KR20130063216A KR1020110129624A KR20110129624A KR20130063216A KR 20130063216 A KR20130063216 A KR 20130063216A KR 1020110129624 A KR1020110129624 A KR 1020110129624A KR 20110129624 A KR20110129624 A KR 20110129624A KR 20130063216 A KR20130063216 A KR 20130063216A
Authority
KR
South Korea
Prior art keywords
column
drilling rig
structures
pontoon
outside
Prior art date
Application number
KR1020110129624A
Other languages
Korean (ko)
Other versions
KR101393331B1 (en
Inventor
한점환
Original Assignee
대우조선해양 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 대우조선해양 주식회사 filed Critical 대우조선해양 주식회사
Priority to KR1020110129624A priority Critical patent/KR101393331B1/en
Publication of KR20130063216A publication Critical patent/KR20130063216A/en
Application granted granted Critical
Publication of KR101393331B1 publication Critical patent/KR101393331B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • B63B35/4413Floating drilling platforms, e.g. carrying water-oil separating devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/002Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables specially adapted for underwater drilling

Abstract

PURPOSE: A column mounting method of a drilling rig is provided to minimize a defect generation part by minimizing a connection part and to reduce construction periods according to mounting construction of a column through a pre-installation of an outfit. CONSTITUTION: A column mutually connects a platform and a pontoon of a drilling rig and is manufactured as a structure form divided into two parts in a vertical longitudinal direction(S11). An outfit mounted on the inside or the outside of a structure is manufactured(S12). The outfit is mounted on the inside and the outside of the structure(S13). The column comprised by connecting the structures is mounted on the pontoon(S14). [Reference numerals] (S11) Manufacture structures which divide a column by half in the vertical longitudinal direction; (S12) Manufacture fittings to be mounted inside and outside the structures; (S13) Mount the fittings inside and outside the structures; (S14) Load the column comprised by connecting the structures on a pontoon

Description

드릴링 리그의 컬럼 탑재 공법{COLUMN INSTALLING METHOD OF DRILLING RIG}{COLUMN INSTALLING METHOD OF DRILLING RIG}

본 발명은 드릴링 리그의 컬럼 탑재 공법에 관한 것으로, 더욱 상세하게는 시공 시간을 단축하고 작업 공수를 최소화하면서도 품질 향상의 도모가 가능하도록 하는 드릴링 리그의 컬럼 탑재 공법에 관한 것이다.BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a column mounting method for a drilling rig, and more particularly, to a column mounting method for a drilling rig that shortens a construction time and minimizes the number of workings while improving quality.

드릴링 리그(drilling rig)는 통상 하나 이상의 폰툰(pontoon)과, 이러한 폰툰 상에 하나 이상의 칼럼(column)에 의해 지지되고 시추설비를 구비하는 플랫폼(platform)을 포함하는 구조로, 반잠수식 시추선(semi-submersible drilling vessel)이라고도 한다.Drilling rigs typically have one or more pontoons and a platform that is supported by one or more columns on the pontoons and has a drilling facility. A semi-submersible drilling rig semi-submersible drilling vessel.

이러한 드릴링 리그에는 라이저(riser), 시추관, 케이싱, 라이너(liner) 등과 같은 관형 시추 장비용 보관 수단이 마련되어 있다.These drilling rigs have storage means for tubular drilling equipment such as risers, drilling pipes, casings, liners, and the like.

이러한 드릴링 리그는 일반적으로 2개의 부체, 즉 폰툰을 포함하며, 이러한 폰툰은 소정 간격을 두고 서로 평행하게 배치되어 있고, 폰툰 각각에는 플랫폼을 지지하는 2개 이상의 칼럼이 마련되어 있다.Such drilling rigs generally comprise two entities, i. E. Pontoons, which are arranged parallel to one another at regular intervals, and each of the pontoons has two or more columns supporting the platform.

