KR20140023102A - Foundation structure and foundation executing method - Google Patents

Foundation structure and foundation executing method Download PDF

Info

Publication number
KR20140023102A
KR20140023102A KR1020120089832A KR20120089832A KR20140023102A KR 20140023102 A KR20140023102 A KR 20140023102A KR 1020120089832 A KR1020120089832 A KR 1020120089832A KR 20120089832 A KR20120089832 A KR 20120089832A KR 20140023102 A KR20140023102 A KR 20140023102A
Authority
KR
South Korea
Prior art keywords
structure body
foundation
support
coupling
base structure
Prior art date
Application number
KR1020120089832A
Other languages
Korean (ko)
Inventor
채태우
공웅섭
이석태
Original Assignee
채태우
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 채태우 filed Critical 채태우
Priority to KR1020120089832A priority Critical patent/KR20140023102A/en
Publication of KR20140023102A publication Critical patent/KR20140023102A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • E02D2200/1692Shapes conical or convex

Abstract

The present invention provides a foundation structure for constructing a building, which comprises: a foundation structure body; a support formed on the lower part of the foundation structure body and supported on a rubble stone supporting layer; and a combining unit which is combined with the reinforcing steels in order for multiple reinforcing steels to be built from the top center of the foundation structure body. In addition, the present invention provides a foundation construction method using a foundation structure.

Description

Foundation structure for building construction and foundation construction method using the same {FOUNDATION STRUCTURE AND FOUNDATION EXECUTING METHOD}

The present invention relates to a basic structure for the construction of a building and a method of foundation construction using the same, and more particularly, the basic structure for the construction of a building that can simplify the foundation construction by integrating the foundation and the pile and the basic construction method using the same It is about.

In general, in all buildings it is necessary for the foundation soil to have sufficient bearing capacity to support the building. Otherwise, settling may occur at the top or deep of the underlying soil, destroying the building built on it.

Therefore, before erecting any building, use appropriate soil studies, for example geological research and geotechnical research, if necessary, so that the weight or load the soil's bearing capacity imparts to the soil by the building. Is calculated according to

In the conventional case, in the case of carrying out a building foundation, a trench is drilled on a predetermined foundation surface, and rubble designation is performed in an area where the trench is drilled, and then a concrete structure is installed in this designated region.

In this case, a plurality of reinforcing bars are installed in the concrete installation using a plurality of basic methods such as concrete placing and formwork installation and dismantling.

Accordingly, conventionally, when constructing the foundation of a building, there is a problem in that the construction period is increased due to the sequential or repetitive processes of several processes.

Prior art related to the present invention is Republic of Korea Patent Publication No. 10-2000-0057359 (published: September 15, 2000), the prior art discloses a technique for increasing the bearing capacity of the basic soil for buildings .

An object of the present invention is to provide a foundation structure for the construction of buildings that can shorten the construction period by simplifying the foundation construction by integrating the foundation and the pile and a foundation construction method using the same.

In a preferred aspect, the present invention provides a structure comprising: a base structure body; A support formed at a lower end of the base structure body and supported by a rubble designation layer; And it provides a base structure for the construction of the building comprising a coupling portion coupled to the reinforcement so that a plurality of reinforcing bars are erected in the upper center portion of the base structure body.

The upper end of the base structure body, the coupling region is formed is formed in the coupling portion, the lower end of the base structure body, the support is installed, the outer periphery of the base structure body to gradually open along the lower end from the top It is preferably formed.

The coupling part may include a plurality of coupling holes formed at a predetermined depth along the lower side in the coupling area, and each coupling hole may be screw-fastened with the lower end of the rebar.

The support is disposed in a grid shape at the lower end of the base structure body, it is preferable to have a plurality of support protrusions formed in a conical shape along the lower side.

In another aspect, the present invention is to excavate the foundation surface of a predetermined depth, the rubble is assigned to the surface on which the trench is implemented, the foundation structure body, and formed on the bottom of the foundation structure body, the rubble designation layer A support part and a coupling part coupled to the reinforcing bars so that a plurality of reinforcing bars are erected at the upper center portion of the base structure body, and are disposed in a grid shape at the bottom of the base structure body and formed in a conical shape along the lower side. Is provided with a plurality of support projections, the upper end of the base structure body, the coupling region is formed is formed, the lower end of the base structure body, the support is installed, the outer periphery of the base structure body is the upper end Is formed to gradually open along the bottom in the, the coupling portion, along the downward in the coupling region It includes a plurality of coupling holes formed to a predetermined depth, each coupling hole is fixed by placing the support protrusions of the support on the surface of the rubble designation using a base structure that is screw-fastened to the bottom of the rebar, It provides a basic construction method using a base structure for the construction of the building, characterized in that the fastening by fixing the lower ends of the reinforcing bars so that the reinforcing bars are erected in the plurality of coupling holes.

