KR20180117877A - Method of manufacturing prestressed composite girder, method thereof and of constructing continuous birdge upper structure of using same - Google Patents

Method of manufacturing prestressed composite girder, method thereof and of constructing continuous birdge upper structure of using same Download PDF

Info

Publication number
KR20180117877A
KR20180117877A KR1020170050970A KR20170050970A KR20180117877A KR 20180117877 A KR20180117877 A KR 20180117877A KR 1020170050970 A KR1020170050970 A KR 1020170050970A KR 20170050970 A KR20170050970 A KR 20170050970A KR 20180117877 A KR20180117877 A KR 20180117877A
Authority
KR
South Korea
Prior art keywords
girder
steel
concrete
casing concrete
coating
Prior art date
Application number
KR1020170050970A
Other languages
Korean (ko)
Other versions
KR101932440B1 (en
Inventor
김충언
양인욱
하태열
Original Assignee
(주)삼현피에프
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)삼현피에프 filed Critical (주)삼현피에프
Priority to KR1020170050970A priority Critical patent/KR101932440B1/en
Publication of KR20180117877A publication Critical patent/KR20180117877A/en
Application granted granted Critical
Publication of KR101932440B1 publication Critical patent/KR101932440B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/02Bridges characterised by the cross-section of their bearing spanning structure of the I-girder type
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/268Composite concrete-metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to a method to manufacture a prestressed steel composite girder, to fundamentally prevent a crack at an end part of casing concrete, and a continuous bridge construction method using the same. According to the present invention, the method to manufacture a prestressed steel composite girder comprises: a girder preparation step; a girder coating step; a steel girder supporting step; a rebar arrangement step of arranging a rebar in a first area of a steel girder to compose casing concrete thereto; a mold installation step of installing a mold for composing the casing concrete in the first area; a coating protection material installation step of installing a coating protection material for blocking a gap between the mold and an abutment of the steel girder, and between the mold and a vertical reinforcement member; a concrete composing step of composing the concrete casing to the steel girder; and a removal step of removing the mold and the coating protection material from the steel girder.

Description

프리스트레스트 강합성 거더의 제작 방법 및 이에 의해 제작된 강합성 거더를 이용한 연속 교량의 시공 방법 {METHOD OF MANUFACTURING PRESTRESSED COMPOSITE GIRDER, METHOD THEREOF AND OF CONSTRUCTING CONTINUOUS BIRDGE UPPER STRUCTURE OF USING SAME}BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of manufacturing a prestressed steel composite girder and a method of constructing a continuous bridge using the steel composite girder manufactured by the method. ≪ Desc / Clms Page number 1 >

본 발명은 프리스트레스트 강합성 거더의 제작 방법 및 이를 이용한 연속 교량의 시공 방법에 관한 것으로, 보다 구체적으로는, 강합성 거더의 도장면의 손상없이 짧은 시간 내에 도장면을 형성할 수 있으며, 포스트텐션 방식으로 케이싱 콘크리트에 압축 프리스트레스를 도입하는 과정에서 케이싱 콘크리트의 단부에 발생되는 균열을 억제하는 프리스트레스트 강합성 거더의 제작 방법 및 이를 이용한 연속 교량의 시공 방법에 관한 것이다.The present invention relates to a method of manufacturing a prestressed steel composite girder and a method of constructing a continuous bridge using the same. More specifically, it is possible to form a coated surface in a short time without damaging the painted surface of the composite girder, The present invention relates to a method of manufacturing a prestressed steel composite girder and a method of constructing a continuous bridge using the same, and more particularly, to a method of manufacturing a prestressed steel composite girder which suppresses cracks generated at the ends of casing concrete during the introduction of compressive prestress into casing concrete.

일반적으로 강재는 인장력에 대해서는 효과적으로 저항할 수 있지만, 압축력에 대해서는 좌굴이 발생되어 갑작스런 붕괴를 유발하는 문제가 있고, 콘크리트는 압축력에 대해서는 효과적으로 저항할 수 있지만 인장력에 취약하여 인장력이 작용하면 균열이 쉽게 발생되어 구조물의 내하력이 급격히 감소하는 문제가 있다. Generally, steel can resist effectively tensile force, but there is a problem that buckling occurs in compressive force, causing sudden collapse. Concrete can resist effectively compressive force, but is vulnerable to tensile force. There is a problem that the load-bearing capacity of the structure is rapidly reduced.

이에 따라, 교량을 시공함에 있어서 보행자나 차량이 통행하는 상판을 지지하는 거더는 강재와 콘크리트가 합성된 강합성 거더가 널리 사용되고 있다. 일반적으로, 강합성 거더는 미리 제작된 강재 거더에 거푸집이 일부 이상을 감싸는 형태로 설치되고, 거푸집에 굳지않은 콘크리트를 타설 양생하여, 케이싱 콘크리트를 강재 거더에 합성하여 제작된다. Accordingly, in the construction of a bridge, a girder that supports a pedestrian or an upper plate to which a vehicle passes is widely used as a composite girder made of a composite of steel and concrete. Generally, a steel composite girder is formed by pre-fabricating a steel girder to cover at least a part of the formwork, casting the unhardened concrete in the form, cementing the casing concrete to the steel girder.

강합성 거더의 제작 과정은 교량에 시공된 상태에서 외부에 드러난 강재에 대하여 부식 방지를 위하여 도색 등 도장면을 형성하는 도장 공정이 수반된다. The manufacturing process of steel composite girder is accompanied by a painting process which forms painted surface such as painting in order to prevent corrosion to steel which is exposed to the outside in the state of being installed in the bridge.

그런데, 케이싱 콘크리트의 합성 이후에 도장 공정이 행해지는 경우에는, 도장 공정 중에 도장 액적이 주변으로 퍼지는 것을 억제하기 위하여 현장에 밀폐 공간을 시공해야 하므로, 현장에서 밀폐 공간을 시공하는 데 소요되는 비용과 시간의 소모가 매우 커지는 문제가 야기된다. 이와 반대로, 공장에서 미리 강재 거더의 표면에 도장하는 경우에는, 도장된 강재 거더를 현장으로 운반하여 케이싱 콘크리트를 합성하는 강합성 거더 제작시 케이싱 콘크리트 거푸집에 콘크리트를 타설하는 공정 중에 굳지 않은 콘크리트가 도장면에 튀면서 도장면을 오염시키는 문제가 야기되어, 재도장할 가능성이 매우 높아지는 문제가 있다. However, when the coating process is carried out after the synthesis of the casing concrete, it is necessary to construct a closed space in the field in order to suppress the spread of the coating liquid around the coating process during the coating process. Which leads to a problem that the consumption of the time becomes very large. On the other hand, when painting on the surface of a steel girder in advance at the factory, it is necessary to coat the concrete with a hardened concrete during the process of casting the concrete into the casing concrete form when manufacturing a steel composite girder for conveying the coated steel girder to the site, There arises a problem of contaminating the coated surface while bouncing on the surface, and there is a problem that the possibility of re-coating becomes very high.

따라서, 교량 시공 이후에 외부에 드러나는 강재의 표면에 도장면을 형성하는 효율적인 방안의 필요성이 절실히 요구되고 있다.Therefore, there is a great demand for an efficient method of forming a coating surface on the surface of a steel material exposed to the outside after the bridge construction.

한편, 강재 거더와 케이싱 콘크리트가 합성되는 강합성 거더는 보다 높은 내하 능력을 얻기 위하여, 대한민국 등록특허공보 제10-1064731호에 개시된 바와 같이, 케이싱 콘크리트의 내부에 긴장재를 내설하고 긴장재를 긴장 정착하는 것에 의하여 케이싱 콘크리트에 압축 프리스트레스를 도입하여 제작되기도 한다. On the other hand, a steel composite girder in which a steel girder and a casing concrete are combined has a structure in which a tension member is installed inside a casing concrete and a tension member is tensioned and fixed as described in Korean Patent Registration No. 10-1064731 It is also made by introducing compression prestress into casing concrete.

케이싱 콘크리트에 압축 프리스트레스를 도입하는 방법은 포스트텐션방식과 프리텐션 방식 중 어느 하나 이상을 선택하여 이루어질 수 있는데, 거더의 길이가 충분히 길고 큰 압축 프리스트레스를 도입하는 경우에는 케이싱 콘크리트에 쉬스관을 내설하고 강선 다발 형태의 긴장재를 내설하여, 긴장재를 긴장 정착하는 방식으로 행해진다. The method of introducing compressive prestress into the casing concrete can be selected by selecting at least one of the post tension method and the pre-tension method. If a length of the girder is sufficiently long and a large compression prestress is introduced, a sheath tube is installed in the casing concrete And a tension member in the form of a steel wire bundle is put in place to tension and fix the tension member.

그런데, 강합성 거더에는 수직력 및 전단력을 지지하기 위한 수직 보강재가 단부 지점부를 포함하여 복부에 다수 이격 배치되고, 케이싱 콘크리트가 충분히 양생된 이후에 압축 프리스트레스의 도입을 위하여 쉬스관 내의 긴장재를 긴장력을 도입하는 과정에서 케이싱 콘크리트가 압축 변형이 생기는데, 케이싱 콘크리트의 압축 변형이 발생되면서 단부 지점부의 수직 보강재에 간섭되면서 콘크리트의 균열이 발생되는 것이 새롭게 발견되었다.However, in the steel composite girder, a plurality of vertical stiffeners for supporting the vertical force and shearing force are disposed on the abdomen portion including the end flank portions. After the casing concrete is sufficiently cured, the tension members in the sheath pipe are introduced The cracks of the concrete were found to occur due to the compressive deformation of the casing concrete and the interference with the vertical stiffener at the end portion of the casing.

따라서, 강합성 거더의 하연에 합성된 케이싱 콘크리트에 내설된 긴장재에 긴장력을 도입하는 과정에서, 케이싱 콘크리트의 단부에서의 균열 발생을 억제할 필요성도 크게 대두되었다.Therefore, it is necessary to suppress the occurrence of cracks at the ends of the casing concrete in the process of introducing the tensile force into the tensile material embedded in the casing concrete synthesized at the lower edge of the steel composite girder.

전술한 배경 기술은 본 출원일 이전에 이미 공지된 구성 및 사실을 자인하여 기재한 것이 아니며, 본 발명이 해결하고자 하는 과제를 명확히 하기 위하여 기재한 것이다.The background art described above is not described in the prior art on the date of filing of the present application, but is described in order to clarify the problem to be solved by the present invention.

본 발명은 상기와 같은 종래의 문제점을 해결하기 위하여, 교량 시공된 상태에서 외부로 드러난 강합성 거더의 강재 표면의 도장 공정을 보다 저렴하면서도 간단한 공정에 의해 행하는 것을 목적으로 한다.SUMMARY OF THE INVENTION It is an object of the present invention to provide a method of coating a surface of a steel material of a steel composite girder exposed to the outside under a bridge construction by a simple and inexpensive process.

그리고, 본 발명은, 강합성 거더의 케이싱 콘크리트에 내설된 긴장재를 긴장 정착하는 과정에서, 케이싱 콘크리트의 단부에서 균열이 발생되는 것을 억제하는 것을 목적으로 한다.It is another object of the present invention to suppress the generation of cracks at the ends of casing concrete in the process of tension-fixing the tensile material embedded in the casing concrete of the steel composite girder.

