KR20180059077A - Flexible barrier of preventing debris flows and method of preventing debris flow disaster - Google Patents

Flexible barrier of preventing debris flows and method of preventing debris flow disaster Download PDF

Info

Publication number
KR20180059077A
KR20180059077A KR1020160158230A KR20160158230A KR20180059077A KR 20180059077 A KR20180059077 A KR 20180059077A KR 1020160158230 A KR1020160158230 A KR 1020160158230A KR 20160158230 A KR20160158230 A KR 20160158230A KR 20180059077 A KR20180059077 A KR 20180059077A
Authority
KR
South Korea
Prior art keywords
wire ropes
wire rope
ropes
wire
horizontal
Prior art date
Application number
KR1020160158230A
Other languages
Korean (ko)
Other versions
KR101942012B1 (en
Inventor
권태혁
최신규
Original Assignee
한국과학기술원
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국과학기술원 filed Critical 한국과학기술원
Priority to KR1020160158230A priority Critical patent/KR101942012B1/en
Publication of KR20180059077A publication Critical patent/KR20180059077A/en
Application granted granted Critical
Publication of KR101942012B1 publication Critical patent/KR101942012B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F7/00Devices affording protection against snow, sand drifts, side-wind effects, snowslides, avalanches or falling rocks; Anti-dazzle arrangements ; Sight-screens for roads, e.g. to mask accident site
    • E01F7/04Devices affording protection against snowslides, avalanches or falling rocks, e.g. avalanche preventing structures, galleries

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

A flexible barrier for preventing a debris flow comprises: a plurality of first wire ropes extended in a first direction, respectively, and arranged along a second direction crossing with the first direction; a plurality of second wire ropes extended in the second direction, respectively, arranged along the first direction, and connected to the first wire ropes, respectively; and a mesh supported by the first and second wire ropes and absorbing kinetic energy of the debris flow. Each of the second wire ropes and the mesh are overlapped along a third direction crossing with the first and the second directions.

Description

토석류 방재를 위한 유연성 방호책 및 토석류 방재 방법{FLEXIBLE BARRIER OF PREVENTING DEBRIS FLOWS AND METHOD OF PREVENTING DEBRIS FLOW DISASTER}FIELD OF THE INVENTION [0001] The present invention relates to a flexible barrier for disaster prevention and a disaster prevention method for disaster prevention,

본 발명은 토석류 방재를 위한 유연성 방호책 및 토석류 방재 방법에 관한 것이다. 보다 상세하게는, 와이어 로프를 이용한 토석류 방재를 위한 유연성 방호책 및 토석류 방재 방법에 관한 것이다.The present invention relates to a flexible barrier for disaster prevention and a disaster prevention method. More particularly, the present invention relates to a flexible barrier for disaster prevention using a wire rope and a disaster prevention method.

토석류는 여름철 장마 또는 국지적인 집중 호우 등에 의해 산사태가 일어나 토석이 물과 함께 하류로 세차게 밀려 떠내려가는 현상을 뜻하는 것으로, 상기 토석류에 의한 파괴력 및 이에 의한 피해는 매우 크다.Debris flow is a phenomenon in which a landslide occurs due to summer rainy season or localized heavy rainfall, and soot stones float along with water.

특히, 물에 토석이 섞여 밀려오는 상기 토석류의 파괴력은 단순히 물만 밀려오는 경우에 비하여, 10배 이상의 파괴력을 지니는 것으로 연구되고 있다. 특히, 상기 토석류는 경사를 따라 진행하면서 가속되어, 상기 파괴력이 크게 증가되는 것으로 보고되고 있다.Particularly, the destructive power of the above-mentioned debris, which is mixed with water, is studied to have a destructive power of 10 times or more as compared with the case where only water is pushed. Particularly, it has been reported that the above-mentioned debris is accelerated along a slope and the destructive force is greatly increased.

산이 많은 지역에 있어서, 개천 바닥이 급한 기울기를 가지고 상기 개천 바닥을 따라 흐르는 토석류는 빠른 유속을 가지게 되는 문제가 있다. 이러한 토석류에 의한 피해는 생태계의 훼손 뿐만 아니라 막대한 재산 및 인명 피해를 유발할 수 있다.In a mountainous area, there is a problem that the bottom of the riverbed has a steep slope and soils flowing along the bottom of the riverbed have a high flow rate. The damage caused by these debris can cause damage to the ecosystem as well as damage to property and human life.

상기 토석류의 피해를 줄이기 위해 계곡부를 횡단하여 설치되는 사방댐 등이 설치될 수 있으나, 상기 사방댐은 설치 및 유지보수가 어렵고 생태계를 교란시킬 수 있는 문제가 있다.And a four-way dam installed across the valley to reduce the damage of the above-mentioned debris. However, there is a problem that the four-way dam is difficult to install and maintain and disturb the ecosystem.

이러한 상기 토석류로부터 도로나 선로의 안전 및 주거지의 안전을 확보하기 위해, 상기 토석류의 높은 운동 에너지를 흡수할 수 있는 방호책에 관한 연구가 다양하게 진행되고 있다.In order to secure the safety of roads and lines from the above-mentioned debris, and the safety of the settlement area, various researches have been conducted on a barrier for absorbing high kinetic energy of the above-mentioned debris.

본 발명의 일 과제는 토석류로부터 피해를 효과적으로 줄일 수 있는 토석류 방재를 위한 유연성 방호책을 제공함에 있다.An object of the present invention is to provide a flexible barrier for disaster prevention that can effectively reduce damage from debris.

본 발명의 다른 과제는 토석류로부터 피해를 효과적으로 줄일 수 있는 토석류 방재 방법을 제공함에 있다.Another object of the present invention is to provide a disaster prevention method for effectively reducing damage from debris flow.

본 발명이 해결하고자 하는 과제가 상술한 과제들에 한정되는 것이 아니며, 본 발명의 사상 및 영역으로부터 벗어나지 않는 범위에서 다양하게 확장될 수 있을 것이다.It is to be understood that the invention is not limited to the disclosed exemplary embodiments and that various changes and modifications may be made therein without departing from the spirit and scope of the invention.

상술한 본 발명의 일 과제를 달성하기 위하여, 예시적인 실시예들에 따른 토석류 방재를 위한 유연성 방호책은 제1 방향으로 각각 연장되고 상기 제1 방향과 교차하는 제2 방향을 따라 배열되는 복수의 제1 와이어 로프들, 상기 제2 방향으로 각각 연장되고 상기 제1 방향을 따라 배열되며 상기 제1 와이어 로프들과 각각 연결되는 복수의 제2 와이어 로프들, 및 상기 제1 및 제2 와이어 로프들에 의해 지지되며 토석류의 운동에너지를 흡수하기 위한 그물망을 포함한다. 각각의 상기 제2 와이어 로프들 및 상기 그물망은 상기 제1 및 제2 방향들과 교차하는 제3 방향을 따라 중첩된다.In order to accomplish the above-mentioned object of the present invention, a flexible barrier for disaster prevention according to exemplary embodiments includes a plurality of flexible members, each extending in a first direction and arranged in a second direction intersecting the first direction, 1 wire ropes, a plurality of second wire ropes each extending in the second direction and arranged along the first direction and each connected to the first wire ropes, and a plurality of second wire ropes And includes a mesh for absorbing the kinetic energy of the metamorphic rocks. Each of the second wire ropes and the mesh are superimposed along a third direction intersecting the first and second directions.

예시적인 실시예들에 있어서, 상기 제1 와이어 로프들은 상기 제2 방향을 따라 순차적으로 배열되는 제1 내지 제4 수평 와이어 로프들을 포함할 수 있다. 각각의 상기 제2 와이어 로프들은 상기 제2 방향을 따라 상기 제1 수평 와이어 로프, 상기 제3 수평 와이어 로프, 상기 제2 수평 와이어 로프, 및 상기 제4 수평 와이어 로프와 순차적으로 연결될 수 있다.In exemplary embodiments, the first wire ropes may include first through fourth horizontal wire ropes sequentially arranged along the second direction. Each of the second wire ropes may be sequentially connected to the first horizontal wire rope, the third horizontal wire rope, the second horizontal wire rope, and the fourth horizontal wire rope along the second direction.

예시적인 실시예들에 있어서, 상기 제1 수평 와이어 로프와 연결되는 각각의 상기 제2 와이어 로프들의 일부 및 상기 제3 수평 와이어 로프와 연결되는 각각의 상기 제2 와이어 로프들의 다른 일부를 각각 연결하며, 상기 토석류의 상기 운동에너지에 의하여 기 설정된 부하를 초과하여 인가되는 경우에 끊어질 수 있는 복수의 예비 로프들을 더 포함할 수 있다.In the exemplary embodiments, each of the portions of each of the second wire ropes connected to the first horizontal wire rope and another portion of each of the second wire ropes connected to the third horizontal wire rope, respectively, , And a plurality of preliminary ropes that can be cut off when applied above a predetermined load by the kinetic energy of the above-mentioned debris.

예시적인 실시예들에 있어서, 상기 제1 수평 와이어 로프 및 상기 제3 수평 와이어 로프 사이의 각각의 상기 제2 와이어 로프들의 일부, 상기 제3 수평 와이어 로프 및 상기 제2 수평 와이어 로프 사이의 각각의 상기 제2 와이어 로프들의 다른 일부, 및 상기 제2 수평 와이어 로프 및 상기 제4 수평 와이어 로프 사이의 각각의 상기 제2 와이어 로프들의 또 다른 일부를 서로 연결하고 각각 감싸며, 상기 토석류의 상기 운동에너지에 의해 상기 제2 와이어 로프에 발생되는 부하를 흡수하여 상기 제2 와이어 로프의 중첩된 부분의 크기가 줄어드는 속도를 조절하는 복수의 제1 브레이킹 부재들을 더 포함할 수 있다.In some exemplary embodiments, a portion of each of the second wire ropes between the first horizontal wire rope and the third horizontal wire rope, a portion of each of the third horizontal wire rope and the second horizontal wire rope, And another portion of each of said second wire ropes between said second horizontal wire rope and said fourth horizontal wire rope to each other and surround each other, And a plurality of first braking members for absorbing a load generated in the second wire rope to adjust the speed at which the size of the overlapped portion of the second wire rope is reduced.

예시적인 실시예들에 있어서, 각각의 상기 제1 와이어 로프들에 배치되어 각각의 상기 제1 와이어 로프들을 감싸며, 각각의 상기 제1 와이어 로프들을 상기 제3 방향을 중심으로 원형으로 감고 상기 제3 방향을 따라 중첩시켜, 상기 토석류의 상기 운동에너지에 의해 상기 제1 와이어 로프에 발생되는 부하를 흡수하여 상기 제1 와이어 로프의 원형의 크기가 줄어드는 속도를 조절하는 복수의 제2 브레이킹 부재들을 더 포함할 수 있다.In the exemplary embodiments, each of the first wire ropes is wrapped around each of the first wire ropes, and each of the first wire ropes is rounded about the third direction, And further includes a plurality of second braking members for adjusting a speed at which the size of the circular shape of the first wire rope is reduced by absorbing a load generated in the first wire rope by the kinetic energy of the debris flows can do.

예시적인 실시예들에 있어서, 상기 그물망은 복수의 링들이 서로 연결되는 링 네트를 포함할 수 있다.In exemplary embodiments, the network may include a ring net in which a plurality of rings are connected to each other.

예시적인 실시예들에 있어서, 각각의 상기 제1 와이어 로프들의 일단 및 타단에 연결되며, 지면에 각각의 상기 제1 와이어 로프들을 고정시키는 복수의 앵커들을 더 포함할 수 있다.In exemplary embodiments, it may further comprise a plurality of anchors connected to one end and the other end of each of the first wire ropes and fixing the first wire ropes to each other on the ground.

예시적인 실시예들에 있어서, 각각의 상기 제2 와이어 로프들의 일단은 적어도 하나의 상기 제1 와이어 로프에 연결될 수 있다. 각각의 상기 제2 와이어 로프들의 타단에 연결되며, 상기 지면에 각각의 제2 와이어 로프들을 고정시키는 복수의 베이스 기초대들을 더 포함할 수 있다.In the exemplary embodiments, one end of each of the second wire ropes may be connected to at least one of the first wire ropes. And a plurality of base rods connected to the other end of each of the second wire ropes and fixing the respective second wire ropes to the ground.

