KR20170111368A - 전력 네트워크 시스템 - Google Patents
전력 네트워크 시스템 Download PDFInfo
- Publication number
- KR20170111368A KR20170111368A KR1020160036671A KR20160036671A KR20170111368A KR 20170111368 A KR20170111368 A KR 20170111368A KR 1020160036671 A KR1020160036671 A KR 1020160036671A KR 20160036671 A KR20160036671 A KR 20160036671A KR 20170111368 A KR20170111368 A KR 20170111368A
- Authority
- KR
- South Korea
- Prior art keywords
- power
- sub
- electronic device
- breaker
- main
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/003—Load forecast, e.g. methods or systems for forecasting future load demand
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R13/00—Arrangements for displaying electric variables or waveforms
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R19/00—Arrangements for measuring currents or voltages or for indicating presence or sign thereof
- G01R19/165—Indicating that current or voltage is either above or below a predetermined value or within or outside a predetermined range of values
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R22/00—Arrangements for measuring time integral of electric power or current, e.g. electricity meters
- G01R22/06—Arrangements for measuring time integral of electric power or current, e.g. electricity meters by electronic methods
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R22/00—Arrangements for measuring time integral of electric power or current, e.g. electricity meters
- G01R22/06—Arrangements for measuring time integral of electric power or current, e.g. electricity meters by electronic methods
- G01R22/061—Details of electronic electricity meters
- G01R22/063—Details of electronic electricity meters related to remote communication
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00001—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the display of information or by user interaction, e.g. supervisory control and data acquisition systems [SCADA] or graphical user interfaces [GUI]
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00006—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
-
- H02J13/001—
-
- H02J13/0013—
-
- H02J2003/007—
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2203/00—Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
- H02J2203/20—Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
-
- Y02B70/3233—
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02B90/20—Smart grids as enabling technology in buildings sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
- Y04S40/12—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Power Engineering (AREA)
- Business, Economics & Management (AREA)
- Economics (AREA)
- Health & Medical Sciences (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Human Computer Interaction (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
