KR100787099B1 - Method for manufacturing retaining wall and retaining wall manufactured thereof - Google Patents
Method for manufacturing retaining wall and retaining wall manufactured thereof Download PDFInfo
- Publication number
- KR100787099B1 KR100787099B1 KR1020050032685A KR20050032685A KR100787099B1 KR 100787099 B1 KR100787099 B1 KR 100787099B1 KR 1020050032685 A KR1020050032685 A KR 1020050032685A KR 20050032685 A KR20050032685 A KR 20050032685A KR 100787099 B1 KR100787099 B1 KR 100787099B1
- Authority
- KR
- South Korea
- Prior art keywords
- vegetation
- formwork
- scaffold
- net
- reinforcement
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2200/00—Geometrical or physical properties
- E02D2200/13—Geometrical or physical properties having at least a mesh portion
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0026—Metals
- E02D2300/0029—Steel; Iron
- E02D2300/0034—Steel; Iron in wire form
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
Abstract
본 발명은 식생보강토 시공방법 및 이 방법에 의해 시공된 식생보강토 시공구조에 관한 것이다. 이 중 식생보강토 시공방법은, 배수구와 배수선이 시공된 원지반 위에, 요구되는 기울기에 기초하여 비계와 거푸집을 비계고정핀으로 지지하여 설치하는 제1단계와; 지지된 상기 비계와 거푸집의 뒷면에 망과 식생매트를 설치하는 제2단계와; 지면에다 성토층을 형성한 다음, 그 위에 보강재를 배치하되, 상기 망 쪽에 인접한 보강재의 단부를 상기 망과 연결한 후, 해당 성토층을 균등하게 다지는 제3단계와; 시공될 성토 높이에 맞게 상기 제3단계를 높이방향으로 반복 수행하면서, 다짐에 변형이 발생하지 않도록 성토층의 전면부에다 상기 비계고정핀으로 상기 비계와 거푸집을 고정하는 제4단계와; 원하는 높이의 성토체가 완성된 후, 상기 비계와 거푸집을 해체하는 제5단계;를 포함하는 것을 특징으로 한다. 이에 의하면, 전면부에 비계와 거푸집을 대고 시공하기 때문에 기울기에 제한을 받지 않고 모든 구간이 충분히 다짐이 가능하여, 보다 안정된 구조를 이룰 수 있다.The present invention relates to a vegetation reinforced soil construction method and a vegetation reinforced soil construction structure constructed by the method. Among these, the vegetation reinforcement soil construction method, the first step of supporting the scaffolding and formwork with a scaffold fixing pin on the base plate on which the drainage port and the drainage line is constructed; A second step of installing a net and vegetation mat on the back side of the supported scaffold and formwork; Forming a fill layer on the ground, and then arranging a reinforcement thereon, connecting an end of the reinforcement adjacent to the net with the net, and then slicing the fill layer evenly; A fourth step of fixing the scaffold and the formwork with the scaffold fixing pins on the front part of the fill layer so as not to cause deformation in compaction while repeatedly performing the third step according to the height of the fill to be constructed; And a fifth step of dismantling the scaffold and the formwork after the fill body of the desired height is completed. According to this construction, since the scaffold and the formwork are placed on the front surface, all sections can be sufficiently compacted without being limited to the slope, thereby achieving a more stable structure.
Description
도 1은 본 발명의 제1실시예에 따른 식생보강토 시공방법을 보인 도면,1 is a view showing a vegetation reinforced soil construction method according to a first embodiment of the present invention,
도 2는 도 1의 방법에 의해 시공된 식생보강토 시공구조를 보인 도면,2 is a view showing the vegetation reinforced soil construction structure constructed by the method of FIG.
도 3은 보강재와 망의 연결상태를 보인 도면,3 is a view showing a connection state of the reinforcement and the net,
도 4는 식생이 이루어진 도 2의 완성도면,Figure 4 is a complete view of Figure 2 made up of vegetation,
도 5는 본 발명의 제2실시예에 따른 식생보강토 시공구조의 요부 확대도,5 is an enlarged view of main parts of the construction structure of vegetation reinforcement soil according to the second embodiment of the present invention,
도 6은 도 5에 사용된 식생부재의 정면도,6 is a front view of the vegetation member used in FIG.