본 발명은 상기와 같은 과제를 달성하기 위하여 도출된 것으로서, 상부 플랜지와, 하부 플랜지와, 상기 상부 플랜지와 상기 하부 플랜지를 연결하는 복부를 포함하는 단면으로 연장 형성된 강재 거더를 준비하되, 상기 강재 거더에는 단부 지점부를 포함하여 길이 방향에 대하여 간격을 두고 다수의 수직 보강재들이 배치된 상기 강재 거더를 준비하는 거더 준비 단계와; 상기 강재 거더에 케이싱 콘크리트가 합성되는 상기 강재 거더의 제1영역 이외의 표면의 일부 이상을 포함하는 상기 강재 거더의 표면에 공장에서 도장을 행하는 거더 도장 단계와; 상기 강재 거더를 지지대에 매달아 지지하되, 상기 지지대와 상기 강재 거더를 연결하는 턴버클이 상기 수직 보강재의 일부 이상과 연결되어 상기 강재 거더를 상기 지지대에 매달아 지지하는 강재 거더 지지단계와; 상기 케이싱 콘크리트가 합성되는 상기 강재 거더의 제1영역에 철근을 배근하는 철근 배근 단계와; 상기 제1영역에 상기 케이싱 콘크리트를 합성하기 위한 거푸집을 설치하는 거푸집 설치단계와; 상기 강재 거더의 복부 및 상기 수직 보강재와 상기 거푸집의 사이를 차단하는 도장손상 방지재를 설치하는 방지재 설치단계와; 상기 거푸집에 굳지않은 콘크리트를 타설하고 양생하여, 상기 강재 거더에 상기 케이싱 콘크리트를 합성하는 콘크리트 합성단계와; 상기 거푸집과 상기 도장손상 방지재를 상기 강재 거더로부터 제거하는 제거단계를; 포함하여 구성된 것을 특징으로 하는 강합성 거더의 제작 방법을 제공한다.SUMMARY OF THE INVENTION The present invention has been made in order to solve the above problems, and it is an object of the present invention to provide a steel girder extending from a section including an upper flange, a lower flange, and a lower portion connecting the upper flange and the lower flange, A girder preparing step of preparing the steel girder including a plurality of vertical stiffeners spaced apart with respect to the longitudinal direction including the end flank; A girder coating step of coating a surface of the steel girder including a part of the surface of the steel material girder other than the first area of the steel material girder in which the casing concrete is synthesized, A steel girder supporting step for supporting the steel girder by supporting the steel girder to a support base, a turnbuckle for connecting the support bracket to the steel girder is connected to at least a part of the vertical reinforcing member to support the steel girder to the support base; A reinforcement step of placing reinforcing bars in a first region of the steel girder where the casing concrete is synthesized; A mold setting step of installing a mold for synthesizing the casing concrete in the first area; A step of installing a coating damage preventing material for blocking the abdomen of the steel girder and the vertical reinforcement and the formwork; A concrete synthesis step of pouring and curing unhardened concrete in the mold to synthesize the casing concrete on the steel girder; A removing step of removing the mold and the painting damage preventing material from the steel girder; The present invention also provides a method of manufacturing a composite steel girder.

여기서, 상기 도장손상 방지재는 상기 강재 거더의 상부 플랜지에 거치된 수평재와 상기 복부를 연결하는 형태로 설치되어, 상기 복부를 감싸는 단면을 형성할 수 있다. In this case, the coating damage preventing member may be formed to connect the horizontal member fixed to the upper flange of the steel girder and the abdomen to form a cross-section enclosing the abdomen.

예를 들어, 상기 도장손상 방지재는 비닐, 합성수지재, 천 등의 얇은 재질로 형성될 수 있다.For example, the coating damage prevention material may be formed of a thin material such as vinyl, synthetic resin, or cloth.

그리고, 상기 도장손상 방지재는 탈부착이 가능한 재질로 상기 강재 거더의 복부 도장면에 직접 부착 설치될 수 있다.The painting damage prevention material may be detachably attached and directly attached to the abrasive coating surface of the steel girder.

또한, 상기 강재 거더 지지단계는, 상기 강합성 거더는 교각과 거더의 교축방향에 대하여 직교(直橋)가 아닌 사교(斜橋)에 설치되고, 상기 지지대와 상기 턴버클로 연결되는 상기 수직 보강재가 상기 강합성 거더의 사교와 같은 각도로 설치될 경우, 상기 수직 보강재에 수평 방향으로 절곡지게 연결된 임시 지지판을 더 포함하여, 상기 임시 지지판이 상기 턴버클과 연결될 수 있다.In addition, in the step of supporting the steel girder, the steel composite girder is installed at a diagonal bridge not orthogonal to the direction of intersection of the pier and the girder, and the vertical reinforcement connected to the support and the turnbuckle And a temporary support plate connected to the vertical stiffener so as to be bent in a horizontal direction when installed at the same angle as the sifting of the steel composite girder, wherein the temporary support plate is connected to the turnbuckle.

한편, 상기 거더 지지단계는, 상기 강재 거더의 길이(L)의 1/5~1/3배만큼 양단부로부터 이격된 지점의 상기 수직 보강재에 상기 턴버클이 연결되어 상기 강합성 거더를 내민보 형태로 지지하고, 내민보 형태로 상기 강재 거더가 거치된 상태로 상기 콘크리트 합성단계가 행해질 수 있다.Meanwhile, in the girder supporting step, the turnbuckle is connected to the vertical stiffener at a point spaced from both ends by 1/5 to 1/3 of the length L of the steel girder, And the concrete synthesis step can be performed in a state in which the steel girder is mounted in the form of a mining bolt.

상기 강재 거더 지지단계에서, 상기 지지대와 연결되는 상기 수직 보강재에는 상기 턴버클과 연결을 위한 연결공이 형성되어지며, 상기 강합성 거더는 2개 이상이 교량 바닥판을 지지하도록 시공되고, 상기 강합성 거더 와 횡방향으로 인접한 거더와 가로보 연결시 상기 강재 거더 지지단계시 상기 수직 보강재에 형성된 연결공을 상기 가로보를 연결하기 위한 체결 홀로 활용할 수도 있다.In the step of supporting the steel girder, the vertical stiffener connected to the support is formed with a connection hole for connection with the turnbuckle, and the steel composite girder is constructed so as to support at least two bridge decks, And a connecting hole formed in the vertical stiffener at the time of supporting the steel girder when the girder is connected to the girder adjacent to the transverse direction, may be used as a fastening hole for connecting the crossbar.

상기 거더 도장 단계는, 상기 제1영역의 경계로부터 상방으로 50mm 이하만큼 이격된 영역까지 상기 강재 거더의 복부에 도장하여 도장면을 형성하고, 상기 콘크리트 합성단계 이후에, 상기 도장면과 상기 케이싱 콘크리트 사이의 사잇 영역에 추가 도장을 실시하는 추가도장단계를; 더 포함하여 구성될 수 있다.The girder coating step may be performed by coating the abdomen of the steel girder up to an area spaced by 50 mm or less upward from the boundary of the first area to form a coated surface and after the concrete forming step, An additional coating step of applying an additional coating to the sidewall between the first and second substrates; And the like.

무엇보다도, 본 발명은, 상기 케이싱 콘크리트의 내부에는 쉬스관이 설치되고; 상기 쉬스관 내에 강선 다발이 긴장재로 내설되어, 상기 긴장재를 긴장 정착하는 것에 의하여 상기 케이싱 콘크리트에 압축 프리스트레스를 도입하는 압축프리스트레스 도입단계를; 더 포함하고, 상기 수직 보강재 중 단부 지점부에 설치되는 제1수직 보강재는 하단이 상기 케이싱 콘크리트의 상면까지만 연장될 수 있다.Above all, according to the present invention, a sheath pipe is installed inside the casing concrete; A compression prestress introduction step of introducing a compression prestress into the casing concrete by tensioning and fixing the prestressing material with the steel wire bundle being embedded in the prestressing material in the sheath tube; The first vertical stiffener disposed at the end portion of the vertical stiffener may have a lower end extending only to the upper surface of the casing concrete.

특히, 상기 제1수직 보강재의 하단에는 수평판이 형성되고, 상기 수평판에는 1개 이상의 관통공이 형성되며; 상기 콘크리트 합성단계는 상기 케이싱 콘크리트가 상기 관통공을 채워 넘치지 않은 높이로 타설되게 하여, 긴장재에 긴장력이 도입되는 때에 케이싱 콘크리트의 균열을 확실하게 억제할 수 있다.In particular, a horizontal plate is formed at the lower end of the first vertical stiffener, and at least one through hole is formed in the horizontal plate; In the concrete synthesis step, the casing concrete is poured at a height that does not overflow the through-hole, so that cracking of the casing concrete can be reliably suppressed when a tensile force is introduced into the tensile material.

더욱이, 상기 수평판의 둘레의 일부 이상에는 탄성재가 부착 형성되어, 상기 탄성재의 탄성 변형에 의하여 케이싱 콘크리트의 압축 변형량을 일부 수용할 수 있게 구성될 수 있다.Further, an elastic material may be adhered to at least a part of the periphery of the horizontal plate so that the elastic deformation of the elastic material can partially accommodate the compression deformation amount of the casing concrete.

한편, 본 발명은, 상부 플랜지와, 하부 플랜지와, 상기 상부 플랜지와 상기 하부 플랜지를 연결하는 복부를 포함하는 단면으로 연장 형성되고, 상기 상부 플랜지로부터 상기 복부를 따라 하방 연장된 수직 보강재들이 종방향을 따라 이격 배치된 강재 거더와; 상기 강재 거더의 하부 플랜지를 감싸는 단면으로 합성된 케이싱 콘크리트와; 상기 케이싱 콘크리트를 관통하는 쉬스관에 내설되어 인장력이 도입된 상태로 정착된 강선 다발로 형성된 긴장재를; 포함하고, 상기 수직 보강재들 중에 단부 지점부에 설치되는 제1수직보강재는 하단이 상기 케이싱 콘크리트의 상면까지만 연장된 것을 특징으로 하는 강합성 거더를 제공한다.According to another aspect of the present invention, there is provided a vertical stiffener comprising: an upper flange; a lower flange; and a vertical stiffener extending from the upper flange downwardly along the stomach, the vertical stiffeners extending in a section including an abdomen connecting the upper flange and the lower flange, A steel girder spaced apart from the steel girder; A casing concrete synthesized in a cross section enclosing a lower flange of the steel girder; A tensile member formed of a steel wire bundle embedded in a sheath pipe passing through the casing concrete and fixed in a state in which a tensile force is introduced; And a first vertical stiffener disposed at an end portion of the vertical stiffeners has a lower end extending only to an upper surface of the casing concrete.

여기서, 상기 제1수직 보강재의 하단에는 수평판이 형성되고, 상기 수평판에는 1개 이상의 관통공이 형성되며; 상기 케이싱 콘크리트는 상기 수평판의 상면보다 낮은 높이로 상기 강재 거더에 합성될 수 있다.Here, a horizontal plate is formed at a lower end of the first vertical stiffener, and at least one through hole is formed in the horizontal plate; The casing concrete can be combined with the steel girder at a lower height than the upper surface of the horizontal plate.

그리고, 상기 수평판의 둘레의 일부 이상에는 탄성재가 부착 형성될 수 있다. An elastic material may be adhered to at least a part of the periphery of the horizontal plate.

본 명세서 및 특허청구범위에 기재된 '종방향', '교축 방향' 및 이와 유사한 용어는 거더의 길이 방향을 지칭하는 것으로 정의하며, 본 명세서 및 특허청구범위에 기재된 '횡방향', '교축직각방향' 및 이와 유사한 용어는 거더의 종방향에 수직한 수평 방향을 지칭하는 것으로 정의한다.The terms' longitudinal direction, 'diagonal direction' and similar terms defined in this specification and claims are defined to refer to the longitudinal direction of the girder, and the terms' lateral direction ',' transverse direction ' 'And similar terms are defined to refer to the horizontal direction perpendicular to the longitudinal direction of the girder.