Description
도 2는 본 발명의 일 실시예에 따른 전력 네트워크 시스템을 도시한 도면이다.
도 3은 본 발명의 일 실시예에 따른 분전반과 관련된 설명에 도면이다.
도 4는 본 발명의 일 실시예에 따른 차단기와 관련된 설명에 도면이다.
도 5 내지 도 7은 본 발명의 실시예에 따른 전자기기가 표시하는 화면 및 서비스들을 나타내는 도면이다.
도 8은 본 발명의 일 실시예에 따른 전력 네트워크 시스템을 도시한 도면이다.
도 9와 도 10은 본 발명의 실시예에 따른 전자기기가 표시하는 화면 및 서비스들을 나타내는 도면이다.
도 11 내지 도 13은 본 발명의 다양한 실시예에 따른 전력 네트워크 시스템을 도시한 도면이다.
도 14는 본 발명의 일 실시예에 따른 분전반과 관련된 설명에 참조되는 도면이다.
메인 차단기: 210
서브 차단기: 221, 222, 223, 224
전력 모니터링부: 250
Claims (20)
- 외부로부터 공급되는 전력을 분배하는 메인 차단기;
상기 메인 차단기로부터 분배된 전력을 각각 대응하는 구역의 부하로 공급하는 복수의 서브 차단기; 및,
상기 메인 차단기와 상기 서브 차단기 사이에 연결되어 전력 사용량을 모니터링하는 전력 모니터링부;를 포함하고,
상기 메인 차단기는, 외부의 전자기기와 제1 통신 규격으로 통신하고, 상기 메인 차단기와 상기 서브 차단기는 제2 통신 규격으로 통신하는 것을 특징으로 하는 전력 네트워크 시스템. - 제1항에 있어서,
상기 메인 차단기는,
상기 전력 모니터링부의 전력 모니터링 데이터를 상기 외부의 전자기기로 전송하는 것을 특징으로 하는 전력 네트워크 시스템. - 제2항에 있어서,
상기 메인 차단기는,
상기 전력 모니터링부의 전력 모니터링 데이터를 구역별 또는 기기 그룹별로 구분하여 상기 외부의 전자기기로 전송하는 것을 특징으로 하는 전력 네트워크 시스템. - 제1항에 있어서,
상기 메인 차단기는,
상기 복수의 서브 차단기 중 소정 구역에 대응하는 서브 차단기로 전력 공급을 온(on) 또는 오프(off)하는 제어 신호를 전송하는 것을 특징으로 하는 전력 네트워크 시스템. - 제1항에 있어서,
상기 메인 차단기는,
상기 외부의 전자기기로부터 수신된 신호에 기초하는 제어 신호를 상기 복수의 서브 차단기 중 상기 외부의 전자기기로부터 수신된 신호에 연관된 구역에 대응하는 서브 차단기로 전송하는 것을 특징으로 하는 전력 네트워크 시스템. - 제5항에 있어서,
상기 서브 차단기는, 상기 메인 차단기로부터 수신한 제어 신호에 따라 대응하는 구역에 포함되는 부하 중 적어도 하나에 대한 전력 공급을 차단하는 것을 특징으로 하는 전력 네트워크 시스템. - 제1항에 있어서,
상기 메인 차단기는,
상기 외부의 전자기기와 제1 통신 규격으로 통신하는 제1 통신 모듈, 및, 상기 서브 차단기와 제2 통신 규격으로 통신하는 제2 통신 모듈을 포함하는 것을 특징으로 하는 전력 네트워크 시스템. - 제1항에 있어서,
상기 서브 차단기는,
상기 메인 차단기와 제2 통신 규격으로 통신하는 제2 통신 모듈을 포함하는 것을 특징으로 하는 전력 네트워크 시스템. - 제1항에 있어서,
상기 전력 모니터링부는,
CT(Current Transformer) 센서를 포함하는 것을 특징으로 하는 전력 네트워크 시스템. - 제9항에 있어서,
상기 CT 센서에서 측정된 데이터에 기초하여, 에너지 분해(Energy Disaggregation) 방식으로 각 구역별, 그룹별 에너지 사용량을 산출하는 것을 특징으로 하는 전력 네트워크 시스템. - 제1항에 있어서,
상기 전력 모니터링부는,
NILM(Non-Intrusive Load Monitoring) 센서를 포함하는 것을 특징으로 하는 전력 네트워크 시스템. - 제1항에 있어서,
상기 전력 모니터링부는,
전력 사용량 및 전기 요금을 실시간으로 측정할 수 있는 스마트미터인 것을 특징으로 하는 전력 네트워크 시스템. - 제1항에 있어서,
상기 전력 모니터링부는,
소정 서버 또는 전자기기로 전력 모니터링 데이터를 전송하는 것을 특징으로 하는 전력 네트워크 시스템. - 제1항에 있어서,
상기 복수의 서브 차단기와 부하들 사이에 연결되어, 각각 연결된 부하들로 전력을 공급하거나 차단하는 복수의 온(on)/오프(off) 제어기;를 더 포함하는 것을 특징으로 하는 전력 네트워크 시스템. - 제1항에 있어서,
상기 복수의 서브 차단기와 부하들 사이에 연결되어, 상기 복수의 서브 차단기로부터 전송되는 제어 신호에 따라, 부하들로 전력을 공급하거나 차단하는 멀티(multi) 온(on)/오프(off) 제어기;를 더 포함하는 것을 특징으로 하는 전력 네트워크 시스템. - 제1항에 있어서,
상기 메인 차단기와 부하들 사이에 연결되어, 상기 메인 차단기로부터 전송되는 제어 신호에 따라, 대응하는 부하들로 전력을 공급하거나 차단하는 멀티(multi) 온(on)/오프(off) 제어기;를 더 포함하는 것을 특징으로 하는 전력 네트워크 시스템. - 제1항에 있어서,
상기 복수의 서브 차단기 중 적어도 하나는 복수의 2차 서브 차단기와 연결되는 것을 특징으로 하는 전력 네트워크 시스템. - 제1항에 있어서,
상기 전력 모니터링부의 전력 모니터링 데이터를 표시하는 디스플레이;를 더 포함하는 것을 특징으로 하는 전력 네트워크 시스템. - 제1항에 있어서,
상기 메인 차단기 또는 상기 전력 모니터링부는,
기설정된 전력 사용량을 초과한 전자기기, 콘센트, 그룹 또는 구역에 대한 정보를 소정 서버 또는 전자기기로 전송하는 것을 특징으로 하는 전력 네트워크 시스템. - 제1항에 있어서,
상기 메인 차단기는,
기설정된 전력 사용량 기준을 만족하는 전자기기, 콘센트, 그룹 또는 구역에 대한 정보 입력을 가이드(guide)하는 메시지를 소정 서버 또는 전자기기로 전송하는 것을 특징으로 하는 전력 네트워크 시스템.
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020160036671A KR20170111368A (ko) | 2016-03-28 | 2016-03-28 | 전력 네트워크 시스템 |
| PCT/KR2017/003272 WO2017171332A1 (ko) | 2016-03-28 | 2017-03-27 | 전력 네트워크 시스템 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020160036671A KR20170111368A (ko) | 2016-03-28 | 2016-03-28 | 전력 네트워크 시스템 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| KR20170111368A true KR20170111368A (ko) | 2017-10-12 |
Family
ID=59964934
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| KR1020160036671A Ceased KR20170111368A (ko) | 2016-03-28 | 2016-03-28 | 전력 네트워크 시스템 |
Country Status (2)
| Country | Link |
|---|---|
| KR (1) | KR20170111368A (ko) |
| WO (1) | WO2017171332A1 (ko) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20190095688A (ko) * | 2018-02-07 | 2019-08-16 | 한국전력공사 | 양방향 전력 통신망을 이용한 가전 기기 제어 시스템, 이의 방법, 그리고 그 방법의 작동 이력이 저장된 컴퓨터 판독 가능 저장 매체 |
| KR20200064382A (ko) * | 2018-11-29 | 2020-06-08 | 현대자동차주식회사 | 차량 및 그 제어방법 |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112713648A (zh) * | 2019-10-25 | 2021-04-27 | 北京人民电器厂有限公司 | 一种电费控制系统 |
| FR3150357A1 (fr) * | 2023-06-21 | 2024-12-27 | Michaud | Système d’alimentation électrique d’un bâtiment |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104282086A (zh) * | 2007-01-09 | 2015-01-14 | 功率监视器公司 | 用于智能电路断路器的方法和设备 |
| KR20100094833A (ko) * | 2009-02-19 | 2010-08-27 | (주)지능형빌딩시스템기술연구소 | 전력 제어 장치 및 방법 |
| KR100963161B1 (ko) * | 2010-03-19 | 2010-06-10 | 벽산파워 주식회사 | 건물의 스마트 에너지 관리 시스템 및 방법 |
| KR101893013B1 (ko) * | 2011-10-28 | 2018-08-30 | 삼성전자주식회사 | 전력 관리 장치 및 그 제어 방법 |
| KR200468498Y1 (ko) * | 2013-07-03 | 2013-08-19 | 김선우 | 실시간 사용 전력량 계측장치 |
-
2016
- 2016-03-28 KR KR1020160036671A patent/KR20170111368A/ko not_active Ceased
-
2017
- 2017-03-27 WO PCT/KR2017/003272 patent/WO2017171332A1/ko not_active Ceased
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20190095688A (ko) * | 2018-02-07 | 2019-08-16 | 한국전력공사 | 양방향 전력 통신망을 이용한 가전 기기 제어 시스템, 이의 방법, 그리고 그 방법의 작동 이력이 저장된 컴퓨터 판독 가능 저장 매체 |
| KR20200064382A (ko) * | 2018-11-29 | 2020-06-08 | 현대자동차주식회사 | 차량 및 그 제어방법 |
Also Published As
| Publication number | Publication date |
|---|---|
| WO2017171332A1 (ko) | 2017-10-05 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP2587729B1 (en) | Network system | |
| KR20170111368A (ko) | 전력 네트워크 시스템 | |
| KR20120000011A (ko) | 네트워크 시스템 및 에너지소비부 | |
| KR20120000026A (ko) | 네트워크 시스템 | |
| KR20120127980A (ko) | 네트워크 시스템 | |
| KR20120094625A (ko) | 에너지관리장치 및 이를 포함하는 공기조화시스템 | |
| KR101656885B1 (ko) | 네트워크 시스템 및 이를 구성하는 컴포넌트 | |
| KR20120128735A (ko) | 네트워크 시스템의 제어방법 및 그를 위한 컴포넌트의 제어방법 | |
| KR20120000018A (ko) | 네트워크 시스템 | |
| KR20120029568A (ko) | 네트워크 시스템 | |
| KR20120029565A (ko) | 네트워크 시스템 | |
| KR101674938B1 (ko) | 전기제품의 전력관리네트워크 등록방법 및 전력관리네트워크 바인더 | |
| Bharathi et al. | Implementation of Smart Energy Management and Control Using IOT | |
| KR20120029566A (ko) | 네트워크 시스템 | |
| KR20120000015A (ko) | 네트워크 시스템 | |
| KR20120008375A (ko) | 네트워크 시스템 | |
| KR20120029567A (ko) | 네트워크 시스템 | |
| KR20120067033A (ko) | 네트워크 시스템 | |
| KR20120080086A (ko) | 네트워크 시스템을 위한 컴포넌트의 제어방법 | |
| KR20120000019A (ko) | 네트워크 시스템 | |
| KR20120000308A (ko) | 네트워크 시스템 | |
| KR20120000012A (ko) | 네트워크 시스템 | |
| KR20120000313A (ko) | 네트워크 시스템 | |
| KR20110138811A (ko) | 네트워크 시스템 | |
| KR20120080090A (ko) | 네트워크 시스템 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PA0109 | Patent application |
Patent event code: PA01091R01D Comment text: Patent Application Patent event date: 20160328 |
|
| PG1501 | Laying open of application | ||
| A201 | Request for examination | ||
| PA0201 | Request for examination |
Patent event code: PA02012R01D Patent event date: 20210219 Comment text: Request for Examination of Application Patent event code: PA02011R01I Patent event date: 20160328 Comment text: Patent Application |
|
| E902 | Notification of reason for refusal | ||
| PE0902 | Notice of grounds for rejection |
Comment text: Notification of reason for refusal Patent event date: 20221014 Patent event code: PE09021S01D |
|
| E601 | Decision to refuse application | ||
| PE0601 | Decision on rejection of patent |
Patent event date: 20230401 Comment text: Decision to Refuse Application Patent event code: PE06012S01D Patent event date: 20221014 Comment text: Notification of reason for refusal Patent event code: PE06011S01I |