* 도면의 주요 부분에 대한 부호의 설명* Explanation of symbols for the main parts of the drawings
1 : 성토체 1a,1b,1c... : 성토층1:
10 : 배수구 12 : 배수선10: drain hole 12: drain line
14 : 비계 16 : 거푸집14
18 : 비계고정핀 20 : 망18: scaffolding pin 20: mesh
22 : 식생매트 24 : 철선22: vegetation mat 24: iron wire
30a,30b,30c... : 보강재 40 : 식생부재30a, 30b, 30c ...: Stiffener 40: Vegetation member
본 발명은, 식생보강토 시공방법 및 이 방법에 의해 시공된 식생보강토 시공구조에 관한 것으로서, 보다 상세하게는, 전면부에 비계와 거푸집을 대고 시공하기 때문에 기울기에 제한을 받지 않고 모든 구간이 충분히 다짐이 가능하여 보다 안정된 구조를 보일 수 있도록 한 식생보강토 시공방법 및 이 방법에 의해 시공된 식생보강토 시공구조에 관한 것이다.The present invention relates to a vegetation reinforced soil construction method and a vegetation reinforced soil construction structure constructed by the method, and more specifically, all sections are sufficiently compacted without being limited to the slope because the construction is performed with the scaffold and the formwork on the front surface. The present invention relates to a vegetation reinforced soil construction method and a vegetation reinforced soil construction structure constructed by this method to enable a more stable structure.
옹벽(Retaining Wall)이란, 토압에 저항하여 흙이 무너지지 않도록 예방하는 벽체 구조물을 가리킨다. 벽 자체의 무게와 바닥면의 마찰력 등을 이용하여 안정을 유지하는 항토압 구조물이며, 벽에 작용하는 토압과 그 흙 위에 실린 하중, 지지력, 지반의 지지력 등을 조건으로 하여 구조부재의 안전성과 벽 전체가 쓰러지거나 미끄러지는 데 대한 안정성이 확보되도록 설계된다.Retaining wall refers to a wall structure that resists earth pressure and prevents soil from falling down. It is an anti-earth pressure structure that maintains stability by using the weight of the wall itself and the frictional force of the floor surface.It is based on the earth pressure acting on the wall, the load on the soil, the support force, the support force of the ground, etc. It is designed to ensure stability against falling or slipping of the whole.
옹벽의 종류는 구조에 따라 중력식, 반중력식과 역T형 및 L형식, 부벽식 옹벽과 특수옹벽 등으로 분류된다.Retaining wall types are classified into gravity type, anti-gravity type and inverted type T and L type, subwall type retaining wall and special retaining wall depending on the structure.
중력식은 주로 옹벽 자체의 무게로 안정을 유지하는 형식으로 일반적으로 콘크리트로 쌓으며, 높이 3~4m 정도 이하의 소형 옹벽에 이용된다. 반중력식은 중력식과 역T형, L형의 중간형식으로, 철근량을 아주 적게한 철근콘크리트를 사용한다. 역T형 및 L형은 세로벽과 밑판으로 구성되어 철근콘크리트를 사용하며 보통 3~7m 정도의 중형옹벽에 이용된다. 부벽식 옹벽은 L형옹벽에 부벽(보조벽 또는 지지벽)을 세운 것이며, 일반적으로 6~7m 정도 이상의 옹벽에 이용되는 경우가 많다. 돌담 또는 블록담식 옹벽은 돌 또는 블록을 쌓아 올린 것이므로 시공이 용이하여 예로부터 널리 이용되어 왔다. 이 밖에 특수한 형식으로서 선반식 옹벽, 선반이 붙은 보조식 옹벽, 상자식 옹벽, 널말뚝식 옹벽, 테틀식 옹벽, 보강토 공법에 따른 옹벽 등이 있다.Gravity type is mainly in the form of maintaining the stability of the retaining wall itself. It is generally stacked with concrete and is used for small retaining walls with a height of 3 to 4m or less. The antigravity type is the intermediate type between gravity type, inverse T type, and L type, and it uses reinforced concrete with very low rebar. Inverted T-type and L-type consist of vertical wall and base plate and use reinforced concrete and are usually used for medium retaining walls of about 3 ~ 7m. The subwall retaining wall is a subwall (secondary wall or support wall) formed on an L-shaped retaining wall, and is generally used for retaining walls of about 6 to 7 m or more. Stone wall or block wall retaining wall is a stack of stones or blocks, so it is easy to construct and has been widely used since ancient times. Other special types include shelf retaining walls, shelf-supported retaining walls, box retaining walls, board pile retaining walls, tettle retaining walls, and retaining walls according to reinforced earthwork.