상기와 같이 구성된 본 발명은, 강재 거더에 케이싱 콘크리트가 합성되는 제1영역 이외의 표면에 대해서만 공장에서 미리 도장 공정을 행하고, 도장면과 거푸집 사이를 차단하는 도장손상 방지재를 설치함으로써, 현장에서 케이싱 콘크리트를 합성하는 과정에서 콘크리트가 도장면에 들러붙는 것을 방지하여, 도장면의 품질을 보장하면서 신속한 현장 시공이 가능해지는 유리한 효과를 얻을 수 있다.According to the present invention configured as described above, a coating damage prevention material is provided on the steel girder in advance in the factory only for the surfaces other than the first area where the casing concrete is synthesized, and the coating damage prevention material is interposed between the coating surface and the formwork. It is possible to prevent the concrete from adhering to the coating surface in the course of synthesizing the casing concrete, and it is possible to obtain a favorable effect of enabling quick field construction while ensuring the quality of the coating surface.

또한, 본 발명은, 강재 거더의 단부 지지점에서 상부 플랜지로부터 하방 연장되게 복부에 돌출된 제1수직보강재가 케이싱 콘크리트의 상면까지만 연장되게 구성함으로써, 케이싱 콘크리트에 내설된 긴장재를 긴장 정착하는 과정에서 케이싱 콘크리트의 압축 변위가 종래 수직 보강재와 간섭되지 않음에 따라, 수직 보강재와의 간섭에 의하여 케이싱 콘크리트의 단부에 균열이 발생되는 문제를 해결하는 효과를 얻을 수 있다.According to the present invention, since the first vertical stiffener projecting downward from the upper flange at the end supporting point of the steel girder is extended only to the upper surface of the casing concrete, in the process of tightly fixing the tension material inserted into the casing concrete, The compressive displacement of the concrete is not interfered with the conventional vertical stiffener, so that there is obtained an effect of solving the problem that the end of the casing concrete is cracked due to the interference with the vertical stiffener.

이 뿐만 아니라, 본 발명은, 제1수직보강재의 하단에 수평 부재가 형성되어 케이싱 콘크리트와 접촉 형성함으로써, 교량 공용시 거더의 양지점부에서 작용하는 수직력을 제1수직보강재와 케이싱콘크리트에 의하여 지지할 수 있도록 할 뿐만 아니라, 수평면에 관통공을 형성하여 상기 강합성 거더 제작시 케이싱 콘크리트가 수평면보다 높게 형성되지 않는 것을 작업자가 확인할 수 있도록 하여, 케이싱 콘크리트의 타설 높이를 단부에서의 균열이 발생되지 않는 높이로 정확하게 제어할 수 있는 유리한 효과를 얻을 수 있다.In addition, in the present invention, since a horizontal member is formed at the lower end of the first vertical stiffener to contact with the casing concrete, a vertical force acting on the stipulated portion of the girder when the bridge is shared is supported by the first vertical stiffener and the casing concrete In addition, the operator can confirm that the casing concrete is not formed higher than the horizontal plane at the time of manufacturing the steel composite girder by forming the through hole in the horizontal plane, so that the installation height of the casing concrete can be set so that cracks do not occur at the ends It is possible to obtain an advantageous effect that can be accurately controlled by the height.

또한, 본 발명은, 제1수직보강재의 하단의 수평 부재의 둘레에 탄성재를 감싸도록 형성함에 따라, 케이싱 콘크리트에 내설된 긴장재를 긴장하는 과정에서 케이싱 콘크리트가 압축 변형이 생기면서, 케이싱 콘크리트의 상면이 수평 부재와 간섭이 되더라도, 탄성재의 탄성 변형에 의해 이를 수용하도록 함으로써, 케이싱 콘크리트에 압축 프리스트레스를 도입하는 과정에서 케이싱 콘크리트의 압축 변형에 따른 단부 표면에서의 손상도 확실하게 방지하는 효과를 얻을 수 있다. In addition, according to the present invention, since the elastic material is wrapped around the horizontal member at the lower end of the first vertical stiffener, the casing concrete undergoes compressive deformation in the course of tensing the tension material in the casing concrete, Even when the upper surface interferes with the horizontal member, the elasticity of the elastic material accommodates the elasticity of the elastic material, thereby preventing the damage to the end surface due to the compressive deformation of the casing concrete in the process of introducing the compression prestress into the casing concrete .

도1 내지 도10은 본 발명의 일 실시예에 따른 강합성 거더의 제작 방법을 순차적으로 도시한 도면으로서,
도1은 강재 거더를 도시한 사시도,
도2는 도1의 강재 거더에 도장 작업이 행해진 구성을 도시한 사시도,
도3은 도2의 강재 거더를 지지대에 매달은 구성을 도시한 사시도,
도4는 도3의 강재 거더에 도장손상 방지재를 설치하고 철근 및 쉬스관이 설치된 구성을 도시한 사시도,
도5는 도4의 강재 거더의 하부 플랜지를 감싸는 케이싱 콘크리트 합성을 위한 거푸집이 설치된 구성을 도시한 사시도,
도6a는 도5의 거푸집에 굳지않은 콘크리트를 타설한 구성을 도시한 사시도,
도6b는 본 발명의 다른 실시예로서, 도장면에 투명한 재질의 도장손상 방지재가 부착되어 있고 케이싱 콘크리트를 합성하기 위하여 거푸집에 굳지않은 콘크리트를 타설한 구성을 도시한 사시도,
도7은 타설된 케이싱 콘크리트의 양생과정을 도시한 도면,
도8은 케이싱 콘크리트의 양생 이후에 거푸집을 제거하고 거더를 지지대로부터 분리한 강합성 거더를 적치 기간 동안 거치하는 구성을 도시한 사시도,
도9는 도8의 강합성 거더의 케이싱 콘크리트에 내설된 긴장재를 긴장하여 케이싱 콘크리트에 압축 프리스트레스를 도입하는 구성을 도시한 사시도,
도10은 완성된 강합성 거더를 도시한 사시도,
도11은 도10의 측면도,
도12a는 도9의 'B'부분의 확대도,
도12b는 도9의 'B'부분의 다른 실시 형태를 도시한 확대도,
도13a는 도3의 'A'부분의 다른 실시 형태를 도시한 확대도,
도13b는 도13a의 절단선 Y-Y에 따른 횡단면도,
도14a는 도10의 강합성 거더를 제1교각의 상측에 종방향으로 거치한 구성을 도시한 도면,
도14b는 도14a의 강합성 거더를 종방향으로 연결하여 연속 교량의 상부 구조체를 형성하는 구성을 도시한 도면이다.
1 to 10 are views sequentially showing a method of manufacturing a composite steel girder according to an embodiment of the present invention,
1 is a perspective view showing a steel girder,
Fig. 2 is a perspective view showing the construction in which the steel girder of Fig. 1 is painted;
Fig. 3 is a perspective view showing a construction in which the steel girder of Fig. 2 is suspended on a support,
Fig. 4 is a perspective view showing a structure in which a coating damage preventing member is installed on the steel girder of Fig. 3 and a reinforcing bar and a sheath pipe are installed,
FIG. 5 is a perspective view showing a configuration in which a mold for composing casing concrete is installed to surround the lower flange of the steel girder of FIG. 4;
FIG. 6A is a perspective view showing a configuration in which unhardened concrete is laid in the formwork of FIG. 5,
FIG. 6B is a perspective view showing a construction in which a coating damage preventing material, which is made of a transparent material, is attached to a painting surface and an unhardened concrete is placed in a formwork to form a casing concrete,
7 is a view showing the curing process of the casing concrete placed,
8 is a perspective view showing a construction in which a form composite is removed after curing of a casing concrete and a steel composite girder, in which a girder is separated from a support,
Fig. 9 is a perspective view showing a construction in which a tension applied to a casing concrete of a steel composite girder of Fig. 8 is tensioned to introduce a compressive prestress into a casing concrete,
10 is a perspective view showing the finished steel composite girder,
11 is a side view of Fig. 10,
12A is an enlarged view of a portion 'B' in FIG. 9,
FIG. 12B is an enlarged view showing another embodiment of the portion 'B' in FIG. 9,
13A is an enlarged view showing another embodiment of the portion "A" in FIG. 3,
FIG. 13B is a cross-sectional view along the cutting line YY in FIG. 13A,
Fig. 14A is a view showing a construction in which the steel composite girder of Fig. 10 is mounted on the upper side of the first bridge pier in the longitudinal direction,
Fig. 14B is a view showing a configuration for forming the upper structure of the continuous bridge by connecting the steel composite girders of Fig. 14A in the longitudinal direction. Fig.

이하, 첨부 도면을 참조하여 본 발명의 일 실시예에 따른 강합성 거더(100) 및 그 제작 방법을 상술한다. 다만, 본 발명을 설명함에 있어서, 공지된 기능 혹은 구성에 대한 구체적인 설명은 본 발명의 요지를 명료하게 하기 위하여 생략하기로 한다.Hereinafter, a steel composite girder 100 according to an embodiment of the present invention and a manufacturing method thereof will be described in detail with reference to the accompanying drawings. In the following description, well-known functions or constructions are not described in detail to avoid obscuring the subject matter of the present invention.

도10 및 도11에 도시된 바와 같이, 본 발명의 일 실시예에 따른 강합성 거더(100)는, 수직 보강재(115)가 종방향을 따라 이격 분포된 강재 거더(110)와, 강재 거더(110)의 하부 플랜지를 감싸도록 강재 거더(110)에 합성된 케이싱 콘크리트(150)와, 케이싱 콘크리트(150)의 쉬스관(140)에 내설되어 긴장 정착되면서 케이싱 콘크리트(150)에 압축 프리스트레스를 도입하는 긴장재(140a)를 포함하여 구성된다. 10 and 11, the steel composite girder 100 according to the embodiment of the present invention includes a steel girder 110 having vertical stiffeners 115 distributed vertically along the longitudinal direction, The casing concrete 150 is inserted into the sheath pipe 140 of the casing concrete 150 and tightly fixed to the casing concrete 150 so as to enclose the lower flange of the casing concrete 110. The compression concrete is introduced into the casing concrete 150, And a tensile member 140a.

상기 강재 거더(110)는 상부 플랜지(111)와, 하부 플랜지(112)와, 상부 플랜지(111)와 하부 플랜지(112)를 연결하는 복부(113)를 포함하는 단면으로 연장 형성된다. 도면에 도시된 바와 같이, 강재 거더(110)는 하나의 복부를 구비한 'I'자형 단면으로 형성될 수 있으며, 'ㅁ' 자 형태를 포함하는 등 다양한 단면으로 형성될 수 있다.The steel girder 110 is formed to have a cross section including an upper flange 111, a lower flange 112 and an abdomen 113 connecting the upper flange 111 and the lower flange 112. As shown in the figure, the steel girder 110 may be formed as an I-shaped section having one abdomen, and may have various sections such as a ㅁ 'shape.

그리고, 강재 거더(110)에는 단부 지점부를 포함하여 길이 방향에 대하여 간격을 두고 다수의 수직 보강재(115, 115')들이 배치된다.A plurality of vertical stiffeners 115 and 115 'are disposed on the steel girder 110 at intervals with respect to the longitudinal direction including the end portion.

여기서, 수직 보강재(115, 115')는 상부 플랜지(111)로부터 하방으로 연장되는 형태로 거더의 길이 방향으로 다수 이격되어 배치된다. 도1에 도시된 바와 같이, 수직 보강재(115)들은 상부 플랜지(111)와 하부 플랜지(112)를 연결하는 형태로 형성되지만, 수직 보강재(115, 115')들 중에 양단부 지점부에 위치한 제1수직보강재(115')는 케이싱 콘크리트(150)의 상면까지만 복부(113)로부터 돌출되게 연장된다. Here, the vertical stiffeners 115 and 115 'are disposed to be spaced apart from each other in the longitudinal direction of the girder in a form extending downward from the upper flange 111. As shown in FIG. 1, the vertical stiffeners 115 are formed to connect the upper flange 111 and the lower flange 112, but the vertical stiffeners 115 and 115 ' The vertical stiffener 115 'extends so as to protrude from the abdomen 113 only up to the upper surface of the casing concrete 150.

