KR20130127790A - Rolled steel cargo work information managing system using a mobile device and controlling method therefor - Google Patents

Rolled steel cargo work information managing system using a mobile device and controlling method therefor Download PDF

Info

Publication number
KR20130127790A
KR20130127790A KR1020120051564A KR20120051564A KR20130127790A KR 20130127790 A KR20130127790 A KR 20130127790A KR 1020120051564 A KR1020120051564 A KR 1020120051564A KR 20120051564 A KR20120051564 A KR 20120051564A KR 20130127790 A KR20130127790 A KR 20130127790A
Authority
KR
South Korea
Prior art keywords
information
unloading
steel
loading
mobile terminal
Prior art date
Application number
KR1020120051564A
Other languages
Korean (ko)
Inventor
정홍근
Original Assignee
현대중공업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 현대중공업 주식회사 filed Critical 현대중공업 주식회사
Priority to KR1020120051564A priority Critical patent/KR20130127790A/en
Publication of KR20130127790A publication Critical patent/KR20130127790A/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F21/00Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • G06F21/60Protecting data
    • G06F21/602Providing cryptographic facilities or services
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W4/00Services specially adapted for wireless communication networks; Facilities therefor
    • H04W4/12Messaging; Mailboxes; Announcements

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Economics (AREA)
  • Development Economics (AREA)
  • Accounting & Taxation (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Finance (AREA)
  • General Business, Economics & Management (AREA)
  • Signal Processing (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Health & Medical Sciences (AREA)
  • Bioethics (AREA)
  • General Health & Medical Sciences (AREA)
  • Computer Hardware Design (AREA)
  • Computer Security & Cryptography (AREA)
  • Software Systems (AREA)
  • General Engineering & Computer Science (AREA)

Abstract

The present invention is a mobile terminal for processing the loading and unloading process by the forced raw material is shipped from the raw material supplier and the actual confirmed processing information is transmitted to the radio signal; After loading and unloading the actual steel from the mobile terminal, the processing information transmitted wirelessly in each processing step is classified and managed to manage the history of the steel and retrieve the corresponding information when requesting the loading and unloading information of the steel. It provides a forced loading information management system and a control method using a mobile terminal configured to include a receipt management server to transmit.
In the present invention as described above, the forced raw material sent from the raw material supplier is transported by sea, unloaded to the dock and transported to the stockyard by land transportation for each step of receiving the actual processed information through the mobile terminal and storing the material stock information. By processing the raw materials from the raw material supplier, the actual raw materials are processed at each stage of the unloading and transportation, and the actual processed information is transmitted in real time through the mobile terminal to accurately process the material stock information of the steel. Therefore, there is an effect of maximizing the precision of steel stock accordingly.

Description

    Rolled steel cargo work information managing system using a mobile device and controlling method therefor}

The present invention relates to a forced loading information management system using a mobile terminal and a control method thereof, and in particular, a mobile terminal for each step in which forced raw materials sent from a raw material supplier are transported by sea, unloaded at a dock, and transported to a stockyard by land transportation. The present invention relates to a forced unloading information management system and a control method using a mobile terminal that maximizes the precision of steel stock by receiving and storing the actual processed information and processing it as material stock information.

In general, in drying ships, one large metal plate is cut and processed according to the shape of the application site and fixed to the application site of the steel by welding or other means. As such, the steel for hull is the most important material. Various types are used in various fields such as reinforcing materials, structures, and outer plates. Therefore, the purchase and transportation of these steels is directly dependent on the weight of the freight cost and is transported from the steel manufacturer to the ship manufacturer (shipyard) by sea and trailer by land. At this time, the steel as described above is transported to the loading dock through the land loading and unloading work in the ship pier when transported to the sea transport through the ship. In the steel stockyard as described above, the received steel materials are properly classified and placed in a predetermined space.

Here, the prior art related to the steel loading and unloading system as disclosed in Korea Patent Publication No. 2010-0110450 filed by STD offshore & Shipbuilding Co., Ltd. (name of the invention: steel management system and method; Publication date: October 2010 13 days) is known.

