KR20170035526A - Vessel with Dual Layer Way - Google Patents
Vessel with Dual Layer Way Download PDFInfo
- Publication number
- KR20170035526A KR20170035526A KR1020150134452A KR20150134452A KR20170035526A KR 20170035526 A KR20170035526 A KR 20170035526A KR 1020150134452 A KR1020150134452 A KR 1020150134452A KR 20150134452 A KR20150134452 A KR 20150134452A KR 20170035526 A KR20170035526 A KR 20170035526A
- Authority
- KR
- South Korea
- Prior art keywords
- passage
- emergency
- handling
- deck
- bottom frame
- Prior art date
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B29/00—Accommodation for crew or passengers not otherwise provided for
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B17/00—Vessels parts, details, or accessories, not otherwise provided for
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B17/00—Vessels parts, details, or accessories, not otherwise provided for
- B63B17/04—Stanchions; Guard-rails ; Bulwarks or the like
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B3/00—Hulls characterised by their structure or component parts
- B63B3/14—Hull parts
- B63B3/70—Reinforcements for carrying localised loads, e.g. propulsion plant, guns
-
- B63B9/00—
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Emergency Lowering Means (AREA)
Abstract
Description
[0001] The present invention relates to a ship in which a passageway is formed by which an operator can pass, and in particular, an operator has a handling passageway that travels normally in order to preserve the equipment and apparatus of a ship, and an emergency passageway which can be quickly evacuated in an emergency So that the space utilization can be increased.
For the preservation management of the facilities and devices of the ship, the ship is provided with a handling passage for the operator to pass through.
The handling passage is designed considering the operator's line and the position of the ship's facilities and equipment at the time of ship design. The surface area of the handling passage formed in the inside of the hull occupies a considerable portion of the surface area of the ship.
In this way, in the state where the handling passage is installed on the ship, the operator moves along the handling passage to preserve and manage the facilities and devices of the ship.
On the other hand, in designing the ship, an emergency passage is designed so that it can be quickly evacuated from dangerous areas by one-way traffic in an emergency.
Emergency passages are not used at normal times, and only emergency passages are used to move in one direction for rapid evacuation.
Emergency aisles are also installed in the interior of the hull, so that the surface area of the emergency aisles also accounts for a significant portion of the surface area of the vessel.
In designing the ship in such a manner, the entire area of the passages must be secured by designing and constructing the handling passages and the emergency passages in a planar manner, and there is a problem that the space utilization of the ship is relatively lowered.
As the utilization of the space of the ship becomes lower, the capacity of the ship is inevitably reduced. In setting the position of the ship's facilities and equipment, it is difficult to design the ship so as not to interfere with the handling passage and the emergency passage.
The present invention has been made in order to solve the problems of the prior art as described above, and it is an object of the present invention to provide a three-dimensional installation of a handling passage and an emergency passage to be installed in a ship, The present invention has been made in view of the above problems, and it is an object of the present invention to provide a ship having a passageway having a multi-layer structure.
According to another aspect of the present invention, there is provided a ship having an inner space formed by a deck and a partition wall vertically disposed on a top surface of the deck, the ship having a handling passage formed at a height of the partition wall, And an emergency passage formed on the upper surface of the deck corresponding to the handling passage.
According to a preferred embodiment of the present invention, the handling passage includes an aligned bottom plate, a bottom frame fixed to the middle of the height of the partition to form an interval corresponding to the width of the bottom plate so that the bottom plates can be seated, A railing provided on one side of the bottom frame, and a reinforcing bar connecting the bottom of the bottom frame to the partition so as to support the bottom frame.
Further, according to a preferred embodiment of the present invention, the handling passage is folded so as to be spaced apart from the partition wall, and the deck-extended post is fixed to the bottom surface of the bottom frame of the folded portion.
According to a preferred embodiment of the present invention, a reinforcing bar connecting the post and the bottom frame is fixed to the bottom surface of the bottom frame at the bent portion of the handling passage.
Further, according to a preferred embodiment of the present invention, in the emergency passage, a passage line is formed on the upper surface of the deck to indicate the emergency passage.
As described above, according to the present invention, a ship having a passageway having a multi-layer structure is constructed by forming a handling passage and an emergency passage in a multi-layer structure along a partition wall inside the hull, It is advantageous that space utilization can be increased.
In addition, since the handling passage and the emergency passage are formed in a multi-layer structure, it is easy to secure a space for avoiding interference with equipment and equipment located inside the hull, thereby facilitating the design of the two passages.
1 is a perspective view showing a passage of a multi-layer structure installed on a ship according to the present invention,
Fig. 2 is a side view showing the passage of the multi-layer structure shown in Fig. 1,
Fig. 3 is a plan view showing a modified example of the multi-layered passageway shown in Fig. 1,
4 is a side view of the passageway of the multi-layer structure shown in Fig.
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, preferred embodiments of a ship having a multi-layer structure according to the present invention will be described in detail with reference to the accompanying drawings.
1 is a side view showing a passageway of the multi-layer structure shown in FIG. 1, and FIG. 3 is a cross-sectional view of the multi-layer structure shown in FIG. 1 Fig. 4 is a side view of the passageway of the multi-layer structure shown in Fig. 3; Fig.
As shown in Figures 1 and 2, the interior of the hull includes an
The operator moves along the
The
1, a
An emergency passage (120) is formed in a lower portion of the handling passage (110). The
Hereinafter, the
1 and 2, the
The
In the
A plurality of
The distance between the
In addition, the
In this way, in the state where one side long side of the
On the bottom surface of the
Therefore, the load applied to the
Thus, the worker can safely move along the
On the other hand, as described above, the
The
Although the
3 and 4, when the
A part of the
A
Meanwhile, the
In the
The handling
101, 102: Deck
103:
105: Stiffener
110: Handling passage
111: bottom plate
113: floor frame
115: Support
117: Railing
119: Receptacle
120: emergency passage
127: passage line
130: Post
Claims (5)
A handling passage 110 formed at the middle of the height of the partition 103 and fixed to the partition 103,
And an emergency passage (120) formed on an upper surface of the deck (102) corresponding to the handling passage (110).
The handling passage 110 is formed in the center of the bottom plate 111 and the bottom plate 111. The handling passage 110 is formed to have a width corresponding to the width of the bottom plate 111 so that the bottom plate 111 and the bottom plates 111 can be seated, A railing 117 raised on one side of the bottom frame 113 and a reinforcing bar 119 connecting the bottom of the bottom frame 113 and the partition 103 to support the bottom frame 113 And a plurality of passageways connected in parallel to each other.
The handling passage 110 is folded away from the partition wall 103 and a post 130 extending from the deck 102 is fixed to the bottom surface of the bottom frame 113 at the folded portion. .
And a reinforcing bar 119 connecting the post 130 and the bottom frame 113 is fixed to the bottom surface of the bottom frame 113 at the bent portion of the handling passage 110. [ .
Wherein the emergency passage (120) is provided with a passage line (127) indicating an emergency passage (120) on the upper surface of the deck (102).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020150134452A KR20170035526A (en) | 2015-09-23 | 2015-09-23 | Vessel with Dual Layer Way |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020150134452A KR20170035526A (en) | 2015-09-23 | 2015-09-23 | Vessel with Dual Layer Way |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20170035526A true KR20170035526A (en) | 2017-03-31 |
Family
ID=58501057
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020150134452A KR20170035526A (en) | 2015-09-23 | 2015-09-23 | Vessel with Dual Layer Way |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20170035526A (en) |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20150047728A (en) | 2013-10-25 | 2015-05-06 | 대우조선해양 주식회사 | Citadel of Secret Structure for Ship |
-
2015
- 2015-09-23 KR KR1020150134452A patent/KR20170035526A/en unknown
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20150047728A (en) | 2013-10-25 | 2015-05-06 | 대우조선해양 주식회사 | Citadel of Secret Structure for Ship |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2019200291B2 (en) | Elevator | |
AU2016203815B2 (en) | Hoisting Apparatus and System | |
US7219771B2 (en) | Elevator counter weight | |
JP6227153B2 (en) | Ceiling unit and elevator car with ceiling unit | |
KR970001353B1 (en) | Ship construction | |
KR20140001952U (en) | Escaping structure for ship | |
CN103003183A (en) | Fire-fighting lift | |
JP6178177B2 (en) | Elevator equipment | |
US20110103893A1 (en) | Tunnel multi floor | |
KR20170035526A (en) | Vessel with Dual Layer Way | |
KR101356369B1 (en) | Moving and Lifting Device of Table Form | |
JP6300279B2 (en) | Ship | |
US11851304B2 (en) | Method and arrangement | |
JP6567702B2 (en) | Working floor on elevator car | |
EP2589561A1 (en) | Integral system of corner brackets for an elevator frame | |
JP6355053B2 (en) | Switchgear, scaffold, and ship | |
KR101400014B1 (en) | Scaffold for preventing fall | |
KR102346513B1 (en) | Prefabricated electric room having multilayered structure | |
KR101784856B1 (en) | Temporary structure that is mounted on the deck of a ship | |
JP7479973B2 (en) | Lift device for vehicle inspection and maintenance | |
JP7104566B2 (en) | Safety experience facility | |
KR20140005495U (en) | Cable tray | |
JP4072581B2 (en) | Scaffolding equipment | |
KR101417954B1 (en) | Car deck for ship | |
JP7336904B2 (en) | Working floor construction equipment for elevator parking equipment |