이를 통해, 케이싱 콘크리트(150)에 내설된 긴장재(140a)에 긴장력(P)을 도입하고 정착하면서, 거더 양단부의 케이싱 콘크리트(150)가 밀려 압축 변형이 생기는 과정에서, 압축 변형 방향(150d)으로 케이싱 콘크리트(150)가 변형되면서 단부의 수직 보강재(115')와 간섭되는 것을 피할 수 있으므로, 이로인하여, 케이싱 콘크리트(150)에 압축 프리스트레스를 도입하는 과정에서 케이싱 콘크리트(150)에 균열이 발생되었던 종래의 문제점을 해소할 수 있다. This allows the casing concrete 150 at both ends of the girder to be pushed and deformed in the compression deformation direction 150d while the tension force P is introduced and fixed to the tension member 140a installed in the casing concrete 150 It is possible to prevent the casing concrete 150 from being interfered with the vertical stiffener 115 'at the ends while the casing concrete 150 is deformed. Therefore, when the casing concrete 150 is cracked during the introduction of the compression prestress into the casing concrete 150 The conventional problems can be solved.

즉, 도1 및 도12a에 도시된 바와 같이, 단부 지점부에 위치한 제1수직보강재(115')는, 상부 플랜지(111)로부터 연장되어 복부로부터 돌출된 수직판(1151)과, 수직판(1151)의 하단에 수평 방향으로 형성된 수평판(1152)으로 구성된다. 그리고, 수평판(1152)의 상면은 케이싱 콘크리트(150)가 합성된 이후에도, 외부에 드러나는 형태로 되며, 수평판(1152)의 저면은 케이싱 콘크리트(150)에 매립된 상태가 된다. 다시 말하면, 수평판(1152)의 측면(1152s)은 적어도 일부가 케이싱 콘크리트의 바깥에 드러난 상태로 설치된다. 1 and 12A, the first vertical stiffener 115 'positioned at the end fulcrum portion includes a vertical plate 1151 extending from the upper flange 111 and protruding from the abdomen, And a horizontal plate 1152 formed horizontally at the lower end of the lower plate 1151. The upper surface of the horizontal plate 1152 is exposed to the outside even after the casing concrete 150 is synthesized and the bottom surface of the horizontal plate 1152 is embedded in the casing concrete 150. In other words, the side surfaces 1152s of the horizontal plate 1152 are installed at least partially exposed outside the casing concrete.

이에 따라, 거더의 지점부에서 작용하는 수직력(115F)은 수평판(1152)을 매개로 수직판(1151)과 케이싱 콘크리트(150)가 협력하여 지지할 수 있으며, 이와 동시에 케이싱 콘크리트(150)에 압축 프리스트레스를 도입하는 과정에서 상기 케이싱 콘크리트 상기 제1수직보강재(115')에 의해 손상되는 현상을 방지할 수 있다.The vertical force 115F acting on the fulcrum of the girder can be supported by the vertical plate 1151 and the casing concrete 150 in cooperation with each other through the horizontal plate 1152 and at the same time, It is possible to prevent the casing concrete from being damaged by the first vertical stiffener 115 'in the process of introducing the compression prestress.

여기서, 제1수직보강재(115')의 수평판(1152)에는 적어도 하나 이상의 관통공(1152a)이 형성된다. 이에 따라, 케이싱 콘크리트(150)를 합성하기 위한 콘크리트 타설 작업 중에, 작업자는 굳지 않은 콘크리트를 거푸집(80, 80')에 타설하면서, 타설되는 콘크리트가 수평판(1152)의 관통공(1152a)에 채워지지만 관통공(1152a)을 채워 넘치지 않는 정도로 조절하는 것을 시각적으로 정확히 감지할 수 있게 된다. Here, at least one through hole 1152a is formed in the horizontal plate 1152 of the first vertical stiffener 115 '. Accordingly, during the concrete pouring work for synthesizing the casing concrete 150, the operator inserts the uncured concrete into the pouring molds 80 and 80 ', while the concrete to be poured is poured into the through hole 1152a of the horizontal plate 1152 But it is possible to visually and accurately detect that the through hole 1152a is filled and does not overflow.

이를 통해, 케이싱 콘크리트(150)의 상면이 확실하게 수평판(1152)의 저면에 밀착된 상태로 제작하는 것이 가능해질 뿐만 아니라, 수평판(1152)이 케이싱 콘크리트(150)에 매립되지 않아, 케이싱 콘크리트(150)에 압축 프리스트레스를 도입하는 과정에서 케이싱 콘크리트(150)의 수평 방향의 변위(150d)에 의하여, 케이싱 콘크리트(150)의 내부에서 균열이 생기는 것을 방지할 수 있다. This makes it possible not only to make the upper surface of the casing concrete 150 adhered firmly to the bottom surface of the horizontal plate 1152 but also to prevent the horizontal plate 1152 from being embedded in the casing concrete 150, Cracks can be prevented from being generated in the casing concrete 150 due to the horizontal displacement 150d of the casing concrete 150 in the process of introducing the compression prestress into the concrete 150. [

한편, 도12b에 도시된 바와 같이, 제1수직보강재(115')의 수평판(1152)의 측면(1152s)에는 탄성재(1152k)가 둘러싸는 형태로 형성될 수 있다. 도면에 도시된 바와 같이, 탄성재(1152k)는 측면 전체를 둘러싸는 형태로 형성되는 것이 바람직하지만, 케이싱 콘크리트(150)의 압축 변위가 발생되는 방향(150d)과 대향하는 측면에만 형성되어도 무방하다. 탄성재(1152k)의 두께는 케이싱 콘크리트(150)의 압축 변위에 해당하는 길이로 형성될 수 있으며, 예를 들어, 5mm 내지 30mm 정도의 두께로 형성될 수 있다. On the other hand, as shown in FIG. 12B, elastic members 1152k may be formed on the side surfaces 1152s of the horizontal plate 1152 of the first vertical stiffener 115 '. As shown in the figure, the elastic material 1152k is preferably formed to surround the entire side surface, but it may be formed only on the side opposite to the direction 150d in which the compressive displacement of the casing concrete 150 occurs . The thickness of the elastic material 1152k may be a length corresponding to the compressive displacement of the casing concrete 150, and may be, for example, about 5 mm to 30 mm.

이를 통해, 케이싱 콘크리트(150)에 압축 프리스트레스를 도입하는 과정에서 케이싱 콘크리트(150)의 수평 방향의 변위(150d)에 의하여, 케이싱 콘크리트(150)의 표면이 제1수직보강재(115')의 수평판(1152)과 간섭되어 표면에서의 작은 균열이 발생될 가능성도 탄성재(1152k)에 수용되게 함으로써, 압축 프리스트레스의 도입 과정에서 케이싱 콘크리트(150)의 단부에 균열이 발생되는 것을 완전히 방지하는 효과를 얻을 수 있다. The surface of the casing concrete 150 is covered with the number of the first vertical stiffeners 115 'by the horizontal displacement 150d of the casing concrete 150 in the process of introducing the compression prestress into the casing concrete 150. [ It is possible to completely prevent cracks from being generated at the ends of the casing concrete 150 in the process of introducing the compression prestress by allowing the elastic material 1152k to accommodate the possibility that small cracks are generated on the surface by interfering with the flat plate 1152 Can be obtained.

상기 케이싱 콘크리트(150)는 강재 거더(110)의 하부 플랜지(112)와 복부(113)의 하부를 감싸는 형태로 형성된다. 도면에는 강재 거더(110)의 하부 플랜지(113)를 감싸는 형태로 합성되는 케이싱 콘크리트(150)가 예시되어 있지만, 본 발명은 이에 한정되지 아니하며, 강재 거더(110)의 임의의 단면을 감싸는 형태로 케이싱 콘크리트가 합성될 수 있다. The casing concrete 150 is formed to enclose the lower flange 112 of the steel girder 110 and the lower portion of the abdomen 113. Although the casing concrete 150 is illustrated as being wrapped around the lower flange 113 of the steel girder 110, the present invention is not limited to this and may be applied to any shape of the steel girder 110 Casing concrete can be synthesized.

도4에 도시된 바와 같이, 케이싱 콘크리트(150)의 내부에는 종방향 철근과, 횡방향 철근 및 루프 철근 등의 철근(130)이 배근되며, 긴장재(140a)를 설치하기 위한 쉬스관(140)도 설치된다. 도4에 도시된 긴장재(140a)의 배치는 본 출원인의 대한민국 등록특허공보 제10-0547619호의 도면 6a에 도시된 형태인 구성이 예시되어 있지만, 본 발명은 이에 한정되지 아니하고 다양한 형태로 긴장재(140a)가 배치될 수 있다. 4, a reinforcing bar 130 such as a longitudinal reinforcing bar, a lateral reinforcing bar, and a loop reinforcing bar is disposed in the casing concrete 150, and a sheath pipe 140 for installing the tensioning material 140a is installed in the casing concrete 150, . The arrangement of the tensional material 140a shown in Fig. 4 is exemplified by the configuration shown in Fig. 6a of Korean Registered Patent No. 10-0547619 of the present applicant. However, the present invention is not limited to this, May be disposed.

다만, 긴장재(140a)는 쉬스관(140) 내에 강선 다발 형태로 형성되는 것이 큰 긴장력을 한번에 도입하는 측면에서 바람직하다. However, it is preferable that the tensile material 140a is formed in a bundle of steel wires in the sheath tube 140 in view of introducing a large tensile force at a time.

그리고, 도11에 도시된 바와 같이, 강재 거더(110)의 복부(113) 표면과 케이싱 콘크리트(150)가 만나는 접합부에는 실리콘 재질의 수분침투 방지재(110x)를 주입하거나 입힌다. 이를 통해, 강합성 거더(100)가 교량의 시공에 사용되어 공용 중에, 강재 거더(110)와 케이싱 콘크리트(150)의 사이로 수분이 침투하는 것을 억제하여, 강재 거더(110)와 케이싱 콘크리트(150)의 합성 상태를 장기간 동안 유지할 수 있다. 11, a moisture permeation preventive material 110x made of silicone is injected or coated on the joint portion where the surface of the abdomen 113 of the steel girder 110 meets the casing concrete 150. As shown in FIG. The steel composite girder 100 is used for the construction of the bridge to prevent moisture from penetrating between the steel girder 110 and the casing concrete 150 to prevent the steel girder 110 and the casing concrete 150 ) Can be maintained for a long period of time.

상기와 같이 구성된 본 발명의 일 실시예에 따른 강합성 거더의 제작 방법을 상술한다. A method of manufacturing a composite steel girder according to an embodiment of the present invention will be described in detail.

단계 1: 먼저, 도1에 도시된 바와 같이, 상부 플랜지(111)와, 하부 플랜지(112)와, 상부 플랜지(111)와 하부 플랜지(112)를 연결하는 복부(113)를 포함하는 단면으로 연장 형성된 강재 거더(110)를 제작한다. 전술한 바와 같이, 강재 거더(110)에는 단부 지점부를 포함하여 길이 방향에 대하여 간격을 두고 다수의 수직 보강재들(115, 115')이 간격을 두고 다수 배치된다. Step 1 : First, as shown in Fig. 1, a cross section including an upper flange 111, a lower flange 112, and an abdomen 113 connecting the upper flange 111 and the lower flange 112 Thereby forming an elongated steel girder 110. As described above, in the steel girder 110, a plurality of vertical stiffeners 115 and 115 'are disposed with a space therebetween at an interval with respect to the longitudinal direction.