     Then, referring to the conventional steel loading and unloading management apparatus as described with reference to Figure 1, the input unit 70 for inputting the properties of the ordered steel required for production in the purchase order site and transmits the purchase order to the steel production company;

      The steel material 71 loaded and unloaded by the purchase order of the input unit 70 is stored and

 A storage unit 72 for storing information of the retained steel material 71 being held;

      A search control unit 73 for searching for a retaining steel 71 that satisfies the ordered steel condition input by the input unit 70 through the storage unit 72 or searching for a substitute steel;

      And a display unit 74 for displaying the search processing result of the search control unit 73 to the outside.

      On the other hand, the operation of the conventional steel loading control device as described above, first, through the input unit 70 of the steel management device 75 inputs the properties of the ordered steel required for production in the purchase order site to purchase the order to the corresponding steel production company send. And the steel material 71 unloaded and received by the purchase order of the input part 70 is piled up, and the information of the retained steel 71 which is hold | maintained is stored in the storage part 72 via the retrieval control part 73. In this process, when steel is needed, when the ordering steel condition is inputted to the search control unit 73 through the input unit 70, the search control unit 73 stores the retained steel 71 that satisfies the input ordering steel condition. Search through section 72 or search for alternative steel. In addition, the search control unit 73 displays the search processing result to the outside through the display 16, so that the operator sees it and takes appropriate measures.

      However, the conventional steel loading and unloading management device is very inaccurate because the stock management, which takes a considerable amount of processing time, is not a method of checking the actual items at the time of unloading, transporting or loading and managing the history based on the basis. In addition, since the receipt or loading of steel is recorded depending on the manual work of the worker, it is not processed with accurate data.If the specification of the steel received on paper and the actual received steel differ, the request is made when urgent steel is requested at the production site. There was a problem that the productivity of the steel is also significantly reduced accordingly because it does not respond properly.

Therefore, the present invention has been invented to solve the problems of the prior art as described above, the forced raw material sent from the raw material supplier is processed the actual real at each step of the unloading and transport of the real information and the actual processed physical information The purpose of the present invention is to provide a compulsory loading information management system and a control method using a mobile terminal that can be processed in real time through the terminal to accurately process the material stock information of steel.

Still another object of the present invention is to unload through the shipping and land transportation from the shipping stage, the entire process is stored in real time through the mobile terminal and the steel stock information is always managed, even in the emergency supply request of steel required by the production site The present invention provides a forced loading information management system using a mobile terminal and a control method thereof.

The present invention for achieving the above object is a mobile terminal for handling the loading and unloading process by the forced raw material is shipped by sea from the raw material supplier and a mobile terminal for carrying the actual confirmed processing information in a wireless signal;

After loading and unloading the actual steel from the mobile terminal, the processing information transmitted wirelessly in each processing step is classified and managed to manage the history of the steel and retrieve the corresponding information when requesting the loading and unloading information of the steel. Provides a compulsory loading and unloading information management system using a mobile terminal configured to include a receipt management server to transmit.

Another feature of the present invention is a shipment information management process for the microcomputer to receive and manage the shipment product status information transmitted through the communication line established from the server of the raw material supplier supplier and stored in the shipment product status information management module;

After the shipment information management process, the steel material purchased by Micom arrived at the dock by sea transportation and the unloading company unloaded the compulsory information, received the unloading information through the mobile terminal, processed it, and received the unloading information processing module. Loading and loading information processing for storing and managing;

After the loading and unloading loading information processing process, the microcomputer actually identifies the steel transported by transport or land transportation, loads it on the storage area, receives the received information through the mobile terminal, receives and processes the stored information, and stores and manages the storage information processing module. The present invention provides a control method of a mandatory unloading information management system using a mobile terminal including a material loading information processing process.

According to the present invention as described above, the forced raw materials sent from the raw material supplier is transported by sea, unloaded to the docks and transported to the stockyard by land transportation at each step of the actual processed information received through the mobile terminal and then stored there By processing the goods receipt information, the forced raw material sent from the raw material supplier processes the actual goods at each stage of the unloading and transportation, and the actual processed information is transmitted in real time through the mobile terminal to accurately receive the material stock information of the steel. Since it can be processed, there is an effect of maximizing the precision of steel stock accordingly.

In addition, the present invention as described above, after loading and unloading through shipping and land transportation from the shipping stage, the entire process is transferred in real time through the mobile terminal, so that the steel stock information is managed, even in the urgent supply request of steel required by the production site As it can always respond, it also significantly improves the efficiency of receipt data management.