상술한 본 발명의 다른 과제를 달성하기 위하여, 예시적인 실시예들에 따른 토석류 방재 방법은 제1 방향으로 각각 연장되고 상기 제1 방향과 교차하는 제2 방향을 따라 배열되는 복수의 제1 와이어 로프들, 상기 제2 방향으로 각각 연장되고 상기 제1 방향을 따라 배열되며 상기 제1 와이어 로프들과 각각 연결되는 복수의 제2 와이어 로프들, 및 상기 제1 및 제2 와이어 로프들에 의해 지지되며 토석류의 운동에너지를 흡수하기 위한 그물망을 포함하며, 각각의 상기 제2 와이어 로프들 및 상기 그물망은 상기 제1 및 제2 방향들과 교차하는 제3 방향을 따라 중첩되는 토석류 방재를 위한 유연성 방호책을 제공한다. 상기 토석류 방재를 위한 유연성 방호책을 지면에 설치한다. 상기 토석류의 상기 운동에너지에 의하여 각각의 상기 제2 와이어 로프들 및 상기 그물망의 상기 제3 방향을 따라 중첩된 부분들이 펼쳐진다.According to another aspect of the present invention, there is provided a method for preventing soil erosion, comprising: disposing a plurality of first wire ropes each extending in a first direction and arranged in a second direction crossing the first direction, A plurality of second wire ropes each extending in the second direction and arranged along the first direction and each connected to the first wire ropes, and a plurality of second wire ropes supported by the first and second wire ropes Wherein each of said second wire ropes and said netting network comprises a flexible barrier for dislocation flooding superimposed along a third direction intersecting said first and second directions, to provide. A flexible barrier for disaster prevention is installed on the ground. The kinetic energy of the debris causes the overlapping portions of the second wire ropes and the nets along the third direction to be unfolded.

예시적인 실시예들에 있어서, 상기 제1 와이어 로프들은 상기 제2 방향을 따라 순차적으로 배열되는 제1 내지 제4 수평 와이어 로프들을 포함할 수 있다. 각각의 상기 제2 와이어 로프들은 상기 제2 방향을 따라 상기 제1 수평 와이어 로프, 상기 제3 수평 와이어 로프, 상기 제2 수평 와이어 로프, 및 상기 제4 수평 와이어 로프와 순차적으로 연결될 수 있다. 상기 토석류 방재를 위한 유연성 방호책은 상기 제1 수평 와이어 로프와 연결되는 각각의 상기 제2 와이어 로프들의 일부 및 상기 제3 수평 와이어 로프와 연결되는 각각의 상기 제2 와이어 로프들의 다른 일부를 각각 연결하는 복수의 예비 로프들을 더 포함할 수 있다. 상기 중첩된 부분들이 펼쳐지는 것은 상기 토석류의 상기 운동에너지에 의하여 기 설정된 부하를 초과하여 인가되는 경우에 각각의 상기 예비 로프들이 끊어지는 것을 포함할 수 있다.In exemplary embodiments, the first wire ropes may include first through fourth horizontal wire ropes sequentially arranged along the second direction. Each of the second wire ropes may be sequentially connected to the first horizontal wire rope, the third horizontal wire rope, the second horizontal wire rope, and the fourth horizontal wire rope along the second direction. Wherein the flexibility barrier for destructive disruption connects a portion of each of the second wire ropes connected to the first horizontal wire rope and another portion of each of the second wire ropes connected to the third horizontal wire rope, And may further comprise a plurality of spare ropes. The expansion of the overlapping portions may include the breaking of each of the spare ropes when applied by the kinetic energy of the debris exceeding a predetermined load.

예시적인 실시예들에 있어서, 상기 토석류 방재를 위한 유연성 방호책은 상기 제1 수평 와이어 로프 및 상기 제3 수평 와이어 로프 사이의 각각의 상기 제2 와이어 로프들의 일부, 상기 제3 수평 와이어 로프 및 상기 제2 수평 와이어 로프 사이의 각각의 상기 제2 와이어 로프들의 다른 일부, 및 상기 제2 수평 와이어 로프 및 상기 제4 수평 와이어 로프 사이의 각각의 상기 제2 와이어 로프들의 또 다른 일부를 서로 연결하고 각각 감싸는 복수의 제1 브레이킹 부재들을 더 포함할 수 있다. 상기 중첩된 부분들이 펼쳐지는 것은 각각의 상기 제1 브레이킹 부재들이 상기 토석류의 상기 운동에너지에 의하여 상기 제2 와이어 로프에 발생되는 부하를 흡수하여 상기 제2 와이어 로프의 중첩된 부분의 크기가 줄어드는 속도를 조절하는 것을 더 포함할 수 있다.In the exemplary embodiments, the flexibility barrier for destructive disruption may include a portion of each of the second wire ropes between the first horizontal wire rope and the third horizontal wire rope, the third horizontal wire rope, Connecting another portion of each of said second wire ropes between two horizontal wire ropes and another portion of each said second wire ropes between said second horizontal wire rope and said fourth horizontal wire rope, And may further include a plurality of first braking members. Wherein the overlapping portions are deployed is such that each of the first braking members absorbs the load generated in the second wire rope by the kinetic energy of the debris flow so that the size of the overlapped portion of the second wire rope is reduced As shown in FIG.

예시적인 실시예들에 있어서, 상기 토석류 방재를 위한 유연성 방호책은 각각의 상기 제1 와이어 로프들에 배치되어 각각의 상기 제1 와이어 로프들을 감싸며, 각각의 상기 제1 와이어 로프들을 상기 제3 방향을 중심으로 감고 상기 제3 방향을 따라 중첩시키는 복수의 제2 브레이킹 부재들을 더 포함할 수 있다. 상기 중첩된 부분들이 펼쳐지는 것은 각각의 상기 제2 브레이킹 부재들이 상기 토석류의 상기 운동에너지에 의하여 상기 제1 와이어 로프에 발생되는 부하를 흡수하여 상기 제1 와이어 로프의 원형의 크기가 줄어드는 속도를 조절하는 것을 더 포함할 수 있다.In exemplary embodiments, the flexibility barrier for dislocation disruption may be disposed in each of the first wire ropes to wrap each of the first wire ropes, and each of the first wire ropes may extend in the third direction And a plurality of second braking members which are wound around the center and overlap along the third direction. Wherein the overlapping portions are deployed is such that each of the second braking members absorbs the load generated in the first wire rope by the kinetic energy of the deformation stone to control the rate at which the size of the prototype of the first wire rope decreases And < / RTI >

예시적인 실시예들에 있어서, 상기 토석류 방재를 위한 유연성 방호책은 각각의 상기 제1 와이어 로프들의 일단 및 타단에 연결되는 복수의 앵커들을 더 포함할 수 있다. 상기 토석류 방재를 위한 유연성 방호책을 상기 지면에 설치하는 것은 상기 앵커들을 이용하여 상기 지면에 각각의 상기 제1 와이어 로프들을 고정시키는 것을 포함할 수 있다.In exemplary embodiments, the flexibility barrier for dislocation disruption may further include a plurality of anchors connected to one end and the other end of each of the first wire ropes. The provision of a flexural barrier to the ground for dislocation disruption may include securing each of the first wire ropes to the ground using the anchors.

예시적인 실시예들에 있어서, 각각의 상기 제2 와이어 로프들의 일단은 적어도 하나의 상기 제1 와이어 로프에 연결될 수 있다. 상기 토석류 방재를 위한 유연성 방호책은 각각의 상기 제2 와이어 로프들의 타단에 연결되는 복수의 베이스 기초대들을 더 포함할 수 있다. 상기 토석류 방재를 위한 유연성 방호책을 상기 지면에 설치하는 것은 상기 베이스 기초대들을 이용하여 상기 지면에 각각의 제2 와이어 로프들을 고정시키는 것을 더 포함할 수 있다.In the exemplary embodiments, one end of each of the second wire ropes may be connected to at least one of the first wire ropes. The flexural barrier for dislocation disruption may further include a plurality of base bases connected to the other end of each of the second wire ropes. The provision of a flexural barrier to the ground for dislocating the soil may further comprise securing each of the second wire ropes to the ground using the base bases.

전술한 바와 같이 본 발명의 예시적인 실시예들에 따른 토석류 방재를 위한 유연성 방호책 및 토석류 방재 방법은 토석류의 운동에너지에 의하여 각각의 제2 와이어 로프들 및 그물망의 중첩된 부분들이 펼쳐진다.As described above, according to the exemplary embodiments of the present invention, the flexural barrier and the anti-earth stone disaster prevention method for disaster prevention disrupt the unfolded portions of the respective second wire ropes and the mesh by the kinetic energy of the earth rock.

이에 따라, 상기 토석류 방재를 위한 유연성 방호책 및 상기 토석류 방재 방법은 상기 토석류의 운동에너지를 흡수하고, 많은 양의 부하를 견딜 수 있어 생태계를 보호하고 상기 토석류가 발생된 지역의 재산 및 인명 피해를 줄일 수 있는 장점이 있다.Accordingly, the flexible barrier for disaster prevention and the disaster prevention method can absorb the kinetic energy of the earths stone, withstand a large amount of load, protect the ecosystem, and reduce damage to property and human life There are advantages to be able to.

구체적으로, 상기 토석류가 발생되기 전에는 예비 로프들이 상기 제2 와이어 로프들 및 상기 그물망의 형태를 유지시키며, 상기 토석류의 상기 운동에너지에 의하여 기 설정된 부하를 초과하여 인가되는 경우에 각각의 상기 예비 로프들이 끊어지면서 각각의 상기 제2 와이어 로프들 및 상기 그물망이 중첩된 부분이 펼쳐질 수 있다.Specifically, before the debris flows out, the preliminary ropes maintain the shape of the second wire ropes and the mesh, and when the preliminary ropes are applied in excess of a predetermined load by the kinetic energy of the debris, The portions where the second wire ropes and the network are overlapped with each other can be unfolded.

또한, 각각의 상기 제2 와이어 로프들에 설치된 각각의 제1 브레이킹 부재들이 상기 토석류의 상기 운동에너지에 의하여 상기 제2 와이어 로프에 발생되는 부하를 흡수하여 상기 제2 와이어 로프의 중첩된 부분의 크기가 줄어드는 속도를 조절할 수 있다.Each of the first braking members installed on each of the second wire ropes absorbs the load generated in the second wire rope by the kinetic energy of the unburstant, so that the size of the overlapped portion of the second wire rope Can be controlled.

나아가, 각각의 제1 와이어 로프들에 설치된 각각의 제2 브레이킹 부재들이 상기 토석류의 상기 운동에너지에 의하여 상기 제1 와이어 로프에 발생되는 부하를 흡수하여 상기 제1 와이어 로프의 원형의 크기가 줄어드는 속도를 조절할 수 있다.Further, each of the second braking members installed on each of the first wire ropes absorbs the load generated in the first wire rope by the kinetic energy of the debris flow so that the size of the circular shape of the first wire rope decreases Can be adjusted.

따라서, 상기 토석류 방재를 위한 유연성 방호책 및 상기 토석류 방재 방법은 상기 제2 와이어 로프들 및 상기 그물망의 중첩된 부분이 펼쳐지거나, 상기 제1 및 제2 브레이킹 부재들을 이용하여 상기 토석류의 높은 운동에너지를 흡수할 수 있으며, 상기 토석류로부터 도로나 선로의 안전 및 주거지의 안전을 확보할 수 있다.Accordingly, the flexible barrier for disaster prevention and the disaster prevention method can be constructed so that the overlapped portion of the second wire ropes and the mesh network is unfolded or the high kinetic energy of the undrained stone is increased by using the first and second braking members And it is possible to secure the safety of roads and lines and the security of residential areas from the above-mentioned debris.

도 1은 예시적인 실시예들에 따른 토석류 방재를 위한 유연성 방호책을 나타내는 평면도이다.
도 2는 도 1의 I-I' 라인을 따라 절단한 단면도이다.
도 3은 도 1의 제1 및 제2 와이어 로프들을 나타내는 사시도이다.
도 4 및 도 5는 도 1의 토석류 방재를 위한 유연성 방호책의 작동 원리를 나타내는 단면도 및 사시도이다.
도 6은 도 1의 A 부분을 나타내는 확대도이다.
도 7은 도 1의 그물망의 링을 나타내는 사시도이다.
도 8은 예시적인 실시예들에 따른 토석류 방재를 위한 유연성 방호책을 나타내는 평면도이다.
도 9는 도 8의 B 부분을 나타내는 사시도이다.
도 10은 도 8의 예시적인 실시예들에 따른 제1 브레이킹 부재를 나타내는 사시도이다.
도 11은 예시적인 실시예들에 따른 토석류 방재를 위한 유연성 방호책을 나타내는 평면도이다.
도 12는 도 11의 제2 브레이킹 부재를 나타내는 사시도이다.
도 13은 예시적인 실시예들에 따른 토석류 방재 방법을 나타내는 흐름도이다.
BRIEF DESCRIPTION OF THE DRAWINGS Fig. 1 is a plan view showing a flexible barrier for disaster prevention according to exemplary embodiments. Fig.
2 is a cross-sectional view taken along line II 'of FIG.
Figure 3 is a perspective view showing the first and second wire ropes of Figure 1;
Figs. 4 and 5 are a cross-sectional view and a perspective view showing the operation principle of the flexibility barrier for disaster prevention of Fig. 1;
6 is an enlarged view showing part A of Fig.
7 is a perspective view showing a ring of the mesh of FIG.
8 is a plan view showing a flexibility barrier for dislocation disruption according to exemplary embodiments.
9 is a perspective view showing part B of Fig.
10 is a perspective view illustrating a first braking member in accordance with the exemplary embodiments of FIG. 8;
FIG. 11 is a top view showing a flexibility barrier for dislocation disruption according to exemplary embodiments. FIG.
12 is a perspective view showing the second braking member of Fig.
Fig. 13 is a flowchart showing a method for preventing soil erosion according to exemplary embodiments. Fig.

