 사용자 단말(120)에 제공하여 사용자 단말(120)이 주요 노트 객체를 강조하거나 노트 객체 리스트 중 우선적으로 표시하도록 할 수 있다.In one embodiment, the micro management process execution unit 430 may generate the number of times the task object 350 is generated through the corresponding note object 330 and the message processing amount processed by the task message thread 340 during a specific time period The activity of each note object 330 can be calculated on the basis of the activity, and the note object 330 having the highest activity can be determined as a main note object. Similarly, the macro management process performing unit 410 may provide information on the main note object to the user terminal 120 so that the user terminal 120 may highlight the main note object or preferentially display the note object list.

도 5는 도 2에 있는 프로세서에 의하여 수행되는 계층적 프로젝트 관리 프로시저를 설명하는 흐름도이다.5 is a flow chart illustrating a hierarchical project management procedure performed by the processor in FIG.

도 5에서, 매크로 관리 과정 수행부(410)는 매크로 관리 블록(222)에 프로젝트(310) 및 해당 프로젝트(310)와 연관된 프로젝트 메시지 쓰레드(320)를 생성하고(단계 S510), 해당 프로젝트 메시지 쓰레드(320)에 해당 프로젝트(310)의 단위 업무로서 업무 객체(350)의 컨테이너를 포함하는 노트 객체(330)를 연관시키는(단계 S520) 매크로 관리 과정을 수행할 수 있다.5, the macro management process execution unit 410 creates a project 310 and a project message thread 320 associated with the project 310 in the macro management block 222 (step S510) (Step S520) of associating the note object 330 including the container of the business object 350 as a unit task of the project 310 with the macro object 320 of the project object 310 (step S520).

마이크로 관리 과정 수행부(420)는 마이크로 관리 블록(224)에 해당 노트 객체(330)와 연관된 업무 메시지 쓰레드(340)를 생성하고(단계 S530) 해당 업무 메시지 쓰레드(340)에 업무 객체(350)를 연관시키며(단계 S540) 업무 객체(350)가 생성될 때마다 마이크로 관리 블록(222)에 해당 노트 객체(330)를 삽입하여 해당 트리 구조를 갱신(단계 S550)하는 마이크로 관리 과정을 수행할 수 있다(단계 S520).The micro management process execution unit 420 creates a task message thread 340 associated with the corresponding note object 330 in the micro management block 224 in step S530 and transmits the task object 350 to the task message thread 340. [ (Step S540), the micro management block 222 updates the corresponding tree structure by inserting the corresponding note object 330 every time the business object 350 is created (step S550) (Step S520).

일 실시예에서, 계층적 프로젝트 관리 장치(110)는 프로젝트 중심의 매크로 관리 과정과 프로젝트 업무 단위 중심의 마이크로 관리 과정의 수행을 최적화된 계층적 구조로 제공하여 프로젝트 관리의 효율을 증진시킬 수 있다.In one embodiment, the hierarchical project management apparatus 110 can improve the efficiency of project management by providing an optimized hierarchical structure of a macro management process based on a project and a micro management process based on a project task unit.

도 6은 도 1에 있는 계층적 프로젝트 관리 장치가 계층적 프로젝트 관리 데이터를 제공하는 과정의 일 실시예를 나타내는 도면이다.6 is a diagram illustrating an exemplary process of providing hierarchical project management data by the hierarchical project management apparatus of FIG.

도 6에서, 계층적 프로젝트 관리 장치(110)는 사용자 단말(120)에 매크로 관리 블록(222)에 저장되고 해당 사용자와 연관된 프로젝트(310), 프로젝트 메시지 쓰레드(320) 및 노트 객체(330)에 관한 매크로 관리 과정의 수행 결과로서의 매크로 관리 데이터와 마이크로 관리 블록(224)에 저장되며 업무 메시지 쓰레드(340) 및 업무 객체(350)에 관한 마이크로 관리 과정의 수행 결과로서의 마이크로 관리 데이터를 포함하는 계층적 프로젝트 관리 데이터를 제공할 수 있고, 이에 따라, 계층적 프로젝트 관리 장치(110)는 사용자 단말(120)이 해당 사용자 단말(120)에 설치된 프로젝트 관리 메시징 에이전트에 있는 프로젝트 관리 인터페이스(600)를 통해 해당 매크로 관리 데이터와 마이크로 관리 데이터를 디스플레이하도록 할 수 있다. 계층적 프로젝트 관리 장치(110)는 프로젝트 관리 인터페이스(600)를 통해 해당 사용자와 연관된 프로젝트 관리 요청을 수신하여 매크로 관리 과정이나 마이크로 관리 과정을 수행할 수 있다.6, the hierarchical project management apparatus 110 includes a project 310, a project message thread 320, and a note object 330, which are stored in the macro management block 222 and associated with the user, The macro management data as a result of performing the macro management process with respect to the business object 350 and the micro management data stored as the result of performing the micro management process on the business message thread 340 and the business object 350, The hierarchical project management device 110 may provide the project management data to the user terminal 120 via the project management interface 600 in the project management messaging agent installed in the user terminal 120. [ It is possible to display the macro management data and the micro management data. The hierarchical project management apparatus 110 may receive a project management request associated with the user through the project management interface 600 and perform a macro management process or a micro management process.

사용자 단말(120)은 계층적 프로젝트 관리 장치(110)로부터 해당 사용자와 연관된 업무 객체(350)에 관한 리마인드 메시지 정보를 제공 받아 오늘의 할일 제공 영역(610)을 통해 시각화시킬 수 있다. 이에 따라, 사용자는 오늘의 할일 제공 영역(610)을 통해 자신과 연관되고 리마인드가 필요한 업무 객체(350)의 목록을 확인하거나 해당 리마인드 메시지에 접근할 수 있다.The user terminal 120 can receive remind message information about the task object 350 associated with the user from the hierarchical project management apparatus 110 and visualize the remind message information through the task task providing area 610 of today. Accordingly, the user can confirm a list of business objects 350 that are associated with him and need to be reminded through his to-do providing area 610 or access the corresponding remind messages.