1 is an explanatory diagram illustrating an example of a conventional steel loading and unloading management device.
Figure 2 is an explanatory diagram illustrating a forced unloading information management system using a mobile terminal according to the present invention.
3 is a flowchart of the present invention.

Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

According to the present invention, after the forced raw materials are transported by sea from the raw material supplier and loaded and unloaded, as shown in FIG. A mobile terminal (2A-B) carried on the radio signal via a);

After loading and unloading the real steel 3 from the mobile terminal 2A-B, the processing information transmitted wirelessly via the communication network 1 for each processing step is classified and processed to record the history of the steel 3. It is configured to include a receipt management server (4) for managing and transmitting the results after retrieving the corresponding information when the loading load information request of the steel (3).

And the mobile terminal (2A-B) includes a smart phone and a smart pad.

In addition, the goods receipt management server 4 is unloaded and loaded with the actual steel (3) from the mobile terminal (2A-B) and the processing information that has been wirelessly transmitted via the communication network (1) for each processing step Control the history of the steel (3) to be managed by the classification process, and retrieves the corresponding information when requesting the loading load information of the steel (3) and control the transmission of the results, the overall function of the steel loading and unloading information management system (5) A microcomputer 6 for controlling by;

Wireless communication module (7) for transmitting and receiving information to be processed and unloaded and received by each process in conjunction with the mobile terminal (2A-B) preset via the communication network (1) according to the function control signal of the microcomputer (6) Wow;

In response to the function control signal of the microcomputer 6, the received product status information transmitted through the communication line set from the raw material supplier server 1, for example, b2b or e-mail, is received and stored, and updated. Raw material company shipment information management module (8);

A raw material contract management module 9 for storing and managing the raw material contract information of the steel 3 which has requested a purchase according to the function control signal of the microcomputer 6 and updating the stored information;

A material specification information management module (10) for storing and managing specification information of the steel material (3) which has been requested to purchase according to the function control signal of the microcomputer (6) and updating the stored information contents;

The steel 3 purchased according to the function control signal of the microcomputer 6 arrives at the dock by sea transport and the unloading company unloads the compulsory 3, and then unloads the mobile terminal (2A-B). A loading and unloading information processing module 11 for receiving, receiving, processing, storing, managing and transmitting to the microcomputer 6 at the request of the microcomputer 6;

After loading and unloading the steel material (3) unloaded according to the function control signal of the microcomputer (6) in the freight car 14 and transported by land transport and receives the transport company's transport information received through the mobile terminal (2A-B) A handling history information processing module 12 for storing, managing and transmitting the microcommunication request to the microcomputer 6 at the request of the microcomputer 6;

According to the function control signal of the microcomputer 6, the steel 5 conveyed by sea transportation or land transportation is actually identified and stored in a stockyard (not shown), and the stored information is stored through the mobile terminals 2A-B. It is configured to include a stochastic information processing module 13 for receiving, storing and managing received and transmitted to the microcomputer 6 upon request of the microcomputer 6.

In addition, the mobile terminal 2A-B may load and unload the steel material 3 of the real and drive the provided dedicated application to wirelessly transmit the processing information for each processing step.

In addition, the microcomputer 6 loads the unloaded steel 3 through the unloading company information processing module 12 according to the function control signal of the microcomputer 6 in order to transport the unloading company to the truck 14 for land transportation. It further includes the ability to issue historical invoices.

Here, when the microcomputer 6 is requested specification information of the replacement steel to replace the pre-designed steel (3) material specification information management module 10, unloading information processing module 11, unloading history information processing module ( 12) and the steel stock information stored in the stowage information processing module 13 can be transferred to the requesting server or terminal.

Furthermore, the microcomputer 6 may transmit the unloading or loading process information for each process to the mobile terminal 2A-B of the administrator designated through the communication network 1.

Here, each of the modules 8-13 has a large memory.

In addition, the microcomputer 6 inputs a display 15 for externally displaying a situation processed by the microcomputer 6, an output device 16 for outputting the processing information to the outside, and a control command signal of a user. The key panel unit 17 is connected.