단계 2: 그리고, 도2에 도시된 바와 같이, 강재 거더(110)에 케이싱 콘크리트(150)가 합성된 상태에서 강재 거더(110)를 덮는 제1영역(X1) 이외의 표면에 도장면(X2)을 공장에서 도포한다. 도2에서 갈색으로 표시된 영역은 비도장된 영역이고, 청색으로 표시된 영역은 도장된 영역이다. Step 2 : As shown in FIG. 2, the casing concrete 150 is combined with the steel girder 110, and the coating surface X2 is formed on the surface other than the first region X1 covering the steel girder 110 ) Is applied at the factory. In Figure 2, the area indicated in brown is the uncoated area, and the area marked in blue is the painted area.

즉, 케이싱 콘크리트(150)나 바닥판 콘크리트(200)가 합성되는 영역에는 도장면(X2)이 형성되지 않도록 하여, 도장면에 의하여 콘크리트(150, 200)와 강재의 합성 상태가 저해되는 것을 방지한다. 그리고, 공장에서는 거더의 일부 길이에 대하여 분절 거더 형태로 제작하므로, 분절 거더가 종방향으로 연결되는 부위에 대해서도, 용접 결합의 신뢰성을 보장하기 위하여 비도장 영역(113c)으로 남겨둔다. That is, the coating surface X2 is not formed in the area where the casing concrete 150 or the bottom plate concrete 200 is synthesized to prevent the composite state of the concrete 150, 200 and the steel material from being hindered by the coating surface do. In the factory, since the girder is formed in the form of a segmented girder with respect to a part of its length, the portion where the segmented girder is connected in the longitudinal direction is left as the non-coated region 113c in order to assure the reliability of the welded joint.

또한, 케이싱 콘크리트(150)가 합성되는 제1영역(X1)의 상단 경계로부터 20mm 내지 50mm에 해당하는 높이만큼 이격된, 제1영역(X1)과 도장 영역(X2)의 사잇 영역(c)에는 공장에서 미도장 상태로 남겨두어, 이후 단계에서 설치되는 도장손상 방지재(120)를 복부(113)에 부착시키는 테이핑 설치 공간으로 활용한다. 이를 통해, 콘크리트 타설 완료 이후에 테이프 제거 과정에서 발생되는 도장 손상을 미연에 방지할 수 있다.The first area X1 and the sidewall area c of the coating area X2 are spaced apart from each other by a height corresponding to 20 mm to 50 mm from the upper boundary of the first area X1 in which the casing concrete 150 is synthesized It is used as a taping installation space for attaching the painting damage preventing member 120 installed at a later stage to the abdomen 113. [ As a result, it is possible to prevent the coating damage caused in the tape removing process after completion of the concrete pouring.

한편, 도면에 도시되지 않았지만, 케이싱 콘크리트(150)가 타설되는 제1영역(X1)의 상단으로부터 10mm 내지 30mm 만큼 하측으로 도장 영역(X2)을 보다 더 넓은 영역에 걸쳐 도장 공정이 행해질 수 있다. 즉, 도장면의 10mm 내지 30mm는 케이싱 콘크리트에 묻히게 구성될 수 있다. 이를 통해, 케이싱 콘크리트(150)의 표면과 강재 복부(113)가 만나는 접합면에 도장면이 형성되지 않은 미세한 틈새가 존재하여 부식이 발생하는 것을 근본적으로 억제할 수도 있다.Although not shown in the drawings, the painting process can be performed over a wider area of the painting area X2 downward by 10 mm to 30 mm from the upper end of the first area X1 in which the casing concrete 150 is laid. That is, 10 to 30 mm of the coated surface may be embedded in the casing concrete. Accordingly, it is possible to fundamentally suppress the occurrence of corrosion due to the existence of a minute gap where no coating surface is formed on the joint surface where the surface of the casing concrete 150 meets the steel material belly portion 113.

상기와 같이, 도장 공정이 행해진 분절 형태의 거더는 현장으로 운반되어, 종방향으로 서로 연결되어 도2의 강재 거더(110)의 형상이 된다. 즉, 분절 거더의 연결부(113c)에는 미도장면으로 형성된다. As described above, the segmented girders subjected to the coating process are carried to the site and connected to each other in the longitudinal direction to become the shape of the steel girder 110 of FIG. That is, the connecting portion 113c of the segment girder is formed as an unscaled view.

단계 3: 그리고 나서, 도3에 도시된 바와 같이, 지지대(90)에 강재 거더(110)를 매달아 지면으로부터 이격되게 지지한다. 이 때, 강재 거더(110)의 수직 보강재(115, 115') 중에 지지대(90)의 턴버클(95)과 연결되는 수직 보강재는 연결공(115e)이 형성되어, 연결공(115e)을 매개로 턴버클(95)로 강재 거더(110)를 연결하여 지지할 수 있다. Step 3 : Then, as shown in Fig. 3, the steel girder 110 is suspended on the support 90 so as to be spaced apart from the ground. The vertical stiffeners connected to the turnbuckles 95 of the support platform 90 among the vertical stiffeners 115 and 115 'of the steel girder 110 are formed with connection holes 115e through the connection holes 115e It is possible to connect and support the steel girder 110 with the turnbuckle 95.

여기서, 강재 거더(110)의 수직 보강재(115, 115')는 거더의 상하 방향으로의 강성을 보강하여 보다 높은 저항 능력을 구현하기 위한 것이지만, 교량에 2열 이상으로 배열 시공된 상태에서 횡방향으로 인접한 다른 강합성 거더와 연결하는 가로보(미도시)의 연결 플레이트로 활용될 수 있다. 이를 위하여, 수직 보강재(115, 115')에는 가로보와의 연결을 보조하는 연결공(115e)이 다수 형성될 수 있으며, 이 연결공(115e)은 지지대(90)의 턴버클(95)에 연결되는 매개 역할을 할 수 있다. Here, the vertical stiffeners 115 and 115 'of the steel girder 110 are for reinforcing the rigidity of the girder in the up-and-down direction so as to realize higher resistance. However, in a state in which two or more arrays are arranged on the bridge, (Not shown) for connecting to adjacent steel composite girders. A plurality of connection holes 115e may be formed in the vertical stiffeners 115 and 115 'to assist connection with the cross beams. The connection holes 115e are connected to the turnbuckle 95 of the support 90 It can act as an intermediary.

한편, 다수의 열로 배열되는 강합성 거더(100)로 시공되는 교량이, 교각에 대하여 경사진 사교(斜橋)인 경우에는, 도13a 및 도13b에 도시된 바와 같이, 횡방향으로 인접한 다른 강합성 거더와 가로보를 횡방향으로 연결하기 위하여 수직 보강재(115, 115')는 복부(113)와 수직이 아닌 경사진 형태로 연결되어야 한다. 이와 같이, 사교(斜橋)에 시공되는 강합성 거더의 수직 보강재(115, 115')에 대해서는, 절곡 형성된 임시 지지판(1153)이 수직 보강재(115, 115')에 수평 방향으로 경사지게 연결되어, 수직 보강재(115, 115')와 복부(113) 사이에 90도의 편차분을 보상해주어, 턴버클(95)을 수직 보강재(115, 115')에 연결 지지하게 구성할 수 있다. On the other hand, when the bridge constructed by the steel composite girder 100 arranged in a plurality of rows is a slant bridge inclined with respect to the bridge pier, as shown in Figs. 13A and 13B, The vertical stiffeners 115 and 115 'should be connected in a sloping manner, not perpendicular to the stomach 113, in order to connect the composite girder and the beam transversely. As described above, with respect to the vertical stiffeners 115 and 115 'of the steel composite girder installed in the slant bridge, the temporarily formed support plates 1153 are connected to the vertical stiffeners 115 and 115' in an inclined manner in the horizontal direction, The turnbuckle 95 can be connected to and supported by the vertical stiffeners 115 and 115 'by compensating a deviation of 90 degrees between the vertical stiffeners 115 and 115' and the abdomen 113. [

한편, 도3에는 지지대(90)가 강재 거더(110)의 양단부를 지지하도록 배치된 구성이 예시되어 있지만, 본 발명은 이에 한정되지 아니하며, 도6b와 같이 강재 거더(110)의 양끝단으로부터 거더 전체 길이(L)의 1/5~1/3배만큼 이격된 거리(Le)만큼 이격된 내민보 형태로 지지할 수도 있다.3, a support base 90 is arranged to support both ends of the steel girder 110. However, the present invention is not limited to this, and may be applied to the girder 110 from both ends of the steel girder 110, But may be supported in the form of minambular spaced apart by a distance (Le) separated by 1/5 to 1/3 of the total length (L).

단계 4: 그리고 나서, 도4에 도시된 바와 같이, 공장에서 도장된 도장면(X2)을 감싸는 횡단면을 이루도록, 강재 거더(110)의 도장면(X2)과 이후 설치되는 거푸집(80)의 사이를 차단하는 도장손상 방지재(120)를 설치한다. Step 4 : Thereafter, as shown in Fig. 4, the coating surface X2 of the steel girder 110 and the laterally set mold 80 are formed so as to form a transverse section enclosing the painting surface X2 painted on the factory. The coating damage preventing member 120 is provided.

여기서, 도장손상 방지재(120)는 비닐, 합성수지재, 천 등의 얇은 재질로 형성될 수 있으며, 가벼우면서 콘크리트 타설 시 튀는 입자를 차단할 수 있으면 충분하다. Here, the coating damage preventing member 120 may be formed of a thin material such as vinyl, synthetic resin, cloth, or the like.

도장손상 방지재(120)는 콘크리트 타설 공정 중에 튀는 콘크리트 입자가 복부(113)의 도장면(X2)에 도달하는 것을 차단하기 위한 것이므로, 강재 거더(110)의 도장면(X2)을 완전히 감싸는 것이 바람직하지만, 콘크리트 타설 입자의 튀는 방향을 고려하여 도4에 도시된 바와 같이 종방향 양끝단은 감싸지 않더라도 무방하다. The coating damage preventing member 120 is provided to prevent the concrete particles bouncing during the concrete pouring process from reaching the coating surface X2 of the abdomen portion 113. It is therefore necessary to completely wrap the coating surface X2 of the steel girder 110 However, considering the bending direction of the concrete poured particles, it is not necessary to wrap the longitudinally opposite ends as shown in Fig.

여기서, 도장손상 방지재(120)의 설치를 보다 용이하게 하기 위하여, 강재 거더(110)의 상부 플랜지(111)에 수평재(122)를 거치하고, 수평재(122)의 양단에 각각 도장손상 방지재(120)를 고정시켜 수평재(122)의 균형을 유지한 상태에서, 도장손상 방지재(120)의 하단을 복부(113)의 미도장 영역(c)에 고정시킨다. 예를 들어, 도장손상 방지재(120)를 테이프 부착 방식으로 미도장 영역(c)에 간단하게 고정시킬 수 있으며, 테이프가 미도장 영역(c)에 부착됨에 따라, 도장손상 방지재(120)를 제거하기 위하여 케이싱 콘크리트(150)의 합성 이후에 테이프를 분리하더라도 도장면(X2)이 손상되지 않는다. In order to facilitate the installation of the coating damage preventing member 120, a horizontal member 122 is placed on the upper flange 111 of the steel girder 110, The lower end of the coating damage preventing member 120 is fixed to the uncoated region c of the abdomen portion 113 while the horizontal member 122 is held in a state of being balanced. For example, the coating damage preventing member 120 can be easily fixed to the uncoated region c by the tape attaching method, and as the tape is attached to the uncoated region c, The coating surface X2 is not damaged even if the tape is separated after the casing concrete 150 is synthesized.