사용자 단말(120)은 계층적 프로젝트 관리 장치(110)로부터 해당 사용자가 참여 중인 프로젝트(310) 및 해당 프로젝트 메시지 쓰레드(320)에 관한 정보를 제공 받을 수 있고, 프로젝트 대화방 제공 영역(620)을 통해 해당 사용자가 참여 중인 프로젝트 메시지 쓰레드(320) 각각에 관해 프로젝트 이름, 연관된 노트 객체(330), 멀티미디어 자료(사진) 및 첨부파일(파일)의 생성개수를 포함하는 프로젝트 메시지 쓰레드 목록을 표시할 수 있으며, 해당 목록을 통해 해당 프로젝트 메시지 쓰레드(320) 에 접근할 수 있는 접근 경로를 제공할 수 있다.The user terminal 120 can receive information on the project 310 and the project message thread 320 in which the user is participating from the hierarchical project management apparatus 110 and can receive information on the project message thread 320 through the project chat room providing region 620 The user can display a list of project message threads that includes the project name, the associated note object 330, the multimedia material (photo), and the number of generated attachments (files) for each participating project message thread 320 And provide an access path to the project message thread 320 through the list.

사용자 단말(120)은 계층적 프로젝트 관리 장치(110)로부터 해당 사용자가 참여 중인 프로젝트 메시지 쓰레드(320)와 연관된 노트 객체(330)에 관한 정보를 제공 받을 수 있고, 노트 제공 영역(630)을 통해 해당 사용자가 참여 중인 프로젝트(310) 및 프로젝트 메시지 쓰레드(320)와 연관된 노트 객체(330)의 노트 이름, 노트 내용, 연관된 업무 객체(350) 생성 정보를 포함하는 노트 목록을 시각화시킬 수 있으며, 해당 목록을 통해 해당 노트 객체(330)에 접근할 수 있는 접근 경로를 제공할 수 있다.The user terminal 120 may receive information on the note object 330 associated with the project message thread 320 in which the user is participating from the hierarchical project management apparatus 110, The user can visualize a note list containing note names, note contents, and associated work object 350 creation information of the note object 330 associated with the project 310 and project message thread 320 in which the user is participating, And provide an access path to access the note object 330 through the list.

사용자 단말(120)은 계층적 프로젝트 관리 장치(110)로부터 해당 사용자가 참여 중인(노트 제공 영역(630)에 표시된 노트 객체(330)와 연관된) 업무 메시지 쓰레드(340)에 관한 정보를 제공 받을 수 있고, 업무 메시지 쓰레드 제공 영역(640)을 통해 해당 사용자가 업무생성자 또는 업무처리자로서 연관된 업무 객체(350)의 업무내용와 업무진행상태 또는 해당 사용자가 채팅참여자로서 연관된 업무 메시지 쓰레드(340)에 관한 정보를 시각화시킬 수 있으며, 노트 객체(330)에 관한 정보가 제공되는 일단에 해당 노트 객체(330)와 연관된 업무 메시지 쓰레드(340) 중 가장 최근에 갱신된 메시지 쓰레드의 내용을 표시하여 업무 관리 효율을 증진시킬 수 있다.The user terminal 120 may receive information from the hierarchical project management device 110 about the task message thread 340 in which the user is participating (associated with the note object 330 displayed in the note providing area 630) And information about the business process state of the associated business object 350 as a business creator or business processor or the business message thread 340 to which the user is related as a chat participant through the business message thread providing area 640 And the contents of the most recently updated message thread among the task message threads 340 associated with the corresponding note object 330 are displayed at a time when information on the note object 330 is provided, .

사용자 단말(120)은 계층적 프로젝트 관리 장치(110)로부터 제공 받은 매크로 및 마이크로 관리 데이터를 기초로 프로젝트 대화방 제공 영역(620)에 있는 모든프로젝트보기 버튼(625)을 통해 해당 사용자와 연관된 모든 전략, 프로젝트(310) 및 노트 객체(330)를 시각화시킬 수 있는 인터페이스를 제공할 수 있다. 일 실시예에서, 전략은 적어도 하나의 프로젝트(310)와 일대 다로 연관될 수 있고, 프로젝트(310) 각각은 하나의 전략에 종속적으로 연관될 수 있다.The user terminal 120 displays all the strategies associated with the user through the all project view button 625 in the project chat room provision area 620 based on the macro and micro management data provided from the hierarchical project management apparatus 110, The project 310 and the note object 330 can be visualized. In one embodiment, the strategy may be one-to-many associated with at least one project 310, and each of the projects 310 may be subordinate to one strategy.

계층적 프로젝트 관리 장치(110)는 상기와 같이, 사용자 단말(120)에 매크로 관리 데이터를 제공하여 프로젝트 대화방 제공 영역(620) 및 노트 제공 영역(630)을 통해 프로젝트 방향성 등과 같은 거시적 관점의 주제들이 토의되도록 지원하고, 프로젝트(310) 및 노트 객체(330), 멀티미디어 자료 및 첨부파일의 신규 생성이나 수정 발생 시에 해당 프로젝트 메시지 쓰레드(320)를 통해 알림 메시지를 제공하는 등의 매크로 관리 과정을 수행할 수 있다.As described above, the hierarchical project management apparatus 110 provides macro management data to the user terminal 120 to provide macroscopic topics such as project direction through the project chat room provision area 620 and the note provision area 630 And performs a macro management process such as providing a notification message through the corresponding project message thread 320 when a new creation or modification of the project 310 and the note object 330, the multimedia data, and the attached file is performed can do.

또한, 계층적 프로젝트 관리 장치(110)는 상기와 같이, 사용자 단말(120)에 마이크로 관리 데이터를 제공하여 업무 메시지 쓰레드 제공 영역(640)을 통해 프로젝트 단위 업무로서 업무 객체(350)에 관한 미시적 과점의 주제들이 토의되도록 지원하고, 업무 객체(350)의 신규 생성이나 수정 발생 시에 해당 업무 메시지 쓰레드(340)를 통해 알림 메시지를 제공하며 업무 객체(350)의 업무진행상태가 갱신되면 해당 업무 메시지 쓰레드(340)를 갱신하는 등의 마이크로 관리 과정을 수행할 수 있다.As described above, the hierarchical project management apparatus 110 provides micro management data to the user terminal 120 and provides micro management data to the user terminal 120 through the business message thread provision area 640 as a project unit task, And provides a notification message through the corresponding task message thread 340 when a new creation or modification of the task object 350 occurs and if the task progress status of the task object 350 is updated, A micro management process such as updating the thread 340 can be performed.

도 7은 도 1에 있는 계층적 프로젝트 관리 장치가 프로젝트 메시지 쓰레드를 통해 매크로 관리 과정의 수행 결과를 제공하는 과정의 일 실시예를 나타내는 도면이다.FIG. 7 is a diagram illustrating an exemplary process of the hierarchical project management apparatus of FIG. 1 providing a result of performing a macro management process through a project message thread.