The mobile terminal 2A-B runs a dedicated application and executes a loading and unloading transportation function using, for example, a line / mark number, a product number, and a contract number on the driving menu.

Next, the control method of the present invention having the above-described configuration will be described.

In the method of the present invention, as shown in FIG. 3, the microcomputer receives and processes the shipment product status information transmitted through the communication line established from the server of the raw material supplier in the initial state (S1), and stores it in the shipment product status information management module. Shipping information management process (S2) to manage;

After the shipment information management process (S2), the information that the steel purchased by the microcomputer arrived at the dock by sea transport and the unloading company unloaded the compulsory and received and processed the unloading information through the mobile terminal and then unloading information Loading and unloading information processing process (S3) for storage management in the processing module;

After the loading and unloading loading information processing process (S3), the microcomputer actually identifies the steel conveyed by sea transportation or land transportation, loads it into the stockyard, receives the loaded information through a mobile terminal, and receives and processes the loaded data. It is configured to include material loading information processing (S4) for storage management.

In addition, in the material loading information processing process (S4), the incoming goods loading information extracted from the loading information processing module by Mycom and the shipment product status information stored in the raw material company's shipping information management module are compared with each other to identify the receiving error information, and the receiving error is corrected. Alarming to the mobile device of the person in charge as preset, and further includes an error information processing process for updating the receipt error information to reflect the result of the action.

Here, in the material loading information processing process (S4), when the microcomputer receives a request for specification information of the replacement steel to replace the pre-designed steel, the raw material company shipment information management module, unloading information processing module, loading history information processing module, and loading information After searching the steel stock information stored in the processing module further comprises the emergency steel retrieval step of transmitting the retrieved replacement steel information to the server or the terminal requesting the replacement steel search.

Furthermore, in the material loading information processing process (S4), when the remote access to the goods management menu downloaded through encryption authentication through the Internet or the wireless Internet of the mobile device, and requests the steel loading and unloading goods management information, the microcomputer sends the request signal. It further comprises a remote information management step of processing.

In other words, the steel loading and unloading information management system 5 of the present invention displays the shipped product status information through a communication line, for example, b2b or e-mail, in which a server 18 of a raw material supplier who has received an order of steel 3 is set. ). Then, the shipment product status information is received and processed by the microcomputer 6 and stored in the raw material company shipment information management module 8.

At this time, during the shipment information management process, the fact information that the steel (3) purchased by the microcomputer (6) arrived at the dock by sea transport and the unloading company unload the compulsory (3) and then load the unloading information on the mobile terminal (2A-). After receiving and receiving through B) to store and manage the loading and unloading information processing module (11). The microcomputer 6 actually identifies the steel 5 transported by sea transportation or land transportation, places it in the stockyard, receives the loaded information through the mobile terminal 2A-B, and then processes the stock data. The storage module 13 is stored and managed.

Here, during the material loading information processing process, the microcomputer 6 compares the incoming goods loading information extracted from the loading information processing module 13 and the shipment product status information stored in the raw material company shipment information management module 8 with each other. And the alarm on the mobile device (1A-B) of the person in charge so that the stock error is corrected.

Furthermore, during the material loading information processing, when the microcomputer 6 is requested specification information of the replacement steel to replace the pre-designed steel 3, it is sent to the raw material supplier shipping information management module 8, unloading information processing module 11 ), After retrieving the steel stock information stored in the unloading history information processing module 12 and the stowage information processing module 13 transmits the retrieved replacement steel information to the server or the terminal requesting the replacement steel search.

In addition, during the material loading information processing, if you want to check the steel loading and unloading management information at a remote site, your own wired or wireless terminal of the management company via the Internet or the wireless Internet of the mobile device (1A-B) After accessing the site, download the receipt management menu from the site. And when requesting the steel loading and unloading management information through the password and authentication in the corresponding receipt management menu downloaded as described above, the microcomputer 6 is a raw material supplier shipment information management module (8), loading and unloading information processing module (11), loading company After retrieving the steel stock information stored in the information processing module 12 and the stowage information processing module 13, the request is processed.

