KR20130051187A - Method collecting iron bar in disused ferro-concrete pole - Google Patents

Method collecting iron bar in disused ferro-concrete pole Download PDF

Info

Publication number
KR20130051187A
KR20130051187A KR1020110116395A KR20110116395A KR20130051187A KR 20130051187 A KR20130051187 A KR 20130051187A KR 1020110116395 A KR1020110116395 A KR 1020110116395A KR 20110116395 A KR20110116395 A KR 20110116395A KR 20130051187 A KR20130051187 A KR 20130051187A
Authority
KR
South Korea
Prior art keywords
crusher
cutting
reinforcing bar
excavator
cut
Prior art date
Application number
KR1020110116395A
Other languages
Korean (ko)
Inventor
윤형자
Original Assignee
(주)이레에스알
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)이레에스알 filed Critical (주)이레에스알
Priority to KR1020110116395A priority Critical patent/KR20130051187A/en
Publication of KR20130051187A publication Critical patent/KR20130051187A/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B09DISPOSAL OF SOLID WASTE; RECLAMATION OF CONTAMINATED SOIL
    • B09BDISPOSAL OF SOLID WASTE NOT OTHERWISE PROVIDED FOR
    • B09B3/00Destroying solid waste or transforming solid waste into something useful or harmless
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C1/00Crushing or disintegrating by reciprocating members
    • B02C1/02Jaw crushers or pulverisers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/36Component parts
    • E02F3/3604Devices to connect tools to arms, booms or the like
    • E02F3/3609Devices to connect tools to arms, booms or the like of the quick acting type, e.g. controlled from the operator seat
    • E02F3/3663Devices to connect tools to arms, booms or the like of the quick acting type, e.g. controlled from the operator seat hydraulically-operated
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/20Waste processing or separation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/52Mechanical processing of waste for the recovery of materials, e.g. crushing, shredding, separation or disassembly
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/58Construction or demolition [C&D] waste

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Food Science & Technology (AREA)
  • Crushing And Grinding (AREA)
  • Processing Of Solid Wastes (AREA)

Abstract

PURPOSE: An iron collecting method of concrete waste prop is provided to perform crushing, cutting, laminating of iron collecting method with only operating excavator and crusher by mounting a crusher which has cutter to an excavator. CONSTITUTION: An iron collecting method of concrete waste prop comprises the following steps. (S1) waste prop(A) is crushed by the crusher(20) mounted on the excavator(10) to separate iron(B) reclaimed inside the crushed concrete. (S2) The separated iron is cut for a certain size using a cutter(23) mounted on the crusher. And (S3) the severed iron is laminated by delivering the crusher at named place. The step(S1) comprises the following steps. (a) The center portion of waste prop is first crushed by using the crusher. And (b) the waste prop is crushed by bending the waste prop. The excavator is located at one place and process the step (S1), (S2), and (S3) by driving of the crusher with fluid pressure.

Description

콘크리트 폐지주의 철근 수거방법{Method collecting iron bar in disused ferro-concrete pole}Method of collecting iron bars in concrete waste stock {Method collecting iron bar in disused ferro-concrete pole}

본 발명은 땅속에 박힌 상태로 세움 설치되는 전주 또는 지반 강화를 위해 땅속에 완전히 박히는 파일(pile) 등과 같이 콘크리트 내부에 철근이 매립된 지주 (pole)를 폐기할 때 폐지주 속에 매립되어 있는 철근을 수거하는 방법에 관한 것으로, 특히 철근을 절단하는 커터를 가진 압쇄기를 굴삭기에 장착하여 이 굴삭기 유압에 의해 압쇄기가 폐지주를 파쇄하여 콘크리트와 철근을 분리하고 분리된 철근을 압쇄기의 커터가 일정한 크기로 절단한 다음 절단된 철근을 압쇄기가 파지한 상태로 이동시켜 야적 장소에 적층 함으로써, 폐지주 파쇄부터 절단된 철근을 야적장소에 적층 하기까지 일련의 철근 수거공정이 굴삭기와 압쇄기의 구동으로만 이루어지고, 더 나아가 굴삭기가 정지된 위치에서 일련의 철근 수거공정을 수행할 수 있어 동선(動線)이 없으므로 철근 수거공정을 단순화하여 좁은 장소에서 단시간에 많은 철근을 효율적으로 수거할 수 있고, 또한 불필요한 장비와 인원이 투입되는 것을 방지하여 수거비용을 현저히 줄일 수 있는 폐지주의 철근 수거방법에 관한 것이다.
The present invention is for reinforcing rods embedded in waste land when discarding poles embedded in reinforcement in concrete, such as poles installed in the ground or piles completely embedded in the ground for ground reinforcement In particular, the method of collecting, in particular, is equipped with a crusher having a cutter for cutting the rebar, the excavator hydraulic crusher scraps the waste paper to separate the concrete and the reinforcing bar, the cutter of the crusher to a certain size After cutting, the cut rebar is moved to the crusher and laminated to the yard, so that a series of rebar collection processes are performed only by the excavator and the crusher, from scrapping waste paper to laminating the cut rebar to the yard. In addition, there is no moving line since the excavator can carry out a series of rebar collection processes at the stationary position. Can be simplified to efficiently collect a lot of reinforcement in a short period of time in confined spaces rebar collection process also relates to the equipment and prevent unnecessary personnel committed to the abolition that can significantly reduce the cost of collection care Ferro collection methods.