이러한 옹벽 중에서도 종래에는 특히 직면체각형의 철선에 잡석을 넣어 단계별로 쌓아 올린 후 그 자중으로 토압에 저항하는 사면 보호 공법인 개비온 옹벽과, 전면부에 보강토 블록을 쌓고 배면에 그리드 등과 토사에 의해 층 다짐하여 토압에 저항하는 보강토 옹벽과, 콘크리트 구조체를 형성하여 토압에 저항하는 구조물을 형성하는 것 등이 주로 채용되어 왔다.Among these retaining walls, the rubble retaining wall, which is a slope protection method that resists earth pressure with its own weight, is piled up step by step by placing rubble on the iron wire of the faceted square, and the reinforcement soil blocks are piled on the front side, and the floor is laid by grids and soil on the back. Therefore, the reinforcement earth retaining wall which resists earth pressure, and the concrete structure are formed to form a structure which resists earth pressure.
이러한 종래의 콘크리트 옹벽, 보강토 옹벽, 석축 등은 강성으로서 구조적으로 안정하다. 하지만 옹벽의 법면에는 식생(풀이나 나무가 자라는 것)이 불가능하여 환경친화적이지 못하다.Such conventional concrete retaining wall, reinforced earth retaining wall, stonework and the like are structurally stable as rigid. However, it is not environmentally friendly because vegetation (growing of grass or trees) is impossible on the retaining wall.
뿐만 아니라 시공기간이 길고 재료비가 비싸다. 또한 기존 보강토 공법에서는 전면부에 비계와 거푸집을 대지 않고 성토작업을 하기 때문에 기울기에 제한을 받는다. 또, 평면에 보강재를 깔고 전면부에 층층이 부직포를 설치한 후 앙카핀을 박아 망을 설치하고 그 위에 식생재를 투여하거나 식생토층을 부직포로 감싸서 시공하기 때문에, 작업이 번거로울 뿐만 아니라 필요 이상의 자재가 소요되는 단점을 보인다. 그리고 전면부의 시공 후에 인장응력이 약하고 성토층의 끝단면 다짐시 처지기 때문에 충분한 다짐이 이루어지지 않은 결점이 있다.In addition, the construction period is long and the material cost is high. In addition, in the existing reinforcement method, the slope is limited because the work is carried out without placing scaffolding and formwork on the front side. In addition, since the reinforcing material is laid on the flat surface, and the non-woven fabric is installed on the front side, the anchor is pinned to install the net, and the vegetation material is administered or the vegetation soil layer is wrapped with the non-woven fabric. It shows the disadvantage. In addition, since the tensile stress is weak after the construction of the front part and sags at the end surface of the fill layer, there is a defect that the sufficient compaction is not made.
본 발명의 목적은, 전면부에 비계와 거푸집을 대고 시공하기 때문에 기울기에 제한을 받지 않고 모든 구간이 충분히 다짐이 가능하여 보다 안정된 구조를 보일 수 있도록 한 식생보강토 시공방법 및 이 방법에 의해 시공된 식생보강토 시공구조를 제공하는 것이다.An object of the present invention, because the construction of the scaffold and formwork on the front part is not limited to the slope, all the sections can be compacted enough to show a more stable structure and construction method of the vegetation-reinforced soil and the construction by this method It is to provide the structure of vegetation reinforcement soil.