이 플랫폼 상에는 일반적으로 중앙에 시추 설비가 배치되어 있으며, 이 플랫폼에는 승무원 숙박 시설, 작업 영역 및 라이저, 시추관, 케이싱, 라이너 등의 형태의 관형 시추 장비와 같은 시추 장비용 보관 영역 및 보관 수단이 마련되어 있다.On this platform there is generally a drilling facility in the center, which includes crew accommodation, work area and storage area for drilling equipment such as tubular drilling equipment in the form of risers, drilling pipes, casings, liners, Lt; / RTI >

이때, 이러한 드릴링 리그의 칼럼은 통상 상하 길이 방향을 따라 상하 다단으로 적층되는 블럭 형태로 조립하고 칼럼을 구성하는 각각의 블럭 내, 외측에 의장품을 설치하여 함께 적층하는 방식으로 폰툰 상에 장착된다.At this time, the columns of the drilling rig are assembled into a block form stacked vertically and vertically along the vertical direction, and are mounted on the pontoons by installing and stacking the equipment inside and outside each block constituting the column.

그러나, 이러한 방법은 칼럼의 상하 길이 방향을 따라 장착되는 복잡한 구조의 의장품을 블럭에 일일이 장착하고 도장하는 등의 번거로운 작업 및 장시간의 시공 시간이 소요되는 문제점이 있었다.However, this method has a problem in that complicated construction equipment mounted along the vertical direction of the column is mounted on the block and painted, and the construction time is long.

본 발명은 상기와 같은 문제점을 개선하기 위하여 발명된 것으로, 시공 시간을 단축하고 작업 공수를 최소화하면서도 품질 향상의 도모가 가능하도록 하는 드릴링 리그의 컬럼 탑재 공법을 제공하기 위한 것이다.The present invention has been made in order to solve the above problems, and it is an object of the present invention to provide a column mounting method of a drilling rig which can shorten the construction time and minimize the number of workings while improving quality.

상기와 같은 문제점을 개선하기 위하여, 본 발명은 드릴링 리그의 플랫폼과 폰툰(pontoon)을 상호 연결하는 컬럼(column)을 상하 길이 방향으로 양분하는 구조물로 제작하는 제1 단계; 구조물 각각의 내, 외측에 장착할 의장품을 제작하는 제2 단계; 구조물 각각의 내, 외측에 의장품을 장착하는 제3 단계; 구조물을 상호 결합하여 이루어진 컬럼을 폰툰에 탑재하는 제4 단계;를 포함하는 것을 특징으로 하는 드릴링 리그의 컬럼 탑재 공법을 제공할 수 있다.In order to solve the above problems, the present invention provides a method for manufacturing a drilling rig, comprising the steps of: (a) forming a column that interconnects a platform of a drilling rig and a pontoon, into a structure that bisects the column in a vertical direction; A second step of manufacturing equipment to be installed inside and outside each of the structures; A third step of mounting the equipment on the inside and outside of each of the structures; And a fourth step of mounting the columns formed by mutually joining the structures on the pontoons. The column mounting method of the drilling rig can be provided.

여기서, 제1 단계에서, 기제작된 구조물의 내, 외측에 도장 처리하는 것을 특징으로 한다.Here, in the first step, coating is performed on the inside and outside of the previously fabricated structure.

이때, 제1 단계에서, 구조물은 폰툰의 선수에서 선미 방향을 따라 상호 양분된 것을 특징으로 한다.At this time, in the first step, the structure is characterized in that the pontoons are mutually divided in the stern direction.

그리고, 제2 단계에서, 의장품은 구조물 각각의 상하 길이 방향을 따라 복수의 부품이 조합된 유닛으로 제작되는 것을 특징으로 한다.In the second step, the equipment is manufactured as a unit in which a plurality of parts are combined along the vertical direction of each of the structures.

그리고, 제2 단계에서, 기제작된 의장품에 도장 처리하는 것을 특징으로 한다.Then, in the second step, the previously-manufactured equipment is painted.