도 7에서, 계층적 프로젝트 관리 장치(110)는 사용자 단말(120)에 매크로 및 마이크로 관리 과정의 수행 결과를 제공하여 사용자 단말(120)이 프로젝트 메시지 쓰레드 인터페이스(710)를 통해 해당 매크로 관리 과정의 수행 결과를 디스플레이하도록 할 수 있다.7, the hierarchical project management apparatus 110 provides a result of performing the macro and micro management processes to the user terminal 120, and the user terminal 120 accesses the project message thread interface 710 through the project message thread interface 710, And display the execution result.

사용자 단말(120)은 계층적 프로젝트 관리 장치(110)로부터 수신된 매크로 및 마이크로 관리 데이터를 기초로 프로젝트 메시지 쓰레드 인터페이스(710)에 있는 연관 노트 개수 제공 영역(712)을 통해 연관된 노트 객체(330), 멀티미디어 자료(사진), 첨부파일(파일)의 생성개수에 관한 정보 및 접근 링크를 제공할 수 있다.The user terminal 120 accesses the associated note object 330 through the associated note number providing area 712 in the project message thread interface 710 based on the macro and micro management data received from the hierarchical project management device 110. [ , Multimedia data (pictures), information about the number of generated attachments (files), and an access link.

사용자 단말(120)은 계층적 프로젝트 관리 장치(110)로부터 수신된 노트 객체(330)에 관한 정보를 기초로 해당 노트 객체(330)를 식별번호 714와 같이 노트 메시지로서 시각화시킬 수 있고, 대화 메시지 입력란(716)을 통해 대화 메시지를 입력 받을 수 있으며, 해당 연관된 노트 객체(330), 멀티미디어 자료 및 첨부파일의 신규 생성 등의 사용자 요청을 수신하여 계층적 프로젝트 관리 장치(110)에 전송할 수 있다.The user terminal 120 may visualize the note object 330 as a note message as an identification number 714 based on the information about the note object 330 received from the hierarchical project management apparatus 110, The user can receive a conversation message through the input field 716 and receive a user request such as the related note object 330, a multimedia data and a new creation of an attached file, and transmit the user request to the hierarchical project management apparatus 110.

사용자 단말(120)은 계층적 프로젝트 관리 장치(110)로부터 수신된 해당 연관된 노트 객체(330)에 관한 리스트를 열람할 수 있는 접근 링크를 연관 노트 개수 제공 영역(712)을 통해 시각화할 수 있고, 사용자에 의하여 특정 접근 링크의 접근이 요청되면 계층적 프로젝트 관리 장치(110)와 연동하여 노트 객체 리스트 인터페이스(720)를 통해 연관된 적어도 하나의 노트객체(330)를 시각화시킬 수 있다.The user terminal 120 may visualize through the associated note number providing area 712 an access link for viewing a list of corresponding associated note objects 330 received from the hierarchical project management device 110, When a user requests access to a specific access link, the user can visualize the associated at least one note object 330 through the note object list interface 720 in conjunction with the hierarchical project management device 110.

계층적 프로젝트 관리 장치(110)는 연관 노트 개수 제공 영역(712)에 있는 특정 노트 객체(330)가 선택되면 해당 특정 노트 객체(330)에 관한 상세 정보를 사용자 단말(120)에 제공하여 사용자 단말(120)이 노트 객체 제어 인터페이스(730)를 통해 해당 노트 객체(330)의 노트 내용, 노트 생성자, 노트 작성일, 첨부파일 등을 시각화하도록 할 수 있고, 연관된 업무 메시지 쓰레드(340)의 생성개수 및 업무 객체(350)의 생성개수에 관한 정보와 접근 링크를 제공할 수 있다.The hierarchical project management apparatus 110 provides detailed information about the specific note object 330 to the user terminal 120 when the specific note object 330 in the related note number providing area 712 is selected, Note creator, note creation date, attachments, etc. of the corresponding note object 330 through the note object control interface 730, and the number of generated job message threads 340 Information about the number of generated business objects 350 and an access link.

이에 따라, 사용자 단말(120)은 계층적 프로젝트 관리 장치(110)로부터 수신된 매크로 및 마이크로 관리 데이터를 기초로 생성 대화방 표시 아이콘(731)을 통해 연관된 업무 메시지 쓰레드(340)의 생성개수 표시 및 접근 링크의 제공을 지원하고, 생성 업무 객체 표시 아이콘(732)을 통해 연관된 업무 객체(350)의 생성개수 표시 및 접근 링크의 제공을 지원하며, 즐겨찾기 아이콘(733)을 통해 해당 노트 객체(330)를 주요 노트 객체로 설정하기 위한 사용자 요청을 수신할 수 있고, 신규 대화방 생성 아이콘(734)을 통해 해당 노트 객체(330)와 연관된 새로운 대화방을 생성하기 위한 사용자 요청을 수신할 수 있으며, 신규 업무 객체 생성 아이콘(735)을 통해 해당 노트 객체(330)와 연관된 새로운 업무 객체(350)를 생성하기 위한 사용자 요청을 수신할 수 있다.Accordingly, the user terminal 120 displays the generated number of related task message threads 340 and accesses the generated task message thread 340 through the generated chatting screen display icon 731 based on the macro and micro management data received from the hierarchical project management device 110 And supports the presentation of the generated number of the associated business object 350 and the provision of the access link through the created task object display icon 732 and displays the corresponding notebook object 330 through the favorite icon 733, And may receive a user request to create a new chat room associated with the corresponding note object 330 via the new chat room creation icon 734, Via the create icon 735, a user request to create a new business object 350 associated with the corresponding note object 330. [

도 8은 도 1에 있는 계층적 프로젝트 관리 장치가 업무 메시지 쓰레드를 통해 마이크로 관리 과정을 수행하는 과정의 일 실시예를 나타내는 도면이다.FIG. 8 is a diagram illustrating an exemplary process of the hierarchical project management apparatus of FIG. 1 performing a micro management process through a task message thread.

계층적 프로젝트 관리 장치(110)는 사용자 단말(120)에 해당 사용자가 프로젝트 참여자로서 연관된 업무 메시지 쓰레드(340) 및 업무 객체(350)에 관한 마이크로 관리 데이터를 제공하여 해당 프로젝트 관리 메시징 에이전트에 있는 업무 메시지 쓰레드 인터페이스(800)을 통해 관련 정보를 시각화시킬 수 있고, 업무 메시지 쓰레드 인터페이스(800)을 통해 특정 마이크로 관리 과정과 연관된 사용자 요청을 수신하여 해당 마이크로 관리를 수행할 수 있다.The hierarchical project management apparatus 110 provides the micro management data related to the business message thread 340 and the business object 350 to the user terminal 120 by the user as a project participant, The related information can be visualized through the message thread interface 800 and the user request related to the specific micro management process can be received through the business message thread interface 800 to perform the corresponding micro management.