한편, 도장손상 방지재(120)는 도6b와 같이 강판에 탈부착이 가능한 재질로 도장 부위에 투명 비닐 등의 소재를 부착시켜 설치할 수도 있다. 이 때 케이싱 콘크리트(150) 타설 후 도장손상 방지재(120)를 제거시 도장면과 부착력이 약하기 때문에 손쉽게 제거가 가능하다.Meanwhile, the coating damage preventing member 120 may be formed by attaching a material such as transparent vinyl or the like to the painted portion with a material detachable to the steel plate as shown in FIG. 6B. At this time, when the casing damage prevention material 120 is removed after the casing concrete 150 is installed, it can be easily removed because of its weak adhesion with the coating surface.

단계 4는 단계 6의 거푸집이 설치된 이후에 행해질 수도 있다.Step 4 may be performed after the mold of step 6 is installed.

단계 5: 단계 4의 이전 또는 이후에, 케이싱 콘크리트(150)가 합성되는 하부 플랜지(112)의 둘레에 종방향 철근, 횡방향 철근, 루프 철근 등의 철근을 배근하고, 긴장재(140a) 설치를 위한 쉬스관(140)을 설치한다. Step 5 : Before or after step 4, reinforcing bars such as longitudinal reinforcing bars, lateral reinforcing bars, and loop reinforcing bars are placed around the lower flange 112 where the casing concrete 150 is synthesized, The sheath tube 140 is installed.

단계 6: 단계 5가 행해진 이후에, 도5에 도시된 바와 같이, 케이싱 콘크리트(150)의 합성을 위한 거푸집(80)을 설치한다. 거푸집(80)은 하부 플랜지(112)를 감싸는 형태로 설치된다. Step 6 : After Step 5 is performed, a mold 80 for the synthesis of the casing concrete 150 is installed as shown in Fig. The mold 80 is installed so as to surround the lower flange 112.

여기서, 거푸집(80)은, 도5에 도시된 바와 같이 거푸집 지지대(85)에 의하여 강재 거더(110)에 지지되도록 매달려 설치될 수도 있고, 도6b에 도시된 바와 같이, 지면에 동바리에 의하여 지지되게 설치될 수도 있다. 강재 거더(110)에 매달린 거푸집(80)에 의해 합성된 케이싱 콘크리트(150)는 자중을 강재 거더(110)가 부담하므로 무응력 상태로 합성될 수 있으며, 동바리에 의해 지면에 지지된 거푸집(80')에 의해 합성된 케이싱 콘크리트(150)는 자중을 스스로 부담하므로 강재 거더가 부담하는 하중을 줄일 수 있다.5, the form 80 may be suspended from the steel girder 110 by means of a form support 85, and may be suspended by supporting it on the ground as shown in FIG. 6B. . The casing concrete 150 synthesized by the dies 80 hanging from the steel girder 110 can be synthesized in a stressless state since the weight of the casing concrete 150 is burdened by the steel girder 110 and the dies 80 ', The weight of the casing concrete 150 itself can be borne by itself, so that the load imposed on the steel girder can be reduced.

필요에 따라, 쉬스관(140) 내부에 미리 긴장재(140a)를 미리 삽입 설치해둘 수도 있다. 여기서, 긴장재(140a)는 다수의 강선이 다발 형태로 형성되어, 한꺼번에 강선 다발 형태의 긴장재(140a)에 긴장력을 도입한다는 점에서 작업 효율이 우수해지는 이점을 얻을 수 있다. If necessary, the tension member 140a may be previously inserted into the sheath tube 140 in advance. Here, the tensile material 140a has a plurality of steel wires formed in a bundle shape, and the tensile force is introduced to the tensile material 140a in the form of a bundle of steel wires at once, which is advantageous in that the working efficiency is improved.

단계 7: 그리고 나서, 도6a 및 도6b에 도시된 바와 같이, 거푸집(80, 80')에 굳지 않은 콘크리트를 타설한다. 콘크리트의 타설 과정에서 시멘트 페이스트가 주변으로 튀는 것이 불가피하지만, 공장에서 도장 공정이 행해진 도장면(X2)은 횡단면을 기준으로 도장손상 방지재(120)에 의하여 차단되어 있으므로, 시멘트 페이스트가 튀는 것이 모두 도장손상 방지재(120)에 차단되어, 공장에서 도장된 도장 영역(X2)의 도장면은 오염없이 깨끗하게 도장 상태를 유지한다. Step 7 : Then, as shown in FIGS. 6A and 6B, the uncured concrete is poured into the molds 80 and 80 '. The cement paste is inevitably splashed around the concrete in the process of casting the concrete. However, since the painting surface X2 subjected to the painting process at the factory is cut off by the coating damage preventing member 120 on the basis of the cross section, The painting surface of the painting area X2 painted at the factory is shielded by the painting damage preventing member 120 so that the painting surface is kept clean without any contamination.

이 때, 거더 양단부 지지점의 제1수직 보강재(115')의 수평판(1152)의 관통공(1152a)에 굳지 않은 콘크리트가 채워지지만, 수평판(1152)의 관통공(1152a)을 채워 넘치지 않을 정도로 콘크리트 타설량을 조절하는 것에 의하여, 케이싱 콘크리트의 상면은 제1수직 보강재(115')의 수평판(1152)으로 그 높이를 정확히 맞출 수 있게 된다. 이에 따라, 제1수직보강재(115')와 케이싱 콘크리트(150)가 협력하여 수직력(115F)을 지지할 수 있는 상태가 된다.At this time, although the unreinforced concrete is filled in the through hole 1152a of the horizontal plate 1152 of the first vertical stiffener 115 'at the both end supporting points of the girder, it is possible to fill the through hole 1152a of the horizontal plate 1152 The height of the upper surface of the casing concrete can be precisely adjusted to the horizontal plate 1152 of the first vertical stiffener 115 'by adjusting the amount of concrete pouring. Accordingly, the first vertical stiffener 115 'and the casing concrete 150 can cooperate to support the vertical force 115F.

콘크리트 타설이 완료되면, 도7에 도시된 바와 같이, 지지대(90) 및 강재 거더(110) 등의 설비를 외기와 차단하는 덮개(50)를 씌우고, 콘크리트가 충분한 강도로 발현하도록 양생시킨다. When the concrete pouring is completed, as shown in Fig. 7, a lid 50 for blocking the facilities such as the support platform 90 and the steel girder 110 is installed to cure the concrete so as to exhibit sufficient strength.

한편, 상기 도장손상 방지재(120)는 양생을 위한 덮개(50)를 설치하기 전, 즉 케이싱 콘크리트 타설 완료 후 즉시 제거할 수도 있다.On the other hand, the coating damage preventing member 120 may be removed immediately before the lid 50 for curing is installed, that is, after completion of pouring of the casing concrete.

단계 8: 그리고 나서, 도8에 도시된 바와 같이, 거푸집(80, 80')과 도장손상 방지재(120)를 제거하여, 케이싱 콘크리트(150)가 강재 거더(110)에 합성된 강합성 거더를 지상의 지지대(40)에 거치시킨다. Step 8 : The molds 80 and 80 'and the coating damage preventing material 120 are then removed as shown in FIG. 8 so that the casing concrete 150 is removed from the steel composite girder 110, To the ground support (40).

여기서, 지지대(40)는 케이싱 콘크리트의 합성 당시에 강재 거더(110)가 지지된 상태와 동일(도6a 및 도6b)하게 지지하는 것이 바람직하다. 즉, 도6a에 도시된 바와 같이, 양단 지지된 상태에서 케이싱 콘크리트(150)가 강재 거더(110)에 합성되었으면, 지상의 지지대(40)도 강합성 거더를 양단 지지한 상태로 거치한다. 그리고, 도6b에 도시된 바와 같이, 내민보 지지된 상태에서 케이싱 콘크리트(150)가 강재 거더(110)에 합성되었으면, 지상의 지지대(40)도 강합성 거더를 내민보 형태로 양단에서 소정거리(Le)만큼 이격된 위치에서 지지하여 거치한다. Here, it is preferable that the support rods 40 are supported in the same manner as the state in which the steel girder 110 is supported (Figs. 6A and 6B) at the time of the synthesis of the casing concrete. That is, as shown in FIG. 6A, when the casing concrete 150 is combined with the steel girder 110 in a state where both ends are supported, the ground support 40 is also supported in a state where the steel composite girder is supported on both ends. 6B, when the casing concrete 150 is synthesized on the steel girder 110, the ground support 40 also receives the steel composite girder in the form of min- (Le).

단계 9: 그리고 나서, 도9에 도시된 바와 같이, 긴장 장치(77)를 긴장재(140a)의 단부에 설치하고, 긴장재(140a)에 긴장력(P)을 도입한 상태로 정착하여, 케이싱 콘크리트(150)에 압축 프리스트레스를 도입한다. Step 9 : The tensioning device 77 is then installed on the end of the tensile member 140a and is fixed with the tensile force P introduced into the tensile member 140a, as shown in Fig. 9, 150 with a compressive prestress.

이 때, 도6b에 도시된 바와 같이, 내민보 형태로 케이싱 콘크리트(150)가 강재 거더(110)에 합성되고, 내민보 형태로 지지대(40)가 지상에서 지지된 상태로 케이싱 콘크리트(150)에 압축 프리스트레스를 도입할 수도 있다. 6B, the casing concrete 150 is synthesized on the steel girder 110 and the casing concrete 150 is supported on the ground while the support platform 40 is supported on the ground. A compressive prestress may be introduced.

또한, 도12a 및 도12b에 도시된 바와 같이, 케이싱 콘크리트(150)의 양단부 지지점의 제1수직 보강재(115')가 케이싱 콘크리트(150)의 상면까지만 연장 형성됨에 따라, 케이싱 콘크리트(150)에 내설된 긴장재(140a)에 긴장력(P)이 도입되면서 케이싱 콘크리트(150)의 양단부에서 압축 변형이 도12b의 150d로 표시된 방향으로 일어나더라도, 케이싱 콘크리트(150)는 수직 보강재(115')에 간섭되지 않으므로, 제1수직보강재(115')와의 간섭에 의하여 응력이 집중되면서 발생되었던 균열 현상은 발생되지 않는다. 12A and 12B, since the first vertical stiffener 115 'at both end support points of the casing concrete 150 is extended to only the upper surface of the casing concrete 150, the first vertical stiffener 115' Even if compressive deformation occurs at both ends of the casing concrete 150 in the direction indicated by 150d in FIG. 12b while introducing the tensile force P into the installed tensional material 140a, the casing concrete 150 may interfere with the vertical stiffener 115 ' So that no cracking phenomenon occurred due to the concentration of stress due to the interference with the first vertical stiffener 115 '.

더욱이, 도12b에 도시된 바와 같이, 제1수직보강재(115')의 측면(1152s) 둘레에 탄성 변형이 가능한 탄성재(1152k)가 감싸도록 구성되는 경우에는, 케이싱 콘크리트(150)의 압축 변형(150d)에 따라 케이싱 콘크리트(150)의 상면 일부가 수평판(1152)의 측면(1152s)과 간섭되더라도, 탄성재(1152k)에 의하여 압축 변형량의 일부 이상이 수용되므로, 케이싱 콘크리트(150)의 표면에서의 국부적인 손상 가능성도 완전히 제거할 수 있는 유리한 효과를 얻을 수 있다. 12B, when the elastic members 1152k capable of being elastically deformed are wrapped around the side surfaces 1152s of the first vertical stiffener 115 ', the compressive deformation of the casing concrete 150 Even if a part of the upper surface of the casing concrete 150 interferes with the side surface 1152s of the horizontal plate 1152 according to the elastic member 1152k, part or more of the compression deformation amount is accommodated by the elastic member 1152k, It is possible to obtain a favorable effect of completely eliminating the possibility of local damage at the surface.