한편, 본 발명은 드릴링 리그의 플랫폼과 폰툰(pontoon)을 상호 연결하는 컬럼(column)을 상하 길이 방향으로 양분하여 내, 외측 구조물로 제작하는 제1 단계; 내, 외측 구조물의 내, 외측에 도장 처리하는 제2 단계; 내, 외측 구조물의 내, 외측에 장착할 의장품을 제작하는 제3 단계; 의장품에 도장 처리하는 제4 단계; 내측 구조물과 외측 구조물의 내, 외측에 각각 의장품을 장착하는 제5 단계; 및 내측 구조물과 외측 구조물을 상호 결합하여 이루어진 컬럼을 폰툰에 탑재하는 제6 단계;를 포함하는 것을 특징으로 하는 드릴링 리그의 컬럼 탑재 공법을 제공할 수도 있다.According to another aspect of the present invention, there is provided a drilling rig, comprising: a first step of dividing a column connecting a platform of a drilling rig and a pontoon into two parts in a vertical direction to form an outer structure; A second step of painting the inside and outside of the inner and outer structures; A third step of manufacturing equipment to be mounted on the inside and outside of the inner and outer structures; A fourth step of painting the fittings; A fifth step of mounting each piece of equipment on the inside and outside of the inside structure and the outside structure; And a sixth step of mounting a column formed by coupling the inner structure and the outer structure to the pontoons.

또한, 본 발명은 드릴링 리그의 플랫폼과 폰툰(pontoon)을 상호 연결하는 컬럼(column)을 상하 길이 방향으로 양분하는 내, 외측 구조물을 제작하여 내, 외측 구조물의 내, 외측에 각각 의장품을 장착한 다음, 내, 외측 구조물을 상호 결합하여 이루어진 컬럼을 폰툰에 탑재하는 것을 특징으로 하는 드릴링 리그의 컬럼 탑재 공법을 제공할 수도 있음은 물론이다.In addition, the present invention is characterized in that inner and outer structures that divide a column interconnecting a platform and a pontoon of a drilling rig into upper and lower longitudinal bores are manufactured, and each equipment is mounted inside and outside of the outer structure Next, it is a matter of course to provide a column mounting method of a drilling rig, characterized in that a column formed by mutually coupling inner and outer structures is mounted on the pontoons.

상기와 같은 실시예에 따르면 본 발명은 다음과 같은 효과를 도모할 수 있을 것이다.According to the embodiment as described above, the following effects can be achieved.

우선, 본 발명은 컬럼을 상하 길이 방향으로 양분된 구조물로 제작하고, 구조물의 내, 외측에 의장품을 장착한 후 상호 결합하여 폰툰 상에 탑재하는 실시예로부터 생산성을 극대화할 수 있다.First, the present invention can maximize productivity from an embodiment in which a column is divided into two parts in the longitudinal direction and the equipment is mounted on the inside and outside of the structure, and then the parts are mutually coupled and mounted on the pontoon.

특히, 본 발명은 상기와 같은 의장품의 선행 설치(pre-erection)을 통하여 컬럼의 탑재 시공에 따른 공기를 단축하고 기존의 시공 방법에 비하여 결합하는 부위를 최소화하여 하자 발생 부위 또한 최소화할 수 있으므로, 품질 향상을 도모할 수 있음은 물론, 도장 작업 등의 제반 작업을 간소화하고 안전 설계가 가능하게 된다.Particularly, the present invention can shorten the air flow due to the installation of the column through the pre-erection of the above-mentioned equipment, minimize the defective portion and minimize the defective portion compared with the existing construction method, It is possible not only to improve the quality, but also to simplify various works such as painting work and to design safety.

도 1은 본 발명의 일 실시예에 따른 드릴링 리그의 컬럼 탑재 공법을 나타낸 블록 선도
도 2는 본 발명의 다른 실시예에 따른 드릴링 리그의 컬럼 탑재 공법을 나타낸 블록 선도
도 3은 본 발명의 일 실시예에 따른 드릴링 리그의 컬럼 탑재 공법을 이용하여 폰툰에 컬럼이 탑재되는 것을 나타낸 분해 사시도
1 is a block diagram showing a column mounting method of a drilling rig according to an embodiment of the present invention;
2 is a block diagram showing a column mounting method of a drilling rig according to another embodiment of the present invention.
FIG. 3 is an exploded perspective view showing a column mounted on a pontoon using a column mounting method of a drilling rig according to an embodiment of the present invention.