사용자 단말(120)은 계층적 프로젝트 관리 장치(110)로부터 수신된 마이크로 관리 데이터를 기초로 업무 메시지 쓰레드 인터페이스(800)을 통해 마이크로 관리 수행 결과를 제공할 수 있다. 업무 메시지 쓰레드 인터페이스(800)는 노트 주요정보 표시란(810), 업무객체 진행상태 표시란(820), 메시지 표시란(830), 업무객체 생성 버튼(840), 멀티미디어 업로드 메뉴(850), 파일 업로드 메뉴(860) 및 채팅메시지 입력란(870)을 포함할 수 있다.The user terminal 120 may provide a micro management performance result through the business message thread interface 800 based on the micro management data received from the hierarchical project management device 110. [ The task message thread interface 800 includes a note main information display field 810, a task object progress state display field 820, a message display field 830, a task object creation button 840, a multimedia upload menu 850, An upload menu 860 and a chat message entry field 870.

사용자 단말(120)은 노트 주요정보 표시란(810)을 통해 해당 연관된 노트 객체(330)에 포함된 노트 이름, 노트 내용 및 노트 생성자 중 적어도 하나에 관해 표시할 수 있고, 사용자 입력을 통해(예를 들어, '자세히보기') 해당 노트 객체(330)의 전체 내용에 관해 표시하거나 또는 해당 노트 객체(330)에 접근할 수 있도록 지원할 수 있다.The user terminal 120 may display at least one of the note name, note content and note creator included in the associated note object 330 via the note main information display field 810, For example, 'view details') to display the entire contents of the corresponding note object 330 or to access the corresponding note object 330.

사용자 단말(120)은 업무객체 진행상태 표시란(820)을 통해 해당 업무 메시지 쓰레드(340)를 통해 생성된 업무 객체(350)에 관한 업무진행상태 단위의(새로운, 하는중, 다했음 및 확인 단계 별로) 생성개수를 표시할 수 있고, 사용자 요청에 따라 해당 업무 객체(330)에 접근하도록 지원할 수 있다.The user terminal 120 displays the status of the business progress unit 350 related to the business object 350 generated through the business message thread 340 through the business object progress status display field 820 And can support the access to the corresponding business object 330 according to a user request.

사용자 단말(120)은 메시지 표시란(830)을 통해 업무 메시지로 표현되는 업무 객체(350) 및 대화 메시지로 표현되는 일반적인 채팅 메시지를 제공할 수 있고, 예를 들어, 업무 객체(350)의 경우, 식별번호 832와 같이, 일반적인 채팅 메시지나 멀티미디어 자료외 구분되는 독립적인 업무 메시지로 표현하고 각 업무 객체(350)의 업무 내용, 업무 생성자, 업무 처리자 및 업무진행상태 중 적어도 하나에 관해 표시할 수 있다(도 8에서, 업무진행상태와 관련하여 새로운(●○○○), 하는중(○●○○), 다했음(○○●○) 또는 확인(○○○●)과 같은 현재 처리 단계에 대응되는 심볼을 통해 현재 업무진행상태를 나타낼 수 있음). 또한, 사용자 단말(120)은 메시지 표시란(830)을 통해 리마인드 메시지를 제공할 수도 있고, 예를 들어, 계층적 프로젝트 관리 장치(110)에 의해 리마인드가 필요한 것으로 판단된 특정 업무 객체(350)의 경우, 식별번호 834와 같이, 리마인드 대상에 관한 정보(해당 업무 객체(350)의 할일 처리자, 마감일 및 현재 업무진행상태) 및 해당 업무 객체(330)의 현재 업무진행상태를 다음 단계로 변경할 수 있는 상태 변경 버튼(업무 처리자에 의해 '하는중(doing)' 상태에서 '다했음(done)' 상태로 변경 가능)을 포함하는 리마인드 메시지를 제공할 수 있다.The user terminal 120 may provide a general chat message represented by a business object 350 and a chat message represented by a business message through a message display field 830, And an identification number 832, it is possible to express the message in at least one of the task contents, the task creator, the task processor, and the task progress status of each task object 350 (In FIG. 8, a current processing step such as a new (? OO), a current (? OO), a completed (OO?) Or an OK (OO? May indicate the current progress of the task through the corresponding symbol. The user terminal 120 may also provide a remind message through the message display field 830 and may include a specific business object 350 that is determined to be required to be reminded by the hierarchical project management device 110, (The to-do list of the corresponding task object 350, the due date and the current task progress status) and the current task progress status of the corresponding task object 330 can be changed to the next stage as shown in the identification number 834 A status change button (which can be changed from a 'doing' state to a 'done' state) by a task processor.

사용자 단말(120)은 업무객체 생성 버튼(840)을 통해 해당 업무 메시지 쓰레드(340)와 연관되고 사용자에 의해 지정된 업무 생성자, 업무 처리자, 업무내용 및 업무평점에 관한 업무 정보를 포함하는 업무 객체 생성 요청을 수신하여 계층적 프로젝트 관리 장치(110)에 전송할 수 있고, 이에 따라 계층적 프로젝트 관리 장치(110)는 수신된 업무 객체 생성 요청을 기초로 업무 생성자, 업무 처리자, 업무내용 및 업무평점을 포함하는 업무 객체(350)를 생성하여 해당 업무 메시지 쓰레드(340)에 업무 메시지로서 추가할 수 있으며, 사용자 단말(120)은 식별번호 832와 유사하게, 해당 업무 객체(350)를 업무 메시지로서 대화방 내에 시각화시킬 수 있다.The user terminal 120 is connected to the corresponding task message thread 340 through a task object creation button 840 and generates a task object including task information related to a task creator, The hierarchical project management apparatus 110 may include a task creator, a task processor, task content, and task ratings based on the received task object creation request. The user terminal 120 may add the business object 350 to the corresponding business message thread 340 as a business message and the user terminal 120 may add the business object 350 as a business message Can be visualized.

사용자 단말(120)은 멀티미디어 업로드 메뉴(850) 및 파일 업로드 메뉴(860) 각각을 통해 멀티미디어 및 파일에 관한 업로드 요청을 수신할 수 있고, 해당 수신에 따라 파일을 제공 받아 해당 채팅방과 연관된 메시지 쓰레드에 멀티미디어 자료로서 추가하거나 접근 링크를 제공할 수 있다.The user terminal 120 can receive an upload request for multimedia and files via the multimedia upload menu 850 and the file upload menu 860, and receives a file according to the reception, It can be added as multimedia data or provide access links.