The present invention has the effect of shortening the construction period by simplifying the foundation construction by integrating the foundation and the pile.

In addition, the present invention has the effect that the support portion, which is the pile portion, has a spike function in the shape of a plurality of cones, so that the cross section is increased and the fixing ability is increased at the same time compared to the existing foundation.

In addition, the present invention has an effect that can significantly compensate for the consolidation settlement and floating settlement of the ground at the same time as the ground bearing capacity improvement and bearing force, the reaction force to the lateral force is increased.

In addition, the present invention is to increase the productivity of the reduction of labor and on-site labor, to reduce the cost and stability of the air shortening, to ensure the compatibility of the components according to the standardization, simplify and rationalize the site management, increase the fixed manpower according to industrialization It can bring an effect.

1 is a cross-sectional view showing a basic structure for the construction of the building of the present invention.
FIG. 2 is a plan view showing the basic structure of FIG. 1. FIG.
3 to 6 are views showing reaction force or stress distribution in various environments.
Figure 7 is a perspective view showing a three-dimensional view to explain the basic structure for the construction of the building of the present invention.
FIG. 8 is a front view illustrating the foundation structure of FIG. 7.
Figure 9 is a perspective view showing a three-dimensional view to explain another embodiment of the foundation structure for the construction of the building of the present invention.
10 is a front view showing the foundation structure of FIG.

Hereinafter, with reference to the accompanying drawings will be described the basic structure for the construction of the building of the present invention and the basic construction method using the same.

1 is a cross-sectional view showing a basic structure for the construction of the building of the present invention, Figure 2 is a plan view showing the basic structure of Figure 1, Figure 7 is a three-dimensional view to explain the basic structure for the construction of the building of the present invention 8 is a perspective view illustrating the basic structure of FIG. 7.

1, 7 and 8, to describe the configuration of the foundation structure for the building construction of the present invention.

The foundation structure 1 for the building construction is largely composed of the foundation structure body 100, the support 200 and the coupling portion 300.

A predetermined region is formed at the top of the base structure body 100, and a predetermined region is formed at the bottom thereof.

The region formed on the top of the base structure body 100 is a region where the coupling portion 300, which will be described later, is formed as the coupling region (A).

In addition, an area formed at the bottom of the base structure body 100 is an area in which the support 200 is formed.

In addition, the outer periphery of the foundation structure body 100 is formed in a shape that gradually opens along the lower end from the top.

Here, the inclined surface 110 is formed on the outer circumference of the base structure body 100.

Since the foundation structure body 100 according to the present invention is formed in a configuration in which the area is generally increased along the lower end, when the load is formed on the upper end, it serves to distribute the load uniformly.

The coupling part 300 is formed in the coupling area A.

The coupling part 300 may be composed of a plurality of coupling holes 310. The plurality of coupling holes 310 are formed to have a predetermined interval from each other. For example, the coupling holes 310 may be screw coupling holes.

In particular, the coupling holes 310 may be formed by inserting the anchor coupling screw into the base structure body 100.

Reinforcing bars (not shown) of a predetermined length are fixed to the coupling holes 310.

Screw threads are formed at the bottom of the reinforcing bar to be screwed to the coupling hole 310.

Reinforcing bars can be maintained in an upright state by being screwed and fixed to the coupling holes 310, respectively.

In addition, the support 200 is formed in the lower region of the base structure body 100.

The support 200 is formed of a plurality of support protrusions 210, the support protrusions 210 may be formed in a conical shape that is pointed along the lower side.

In addition, referring to Figure 2, the plurality of support protrusions 210 are arranged in a grid shape. Thus, the spacing between the support protrusions 210 may be kept constant with each other.

Preferably, the support protrusions 210 may be formed of a conical body 211, and may further include a protrusion 212 protruding from a lower center of the conical body 211.