일반적으로 기둥형상을 갖는 콘크리트식 전주는 강도 보강을 위해 콘크리트 내부에 철근이 매립된 상태로 제조되고, 설치장소에 세움 설치되어 전력선 또는 전화선을 고정하여 배선되도록 하고 있다. In general, a concrete pole having a columnar shape is manufactured in a state where reinforcing bars are embedded in concrete to reinforce strength, and is installed at an installation place to fix and wire a power line or a telephone line.

또한, 파일은 땅 속에 박아넣는 기둥을 말하는데 연약한 지반에 박음으로써 기초지반의 강도를 높이고 그 위에 실리는 무거운 하중에 견디게 하는 것으로, 역시 강도 보강을 위해 내부에 철근이 매립되어 있다.
In addition, the pile is a pillar that is embedded in the ground, which is embedded in the soft ground to increase the strength of the foundation ground and to withstand the heavy loads on it, which is also embedded with reinforcing bars for strength.

특히, 전주는 전기와 전화 사용량이 많은 도심지역은 물론이고 농어촌 지역 그리고 산업시설이 집중된 공장지역 등 사람이 활동하는 곳이라면 어디든지 약 50미터 간격으로 설치되므로 그 수량이 너무 많아 환경을 해치는 원인이 되고, 또한 토목공사시 장애물로 작용하여 제거에 따른 많은 비용 소요 및 공기 지연의 원인이 되었다. In particular, Jeonju is installed at intervals of about 50 meters wherever people are active, such as urban areas where electricity and telephone usage is high, as well as farming and fishing areas, and factory areas where industrial facilities are concentrated. Also, it acts as an obstacle in civil engineering, causing a lot of cost and air delay due to removal.

이러한 문제점 때문에 최근에는 전주를 사용하지 않고 전력선과 전화선을 지하에 매설하고 있고, 이에 따라 이미 설치된 많은 전주 중에는 상당한 수량이 사용되지 않으므로 이를 제거하여 폐기하고 있다.
Because of these problems, in recent years, electric power lines and telephone lines are buried underground without using electric poles. Accordingly, many of the electric poles already installed have been removed and disposed of since a considerable quantity is not used.

이렇게 폐기된 전주 또는 파일과 같은 폐지주는 콘크리트와 철근으로 구성되어 있으므로 콘크리트를 파쇄하여 내부에 매립된 철근을 분리하여 재활용하고, 파쇄된 콘크리트 덩어리는 기초면을 다지는 골재용으로 재활용하고 있다.
The discarded poles such as poles or piles discarded in this way are composed of concrete and reinforcing bars, so the concrete is crushed to separate the reinforcement embedded therein, and the crushed concrete lumps are recycled for the aggregates for the foundation.

폐지주를 분쇄하는 종래의 전신주 분쇄기는 특허등록 제0177538호에 개시되어 있다. Conventional telegraph pole crusher for crushing waste paper is disclosed in Patent Registration No. 0177538.

상기 전신주 분쇄기는 다단식분쇄기(100)를 구성함에 있어서, 회전 가능하게 설치되어 전신주를 1차 분쇄하는 이동 로울러(30) 및 고정로울러(40)와, 상기 이동로울러(30)를 슬라이딩 홈에서 상하 슬라이드 이송시키는 유압실린더(13)(23)와 상기 유압실린더(13)(23)의 피스톤 로드를 구동하는 유압펌프(60)로 구성되는 제1 분쇄부와, 상기 제1 파쇄부의 후방에 위치하고 1차 분쇄되어 이송되는 전신주를 2차 분쇄하며 회전가능하게 설치되는 이동로울러 및 고정로울러와, 상기 이동로울러를 슬라이딩 홈에서 상하 슬라이드 이송시키는 유압 실린더와, 상기 유압실린더의 피스톤 로드를 구동하는 유압펌프로 구성되는 제2 분쇄부와, 상기 제2 파쇄부의 후방에 위치하고, 1차, 2차 분쇄되어 이송되는 전신주를 3차 분쇄하여 회전 가능하게 설치되는 이동로울러 및 고정로울러와 상기 이동로울러를 슬라이딩 홈에서 상하 슬라이드 이송시키는 유압실린더와, 상기 유압실린더의 피스톤로드를 구동하는 유압펌프로 구성되는 제3 분쇄부와, 상기 제1, 제2, 제3 분쇄부와 유압 실린더를 조작 제어하는 유압 제어밸브(70)로 이루어진다.
The telephone pole grinder in the configuration of the multi-stage grinding machine 100, rotatably installed to move the primary roller 30 and the fixed roller 40 to grind the main pole, and the movable roller 30 in the sliding groove up and down slide A first pulverizing unit comprising a hydraulic cylinder (13) 23 for conveying and a hydraulic pump (60) for driving a piston rod of the hydraulic cylinder (13) (23); Composed of a mobile roller and a fixed roller rotatably installed by crushing the telegraph pole to be crushed and transported secondly, a hydraulic cylinder for vertically sliding the moving roller in the sliding groove, and a hydraulic pump for driving the piston rod of the hydraulic cylinder The second grinding unit is located behind the second crushing unit, and the mobile roller and fixed to be rotatably installed by crushing three times the primary pole and the second pole crushed conveyed A third cylinder comprising a hydraulic cylinder for vertically sliding the roller and the moving roller from a sliding groove, a hydraulic pump for driving a piston rod of the hydraulic cylinder, and the first, second, and third grinding units and hydraulic pressure. Hydraulic control valve 70 for controlling the operation of the cylinder.

그런데, 이와 같이 구성된 종래 전신주 분쇄기는 전신주를 수용할 수 있도록 대형 시설물을 갖추어야 하므로 이에 따른 넓은 장소가 필요하고, 전신주를 직접 분쇄하는 제1,2,3 분쇄부의 구성이 고정로울러, 이동로울러, 유압실린더, 및 유압펌프로 구성되므로 구성이 복잡하여 제조 및 설치에 많은 시간과 비용이 소요되는 문제가 있었다.However, the conventional telephone pole grinder configured as described above needs to have a large facility to accommodate the telephone pole, so a large space is required, and the configuration of the first, second, and third grinding units for directly grinding the telephone pole is fixed, moving rollers, and hydraulic pressure. Since it is composed of a cylinder and a hydraulic pump, there is a problem in that a complicated configuration takes a lot of time and money to manufacture and install.

또한, 상기 복잡한 장치에 의해 분쇄된 콘크리트 덩어리는 자중에 의해 바닥에 누적되고, 상부에 분리되어 남은 철근이 로울러 사이를 통과할 때 이들 로울러에 감겨 꼬이는 심각한 문제를 발생시켜 정작 수거대상이 되는 철근이 수거과정에서 분쇄기의 고장 주원인이 되었다. In addition, the concrete mass crushed by the complex device accumulates on the floor by its own weight, and when the remaining rebar is separated from the upper portion and passes through the rollers, it causes a serious problem of being wound around these rollers, causing the rebar to be collected. The main cause of the breakdown of the grinder during the collection process.

그리고, 별도로 수거된 철근은 보관 및 운반을 편리하게 하고, 재활용을 위한 규격에 맞게 반드시 절단해야 하는데, 이를 위해 별도로 철근 절단시설을 갖추어야 하는 문제가 있었다.
In addition, the separately collected reinforcing bar is easy to store and transport, and must be cut to meet the standards for recycling, there was a problem that must be equipped with a separate reinforcing bar for this purpose.

한편, 폐지주의 철근을 수거하는 다른 실시예의 종래 방법은 도 1과 같이 굴삭기(1)에 압쇄기(2)를 장착하여 이 압쇄기(2)로 콘크리트 폐지주(A)를 파쇄하여 철근(B)을 분리 수거하는 방법이 있었으나, 압쇄기(2)에 의해 파쇄된 콘크리트에서 분리된 철근(B)들을 모아 일정한 부피로 적층되면 이를 지게차(C)를 이용하여 절단장소로 운반하기 위해 도 2와 같이 작업자가 투입되어 적층된 철근(B)을 제1와이어(W)로 임시로 묶은 다음 지게차(C)를 이용하여 절단장소로 운반하고, 운반된 철근(B)이 절단된 후 분리되지 않도록 도 3과 같이 철근(B)의 절단위치 사이를 제2와이어(W-1)를 이용하여 견고하게 묶은 후 산소용접기(C)를 이용하여 와이어(W) 사이를 절단한다. 이렇게 절단된 단위철근은 묶음된 와이어(W)에 의해 분리되지 않게 된다. 이후 작업자는 지게차(C)를 이용하여 도 4와 같이 상기 묶음된 단위철근들을 야적장소로 이동시켜 적층시켰다.
On the other hand, the conventional method of collecting the reinforcing bar reinforcement is equipped with a crusher (2) to the excavator 1 as shown in Figure 1 to crush the concrete waste column (A) with the crusher (2) to the reinforcing bar (B) There was a separate collection method, but when the reinforcing bars (B) separated from the concrete crushed by the crusher (2) is stacked in a predetermined volume and transported to a cutting place using a forklift (C) as shown in Figure 2 The reinforcing bars (B) are added and stacked temporarily by the first wire (W) and then transported to the cutting place using a forklift (C), so that the transported bar (B) is not cut and separated as shown in Figure 3 After tightly tying between the cutting positions of the reinforcing bars (B) using the second wire (W-1), the wires (W) are cut using the oxygen welding machine (C). The unit reinforcement thus cut is not separated by the bundled wire (W). Thereafter, the worker moved to the yard by stacking the bundled unit reinforcement as shown in FIG. 4 using a forklift (C).

그런데, 이러한 종래 폐지주의 철근 수거방법은 작업자가 분리된 철근(B)을 1차로 묶은 다음 이를 지게차(C)를 이용하여 절단장소로 운반하고, 또한 운반된 철근(B)의 길이방향 다수 곳을 와이어(W)로 2차로 묶은 후 산소용접기(C)로 와이어(W) 사이를 절단해야 하며, 이렇게 절단된 단위철근을 지게차(C)로 운반하여 적층해야 하므로, 철근 수거작업이 번거로워 철근 수거 효율이 떨어지고 철근 수거에 필요한 넓은 장소가 요구되는 종래의 문제점을 해결하지 못하고 있다. By the way, the rebar collection method of the conventional waste paper, the worker bundles the separated reinforcing bar (B) first and then transported to the cutting place using a forklift (C), and also transported a plurality of places in the longitudinal direction of the reinforcement (B) After tying twice with wires (W), it is necessary to cut the wires (W) with an oxygen welding machine (C). Since the cut unit reinforcements are transported and stacked by a forklift truck (C), the rebar collection work is cumbersome and the rebar collection efficiency This has not solved the conventional problem of falling and requiring a large place for rebar collection.

이러한 폐지주 철근 수거방법은 지게차(C) 운전 및 철근(B) 묶음을 위해 많은 작업자들이 투입되어야 하므로 인건비가 많이 소요되었다. 또한 작업자가 분리된 철근(B)을 임시로 묶을 때 안전을 위해 굴삭기(1)에 의한 폐지주(A) 파쇄작업이 정지되어야 하므로 불필요한 시간이 많이 소요됨은 물론 운반된 철근(B)을 산소용접기(C)로 하나씩 절단해야 하므로 이 또한 많은 시간이 소요되었다.This waste bar rebar collection method was a lot of labor costs because a lot of workers must be input for forklift (C) operation and reinforcement (B) bundle. In addition, when the worker temporarily binds the separated reinforcing bars (B) for safety, the waste paper (A) crushing work by the excavator (1) should be stopped, so much unnecessary time is taken, and the transported bars (B) are oxygen welders. This also took a lot of time because it had to be cut one by one with (C).

더 큰 문제점은, 단위철근을 만들기 위해 철근(B) 길이방향 다수 곳을 산소용접기(C)로 절단할 때 많은 철근이 녹아 제거되므로 손실량이 많아 경제적 손실이 크고, 또한 철근 절단을 위한 가스 소모량이 증가하는 문제가 있었다.
The bigger problem is that when cutting a large number of reinforcing bars (B) longitudinally with oxygen welding machine (C) to make unit reinforcing bars, many steel bars are melted and removed, resulting in large economic losses and gas consumption for cutting steel. There was a growing problem.

이에, 본 발명은 상술한 바와 같은 종래 폐지주 분쇄기의 제반 문제점을 해결하기 위한 것으로, 그 목적은 철근을 절단하는 커터를 가진 압쇄기를 굴삭기에 장착하여 이 굴삭기 유압에 의해 압쇄기가 폐지주를 파쇄하여 콘크리트와 철근을 분리하고 분리된 철근을 압쇄기의 커터가 일정한 크기로 절단한 다음 절단된 철근을 압쇄기가 파지한 상태로 이동시켜 야적 장소에 적층 함으로써, 폐지주 파쇄부터 절단된 철근을 야적장소에 적층 하기까지 일련의 철근 수거공정이 굴삭기와 압쇄기의 구동으로만 이루어지도록 하는 폐지주의 철근 수거방법을 제공함에 있다.
Accordingly, the present invention is to solve the various problems of the conventional waste paper mill crusher as described above, the object is to mount a crusher having a cutter for cutting the rebar in the excavator to crush the waste paper by the excavator hydraulic pressure By separating the concrete and the reinforcing bar, and cutting the separated bar to a certain size by the cutter of the crusher, and moving the cut bar while the crusher is held and laminating it to the yard, the rebar cut from waste paper crushing is laminated to the yard. Until now, a series of reinforcing bar collection processes are provided so that a series of rebar collection processes are performed only by driving an excavator and a crusher.

본 발명의 다른 목적은 굴삭기가 정지된 위치에서 일련의 철근 수거공정을 수행할 수 있어 동선(動線)이 없으므로 철근 수거공정을 단순화하여 좁은 장소에서 단시간에 많은 철근을 효율적으로 수거할 수 있는 폐지주의 철근 수거방법을 제공함에 있다.
Another object of the present invention can be carried out a series of reinforcing bar collection process in the position where the excavator is stopped, there is no copper wire (moving line) to simplify the rebar collection process waste paper can be efficiently collected in a short place in a short time Attention is provided in the method of collecting rebar.

본 발명의 또 다른 목적은 불필요한 장비와 인원이 투입되는 것을 방지하여 수거비용을 현저히 줄일 수 있는 폐지주의 철근 수거방법을 제공함에 있다.
Still another object of the present invention is to provide a method for collecting reinforcing rods that can significantly reduce collection costs by preventing unnecessary equipment and personnel from being introduced.

상기 목적을 달성하기 위한 본 발명에 따른 폐지주의 철근 수거방법은 입고된 폐지주를 굴삭기에 장착된 압쇄기로 파쇄하여 파쇄된 콘크리트 내부에 매립된 철근을 분리시키는 단계;Reinforcing bar collection method according to the present invention for achieving the above object comprises the steps of separating the reinforcement embedded in the crushed concrete by crushing the waste paper stock received in the crusher mounted on the excavator;

상기 분리된 철근을 상기 압쇄기에 장착된 커터를 이용하여 일정한 크기로 절단하는 단계;Cutting the separated reinforcing bars into a predetermined size using a cutter mounted on the crusher;

상기 절단된 철근을 상기 압쇄기로 운반하여 지정된 장소에 적층시키는 단계;를 포함한다.
And transporting the cut reinforcing bars to the crusher and stacking them in a designated place.

본 발명에 따른 철근을 분리시키는 단계는 상기 압쇄기를 이용하여 폐지주의 길이방향을 일부분을 파쇄한 후 상기 파쇄부를 절곡시켜 1개의 폐지주를 2겹 이상으로 겹치게 한 상태에서 파쇄한다.
Separating the reinforcing bar according to the present invention by crushing a portion in the longitudinal direction of the waste paper using the crusher and then crushing the crushing part to crush in the state of overlapping one waste paper in two or more layers.

본 발명에 따른 철근을 절단하는 단계는 수납공간을 갖는 절단데스크를 절단 장소에 매립하여 철근을 절단할 때 압쇄기가 분리된 철근을 상기 절단데스크의 수납공간 상부에 가로질러 거치한 상태에서 상기 압쇄기가 수납공간 내부로 삽입되어 커터의 절단 영역에 상기 거치된 철근이 삽입되면 상기 커터가 구동하여 철근을 절단한다.
Cutting the reinforcing bar according to the present invention is embedded in the cutting desk having a storage space in the cutting place when cutting the rebar, the crusher in the state that mounted the rebar separated across the upper storage space of the cutting desk When the mounted rebar is inserted into the cutting area of the cutter, the cutter is driven to cut the rebar.

본 발명에 따른 압쇄기는 굴삭기에 장착되어 유압으로 구동된다.
The crusher according to the invention is mounted on an excavator and driven hydraulically.

본 발명은 폐지주를 파쇄하여 철근을 분리하는 단계, 분리된 철근을 절단하는 단계, 및 절단된 철근을 적층하는 단계는 굴삭기가 한 장소에 위치된 상태에서 유압에 의한 압쇄기의 구동에 의해 진행된다.
In the present invention, the step of crushing the waste paper to separate the reinforcing bar, cutting the separated reinforcing bar, and laminating the cut reinforcing bar is carried out by the operation of the crusher by hydraulic pressure in the state where the excavator is located in one place .

전주 또는 파일과 같은 폐지주에 매립된 철근 수거방법은 폐지주 파쇄부터 절단된 철근을 야적장소에 적층 하기까지 일련의 철근 수거공정이 굴삭기와 압쇄기의 구동으로만 이루어지므로 폐지주를 파쇄하는 공장과 같은 별도의 시설물을 시공하지 않아도 되므로 시설물 시공에 따른 고비용을 줄일 수 있고, 또한 넓은 장소가 필요치 않으므로 좁은 장소에서도 단시간에 많은 철근을 효율적으로 수거할 수 있는 장점을 가진다.Rebar collection methods embedded in waste stocks such as electric poles or piles have a series of reinforcing bar collection processes from crushing waste stocks to stacking reinforcing bars in yards. Since it is not necessary to construct a separate facility, it is possible to reduce the high cost according to the construction of the facility, and also, since a large place is not required, it has the advantage of efficiently collecting a large number of rebars in a short time even in a narrow place.

폐지주 파쇄에 따른 철근 수거공정이 굴삭기와 압쇄기에 의해 수행되므로 불필요한 장비가 필요 없고, 특히 종래와 같이 파쇄된 콘크리트가 누적되어도 이를 별도의 수단을 이용하여 제거하지 않아도 되고, 또한 수거된 철근을 처리하기 위해 별도의 작업인원이 투입되지 않아도 되므로 수거에 따른 시간과 비용을 현저히 줄일 수 있다.
Since the rebar collection process according to waste paper shredding is performed by an excavator and a crusher, unnecessary equipment is not necessary. In particular, even if crushed concrete is accumulated as in the prior art, it is not necessary to remove it by a separate means, and also the collected rebar is processed. This eliminates the need for a separate workforce to significantly reduce the time and costs associated with collection.

도 1은 종래 발명에 따른 압쇄기가 폐지주를 파쇄하는 공정을 보인 도면
도 2는 종래 발명에 따른 폐지주 파쇄에 의해 분리된 철근을 묶은 후 지게차로 운반하는 과정을 보인 도면
도 3은 종래 발명에 의해 분리된 철근 길이방향 복수의 곳을 와이어로 묶은 후 와이어 사이를 산소용접기로 절단한 공정을 보인 도면
도 4는 종래 발명에 따라 절단된 단위철근을 지게차로 운반하여 적층한 공정을 보인 도면
도 5는 본 발명에 따른 압쇄기가 폐지주를 파쇄하는 공정을 보인 도면
도 6은 본 발명에 따른 폐지주를 파쇄하여 철근을 분리 수거하는 일련의 공정을 보인 도면
도 7은 본 발명에 따른 철근 수거공정을 보인 순서도
도 8은 본 발명에 의해 철근을 수거하는 실제 현장 사진
도 9는 본 발명에 따른 압쇄기가 입고된 폐지주를 파쇄하기 위해 파지하여 옮기는 사진
도 10은 본 발명에 따른 압쇄기가 폐지주를 파쇄하는 사진
도 11은 본 발명에 따른 압쇄기가 분리된 철근을 절단하기 위해 절단데스크에 거치한 상태의 사진
도 12는 본 발명에 따른 압쇄기가 절단데스크에 거치된 철근을 절단하고 있는 사진
도 13은 본 발명에 따른 압쇄기가 철근을 절단한 사진
도 14는 본 발명에 따른 압쇄기가 절단된 철근을 적층하기 위해 파지하고 있는 사진
도 15는 본 발명에 다른 압쇄기가 절단된 철근을 파지 운반하는 사진
1 is a view showing a process of crushing waste paper holding a crusher according to the conventional invention
2 is a view showing a process of carrying a forklift after tying up the reinforcing bar separated by the waste paper breaking according to the prior invention
3 is a view showing a process of cutting a plurality of rebar longitudinal direction separated by a wire in the oxygen welding between the wires according to the conventional invention.
4 is a view showing a process of stacking by transporting the unit reinforcement cut by a forklift according to the conventional invention
5 is a view showing a process of crushing the waste paper holding the crusher according to the present invention
6 is a view showing a series of processes for separating and collecting the reinforcing bar crushing waste paper according to the present invention
7 is a flow chart showing a rebar collection process according to the present invention
8 is a real site picture for collecting the reinforcing bar according to the present invention
Figure 9 is a photograph to be carried by holding to crush the waste paper stock wearing crusher according to the present invention
10 is a photograph of a crusher waste paper crushing waste paper according to the present invention
11 is a photograph of a state in which a crusher is mounted on a cutting desk to cut a separated rebar according to the present invention.
12 is a photograph of a crusher cutting the rebar mounted on the cutting desk according to the present invention
Figure 13 is a photograph of the crusher cutting the rebar according to the present invention
14 is a photograph held by the crusher according to the present invention for stacking the cut steel
15 is a photograph for holding and carrying the rebar cut crusher according to the present invention

이하, 첨부된 도면을 참조하여 본 발명에 따른 폐지주의 철근 수거방법을 상세히 설명한다.
Hereinafter, with reference to the accompanying drawings will be described in detail the reinforcing bar collection method according to the present invention.

본 발명에 사용된 폐지주는 콘크리트로 구성된 기둥 내부에 강도 보강을 위해 철근이 매립된 형태, 예컨대, 폐전주 또는 폐파일 등을 포함한다.Waste paper used in the present invention includes a form in which reinforcing bars are embedded in the pillars made of concrete for strength reinforcement, for example, waste poles or piles.