According to the present invention as described above, the forced raw materials sent from the raw material supplier is transported by sea, unloaded to the docks and transported to the stockyard by land transportation at each step of the actual processed information received through the mobile terminal and then stored there By processing the goods receipt information, the forced raw material sent from the raw material supplier processes the actual goods at each stage of the unloading and transportation, and the actual processed information is transmitted in real time through the mobile terminal to accurately receive the material stock information of the steel. Can be processed.

In addition, the present invention as described above, after loading and unloading through shipping and land transportation from the shipping stage, the entire process is transferred in real time through the mobile terminal, so that the steel stock information is managed, even in the urgent supply request of steel required by the production site Responsiveness is always available, which greatly improves the efficiency of receipt data management.

1: Telecommunication network 2A- B : Mobile terminal
3: Steel 4: Receipt Management Server
5: steel loading and unloading information management system 6: microcomputer
7: Wireless communication module unit 8: Shipment status information management module
9: Raw Material Contract Management Module 10: Material Specification Information Management Module
11: unloading information management module 12: unloading company transport information management module
13: stock load management module 14: truck
15: display 16: output unit
17: key input 18: raw material supplier server

Claims (10)

A mobile terminal for handling the loading and unloading process by forcing raw materials from the raw material supplier and carrying the actual identified processing information in a wireless signal;
After loading and unloading the actual steel from the mobile terminal, the processing information transmitted wirelessly in each processing step is classified and managed to manage the history of the steel and retrieve the corresponding information when requesting the loading and unloading information of the steel. Forced unloading information management system using a mobile terminal configured to include a receipt management server to transmit.
According to claim 1, The receipt management server unloading the real steel from the mobile terminal after the processing of the processing information transmitted wirelessly by each processing step to control the history of the steel to control and manage the loading of the steel A microcomputer that controls the transmission of the result after searching for the corresponding information when the information is requested and controls the overall function of the steel loading and unloading information management system;
A wireless communication module for transmitting / receiving / receiving and processing information for each process by interworking with a preset mobile terminal according to the function control signal of the microcomputer;
A raw material supplier shipment information management module configured to receive, store, and update shipment product status information transmitted through a communication line set from a raw material supplier server according to the function control signal of the microcomputer;
Unloading information processing to store and manage the fact that the steel material purchased according to the function control signal of the microcomputer arrived at the dock by sea transport and the unloading company unloads the compulsory and receives the unloading information through the mobile terminal. A module;
An unloading company information processing module for storing the unloaded steel in accordance with the function control signal of the microcomputer and transporting the unloading company in a freight car, and then receiving and handling the unloading company transport information through a mobile terminal;
According to the function control signal of the microcomputer, the actual transportation of the steel transported by sea transportation or land transportation is carried out in the stockyard, and the stowed information is received through the mobile terminal. Forced unloading information management system using a mobile terminal, characterized in that configured to include.
According to claim 1, The mobile terminal after loading and unloading the actual steel, the forced application by using the mobile terminal, characterized in that by driving the provided dedicated application to transmit the processing information for each processing step wirelessly Management system. The mobile terminal according to claim 1, wherein the micom issues an unloading company invoice so that the unloaded steel is loaded on the truck by the unloading company information processing module according to the function control signal of the microcomputer. Forced unloading information management system using a terminal. According to claim 1, Wherein the microcom is requested when the specification information of the replacement steel to replace the pre-designed steel material stock stored in the material specification information management module, loading and unloading information processing module, loading history information processing module and load information processing module Forced unloading information management system using a mobile terminal, characterized in that the search for information and transmits the result of the search to the requesting server or terminal. The mandatory unloading information management system according to claim 1, wherein the microcomputer transmits unloading or load processing information for each process to a mobile terminal of a predetermined manager. A shipment information management process in which the microcomputer receives and processes the shipment product status information transmitted through the communication line established from the server of the raw material supplier, and stores and manages it in the shipment product status information management module;
After the shipment information management process, the steel material purchased by Micom arrived at the dock by sea transportation and the unloading company unloaded the compulsory information, received the unloading information through the mobile terminal, processed it, and received the unloading information processing module. Loading and loading information processing for storing and managing;
After the loading and unloading loading information processing process, the microcomputer actually identifies the steel transported by transport or land transportation, loads it on the storage area, receives the received information through the mobile terminal, receives and processes the stored information, and stores and manages the storage information processing module. Control method of the forced loading and unloading information management system using a mobile terminal comprising a material loading information processing process.
      The process of claim 7, wherein in the material loading information processing process, the goods receipt information extracted by the microcomputation information processing module and the shipment product status information stored in the raw material company shipment information management module are compared with each other to identify the goods receipt error information, and the goods receipt error. Alarming to the mobile device of the person in charge is set to take action, the control method of the forced loading and unloading information management system using a mobile terminal, characterized in that it further comprises an error information processing process for updating the receipt error information to reflect the result of the action . The method of claim 7, wherein the material loading information processing process when the microcomputer is requested specification information of the replacement steel to replace the pre-designed steel, raw material company shipment information management module, loading and unloading information processing module, handling history information processing module and loading Compulsory loading information management using a mobile terminal further comprises an emergency steel retrieval step of retrieving the steel stock information stored in the information processing module and then transfers the retrieved alternative steel information to the server or terminal requesting the alternative steel search Control method of the system. The method of claim 7, wherein when the material loading information processing request the steel loading and unloading management information by accessing the receipt management menu that is downloaded through encryption authentication through the Internet or the wireless Internet of the mobile device from the remote site, the microcomputer sends the request signal. Control method of the forced loading and unloading information management system using a mobile terminal, characterized in that it further comprises a remote information management step of processing.