사용자 단말(120)은 채팅메시지 입력란(870)을 통해 사용자로부터 대화를 수신하여 계층적 프로젝트 관리 장치(110)에 전송할 수 있고, 계층적 프로젝트 관리 장치(110)는 전송된 대화를 해당 업무 메시지 쓰레드(340)에 대화 메시지로서 추가하여 해당 채팅방에 참여 중인 사용자들 간에 대화 메시지를 통해 의사소통하도록 지원할 수 있다.The user terminal 120 can receive the dialogue from the user via the chat message input field 870 and transmit the dialogue to the hierarchical project management apparatus 110. The hierarchical project management apparatus 110 transmits the transmitted dialogue to the corresponding task message thread May be added to the chat room 340 as a chat message to support communication among the users participating in the chat chat through the chat message.

도 9는 도 1에 있는 계층적 프로젝트 관리 장치가 사용자 요청에 따른 분석을 수행하는 과정의 일 실시예를 나타내는 도면이다.FIG. 9 is a diagram illustrating an exemplary process of the hierarchical project management apparatus of FIG. 1 performing analysis according to a user request.

계층적 프로젝트 관리 장치(110)는 프로젝트 대화방 제공 영역(620)에 있는 분석 버튼(650)을 통해 해당 사용자와 연관된 모든 노트 객체(330) 및 업무 객체(350)에 관한 분석 요청을 수신할 수 있고, 분석 요청이 수신되면 각 프로젝트(310)에 소속된 노트 객체(330), 해당 노트 객체(330)에 소속된 업무 객체(350)에 관한 분석을 수행할 수 있으며, 프로젝트 별로 분석 결과를 연산하여 사용자 단말(120)에 제공할 수 있다.The hierarchical project management apparatus 110 may receive an analysis request for all the notebook objects 330 and business objects 350 associated with the user via the analysis button 650 in the project chat room provision area 620 The analyzer 310 may analyze the notebook object 330 belonging to each project 310 and the business object 350 belonging to the corresponding notebook object 330. The analysis result may be calculated for each project To the user terminal 120.

도 9a에서, 계층적 프로젝트 관리 장치(110)는 노트 분석을 통해 각 프로젝트(310) 별로 연관된 노트 객체(330)의 개수에 관한 분석을 수행할 수 있고, 해당 분석 결과를 사용자 단말(120)에 제공하여 사용자 단말(120)이 노트수 분석 조회 인터페이스(도 9a)를 통해 각 프로젝트(310) 별 노트 개수를 표시하도록 할 수 있다. 계층적 프로젝트 관리 장치(110)는 각 점수가 선택되면 해당 노트 객체(330)에 관한 리스트를 제공하여 이를 표시하도록 할 수 있다.9A, the hierarchical project management apparatus 110 can analyze the number of the related note objects 330 for each project 310 through a note analysis and transmit the analysis result to the user terminal 120 So that the user terminal 120 can display the number of notes for each project 310 through the note number analysis inquiry interface (FIG. 9A). The hierarchical project management apparatus 110 may provide a list of corresponding note objects 330 and display them when each score is selected.

도 9b에서, 계층적 프로젝트 관리 장치(110)는 업무객체 분석(부탁수 분석)을 통해 각 프로젝트(310) 별로 해당 연관된 업무 객체(350)의 개수에 관한 분석을 수행할 수 있고, 해당 분석 결과를 사용자 단말(120)에 제공하여 사용자 단말(120)이 부탁수 분석 조회 인터페이스(도 9b)를 통해 각 프로젝트(310) 별로 부탁(업무 객체(350))의 생성개수, 예약된 부탁점수(업무 객체(350)의 예약점수)를 시각화하도록 할 수 있다. 여기에서, 확인전 부탁수는 업무처리자에 의해 확인되기 전의 상태에 있는 업무 객체(350)의 개수를 의미한다.In FIG. 9B, the hierarchical project management apparatus 110 can analyze the number of related business objects 350 for each project 310 through a business object analysis (favoritics analysis) To the user terminal 120 so that the user terminal 120 transmits the number of requests (task objects 350) generated for each project 310 (the task object 350) The reservation score of the object 350). Here, the number of requests before confirmation means the number of work objects 350 in a state before being confirmed by the work processor.

도 9c에서, 계층적 프로젝트 관리 장치(110)는 업무평점 분석(부탁점수 분석)을 통해 각 프로젝트(310) 별로 해당 연관된 업무 객체(350)의 업무평점에 관한 분석을 수행할 수 있고, 해당 분석 결과를 사용자 단말(120)에 제공하여 사용자 단말(120)이 부탁점수 분석 조회 인터페이스(도 9c)를 통해 각 프로젝트(310) 별로 평가된 부탁점수(업무 객체(350)의 업무평점)을 시각화하도록 할 수 있다.In FIG. 9C, the hierarchical project management apparatus 110 may perform an analysis of the business ratings of the associated business object 350 for each project 310 through a business grade analysis (favor point analysis) The result is provided to the user terminal 120 so that the user terminal 120 visualizes the favor score (task rating of the task object 350) evaluated for each project 310 through the favor score analysis inquiry interface (FIG. 9C) can do.

도 9d에서, 계층적 프로젝트 관리 장치(110)는 업무반응속도 분석(처리속도 분석)을 통해 각 프로젝트(310) 별로 해당 연관된 업무 객체(350)의 업무반응속도에 관한 분석을 수행할 수 있고, 해당 분석 결과를 사용자 단말(120)에 제공하여 사용자 단말(120)이 처리속도 분석 조회 인터페이스(도 9d)를 통해 각 프로젝트(310) 별로 처리된 업무반응속도를 시각화하도록 할 수 있다.In FIG. 9D, the hierarchical project management apparatus 110 can analyze the task response speed of the associated task object 350 for each project 310 through a task response speed analysis (processing speed analysis) The analysis result may be provided to the user terminal 120 so that the user terminal 120 visualizes the task response speed processed for each project 310 through the processing speed analysis inquiry interface (FIG. 9D).

상기에서는 본 출원의 바람직한 실시예를 참조하여 설명하였지만, 해당 기술 분야의 숙련된 통상의 기술자는 하기의 특허 청구의 범위에 기재된 본 발명의 사상 및 영역으로부터 벗어나지 않는 범위 내에서 본 출원을 다양하게 수정 및 변경시킬 수 있음을 이해할 수 있을 것이다.While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it will be understood by those of ordinary skill in the art that various changes in form and details may be made therein without departing from the spirit and scope of the invention as set forth in the following claims And changes may be made without departing from the spirit and scope of the invention.