본문에 개시되어 있는 본 발명의 실시예들에 대해서, 특정한 구조적 내지 기능적 설명들은 단지 본 발명의 실시예를 설명하기 위한 목적으로 예시된 것으로, 본 발명의 실시예들은 다양한 형태로 실시될 수 있으며 본문에 설명된 실시예들에 한정되는 것으로 해석되어서는 아니 된다.For the embodiments of the invention disclosed herein, specific structural and functional descriptions are set forth for the purpose of describing an embodiment of the invention only, and it is to be understood that the embodiments of the invention may be practiced in various forms, The present invention should not be construed as limited to the embodiments described in Figs.

본 발명은 다양한 변경을 가할 수 있고 여러 가지 형태를 가질 수 있는바, 특정 실시예들을 도면에 예시하고 본문에 상세하게 설명하고자 한다. 그러나 이는 본 발명을 특정한 개시 형태에 대해 한정하려는 것이 아니며, 본 발명의 사상 및 기술 범위에 포함되는 모든 변경, 균등물 내지 대체물을 포함하는 것으로 이해되어야 한다.The present invention is capable of various modifications and various forms, and specific embodiments are illustrated in the drawings and described in detail in the text. It is to be understood, however, that the invention is not intended to be limited to the particular forms disclosed, but on the contrary, is intended to cover all modifications, equivalents, and alternatives falling within the spirit and scope of the invention.

제 1, 제 2 등의 용어는 다양한 구성요소들을 설명하는데 사용될 수 있지만, 상기 구성요소들은 상기 용어들에 의해 한정되어서는 안 된다. 상기 용어들은 하나의 구성요소를 다른 구성요소로부터 구별하는 목적으로 사용될 수 있다. 예를 들어, 본 발명의 권리 범위로부터 이탈되지 않은 채 제 1 구성요소는 제 2 구성요소로 명명될 수 있고, 유사하게 제 2 구성요소도 제 1 구성요소로 명명될 수 있다. The terms first, second, etc. may be used to describe various components, but the components should not be limited by the terms. The terms may be used for the purpose of distinguishing one component from another. For example, without departing from the scope of the present invention, the first component may be referred to as a second component, and similarly, the second component may also be referred to as a first component.

어떤 구성요소가 다른 구성요소에 "연결되어" 있다거나 "접속되어" 있다고 언급된 때에는, 그 다른 구성요소에 직접적으로 연결되어 있거나 또는 접속되어 있을 수도 있지만, 중간에 다른 구성요소가 존재할 수도 있다고 이해되어야 할 것이다. 반면에, 어떤 구성요소가 다른 구성요소에 "직접 연결되어" 있다거나 "직접 접속되어" 있다고 언급된 때에는, 중간에 다른 구성요소가 존재하지 않는 것으로 이해되어야 할 것이다. 구성요소들 간의 관계를 설명하는 다른 표현들, 즉 "~사이에"와 "바로 ~사이에" 또는 "~에 이웃하는"과 "~에 직접 이웃하는" 등도 마찬가지로 해석되어야 한다. It is to be understood that when an element is referred to as being "connected" or "connected" to another element, it may be directly connected or connected to the other element, . On the other hand, when an element is referred to as being "directly connected" or "directly connected" to another element, it should be understood that there are no other elements in between. Other expressions that describe the relationship between components, such as "between" and "between" or "neighboring to" and "directly adjacent to" should be interpreted as well.

본 출원에서 사용한 용어는 단지 특정한 실시예를 설명하기 위해 사용된 것으로, 본 발명을 한정하려는 의도가 아니다. 단수의 표현은 문맥상 명백하게 다르게 뜻하지 않는 한, 복수의 표현을 포함한다. 본 출원에서, "포함하다" 또는 "가지다" 등의 용어는 설시된 특징, 숫자, 단계, 동작, 구성요소, 부분품 또는 이들을 조합한 것이 존재함을 지정하려는 것이지, 하나 또는 그 이상의 다른 특징들이나 숫자, 단계, 동작, 구성요소, 부분품 또는 이들을 조합한 것들의 존재 또는 부가 가능성을 미리 배제하지 않는 것으로 이해되어야 한다.The terminology used in this application is used only to describe a specific embodiment and is not intended to limit the invention. The singular expressions include plural expressions unless the context clearly dictates otherwise. In the present application, the terms "comprise", "having", and the like are intended to specify the presence of stated features, integers, steps, operations, elements, components, or combinations thereof, , Steps, operations, components, parts, or combinations thereof, as a matter of principle.

다르게 정의되지 않는 한, 기술적이거나 과학적인 용어를 포함해서 여기서 사용되는 모든 용어들은 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자에 의해 일반적으로 이해되는 것과 동일한 의미이다. 일반적으로 사용되는 사전에 정의되어 있는 것과 같은 용어들은 관련 기술의 문맥상 가지는 의미와 일치하는 의미인 것으로 해석되어야 하며, 본 출원에서 명백하게 정의하지 않는 한, 이상적이거나 과도하게 형식적인 의미로 해석되지 않는다.Unless otherwise defined, all terms used herein, including technical or scientific terms, have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. Terms such as those defined in commonly used dictionaries should be construed as meaning consistent with meaning in the context of the relevant art and are not to be construed as ideal or overly formal in meaning unless expressly defined in the present application .

도 1은 예시적인 실시예들에 따른 토석류 방재를 위한 유연성 방호책을 나타내는 평면도이다. 도 2는 도 1의 I-I' 라인을 따라 절단한 단면도이다. 도 3은 도 1의 제1 및 제2 와이어 로프들을 나타내는 사시도이다. 도 4 및 도 5는 도 1의 토석류 방재를 위한 유연성 방호책의 작동 원리를 나타내는 단면도 및 사시도이다. 도 6은 도 1의 A 부분을 나타내는 확대도이다. 도 7은 도 1의 그물망의 링을 나타내는 사시도이다.BRIEF DESCRIPTION OF THE DRAWINGS Fig. 1 is a plan view showing a flexible barrier for disaster prevention according to exemplary embodiments. Fig. 2 is a cross-sectional view taken along line I-I 'of FIG. Figure 3 is a perspective view showing the first and second wire ropes of Figure 1; Figs. 4 and 5 are a cross-sectional view and a perspective view showing the operation principle of the flexibility barrier for disaster prevention of Fig. 1; 6 is an enlarged view showing part A of Fig. 7 is a perspective view showing a ring of the mesh of FIG.

도 1 내지 도 7을 참조하면, 예시적인 실시예들에 따른 토석류 방재를 위한 유연성 방호책(10)은 복수의 제1 와이어 로프들(100, 110, 120, 130), 복수의 제2 와이어 로프들(200, 210, 220), 및 그물망(300)을 포함한다.1 to 7, a flexible barrier 10 for a dislocation barrier according to exemplary embodiments includes a plurality of first wire ropes 100, 110, 120, 130, a plurality of second wire ropes 100, (200, 210, 220), and a mesh (300).

각각의 제1 와이어 로프들(100, 110, 120, 130)은 제1 방향(D1)으로 각각 연장될 수 있다. 또한, 제1 와이어 로프들(100, 110, 120, 130)은 제1 방향(D1)과 교차하는 제2 방향(D2)을 따라 배열될 수 있다. 예를 들어, 제1 방향(D1)과 제2 방향(D3)은 실질적으로 서로 수직할 수 있다.Each of the first wire ropes 100, 110, 120, 130 may extend in a first direction D1. In addition, the first wire ropes 100, 110, 120, and 130 may be arranged along a second direction D2 that intersects the first direction D1. For example, the first direction D1 and the second direction D3 may be substantially perpendicular to each other.

각각의 제1 와이어 로프들(100, 110, 120, 130)은 수 개의 철사를 꼬아서 1줄의 새끼줄을 형성하고, 수 개의 새끼줄들을 서로 꼬아서 만들어질 수 있다. 예를 들어, 각각의 제1 와이어 로프들(100, 110, 120, 130)은 상기 새끼줄의 꼬임 방향에 따라서 S꼬임 포르 또는 Z꼬임 로프를 포함할 수 있다.Each of the first wire ropes 100, 110, 120, and 130 may be formed by twisting several wires to form one strand and twining several strands together. For example, each of the first wire ropes 100, 110, 120, 130 may include an S-twisted or Z-twisted rope depending on the twist direction of the twisted wire.

예를 들어, 각각의 제1 와이어 로프들(100, 110, 120, 130)은 스테인리스 스틸 등을 포함할 수 있으며, 각각이 제1 와이어 로프들(100, 110, 120, 130)은 코팅층(도시되지 않음)을 더 포함할 수 있다.For example, each of the first wire ropes 100, 110, 120, 130 may comprise stainless steel or the like, and each of the first wire ropes 100, 110, 120, (Not shown).

예시적인 실시예들에 있어서, 토석류 방재를 위한 유연성 방호책(10)은 제1 방향(D1)으로 각각 연장되며, 제2 방향(D2)을 따라 배열되는 복수의 제1 보조 와이어 로프들(105, 115, 125)을 더 포함할 수 있다. 예를 들어, 제1 와이어 로프들(100, 110, 120, 130)의 각각의 크기는 제1 보조 와이어 로프들(105, 115, 125)의 각각의 크기보다 클 수 있다.In the exemplary embodiments, the flexibility barriers 10 for destructive disaster prevention include a plurality of first auxiliary wire ropes 105, 105 extending in a first direction D1 and arranged along a second direction D2, 115, and 125, respectively. For example, the size of each of the first wire ropes 100, 110, 120, 130 may be greater than the size of each of the first auxiliary wire ropes 105, 115, 125.

제2 와이어 로프들(200, 210, 220)은 제2 방향(D2)으로 각각 연장될 수 있다. 또한, 제2 와이어 로프들(200, 210, 220)은 제1 방향(D1)을 따라 배열되며 제1 와이어 로프들(100, 110, 120)과 각각 연결될 수 있다.The second wire ropes 200, 210, 220 may extend in the second direction D2, respectively. The second wire ropes 200, 210 and 220 may be arranged along the first direction D1 and connected to the first wire ropes 100, 110 and 120, respectively.

각각의 제2 와이어 로프들(200, 210, 220)은 수 개의 철사를 꼬아서 1줄의 새끼줄을 형성하고, 수 개의 새끼줄들을 서로 꼬아서 만들어질 수 있다. 예를 들어, 각각의 제2 와이어 로프들(200, 210, 220)은 상기 새끼줄의 꼬임 방향에 따라서 S꼬임 포르 또는 Z꼬임 로프를 포함할 수 있다.Each of the second wire ropes 200, 210, and 220 may be formed by twisting several wires to form one strand and twining several strands together. For example, each of the second wire ropes 200, 210, 220 may comprise an S-twisted or Z-twisted rope in accordance with the twist direction of the barb.

예를 들어, 각각의 제2 와이어 로프들(200, 210, 220)은 스테인리스 스틸 등을 포함할 수 있으며, 각각이 제2 와이어 로프들(200, 210, 220)은 코팅층(도시되지 않음)을 더 포함할 수 있다.For example, each of the second wire ropes 200, 210, and 220 may include stainless steel or the like, and each of the second wire ropes 200, 210, and 220 may include a coating layer (not shown) .

예시적인 실시예들에 있어서, 토석류 방재를 위한 유연성 방호책(10)은 제2 방향(D2)으로 각각 연장되며, 제1 방향(D1)을 따라 배열되는 복수의 제2 보조 와이어 로프들(205, 215)을 더 포함할 수 있다. 예를 들어, 제2 와이어 로프들(200, 210, 220)의 각각의 크기는 제2 보조 와이어 로프들(205, 215)의 각각의 크기보다 클 수 있다.In the exemplary embodiments, the flexibility barrier 10 for de-stones flow prevention comprises a plurality of second auxiliary wire ropes 205, 205 extending in a second direction D2 and arranged along a first direction D1, 215). For example, the size of each of the second wire ropes 200, 210, 220 may be greater than the size of each of the second auxiliary wire ropes 205, 215.

그물망(300)은 제1 및 제2 와이어 로프들(100, 110, 120, 130, 200, 210, 220)에 의해 지지되며 연결될 수 있다. 그물망(300)은 토석류의 운동에너지를 흡수할 수 있다.The mesh 300 may be supported and connected by the first and second wire ropes 100, 110, 120, 130, 200, 210, 220. The mesh 300 can absorb the kinetic energy of the metamorphic rocks.