KR1020120051564A 2012-05-15 2012-05-15 Rolled steel cargo work information managing system using a mobile device and controlling method therefor KR20130127790A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120051564A KR20130127790A (en) 2012-05-15 2012-05-15 Rolled steel cargo work information managing system using a mobile device and controlling method therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120051564A KR20130127790A (en) 2012-05-15 2012-05-15 Rolled steel cargo work information managing system using a mobile device and controlling method therefor

Publications (1)

Publication Number Publication Date
KR20130127790A true KR20130127790A (en) 2013-11-25

Family

ID=49855187

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120051564A KR20130127790A (en) 2012-05-15 2012-05-15 Rolled steel cargo work information managing system using a mobile device and controlling method therefor

Country Status (1)

Country Link
KR (1) KR20130127790A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108596533A (en) * 2018-03-16 2018-09-28 广东科达洁能股份有限公司 A kind of verification of materiel warehouse-in, material, which pick, matches and the method for material vanning

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108596533A (en) * 2018-03-16 2018-09-28 广东科达洁能股份有限公司 A kind of verification of materiel warehouse-in, material, which pick, matches and the method for material vanning

Similar Documents

Publication Publication Date Title
US11934992B2 (en) Cross-dock management system, method and apparatus
US10592842B2 (en) Methods and systems for loading products into a cargo space of a delivery vehicle
JP4667205B2 (en) Industrial waste transportation management system
US11113655B2 (en) Controlling industrial trucks in a warehouse
US7423534B2 (en) Electronic method and system for monitoring containers and products
US20180053138A1 (en) System and method for securely transporting cargo
KR20100051156A (en) Method for managing pallet distribution using barcode and rfid tag
US20080189161A1 (en) Rfid information control
KR20130127790A (en) Rolled steel cargo work information managing system using a mobile device and controlling method therefor
KR101709096B1 (en) System and method for managing dangerous goods information using information network
US20200210949A1 (en) Shipment Tracking Systems and Methods
KR101941630B1 (en) System and method for managing weight information of export cargo
KR20130127789A (en) System for processing a rolled steel input information and controlling method therefor
KR20190107145A (en) Methods and systems for replacing shipping containers
US11270179B2 (en) System and method for managing containers
TWM600880U (en) Container Management Assistant System
JP7091077B2 (en) Outpatient work management system and outpatient work management method
KR20220073110A (en) Integrated management of shipment inspection and automatic creation of export documents
KR101264065B1 (en) Panel Warehousing and Release Works Handling System and Handling Method
US20180053148A1 (en) System and method for securely transporting cargo
JP2012171749A (en) Storage and shipment management system
JP2020170378A (en) Searching cargo and vehicle system
US20230135805A1 (en) Systems and methods for quality monitoring of pallets
WO2022191027A1 (en) Information processing device, information processing method, program, and system
KR20140046505A (en) Method for managing steel data of ship

Legal Events

Date Code Title Description
WITN Withdrawal due to no request for examination