단계 10: 그리고 나서, 긴장재(140a)를 긴장, 정착하는 데 사용하였던 긴장 장치(77)를 제거하고, 도10에 도시된 바와 같이, 외부에 드러나는 강재 부분 중에 도장되지 않은 부분(113c, c)을 스프레이 이외의 방법(예를 들어, 붓칠)으로 도장 공정을 행한다. Step 10 : Thereafter, the tension device 77 used for tensioning and fixing the tension member 140a is removed, and as shown in Fig. 10, the uncoated portion 113c (c) Is applied by a method other than spraying (for example, brushing).

붓칠 등에 의한 도장 공정은 시간이 오래 소요되지만, 이미 공장에서 대부분의 드러난 영역이 도장면(X2)으로 형성되어 있으므로, 도장 면적이 작아 추가도장의 작업 시간이 오래 소요되지 않는다. Painting process by brushing, etc. takes a long time, but since the most exposed area is already formed on the painting surface (X2) in the factory, the painting area is small and the additional painting time is not long.

한편, 상기 강재 거더의 복부면과 상기 케이싱 콘크리트의 접합부에는 실리콘 재질의 수분침투 방지재를 설치하여 수분 침투에 의한 강재의 부식과 콘크리트 열화 현상에 따른 내구성 감소를 추가적으로 방지할 수 있다.Meanwhile, a moisture permeation preventing material made of silicone may be installed on the abutment surface of the steel girder and the casing concrete to further prevent the corrosion of the steel due to moisture penetration and the decrease in durability due to the deterioration of concrete.

이를 통해, 도10에 도시된 바와 같이, 본 발명에 따른 강합성 거더(100)의 제작이 완료된다. Thus, as shown in FIG. 10, the manufacture of the composite steel girder 100 according to the present invention is completed.

상기와 같이 제작된 강합성 거더(100)는 단계 8, 단계 9, 단계 10 이후의 어느 단계에서도, 교각이나 교대 등의 하부 구조에 인상되어 거치되기 이전의 적치 공정이 행해질 수 있다. 특히, 단계 9의 이전에 적치 공정이 행해지면, 케이싱 콘크리트(150)의 양생이 충분히 이루어진 상태이므로, 크리프 손실에 의한 영향을 최소화할 수 있는 이점도 얻을 수 있다.The steel composite girder 100 manufactured as described above can be pulled up to a lower structure such as a pier or an alternating structure at any stage after step 8, step 9, Particularly, when the compacting process is performed before Step 9, since the casing concrete 150 is sufficiently cured, the effect of creep loss can be minimized.

한편, 상기와 같이 제작된 강합성 거더(100)를 이용하여 연속 교량을 시공할 수도 있다.Meanwhile, a continuous bridge can be constructed using the steel composite girder 100 manufactured as described above.

도14a에 도시된 바와 같이, 강합성 거더(100)를 교각, 교대 등의 하부 구조 상에 거치하되, 제1교각(20)을 사이에 두고 2경간 이상으로 강합성 거더(100)를 거치시킬 수도 있다. 14A, the steel composite girder 100 is placed on a lower structure such as a pier, an alternate, or the like, and the steel composite girder 100 is placed over two spans with the first pier 20 interposed therebetween It is possible.

이와 같이 강합성 거더가 제1교각(20)을 사이에 두고 거치되는 경우에는, 제1교각(20)에 종방향으로 인접 거치된 강합성 거더(100)를 현장 타설 콘크리트로 연결하여 연속화시킬 수 있다. 이를 위하여, 종방향으로 인접한 강합성 거더(100)를 연결하는 연결 콘크리트(190)의 타설을 위한 거푸집(미도시)의 설치가 필요하다.In the case where the steel composite girder is mounted with the first bridge pier 20 interposed therebetween, the steel composite girder 100 adjoining in the longitudinal direction to the first bridge pier 20 can be continuously connected have. To this end, it is necessary to install a formwork (not shown) for casting the connecting concrete 190 connecting longitudinally adjacent steel composite girders 100.

마찬가지로, 종방향으로 인접한 강합성 거더(100)의 사이에 철근을 배근하고, 필요에 따라 긴장재를 연결부 중립축 상연에 배치할 수도 있다. 그리고, 연결 콘크리트(190)의 타설을 위한 거푸집을 설치함에 있어서, 거더의 단부 지점부에 배치된 제1수직보강재(115')가 거푸집의 일부로 사용되는 형태로 거푸집을 설치할 수 있다. Likewise, reinforcing bars may be arranged between the steel composite girders 100 adjacent to each other in the longitudinal direction, and a tensile material may be disposed on the joint portion of the connecting portion neutral axis, if necessary. In addition, when the formwork for installing the connection concrete 190 is installed, the formwork can be installed in such a form that the first vertical stiffener 115 'disposed at the end portion of the girder is used as a part of the formwork.

이를 통해, 연결 콘크리트(119)는 거더의 끝단을 연결하는 데 그치지 않고, 강합성 거더(100)의 노출된 강재 부분을 감싸는 형태로 연결하므로, 보다 견고하게 종방향을 연결된 연속화 교량의 상부 구조체를 시공할 수 있는 이점을 얻을 수 있다.As a result, the connecting concrete 119 is connected not only to the ends of the girders but also to the steel composite girder 100 so as to surround the exposed steel part, so that the upper structure of the continuous bridge connected in the longitudinal direction It is possible to obtain an advantage in construction.

이상에서는 본 발명의 바람직한 실시예를 예시적으로 설명하였으나, 본 발명의 범위는 이와 같은 특정 실시예에만 한정되는 것은 아니며, 특허청구 범위에 기재된 범주 내에서 적절하게 변경 가능한 것이다. While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is to be understood that the invention is not limited to the disclosed embodiments, but, on the contrary, is intended to cover various modifications and equivalent arrangements included within the spirit and scope of the invention.

80, 80': 거푸집 85: 거푸집 지지대
90: 지지대 95: 턴버클
100: 강합성 거더 110: 강재 거더
113: 복부 115, 115': 수직 보강재
115': 제1수직보강재 1152: 수평판
1152a: 관통공 1153: 임시 지지판
120: 도장손상 방지재 130: 철근
140: 쉬스관 140a: 긴장재
150: 케이싱 콘크리트 200: 바닥판 콘크리트
80, 80 ': Form 85: Form support
90: support 95: turnbuckle
100: Steel composite girder 110: Steel girder
113: abdomen 115, 115 ': vertical stiffener
115 ': first vertical stiffener 1152: horizontal plate
1152a: through hole 1153: temporary support plate
120: paint damage prevention material 130: reinforcing steel
140: Sheath tube 140a: Tension material
150: casing concrete 200: bottom plate concrete

Claims (14)