예를 들어, 그물망(300)은 체결수단(도시되지 않음)에 의해 제1 및 제2 와이어 로프들(100, 110, 120, 130, 200, 210, 220)에 체결될 수 있다. 상기 체결수단은 단면이 C형상인 금속부재를 포함할 수 있으며, 상기 금속부재를 그물망(300) 및 상기 제1 및 제2 와이어 로프들에 끼운 후 클램핑 공구로 서로 고정시킬 수 있다.For example, the mesh 300 may be fastened to the first and second wire ropes 100, 110, 120, 130, 200, 210, 220 by fastening means (not shown). The fastening means may include a metal member having a C-shaped cross section, and the metal member may be fixed to the mesh 300 and the first and second wire ropes, and then clamped together with a clamping tool.

도 6 및 도 7에 도시된 바와 같이, 그물망(300)은 복수의 링들(302)이 서로 교차하여 연결되는 링네트를 포함할 수 있다. 각각의 링들(302)은 선재를 복수회 돌려 감아 선재 다발(310)을 형성하고, 선재 다발(310)의 둘레방향의 여러 부분들을 체결수단(320)으로 고정하여 형성될 수 있다. 체결수단(320)은 예를 들어, 단면이 C형상이며 원통 형상을 갖는 금속 부재일 수 있다.As shown in FIGS. 6 and 7, the network 300 may include a ring net in which a plurality of rings 302 are connected to each other. Each of the rings 302 may be formed by winding a plurality of turns of the wire to form a wire bundle 310 and fixing various circumferential portions of the wire bundle 310 with the fastening means 320. The fastening means 320 may be, for example, a metal member having a C-shaped cross section and a cylindrical shape.

상기 선재의 감김 횟수를 가감하거나 상기 선재의 굵기를 조절하여, 각각의 링들(302)의 상기 토석류의 상기 운동에너지에 대한 흡수력을 조정할 수 있다. 예를 들어, 상기 선재는 강재를 포함할 수 있다.The absorbing power for the kinetic energy of the debris of each ring 302 can be adjusted by increasing or decreasing the number of winding of the wire rod. For example, the wire rod may include a steel material.

그물망(300)에 상기 토석류의 상기 운동에너지에 의한 부하가 인가되었을 때, 선재 다발(310)의 상기 선재는 서로 슬라이딩되며 마찰력에 의해 상기 부하를 흡수할 수 있다. 또한, 각각의 링들(302)은 원형 형상의 크기가 커지거나, 다각형의 형상으로 변형하면서 상기 부하를 흡수할 수도 있다.When the load due to the kinetic energy of the above-mentioned debris is applied to the mesh 300, the wire rod of the wire bundle 310 slides and can absorb the load by frictional force. Further, each of the rings 302 may absorb the load while increasing the size of the circular shape or deforming into a polygonal shape.

도 2 및 도 3에 도시된 바와 같이, 각각의 제2 와이어 로프들(200, 210, 220) 및 그물망(300)은 제1 및 제2 방향들(D1, D2)과 교차하는 제3 방향(D3)을 따라 중첩될 수 있으며, 상기 토석류의 상기 운동에너지에 의해 발생되는 부하가 흡수되며 제3 방향(D3)을 따라 중첩되는 각각의 제2 와이어 로프들(200, 210, 220)의 부분은 펼쳐질 수 있다.2 and 3, each of the second wire ropes 200, 210, 220 and the network 300 may be disposed in a third direction (a first direction) intersecting the first and second directions D1, D3 and the portion of each of the second wire ropes 200, 210, 220 that is absorbed by the kinetic energy of the debris and overlaps along the third direction D3 Can be unfolded.

구체적으로, 제1 와이어 로프들(100, 110, 120, 130)은 제2 방향(D2)을 따라 순차적으로 배열되는 제1 수평 와이어 로프(100), 제2 수평 와이어 로프(110), 제3 수평 와이어 로프(120), 및 제4 수평 와이어 로프(130)를 포함할 수 있다.Specifically, the first wire ropes 100, 110, 120, and 130 include a first horizontal wire rope 100, a second horizontal wire rope 110, a third horizontal wire rope 100, and a third horizontal wire rope 100, which are sequentially arranged along a second direction D2. A horizontal wire rope 120, and a fourth horizontal wire rope 130.

또한, 각각의 제2 와이어 로프들(200, 210, 220)은 제2 방향(D2)을 따라 제1 수평 와이어 로프(100), 제3 수평 와이어 로프(120), 제2 수평 와이어 로프(110), 및 제4 수평 와이어 로프(130)와 순차적으로 연결될 수 있다.Each of the second wire ropes 200, 210 and 220 is connected to the first horizontal wire rope 100, the third horizontal wire rope 120, the second horizontal wire rope 110 ), And the fourth horizontal wire rope (130).

이에 따라, 각각의 제2 와이어 로프들(200, 210, 220) 및 제2 와이어 로프들(200, 210, 200)에 의해 지지되는 그물망(300)은 제3 방향(D3)을 따라 중첩되는 부분이 형성될 수 있다.The mesh 300 supported by each of the second wire ropes 200, 210 and 220 and the second wire ropes 200, 210 and 200 is positioned in the third direction D3, Can be formed.

예시적인 실시예들에 있어서, 토석류 방재를 위한 유연성 방호책(10)은 제1 수평 와이어 로프(100)와 연결되는 제2 와이어 로프(210)의 일부 및 제3 수평 와이어 로프(120)와 연결되는 제2 와이어 로프(220)의 다른 일부를 연결하는 예비 로프(214)를 더 포함할 수 있다. 예를 들어, 토석류 방재를 위한 유연성 방호책(10)은 복수의 예비 로프들(214)을 더 포함할 수 있다.In the exemplary embodiments, the flexural barrier 10 for deforestation has a portion of the second wire rope 210 connected to the first horizontal wire rope 100 and a portion of the second wire rope 210 connected to the third horizontal wire rope 120 And a preliminary rope 214 connecting another portion of the second wire rope 220. For example, the flexibility barrier 10 for the prevention of soil erosion can further include a plurality of spare ropes 214.

예비 로프(214)는 상기 토석류의 상기 운동에너지에 의하여 기 설정된 부하가 초과하여 인가되는 경우에 끊어질 수 있다. 예를 들어, 예비 로프(214)는 50KJ의 부하가 인가되는 경우에 끊어질 수 있다. 이와는 달리, 예비 로프(214)는 200KJ의 부하가 인가되는 경우에 끊어질 수 있다.The preliminary rope 214 may be broken if the predefined load is applied in excess by the kinetic energy of the debris. For example, spare rope 214 may be broken when a load of 50 KJ is applied. Alternatively, the spare rope 214 may be broken if a load of 200 KJ is applied.

예를 들어, 예비 로프(214)는 와이어 로프 또는 스프링과 같은 탄성 부재를 포함할 수 있으며, 도 4 및 도 5에 도시된 바와 같이, 예비 로프(214)는 상기 기 설정된 부하가 초과하여 인가되는 경우에 끊어지면서, 제3 방향(D3)을 따라 중첩되는 각각의 제2 와이어 로프들(200, 210, 220)의 상기 부분은 펼쳐질 수 있다.For example, the spare rope 214 may include an elastic member such as a wire rope or spring, and as shown in Figures 4 and 5, the spare rope 214 may be applied The portions of each of the second wire ropes 200, 210, 220 that overlap along the third direction D3 may be unfolded.

예시적인 실시예들에 있어서, 토석류 방재를 위한 유연성 방호책(10)은 각각의 제1 와이어 로프들(100, 110, 120, 130)의 일단 및 타단에 연결되며, 지면에 각각의 제1 와이어 로프들(100, 110, 120, 130)을 고정시키는 복수의 앵커들(102, 104, 112, 114, 122, 124, 132, 134)을 더 포함할 수 있다. 예를 들어, 상기 앵커들은 금속 부재를 포함할 수 있다.In the exemplary embodiments, the flexural barrier 10 for the prevention of soil erosion is connected to one end and the other end of each of the first wire ropes 100, 110, 120, 130, And a plurality of anchors 102, 104, 112, 114, 122, 124, 132, 134 for fixing the plurality of anchors 100, 110, 120, For example, the anchors may include metal members.

또한, 각각의 제2 와이어 로프들(200, 210, 220)의 일단은 제1 수평 와이어 로프(100)에 연결될 수 있다. 예시적인 실시예들에 있어서, 토석류 방재를 위한 유연성 방호책(10)은 각각의 제2 와이어 로프들(200, 210, 220)의 타단에 연결되며 상기 지면에 각각의 제2 와이어 로프들(200, 210, 220)을 고정시키는 복수의 베이스 기초대들(202, 212, 222)을 더 포함할 수 있다. 예를 들어, 베이스 기초대들(202, 212, 222)은 콘트리트를 포함할 수 있다.Further, one end of each of the second wire ropes 200, 210, 220 may be connected to the first horizontal wire rope 100. In the exemplary embodiments, a flexural barrier 10 for the prevention of deforestation is connected to the other end of each of the second wire ropes 200, 210, 220, and each of the second wire ropes 200, 212, 222 for fixing the base plates 210, 220, 220, respectively. For example, the base bases 202, 212, 222 may comprise a concrete.

예시적인 실시예들에 따른 토석류 방재를 위한 유연성 방호책(10)은 상기 토석류의 상기 운동에너지에 의하여 각각의 제2 와이어 로프들(200, 210, 220) 및 그물망(300)의 중첩된 상기 부분들이 펼쳐진다.The flexibility barrier 10 for the prevention of deforestation according to exemplary embodiments allows the second wire ropes 200, 210, 220 and the overlapping portions of the mesh 300 to be separated by the kinetic energy of the debris It unfolds.

이에 따라, 토석류 방재를 위한 유연성 방호책(10)은 상기 토석류의 상기 운동에너지를 흡수하고, 많은 양의 부하를 견딜 수 있어 생태계를 보호하고 상기 토석류가 발생된 지역의 재산 및 인명 피해를 줄일 수 있는 장점이 있다.Accordingly, the flexibility barrier 10 for the prevention of deforestation can absorb the kinetic energy of the above-mentioned debris and can bear a large amount of load, thereby protecting the ecosystem and reducing damage to property and human life in the area where the debris is generated There are advantages.

구체적으로, 상기 토석류가 발생되기 전에는 예비 로프들(214)이 각각의 제2 와이어 로프들(200, 210, 220) 및 그물망(300)의 형태를 유지시키며, 상기 토석류의 상기 운동에너지에 의하여 기 설정된 부하를 초과하여 인가되는 경우에 각각의 예비 로프들(214)이 끊어지면서 각각의 제2 와이어 로프들(200, 210, 220) 및 그물망(300)이 중첩된 상기 부분이 펼쳐질 수 있다.The pre-ropes 214 maintain the shape of each of the second wire ropes 200, 210, 220 and the net 300 before the debris flows, When the predetermined load is applied, the respective preliminary ropes 214 are broken, and the portions where the respective second wire ropes 200, 210, 220 and the network 300 are overlapped can be unfolded.

따라서, 토석류 방재를 위한 유연성 방호책(10)은 제2 와이어 로프들(200, 210, 22) 및 그물망(300)의 중첩된 상기 부분이 펼쳐지면서 상기 토석류의 높은 운동에너지를 흡수할 수 있으며, 상기 토석류로부터 도로나 선로의 안전 및 주거지의 안전을 확보할 수 있다.Therefore, the flexibility barrier 10 for the prevention of the unintentional debris can absorb the high kinetic energy of the debris flows as the overlapped portions of the second wire ropes 200, 210, 22 and the mesh 300 are unfolded, It is possible to secure the safety of roads and tracks and the security of residential areas from debris.

도 8은 예시적인 실시예들에 따른 토석류 방재를 위한 유연성 방호책을 나타내는 평면도이다. 도 9는 도 8의 B 부분을 나타내는 사시도이다. 도 10은 도 8의 예시적인 실시예들에 따른 제1 브레이킹 부재를 나타내는 사시도이다. 도 8 내지 도 10에 도시된 토석류 방재를 위한 유연성 방호책은 도 1 내지 도 7을 참조로 설명한 토석류 방재를 위한 유연성 방호책에서 제1 브레이킹 부재를 제외하고는 실질적으로 동일하거나 유사한 구성 및/또는 구조를 가질 수 있다. 따라서, 중복되는 구성에 대한 상세한 설명은 생략된다.8 is a plan view showing a flexibility barrier for dislocation disruption according to exemplary embodiments. 9 is a perspective view showing part B of Fig. 10 is a perspective view illustrating a first braking member in accordance with the exemplary embodiments of FIG. 8; The flexible barrier for dislocation disruption shown in Figs. 8 to 10 has substantially the same or similar structure and / or structure except for the first braking element in the flexible barrier for dislocation disruption described with reference to Figs. 1 to 7 Lt; / RTI > Therefore, a detailed description of the redundant configuration is omitted.