Substantially, in the case where the support protrusions 210 are disposed in the rubble designating region 2, the protrusions 212 of the support protrusion 210 fix the posture of the support 200 and withstand the flow from side to side. Can be supported.

In addition, a plurality of wires 120 may be internal to the inside of the base structure body 100 according to the present invention, preferably the upper side of the support 200.

The wire 120 may serve to ensure durability of the base support body 100 itself.

Next, the foundation construction method using the foundation structure comprised as mentioned above is demonstrated.

Referring to Figures 1 and 2, first, the trench is carried out at a certain location on the ground to form a foundation.

And rubble is assigned to the area | region where the dig was performed as mentioned above.

Next, the foundation structure 1 of this invention is installed in the area | region 2 which designated the rubble.

Here, the support 200 in the foundation structure 1 is physically located and supported in the rubble designation region 2.

The support 200 includes a plurality of support protrusions 210, and protrusions 212 are formed at the center of the lower ends of the support protrusions 210.

The support protrusions 210 are located inside the rubble designation region A, and the plurality of protrusions 212 extend downward from the bottom center of the support protrusion 210 to further secure the supporting force.

Accordingly, the foundation structure body 100 including the support 200 can mitigate the shaking by the flow to the left and right of the ground.

In addition, since the plurality of support protrusions 210 are formed in a conical shape, the support force can be uniformly formed in all directions.

Figure 3 shows the reaction force distribution with respect to the vertical load in the foundation structure, Figure 4 shows the reaction force distribution for the foundation structure and mat foundation horizontal load of the present invention. In addition, Figure 5 shows that the load is transmitted evenly in the mud but, Figure 6 shows that the stress is transmitted evenly in the sandy ground.

That is, since the lower region of the foundation structure 1 is wider than the upper region, the cross section is increased, thereby uniformly distributing the load acting on the upper portion of the foundation structure body 100 downwardly. It plays a role.

And a lot of rebars are prepared.

The lower end of the reinforcing bar is preferably formed screw thread.

These reinforcing bars are installed to stand in the upper coupling region (A) of the base structure body (100).

That is, the bottom of the reinforcing bar is fixed by screwing to the coupling hole 310 formed in the coupling region (A).

Therefore, the reinforcing bar may be installed upright in the upper coupling region (A) of the base structure body 100.

In addition, after the reinforcing bars are installed and installed as described above, it is also possible to implement a method such as formwork installation and release, concrete pouring.

Accordingly, the embodiment according to the present invention, because the support has a spike function in the form of a plurality of cones, the cross section is increased compared to the existing foundation and at the same time the fixing capacity is increased.

In addition, it is possible to remarkably improve the consolidation settlement and floating settlement of the ground at the same time as the ground bearing capacity improvement and the bearing force and the reaction force to the lateral force are increased.

On the other hand, Figure 9 is a perspective view showing a three-dimensional view to explain another embodiment of the foundation structure for the construction of the building of the present invention, Figure 10 is a front view showing the foundation structure of FIG.

As described above, the plurality of supports 200 located at the lower end of the foundation body 100 may not have a cone shape, but may have the support 201 in a pyramid shape.

As mentioned above, although the specific embodiments regarding the foundation structure for the construction of the building of the present invention and the foundation construction method using the same have been described, it is obvious that various embodiments can be modified within the scope of the present invention.

Therefore, the scope of the present invention should not be limited to the above-described embodiments, but should be determined by the scope of the appended claims and equivalents thereof.

It is to be understood that the foregoing embodiments are illustrative and not restrictive in all respects and that the scope of the present invention is indicated by the appended claims rather than the foregoing description, It is intended that all changes and modifications derived from the equivalent concept be included within the scope of the present invention.

1: foundation structure
100: foundation structure body
110:
120: wire
200: support
210: support protrusion
211 conical body
212: projection
300: coupling part
310: coupling hole
2: rubble designation

Claims (5)