상부 플랜지와, 하부 플랜지와, 상기 상부 플랜지와 상기 하부 플랜지를 연결하는 복부를 포함하는 단면으로 연장 형성된 강재 거더를 준비하되, 상기 강재 거더에는 단부 지점부를 포함하여 길이 방향에 대하여 간격을 두고 다수의 수직 보강재들이 배치된 상기 강재 거더를 준비하는 거더 준비 단계와;
상기 강재 거더에 케이싱 콘크리트가 합성되는 상기 강재 거더의 제1영역 이외의 표면의 일부 이상을 포함하는 상기 강재 거더의 표면에 공장에서 도장을 행하는 거더 도장 단계와;
상기 강재 거더를 지지대에 매달아 지지하되, 상기 지지대와 상기 강재 거더를 연결하는 턴버클이 상기 수직 보강재의 일부 이상과 연결되어 상기 강재 거더를 상기 지지대에 매달아 지지하는 강재 거더 지지단계와;
상기 케이싱 콘크리트가 합성되는 상기 강재 거더의 제1영역에 철근을 배근하는 철근 배근 단계와;
상기 제1영역에 상기 케이싱 콘크리트를 합성하기 위한 거푸집을 설치하는 거푸집 설치단계와;
상기 강재 거더의 복부 및 상기 수직 보강재와 상기 거푸집의 사이를 차단하는 도장손상 방지재를 설치하는 방지재 설치단계와;
상기 거푸집에 굳지않은 콘크리트를 타설하고 양생하여, 상기 강재 거더에 상기 케이싱 콘크리트를 합성하는 콘크리트 합성단계와;
상기 거푸집과 상기 도장손상 방지재를 상기 강재 거더로부터 제거하는 제거단계를;
포함하여 구성된 것을 특징으로 하는 강합성 거더의 제작 방법.
A steel girder extending from a section including an upper flange, a lower flange, and an abdomen connecting the upper flange and the lower flange, wherein the steel girder is provided with a plurality of A girder preparation step of preparing the steel girder in which vertical stiffeners are disposed;
A girder coating step of coating a surface of the steel girder including a part of the surface of the steel material girder other than the first area of the steel material girder in which the casing concrete is synthesized,
A steel girder supporting step for supporting the steel girder by supporting the steel girder to a support base, a turnbuckle for connecting the support bracket to the steel girder is connected to at least a part of the vertical reinforcing member to support the steel girder to the support base;
A reinforcement step of placing reinforcing bars in a first region of the steel girder where the casing concrete is synthesized;
A mold setting step of installing a mold for synthesizing the casing concrete in the first area;
A step of installing a coating damage preventing material for blocking the abdomen of the steel girder and the vertical reinforcement and the formwork;
A concrete synthesis step of pouring and curing unhardened concrete in the mold to synthesize the casing concrete on the steel girder;
A removing step of removing the mold and the painting damage preventing material from the steel girder;
Wherein the steel composite girder is made of steel.
제 1항에 있어서,
상기 도장손상 방지재는 상기 강재 거더의 상부 플랜지에 거치된 수평재와 상기 복부를 연결하는 형태로 설치되어, 상기 복부를 감싸는 단면을 형성하는 것을 특징으로 하는 강합성 거더의 제작 방법.
The method according to claim 1,
Wherein the coating damage preventing member is provided in a form connecting the horizontal member fixed to the upper flange of the steel girder and the abdomen to form a cross section enclosing the abdomen.
제 1항에 있어서,
상기 도장손상 방지재는 탈부착이 가능한 재질로 구성되어 상기 강재 거더의 복부 도장면에 직접 부착 설치되는 것을 특징으로 하는 강합성 거더의 제작 방법.
The method according to claim 1,
Wherein the painting damage preventing member is made of a detachable material and is directly attached to the painting surface of the abdomen of the steel girder.
제 1항에 있어서, 상기 강재 거더 지지단계는,
상기 강합성 거더는 교각과 거더의 교축방향에 대하여 직교(直橋)가 아닌 사교(斜橋)에 설치되고, 상기 지지대와 연결되는 상기 수직 보강재가 상기 강합성 거더에 대하여 설치될 예정인 상기 사교의 교축 직각 방향으로 설치되며, 상기 수직 보강재에 수평 방향으로 절곡지게 연결된 임시 지지판을 더 포함하여, 상기 임시 지지판이 상기 턴버클과 연결되는 것을 특징으로 하는 강합성 거더의 제작 방법.
The method of claim 1, wherein the step of supporting the steel girder comprises:
Wherein the steel composite girder is installed at a diagonal bridge not orthogonal to the direction of intersection between the bridge pier and the girder, and the vertical stiffener connected to the support bridge is disposed at a side of the girder Further comprising a temporary support plate installed in a direction perpendicular to the throttling axis and connected to the vertical stiffener in a horizontal direction so that the temporary support plate is connected to the turnbuckle.
제 1항에 있어서,
상기 강재 거더 지지단계에서, 상기 지지대와 연결되는 상기 수직 보강재에는 상기 턴버클과 연결을 위한 연결공이 형성되고,
상기 강합성 거더는 2개 이상이 교량 바닥판을 지지하도록 시공되고,
상기 강합성 거더와 횡방향으로 인접한 거더와 가로보 연결시 상기 강재 거더 지지단계시 상기 수직 보강재에 형성된 연결공을 상기 가로보를 연결하기 위한 체결 홀로 활용되는 것을 특징으로 하는 강합성 거더의 제작 방법.
The method according to claim 1,
In the step of supporting the steel girder, a connection hole for connection with the turnbuckle is formed in the vertical stiffener connected to the support,
The steel composite girder is constructed so that at least two steel girders support the bridge deck,
Wherein a connecting hole formed in the vertical stiffener in the step of supporting the steel girder when the girder is connected to the girder adjacent to the steel composite girder in the transverse direction is utilized as a fastening hole for connecting the beam.
제 1항에 있어서,
상기 거더 도장 단계는, 상기 제1영역의 상단 경계로부터 상방으로 50mm 이하만큼 이격된 영역까지 상기 강재 거더의 복부에 도장하여 도장면을 형성하고,
상기 콘크리트 합성단계 이후에, 상기 도장면과 상기 케이싱 콘크리트 사이의 사잇 영역에 추가 도장을 실시하는 추가도장단계를;
포함하여 구성된 것을 특징으로 하는 강합성 거더의 제작 방법.
The method according to claim 1,
The girder coating step may be performed by coating the abdomen of the steel girder up to an area spaced by 50 mm or less upward from the upper boundary of the first area to form a coated surface,
An additional coating step of applying an additional coating to the slack region between the coating surface and the casing concrete after the concrete synthesis step;
Wherein the steel composite girder is made of steel.
제 1항에 있어서,
상기 거더 도장 단계는, 상기 제1영역의 상단 경계로부터 하방으로 10∼30mm 만큼 더 상기 강재 거더의 복부에 도장하여 도장면을 형성하는 것을 특징으로 하는 강합성 거더의 제작 방법.
The method according to claim 1,
Wherein the step of painting the girder further comprises coating the abdomen of the steel girder by 10 to 30 mm downward from the upper boundary of the first region to form a coated surface.
제 1항 내지 제 7항 중 어느 한 항에 있어서,
상기 케이싱 콘크리트의 내부에는 쉬스관이 설치되고;
상기 쉬스관 내에 강선 다발이 긴장재로 내설되어, 상기 긴장재를 긴장 정착하는 것에 의하여 상기 케이싱 콘크리트에 압축 프리스트레스를 도입하는 압축프리스트레스 도입단계를;
더 포함하고, 상기 수직 보강재 중 단부 지점부에 설치되는 제1수직 보강재는 하단이 상기 케이싱 콘크리트의 상면까지만 연장된 것을 특징으로 하는 강합성 거더의 제작 방법.
8. The method according to any one of claims 1 to 7,
A sheath pipe is installed inside the casing concrete;
A compression prestress introduction step of introducing a compression prestress into the casing concrete by tensioning and fixing the prestressing material with the steel wire bundle being embedded in the prestressing material in the sheath tube;
Wherein a first vertical stiffener provided at an end portion of the vertical stiffener has a lower end extending only to an upper surface of the casing concrete.
제 8항에 있어서,
상기 제1수직 보강재의 하단에는 수평판이 형성되고, 상기 수평판에는 1개 이상의 관통공이 형성되며;
상기 콘크리트 합성단계는 상기 케이싱 콘크리트가 상기 관통공을 채워 넘치지 않은 높이로 타설되는 것을 특징으로 하는 강합성 거더의 제작 방법.
9. The method of claim 8,
A horizontal plate is formed at a lower end of the first vertical stiffener, and at least one through hole is formed in the horizontal plate;
Wherein the concrete composing step is poured at a height that does not overflow the casing concrete by filling the through holes.
제 9항에 있어서,
상기 수평판의 둘레의 일부 이상에는 탄성재가 부착 형성된 것을 특징으로 하는 강합성 거더의 제작 방법.
10. The method of claim 9,
Wherein an elastic material is adhered to at least a part of a periphery of the horizontal plate.
상부 플랜지와, 하부 플랜지와, 상기 상부 플랜지와 상기 하부 플랜지를 연결하는 복부를 포함하는 단면으로 연장 형성되고, 상기 상부 플랜지로부터 상기 복부를 따라 하방 연장된 수직 보강재들이 종방향을 따라 이격 배치된 강재 거더와;
상기 강재 거더의 하부 플랜지를 감싸는 단면으로 합성된 케이싱 콘크리트와;
상기 케이싱 콘크리트를 관통하는 쉬스관에 내설되어 인장력이 도입된 상태로 정착된 강선 다발로 형성된 긴장재를;
포함하고, 상기 수직 보강재들 중에 단부 지점부에 설치되는 제1수직보강재는 하단이 상기 케이싱 콘크리트의 상면까지만 연장된 것을 특징으로 하는 강합성 거더.
A vertical flange extending from the upper flange downwardly along the abdomen and extending vertically downwardly from the upper flange and extending downwardly along the abdomen, the upper flange, the lower flange and the abutment connecting the upper flange and the lower flange; A girder;
A casing concrete synthesized in a cross section enclosing a lower flange of the steel girder;
A tensile member formed of a steel wire bundle embedded in a sheath pipe passing through the casing concrete and fixed in a state in which a tensile force is introduced;
And a first vertical stiffener installed at an end portion of the vertical stiffeners has a lower end extending only to an upper surface of the casing concrete.
제 11항에 있어서,
상기 제1수직 보강재의 하단에는 수평판이 형성되고, 상기 수평판에는 1개 이상의 관통공이 형성되며;
상기 케이싱 콘크리트는 상기 수평판의 상면보다 낮은 높이로 상기 강재 거더에 합성된 것을 특징으로 하는 강합성 거더.
12. The method of claim 11,
A horizontal plate is formed at a lower end of the first vertical stiffener, and at least one through hole is formed in the horizontal plate;
And the casing concrete is synthesized on the steel girder at a lower height than the upper surface of the horizontal plate.
제 12항에 있어서,
상기 수평판의 둘레의 일부 이상에는 탄성재가 부착 형성된 것을 특징으로 하는 강합성 거더.
13. The method of claim 12,
And an elastic material is attached to at least a part of the periphery of the horizontal plate.
제 11항 내지 제 13항 중 어느 한 항에 따른 강합성 거더를 하부 구조 상에 거치하되, 제1교각을 사이에 두고 2경간 이상으로 상기 강합성 거더를 거치시키는 거더 거치단계와;
상기 제1교각에 종방향으로 인접 거치된 상기 강합성 거더를 연결하기 위한 거푸집을 설치하되, 상기 제1수직보강재가 상기 거푸집의 일부로 사용되는 형태로 상기 거푸집을 설치하는 거푸집 설치단계와;
상기 거푸집에 굳지 않은 콘크리트를 타설하고 양생하여, 종방향으로 인접 거치된 상기 강합성 거더를 연결하는 거더 연결 단계를;
포함하여 구성된 것을 특징으로 하는 연속 교량의 시공 방법
A method of manufacturing a steel composite girder, comprising the steps of: placing a steel composite girder according to any one of claims 11 to 13 on a lower structure, wherein the steel composite girder is placed over two spans over a first pier;
A mold setting step of installing a mold for connecting the steel composite girder adjacent to the first pier in the longitudinal direction, wherein the first vertical stiffener is used as a part of the mold;
A girder connecting step of placing the uncured concrete in the formwork and curing it and connecting the steel composite girders adjoining in the longitudinal direction;
A method of constructing a continuous bridge
KR1020170050970A 2017-04-20 2017-04-20 Method of manufacturing prestressed composite girder, method thereof and of constructing continuous birdge upper structure of using same KR101932440B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020170050970A KR101932440B1 (en) 2017-04-20 2017-04-20 Method of manufacturing prestressed composite girder, method thereof and of constructing continuous birdge upper structure of using same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020170050970A KR101932440B1 (en) 2017-04-20 2017-04-20 Method of manufacturing prestressed composite girder, method thereof and of constructing continuous birdge upper structure of using same

Publications (2)

Publication Number Publication Date
KR20180117877A true KR20180117877A (en) 2018-10-30
KR101932440B1 KR101932440B1 (en) 2018-12-26

Family

ID=64101040

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020170050970A KR101932440B1 (en) 2017-04-20 2017-04-20 Method of manufacturing prestressed composite girder, method thereof and of constructing continuous birdge upper structure of using same

Country Status (1)

Country Link
KR (1) KR101932440B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20230040641A (en) * 2021-09-16 2023-03-23 (주)에이치앤디건설 Unsupported formwork construction method using socket member

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002129521A (en) * 2000-10-25 2002-05-09 Nkk Corp Sealing construction for boundary portion between steel and concrete
JP2002275833A (en) * 2001-03-15 2002-09-25 Topy Ind Ltd Continuing method of simple beam of existing bridge and continuous beam structure
KR100540625B1 (en) * 2003-05-27 2006-01-11 주식회사 노빌테크 Constructing Method of Composite Beam Stiffened with In-Situ Concrete Panel Having Embedded Lower Flange
KR100982659B1 (en) * 2010-02-18 2010-09-16 주식회사 케이원레일 Laminated elastomeric bearing and apparatus for enhancing fixing power of finger joint on bridges

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20230040641A (en) * 2021-09-16 2023-03-23 (주)에이치앤디건설 Unsupported formwork construction method using socket member

Also Published As

Publication number Publication date
KR101932440B1 (en) 2018-12-26

Similar Documents

Publication Publication Date Title
KR101449708B1 (en) Improving structure integrity with topping concrete and improved shear load carrying of hollow slab structure using shear reinforcing bar and constructing method using the same
JPS6114287B2 (en)
TW201704594A (en) A module for a structure
KR101222620B1 (en) Prestressed concrete girder and it's manufacture and construction method which used pretensioning steel plate
JP2013530322A (en) REINFORCING METHOD AND REINFORCING DEVICE FOR REINFORCING AND WEIGHTING FLOOR AND ROOF FRAME STRUCTURE
KR100613592B1 (en) Method for mending/reinforcing crack of concrete structures using a stainless steel wire mesh
KR101665482B1 (en) Method for Constructing Long Span Continuous Bridge of Spliced Prestressed Concrete Girders without Temporary Supports
KR102153007B1 (en) Precast slab under groove and shear truss member and construction method thereof
KR100761785B1 (en) Mold-concrete composite crossbeam
KR101924092B1 (en) Temporary structure and constructing method for the same
KR101665121B1 (en) Method of manufacturing composite girder for bridge
KR20160115602A (en) Method of replacing bridge deck slab and prestressed concrete girder assembly used therein
JP6517122B2 (en) Superstructure of T-girder bridge
KR20130005928A (en) A composite steel box girder using prestressed concrete for a positive moment area of a bridge
KR101932440B1 (en) Method of manufacturing prestressed composite girder, method thereof and of constructing continuous birdge upper structure of using same
KR101020483B1 (en) Apparatus having a girder connection anchor plate and construction method for continuity of precast prestressed concrete girder bridges using the same apparatus
KR100631029B1 (en) Precasted concrete plate assembly and the construction method using thereof
KR101815009B1 (en) Rahmen bridge construction method using hinge and protection for upset joint
KR101067717B1 (en) Process for producing prestressed concrete girder and concrete girder structure
KR101028372B1 (en) Construction for connection of the truss assembled deck plates
JP3877995B2 (en) How to build a string string bridge
KR101807234B1 (en) Apparatus for introducing compressive force in slab of a bridge and method for constructing a bridge having the same
KR101958862B1 (en) Continuous concrete girder and bridge structure using the same
KR20170043687A (en) Apparatus for introducing compressive force in slab of a bridge and method for constructing a bridge having the same
KR100556721B1 (en) Prestressed composite girder manufactured by connection of prestressed composite beam units through precast coupling device and bridge construction method using the composite girder

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant