KR20160075355A - System and method for providing integratively loading plan using cloud service - Google Patents

System and method for providing integratively loading plan using cloud service Download PDF

Info

Publication number
KR20160075355A
KR20160075355A KR1020150180857A KR20150180857A KR20160075355A KR 20160075355 A KR20160075355 A KR 20160075355A KR 1020150180857 A KR1020150180857 A KR 1020150180857A KR 20150180857 A KR20150180857 A KR 20150180857A KR 20160075355 A KR20160075355 A KR 20160075355A
Authority
KR
South Korea
Prior art keywords
plan
loading
unloading
cloud service
side terminal
Prior art date
Application number
KR1020150180857A
Other languages
Korean (ko)
Other versions
KR102061788B1 (en
Inventor
이훈
Original Assignee
(주)토탈소프트뱅크
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)토탈소프트뱅크 filed Critical (주)토탈소프트뱅크
Publication of KR20160075355A publication Critical patent/KR20160075355A/en
Priority to SG11201805194UA priority Critical patent/SG11201805194UA/en
Priority to PCT/KR2016/014622 priority patent/WO2017105069A1/en
Priority to US16/063,147 priority patent/US20200167726A1/en
Application granted granted Critical
Publication of KR102061788B1 publication Critical patent/KR102061788B1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/083Shipping
    • G06Q10/0831Overseas transactions
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/083Shipping
    • G06Q10/0832Special goods or special handling procedures, e.g. handling of hazardous or fragile goods

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Human Resources & Organizations (AREA)
  • Tourism & Hospitality (AREA)
  • General Physics & Mathematics (AREA)
  • Quality & Reliability (AREA)
  • Marketing (AREA)
  • Development Economics (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Operations Research (AREA)
  • Theoretical Computer Science (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The purpose of the present invention is to provide a system and a method for integrally providing a loading plan using a cloud service, which allows terminals of a shipping company, an inspection company, and an operation company to mutually share a loading plan list required for loading and unloading containers of ships through the cloud service and allows user terminals associated with the loading of the containers to integrally receive a predetermined loading plan. The system for integrally providing the loading plan using the cloud service comprises; a first loading plan execution group (101) which is composed of a shipping company side terminal (110), a first mate side terminal (120), an inspection company side terminal (130), a management planner side terminal (140), a loading and unloading clerk side terminal (150), an equipment operator side terminal (160), and an operation company inspector side terminal (170) and executes the loading plan; a plurality of loading plan execution groups (102-105) which include the same composition as the first loading plan execution group (101); and a cloud service server (200) which collects and manages loading plans transmitted from the first loading plan execution group (101) and the plurality of loading plan execution groups (102-105). Therefore, it is possible to share and utilize data according to loading plan and execution performed at each port.

Description

클라우드 서비스를 이용한 적하계획 통합 제공 시스템 및 방법{System and method for providing integratively loading plan using cloud service}BACKGROUND OF THE INVENTION Field of the Invention The present invention relates to a system and method for providing integration of a loading plan using a cloud service,

본 발명은 클라우드 서비스를 이용한 적하계획 통합 제공 시스템 및 방법에 관한 것으로, 더욱 상세하게는 선박의 컨테이너 하역을 위해 필요한 적하계획 목록을 클라우드 서비스를 통해 상호 공유하여, 컨테이너의 적하와 관련된 사용자측 단말기들이 소정의 적하계획을 통합적으로 제공받을 수 있도록 하는 클라우드 서비스를 이용한 적하계획 통합 제공 시스템 및 방법에 관한 것이다.
More particularly, the present invention relates to a system and method for providing integration of a loading plan using a cloud service, and more particularly, The present invention relates to a system and a method for providing an integration of a loading plan using a cloud service.

일반적으로, 선사 소속의 선박은 여러 항구를 경유하는 항로를 기준으로 운항하여 컨테이너를 이송하고, 경유지 항구별로 소정의 주기로 운항 서비스를 제공할 수 있도록 복수의 선박을 선대로 구성하여 컨테이너 이송 서비스를 제공한다.Generally, a ship belonging to a ship belongs to a vessel, and the container is transported on the basis of a route through a plurality of ports, and a plurality of vessels are provided in advance to provide a container transportation service do.

또한, 하나의 컨테이너 선박을 대상으로 하여, 선박이 경유하는 항구별로 컨테이너에 대한 선적예약, 입항신고, 선적계획, 화물신고, 검수, 하역 계획 및 실행 및 운송 등의 관련 서비스들이 제공된다.In addition, related services such as shipping reservation, arrival report, shipment plan, cargo report, inspection, unloading plan, execution and transportation are provided for each container through a ship for each container.

즉, 도 1에 도시된 바와 같이, 일반적인 컨테이너 터미널에서, 선사는 컨테이너 선박 대상으로 각 항구별 하역작업을 고려하여 적하계획을 수립하고, 검수사는 하역 계획 및 하역 작업에 대한 검수 활동을 수행하며, 운영사는 컨테이너 선박 대상에 대한 하역 작업계획을 수립한 후 하역 장비를 이용하여 해당 적하작업을 수행 및 관리하고, 하역된 컨테이너는 하주의 요청에 따라 운송사를 통해 배송된다.In other words, as shown in FIG. 1, in a general container terminal, a shipping company establishes a loading plan considering the unloading work for each port for a container ship, and the inspection company carries out inspections for unloading planning and unloading work, The operator constructs a cargo operation plan for the container ship, carries out the loading operation using the cargo equipment, and the unloaded container is delivered through the carrier at the request of the owner.

예를 들어, 컨테이너 터미널을 이용하는 선사 및 운영사는, 도 2에 도시된 바와 같이, 각각 운영되는 별도의 시스템을 구성하여 적하계획을 운영하고, 검수사는 별도의 시스템을 운영하거나 선사 또는 운영사 시스템을 통해 출력한 문서를 기준으로 적하 작업을 수행하게 된다.
For example, a shipping company and an operating company using a container terminal construct a separate system operated as shown in FIG. 2 to operate a loading plan, and the inspection company may operate a separate system, or may operate a shipper or an operator system And the loading operation is performed based on the output document.

즉, 선사 소속의 '플래너'를 통해 각 항구별 수출입 화물을 고려하여 적하계획을 수립하고, 관련 정보를 일등항해사 및 운영사에게 전달한다.In other words, through the 'planner' belonging to the shipping company, the loading plan is established considering the import and export cargoes for each port, and related information is transmitted to the first class mate and operator.

'일등항해사'는 선박의 안전을 고려한 화물의 적.양하계획을 수립한다.The "First Officer" shall establish a plan for the redemption of the cargo taking into account the safety of the ship.

검수사의 '수석검수원'은 작업 전 선박회사가 세관에 신고한 목록과 본선 적부도와 상호 대조하여 상이한 경우 선박회사에 연락조치하고, 특수 화물에 대한 조치 계획을 수립하여 일등항해사의 검토를 통해 작업 계획을 확정한다The 'Chief Checker' of the inspection company compares the list with the customs declaration of the ship company before the operation, and when it is different, it contacts the ship company when different, establishes the action plan for the special cargo, Confirm

해당 결과가 운영사 소속의 플래너에게 전달되고, 운영사/플래너가 하역장비 배정 및 하역작업 실행 순서를 계획한다.The results are passed on to the planner belonging to the operator, and the operator / planner plans the order of loading and unloading the work.

해당 계획은 운영사소속의 하역 담당자 및 장비기사와 검수사 소속의 검수원에게 전달되어 하역 작업을 수행하고, 수행 결과는 운영사 및 검수사 담당자를 통해 작업 결과가 선사 및 관련 기관에 보고된다.
The plan is delivered to the cargo handler of the operating company, the equipment engineer and the checkers belonging to the inspection engineer to carry out the unloading work, and the result of the operation is reported to the shipping company and related organizations through the operator and the investigator.

그러나, 상술한 종래의 적하계획 제공 시스템 및 방법은, 선사, 검수사 및 운영사가 각각 개별적으로 적하계획 시스템을 구성하고, 개별적으로 정보 생성 및 관리활공이 이루어졌으며, 상호 간에는 EDI(Electronic Data Interchange: 전자문서교환) 또는 기록매체를 적하계획 데이터를 교환하는 방식으로서, 각 적하계획 시스템 상호간 데이터 교환 및 작업중 계획변경과 같은 예외상황 발생시에는 실시간으로 조치가 이루어지지 않게 됨과 동시에 적하계획에 대한 작업의 지연이 발생되는 문제점이 있었다.
However, in the conventional system and method for providing a cargo plan, the cargo planning system constitutes a cargo planning system, and information generation and management glide is individually performed. In the case of an exceptional situation such as exchange of data between each loading planning system and change of the plan during the work, it is not possible to take action in real time, and at the same time, There has been a problem in that it occurs.

본 발명은 상기와 같은 문제점을 해결하기 위한 것으로서, 그 목적은 선박의 컨테이너 하역을 위해 필요한 적하계획 목록을 클라우드 서비스를 통해 선사, 검수사 및 운영사측 단말기가 상호 공유하게 하여, 컨테이너의 적하와 관련된 사용자측 단말기들이 소정의 적하계획을 통합적으로 제공받을 수 있도록 하는 클라우드 서비스를 이용한 적하계획 통합 제공 시스템 및 방법을 제공하는 것이다.SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems, and it is an object of the present invention to provide a method and system for providing a list of loading plans necessary for loading and unloading containers on a ship, The present invention also provides a system and method for providing an integration of a loading plan using a cloud service that enables user terminals to receive a predetermined loading plan integrally.

이상의 목적 및 다른 추가적인 목적들이, 첨부되는 청구항들에 의해 본 발명의 기술사상을 벗어나지 않는 범위 내에서, 당업자들에게 명백히 인식될 수 있을 것이다.
These and other objects of the present invention will be apparent to those skilled in the art without departing from the scope of the present invention by the appended claims.

상기의 목적을 달성하기 위한 본 발명의 일 측면에 따른 클라우드 서비스를 이용한 적하계획 통합 제공 시스템은, 선사측 단말기(110), 일등항해사측 단말기(120), 검수사측 단말기(130), 운영사 플래너측 단말기(140), 하역담당자측 단말기(150), 장비기사측 단말기(160) 및 운영사 검수원측 단말기(170)로 구성된 적하계획을 수행하는 제 1 적하계획 수행 그룹(101); 상기 제 1 적하계획 수행 그룹(101)과 동일한 구성을 갖는 복수개의 적하계획 수행 그룹(102 ~ 105); 및 상기 제 1 적하계획 수행 그룹(101) 및 복수개의 적하계획 수행 그룹(102 ~ 105)으로부터 전달되는 적하계획을 취합하고, 컨테이너의 적하와 관련된 소정의 적하계획을 통합적으로 제공하여, 각 항구별로 수행된 적하작업 계획 및 수행에 따른 데이터를 상호 공유하여 활용할 수 있도록 하는 클라우드 서비스 서버(200)를 포함한다.In order to accomplish the above object, according to one aspect of the present invention, there is provided a system for providing integration of a dumping plan using a cloud service, including a provisional terminal 110, a first navigator terminal 120, a verification receiver terminal 130, A first loading plan execution group 101 for carrying out a loading schedule composed of an unloading person side terminal 140, an unloading person side terminal 150, an equipment article side terminal 160 and an operator checker side terminal 170; A plurality of loading plan execution groups (102-105) having the same configuration as the first loading planning executing group (101); And collecting the loading plan delivered from the first loading plan execution group (101) and the plurality of loading plan execution groups (102-105), integrally providing a predetermined loading plan related to the loading of the containers, And a cloud service server 200 that enables mutual sharing and utilization of data according to the performed loading operation plan and execution.

바람직하게는, 상기 적하계획 수행 그룹 중의 적어도 하나는, 자체의 터미널운영시스템(TOS)을 포함하는 하역계획클라우드서비스(SPCS)를 이용한 클라우드 서비스를 이용한 적하계획 통합 제공 방법을 수행하는 것을 특징으로 한다.
Advantageously, at least one of the loading planning execution groups performs a loading scheme integration providing method using a cloud service using a loading planning cloud service (SPCS) including its own terminal operating system (TOS) .

한편, 상기의 목적을 달성하기 위한 본 발명의 다른 측면에 따른 하역계획클라우드서비스(SPCS)를 이용한 클라우드 서비스를 이용한 적하계획 통합 제공 방법은, (a) 선사측 단말기(110)로부터 선사 플래너가 컨테이너 운반 예약을 토대로 수립한 ‘하역계획’을 상기 하역계획클라우드서비스(SPCS)에 등록받는 단계(S1); (b) 검수사측 단말기(130)으로부터 수석 검수원의 상기 하역계획클라우드서비스(SPCS)에서의 하역 대상 특수 화물에 대한 검토, 수정을 입력받는 단계(S2); (c) 일등항해사측 단말기(120)로부터, 상기 하역계획클라우드서비스(SPCS)에서 선박의 운항 안정성 및 선적 위치 검토, 일등 항해사의 검토 결과를 입력받는 단계(S3); (f) 수석 검수원에 의해 확정된 ‘하역계획’을 상기 하역계획클라우드서비스(SPCS)에 등록하는 단계(S6); (g) 상기 (f) 단계 이후, 운영사 플래너측 단말기(140)로부터 터미널 플래너에 의한 상기 하역계획클라우드서비스(SPCS) 내 ‘하역계획’으로부터, ‘하역작업계획’을 수립하고 등록하는 단계(S7); (h) 하역담당자측 단말기(150)에 대해, 하역 담당자들과 장비 기사들로 하여금 터미널운영시스템(TOS)을 이용하여 ‘하역작업계획’을 기준으로 하역 작업을 수행하도록 지원하는 단계(S8); (i) 운영사 검수원측 단말기(170)로 하여금, 검수원들에 의해 하역되는 개별 컨테이너에 대해 검수 활동 수행, 개별 ‘하역작업결과’를 상기 하역계획클라우드서비스(SPCS)에 등록하도록 지원하고, 이를 상기 검수사측 단말기(130)로 통보하는 단계(S9); 및 (j) 운영사 검수원측 단말기(170)에 대해, 수석 검수원에 의한 ‘하역작업결과’를 취합, 정리한 결과를 상기 하역계획클라우드서비스(SPCS)에 등록하도록 지원하고, 이를 상기 일등항해사측 단말기(120) 및 선사측 단말기(110)에게 통보하는 단계(S10); 를 포함하는 것을 특징으로 한다.According to another aspect of the present invention, there is provided a method for integrating a loading plan using a cloud service using a loading planning cloud service (SPCS), comprising the steps of: (a) (S1) of registering an 'unloading plan' established based on reservation on the unloading plan cloud service (SPCS); (b) receiving (S2) a review and correction of the special cargo to be unloaded in the unloading plan cloud service (SPCS) of the chief checker from the inspection side terminal (130); (c) receiving, from the first navigator side terminal (120), the navigation stability of the ship in the loading planning cloud service (SPCS) and the review of the shipping position and the review result of the first class mate; (f) registering the 'unloading plan' determined by the chief checker in the unloading plan cloud service (SPCS) (S6); (g) After step (f), a step of establishing and registering a 'unloading work plan' from the 'unloading plan' in the unloading plan cloud service (SPCS) by the terminal planner from the operator planner side terminal 140 ); (h) supporting the unloading person side terminal 150 to perform unloading operations based on the 'unloading work plan' using the terminal operating system (TOS) (S8) ; (i) Assisting the operator checker-side terminal 170 to carry out the inspection operation for the individual containers unloaded by the checkers and to register the individual 'unloading operation result' in the unloading plan cloud service (SPCS) (S9) of notifying the examiner-side terminal 130; And (j) assisting the operator checker side terminal 170 to register the results of the 'unloading operation result' by the chief checker in the unloading plan cloud service (SPCS) (S10) notifying the preliminary terminal (120) and the prospective terminal (110); And a control unit.

바람직하게는, 상기 (c) 단계 이후, (d) 적재 위치 조정이 필요한지 여부를 검토하는 단계(S4); 를 더 포함하며, 상기 (d) 단계에서 판단 결과, 조정이 필요하다고 판단되면, 상기 (b) 단계로 리턴하며, 그렇지 않다고 판단되면 계속해서 다음 단계로 진행하는 것을 특징으로 한다.Preferably, after step (c), (d) examining whether loading position adjustment is necessary (S4); If it is determined in step (d) that adjustment is necessary, the process returns to step (b). If it is determined that the adjustment is not necessary, the process proceeds to the next step.

더욱 바람직하게는, 상기 (d) 단계 이후, (e) 선적 불가 화물이 있는지 여부를 판단하는 단계(S5); 를 더 포함하며, 상기 (e) 단계에서 판단 결과, 선적 불가 화물이 있다고 판단되면, 상기 (a) 단계로 리턴하며, 그렇지 않다고 판단되면 계속해서 다음 단계로 진행하는 것을 특징으로 한다.
More preferably, after the step (d), (e) a step S5 of judging whether or not there is a shipment incompetent; If it is determined in step (e) that there is a non-shipment item, the process returns to step (a). If it is determined that the shipment is not shipable, the process proceeds to the next step.

본 발명에 따른 클라우드 서비스를 이용한 적하계획 통합 제공 시스템 및 방법에 따르면, 선박의 컨테이너 하역을 위해 필요한 적하계획 목록을 클라우드 서비스를 통해 선사, 검수사 및 운영사측 단말기가 상호 공유하게 하여, 컨테이너의 적하와 관련된 사용자측 단말기들이 소정의 적하계획을 통합적으로 제공받을 수 있도록 함으로써 적하계획 수행에 따른 작업지연이 발생하지 않도록 할 수 있다.According to the system and method for providing integration of the loading plan using the cloud service according to the present invention, the list of the loading plan required for unloading the container of the vessel can be mutually shared through the cloud service, Side terminals related to the mobile terminal can receive a predetermined loading schedule integrally so that the operation delay due to the loading schedule can be prevented from occurring.

한편, 본 발명의 추가적인 특징 및 장점들은 이하의 설명을 통해 더욱 명확히 될 것이다.
Additional features and advantages of the present invention will become more apparent from the following description.

도 1은 일반적인 컨테이너 터미널의 적하 작업을 설명하기 위한 도면.
도 2는 상기 도 1의 시스템 구성을 개략적으로 나타내는 도면.
도 3a는 본 발명에 따른 클라우드 서비스를 이용한 적하계획 통합 제공 시스템의 구성을 나타내는 도면.
도 3b는 본 발명에 따른 클라우드 서비스에 따른 적하계획 통합 제공 시스템에 따른 하역 흐름을 나타내는 도면.
도 3c는 본 발명에 따른 클라우드 서비스를 이용한 적하계획 통합 제공 서비스 방법을 나타내는 흐름도.
도 4는 본 발명에 적용되는 클라우드 서비스 서버의 통합 운영에 대한 일예의 구성을 나타내는 도면.
도 5는 본 발명에 따른 클라우드 서비스를 이용한 적하계획 통합 제공 방법을 나타내는 흐름도.
도 6은 기존 시스템과 본 발명의 시스템의 차이점을 대비하는 도면.
BRIEF DESCRIPTION OF THE DRAWINGS Fig. 1 is a view for explaining a loading operation of a general container terminal; Fig.
2 schematically shows the system configuration of Fig. 1; Fig.
FIG. 3A is a diagram showing a configuration of a system for providing integration of a loading plan using a cloud service according to the present invention; FIG.
FIG. 3B is a diagram illustrating a loading and unloading flow according to a loading and unifying integration providing system according to the cloud service according to the present invention; FIG.
FIG. 3C is a flowchart illustrating a method of providing a unified loading plan using a cloud service according to the present invention. FIG.
4 is a diagram illustrating an exemplary configuration of an integrated operation of a cloud service server according to an embodiment of the present invention;
FIG. 5 is a flowchart illustrating a method for integrating a loading plan using a cloud service according to the present invention.
Figure 6 contrasts the existing system with the system of the present invention.

이하, 본 발명의 바람직한 실시예에 따른 클라우드 서비스를 이용한 적하계획 통합 제공 시스템 및 방법을 첨부된 도면들을 참조하여 상세히 설명한다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, a system and method for providing integrated loading planning using a cloud service according to a preferred embodiment of the present invention will be described in detail with reference to the accompanying drawings.

본 발명의 상세한 설명에 앞서, 도면들 중 동일하거나 대응되는 구성요소는 동일한 참조번호를 부여하며, 관련된 공지 구성 또는 기능에 대한 구체적인 설명이 본 발명의 요지를 흐릴 수 있다고 판단되는 경우에는 그 상세한 설명은 생략하기로 한다.Prior to the detailed description of the present invention, the same or corresponding components in the drawings are denoted by the same reference numerals, and if a detailed description of related known configurations or functions is deemed to blur the gist of the present invention, Is omitted.

또한, 본 명세서에서, 후술하는 실시예 및 실시 형태들은 예시로서 제한적이지 않은 것으로 고려되어야 하며, 본 발명은 여기에 주어진 상세로 제한되는 것이 아니라 첨부된 청구항의 범위 및 동등물 내에서 치환 및 균등한 다른 실시예로 변경될 수 있다.Also, in the present specification, the following embodiments and embodiments are to be considered as being illustrative and not restrictive, and the invention is not to be limited to the details given herein but is to be accorded with the scope of the appended claims and their equivalents, It can be changed to another embodiment.

도 3a는 본 발명에 따른 클라우드 서비스를 이용한 적하계획 통합 제공 시스템의 구성을 나타내는 도면이고, 도 3b는 본 발명에 따른 클라우드 서비스에 따른 적하계획 통합 제공 시스템에 따른 하역 흐름을 나타내는 도면이고, 도 3c는 본 발명에 따른 클라우드 서비스를 이용한 적하계획 통합 제공 서비스 방법을 나타내는 흐름도이고, 도 4는 본 발명에 적용되는 클라우드 서비스 서버의 통합 운영에 대한 일예의 구성을 나타내는 도면이며, 도 5는 본 발명에 따른 클라우드 서비스를 이용한 적하계획 통합 제공 방법을 나타내는 흐름도이다.3B is a diagram illustrating a loading and unloading flow according to a system for providing loading and unifying planning according to a cloud service according to the present invention. 4 is a diagram illustrating a configuration of an exemplary integrated operation of a cloud service server according to an embodiment of the present invention. FIG. 5 is a flowchart illustrating a method of providing integrated service of a cloud service according to an embodiment of the present invention. FIG. 2 is a flowchart illustrating a method for providing integration of a loading plan using a cloud service according to the present invention.

도 3a에 도시된 바와 같이, 본 발명에 따른 클라우드 서비스를 이용한 적하계획 통합 제공 시스템은, 선사측 단말기(110), 일등항해사측 단말기(120), 검수사측 단말기(130), 운영사 플래너측 단말기(140), 하역담당자측 단말기(150), 장비기사측 단말기(160), 운영사 검수원측 단말기(170) 및 클라우드 서비스 서버(200)를 포함한다.3A, the system for providing integration of a dumping plan using a cloud service according to the present invention includes a ship terminal 110, a first navigator terminal 120, a verification receiver terminal 130, an operator planner terminal 140 A loader side terminal 150, an equipment side terminal 160, an operator side checker side terminal 170, and a cloud service server 200.

구체적으로, 상기 선사측 단말기(110)는 선사 소속의 플래너를 통해 각 항구별 수출입 화물을 고려하여 적하계획을 수립하고, 관련 정보를 일등항해사측 단말기(120) 및 클라우드 서비스 서버(200)에 전달한다.Specifically, the shipping terminal 110 establishes a loading plan considering the import and export cargoes for each port through the planner belonging to the shipping company, and transmits the related information to the first-class navigation terminal 120 and the cloud service server 200 .

상기 일등항해사측 단말기(120)는 선박의 안전을 고려한 화물의 양적하 계획을 수립하여 검수사측 단말기(130) 및 클라우드 서비스 서버(200)에 전달한다.The first-class navigator-side terminal 120 establishes a quantitative plan of the cargo considering the safety of the ship and transmits it to the verification-side terminal 130 and the cloud service server 200.

상기 검수사측 단말기(130)는 양적하 작업 전 선박회사가 세관에 신고한 목록과 본선 적부도와 상호 대조하여 상이한 경우 선박회사에 연락조치하고, 특수 화물에 대한 작업 계획을 수립하여 운영사 플래너측 단말기(140) 및 클라우드 서비스 서버(200)에 전달한다.The inspection side terminal (130) compares the list with the customs declaration before the quantitative work, and when it is different from the right side, it contacts the shipping company, establishes a work plan for the special cargo, 140 and the cloud service server 200, respectively.

상기 운영사 플래너측 단말기(140)는 하역장비 배정 및 하역작업 실행 순서에 대한 계획을 수립하여 하역담당자측 단말기(150) 및 클라우드 서비스 서버(200)에 전달한다.The operator planner-side terminal 140 establishes a plan for the assignment of the loading equipment and the order of executing the unloading operation, and transmits the plan to the terminal 150 and the cloud service server 200.

상기 하역담당자측 단말기(150)는 상기 운영사 플래너측 단말기(140)로부터 전달되는 계획에 따라 적하 작업을 수행할 수 있도록 하며, 적하 작업 수행에 따른 정보를 장비기사측 단말기(160) 및 클라우드 서비스 서버(200)에 전달한다.The unloading person side terminal 150 can perform the loading operation in accordance with the schedule transmitted from the operator planner side terminal 140. The unloading person side terminal 150 transmits the information on the loading operation to the device side terminal 160 and the cloud service server 160. [ (200).

상기 장비기사측 단말기(160)는 상기 하역담당자측 단말기(150)로부터 전달되는 적하작업을 수행하고, 그 수행 결과를 운영사 검수원측 단말기(170) 및 클라우드 서비스 서버(200)에 전달한다.The equipment-side terminal 160 performs a drop-off operation from the unloading operator-side terminal 150 and delivers the result of the operation to the operator checker-side terminal 170 and the cloud service server 200.

상기 운영사 검수원측 단말기(170)는 상기 장비기사측 단말기(160)로부터 전달되는 적하작업의 일치 여부에 대한 검사를 수행하고, 수행된 검사 결과를 클라우드 서비스 서버(200)에 전달하여, 선사 및 관련 기관이 확인할 수 있도록 한다.The operator checker side terminal 170 checks whether the loading operation delivered from the equipment side terminal 160 is consistent and transmits the inspection result to the cloud service server 200 to determine whether the shipper So that it can be confirmed by the institution.

상기 클라우드 서비스 서버(200)는 상술한 선사측 단말기(110), 일등항해사측 단말기(120), 검수사측 단말기(130), 운영사 플래너측 단말기(140), 하역담당자측 단말기(150), 장비기사측 단말기(160) 및 운영사 검수원측 단말기(170)로부터 전달되는 적하계획을 취합하고, 컨테이너의 적하와 관련된 단말기들이 소정의 적하계획을 통합적으로 제공받을 수 있도록 하여, 각 항구별로 수행된 적하작업 계획 및 수행에 따른 데이터를 상호 공유하여 활용할 수 있도록 한다.The cloud service server 200 includes the above-described ship terminal 110, the first navigator side terminal 120, the inspection side terminal 130, the operator planner side terminal 140, the unloading side terminal 150, The loading plan transmitted from the terminal 160 and the operator checker side terminal 170 is collected and the terminals related to the loading of the container can receive the predetermined loading plan integrally so that the loading operation plan And to share and utilize the data according to the performance.

즉, 도 4에 도시된 바와 같이, 상술한 선사측 단말기(110), 일등항해사측 단말기(120), 검수사측 단말기(130), 운영사 플래너측 단말기(140), 하역담당자측 단말기(150), 장비기사측 단말기(160) 및 운영사 검수원측 단말기(170)를 제 1 적하계획 수행 그룹(101)으로 구성하면, 상기 제 1 적하계획 수행 그룹(101)과 동일한 적하작업 계획을 수행하는 복수개의 다른 적하계획 수행 그룹(102, 103, 104, 105)을 클라우드 서비스 서버(200)가 통합적으로 관리할 수 있게 된다.As shown in FIG. 4, the ship terminal 110, the first navigator side terminal 120, the inspection side terminal 130, the operator planner side terminal 140, the unloading side terminal 150, When the article side terminal 160 and the operator checker side terminal 170 are configured as the first loading planning execution group 101, a plurality of different loading operations, such as the first loading planning execution group 101, The cloud service server 200 can integrally manage the plan execution groups 102, 103, 104, and 105.

참고로, 본 명세서에서는, 상술한 선사측 단말기(110), 일등항해사측 단말기(120), 검수사측 단말기(130), 운영사 플래너측 단말기(140), 하역담당자측 단말기(150), 장비기사측 단말기(160) 및 운영사 검수원측 단말기(170)가 각각, 선사 플래너, 일등항해사, 수석 검수원, 터미널 플래너, 하역담당자, 장비기사 및 검수원과 동일한 의미로 혼용되어 사용된다.
In the present specification, the above-described pre-production side terminal 110, first-class navigation side terminal 120, inspection side terminal 130, operator planner side terminal 140, unloading side terminal 150, The first checker 160 and the operator checker side terminal 170 are used in the same meaning as the pre-planner, the first mate, the chief checker, the terminal planner, the loader, the equipment operator and the checker, respectively.

이제, 본 발명에 따른 클라우드 서비스를 이용한 적하계획 통합 제공 방법을 도 3b 및 도 3c를 참조하여 설명한다.Now, a method of integrating a loading plan using a cloud service according to the present invention will be described with reference to FIGS. 3B and 3C.

본 발명에 따른 클라우드 서비스를 이용한 적하계획 통합 제공 시스템 및 방법은, 기존의 터미널운영시스템(TOS)을 그대로 포함하면서, 하역계획시스템(SPS)을 확대발전시킨 하역계획클라우드서비스(SPCS) 시스템으로 이루어진다. The system and method for providing integration of the loading plan using the cloud service according to the present invention comprises an unloading plan cloud service (SPCS) system which enlarges and develops the loading and unloading planning system (SPS) while including the existing terminal operating system (TOS) .

즉, 이를 이용한 ‘하역계획' 작성/검토로부터 ‘하역작업계획’ 작성/이행/보고 절차까지를 설명하면, In other words, from the creation / review of the 'unloading plan' to the 'unloading work plan'

1. 선사 플래너가 ‘하역계획’을 수립하고, SPCS에 등록(저장)한다.1. Pre-shipment planner establishes "unloading plan" and registers (stores) in SPCS.

2. 수석 검수원이 SPCS로부터 ‘하역계획’ 확인하여, 특수 화물에 대한 검토 및 수정 보완을 행하며, 2. The Chief Checker confirms the "unloading plan" from the SPCS, reviews the special cargo,

3. 수석 검수원이 일등 항해사와 온라인 상으로, ‘하역계획‘ 검토를 받고, 이를 확정한다. 3. The chief checker receives and reviews the "unloading plan" with the first-class mate and online.

4. 수석 검수원이 확정된 ‘하역계획’을 등록(저장) 한다.4. The chief checker registers (stores) the confirmed "unloading plan".

5. 터미널 플래너가 ‘하역계획’을 토대로 ‘하역작업계획’을 수립하고 SPCS에 등록(저장) 한다.5. Terminal Planner establishes "unloading work plan" based on "unloading plan" and registers (saves) to SPCS.

6. ‘하역작업계획’을 기준으로 하역 담당자들과 장비 기사들이 하역작업(양하, 적하, 환적, 이적, 등)을 수행하고, 검수원들이 검수 활동을 이행 (단, 터미널 내 자체 보고, 등 설명 생략) 한다.6. The unloading officers and equipment operators perform unloading operations (unloading, loading, transshipment, transfer, etc.) based on the 'unloading work plan', and the checkers perform the inspection activities .

7. 개별 검수원들이 현장에서 확인한 ‘하역작업결과’를 등록(저장)을 통해 수석 검수원에게 보고(통지) 하고, 7. Report (notify) the chief checker through the registration (storage) of the "unloading work results" checked by the individual checkers on site,

8. 수석 검수원은 ‘하역작업결과’를 취합하여 등록(저장), 일등 항해사 및 선사 플래너에게 보고(통지) 한다.8. The chief checker collects the results of the unloading work, registers (stores) it, and reports (notifies) to the first class mate and prefectural planner.

그리고, 위 작업은 선박이 입항하는 항구(예: 오사카항 - 부산항 - 카우슝항 - …, 등)에서 입항 전부터 출항 후까지 반복 수행되는 활동이다.
The above work is repeatedly performed from the port to the port where the ship enters (eg, Osaka Port - Busan Port - Khao Seung Port - ..., etc.).

계속해서, 도 3c를 참조하면, 이러한 하역계획클라우드서비스(SPCS)를 이용한 ‘하역계획‘ 작성, 검토, 검수 및 보고 절차를 다시 설명하면, Referring to FIG. 3C, the procedure of creating, reviewing, inspecting and reporting the 'unloading plan' using the unloading plan cloud service (SPCS) will be described again.

1. 선사 플래너가 컨테이너 운반 예약을 토대로 수립한 ‘하역계획’을 SPCS에 등록(저장)하여 두었을 때(S1), 이를 토대로, 1. When the pre-shipment planner registers (stores) the "unloading plan" established based on the container transportation schedule (SP) (S1)

2. 수석 검수원으로부터, SPCS에서의 하역 대상 특수 화물에 대한 검토, 수정을 입력받고(S2), 2. From the chief checker, enter (S2) the review and modification of the special cargo to be unloaded in the SPCS,

3. 일등 항해사로부터, SPCS에서 선박의 운항 안정성 및 선적 위치 검토, 일등 항해사의 검토 결과를 입력받아(S3), 이에 따라, 적재 위치 조정, 선적 취소, 등의 조치를 취하는바, 3. The SPCS receives the review of the ship's operational stability and loading position from the first-class navigator, the results of review by the first-class navigator (S3), and accordingly takes measures such as adjustment of the loading position,

먼저, 적재 위치 조정이 필요한지 여부를 검토하여(S4), 조정이 필요하다고 판단되면, 상기 S2 단계로 리턴하며, 그렇지 않다고 판단되면, 선적 불가 화물이 있는지 여부를 판단하여(S5), 있다고 판단되면, 상기 S1 단계로 리턴하며, 그렇지 않다고 판단되면, First, it is checked whether or not the loading position adjustment is necessary (S4). If it is determined that adjustment is necessary, the process returns to step S2. If it is determined that the loading position adjustment is necessary (S5) , The process returns to step S1, and if not,

4. 수석 검수원에 의해 확정된 ‘하역계획’을 SPCS에 등록(저장) 한다(S6).4. Register (store) the "unloading plan" confirmed by the chief checker in SPCS (S6).

5. 이후, 터미널 플래너에 의한 SPCS 내 ‘하역계획’으로 부터, ‘하역작업계획’을 수립하고 등록(저장)하고(S7), 5. Then, from the "unloading plan" in the SPCS by the terminal planner, a "unloading work plan" is established, registered (stored) (S7)

6. 하역 담당자들과 장비 기사들로 하여금, TOS를 이용하여 ‘하역작업계획’을 기준으로 하역 작업 수행하도록 지원한다(S8).6. Cargo holders and equipment operators are assisted to carry out cargo handling work on the basis of 'unloading work plan' using TOS (S8).

7. 이때, 검수원들에 의해, 하역되는 개별 컨테이너에 대해 검수 활동 수행, 개별 ‘하역작업결과’를 SPCS에 등록(저장) 하게 되며(S9),7. At this time, checkers perform inspection of the individual containers unloaded, and register (store) the individual 'unloading operation results' in SPCS (S9)

8. 수석 검수원에 의해, ‘하역작업결과’를 취합, 정리한 결과를 SPCS에 등록(저장) 하게 된다(S10).8. The main checker collects and summarizes the results of the unloading work and registers it in the SPCS (S10).

물론, 위 작업 역시, 선박이 입항하는 항구(예: 오사카항-부산항-카우슝항- …, 등)에서 입항 전부터 출항 후까지 반복 수행되는 활동이다
Of course, the above activities are also repeatedly carried out from pre-entry to post-departure ports at the port where the vessel is entering (eg, Osaka Port - Busan Port - Kaushu Port - ...)

이하, 본 발명의 시스템 및 방법의 특징을 기존의 방식과 대비하여 설명한다. Hereinafter, the features of the system and method of the present invention will be described in comparison with the existing method.

기존 방식은 선사, 검수사 및 운영사 개별적으로 시스템이 구성되어 개별적으로 정보 생성 및 관리 활동이 이뤄 졌고, 상호 간에는 EDI 또는 기록매체를 통해 데이터를 교환하였는바, 상호간 데이터 교환 및 작업 중 계획 변경과 같은 예외사항 발생 시 즉각적으로 조치되지 않고 작업 지연을 초래하는 원인이 되었으나, In the existing method, information is generated and managed individually by a shipper, an investigator, and an operator, and the data is exchanged through the EDI or the recording medium. As a result, mutual data exchange and plan change If an exception occurred, it could not be immediately addressed and caused the job to be delayed. However,

본 발명의 시스템 및 방법은, 개별 시스템을 단일 시스템으로 구성하여, 각 항구의 하역작업에 초점을 두고 관련 시스템을 구성하며, 또한, 각 항구별로 필요한 시스템을 통합하여 글로벌 서비스로 구성하여 각 항구별로 수행하여 하역작업 계획 및 수행에 따른 경험을 상호 공유하여 활용할 수 있도록 한다.The system and method of the present invention can be implemented as a single system for individual systems to organize related systems with a focus on the unloading operations of each port, To share and utilize the experience of cargo operation planning and execution.

즉, 도 6에서 보는 바와 같이, 하역계획 수립 과정에 있어서, 1) 종래 시스템은, 경유지마다 플래너들이 별도 하역 작업 계획 수립하여야 하나, 본 발명은, 공통적인 작업 계획 활용 및 특수한 계획만 수립하면 된다. 2) 실시간 정보 공유에 있어서는, 종래기술은 EDI, 메일 형태로 전달되나, 본 발명은, 선박 구조 정보, 하역작업 계획 정보 등 공유한다. 3) 서비스 형태에 있어서, 종래기술은, Stand alone 솔루션 방식이나. 본 발명은 클라우드 서비스 + 솔루션 방식이다. 4) 더욱이, 본 발명은, 정보 전달 행위가 없어지면서, 실시간 정보 갱신 및 공유 가능하게 되고, 계획수립 경험 공유 및 일괄적인 작업 품질 유지가 가능하게 된다. That is, as shown in FIG. 6, in the process of establishing the unloading plan, 1) In the conventional system, the planners should separately establish the unloading work plan for each stopping point, but the present invention requires only a common work plan utilization and a special plan . 2) In the real-time information sharing, the prior art is transmitted as EDI or mail, but the present invention shares ship structure information, unloading work plan information, and the like. 3) In the service type, the conventional technique is a stand alone solution method. The present invention is a cloud service + solution approach. 4) Further, the present invention can update and share real-time information while eliminating the information transfer activity, and it is possible to share the planning establishment experience and to maintain the quality of work in batch.

따라서, 본 발명에 의하면, 개별 선사, 운영사, 검수사가 필요한 적하계획 시스템 통합 서비스를 통해 작업 효율성 향상 기대할 수 상호간 데이터 교환 및 작업 중 계획 변경과 같은 예외사항 발생시 즉각적으로 조치가 용이하고, 각 항구 별로 필요한 시스템을 통합하여 글로벌 서비스로 구성하고, 각 항구별로 수행하여 하역작업 계획 및 수행에 따른 경험을 상호 공유에 의해, 선박의 입항 직전 항구에서 하역작업 수행 중 발생된 예외사항에 대해서 확인하고 사전에 대응할 수 있어 작업 생산성 향상 기대할 수 있으며, 컨테이너 선박 대상 "입항신고, 선적계획, 화물신고, 검수, 하역 계획"을 단일 플랫폼으로 구성하여 부가 서비스 제공이 용이하다.
Therefore, according to the present invention, work efficiency can be expected to be improved through the integrated loading service planning system integration service which requires an individual carrier, an operator, and a checker. When an exception such as mutual data exchange or plan change during operation is easily generated, By integrating the required systems and constructing them as global services, it is possible to check the exceptions that occurred during the unloading operation at the ports just before the port of entry by mutual sharing, It is easy to provide supplementary services by constructing a single platform for "container arrival report, shipment planning, cargo declaration, inspection and unloading plan" for container ships.

참고로, 본 발명의 명세서에서 나오는 용어에 대하여 간략히 정리해 보면, '본선적부도(Stowage Plan)'란, 본선의 선창에 화물이 적재된 상태를 나타낸 도면을 말하며, '적하목록(cargo manifest)'란, 선박 또는 항공기에 적재한 화물의 목록을 말한다.The term 'Stowage Plan' refers to a state in which a cargo is loaded on a dock of the main line, and a 'cargo manifest' Refers to a list of cargoes loaded on ships or aircraft.

한편, '선사/플래너'란, 선박 운항사 소속의 하역계획 담당자이다.On the other hand, 'shipper / planner' is the person in charge of unloading plan belonging to the vessel operator.

'선박 항해사'란, '항해사' 및 '일등 항해사'를 포함하는바, '항해사'는, 선박의 안전을 고려한 화물의 적·양하 계획을 수립하고 충분한 복원력 및 선체강도의 확보를 고려한 적·양하 작업 및 이와 관련한 밸러스트(ballast: 배의 중심(重心)을 낮추어 복원력을 증대시키기 위하여 배 밑에 싣는 돌, 모래, 해수 등)작업을 감독하고, 화물의 고정상태를 점검한다. 유조선의 경우 오일기록부의 기록을 하기도 한다. 아울러, '일등 항해사'(Chief officer, C/O)는 갑판부의 책임자로 항해사 및 갑판부원의 지휘, 감독 및 선장을 보좌하고, 선장 부재시 그 직무를 대행하고, 선박에 승선한 선원 가운데 선장 다음으로 높은 지위의 간부선원. 선장을 보좌하고 선장의 명을 받아 선원을 지휘·통솔하며 갑판의 모든 업무를 관장하는 책임을 지며, 특히 화물의 인수·적재·보관 및 관리 등의 책임자인바, ⑴ 선박의 안전과 규율 및 위생관리 업무, ⑵ 화물의 적재계획 작성 및 하역감독, 화물의 안전 관리, ⑶ 갑판부원의 일과 지시 및 인사관리, ⑷ 선체 각부의 보존 정비 및 관리 감독, ⑸ 갑판부 서류의 작성 관리, ⑹ 식수, 밸러스트, 빌지의 운용 및 관리, ⑺ 출.입항시 선수부 작업 담당 등의 업무를 수행한다.'Ship sailors' include 'sailors' and 'first class sailors', and 'sailors' should establish a plan for enemy and discharge of cargo considering the safety of the ship, considering sufficient resilience and strength of the ship, Supervise the work and the fixed status of the cargo, as well as the ballast (ballast: the stones, sand, sea water, etc. placed under the boat to lower the center of gravity and increase the resilience). In the case of oil tankers, oil records are also recorded. In addition, the Chief Officer (C / O) is the chief officer of the Deck Department, who assists the commander, supervisor and captain of the sailors and deck personnel, performs the duties in the absence of the master, An officer of high rank. He is the person responsible for the management of the deck, especially the acceptance, loading, storage and management of the cargo. (1) Safety, discipline and sanitation of the ship (2) the preparation and management of cargo loading and unloading supervision, (3) the safety management of cargo, (3) the day and direction and personnel management of deck members, (4) the maintenance and management supervision of each part of the hull, (5) Management of bilge, management of bilge, operation of athlete at the time of entry and departure.

'수석 검수원'은, 컨테이너검사반장을 말하는바, '컨테이너 검사 반장 (수석 검수원)'은, 본선작업(선박을 접안시킨 상태에서 선박으로부터 직접 화물을 내리거나, 선박에 싣는 작업)을 위해 본선적부도(Stowage Plan : 본선의 선창에 화물이 적재된 상태를 나타낸 도면)와 적하목록(Cargo Manifest, 積荷目錄 : 선박 또는 항공기가 적재하고 있는 화물의 목록)을 대조·확인하고, 작업일지를 작성하고 검수원들에게 검수작업을 지시하며, 컨테이너검수원이 작성한 검수표와 적하목록을 대조하여, 상이할 경우 하선·적재결과 이상보고서를 작성하고, 검사결과 이상보고서를 세관 및 선사에 송부하며, 컨테이너 파손보고서(Container Damage Report)를 작성하여 항해사와 협의하여 서명을 받는다. 혹은, 냉동컨테이너의 리스트를 작성하기도 한다.The 'Chief Checker' refers to the Inspector of the Container Inspection, and the 'Inspection Inspector (Chief Checker)' is responsible for the inspection of the ship for the main work (work to lower the cargo directly from the ship while loading the ship, Check the Stowage Plan and the Cargo Manifest: check the list of cargo loaded on the ship or aircraft, make a working log, The checkers are inspected by the container checkers and checked against the check list prepared by the container checkers. If different, the inspection result is sent to the customs and shipping companies. (Container Damage Report) and sign it with the navigator. Alternatively, a list of freezing containers may be created.

'운영사 플래너'는 '양적화 플래너' 또는 '컨테이너플래너' 를 말하는바, 먼저, '양적화 플래너'는, "양화 및 적화 정보를 화주나 선사로부터 메일 또는 전자문서교환 등으로 접수, 양화 및 적화 프로파일을 검토하여 선사나 화주와 일정을 협의 조정, 양적화 컨테이너의 정보를 데이터베이스에 입력, 양화플래닝시스템에서 본선작업의 양화플래닝을 실시, 양화순서를 확인하고 특별사항이 있는지 확인 후 수정, 양하순서 내역을 출력하여 냉동, 특수화물, 위험물, 환적화물, 라인별 컨테이너 개수 등을 검토하여 수정, 양화 베이플랜을 작성, 최종 검토 확인된 양화 베이플랜, 작업순서, 작업내역을 출력, 양화작업서류를 정리하여 통제센터의 터미널운영요원에게 전달, 적화플래닝시스템에서 본선작업의 적화플래닝을 실시, 적화순서를 확인하고 특별사항이 있는지 확인후 수정, 적화순서 내역을 출력하여 냉동, 특수화물, 위험물, 환적화물의 개수 등을 검토하여 수정, 적화 베이플랜을 작성, 최종 검토 확인된 적화 베이플랜, 작업순서, 작업내역을 출력, 적하작업서류를 정리하여 통제센터의 터미널운영요원에게 전달, 및 본선작업이 시행되고 작업현장에서 병목현상이나 작업애로 등이 나타나면 선사 등과 협의하여 베이플랜을 수정후 통제센터의 터미널운영요원에게 다시 전달"하는 등의 업무를 수행한다.The 'Operator Planner' refers to 'Quantization Planner' or 'Container Planner'. First, 'Quantification Planner' refers to 'Quantification Planner', which can receive and quantify and quantize information by email or electronic document exchange, Review the profile, negotiate the schedule with the shipper or shipper, input the information of the quantified container into the database, carry out the quantitative planning of the ship's work in the quantification planning system, confirm the order of quantification, Review and revise freezing, special cargo, dangerous goods, transshipment cargo, number of containers per line, etc., and prepare finalized plan, finalized review, confirmation plan, work order, It is then sent to the terminal operator of the control center, and the planning of the main line work is carried out in the redevelopment planning system. After checking whether there are any items, we will revise and revise the details of the order, and revise them by reviewing the number of freezing, special cargo, dangerous goods, transshipment cargo, etc., Output, and loading work documents to the terminal operator of the control center, and after the mainline work is performed and bottlenecks or work troubles appear on the work site, consult with the shipping company to revise the bay plan, Re-transfer ".

아울러, '컨테이너 플래너'는, "크레인 가동상황 등을 파악하여 선적 배정표를 작성, 선석을 배정하고 컨테이너기중기 배정시간을 조정, 선박의 입항시간 또는 작업예정물량의 변동 등이 발생되면 선석 배정 스케줄을 재조정, 양·적하작업계획을 수립, 모선 입항계획을 확인하고 선석이 확정된 선박에 대하여 선석 예정 물량표를 작성. 야드 상황을 감안한 본선하역작업이 될 수 있도록 모선별 세부장치계획을 수립, 및 선박점유율 및 체선 관련자료에 대한 통계를 관리"하는 등의 업무를 수행한다.In addition, the 'Container Planner' has the task of identifying the crane operation status, preparing the shipment assignment table, allocating the berth, adjusting the container crane allocation time, and changing the berth allocation schedule Reassembly, preparation of loading and unloading work plan, confirmation of mothership entrance plan, preparation of berth schedule table for berth confirmed vessel, establishment of detailed device plan for berth to be unloading operation considering yard situation, and Management of statistics on vessel occupancy rate and vessel related data ".

'하역담당자'는, '포맨', '언더맨', '신호수', '컨테이너장비배차원', '컨테이너부두상황실통제원', 등이 포함되는바, '포맨 (Fore man)'은, "화물의 양·적하 서류 내용을 검토하고 컨테이너화물 및 각종 특수화물에 대한 작업계획을 수립, 사고 예방을 위하여 언더맨 및 장비조작원에 대한 안전사항을 확인·교육, 해당 모선의 작업상태를 파악하고 본선 선체 및 각종 선상설비, 특수화물의 손상여부를 확인, 본선작업 설정에 맞도록 인원을 배치하여 작업을 진행·통제하고 관련 종사자들의 작업을 총괄 지휘"하는 등의 업무를 수행하고, 작업 중에 발생하는 사고에 대하여 조치를 취한다.The 'unmanned man' includes the 'foreman', 'underman', 'signal number', 'container equipment dispatch', 'Container dock control room control' Review the contents of loading and loading documents, establish work plans for container cargo and various special cargoes, check safety information for undermen and equipment operators to prevent accidents, To check the damage of hull and various ship facilities and special cargo, to arrange personnel to suit the ship's work setting, to conduct and control the work, and to direct the work of related workers " Take action against accidents.

'언더맨 (Under man)'은, "본선 작업내용을 검토·확인한 후 작업장의 안전사항을 점검, 화물을 일반화물, 특수화물을 분류하여 양·적하하도록 장비조작원들에게 작업을 지시, 손상된 화물은 조치를 취한 후 작업을 진행, 해당 장비조작원 및 터미널상황실통제원과 무선으로 연락을 취하며 작업상황을 주고받으며 작업, 포맨에게 작업상황에 대해 보고하고, 작업 종료 후 작업내용을 확인하고 작업일지를 작성" 하는 등의 업무를 수행한다."Under man", "After reviewing and checking the contents of the main line, check the safety of the workplace, instruct the equipment operators to sort and load the cargo into general cargo and special cargo, After the action is taken, the work is carried out, the worker communicates with the equipment operator and the terminal control room controller wirelessly, and the work situation is exchanged. The worker reports the work situation to the foreman, And "to create".

'장비기사'는, '갠트리크레인조종원' 또는 '컨테이너기중기조작원'을 말하는바, '갠트리크레인조종원 (장비 기사)'은, "선적·하역할 컨테이너의 수량 및 규격을 확인, 컨테이너를 이동시키기 위해 갠트리크레인의 조종장치를 조작, 신호수의 신호에 따라 기중기의 조정레버와 스위치를 조작하여 컨테이너를 선박에 선적하거나 차량에 적재, 사고예방을 위해 크레인을 점검하고 정비'하는 등의 업무를 수행한다.'Equipment operator' refers to 'gantry crane operator' or 'container crane operator'. 'Gantry crane operator' refers to 'the quantity and specification of the container to be shipped and unloaded, Operate the gantry crane control device and operate the adjustment lever and switch of the crane according to the signal signal to load the container on the vessel or load it on the vehicle and check and repair the crane to prevent accidents.

'컨테이너기중기조작원'은, 선적·하역할 컨테이너의 수량 및 규격을 확인하고 조정장치를 조작하여 기중기를 선박의 갑판이나 차량 위로 내리고, "조정레버와 패널을 조작하여 선박으로부터 컨테이너를 들어올려 갑판 위나 차량으로 운반하고, 신호원의 신호에 따라 선적·하역할 장소에 기중기를 내리고 조정장치를 조작하여 컨테이너를 선박에 선적하거나 차량에 적재하며, 컨테이너를 부두에서 야적장으로 이동하는 차량인 리치스태커(Reach stacker)를 운전하기도 한다.  The 'container crane operator' confirms the quantity and specification of the containers to be shipped and unloaded, operates the adjusting device to lower the crane on the ship's deck or vehicle, and "manipulates the control lever and panel to lift the container from the ship, A vehicle that transports containers to a ship or a vehicle by moving a container from a pier to a yard by operating a control device to lower the crane in a place to be shipped or unloaded according to a signal from a signal source, stacker).

'검수원'은, '컨테이너검수원' 및 '본선컨테이너관리원'이 있으며, '컨테이너 검수원'은, "본선적부도(Stowage Plan)를 가지고 실제 컨테이너 적양하 위치를 확인, 양화 화물 위에 타 화물 적재 유무를 확인, 냉동화물에 플러그가 꽂혀 있는지 확인하고 온도측정기를 확인, 적부도상의 화물이 틀릴 경우 수석 검수원에게 보고, 육상의 야드 근무 시에는 컨테이너 번호, 봉인번호를 확인하여 검수표에 기록, 미봉인 발견 시 터미널과 화주 등에 보고하여 세관직원 입회 하에 재 봉인, 컨테이너 파손상태를 확인, 수입화물의 경우 적화목록에 따라 하역회사 입회 하에 봉인을 개봉하고 확인 절차에 따라 화물 상태의 이상 유무를 파악하여 검수표를 작성하며 손상이나 수량부족 등 이상이 있을 경우 세관과 선박회사에 보고, 수출화물의 경우 수출화물의 수량과 포장상태 및 이상 유무 또는 혼적화물을 파악하여 보고하고 사실증명을 검수표로 작성하여 보관"하는 등의 업무를 수행한다.'Checkers' are 'Container Checkers' and 'Main Container Containers'. 'Container Checkers' is to check the actual container unloading position with 'Stowage Plan' Check if the plug is plugged in the freezer, check the temperature meter, report to the chief checker if the cargo on the red default is wrong, check the container number and seal number when working on the yard on the land, It is necessary to check the status of re-seal and container damage with the customs officer in the case of city terminal and shippers. In case of imported cargo, If there is any abnormality such as damage or shortage of quantity, report to customs and ship company. In case of export cargo, Looking to identify the status and abnormalities or cargo consolidation and complete inspection to prove the fact table to perform the tasks, such as archiving. "

'본선 컨테이너 관리원 (하역 담당자)'은, 모선별 작업내용을 검토하고 운영계획원으로부터 각종 본선적부도(Stowage Plan : 본선의 선창에 화물이 적재된 상태를 나타낸 도면)와 작업지시서 등 양하서류를 접수하고 서류의 내용을 검토하고 복사하여 배부, 작업 서류 내용과 실작업 컨테이너 수를 확인, 화물의 본선 위치변경, 규격 등 작업 내용이 상이한 사항을 정정, 양·적하된 컨테이너 수, 규격, 내용을 점검하고 위치를 전산입력, 추가 또는 선적 취소를 전산처리, 작업 상황 보고서 및 컨테이너 리스트를 작성, 선사와 작업 변경 및 선박스케줄 변경 등 필요사항을 협의, 작업종료 후 언더맨이 제출하는 서류 및 작업 수량의 내용을 확인하고 작업현황보고서를 작성"하는 등의 업무를 수행한다.The 'Main Container Container Officer (Unmanned Cargo Officer)' reviews the contents of each work and informs the Operational Planer of the various types of deadline (Stowage Plan: the state of loading the cargo on the main dock) The contents of the documents are reviewed and copied, the contents of the work documents and the number of actual work containers are checked, the position of the ship is changed, and the contents of the work such as specifications are corrected. Check the location, enter the computer, add or cancel the shipment, process the job status report and container list, change the job with the shipping company, and change the vessel schedule, and submit the documents and work quantity And confirms the contents of the work report and creates a work status report ".

이외에도, '신호수', '컨테이너장비배차원', '컨테이너부두상황실통제원' 등이 있는바, '신호수'는, 작업지시서 및 현장 공정(물류)을 숙지하여 작업순서 목록을 만들고, 이동할 화물의 종류와 무게, 위치, 이동경로, 이동 간 장애물의 유무를 확인, 화물의 구속을 확인하고, 장비와 화물의 종류에 따라 각종 장비운전원(언더맨, 신호수, 포맨, 컨테이너크레인 기사, 야드트랙터 기사)에게 무전과 깃발신호를 전달하여 화물의 이동을 돕기도 하며, 컨테이너크레인 주행시 레일선상의 장애물을 확인하여 주행신호를 보내고, 컨테이너크레인 밑의 차량정리를 하고 속도를 제한하기도 하며, 야드트랙터 기사에게 상하차 위치를 지정하고 출발신호를 전달하기도 한다.In addition, there are 'signaling number', 'container equipment dispatching', 'container docking room control room', etc., and 'signaling number' is information of work order and field process (logistics) (Underman, signal, foreman, container crane driver, yard tractor driver) according to the type of equipment and cargo, checking the type and weight, position, movement route, It also helps to move cargo by transmitting radio signal and flag signal. It can check the obstacles on the rail line when the container crane is running, send driving signals, arrange the car under the container crane and limit the speed, It also specifies the location and signals the start signal.

'컨테이너장비배차원'은, 갠트리크레인, 트랜스퍼크레인, 리치스태커, 야드트랙터, 엠티핸들러 등의 컨테이너터미널 장비의 사용 요청에 따른 계획을 수립, 배차지시서를 작성하고 운전기록부를 관리, 장비의 사용 현황을 정리하고 장비 점검 및 예방 정비, 장비 배차 및 작업 통계를 유지하고, 장비 조작원의 업무상황을 파악, 장비조작원의 안전교육을 실시"하는 등의 업무를 수행한다.'Container equipment layout' is a system for planning container terminal equipments such as gantry cranes, transfer crane, rich stacker, yard tractor, and MT handler, making plans for dispatch, issuing dispatch instructions, managing driving log, , Maintain equipment maintenance and preventive maintenance, equipment dispatch and work statistics, identify the operation status of equipment operators, and conduct safety training for equipment operators ".

'컨테이너부두상황실통제원(C/C:Control Center)'은, 당일 작업해야 할 작업량을 파악하고 반입컨테이너의 목록을 접수, 야드의 상황에 따라 운송업자, 선사와 협의하여 게이트 반출입을 통제, 컨테이너 작업현황을 컴퓨터를 통해 모니터링, 계획된 업무의 수행여부를 파악하고 차질이 있을 경우 대안을 마련, 포맨, 언더맨, 게이트관리원과 유·무선으로 연락하며 작업을 지시하고 상황을 전달, 장비 배차를 의뢰하고 작업변동 상황을 확인하여 장치위치를 수정"하는 등의 업무를 수행한다.
The 'Control Center of Container Dock' (C / C: Control Center) is used to identify the amount of work to be performed on the day and to receive a list of the containers to be imported, to control the gate loading / unloading by negotiating with the carrier, Monitoring the status through computer, checking whether the planned work is performed, preparing an alternative if there is a problem, communicating with Forman, Underman, gate manager through wire / wireless, instructing work, delivering the situation, commissioning equipment dispatch And correcting the device position by checking the job change status ".

이상에서는 본 발명의 일실시예에 따라 본 발명을 설명하였지만, 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자가 본 발명의 기술적 사상을 벗어나지 않는 범위 내에서 변경 및 변형한 것도 본 발명에 속함은 당연하다.
While the present invention has been described in connection with what is presently considered to be practical exemplary embodiments, it is to be understood that the invention is not limited to the disclosed embodiments, but, on the contrary, Of course.

101 ~ 105 : 제 1 ~ 제 5 적하계획 수행 그룹
110 : 선사측 단말기 120 : 일등항해사측 단말기
130 : 검수사측 단말기 140 : 운영사 플래너측 단말기
150 : 하역담당자측 단말기 160 : 장비기사측 단말기
170 : 운영사 검수원측 단말기 200 : 클라우드 서비스 서버
101 ~ 105: 1st to 5th loading planning group
110: Ship's side terminal 120: First side navigation side terminal
130: Inspection side terminal 140: Operator planner side terminal
150: Unloading person side terminal 160: Equipment side terminal
170: Operator Checker side terminal 200: Cloud service server

Claims (5)