이하 첨부한 도면을 참조하여 본 발명의 바람직한 실시예에 대한 구성 및 작용을 상세히 설명하면 다음과 같다. 또한 하기 실시예는 여러 가지 다른 형태로 변형될 수 있으며, 본 발명의 범위가 하기 실시예에 한정되는 것은 아니다.
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. In addition, the following examples can be modified in various forms, and the scope of the present invention is not limited to the following examples.

도 1은 본 발명의 일 실시예에 따른 드릴링 리그의 컬럼 탑재 공법을 나타낸 블록 선도이며, 도 2는 본 발명의 다른 실시예에 따른 드릴링 리그의 컬럼 탑재 공법을 나타낸 블록 선도이고, 도 3은 본 발명의 일 실시예에 따른 드릴링 리그의 컬럼 탑재 공법을 이용하여 폰툰에 컬럼이 탑재되는 것을 나타낸 분해 사시도이다.FIG. 1 is a block diagram showing a column loading method of a drilling rig according to an embodiment of the present invention. FIG. 2 is a block diagram showing a column loading method of a drilling rig according to another embodiment of the present invention. FIG. 7 is an exploded perspective view showing a column mounted on a pontoon using a column mounting method of a drilling rig according to an embodiment of the present invention; FIG.

참고로, 도 3에서 1 방향은 폰툰(pontoon)의 선수측을, 2 방향은 탑사이드측을, 3 방향은 폰툰의 좌현측을 각각 나타낸다.3, one direction represents the forward side of the pontoon, the two directions represent the top side, and the three directions represent the port side of the pontoon.

또한, 미설명 부호로, 110은 컬럼(100) 하부측을 지지하면서 폰툰(500)에 탑재되도록 하기 위한 탑재 블럭을 나타내며, 210, 220, 230, 240, 250은 각각 접근용 계단, 파이프 라인, 각종 탱크류, 나선형 승강 계단, 케이블 및 트레이 유닛 등을 나타내며, 이러한 것들이 의장품이 된다.Reference numeral 110 denotes a mounting block for supporting the lower portion of the column 100 and mounting the column 100 on the pontoon 500. Reference numerals 210, 220, 230, 240 and 250 denote accessing steps, Various types of tanks, spiral lifting stairs, cables and tray units, and the like.

본 발명은 도시된 바와 같이 드릴링 리그의 플랫폼(이하 미도시)과 폰툰(500)을 상호 연결하는 컬럼(100, column)을 상하 길이 방향으로 양분하도록 제작된 내, 외측 구조물(100', 100")의 내, 외측에 각각 의장품을 장착한 다음, 내, 외측 구조물(100', 100")을 상호 결합하여 이루어진 컬럼(100)을 폰툰(500)에 탑재하는 실시예를 적용하는 것임을 파악할 수 있다.As shown in the drawings, the inner and outer structures 100 'and 100', which are manufactured to vertically divide a column 100 interconnecting a platform (not shown) of a drilling rig and a pontoon 500, The column 100 having the inner and outer structures 100 'and 100 "coupled to each other is mounted on the pontoon 500, as shown in FIG. .

여기서, 용어 '내측'과 '외측'은 도 3을 기준으로 3 방향에 따른 좌현측이 외측이 되고, 3 방향의 역방향인 우현측이 내측이 되는 것으로 정의한다.Here, the terms 'inner side' and 'outer side' are defined in such a manner that the port side along the three directions is outside on the basis of FIG. 3 and the starboard side opposite to the three directions is inside.

따라서, 본 발명은 기존의 상하 다단 적층에 따른 컬럼의 탑재 방식에 비하여 용접 등의 결합 개소를 최소화하여 시공을 간소화할 수 있을 것이다.Accordingly, the present invention can minimize the joining points of welding or the like compared with the conventional column mounting method for multi-layer stacking, thereby simplifying construction.

본 발명은 상기와 같은 실시예의 적용이 가능하며 다음과 같은 다양한 실시예의 적용이 가능함은 물론이다.It is to be understood that the present invention may be embodied in many other specific forms without departing from the spirit or scope of the invention.

우선, 작업자는 제1 단계(S11)에서 드릴링 리그의 플랫폼과 폰툰(500)을 상호 연결하는 컬럼(100)을 육상 작업장에서 상하 길이 방향으로 양분하는 구조물(100', 100")의 형태로 제작한다.First, the operator constructs a column 100 interconnecting the platform of the drilling rig and the pontoon 500 in the form of a structure 100 ', 100 "that bisects the column 100 in the vertical direction in a land workplace in a first step S11 do.

여기서, 기제작된 구조물(100', 100")의 내, 외측에는 도장 처리하는 것이 바람직하다.Here, it is preferable to coat the inside and outside of the manufactured structures 100 'and 100 ".

이때, 구조물(100', 100")은 상하 길이 방향으로 양분되어지되, 양분되는 방향은 어느 방향이라도 무관하나, 시공의 편의를 위하여 폰툰(500)의 선수에서 선미 방향을 따라 상호 양분되는 것이 바람직하다.At this time, the structures 100 'and 100' 'are divided into two in the vertical direction, and the two directions are independent of each other. However, for convenience of construction, it is preferable that the structures 100' and 100 ' Do.

다음으로, 작업자는 제2 단계(S12)에서 구조물(100', 100") 각각의 내, 외측에 장착할 의장품을 육상 작업장에서 제작하게 된다.Next, in the second step S12, the worker manufactures the equipment to be mounted on the inside and the outside of each of the structures 100 'and 100 "in a land workshop.

여기서, 의장품은 구조물(100', 100") 각각의 상하 길이 방향을 따라 복수의 부품이 조합된 중, 대형의 유닛으로 제작되고, 기제작된 의장품에는 도장 처리하는 것이 바람직하다.Here, it is preferable that the equipment is manufactured as a medium or large unit in which a plurality of parts are combined along the vertical direction of each of the structures 100 ', 100 ", and the equipment thus manufactured is painted.

계속하여 작업자는 제3 단계(S13)에서 구조물(100', 100") 각각의 내, 외측에 의장품을 장착하는 작업을 육상 작업장 또는 크레인 설비가 갖추어진 지정된 장소에서 실시하게 된다.Subsequently, in the third step S13, the worker mounts the equipment on the inside and the outside of each of the structures 100 'and 100 "in a designated place equipped with a land work site or a crane facility.

여기서, 의장품은 특별히 도시하지는 않았으나, 계류장치를 수납하기 위한 체인 라커(chain locker)를 마련할 수도 있고, 관리자 및 작업자가 컬럼(100)의 외측을 통하여 플랫폼과 폰툰(500)을 왕래할 수 있도록 접근용 계단(210)을 마련하거나 컬럼(100)의 내측을 통하여 플랫폼과 폰툰(500)을 왕래할 수 있도록 나선형 승강 계단(240)을 마련할 수도 있을 것이다.Here, the equipment is not specifically shown, but a chain locker for receiving the mooring device may be provided, and a manager and a worker may pass the platform 100 and the pontoon 500 through the outside of the column 100, The accessing stairs 210 may be provided or the spiral stepping stairs 240 may be provided to allow the platform and the pontoon 500 to pass through the inside of the column 100.

또한, 의장품은 밸러스트 탱크 또는 각종 독립형 탱크 및 벌크 탱크 등의 유체가 수용되는 각종 탱크류(230)나 이러한 각종 탱크류(230)와 연결되는 파이프 라인(220)을 마련하거나, 플랫폼으로부터 전원 또는 통신용으로 사용하기 위하여 또는 무인 잠수 로봇(Remotely Operated Vehicle, ROV)의 컨트롤을 위한 케이블 및 트레이 유닛(250) 등을 마련할 수도 있음은 물론이다.The equipment may be provided with a variety of tanks 230 in which a fluid such as a ballast tank or various independent tanks and bulk tanks are accommodated or a pipeline 220 connected to the various tanks 230, A cable and a tray unit 250 for controlling the remotely operated vehicle (ROV), or the like may be provided.

다음으로, 작업자는 이와 같은 의장품 중 도 3과 같이 각종 탱크류(230)를 탑재한 탑재 블럭(110)을 폰툰(500)에 탑재하고, 제4 단계(S14)에서 구조물(100', 100")을 상호 결합하여 이루어진 컬럼(100)을 폰툰(500)에 탑재함으로써 컬럼(100)의 탑재가 완료되는 것이다.Next, the operator mounts the mounting block 110 on which the various tanks 230 are mounted on the pontoons 500 as shown in FIG. 3, and the structures 100 ', 100 "in the fourth step S14. The column 100 is mounted on the pontoon 500 and the mounting of the column 100 is completed.

한편, 본 발명은 상기와 같은 실시예의 적용이 가능함은 물론 다음과 같은 실시예의 적용 또한 가능하다.In addition, the present invention can be applied to the embodiments described below, as well as the following embodiments.

즉, 작업자는 드릴링 리그의 플랫폼과 폰툰(500, pontoon)을 상호 연결하는 컬럼(100, column)을 상하 길이 방향으로 양분하여 내, 외측 구조물(100', 100")로 제작한다(S21).That is, the operator divides the column 100, which connects the platform of the drilling rig and the pontoon 500, into the outer structures 100 'and 100' 'in the vertical direction (S21).

이후, 작업자는 내, 외측 구조물(100', 100")의 내, 외측을 도장 처리한다(S22).Thereafter, the operator paints the inside and the outside of the inner and outer structures 100 'and 100 "(S22).

다음으로, 작업자는 내, 외측 구조물(100', 100")의 내, 외측에 장착할 의장품을 제작한다(S23).Next, the operator manufactures equipment to be mounted on the inside and outside of the inner and outer structures 100 'and 100' '(S23).

계속하여, 작업자는 의장품에 도장 처리 작업을 실시한다(S24).Subsequently, the operator performs a painting processing operation on the equipment item (S24).

다음으로, 작업자는 내측 구조물(100', 100")과 외측 구조물(100', 100")의 내, 외측에 각각 의장품을 장착한다(S25).Next, the operator mounts the equipment on the inner and outer sides of the inner structures 100 'and 100' 'and the outer structures 100' and 100 '' (S25).

최종적으로, 작업자는 내측 구조물(100', 100")과 외측 구조물(100', 100")을 상호 결합하여 이루어진 컬럼(100)을 폰툰(500)에 탑재하게 된다(S26).Finally, the operator mounts the column 100 formed by coupling the inner structures 100 'and 100' 'and the outer structures 100' and 100 '' to the pontoon 500 (S26).

이상과 같이 본 발명은 시공 시간을 단축하고 작업 공수를 최소화하면서도 품질 향상의 도모가 가능하도록 하는 드릴링 리그의 컬럼 탑재 공법을 제공하는 것을 기본적인 기술적 사상으로 하고 있음을 알 수 있다.
As described above, the present invention provides a column mounting method for a drilling rig that can shorten the construction time and minimize the number of workings while improving quality.

본 발명은 상기 실시예에 한정되지 않고 본 발명의 기술적 요지를 벗어나지 아니하는 범위 내에서 다양하게 수정 또는 변형되어 실시될 수 있음은 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에 있어서 자명한 것이다.It will be apparent to those skilled in the art that various modifications and variations can be made in the present invention without departing from the spirit and scope of the invention will be.

100...컬럼 500...폰툰100 ... column 500 ... pontoon

Claims (7)

드릴링 리그의 플랫폼과 폰툰(pontoon)을 상호 연결하는 컬럼(column)을 상하 길이 방향으로 양분하는 구조물로 제작하는 제1 단계(S11);
상기 구조물 각각의 내, 외측에 장착할 의장품을 제작하는 제2 단계(S12);
상기 구조물 각각의 내, 외측에 상기 의장품을 장착하는 제3 단계(S13);
상기 구조물을 상호 결합하여 이루어진 상기 컬럼을 상기 폰툰에 탑재하는 제4 단계(S14);
를 포함하는 것을 특징으로 하는 드릴링 리그의 컬럼 탑재 공법.
A first step (S11) of making a column that interconnects a platform of the drilling rig and a pontoon as a structure that bisects the column in the vertical direction;
A second step (S12) of manufacturing equipment to be mounted inside and outside each of the structures;
A third step (S13) of mounting the equipment to the inside and outside of each of the structures;
A fourth step (S14) of mounting the column made by mutually coupling the structures on the pontoon;
And a second column of the drilling rig.
청구항 1에 있어서,
상기 제1 단계(S11)에서,
기제작된 상기 구조물의 내, 외측에 도장 처리하는 것;
을 특징으로 하는 드릴링 리그의 컬럼 탑재 공법.
The method according to claim 1,
In the first step S11,
Coating the inner and outer sides of the fabricated structure;
Wherein the column is mounted on the drilling rig.
청구항 1에 있어서,
상기 제1 단계(S11)에서,
상기 구조물은 상기 폰툰의 선수에서 선미 방향을 따라 상호 양분된 것;
을 특징으로 하는 드릴링 리그의 컬럼 탑재 공법.
The method according to claim 1,
In the first step S11,
The structure being bisected along the stern direction in the bow of the pontoon;
Wherein the column is mounted on the drilling rig.
청구항 1에 있어서,
상기 제2 단계(S12)에서,
상기 의장품은 상기 구조물 각각의 상하 길이 방향을 따라 복수의 부품이 조합된 유닛으로 제작되는 것;
을 특징으로 하는 드릴링 리그의 컬럼 탑재 공법.
The method according to claim 1,
In the second step S12,
Wherein the equipment is manufactured as a unit in which a plurality of parts are combined along the longitudinal direction of each of the structures;
Wherein the column is mounted on the drilling rig.
청구항 1에 있어서,
상기 제2 단계(S12)에서,
기제작된 상기 의장품에 도장 처리하는 것;
을 특징으로 하는 드릴링 리그의 컬럼 탑재 공법.
The method according to claim 1,
In the second step S12,
Applying paint to the manufactured equipment manufactured in the past;
Wherein the column is mounted on the drilling rig.
드릴링 리그의 플랫폼과 폰툰(pontoon)을 상호 연결하는 컬럼(column)을 상하 길이 방향으로 양분하여 내, 외측 구조물로 제작하는 제1 단계(S21);
상기 내, 외측 구조물의 내, 외측에 도장 처리하는 제2 단계(S22);
상기 내, 외측 구조물의 내, 외측에 장착할 의장품을 제작하는 제3 단계(S23);
상기 의장품에 도장 처리하는 제4 단계(S24);
상기 내측 구조물과 상기 외측 구조물의 내, 외측에 각각 상기 의장품을 장착하는 제5 단계(S25); 및
상기 내측 구조물과 상기 외측 구조물을 상호 결합하여 이루어진 상기 컬럼을 상기 폰툰에 탑재하는 제6 단계(S26);
를 포함하는 것을 특징으로 하는 드릴링 리그의 컬럼 탑재 공법.
A first step (S21) in which a column connecting the platform of the drilling rig and the pontoon is divided into two parts in the vertical direction to manufacture an outer structure;
A second step (S22) of painting the inside and outside of the inner and outer structures;
A third step (S23) of manufacturing equipment to be mounted on the inside and outside of the inner and outer structures;
A fourth step (S24) of painting the equipment item;
A fifth step (S25) of mounting the equipments on the inside and outside of the inside structure and the outside structure, respectively; And
A sixth step (S26) of mounting the column formed by coupling the inner structure and the outer structure to the pontoon;
And a second column of the drilling rig.
드릴링 리그의 플랫폼과 폰툰(pontoon)을 상호 연결하는 컬럼(column)을 상하 길이 방향으로 양분하는 내, 외측 구조물을 제작하여 상기 내, 외측 구조물의 내, 외측에 각각 의장품을 장착한 다음, 상기 내, 외측 구조물을 상호 결합하여 이루어진 상기 컬럼을 상기 폰툰에 탑재하는 것;
을 특징으로 하는 드릴링 리그의 컬럼 탑재 공법.
An inner and outer structures for vertically dividing a column connecting the platform of the drilling rig and a pontoon are manufactured and each equipment is mounted on the inner and outer sides of the inner and outer structures, Mounting the column on the pontoon, the columns being joined to each other;
Wherein the column is mounted on the drilling rig.
KR1020110129624A 2011-12-06 2011-12-06 Column installing method of drilling rig KR101393331B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110129624A KR101393331B1 (en) 2011-12-06 2011-12-06 Column installing method of drilling rig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110129624A KR101393331B1 (en) 2011-12-06 2011-12-06 Column installing method of drilling rig