100: 계층적 프로젝트 관리 시스템
110: 계층적 프로젝트 관리 장치
120: 사용자 단말
210: 프로세서 220: 메모리
230: 사용자 입출력부 240: 네트워크 입출력부
310: 매크로 관리 과정 수행부 320: 제어부
330: 마이크로 관리 과정 수행부
100: Hierarchical Project Management System
110: hierarchical project management device
120: User terminal
210: processor 220: memory
230: user input / output unit 240: network input / output unit
310: macro management process performing unit 320:
330: micro management process performing unit

Claims (17)

서로 다른 업무평가 접근권을 가지는 매크로 관리 블록 및 마이크로 관리 블록을 저장하는 메모리; 및
상기 매크로 관리 블록 및 상기 마이크로 관리 블록 간의 트리 구조 연관성을 제어하는 프로세서를 포함하고,
상기 프로세서는
상기 매크로 관리 블록에 프로젝트 및 상기 프로젝트와 연관된 프로젝트 메시지 쓰레드를 생성하고 상기 프로젝트 메시지 쓰레드에 상기 프로젝트의 단위 업무로서 업무 객체의 컨테이너를 포함하는 노트 객체를 연관시키는 매크로 관리 과정을 수행하는 단계; 및
상기 마이크로 관리 블록에 상기 노트 객체와 연관된 업무 메시지 쓰레드를 생성하고 상기 업무 메시지 쓰레드에 상기 업무 객체를 연관시키며 상기 업무 객체가 생성될 때마다 상기 마이크로 관리 블록에 상기 업무 객체를 삽입하여 상기 트리 구조를 갱신하는 마이크로 관리 과정을 수행하는 단계를 포함하는 계층적 프로젝트 관리 장치.
A memory for storing a macro management block and a micro management block having different task evaluation accesses; And
And a processor for controlling a tree structure association between the macro management block and the micro management block,
The processor
Generating a project message thread associated with the project and the project in the macro management block and associating the project message thread with a note object including a container of a task object as a unit task of the project; And
A task message thread associated with the note object is created in the micro management block, the task object is associated with the task message thread, the task object is inserted into the micro management block each time the task object is created, And performing a micro management process to update the micro management process.
제1항에 있어서, 상기 매크로 관리 과정을 수행하는 단계는
상기 프로젝트 메시지 쓰레드에 참여되는 적어도 하나의 사용자 각각에게 상기 프로젝트와 연관된 매크로 및 마이크로 관리 블록에 대한 업무수행 접근권을 부여하는 단계를 포함하는 것을 특징으로 하는 계층적 프로젝트 관리 장치.
The method of claim 1, wherein the step of performing the macro management comprises:
And granting at least one user participating in the project message thread access to a macro and a micro management block associated with the project, respectively.
제1항에 있어서, 상기 매크로 관리 과정을 수행하는 단계는
상기 프로젝트 메시지 쓰레드와 연관된 노트 객체의 생성개수를 기초로 상기 프로젝트에 관한 중요성을 결정하고 슈퍼 관리자에게 해당 중요성에 관한 정보를 제공하는 단계를 포함하는 것을 특징으로 하는 계층적 프로젝트 관리 장치.
The method of claim 1, wherein the step of performing the macro management comprises:
Determining the importance of the project based on the number of generated note objects associated with the project message thread and providing information about the importance to the super administrator.
제1항에 있어서, 상기 매크로 관리 과정을 수행하는 단계는
상기 프로젝트 메시지 쓰레드와 연관된 노트 객체의 생성개수 또는 해당 업무 메시지 쓰레드의 갱신빈도가 특정 기준 이하이면 상기 프로젝트 메시지 쓰레드를 통해 해당 연관된 신규 노트 객체의 생성을 권장하는 노트 객체 생성 권장 메시지를 제공하는 단계를 포함하는 것을 특징으로 하는 계층적 프로젝트 관리 장치.
The method of claim 1, wherein the step of performing the macro management comprises:
Providing a note object creation recommendation message for encouraging the generation of the associated new note object through the project message thread if the number of generated note objects associated with the project message thread or the update frequency of the corresponding task message thread is below a certain criterion The hierarchical project management apparatus comprising:
제1항에 있어서, 상기 매크로 관리 과정을 수행하는 단계는
상기 프로젝트 메시지 쓰레드와 연관된 노트 객체, 멀티미디어 자료 및 첨부파일 중 적어도 하나에 관한 등록개수 및 프로젝트 연관성을 분석하여 시계열로 분석된 프로젝트 성과정보를 생성하는 단계를 포함하는 것을 특징으로 하는 계층적 프로젝트 관리 장치.
The method of claim 1, wherein the step of performing the macro management comprises:
And generating project performance information analyzed in time series by analyzing the number of registrations and the project relevance with respect to at least one of a note object, multimedia data, and an attachment file associated with the project message thread. .
제1항에 있어서, 상기 매크로 관리 과정을 수행하는 단계는
슈퍼 관리자의 업무평가 접근권을 통해 상기 프로젝트를 평가하는 단계를 포함하는 것을 특징으로 하는 계층적 프로젝트 관리 장치.
The method of claim 1, wherein the step of performing the macro management comprises:
And evaluating the project through a task manager access right of the super administrator.
제6항에 있어서, 상기 매크로 관리 과정을 수행하는 단계는
상기 슈퍼 관리자와 연관된 사용자 단말로부터 수신된 평가를 기초로 상기 프로젝트의 정성적 프로젝트평점을 부여하는 단계;
상기 프로젝트와 연관된 노트 객체의 생성개수와 해당 노트 객체를 통해 생성된 업무 객체에 관한 생성횟수, 처리횟수 및 처리기간을 기초로 상기 프로젝트의 정량적 프로젝트평점을 산출하는 단계; 및
상기 정성적 프로젝트평점과 정량적 프로젝트평점을 기초로 상기 프로젝트에 관한 종합적인 평가점수를 산출하는 단계를 포함하는 것을 특징으로 하는 계층적 프로젝트 관리 장치.
7. The method of claim 6, wherein the step of performing the macro management comprises:
Granting a qualitative project rating of the project based on an evaluation received from a user terminal associated with the super administrator;
Calculating a quantitative project rating of the project on the basis of the number of generated note objects associated with the project and the number of generated, processed times, and a process period related to the business object generated through the corresponding note object; And
And calculating a comprehensive evaluation score on the project based on the qualitative project rating and the quantitative project rating.
제7항에 있어서, 상기 매크로 관리 과정을 수행하는 단계는
상기 프로젝트가 종료되기 전까지 상기 정량적 프로젝트평점을 특정 주기로 갱신하고, 상기 정량적 프로젝트평점을 향상시키기 위한 특정 프로젝트 활동을 선별하여 상기 프로젝트 메시지 쓰레드를 통해 추천하는 단계를 포함하는 것을 특징으로 하는 계층적 프로젝트 관리 장치.
8. The method of claim 7, wherein the step of performing the macro management comprises:
And updating the quantitative project rating to a specific period until the project is terminated and selecting a specific project activity for improving the quantitative project rating and recommending the selected project activity through the project message thread Device.
제8항에 있어서, 상기 매크로 관리 과정을 수행하는 단계는
상기 정량적 프로젝트평점의 산출 기준을 분석하여 노트 객체의 신규 생성, 기 생성된 노트 객체와 연관된 업무 객체의 신규 생성, 기 생성된 업무 객체의 빠른 처리 및 해당 프로젝트 메시지 쓰레드에 처리된 메시지 처리량의 향상 중 하나를 상기 특정 프로젝트 활동으로 결정하는 단계를 포함하는 것을 특징으로 하는 계층적 프로젝트 관리 장치.
The method of claim 8, wherein the step of performing the macro management comprises:
By analyzing the calculation standard of the quantitative project rating, it is possible to newly create a note object, to newly create a business object associated with the created note object, to quickly process the created business object, and to improve the throughput of the message processed in the corresponding project message thread Determining one project activity as the specific project activity.
제1항에 있어서, 상기 매크로 관리 과정을 수행하는 단계는
상기 노트 객체를 상기 프로젝트 메시지 쓰레드에서 직접적으로 접근될 수 있고 텍스트 메시지 또는 미디어 메시지와 구별되는 독립적인 노트 메시지로서 상기 프로젝트 메시지 쓰레드에 추가하여 상기 노트 객체를 생성하는 단계를 포함하는 것을 특징으로 하는 계층적 프로젝트 관리 장치.
The method of claim 1, wherein the step of performing the macro management comprises:
And creating the note object by adding the note object to the project message thread as an independent note message that is directly accessible in the project message thread and distinguishable from a text message or a media message. Ever project management device.
제1항에 있어서, 상기 매크로 관리 과정을 수행하는 단계는
특정 시간 구간 동안 해당 노트 객체를 통해 생성된 업무 객체 생성횟수 및 해당 업무 메시지 쓰레드에 처리된 메시지 처리량을 기초로 각 노트 객체의 활동성을 산출하고, 가장 높은 활동성을 가지는 노트 객체를 상기 프로젝트의 주요 노트 객체로 결정하는 단계를 포함하는 것을 특징으로 하는 계층적 프로젝트 관리 장치.
The method of claim 1, wherein the step of performing the macro management comprises:
The activity of each note object is calculated based on the number of times of generating the task object generated through the corresponding note object and the throughput of the message processed by the corresponding task message thread during a specific time period, And determining the object as an object.
제1항에 있어서, 상기 마이크로 관리 과정을 수행하는 단계는
상기 노트 객체와 연관되고 업무생성자, 업무처리자 및 업무평점을 포함하는 상기 업무 객체가 생성되면 해당 노트 객체와 연관되며 상기 업무생성자와 업무처리자 간의 업무 메시지 쓰레드를 생성하여 해당 업무 메시지 쓰레드에 상기 업무객체를 메시지 객체로서 연관시키는 단계를 포함하는 것을 특징으로 하는 계층적 프로젝트 관리 장치.
The method of claim 1, wherein the performing the micro management process comprises:
When the business object associated with the note object and including the business creator, the business processor, and the business ratings is generated, a business message thread between the business creator and the business processor is associated with the corresponding notebook object, As a message object. ≪ Desc / Clms Page number 21 >
제12항에 있어서, 상기 마이크로 관리 과정을 수행하는 단계는
처리 단계별 진행상태를 나타내는 업무진행상태를 포함하는 상기 업무 객체의 진행을 수행하고, 최종적으로 상기 업무생성자의 업무평가 접근권을 통해 상기 업무 객체를 평가하는 단계를 포함하는 것을 특징으로 하는 계층적 프로젝트 관리 장치.
13. The method of claim 12, wherein performing the micro management procedure comprises:
Performing progress of the business object including a business progress status indicating a progress status by a process step and finally evaluating the business object through a business evaluation access right of the business creator, Device.
제13항에 있어서, 상기 마이크로 관리 과정을 수행하는 단계는
상기 업무생성자와 업무처리자 간의 응답 관계로 구현되는 업무 객체 관련 응답을 통해 상기 업무 객체의 업무진행상태를 갱신하는 단계를 포함하는 것을 특징으로 하는 계층적 프로젝트 관리 장치.
14. The method of claim 13, wherein performing the micro management process comprises:
And updating the business progress status of the business object through a response related to the business object implemented as a response relation between the business creator and the business processor.
제1항에 있어서, 상기 마이크로 관리 과정을 수행하는 단계는
상기 노트 객체와 연관된 업무 메시지 쓰레드를 통해 상기 업무 객체와 연관되고 해당 업무진행상태가 완료될 때까지 특정 반복 기준에 따라 상기 해당 업무진행상태의 완료를 요청하는 리마인드 메시지를 제공하는 단계를 포함하는 것을 특징으로 하는 계층적 프로젝트 관리 장치.
The method of claim 1, wherein the performing the micro management process comprises:
Providing a remind message associated with the business object through a business message thread associated with the note object and requesting completion of the business progress according to a specific iteration criterion until the business progress is completed A hierarchical project management device characterized by.
제15항에 있어서, 상기 마이크로 관리 과정을 수행하는 단계는
상기 제공된 리마인드 메시지의 제공횟수를 기초로 업무반응속도를 산출하여 상기 업무 객체의 업무평점에 포함시키는 단계를 포함하는 것을 특징으로 하는 계층적 프로젝트 관리 장치.
16. The method of claim 15, wherein the performing the micro management process comprises:
And calculating the response speed based on the provided number of times of the provided remind message and including the response speed in the task rating of the task object.
매크로 관리 블록에 프로젝트 및 상기 프로젝트와 연관된 프로젝트 메시지 쓰레드를 생성하고 상기 프로젝트 메시지 쓰레드에 상기 프로젝트의 단위 업무로서 업무 객체의 컨테이너를 포함하는 노트 객체를 연관시키는 매크로 관리 과정을 수행하는 기능; 및
마이크로 관리 블록에 상기 노트 객체와 연관된 업무 메시지 쓰레드를 생성하고 상기 업무 메시지 쓰레드에 상기 업무 객체를 연관시키며 상기 업무 객체가 생성될 때마다 상기 마이크로 관리 블록에 상기 업무 객체를 삽입하여 상기 트리 구조를 갱신하는 마이크로 관리 과정을 수행하는 기능을 포함하는 계층적 프로젝트 관리 방법에 관한 컴퓨터 프로그램을 기록한 컴퓨터에 의해 실행될 수 있고 컴퓨터 판독 가능한 기록매체.
Performing a macro management process of creating a project and a project message thread associated with the project in a macro management block and associating the project message thread with a note object including a container of a task object as a unit task of the project; And
A task message thread associated with the note object is created in the micro management block, the task object is associated with the task message thread, the task object is inserted into the micro management block each time the task object is created, and the tree structure is updated And a microcontroller for performing a microcontrolling process to perform the microcontroller process. The computer-readable recording medium according to claim 1,
KR1020170086249A 2016-07-29 2017-07-07 Hierarchical project management apparatus KR102151546B1 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
KR1020170086249A KR102151546B1 (en) 2017-07-07 2017-07-07 Hierarchical project management apparatus
JP2017145947A JP6576981B2 (en) 2016-07-29 2017-07-27 Hierarchical project management device
US15/664,412 US20180032956A1 (en) 2016-07-29 2017-07-31 Hierarchical project management apparatus
US18/226,586 US20230376906A1 (en) 2016-07-29 2023-07-26 Hierarchical project management apparatus
US18/226,558 US20240005281A1 (en) 2016-07-29 2023-07-26 Hierarchical project management apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020170086249A KR102151546B1 (en) 2017-07-07 2017-07-07 Hierarchical project management apparatus