선사측 단말기(110), 일등항해사측 단말기(120), 검수사측 단말기(130), 운영사 플래너측 단말기(140), 하역담당자측 단말기(150), 장비기사측 단말기(160) 및 운영사 검수원측 단말기(170)로 구성된 적하계획을 수행하는 제 1 적하계획 수행 그룹(101);
상기 제 1 적하계획 수행 그룹(101)과 동일한 구성을 갖는 복수개의 적하계획 수행 그룹(102 ~ 105); 및
상기 제 1 적하계획 수행 그룹(101) 및 복수개의 적하계획 수행 그룹(102 ~ 105)으로부터 전달되는 적하계획을 취합하고, 컨테이너의 적하와 관련된 소정의 적하계획을 통합적으로 제공하여, 각 항구별로 수행된 적하작업 계획 및 수행에 따른 데이터를 상호 공유하여 활용할 수 있도록 하는 클라우드 서비스 서버(200)를 포함하는 것을 특징으로 하는 클라우드 서비스를 이용한 적하계획 통합 제공 시스템.
The apparatus operator side terminal 160 and the operator side check terminal side terminal 150 are connected to each other by the operator's side terminal 110, the first navigator side terminal 120, the inspection side terminal 130, the operator planner side terminal 140, A first loading plan execution group (101) for performing a loading plan composed of the first loading plan group (170);
A plurality of loading plan execution groups (102-105) having the same configuration as the first loading planning executing group (101); And
Collecting the loading plan delivered from the first loading plan execution group 101 and the plurality of loading plan executing groups 102-105 and integrally providing a predetermined loading plan related to the loading of the container, And a cloud service server (200) for mutually sharing and utilizing the data related to the loading operation plan and the execution of the loading operation plan using the cloud service.
제 1 항에 있어서,
상기 적하계획 수행 그룹 중의 적어도 하나는, 자체의 터미널운영시스템(TOS)을 포함하는 하역계획클라우드서비스(SPCS)를 이용한 클라우드 서비스를 이용한 적하계획 통합 제공 방법을 수행하는 것을 특징으로 하는 클라우드 서비스를 이용한 적하계획 통합 제공 시스템.
The method according to claim 1,
Wherein at least one of the dumping planning performing groups performs a dumping plan integration providing method using a cloud service using an unloading plan cloud service (SPCS) including its own terminal operating system (TOS). Integrated loading and unloading planning system.
하역계획클라우드서비스(SPCS)를 이용한 클라우드 서비스를 이용한 적하계획 통합 제공 방법으로서,
(a) 선사측 단말기(110)로부터 선사 플래너가 컨테이너 운반 예약을 토대로 수립한 ‘하역계획’을 상기 하역계획클라우드서비스(SPCS)에 등록받는 단계(S1);
(b) 검수사측 단말기(130)으로부터 수석 검수원의 상기 하역계획클라우드서비스(SPCS)에서의 하역 대상 특수 화물에 대한 검토, 수정을 입력받는 단계(S2);
(c) 일등항해사측 단말기(120)로부터, 상기 하역계획클라우드서비스(SPCS)에서 선박의 운항 안정성 및 선적 위치 검토, 일등 항해사의 검토 결과를 입력받는 단계(S3);
(f) 수석 검수원에 의해 확정된 ‘하역계획’을 상기 하역계획클라우드서비스(SPCS)에 등록하는 단계(S6);
(g) 상기 (f) 단계 이후, 운영사 플래너측 단말기(140)로부터 터미널 플래너에 의한 상기 하역계획클라우드서비스(SPCS) 내 ‘하역계획’으로부터, ‘하역작업계획’을 수립하고 등록하는 단계(S7);
(h) 하역담당자측 단말기(150)에 대해, 하역 담당자들과 장비 기사들로 하여금 터미널운영시스템(TOS)을 이용하여 ‘하역작업계획’을 기준으로 하역 작업을 수행하도록 지원하는 단계(S8);
(i) 운영사 검수원측 단말기(170)로 하여금, 검수원들에 의해 하역되는 개별 컨테이너에 대해 검수 활동 수행, 개별 ‘하역작업결과’를 상기 하역계획클라우드서비스(SPCS)에 등록하도록 지원하고, 이를 상기 검수사측 단말기(130)로 통보하는 단계(S9); 및
(j) 운영사 검수원측 단말기(170)에 대해, 수석 검수원에 의한 ‘하역작업결과’를 취합, 정리한 결과를 상기 하역계획클라우드서비스(SPCS)에 등록하도록 지원하고, 이를 상기 일등항해사측 단말기(120) 및 선사측 단말기(110)에게 통보하는 단계(S10);
를 포함하는 것을 특징으로 하는 클라우드 서비스를 이용한 적하계획 통합 제공 방법.
As a method for integrating a loading plan using a cloud service using an unloading plan cloud service (SPCS)
(a) receiving (S1) an 'unloading plan' established by the preliminary planner based on the container transportation schedule from the shipping terminal 110 in the unloading plan cloud service (SPCS);
(b) receiving (S2) a review and correction of the special cargo to be unloaded in the unloading plan cloud service (SPCS) of the chief checker from the inspection side terminal (130);
(c) receiving, from the first navigator side terminal (120), the navigation stability of the ship in the loading planning cloud service (SPCS) and the review of the shipping position and the review result of the first class mate;
(f) registering the 'unloading plan' determined by the chief checker in the unloading plan cloud service (SPCS) (S6);
(g) After step (f), a step of establishing and registering a 'unloading work plan' from the 'unloading plan' in the unloading plan cloud service (SPCS) by the terminal planner from the operator planner side terminal 140 );
(h) supporting the unloading person side terminal 150 to perform unloading operations based on the 'unloading work plan' using the terminal operating system (TOS) (S8) ;
(i) Assisting the operator checker-side terminal 170 to carry out the inspection operation for the individual containers unloaded by the checkers and to register the individual 'unloading operation result' in the unloading plan cloud service (SPCS) (S9) of notifying the examiner-side terminal 130; And
(j) Assisting the operator checker side terminal 170 to register the results of the 'unloading operation result' by the chief checker in the unloading plan cloud service (SPCS) 120) and the prospective terminal (110);
Wherein the cloud service integration method provides a cloud service integration service using the cloud service.
제 3 항에 있어서,
상기 (c) 단계 이후,
(d) 적재 위치 조정이 필요한지 여부를 검토하는 단계(S4); 를 더 포함하며,
상기 (d) 단계에서 판단 결과, 조정이 필요하다고 판단되면, 상기 (b) 단계로 리턴하며, 그렇지 않다고 판단되면 계속해서 다음 단계로 진행하는 것을 특징으로 하는 클라우드 서비스를 이용한 적하계획 통합 제공 방법.
The method of claim 3,
After the step (c)
(d) examining whether loading position adjustment is necessary (S4); Further comprising:
The method as claimed in claim 5, wherein the step (d) further comprises the steps of: returning to step (b) if it is determined that adjustment is necessary;
제 4 항에 있어서,
상기 (d) 단계 이후,
(e) 선적 불가 화물이 있는지 여부를 판단하는 단계(S5); 를 더 포함하며,
상기 (e) 단계에서 판단 결과, 선적 불가 화물이 있다고 판단되면, 상기 (a) 단계로 리턴하며, 그렇지 않다고 판단되면 계속해서 다음 단계로 진행하는 것을 특징으로 하는 클라우드 서비스를 이용한 적하계획 통합 제공 방법.
5. The method of claim 4,
After the step (d)
(e) determining whether there is a shipment incapable of loading (S5); Further comprising:
If it is determined in step (e) that there is a non-shippable object, the process returns to step (a). If it is determined that the object is not shippable, the process proceeds to the next step .
KR1020150180857A 2014-12-19 2015-12-17 Method for providing integratively loading plan using cloud service KR102061788B1 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
SG11201805194UA SG11201805194UA (en) 2015-12-17 2016-12-14 System and method for providing integrated unloading and loading plans using cloud service
PCT/KR2016/014622 WO2017105069A1 (en) 2015-12-17 2016-12-14 System and method for providing integrated unloading and loading plans using cloud service
US16/063,147 US20200167726A1 (en) 2015-12-17 2016-12-14 System method for providing integrated unloading and loading plans using cloud service

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1020140184255 2014-12-19
KR20140184255 2014-12-19

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR1020180105409A Division KR20180101308A (en) 2014-12-19 2018-09-04 Method for providing integratively loading plan using cloud service

Publications (2)

Publication Number Publication Date
KR20160075355A true KR20160075355A (en) 2016-06-29
KR102061788B1 KR102061788B1 (en) 2020-01-02

Family

ID=56365802

Family Applications (2)

Application Number Title Priority Date Filing Date
KR1020150180857A KR102061788B1 (en) 2014-12-19 2015-12-17 Method for providing integratively loading plan using cloud service
KR1020180105409A KR20180101308A (en) 2014-12-19 2018-09-04 Method for providing integratively loading plan using cloud service

Family Applications After (1)

Application Number Title Priority Date Filing Date
KR1020180105409A KR20180101308A (en) 2014-12-19 2018-09-04 Method for providing integratively loading plan using cloud service

Country Status (1)

Country Link
KR (2) KR102061788B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116663800A (en) * 2023-04-17 2023-08-29 天云融创数据科技(北京)有限公司 Task ship determining method and device

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100984799B1 (en) 2007-12-06 2010-10-04 주식회사 한국무역정보통신 System and method for electronic service of marine manifest consolidation
KR100845707B1 (en) * 2007-12-21 2008-07-10 주식회사 케이엘넷 Multi-planner operation planning system and method of container terminal
KR101085514B1 (en) 2008-02-01 2011-11-23 이찬호 Management system of dealing required materials for delivery service and management method using the same

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116663800A (en) * 2023-04-17 2023-08-29 天云融创数据科技(北京)有限公司 Task ship determining method and device
CN116663800B (en) * 2023-04-17 2024-02-23 天云融创数据科技(北京)有限公司 Task ship determining method and device

Also Published As

Publication number Publication date
KR20180101308A (en) 2018-09-12
KR102061788B1 (en) 2020-01-02

Similar Documents

Publication Publication Date Title
KR101828832B1 (en) Method for providing integratively unloading plan using cloud service
CN110598987A (en) Port scheduling system and method based on unmanned driving
US11416794B2 (en) Equipment control system
US20140278704A1 (en) System and method of shipping scheduling involving parallel port operations using prepositioned vessels
CN109242379B (en) Container unloading and loading transportation system and method for molten iron combined transport railway bay station
Ottjes et al. Simulation of a multiterminal system for container handling
US20180229950A1 (en) System and method for handling automobiles at a distribution site
WO2017105069A1 (en) System and method for providing integrated unloading and loading plans using cloud service
Merz et al. A gap analysis for automated cargo handling operations with geared vessels frequenting small sized ports
KR20210083889A (en) Method for providing integratively loading and unloading plan using cloud service
KR20180101308A (en) Method for providing integratively loading plan using cloud service
Hoff-Hoffmeyer-Zlotnik et al. Interactive planning and control for finished vehicle logistics
Krämer Shunt-E 4.0—Autonomous Zero Emission Shunting Processes in Port and Hinterland Railway Operations
CN112631234B (en) Automatic wharf inspection system based on air rail scheduling
Busch et al. Transportation operations model (TOM) technical manual
Edfors et al. Potential improvements in a container terminal through information sharing
Rathi et al. Enhancing port performance: A case of Jawaharlal Nehru port trust
Mudiyanto et al. The Influence Loading, Discharging Cargo And Ship Documents On The Agency Performance
Kozyreva et al. Smart railway solutions for trans-asian railway network in the times of COVID-19 pandemic
Rachman et al. Supply Chain Performance of Logistic Business Using SCOR Model in Tg. Priok Port Jakarta
Zhao et al. Management of Vessel Loading Operations in the Container Terminal
Oya Abajo Analysis of ICT solutions integration for tracking purposes in container terminal management and operation
Wang et al. Modeling and analyzing of railway container hub scheduling system based on multi-agent system
Masite The State of Implementation of Transnet’s Modal Shift Strategy
MAGAZINE DIGITAL DECADE

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E902 Notification of reason for refusal
E601 Decision to refuse application
A107 Divisional application of patent
J201 Request for trial against refusal decision
J301 Trial decision

Free format text: TRIAL NUMBER: 2018101003695; TRIAL DECISION FOR APPEAL AGAINST DECISION TO DECLINE REFUSAL REQUESTED 20180904

Effective date: 20191030

S901 Examination by remand of revocation
GRNO Decision to grant (after opposition)
GRNT Written decision to grant