본 발명의 다른 목적은, 철선과 보강재들을 일체로 연결하여 성토층 전체를 일체화시킴으로써 효과적인 인장응력을 발휘할 수 있도록 한 식생보강토 시공방법 및 이 방법에 의해 시공된 식생보강토 시공구조를 제공하는 것이다.Another object of the present invention is to provide a vegetation-reinforced soil construction method and the vegetation-reinforced soil construction structure constructed by this method to be able to exert an effective tensile stress by integrally connecting the wire and the reinforcement materials to integrate the entire fill layer.
본 발명의 또 다른 목적은, 철선과 보강재를 직접 연결하고 그 사이에 식생매트를 넣어 시공하기 때문에 작업의 번거로움과 자재소모를 줄이고 토사유실을 막을 수 있으며 주변환경과 조화를 이룰 수 있는 친환경적인 식생보강토 시공방법 및 이 방법에 의해 시공된 식생보강토 시공구조를 제공하는 것이다.Another object of the present invention is to connect the wire and reinforcing material directly, and put the vegetation mat between the construction work, reducing the labor hassle and material consumption, and prevent earth and sand loss, environmentally friendly to harmonize with the surrounding environment It is to provide a vegetation reinforced soil construction method and a vegetation reinforced soil construction structure constructed by the method.
상기 목적은, 소정의 배수구와 배수선이 시공된 원지반 위에, 요구되는 소정의 기울기에 기초하여 비계와 거푸집을 비계고정핀으로 지지하여 설치하는 제1단계와; 지지된 상기 비계와 거푸집의 뒷면에 망과 식생매트를 설치하는 제2단계와; 지면에다 성토층을 형성한 다음 그 위에 보강재를 배치하되, 상기 망 쪽에 인접한 보강재의 단부를 상기 망과 연결한 후, 해당 성토층을 균등하게 다지는 제3단계와; 시공될 성토 높이에 맞게 상기 제3단계를 높이방향으로 반복 수행하면서, 다짐에 변형이 발생하지 않도록 성토층의 전면부에 상기 비계고정핀으로 상기 비계와 거푸집을 고정하는 제4단계와; 원하는 높이의 성토체가 완성된 후, 상기 비계와 거푸집을 해체하는 제5단계;를 포함하는 것을 특징으로 하는 식생보강토 시공방법에 의해 달성된다.The above object is a first step of supporting and installing a scaffold and formwork with a scaffold fixing pin on a base plate on which a predetermined drain hole and a drain line are constructed; A second step of installing a net and vegetation mat on the back side of the supported scaffold and formwork; Forming a fill layer on the ground, and then arranging the reinforcement thereon, connecting the end of the reinforcement adjacent to the net with the net, and then slicing the fill layer evenly; A fourth step of fixing the scaffold and the formwork with the scaffold fixing pins on the front surface of the fill layer so as not to cause deformation in compaction while repeatedly performing the third step according to the height of the fill to be constructed; After completion of the fill body of the desired height, the fifth step of dismantling the scaffold and formwork; is achieved by a vegetation-reinforced soil construction method comprising a.
여기서, 상기 망 쪽에 인접한 보강재의 단부는 ㄴ자 모양으로 절곡된 후, 철선에 의해 망에 연결되는 것이 좋다.Here, the end of the reinforcing material adjacent to the net side is bent in a b-shape, it is preferably connected to the net by the wire.
상기 제4단계에서 사용되는 보강재들은 상기 제3단계에서의 첫 번째 보강재와 상기 철선에 의해 망과 일체로 연결될 수도 있다. 하지만, 반드시 일체화될 필요는 없다.The reinforcement used in the fourth step may be integrally connected to the net by the first reinforcement and the iron wire in the third step. However, it does not necessarily need to be integrated.
한편, 상기 목적은, 전술한 시공방법에 의해 시공된 식생보강토 시공구조에 의해서도 달성된다.On the other hand, the above object is also achieved by the vegetation-reinforced soil construction structure constructed by the above-described construction method.