Foundation structure body;
A support formed at a lower end of the base structure body and supported by a rubble designation layer; And
Foundation structure for the construction of the building, characterized in that it comprises a coupling portion coupled to the reinforcing bars so that a plurality of reinforcing bars are erected in the upper center portion of the base structure body.
The method of claim 1,
On the upper end of the base structure body, a coupling region in which the coupling portion is formed is formed,
At the bottom of the base structure body, the support is installed,
The outer periphery of the base structure body is formed to gradually open along the lower end from the top structure for the construction of the building.
3. The method of claim 2,
The coupling portion
It includes a plurality of coupling holes formed in a predetermined depth along the lower side in the coupling region,
Each coupling hole is a foundation structure for the construction of the building, characterized in that the screw fastened with the bottom of the reinforcing bar.
The method of claim 3, wherein
Wherein the support comprises:
The base structure for the construction of the building, characterized in that it is disposed in a grid shape at the bottom of the base structure body, and having a plurality of support protrusions formed in a conical shape along the bottom.
Digging into the foundation surface of a certain depth,
Designate rubble on the surface of the trench,
A foundation structure body, a support formed on a bottom of the foundation structure body, supported by a rubble designation layer, and a coupling part coupled to the reinforcement bars so that a plurality of reinforcement bars are erected at an upper center portion of the foundation structure body, The base structure body has a plurality of support protrusions disposed in a grid shape and formed in a conical shape along the lower side, the upper end of the base structure body, a coupling region is formed is formed, the base structure body At the bottom, the support is installed, the outer periphery of the base structure body is formed so as to gradually open along the lower end, the coupling portion, a plurality of coupling holes are formed at a predetermined depth along the lower side in the coupling region Including, each coupling hole is used for the basic structure that is screwed with the bottom of the rebar So,
Fix and support the support protrusions of the support in the region where the rubble designation is performed,
Foundation construction method using a foundation structure for the construction of the building, characterized in that the fastening by fixing the lower end of the reinforcing bars so that the reinforcing bars in the plurality of coupling holes.
KR1020120089832A 2012-08-17 2012-08-17 Foundation structure and foundation executing method KR20140023102A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120089832A KR20140023102A (en) 2012-08-17 2012-08-17 Foundation structure and foundation executing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120089832A KR20140023102A (en) 2012-08-17 2012-08-17 Foundation structure and foundation executing method

Publications (1)

Publication Number Publication Date
KR20140023102A true KR20140023102A (en) 2014-02-26

Family

ID=50268723

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120089832A KR20140023102A (en) 2012-08-17 2012-08-17 Foundation structure and foundation executing method

Country Status (1)

Country Link
KR (1) KR20140023102A (en)

Similar Documents

Publication Publication Date Title
CN106013171B (en) A kind of semi-rigid supporting construction semi-flexible and method of deep-foundation side wall
KR101105092B1 (en) A precast retaining panel and construction method of the same with half pc type backfill
KR101341679B1 (en) Device for constructing an underground structure and method thereof
KR101591812B1 (en) Block-type reinforced earth retaining wall construction method and steel rod grid reinforcing material is installed
KR100525156B1 (en) Retaining Wall using Permanent Anchor and Pre-Cast Concrete Panel and its Construction Method
KR100795084B1 (en) Post supporting base
JP4190360B2 (en) Masonry wall reinforcement structure and method
EP3420138B1 (en) Anchoring device for a fence
KR20100053270A (en) Retaining wall and its construction method using tensioning anchor, pre-cast panel and pre-cast reinforcing panel
KR101220256B1 (en) Retaining wall structure
KR101401730B1 (en) Reinforcing method of bearing power for soft ground and reinforcing apparatus used in the same method
JP2004100157A (en) Retaining wall structure and its construction method
KR101125072B1 (en) Reinforced earth retaining wall method in consideration of landscape
KR102395328B1 (en) Embankment retaining wall structure and retaining wall construction method using panel
KR100447331B1 (en) execution method of landscape architecture for cutting ground using blasting stone and landscape architecture apparatus using the same
KR20140023102A (en) Foundation structure and foundation executing method
KR101224872B1 (en) Natural wall using fiber reinforcement
KR101071650B1 (en) Long span pre-cast panel retaining wall using bearing type anchor and its construction method
CN114032932A (en) Construction method of mixed retaining structure
KR101305357B1 (en) Underground structure construction method using the pc beam unit connection structure for expensive space
CN208309592U (en) Foundation pit supporting structure
JP2016199915A (en) Foundation structure and foundation construction method
JP3723541B2 (en) How to prevent the collapse of Mt. Fuji
JP3680150B1 (en) Building foundation and its construction method
KR100787099B1 (en) Method for manufacturing retaining wall and retaining wall manufactured thereof

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E902 Notification of reason for refusal
E601 Decision to refuse application