본 발명은 굴삭기(10)에 압쇄기(20)를 장착하여 이 굴삭기(10)의 유압으로 압쇄기(20)를 구동하고, 또한 압쇄기(20)에 커터(23)를 일체로 장착함으로써 본 발명을 구현할 수 있다.The present invention implements the present invention by mounting the crusher 20 to the excavator 10 to drive the crusher 20 by hydraulic pressure of the excavator 10, and also to integrally mount the cutter 23 to the crusher 20. Can be.

즉, 굴삭기(10) 단부에 장착된 압쇄기(20)가 폐전주 또는 폐파일과 같은 폐지주(A)를 형성하는 콘크리트를 파쇄하여 그 내부에 매립된 철근(B)을 분리한 후 압쇄기(20)가의 커터(23)가 분리된 철근(B)을 절단하고, 절단된 철근(B)을 압쇄기(20)가 파지 운반하여 야적장소에 적층시키게 된다.That is, the crusher 20 mounted at the end of the excavator 10 breaks up the concrete forming the waste column A such as a waste pole or a pile and separates the reinforcing bars B embedded therein, and then the crusher 20. The cutter 23 cuts the separated bar B, and the crusher 20 grips and transports the cut bar B to be stacked on the yard.

더 구체적으로, 상기 첨부된 도면에서와 같이 본 발명에 따른 폐지주의 철근 수거방법은 입고된 폐지주(A)를 굴삭기(10)에 장착된 압쇄기(20)로 파쇄하여 파쇄된 콘크리트 내부에 매립된 철근(B)을 분리시키는 단계(S1);More specifically, the reinforcing bar collection method according to the present invention as shown in the accompanying drawings is embedded in the crushed concrete by crushing the received waste paper (A) with a crusher 20 mounted on the excavator 10 Separating the reinforcing bars B (S1);

상기 분리된 철근(B)을 상기 압쇄기(20)에 장착된 커터(23)를 이용하여 일정한 크기로 절단하는 단계(S2);Cutting the separated reinforcing bars (B) into a predetermined size using a cutter (23) mounted to the crusher (20) (S2);

상기 절단된 철근(B)을 상기 압쇄기(20)로 운반하여 지정된 장소에 적층시키는 단계(S3);를 포함한다.
And transporting the cut reinforcing bars B to the crusher 20 to stack them in a designated place (S3).

상기 철근을 분리시키는 단계(S1)는 굴삭기(10) 끝단에 설치된 압쇄기(20)를 이용한다. 즉, 상기 압쇄기(20)는 굴삭기(10)의 유압장치와 연결된 구동부재(22)가 힌지핀(P)을 중심으로 왕복 이동하여 고정부재(21)에 밀착과 벌어짐을 반복 수행하여 이들 사이에 수용된 폐지주(A)를 가압하여 콘크리트를 파쇄하게 된다.Separating the reinforcing bar (S1) uses a crusher 20 installed at the end of the excavator (10). That is, the crusher 20 is a drive member 22 connected to the hydraulic device of the excavator 10 is reciprocated around the hinge pin (P) to perform a close contact with the fixing member 21 and the gap between them repeatedly between them Pressing the received waste paper (A) is to crush the concrete.

이와 같이 압쇄기(20)의 고정부재(21)와 구동부재(22) 사이에 폐지주(A)를 수용한 상태에서 구동부재(22)를 구동시키면서 이들 고정부재(21)와 구동부재(22)를 폐지주(A)의 길이방향을 따라 천천히 이동시키면 폐지주(A)의 콘크리트는 모두 파쇄된다. 이렇게 파쇄된 콘크리트의 분말이나 덩어리들은 자중에 의해 바닥에 떨어지게 되므로 파쇄된 콘크리트에 매립된 철근(B)은 노출되어 콘크리트와 분리된다.As such, the fixing member 21 and the driving member 22 are driven while the driving member 22 is driven between the holding member 21 and the driving member 22 of the crusher 20. When slowly moving along the longitudinal direction of the waste paper (A), all the concrete of the waste paper (A) is crushed. Since the powder or lumps of the crushed concrete fall on the floor by its own weight, the reinforcing bar B embedded in the crushed concrete is exposed and separated from the concrete.

상기와 같이 압쇄기(20)에 의해 폐지주(A)가 파쇄되어 내부에 매립된 철근(B)이 분리되므로, 철근(B)을 분리시키는 단계에서 상기 압쇄기(20)를 이용하여 폐지주(A)의 중앙 부분을 먼저 파쇄한 후 상기 파쇄부를 절곡시켜 1개의 폐지주(A)를 2겹으로 겹치게 한 상태로 폐지주(A)를 파쇄하는 것이 폐지주(A)의 파쇄 속도를 높여 철근(B)을 효율적으로 분리시키게 된다.As the waste paper (A) is crushed by the crusher 20 as described above, the embedded steel bar (B) is separated, so that the waste paper (A) using the crusher 20 in the step of separating the steel bar (B) After crushing the central portion of the first and then crushing the crushed portion of the waste paper (A) in a state of overlapping one waste paper (A) in two layers to increase the crushing speed of the waste paper (A) to increase the speed of reinforcement ( B) is effectively separated.