Publications (2)

Publication Number Publication Date
KR20130063216A true KR20130063216A (en) 2013-06-14
KR101393331B1 KR101393331B1 (en) 2014-05-09

Family

ID=48860634

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110129624A KR101393331B1 (en) 2011-12-06 2011-12-06 Column installing method of drilling rig

Country Status (1)

Country Link
KR (1) KR101393331B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20150052588A (en) * 2013-11-06 2015-05-14 대우조선해양 주식회사 Riser and cassion mountiong method and mounting structure thereof, and vessel or ocean construction comprising the same

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6935810B2 (en) 2003-06-11 2005-08-30 Deepwater Technologies, Inc. Semi-submersible multicolumn floating offshore platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20150052588A (en) * 2013-11-06 2015-05-14 대우조선해양 주식회사 Riser and cassion mountiong method and mounting structure thereof, and vessel or ocean construction comprising the same

Also Published As

Publication number Publication date
KR101393331B1 (en) 2014-05-09

Similar Documents

Publication Publication Date Title
US20100135728A1 (en) Mobile offshore drilling and production platform
US10648241B2 (en) Marine riser section for subsea wellbore related operations
JP2020033009A (en) Hull used as outer shell for floating body type carbohydrate storage plant and/or floating body type carbohydrate treatment plant, method for manufacturing hull, vessel including hull, and method for manufacturing vessel having hull
CN105416508A (en) Method for increasing outfitting pre-installation ratio
US8657012B2 (en) Efficient open water riser deployment
CN103827438A (en) Drilling ship
KR101393331B1 (en) Column installing method of drilling rig
CN203501081U (en) Installation structure for illuminating lamp of offshore platform and large-scale ship weather deck
KR100785479B1 (en) Installation method and structure with modulation for submerged turret loading into vessel
Tellier et al. The evolution of free standing risers
KR102122093B1 (en) Riser and cassion mountiong method and mounting structure thereof
RU2707615C1 (en) Frame system and method of its operation
KR102071010B1 (en) construction method of Semi-submissible type platform
EP2918491B1 (en) Multipurpose attachment system and methods for attachment
KR101695883B1 (en) Suspension Device For Provisional Bonding Prior To Welding
KR101875090B1 (en) Supporting Structure Of Overboard Pipe For Fixed Drilling Platform
KR101884863B1 (en) Connection device and system for pipelines
Nagel et al. SS WHO DAT Project-Unique SURF Interface on the OPTI-EX Generic
WO2021040535A1 (en) Adapter assembly, flowline connector assembly and subsea production system
KR101625507B1 (en) Drill floor and method for constructing drillship using the same
NL2013942B1 (en) Marine riser section for subsea wellbore related operations.
KR101686231B1 (en) Method for mounting sub-structure of drillship
KR20150145972A (en) Method for loading riser guide tubes
Giles III et al. Gulfstar-Porches and Pull Tubes-Comparing Two Riser Interface Options
KR20170028649A (en) Drilling offshore structure having support barge ship and operation method of the drilling offshore structure

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20170328

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20180427

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20190423

Year of fee payment: 6