여기서, 식생판과, 이 식생판의 판면으로부터 경사지게 상향 연장되어 그 사이에 관통부를 형성하는 경사리브를 갖고서, 전면부에 배치되어 식생을 돕는 식생부재를 더 포함할 수도 있다.The vegetation plate may further include a vegetation member having an inclined rib extending obliquely upwardly from the plate surface of the vegetation plate to form a penetrating portion therebetween and disposed on the front portion to assist vegetation.
이하에서는 첨부도면을 참조하여 본 발명에 대해 상세히 설명한다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.
도 1은 본 발명의 제1실시예에 따른 식생보강토 시공방법을 보인 도면, 도 2는 도 1의 방법에 의해 시공된 식생보강토 시공구조를 보인 도면, 도 3은 보강재와 망의 연결상태를 보인 도면, 도 4는 식생이 이루어진 도 2의 완성도면이다.1 is a view showing a vegetation reinforcement soil construction method according to a first embodiment of the present invention, Figure 2 is a view showing the vegetation reinforcement soil construction structure constructed by the method of Figure 1, Figure 3 shows a connection state of the reinforcement and the network Figure 4 is a complete view of Figure 2 made with vegetation.
이들 도면을 참조할 때, 본 발명의 제1실시예에 따른 식생보강토 시공방법은 다음의 단계를 거친다.Referring to these drawings, the vegetation reinforced soil construction method according to the first embodiment of the present invention goes through the following steps.
우선, 소정의 배수구(10)와 배수선(12)이 시공된 원지반 위에 요구되는 소정의 기울기에 기초하여 비계(14)와 거푸집(16)을 배치한다. 이때, 거푸집(16)을 안쪽에 배치하고 비계(14)를 바깥쪽에 배치한다.First, the
여기서, 비계(14)는 요구되는 법면에 기울기를 만들고 거푸집(16)을 지지하기 위해 배치된다. 거푸집(16)은 성토층(1a,1b,1c...) 전체를 똑같이 다짐을 하는데 밀림이 없이 지지하며 법면을 일정하고 매끄럽게 만들기 위한 목적으로 사용된다. 그리고는 별도의 비계고정핀(18)을 이용하여 비계(14)와 거푸집(16)을 고정한다. 이처럼 비계(14)와 거푸집(16)을 배치하기 때문에 기울기에 제한을 받지 않고 용이하게 시공할 수 있는 이점이 있게 되는 것이다.Here, the
이어서, 비계(14)와 거푸집(16)의 뒷면에 망(20)과 식생매트(22)를 배치한다. 그리고는 지면으로부터 첫 번째의 성토층(1a)을 형성한 다음, 그 위에 보강재(30a)를 배치한다. 보강재(30a)는 그리드, 지오텍스타일 등의 토목섬유보강재와 부식이 방지된 철선, 철망 등이 사용될 수 있는데, 시공 후에도 성토층(1a)에 그대로 매입된다.Subsequently, the net 20 and the
이때, 보강재(30a)가 망(20)과 분리되어 있다면, 성토층(1a)의 다짐시 보강재(30a)가 이탈될 수도 있다. 이를 저지하기 위해, 망(20) 쪽에 인접한 보강재(30a)의 단부를 일정하게 구부려 절곡시킨다. 이때, 보강재의 단부는 거의 한글 "ㄴ"자 형상으로 절곡되는데, 절곡된 후에는 절곡단부와 망(20)을 철선(24)에 의해 연결한다(도 3 참조). 이때, 철선(24)은 부식되지 않게 코팅이나 도금을 한 망으로 보강재(30a)와 일체되어 구조적 안정을 도모한다.At this time, if the reinforcing material (30a) is separated from the
그리고는 첫 번째의 성토층(1a)을 균등하게 다진다. 이처럼 지면으로부터 첫 번째의 성토층(1a) 위에 보강재(30a)를 배치하고 망(20)에 연결한 후, 다진 도면이 도 1의 (a)에 도시되어 있다.Then, the
첫 번째의 성토층(1a)이 완성되면, 도 1의 (b)와 같이, 그 위로 두 번째의 성토층(1b)을 형성한다. 이때 역시, 해당 위치에서 비계고정핀(18)으로 지지한 후, 두 번째의 보강재(30b)를 배치하고 철선(24)을 이용하여 망(20)에 고정한 후, 두 번째의 성토층(1b)을 다지게 된다. 철선(24)으로 연결할 경우, 첫 번째의 보강재(30a)의 단부와 함께 망(20)에 일체로 연결되어도 좋다.When the