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR1020180113713A Division KR20190005808A (en) 2018-09-21 2018-09-21 Hierarchical project management apparatus

Publications (2)

Publication Number Publication Date
KR20190005504A true KR20190005504A (en) 2019-01-16
KR102151546B1 KR102151546B1 (en) 2020-09-03

Family

ID=65280965

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020170086249A KR102151546B1 (en) 2016-07-29 2017-07-07 Hierarchical project management apparatus

Country Status (1)

Country Link
KR (1) KR102151546B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20210046344A (en) * 2019-10-18 2021-04-28 최재호 File system providing apparatus and the method thereof
KR20220116948A (en) * 2021-02-16 2022-08-23 최재호 Kanban-based work processing device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050092173A (en) 2004-03-15 2005-09-21 한국과학기술원 Method for inputting and displaying data of to-do list management by mobile apparatus
KR100663494B1 (en) 2005-02-21 2007-01-02 삼성전자주식회사 Method for managing to-do in a wireless mobile
KR20100063289A (en) * 2008-12-03 2010-06-11 에스케이 텔레콤주식회사 System and method for managing work for integrating
KR20150116275A (en) * 2014-04-07 2015-10-15 엑스퍼타임 주식회사 Method and apparatus for managing communication by project
KR20160038672A (en) * 2014-09-29 2016-04-07 주식회사 사이버다임 System for managing and automatically controlling work and method thereof in atypical work

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050092173A (en) 2004-03-15 2005-09-21 한국과학기술원 Method for inputting and displaying data of to-do list management by mobile apparatus
KR100663494B1 (en) 2005-02-21 2007-01-02 삼성전자주식회사 Method for managing to-do in a wireless mobile
KR20100063289A (en) * 2008-12-03 2010-06-11 에스케이 텔레콤주식회사 System and method for managing work for integrating
KR20150116275A (en) * 2014-04-07 2015-10-15 엑스퍼타임 주식회사 Method and apparatus for managing communication by project
KR20160038672A (en) * 2014-09-29 2016-04-07 주식회사 사이버다임 System for managing and automatically controlling work and method thereof in atypical work

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20210046344A (en) * 2019-10-18 2021-04-28 최재호 File system providing apparatus and the method thereof
KR20220116948A (en) * 2021-02-16 2022-08-23 최재호 Kanban-based work processing device

Also Published As

Publication number Publication date
KR102151546B1 (en) 2020-09-03

Similar Documents

Publication Publication Date Title
US20200380449A1 (en) Task map providing apparatus and method thereof
US20230376906A1 (en) Hierarchical project management apparatus
US20240104504A1 (en) Apparatus and method for processing work activity based on work object
US11616829B2 (en) Apparatus for providing folder chat room and apparatus for receiving the same
KR102076162B1 (en) Apparatus for processing work object and method performing the same
JP6655134B2 (en) Apparatus and method for processing message repository that can be implemented online
KR102200112B1 (en) Hierarchical project management apparatus
JPWO2014061229A1 (en) Information system construction support apparatus, information system construction support method, and information system construction support program
KR102151546B1 (en) Hierarchical project management apparatus
JP7149546B2 (en) Business chat room processing device and business chat room processing method
KR102394101B1 (en) Apparatus of inquiry into work evaluation based on work object and method of the same
KR101884217B1 (en) Method of managing work evaluation, apparatus performing the same, storage media storing the same and program performing the same
KR101987044B1 (en) File sharing apparatus based on message and method thereof
KR20190005808A (en) Hierarchical project management apparatus
KR20220108754A (en) Apparatus for managing conference records object and method performing the same
KR102054724B1 (en) Apparatus for managing evaluation of folder linkage type work object, method by the same and storage media storing the same
JP2007072765A (en) Information browsing support program, method, and device
KR20180138560A (en) Hierarchical project management apparatus
KR20180113480A (en) Apparatus for processing work object and method performing the same
JP6728426B1 (en) Folder chat room providing device
US20230208662A1 (en) Apparatus for providing folder chat room and apparatus for receiving the same
JP2019159859A (en) Information processing apparatus, program, and information processing method
KR102521302B1 (en) Computer-executable to-do management method, to-do management apparatus performing the same and storage medium storing the same
KR20180119144A (en) Apparatus of inquiry into work evaluation based on work object and method of the same
KR20210131960A (en) Work managing apparatus and the method thereof

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
AMND Amendment
E601 Decision to refuse application
X091 Application refused [patent]
A107 Divisional application of patent
J201 Request for trial against refusal decision
J301 Trial decision

Free format text: TRIAL NUMBER: 2018101003956; TRIAL DECISION FOR APPEAL AGAINST DECISION TO DECLINE REFUSAL REQUESTED 20180921

Effective date: 20191220

S901 Examination by remand of revocation
E902 Notification of reason for refusal
AMND Amendment
S601 Decision to reject again after remand of revocation
X091 Application refused [patent]
AMND Amendment
GRNO Decision to grant (after opposition)
X701 Decision to grant (after re-examination)