도 8 내지 도 10을 참조하면, 예시적인 실시예들에 따른 토석류 방재를 위한 유연성 방호책(12)은 복수의 제1 와이어 로프들(100, 110, 120, 130), 복수의 제2 와이어 로프들(200, 210, 220), 그물망(300), 및 복수의 제1 브레이킹 부재들(400, 410, 420)을 포함한다.Referring to Figures 8-10, a flexural barrier 12 for a dislocation barrier according to exemplary embodiments includes a plurality of first wire ropes 100, 110, 120, 130, a plurality of second wire ropes < RTI ID = 0.0 & (200, 210, 220), a network (300), and a plurality of first braking members (400, 410, 420).

각각의 제1 와이어 로프들(100, 110, 120, 130)은 제1 방향(D1)으로 각각 연장될 수 있다. 또한, 제1 와이어 로프들(100, 110, 120, 130)은 제1 방향(D1)과 교차하는 제2 방향(D2)을 따라 배열될 수 있다. 예를 들어, 제1 방향(D1)과 제2 방향(D3)은 실질적으로 서로 수직할 수 있다.Each of the first wire ropes 100, 110, 120, 130 may extend in a first direction D1. In addition, the first wire ropes 100, 110, 120, and 130 may be arranged along a second direction D2 that intersects the first direction D1. For example, the first direction D1 and the second direction D3 may be substantially perpendicular to each other.

제2 와이어 로프들(200, 210, 220)은 제2 방향(D2)으로 각각 연장될 수 있다. 또한, 제2 와이어 로프들(200, 210, 220)은 제1 방향(D1)을 따라 배열되며 제1 와이어 로프들(100, 110, 120)과 각각 연결될 수 있다.The second wire ropes 200, 210, 220 may extend in the second direction D2, respectively. The second wire ropes 200, 210 and 220 may be arranged along the first direction D1 and connected to the first wire ropes 100, 110 and 120, respectively.

그물망(300)은 제1 및 제2 와이어 로프들(100, 110, 120, 130, 200, 210, 220)에 의해 지지되며 연결될 수 있다. 그물망(300)은 토석류의 운동에너지를 흡수할 수 있다.The mesh 300 may be supported and connected by the first and second wire ropes 100, 110, 120, 130, 200, 210, 220. The mesh 300 can absorb the kinetic energy of the metamorphic rocks.

도 9에 도시된 바와 같이, 각각의 제1 브레이킹 부재들(400, 410, 420)은 제1 체결 유닛(412), 제2 체결 유닛(414), 및 제3 체결 유닛((416)을 포함할 수 있다.9, each of the first braking members 400, 410, 420 includes a first fastening unit 412, a second fastening unit 414, and a third fastening unit 416 can do.

예를 들어, 제1 체결 유닛(412)은 제1 수평 와이어 로프(100) 및 제3 수평 와이어 로프(120) 사이의 제2 와이어 로프(210)의 일부에 끼워질 수 있다. 제2 체결 유닛(412)은 제3 수평 와이어 로프(120) 및 제2 수평 와이어 로프(110) 사이의 제2 와이어 로프(210)의 다른 일부에 끼워질 수 있다. 제3 체결 유닛(414)은 제2 수평 와이어 로프(110) 및 제4 수평 와이어 로프(130) 사이의 제2 와이어 로프(210)의 또 다른 일부에 끼워질 수 있다.For example, the first fastening unit 412 may be fitted to a portion of the second wire rope 210 between the first horizontal wire rope 100 and the third horizontal wire rope 120. The second fastening unit 412 can be fitted to the other part of the second wire rope 210 between the third horizontal wire rope 120 and the second horizontal wire rope 110. The third fastening unit 414 can be fitted to another portion of the second wire rope 210 between the second horizontal wire rope 110 and the fourth horizontal wire rope 130.

구체적으로, 제1 내지 제3 체결 유닛들(412, 414, 416)은 단면이 C형상이며 원통형상의 금속 부재일 수 있으며, 개방부를 통하여 제2 와이어 로프(210)에 끼운 후 클램핑 공구에 의해 제2 와이어 로프(210)에 고정될 수 있다.Specifically, the first to third fastening units 412, 414, and 416 may be C-shaped and cylindrical metal members, and may be inserted into the second wire rope 210 through the opening, And may be fixed to the two-wire rope 210.

또한, 제1 내지 제3 체결 유닛들(412, 414, 416)은 서로 연결될 수 있다. 예를 들어, 제1 내지 제3 체결 유닛들(412, 414, 416)은 서로 용접되어 연결될 수 있다.Also, the first to third fastening units 412, 414 and 416 may be connected to each other. For example, the first to third fastening units 412, 414, and 416 may be welded and connected to each other.

이와는 달리, 도 10에 도시된 바와 같이, 예시적인 실시예들에 따른 각각의 제1 내지 제3 체결 유닛들(422, 424, 426)은 체결부를 구비하여 복수의 볼트들 및 너트들을 통해 서로 연결될 수 있다.10, each of the first to third fastening units 422, 424, 426 according to exemplary embodiments has a fastening portion and is connected to each other through a plurality of bolts and nuts .

따라서, 각각의 제2 와이어 로프들(200, 210, 220)에 상기 토석류의 상기 운동에너지에 의한 부하가 인가되는 경우에, 제1 브레이킹 부재들(400, 410, 420)은 제2 와이어 로프들(200, 210, 220)에 발생하는 부하를 흡수하여 제2 와이어 로프들의 중첩된 부분들의 크기(L)가 줄어드는 속도를 조절할 수 있다.Accordingly, when a load due to the kinetic energy of the earth stone is applied to each of the second wire ropes 200, 210, and 220, the first braking members 400, 410, 210, and 220 to adjust the speed at which the size L of the overlapped portions of the second wire ropes decreases.

예를 들어, 상기 부하에 의하여 제2 와이어 로프(210)가 제1 브레이킹 부재(410)에서 슬라이딩 되면서 발생되는 제2 와이어 로프(210)와 제1 브레이킹 부재(410)간 마찰력을 이용하여 상기 부하를 흡수할 수 있다.For example, by using the friction between the second wire rope 210 and the first braking member 410 generated by sliding the second wire rope 210 on the first braking member 410 by the load, Can be absorbed.

예시적인 실시예들에 따른 토석류 방재를 위한 유연성 방호책(12)은 상기 토석류의 상기 운동에너지에 의하여 각각의 제2 와이어 로프들(200, 210, 220) 및 그물망(300)의 중첩된 상기 부분들이 펼쳐진다.The flexibility barrier 12 for the prevention of deforestation according to exemplary embodiments allows the respective second wire ropes 200, 210, 220 and the overlapping portions of the mesh 300 to be separated by the kinetic energy of the debris It unfolds.

이에 따라, 토석류 방재를 위한 유연성 방호책(12)은 상기 토석류의 상기 운동에너지를 흡수하고, 많은 양의 부하를 견딜 수 있어 생태계를 보호하고 상기 토석류가 발생된 지역의 재산 및 인명 피해를 줄일 수 있는 장점이 있다.Accordingly, the flexibility barrier 12 for the prevention of deforestation can absorb the kinetic energy of the above-mentioned debris and can bear a large amount of load, thereby protecting the ecosystem and reducing damage to property and human life in the area where the debris is generated There are advantages.

구체적으로, 상기 토석류가 발생되기 전에는 예비 로프들(214)이 각각의 제2 와이어 로프들(200, 210, 220) 및 그물망(300)의 형태를 유지시키며, 상기 토석류의 상기 운동에너지에 의하여 기 설정된 부하를 초과하여 인가되는 경우에 각각의 예비 로프들(214)이 끊어지면서 각각의 제2 와이어 로프들(200, 210, 220) 및 그물망(300)이 중첩된 상기 부분이 펼쳐질 수 있다.The pre-ropes 214 maintain the shape of each of the second wire ropes 200, 210, 220 and the net 300 before the debris flows, When the predetermined load is applied, the respective preliminary ropes 214 are broken, and the portions where the respective second wire ropes 200, 210, 220 and the network 300 are overlapped can be unfolded.

특히, 각각의 제2 와이어 로프들(200, 210, 220)에 설치된 각각의 제1 브레이킹 부재들(400, 410, 420)이 상기 토석류의 상기 운동에너지에 의하여 제2 와이어 로프들(200, 210, 220)에 발생되는 부하들을 흡수할 수 있다.In particular, each of the first braking members 400, 410, 420 provided on each of the second wire ropes 200, 210, 220 is connected to the second wire ropes 200, 210 , 220).

따라서, 토석류 방재를 위한 유연성 방호책(12)은 제2 와이어 로프들(200, 210, 22) 및 그물망(300)의 중첩된 상기 부분이 펼쳐지거나, 제1 브레이킹 부재들(400, 410, 420)을 이용하여 상기 토석류의 높은 운동에너지를 흡수할 수 있으며, 상기 토석류로부터 도로나 선로의 안전 및 주거지의 안전을 확보할 수 있다.Therefore, the flexibility barrier 12 for the unintentional disruption of the soil can prevent the overlapped portions of the second wire ropes 200, 210, 22 and the mesh 300 from being unfolded or from being broken by the first braking members 400, 410, It is possible to absorb the high kinetic energy of the above-mentioned debris and to secure the safety of roads and lines and the security of the settlement from the above-mentioned debris.

도 11은 예시적인 실시예들에 따른 토석류 방재를 위한 유연성 방호책을 나타내는 평면도이다. 도 12는 도 11의 제2 브레이킹 부재를 나타내는 사시도이다. 도 11 및 도 12에 도시된 토석류 방재를 위한 유연성 방호책은 도 1 내지 도 7을 참조로 설명한 토석류 방재를 위한 유연성 방호책에서 제2 브레이킹 부재를 제외하고는 실질적으로 동일하거나 유사한 구성 및/또는 구조를 가질 수 있다. 따라서, 중복되는 구성에 대한 상세한 설명은 생략된다.FIG. 11 is a top view showing a flexibility barrier for dislocation disruption according to exemplary embodiments. FIG. 12 is a perspective view showing the second braking member of Fig. The flexible barrier for dislocation disruption shown in Figs. 11 and 12 has substantially the same or similar structure and / or structure except for the second braking member in the flexibility barrier for dislocation disruption described with reference to Figs. 1 to 7 Lt; / RTI > Therefore, a detailed description of the redundant configuration is omitted.

도 11 및 도 12를 참조하면, 예시적인 실시예들에 따른 토석류 방재를 위한 유연성 방호책(14)은 복수의 제1 와이어 로프들(100, 110, 120, 130), 복수의 제2 와이어 로프들(200, 210, 220), 그물망(300), 및 복수의 제2 브레이킹 부재들(500)을 포함한다.Referring to Figs. 11 and 12, a flexible barrier 14 for a dislocation barrier according to exemplary embodiments includes a plurality of first wire ropes 100, 110, 120, 130, a plurality of second wire ropes < (200, 210, 220), a network (300), and a plurality of second braking members (500).

각각의 제1 와이어 로프들(100, 110, 120, 130)은 제1 방향(D1)으로 각각 연장될 수 있다. 또한, 제1 와이어 로프들(100, 110, 120, 130)은 제1 방향(D1)과 교차하는 제2 방향(D2)을 따라 배열될 수 있다. 예를 들어, 제1 방향(D1)과 제2 방향(D3)은 실질적으로 서로 수직할 수 있다.Each of the first wire ropes 100, 110, 120, 130 may extend in a first direction D1. In addition, the first wire ropes 100, 110, 120, and 130 may be arranged along a second direction D2 that intersects the first direction D1. For example, the first direction D1 and the second direction D3 may be substantially perpendicular to each other.

제2 와이어 로프들(200, 210, 220)은 제2 방향(D2)으로 각각 연장될 수 있다. 또한, 제2 와이어 로프들(200, 210, 220)은 제1 방향(D1)을 따라 배열되며 제1 와이어 로프들(100, 110, 120)과 각각 연결될 수 있다.The second wire ropes 200, 210, 220 may extend in the second direction D2, respectively. The second wire ropes 200, 210 and 220 may be arranged along the first direction D1 and connected to the first wire ropes 100, 110 and 120, respectively.

그물망(300)은 제1 및 제2 와이어 로프들(100, 110, 120, 130, 200, 210, 220)에 의해 지지되며 연결될 수 있다. 그물망(300)은 토석류의 운동에너지를 흡수할 수 있다.The mesh 300 may be supported and connected by the first and second wire ropes 100, 110, 120, 130, 200, 210, 220. The mesh 300 can absorb the kinetic energy of the metamorphic rocks.