도 1의 (b)와 같이 두 번째의 성토층(1b)이 완성되면 그 상부로 도 1의 (c)와 같이 해당 위치에서 비계고정핀(18)으로 지지한 후, 세 번째의 보강재(30c)를 배치하고 철선(24)을 이용하여 망(20)에 고정한 후, 다짐으로써 도 1의 (c)와 같이 세 번째의 성토층(1c)을 형성한다.When the
이러한 방식으로 시공될 성토 높이(H)에 맞게 성토층(1a,1b,1c...)을 형성하게 되면, 도 2와 같은 성토체(1)의 구조가 완성된다. 그런 다음, 비계(14)와 거푸집(16)을 해체하면 도 4와 같은 구조를 얻을 수 있다. 도 4의 구조는 비계(14)와 거푸집(16)이 해체된 상태에서 전면으로 식생이 이루어진 상태를 보인 도면이다.Forming the fill layer (1a, 1b, 1c ...) in accordance with the fill height (H) to be constructed in this way, the structure of the fill body (1) as shown in Figure 2 is completed. Then, when the
한편, 도 5는 본 발명의 제2실시예에 따른 식생보강토 시공구조의 요부 확대도이고, 도 6은 도 5에 사용된 식생부재의 정면도이다.On the other hand, Figure 5 is an enlarged view of the main portion of the vegetation reinforced soil construction structure according to a second embodiment of the present invention, Figure 6 is a front view of the vegetation member used in FIG.
이들 도면에 도시된 바와 같이, 성토체(1)의 전면에 식생을 위한 별도의 식생부재(40)를 더 배치할 수 있다. 식생부재(40)는 평평한 판상의 식생판(41)과, 식생판(41)의 판면으로부터 경사지게 상향 연장되어 그 사이에 관통부(40a)를 형성하는 경사리브(42)를 갖는다.As shown in these figures, a
이에, 도 5와 같이, 성토체(1)의 전면에 식생부재(40)를 배치하면, 성토층(1a,1b,1c...)의 흙들이 식생부재(40)의 관통부(40a)를 통과하여 경사리브(42)의 단부까지 충전될 수 있다. 따라서, 도 5의 확대된 부분과 같이, 식생을 하기에 유리한 것이다.Thus, as shown in FIG. 5, when the
이러한 본 발명에 따르면, 전면부에 비계(14)와 거푸집(16)을 대고 시공하기 때문에 기울기에 제한을 받지 않고 모든 구간이 충분히 다짐이 가능하여 보다 안정된 구조를 보일 수 있게 된다.According to the present invention, since the
뿐만 아니라 철선(24)과 보강재(30a,30b,30c...)들을 일체로 연결하여 성토층(1a,1b,1c...) 전체를 일체화시킴으로써 효과적인 인장응력을 발휘할 수 있다. 또한, 철선(24)과 보강재(30a,30b,30c...)를 직접 연결하고 그 사이에 식생매트(22)를 넣어 시공하기 때문에 작업의 번거로움과 자재소모를 줄이고 토사유실을 막을 수 있으며, 추후에 식생이 가능하여 주변환경과 조화를 이룰 수 있는 친환경적인 성토체(1)를 완성할 수가 있게 되는 것이다.In addition, by connecting the
토목공사에서 성토체(1) 내부에 보강재(30a,30b,30c...)를 포설함으로써 성토체(1) 사이에 발생하는 마찰저항에 따라 흙의 인장변형을 구속하고 전단슬라이딩 파괴를 방지하여 지반의 보강효과를 얻을 수 있다. 또한, 시공속도가 빠르고 자재가 가벼워 운반이 쉽고 가격이 저렴한 이점이 있다.By installing reinforcing materials (30a, 30b, 30c ...) inside the earthen body (1) in civil engineering work, it restrains the tensile strain of soil according to the frictional resistance generated between the earthen body (1) and prevents shear sliding destruction. The reinforcing effect of the ground can be obtained. In addition, there is an advantage that the construction speed is fast and the material is easy to carry and low price.
이상 도면을 참조하여 본 발명에 대해 상세히 설명하였으나, 본 발명이 이에 제한되는 것은 아니다.Although the present invention has been described in detail with reference to the drawings, the present invention is not limited thereto.
전술한 실시예에서는 그 설명을 생략하고 있지만, 성토구간의 맨 하단부에는 잡석과 맹암거 등으로 배수로를 형성할 수 있으며, 성토체의 배면에는 부직포나 잡석 등으로 배수막을 형성할 수 있다. In the above-described embodiment, the description thereof is omitted, but a drainage channel may be formed at the bottom of the fill section by rubble and blind culvert, and the drainage membrane may be formed on the back of the fill body by non-woven fabric or rubble.
전술한 실시예에 더하여, 식생매트 대신 씨드 스프레이처럼 씨앗을 뿌려서 식생토로 할 수도 있다. 이럴 경우에는 거푸집이 사용되지 않을 수도 있다.In addition to the above-described embodiment, instead of the vegetation mat, the seed may be sprayed like seed spray to make the vegetation soil. In this case the formwork may not be used.
전술한 실시예에서는 그 설명을 생략하고 있지만, 식생매트는 씨앗이 함유되어 있으며, 식생과 토사유실을 방지할 목적으로 판형, 매트형, 블록형, 자루형 등에서 그 하나를 선택적으로 사용할 수도 있는 것이다.Although the description is omitted in the above-described embodiment, the vegetation mat contains seeds, and one of the vegetation mats may be selectively used in the form of plate, mat, block, and bag for the purpose of preventing vegetation and soil loss. .
전술한 실시예에서는 그 설명을 생략하고 있지만, 절단면에 보강재를 배치하기 위해서는 보강재가 배치되는 영역으로 앙카 등을 박아서 보강재를 별도로 지지할 수도 있는 것이다.Although the description is omitted in the above embodiment, in order to arrange the reinforcement on the cut surface, the reinforcement may be separately supported by driving an anchor or the like into a region where the reinforcement is disposed.
이상 설명한 바와 같이, 본 발명에 따르면, 전면부에 비계와 거푸집을 대고 시공하기 때문에 기울기에 제한을 받지 않고 모든 구간이 충분히 다짐이 가능하여 보다 안정된 구조를 보일 수 있는 효과가 있다.As described above, according to the present invention, since the scaffold and the formwork are applied to the front part, all sections can be sufficiently compacted without being limited to the slope, thereby providing a more stable structure.
또한, 철선과 보강재들을 일체로 연결하여 성토층 전체를 일체화시킴으로써 효과적인 인장응력을 발휘할 수 있는 효과가 있다.In addition, by connecting the wire and the reinforcing materials integrally there is an effect that can exhibit an effective tensile stress by integrating the entire fill layer.
또한, 본 발명에 따르면, 철선과 보강재를 직접 연결하고 그 사이에 씨앗이 함유된 식생매트를 넣어 시공하기 때문에 작업의 번거로움과 자재소모를 줄이고 토사유실을 막을 수 있으며 주변환경과 조화를 이룰 수 있는 친환경적인 식생보강토 시공방법 및 이 방법에 의해 시공된 식생보강토 시공구조가 제공된다.In addition, according to the present invention, by connecting the wire and the reinforcement directly and put the vegetation mat containing seeds therebetween to reduce the labor and material consumption of the work, to prevent the loss of earth and sand can be harmonized with the surrounding environment Environmentally friendly vegetation reinforced soil construction method and vegetation reinforced soil construction structure constructed by this method are provided.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020050032685A KR100787099B1 (en) | 2005-04-20 | 2005-04-20 | Method for manufacturing retaining wall and retaining wall manufactured thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020050032685A KR100787099B1 (en) | 2005-04-20 | 2005-04-20 | Method for manufacturing retaining wall and retaining wall manufactured thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20060110913A KR20060110913A (en) | 2006-10-26 |
KR100787099B1 true KR100787099B1 (en) | 2007-12-21 |
Family
ID=37619802
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020050032685A KR100787099B1 (en) | 2005-04-20 | 2005-04-20 | Method for manufacturing retaining wall and retaining wall manufactured thereof |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100787099B1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114541470B (en) * | 2022-03-10 | 2024-07-02 | 浙江交工金筑交通建设有限公司 | Construction method of flexible ecological reinforced retaining wall |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200411787Y1 (en) * | 2005-12-13 | 2006-03-17 | 박누리 | Water Tap Splashes Coupling Hose |
KR200473004Y1 (en) * | 2012-09-05 | 2014-06-03 | 이수익 | General purpose brim applied to metal panel for prefabricated structure |
-
2005
- 2005-04-20 KR KR1020050032685A patent/KR100787099B1/en not_active IP Right Cessation
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200411787Y1 (en) * | 2005-12-13 | 2006-03-17 | 박누리 | Water Tap Splashes Coupling Hose |
KR200473004Y1 (en) * | 2012-09-05 | 2014-06-03 | 이수익 | General purpose brim applied to metal panel for prefabricated structure |
Also Published As
Publication number | Publication date |
---|---|
KR20060110913A (en) | 2006-10-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101591812B1 (en) | Block-type reinforced earth retaining wall construction method and steel rod grid reinforcing material is installed | |
KR100933660B1 (en) | Structure for supporting stone wall for reinforcement and construction method thereof | |
KR100737768B1 (en) | Environmental vegetation mat pannels | |
KR101218174B1 (en) | Grid And Strip of Block Reinforced earth Retaining wall a method of construction | |
KR102395328B1 (en) | Embankment retaining wall structure and retaining wall construction method using panel | |
KR100923290B1 (en) | Abutment structure of bridge | |
KR100763443B1 (en) | Retaining wall having eco-blocks and constructing method thereof | |
KR101401730B1 (en) | Reinforcing method of bearing power for soft ground and reinforcing apparatus used in the same method | |
KR101963362B1 (en) | Reinforced gabion retaining wall capable of completely drainage and construction method thereof | |
KR100889257B1 (en) | Precast concrete facing panel using greening of retaining panel's front | |
KR100787099B1 (en) | Method for manufacturing retaining wall and retaining wall manufactured thereof | |
KR102116085B1 (en) | A Eco-friendly retain wall structure | |
KR100447331B1 (en) | execution method of landscape architecture for cutting ground using blasting stone and landscape architecture apparatus using the same | |
KR100815837B1 (en) | Method for constructing environmental affinity reinforcement soil retaining wall using environmental affinity block with lower open portion and side plate rear portion | |
KR101235826B1 (en) | The method of constructing block for wall | |
KR20090073330A (en) | Revetment structure using natural stones | |
KR100794221B1 (en) | Retaining wall for planting | |
KR100603141B1 (en) | reinforced earth wall for planting and construction/reconstruction method of it | |
JP5800765B2 (en) | Rock fall prevention structure | |
KR100968518B1 (en) | Construction method of reinforced green retaining wall | |
JP7109840B1 (en) | Embankment reinforced wall and construction method of embankment reinforced wall | |
KR20060032271A (en) | Vegetation reinforcement panel and the construction method of retaining wall for the same | |
KR100995094B1 (en) | Method for constructing retaining wall block | |
KR102249603B1 (en) | Retaining wall construction method | |
KR102285192B1 (en) | A Eco-friendly retain wall structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
G170 | Publication of correction | ||
FPAY | Annual fee payment |
Payment date: 20120928 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20131010 Year of fee payment: 7 |
|
LAPS | Lapse due to unpaid annual fee |