제2 브레이킹 유닛들(500)은 각각의 제1 와이어 로프들(100, 110, 120, 130)에 배치될 수 있다. 예를 들어, 각각의 제2 브레이킹 유닛들(500)은 각각의 제1 와이어 로프들(100, 110, 120, 130)을 감싸며, 각각의 제1 와이어 로프들(100, 110, 120, 130)을 제3 방향(D3)을 중심으로 원형으로 감고, 제3 방향(D3)을 따라 중첩시킬 수 있다.The second breaking units 500 may be disposed on each of the first wire ropes 100, 110, 120, 130. For example, each of the second breaking units 500 surrounds each of the first wire ropes 100, 110, 120, 130, and each of the first wire ropes 100, 110, 120, May be rounded around the third direction D3 and superimposed along the third direction D3.

도 12에 도시된 바와 같이, 각각의 제2 브레이킹 유닛들(500)은 루프관(510) 및 체결 부재(520)를 포함할 수 있다. 각각의 제1 와이어 로프들(100, 110, 120, 130)은 루프관(510)을 통과하며, 루프관(510)의 일단과 타단은 제3 방향(D3)을 따라 중첩될 수 있다. 또한, 중첩되는 루프관(510)의 상기 일단과 상기 타단은 체결 부재(520)에 의해 서로 체결될 수 있다.As shown in FIG. 12, each of the second breaking units 500 may include a loop tube 510 and a fastening member 520. Each of the first wire ropes 100, 110, 120 and 130 passes through the loop tube 510 and one end and the other end of the loop tube 510 can be overlapped along the third direction D3. The one end and the other end of the overlapping loop tube 510 may be fastened to each other by a fastening member 520.

각각의 제2 브레이킹 유닛들(500)은 토석류의 운동에너지에 의해 각각의 제1 와이어 로프들(100, 110, 120, 130)에 발생되는 부하를 흡수할 수 있다. 구체적으로, 루프관(510)과 각각의 제1 와이어 로프들(100, 110, 120, 130) 사이의 마찰력 및 체결 부재(520)에 의해 루프관(510)의 상기 일단과 상기 타단 사이에 발생되는 마찰력을 이용하여 상기 부하가 흡수될 수 있으며, 각각의 제2 브레이킹 유닛들(500)은 각각의 제1 와이어 로프들(100, 110, 120, 130)의 원형의 크기(D)가 줄어드는 속도를 조절할 수 있다.Each of the second breaking units 500 can absorb the load generated in each of the first wire ropes 100, 110, 120, 130 by the kinetic energy of the earth rock. Specifically, the frictional force between the loop tube 510 and each of the first wire ropes 100, 110, 120, and 130 and the tension generated between the one end of the loop tube 510 and the other end by the fastening member 520 And the second breaking units 500 are arranged at a speed at which the circular size D of each of the first wire ropes 100, 110, 120, 130 decreases, Can be adjusted.

예시적인 실시예들에 따른 토석류 방재를 위한 유연성 방호책(14)은 상기 토석류의 상기 운동에너지에 의하여 각각의 제2 와이어 로프들(200, 210, 220) 및 그물망(300)의 중첩된 상기 부분들이 펼쳐진다.The flexibility barrier 14 for the prevention of deforestation according to the exemplary embodiments allows the respective second wire ropes 200, 210, 220 and the overlapping portions of the mesh 300 to be separated by the kinetic energy of the debris It unfolds.

이에 따라, 토석류 방재를 위한 유연성 방호책(14)은 상기 토석류의 상기 운동에너지를 흡수하고, 많은 양의 부하를 견딜 수 있어 생태계를 보호하고 상기 토석류가 발생된 지역의 재산 및 인명 피해를 줄일 수 있는 장점이 있다.Accordingly, the flexibility barrier 14 for the prevention of deforestation can absorb the kinetic energy of the above-mentioned debris and can bear a large amount of load, thereby protecting the ecosystem and reducing damage to property and human life of the area where the debris is generated There are advantages.

구체적으로, 상기 토석류가 발생되기 전에는 예비 로프들(214)이 각각의 제2 와이어 로프들(200, 210, 220) 및 그물망(300)의 형태를 유지시키며, 상기 토석류의 상기 운동에너지에 의하여 기 설정된 부하를 초과하여 인가되는 경우에 각각의 예비 로프들(214)이 끊어지면서 각각의 제2 와이어 로프들(200, 210, 220) 및 그물망(300)이 중첩된 상기 부분이 펼쳐질 수 있다.The pre-ropes 214 maintain the shape of each of the second wire ropes 200, 210, 220 and the net 300 before the debris flows, When the predetermined load is applied, the respective preliminary ropes 214 are broken, and the portions where the respective second wire ropes 200, 210, 220 and the network 300 are overlapped can be unfolded.

각각의 제2 와이어 로프들(200, 210, 220)에 설치된 각각의 제1 브레이킹 부재들(400, 410, 420)이 상기 토석류의 상기 운동에너지에 의하여 제2 와이어 로프들(200, 210, 220)에 발생되는 부하들을 흡수할 수 있다.Each of the first braking members 400, 410, 420 mounted on each of the second wire ropes 200, 210, 220 is connected to the second wire ropes 200, 210, 220 ) Of the load.

특히, 각각의 제1 와이어 로프들(100, 110, 120, 130)에 설치된 각각의 제2 브레이킹 부재들(500)이 상기 토석류의 상기 운동에너지에 의하여 제1 와이어 로프들(100, 110, 120, 130)에 발생되는 부하를 흡수할 수 있다.In particular, each of the second braking members 500 installed on each of the first wire ropes 100, 110, 120, 130 is connected to the first wire ropes 100, 110, 120 , 130 can be absorbed.

따라서, 토석류 방재를 위한 유연성 방호책(14)은 제2 와이어 로프들(200, 210, 22) 및 그물망(300)의 중첩된 상기 부분이 펼쳐지거나, 제1 브레이킹 부재들(400, 410, 420) 및 제2 브레이킹 부재들(500)을 이용하여 상기 토석류의 높은 운동에너지를 흡수할 수 있으며, 상기 토석류로부터 도로나 선로의 안전 및 주거지의 안전을 확보할 수 있다.Accordingly, the flexibility barrier 14 for the prevention of deforestation is such that the overlapped portions of the second wire ropes 200, 210, 22 and the mesh 300 are unfolded or the first braking members 400, 410, And the second braking members 500 can be used to absorb the high kinetic energy of the undrawn stone, and the safety of the road or the railway and the safety of the residence can be secured from the undrained stone.

이하에서는, 토석류 방재 방법에 대하여 주로 설명하고자 한다.Hereinafter, a method for preventing soil debris flow will be mainly described.

도 13은 예시적인 실시예들에 따른 토석류 방재 방법을 나타내는 흐름도이다.Fig. 13 is a flowchart showing a method for preventing soil erosion according to exemplary embodiments. Fig.

도 1 및 도 13을 참조하면, 토석류 방재를 위한 유연성 방호책을 제공할 수 있다(S100). 토석류 방재를 위한 유연성 방호책(10)은 복수의 제1 와이어 로프들(100, 110, 120, 130), 복수의 제2 와이어 로프들(200, 210, 220), 및 그물망(300)을 포함한다.Referring to FIGS. 1 and 13, it is possible to provide a flexibility protection measure for disaster prevention (S100). The flexibility barrier 10 for the dislocation disruption includes a plurality of first wire ropes 100, 110, 120 and 130, a plurality of second wire ropes 200, 210 and 220 and a mesh 300 .

각각의 제1 와이어 로프들(100, 110, 120, 130)은 제1 방향(D1)으로 각각 연장될 수 있다. 또한, 제1 와이어 로프들(100, 110, 120, 130)은 제1 방향(D1)과 교차하는 제2 방향(D2)을 따라 배열될 수 있다. 예를 들어, 제1 방향(D1)과 제2 방향(D3)은 실질적으로 서로 수직할 수 있다.Each of the first wire ropes 100, 110, 120, 130 may extend in a first direction D1. In addition, the first wire ropes 100, 110, 120, and 130 may be arranged along a second direction D2 that intersects the first direction D1. For example, the first direction D1 and the second direction D3 may be substantially perpendicular to each other.

제2 와이어 로프들(200, 210, 220)은 제2 방향(D2)으로 각각 연장될 수 있다. 또한, 제2 와이어 로프들(200, 210, 220)은 제1 방향(D1)을 따라 배열되며 제1 와이어 로프들(100, 110, 120)과 각각 연결될 수 있다.The second wire ropes 200, 210, 220 may extend in the second direction D2, respectively. The second wire ropes 200, 210 and 220 may be arranged along the first direction D1 and connected to the first wire ropes 100, 110 and 120, respectively.

그물망(300)은 제1 및 제2 와이어 로프들(100, 110, 120, 130, 200, 210, 220)에 의해 지지되며 연결될 수 있다. 그물망(300)은 토석류의 운동에너지를 흡수할 수 있다.The mesh 300 may be supported and connected by the first and second wire ropes 100, 110, 120, 130, 200, 210, 220. The mesh 300 can absorb the kinetic energy of the metamorphic rocks.

예시적인 실시예들에 있어서, 도 8을 다시 참조하면, 토석류 방재를 위한 유연성 방호책(10)은 각각의 제2 와이어 로프들(200, 210, 220)에 배치되는 복수의 제1 브레이킹 부재들(400, 410, 420)을 더 포함할 수 있다. 이와는 달리, 도 11을 다시 참조하면, 토석류 방재를 위한 유연성 방호책(10)은 각각의 제1 와이어 로프들(100, 110, 120, 130)에 배치되는 복수의 제2 브레이킹 부재들(500)을 더 포함할 수 있다.8, a flexural barrier 10 for the prevention of deforestation includes a plurality of first braking members (not shown) disposed in each of the second wire ropes 200, 210, 220 400, 410, 420). 11, a flexural barrier 10 for the prevention of soil erosion has a plurality of second braking members 500 disposed in respective first wire ropes 100, 110, 120, 130, .

이어서, 토석류 방재를 위한 유연성 방호책(10)을 지면에 설치할 수 있다(S110).Subsequently, a flexible barrier 10 for disaster prevention can be installed on the ground (S110).

도 1을 참조하면, 제1 와이어 로프들(100, 110, 120, 130)은 제1 내지 제4 수평 와이어 로프들(100, 110, 120, 130)을 포함할 수 있다. 토석류 방재를 위한 유연성 방호책(10)은 각각의 제1 와이어 로프들(100, 110, 120, 130)의 일단 및 타단에 연결되며, 지면에 각각의 제1 와이어 로프들(100, 110, 120, 130)을 고정시키는 복수의 앵커들(102, 104, 112, 114, 122, 124, 132, 134)을 더 포함할 수 있다. 예를 들어, 상기 앵커들은 금속 부재를 포함할 수 있다.Referring to FIG. 1, the first wire ropes 100, 110, 120, and 130 may include first to fourth horizontal wire ropes 100, 110, 120, and 130. A flexible barrier 10 for the prevention of earth leakage is connected to one end and the other end of each of the first wire ropes 100, 110, 120 and 130 and has a first wire rope 100, 110, 120, 102, 104, 112, 114, 122, 124, 132, 134 for fixing the anchors 130, For example, the anchors may include metal members.

또한, 각각의 제2 와이어 로프들(200, 210, 220)의 일단은 제1 수평 와이어 로프(100)에 연결될 수 있다. 예시적인 실시예들에 있어서, 토석류 방재를 위한 유연성 방호책(10)은 각각의 제2 와이어 로프들(200, 210, 220)의 타단에 연결되며 상기 지면에 각각의 제2 와이어 로프들(200, 210, 220)을 고정시키는 복수의 베이스 기초대들(202, 212, 222)을 더 포함할 수 있다. 예를 들어, 베이스 기초대들(202, 212, 222)은 콘트리트를 포함할 수 있다.Further, one end of each of the second wire ropes 200, 210, 220 may be connected to the first horizontal wire rope 100. In the exemplary embodiments, a flexural barrier 10 for the prevention of deforestation is connected to the other end of each of the second wire ropes 200, 210, 220, and each of the second wire ropes 200, 212, 222 for fixing the base plates 210, 220, 220, respectively. For example, the base bases 202, 212, 222 may comprise a concrete.

토석류 방재를 위한 유연성 방호책은 상기 앵커들 및 베이스 기초대들(202, 212, 222)을 지면에 삽입 고정하여 토석류 방재를 위한 유연성 방호책(10)을 지면에 고정할 수 있다.A flexible barrier for disaster prevention can securely fix the flexible barrier 10 to the ground by inserting and fixing the anchors and the base bases 202, 212, and 222 on the ground.

이어서, 각각의 제2 와이어 로프들(200, 210, 220) 및 그물망(300)의 제3 방향(D3)을 따라 중첩된 부분들이 펼쳐질 수 있다(S120).Subsequently, overlapping portions of the respective second wire ropes 200, 210, 220 and the mesh 300 along the third direction D3 may be unfolded (S120).

도 4 및 도 5를 참조하면, 예시적인 실시예들에 있어서, 토석류 방재를 위한 유연성 방호책(10)은 제1 수평 와이어 로프(100)와 연결되는 제2 와이어 로프(210)의 일부 및 제3 수평 와이어 로프(120)와 연결되는 제2 와이어 로프(220)의 다른 일부를 연결하는 예비 로프(214)를 더 포함할 수 있다. 예를 들어, 토석류 방재를 위한 유연성 방호책(10)은 복수의 예비 로프들(214)을 더 포함할 수 있다.4 and 5, in the exemplary embodiments, the flexural barrier 10 for deforestation disruption includes a portion of the second wire rope 210 connected to the first horizontal wire rope 100, And a preliminary rope 214 connecting another portion of the second wire rope 220 connected to the horizontal wire rope 120. For example, the flexibility barrier 10 for the prevention of soil erosion can further include a plurality of spare ropes 214.

예비 로프(214)는 상기 토석류의 상기 운동에너지에 의하여 기 설정된 부하가 초과하여 인가되는 경우에 끊어질 수 있다. 예를 들어, 예비 로프(214)는 50KJ의 부하가 인가되는 경우에 끊어질 수 있다. 이와는 달리, 예비 로프(214)는 200KJ의 부하가 인가되는 경우에 끊어질 수 있다.The preliminary rope 214 may be broken if the predefined load is applied in excess by the kinetic energy of the debris. For example, spare rope 214 may be broken when a load of 50 KJ is applied. Alternatively, the spare rope 214 may be broken if a load of 200 KJ is applied.

예를 들어, 예비 로프(214)는 와이어 로프 또는 스프링과 같은 탄성 부재를 포함할 수 있으며, 도 4 및 도 5에 도시된 바와 같이, 예비 로프(214)는 상기 기 설정된 부하가 초과하여 인가되는 경우에 끊어지면서, 제3 방향(D3)을 따라 중첩되는 각각의 제2 와이어 로프들(200, 210, 220)의 상기 부분은 펼쳐질 수 있다.For example, the spare rope 214 may include an elastic member such as a wire rope or spring, and as shown in Figures 4 and 5, the spare rope 214 may be applied The portions of each of the second wire ropes 200, 210, 220 that overlap along the third direction D3 may be unfolded.

예시적인 실시예들에 있어서, 도 9를 다시 참조하면, 각각의 제2 와이어 로프들(200, 210, 220)에 상기 토석류의 상기 운동에너지에 의한 부하가 인가되는 경우에, 제1 브레이킹 부재들(400, 410, 420)은 제2 와이어 로프들(200, 210, 220)에 발생하는 부하를 흡수하여 제2 와이어 로프들의 중첩된 부분들의 크기(L)가 줄어드는 속도를 조절할 수 있다.In the exemplary embodiments, referring again to FIG. 9, when a load due to the kinetic energy of the earth stone is applied to each of the second wire ropes 200, 210, 220, 210, and 220 to absorb the load generated in the second wire ropes 200, 210, and 220 to control the rate at which the size L of the overlapped portions of the second wire ropes decreases.

또한, 예시적인 실시예들에 있어서, 도 12에 도시된 바와 같이, 각각의 제2 브레이킹 유닛들(500)은 토석류의 운동에너지에 의해 각각의 제1 와이어 로프들(100, 110, 120, 130)에 발생되는 부하를 흡수할 수 있다. 구체적으로, 루프관(510)과 각각의 제1 와이어 로프들(100, 110, 120, 130) 사이의 마찰력 및 체결 부재(520)에 의해 루프관(510)의 상기 일단과 상기 타단 사이에 발생되는 마찰력을 이용하여 상기 부하가 흡수될 수 있으며, 각각의 제2 브레이킹 유닛들(500)은 각각의 제1 와이어 로프들(100, 110, 120, 130)의 원형의 크기(D)가 줄어드는 속도를 조절할 수 있다.12, each of the second braking units 500 is connected to each of the first wire ropes 100, 110, 120, 130 (not shown) by the kinetic energy of the debris flow. In addition, in the exemplary embodiments, Can be absorbed. Specifically, the frictional force between the loop tube 510 and each of the first wire ropes 100, 110, 120, and 130 and the tension generated between the one end of the loop tube 510 and the other end by the fastening member 520 And the second breaking units 500 are arranged at a speed at which the circular size D of each of the first wire ropes 100, 110, 120, 130 decreases, Can be adjusted.

이상에서는 본 발명의 실시예들을 참조하여 설명하였지만, 해당 기술 분야의 숙련된 당업자는 하기 특허청구범위에 기재된 본 발명의 기술적 사상 및 영역으로부터 벗어나지 않는 범위 내에서 본 발명을 다양하게 수정 및 변경시킬 수 있음을 이해할 수 있을 것이다.While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it will be understood by those skilled in the art that various changes and modifications may be made therein without departing from the spirit and scope of the invention as defined in the appended claims. It can be understood that.

10, 12, 14: 토석류 방재를 위한 유연성 방호책
100: 제1 수평 와이어 로프 110: 제2 수평 와이어 로프
120: 제3 수평 와이어 로프 130: 제4 수평 와이어 로프
200, 210, 220: 제2 와이어 로프 300: 그물망
400, 410, 420: 제1 브레이킹 부재 500: 제2 브레이킹 부재
10, 12, 14: Flexibility barrier for disaster prevention
100: first horizontal wire rope 110: second horizontal wire rope
120: third horizontal wire rope 130: fourth horizontal wire rope
200, 210, 220: second wire rope 300: mesh
400, 410, 420: first braking member 500: second braking member

Claims (14)

제1 방향으로 각각 연장되고, 상기 제1 방향과 교차하는 제2 방향을 따라 배열되는 복수의 제1 와이어 로프들;
상기 제2 방향으로 각각 연장되고, 상기 제1 방향을 따라 배열되며 상기 제1 와이어 로프들과 각각 연결되는 복수의 제2 와이어 로프들; 및
상기 제1 및 제2 와이어 로프들에 의해 지지되며 토석류의 운동에너지를 흡수하기 위한 그물망을 포함하고,
각각의 상기 제2 와이어 로프들 및 상기 그물망은 상기 제1 및 제2 방향들과 교차하는 제3 방향을 따라 중첩되는 것을 특징으로 하는 토석류 방재를 위한 유연성 방호책.
A plurality of first wire ropes each extending in a first direction and arranged in a second direction intersecting the first direction;
A plurality of second wire ropes each extending in the second direction and arranged along the first direction and each connected to the first wire ropes; And
A mesh supported by the first and second wire ropes and adapted to absorb kinetic energy of the debris;
Wherein each of the second wire ropes and the mesh network are superimposed along a third direction intersecting the first and second directions.
제 1 항에 있어서,
상기 제1 와이어 로프들은 상기 제2 방향을 따라 순차적으로 배열되는 제1 내지 제4 수평 와이어 로프들을 포함하고,
각각의 상기 제2 와이어 로프들은 상기 제2 방향을 따라 상기 제1 수평 와이어 로프, 상기 제3 수평 와이어 로프, 상기 제2 수평 와이어 로프, 및 상기 제4 수평 와이어 로프와 순차적으로 연결되는 것을 특징으로 하는 토석류 방재를 위한 유연성 방호책.
The method according to claim 1,
Wherein the first wire ropes include first through fourth horizontal wire ropes sequentially arranged along the second direction,
And each of the second wire ropes is sequentially connected to the first horizontal wire rope, the third horizontal wire rope, the second horizontal wire rope, and the fourth horizontal wire rope along the second direction Flexibility barrier for the disaster prevention of disasters.
제 2 항에 있어서,
상기 제1 수평 와이어 로프와 연결되는 각각의 상기 제2 와이어 로프들의 일부 및 상기 제3 수평 와이어 로프와 연결되는 각각의 상기 제2 와이어 로프들의 다른 일부를 각각 연결하며, 상기 토석류의 상기 운동에너지에 의하여 기 설정된 부하를 초과하여 인가되는 경우에 끊어질 수 있는 복수의 예비 로프들을 더 포함하는 것을 특징으로 하는 토석류 방재를 위한 유연성 방호책.
3. The method of claim 2,
Each connecting a portion of each of the second wire ropes connected to the first horizontal wire rope and another portion of each of the second wire ropes connected to the third horizontal wire rope, Further comprising a plurality of preliminary ropes that can be cut off when applied in excess of a predetermined load. ≪ RTI ID = 0.0 > [0002] < / RTI >
제 2 항에 있어서,
상기 제1 수평 와이어 로프 및 상기 제3 수평 와이어 로프 사이의 각각의 상기 제2 와이어 로프들의 일부, 상기 제3 수평 와이어 로프 및 상기 제2 수평 와이어 로프 사이의 각각의 상기 제2 와이어 로프들의 다른 일부, 및 상기 제2 수평 와이어 로프 및 상기 제4 수평 와이어 로프 사이의 각각의 상기 제2 와이어 로프들의 또 다른 일부를 서로 연결하고 각각 감싸며, 상기 토석류의 상기 운동에너지에 의해 상기 제2 와이어 로프에 발생되는 부하를 흡수하여 상기 제2 와이어 로프의 중첩된 부분의 크기가 줄어드는 속도를 조절하는 복수의 제1 브레이킹 부재들을 더 포함하는 것을 특징으로 하는 토석류 방재를 위한 유연성 방호책.
3. The method of claim 2,
A portion of each of the second wire ropes between the first horizontal wire rope and the third horizontal wire rope, another portion of each of the second wire ropes between the third horizontal wire rope and the second horizontal wire rope, And another portion of each of the second wire ropes between the second horizontal wire rope and the fourth horizontal wire rope, and which encircles and encounters another portion of each of the second wire ropes between the second horizontal wire rope and the fourth horizontal wire rope, Further comprising a plurality of first braking members for absorbing a load to adjust the speed at which the size of the overlapped portion of the second wire rope decreases. ≪ Desc / Clms Page number 19 >
제 1 항에 있어서,
각각의 상기 제1 와이어 로프들에 배치되어 각각의 상기 제1 와이어 로프들을 감싸며, 각각의 상기 제1 와이어 로프들을 상기 제3 방향을 중심으로 원형으로 감고 상기 제3 방향을 따라 중첩시켜, 상기 토석류의 상기 운동에너지에 의해 상기 제1 와이어 로프에 발생되는 부하를 흡수하여 상기 제1 와이어 로프의 원형의 크기가 줄어드는 속도를 조절하는 복수의 제2 브레이킹 부재들을 더 포함하는 것을 특징으로 하는 토석류 방재를 위한 유연성 방호책.
The method according to claim 1,
Each of the first wire ropes being disposed in each of the first wire ropes and surrounding each of the first wire ropes, and each of the first wire ropes being rounded around the third direction and superimposed along the third direction, Further comprising a plurality of second braking members for absorbing a load generated in the first wire rope by the kinetic energy of the first wire rope to adjust the speed at which the size of the circular shape of the first wire rope is reduced. Flexibility for protection.
제 1 항에 있어서,
상기 그물망은 복수의 링들이 서로 연결되는 링네트를 포함하는 것을 특징으로 하는 토석류 방재를 위한 유연성 방호책.
The method according to claim 1,
Characterized in that the network comprises a ring net to which a plurality of rings are connected to one another.
제 1 항에 있어서, 각각의 상기 제1 와이어 로프들의 일단 및 타단에 연결되며, 지면에 각각의 상기 제1 와이어 로프들을 고정시키는 복수의 앵커들을 더 포함하는 것을 특징으로 하는 토석류 방재를 위한 유연성 방호책.The flexible barrier for disaster prevention according to claim 1, further comprising a plurality of anchors connected to one end and the other end of each of the first wire ropes and fixing each of the first wire ropes to the ground. . 제 7 항에 있어서, 각각의 상기 제2 와이어 로프들의 일단은 적어도 하나의 상기 제1 와이어 로프에 연결되며,
각각의 상기 제2 와이어 로프들의 타단에 연결되며, 상기 지면에 각각의 제2 와이어 로프들을 고정시키는 복수의 베이스 기초대들을 더 포함하는 것을 특징으로 하는 토석류 방재를 위한 유연성 방호책.
8. The apparatus of claim 7, wherein one end of each of the second wire ropes is connected to at least one of the first wire ropes,
Further comprising a plurality of base bases connected to the other end of each of the second wire ropes and fixing the respective second wire ropes to the ground.
제1 방향으로 각각 연장되고 상기 제1 방향과 교차하는 제2 방향을 따라 배열되는 복수의 제1 와이어 로프들, 상기 제2 방향으로 각각 연장되고 상기 제1 방향을 따라 배열되며 상기 제1 와이어 로프들과 각각 연결되는 복수의 제2 와이어 로프들, 및 상기 제1 및 제2 와이어 로프들에 의해 지지되며 토석류의 운동에너지를 흡수하기 위한 그물망을 포함하며, 각각의 상기 제2 와이어 로프들 및 상기 그물망은 상기 제1 및 제2 방향들과 교차하는 제3 방향을 따라 중첩되는 토석류 방재를 위한 유연성 방호책을 제공하는 단계;
상기 토석류 방재를 위한 유연성 방호책을 지면에 설치하는 단계; 및
상기 토석류의 상기 운동에너지에 의하여 각각의 상기 제2 와이어 로프들 및 상기 그물망의 상기 제3 방향을 따라 중첩된 부분들이 펼쳐지는 단계를 포함하는 토석류 방재 방법.
A plurality of first wire ropes each extending in a first direction and arranged in a second direction intersecting the first direction, each of the first wire ropes extending in the second direction and arranged along the first direction, And a net for absorbing the kinetic energy of the meteoroids, wherein each of the second wire ropes and the second wire ropes is supported by the first and second wire ropes, Providing a flexible barrier for dislocation disruption wherein the mesh overlaps along a third direction intersecting the first and second directions;
Installing a flexible barrier for disaster prevention on the ground; And
Wherein said kinetic energy of said debris flows to unfold each of said second wire ropes and overlapping portions along said third direction of said mesh.
제 9 항에 있어서,
상기 제1 와이어 로프들은 상기 제2 방향을 따라 순차적으로 배열되는 제1 내지 제4 수평 와이어 로프들을 포함하고,
각각의 상기 제2 와이어 로프들은 상기 제2 방향을 따라 상기 제1 수평 와이어 로프, 상기 제3 수평 와이어 로프, 상기 제2 수평 와이어 로프, 및 상기 제4 수평 와이어 로프와 순차적으로 연결되며,
상기 토석류 방재를 위한 유연성 방호책은 상기 제1 수평 와이어 로프와 연결되는 각각의 상기 제2 와이어 로프들의 일부 및 상기 제3 수평 와이어 로프와 연결되는 각각의 상기 제2 와이어 로프들의 다른 일부를 각각 연결하는 복수의 예비 로프들을 더 포함하며,
상기 중첩된 부분들이 펼쳐지는 단계는,
상기 토석류의 상기 운동에너지에 의하여 기 설정된 부하를 초과하여 인가되는 경우에 각각의 상기 예비 로프들이 끊어지는 단계를 포함하는 것을 특징으로 하는 토석류 방재 방법.
10. The method of claim 9,
Wherein the first wire ropes include first through fourth horizontal wire ropes sequentially arranged along the second direction,
Each of the second wire ropes being sequentially connected to the first horizontal wire rope, the third horizontal wire rope, the second horizontal wire rope, and the fourth horizontal wire rope along the second direction,
Wherein the flexibility barrier for destructive disruption connects a portion of each of the second wire ropes connected to the first horizontal wire rope and another portion of each of the second wire ropes connected to the third horizontal wire rope, Further comprising a plurality of spare ropes,
Wherein the overlapping portions are unfolded,
Wherein each of the preliminary ropes is broken when a predetermined load is exceeded due to the kinetic energy of the debris flow.
제 10 항에 있어서, 상기 토석류 방재를 위한 유연성 방호책은
상기 제1 수평 와이어 로프 및 상기 제3 수평 와이어 로프 사이의 각각의 상기 제2 와이어 로프들의 일부, 상기 제3 수평 와이어 로프 및 상기 제2 수평 와이어 로프 사이의 각각의 상기 제2 와이어 로프들의 다른 일부, 및 상기 제2 수평 와이어 로프 및 상기 제4 수평 와이어 로프 사이의 각각의 상기 제2 와이어 로프들의 또 다른 일부를 서로 연결하고 각각 감싸는 복수의 제1 브레이킹 부재들을 더 포함하고,
상기 중첩된 부분들이 펼쳐지는 단계는,
각각의 상기 제1 브레이킹 부재들이 상기 토석류의 상기 운동에너지에 의하여 상기 제2 와이어 로프에 발생되는 부하를 흡수하여 상기 제2 와이어 로프의 중첩된 부분의 크기가 줄어드는 속도를 조절하는 단계를 더 포함하는 것을 특징으로 하는 토석류 방재 방법.
11. The method of claim 10, wherein the flexural barrier
A portion of each of the second wire ropes between the first horizontal wire rope and the third horizontal wire rope, another portion of each of the second wire ropes between the third horizontal wire rope and the second horizontal wire rope, And a plurality of first braking members each connecting and enclosing another portion of each of the second wire ropes between the second horizontal wire rope and the fourth horizontal wire rope,
Wherein the overlapping portions are unfolded,
Each of the first braking members absorbing a load generated in the second wire rope by the kinetic energy of the debris so as to adjust the rate at which the size of the overlapped portion of the second wire rope is reduced Wherein the method comprises the steps of:
제 9 항에 있어서, 상기 토석류 방재를 위한 유연성 방호책은,
각각의 상기 제1 와이어 로프들에 배치되어 각각의 상기 제1 와이어 로프들을 감싸며, 각각의 상기 제1 와이어 로프들을 상기 제3 방향을 중심으로 감고 상기 제3 방향을 따라 중첩시키는 복수의 제2 브레이킹 부재들을 더 포함하며,
상기 중첩된 부분들이 펼쳐지는 단계는,
각각의 상기 제2 브레이킹 부재들이 상기 토석류의 상기 운동에너지에 의하여 상기 제1 와이어 로프에 발생되는 부하를 흡수하여 상기 제1 와이어 로프의 원형의 크기가 줄어드는 속도를 조절하는 단계를 더 포함하는 것을 특징으로 하는 토석류 방재 방법.
10. The method according to claim 9,
A plurality of second brakes disposed in each of the first wire ropes to surround each of the first wire ropes and to wind each of the first wire ropes around the third direction and to overlap each of the first wire ropes along the third direction; Further comprising:
Wherein the overlapping portions are unfolded,
And each of the second braking members absorbs a load generated in the first wire rope by the kinetic energy of the deformation stone to adjust the speed at which the size of the circular shape of the first wire rope is reduced. .
제 9 항에 있어서, 상기 토석류 방재를 위한 유연성 방호책은,
각각의 상기 제1 와이어 로프들의 일단 및 타단에 연결되는 복수의 앵커들을 더 포함하며,
상기 토석류 방재를 위한 유연성 방호책을 상기 지면에 설치하는 단계는,
상기 앵커들을 이용하여 상기 지면에 각각의 상기 제1 와이어 로프들을 고정시키는 단계를 포함하는 것을 특징으로 하는 토석류 방재 방법.
10. The method according to claim 9,
Further comprising a plurality of anchors connected to one end and the other end of each of the first wire ropes,
The method of claim 1, wherein the step of installing a flexible barrier for disaster prevention on the ground comprises:
And fixing each of the first wire ropes to the ground using the anchors.
제 13 항에 있어서, 각각의 상기 제2 와이어 로프들의 일단은 적어도 하나의 상기 제1 와이어 로프에 연결되며,
상기 토석류 방재를 위한 유연성 방호책은,
각각의 상기 제2 와이어 로프들의 타단에 연결되는 복수의 베이스 기초대들을 더 포함하며,
상기 토석류 방재를 위한 유연성 방호책을 상기 지면에 설치하는 단계는,
상기 베이스 기초대들을 이용하여 상기 지면에 각각의 제2 와이어 로프들을 고정시키는 단계를 더 포함하는 것을 특징으로 하는 토석류 방재 방법.
14. The method of claim 13, wherein one end of each of the second wire ropes is connected to at least one of the first wire ropes,
The flexible barrier for preventing the above-
And a plurality of base rods connected to the other end of each of the second wire ropes,
The method of claim 1, wherein the step of installing a flexible barrier for disaster prevention on the ground comprises:
Further comprising securing each of the second wire ropes to the ground using the base bases. ≪ RTI ID = 0.0 > 11. < / RTI >
KR1020160158230A 2016-11-25 2016-11-25 Flexible barrier of preventing debris flows and method of preventing debris flow disaster KR101942012B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020160158230A KR101942012B1 (en) 2016-11-25 2016-11-25 Flexible barrier of preventing debris flows and method of preventing debris flow disaster

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020160158230A KR101942012B1 (en) 2016-11-25 2016-11-25 Flexible barrier of preventing debris flows and method of preventing debris flow disaster

Publications (2)

Publication Number Publication Date
KR20180059077A true KR20180059077A (en) 2018-06-04
KR101942012B1 KR101942012B1 (en) 2019-01-24

Family

ID=62628202

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020160158230A KR101942012B1 (en) 2016-11-25 2016-11-25 Flexible barrier of preventing debris flows and method of preventing debris flow disaster

Country Status (1)

Country Link
KR (1) KR101942012B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11414821B2 (en) * 2020-05-05 2022-08-16 Southwest Jiaotong University Expandable modular energy-dissipation protection net unit group and protection net system formed by the same

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000045234A (en) * 1998-07-30 2000-02-15 Nihon Samicon Kk Impact absorbing fence
JP2002054109A (en) * 2000-08-08 2002-02-20 Maruken Netto Kogyo Kk Guard fence for rock fall or the like
KR100471375B1 (en) * 2002-12-24 2005-03-10 (주) 코리아에스이 Shock-absorbing type construction method and net facilities for protecting falling rocks, and shock-absorbing ends device therefor
KR100604179B1 (en) * 1996-08-30 2006-12-07 파처 아게 Protective device that prevents rockfall and absorbs high kinetic energy such as rockfall
JP2006342957A (en) * 2005-06-08 2006-12-21 Isofer Ag Rope braking device
KR100811132B1 (en) * 2007-09-22 2008-03-10 주식회사 태조엔지니어링 Fence of railroad line for blocking falling rocks
KR20110042820A (en) * 2009-10-20 2011-04-27 고주재 Tension compressed type preventinga falling stone
KR20140102093A (en) * 2013-02-13 2014-08-21 (주)케이에이 Falling rock net
KR101551174B1 (en) * 2015-03-24 2015-09-08 (주)창광이앤씨 Double reduction landslide protection facilities

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100604179B1 (en) * 1996-08-30 2006-12-07 파처 아게 Protective device that prevents rockfall and absorbs high kinetic energy such as rockfall
JP2000045234A (en) * 1998-07-30 2000-02-15 Nihon Samicon Kk Impact absorbing fence
JP2002054109A (en) * 2000-08-08 2002-02-20 Maruken Netto Kogyo Kk Guard fence for rock fall or the like
KR100471375B1 (en) * 2002-12-24 2005-03-10 (주) 코리아에스이 Shock-absorbing type construction method and net facilities for protecting falling rocks, and shock-absorbing ends device therefor
JP2006342957A (en) * 2005-06-08 2006-12-21 Isofer Ag Rope braking device
KR100811132B1 (en) * 2007-09-22 2008-03-10 주식회사 태조엔지니어링 Fence of railroad line for blocking falling rocks
KR20110042820A (en) * 2009-10-20 2011-04-27 고주재 Tension compressed type preventinga falling stone
KR20140102093A (en) * 2013-02-13 2014-08-21 (주)케이에이 Falling rock net
KR101551174B1 (en) * 2015-03-24 2015-09-08 (주)창광이앤씨 Double reduction landslide protection facilities

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11414821B2 (en) * 2020-05-05 2022-08-16 Southwest Jiaotong University Expandable modular energy-dissipation protection net unit group and protection net system formed by the same

Also Published As

Publication number Publication date
KR101942012B1 (en) 2019-01-24

Similar Documents

Publication Publication Date Title
JP4188998B2 (en) Shock absorbing fence
JP5358028B1 (en) Slope protection structure and protection method
KR102122768B1 (en) Wirenet assembly for reinforcing slopes and constructing method thereof
KR20190090188A (en) Tunnel type rockfall protection structure having variable pole part for shock absorbing
JP2018178480A (en) Protective fence
KR102269067B1 (en) Impact absorbing device for falling objects in the protective netting
KR101942012B1 (en) Flexible barrier of preventing debris flows and method of preventing debris flow disaster
JP3954414B2 (en) Protective body using net
JPWO2018069970A1 (en) Transmission type capture structure
JP4133517B2 (en) Transmission type sabo dam
KR101207714B1 (en) Rockfall protection fence for distributing and absorbing impect energy
JP5144551B2 (en) Protective fence such as rockfall
KR100659372B1 (en) Fence using wire rope buffer and end equipment and the construction method of this
JP4540259B2 (en) Suspended protective weir
KR20060038266A (en) A method for one-body type slope protection and reinforcement
JP2011069193A (en) Rock fall prevention net structure
KR20150031259A (en) Energy absorber for Rockfall protection fence
JP4115422B2 (en) Protective fence
EA020081B1 (en) Open-type dam for protection against mud torrent
JP6230854B2 (en) Net structure and its construction method
JP7104396B2 (en) Dam rope protection member and dam
CN219410903U (en) Annular passive side slope protection net
JP3844970B2 (en) Preventive facilities such as falling rocks, earth and sand, driftwood, avalanches and their protection methods
KR19980018581A (en) Protective device that prevents rockfall and absorbs his high kinetic energy
CN220364886U (en) Assembled type flexible passive protection net for gully debris flow

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right