더 효율적인 철근 분리방법은, 폐지주(A)의 길이방향 복수 곳을 먼저 파쇄한 후 상기 파쇄부를 절곡시켜 1개의 폐지주(A)를 2겹 이상으로 겹치게 하여 파쇄하면 파쇄 효율을 높일 수 있다.In a more efficient method of separating reinforcing bars, crushing a plurality of places in the longitudinal direction of the waste paper column A first and then bending the crushing unit to crush one waste paper column A in two or more layers may increase the crushing efficiency.

상기와 같이 압쇄기(20)에 의해 폐지주(A)가 파쇄되어 철근(B)이 분리되면, 상기 분리된 철근(B)을 절단하는 단계(S2)가 진행된다. When the waste paper (A) is crushed by the crusher 20 as described above and the reinforcing bar (B) is separated, the step (S2) of cutting the separated reinforcing bar (B) is performed.

상기 철근(B)의 절단단계(S2)는 압쇄기(20)를 이용한다. 즉 상기 압쇄기(20)는 고정부재(21)와 구동부재(22) 내측에 커터(23)가 장착되어 있는데, 이 커터(23)를 이용하여 분리된 철근(B)을 절단한다. Cutting step (S2) of the reinforcing bar (B) uses a crusher (20). That is, the crusher 20 is equipped with a cutter 23 inside the fixing member 21 and the driving member 22, and the separated bar B is cut using the cutter 23.

더 구체적으로, 분리된 철근(B)을 압쇄기(20)가 파지하여 내측에 형성된 커터(23)에 위치되게 한 상태에서 굴삭기(10)의 유압이 작용하면 구동부재(22)가 고정부재(21)에 밀착되면서 커터(23)에 수용된 철근(B)이 절단된다.More specifically, when the hydraulic pressure of the excavator 10 acts while the separated bar B is gripped by the crusher 20 and positioned at the cutter 23 formed therein, the driving member 22 is fixed to the fixed member 21. ), The reinforcing bar (B) accommodated in the cutter 23 is cut.

상기 철근(B)을 절단하는 단계의 일 실시예는 도 6에 도시된 바와 같이 절단데스크(30)를 이용한다. 수납공간(31)을 갖는 상기 절단데스크(30)를 절단 장소에 매립하여 압쇄기(20)가 분리된 철근(B)을 상기 절단데스크(30)의 수납공간(31) 상부에 가로질러 거치한 상태에서 상기 압쇄기(20)가 수납공간(31) 내부로 삽입되어 커터(23)의 절단 영역에 상기 거치된 철근(B)이 삽입되면 구동부재(22)가 고정부재(21)에 밀착될 때 상기 커터(23)가 구동하여 철근(B)을 절단하게 된다.
One embodiment of the step of cutting the reinforcing bar (B) uses a cutting desk 30 as shown in FIG. The cutting desk 30 having the storage space 31 is embedded in the cutting place so that the reinforcing bar B from which the crusher 20 is separated is mounted across the upper portion of the storage space 31 of the cutting desk 30. When the crusher 20 is inserted into the storage space 31 and the mounted reinforcing bar B is inserted into the cutting region of the cutter 23, the driving member 22 is in close contact with the fixing member 21. The cutter 23 is driven to cut the rebar B.

상기와 같이 절단데스크(30) 내부에 삽입하여 커터(23)로 철근(B)을 절단한 압쇄기(20)는 굴삭기(10)의 유압에 의해 다시 절단데스크(30) 외부로 빠져나와 일부만 절단된 철근(B)을 다시 파지하여 절단데스크(30) 상부에 가로질러 거치한 상태에서 절단데스크(30) 내부에 삽입되어 동일한 방법으로 커터(23)가 철근(B)을 절단하게 되고, 이러한 방식으로 길게 연장된 철근(B)을 필요한 길이만큼 반복적으로 절단하게 된다.The crusher 20 inserted into the cutting desk 30 as described above and cutting the reinforcing bars B with the cutter 23 exits the cutting desk 30 again by the hydraulic pressure of the excavator 10 and is partially cut. The rebar B is gripped again and inserted into the cutting desk 30 while being mounted across the top of the cutting desk 30 so that the cutter 23 cuts the steel bar B in the same manner. The elongated rebar B is repeatedly cut to the required length.

상기와 같이 압쇄기(20)의 커터(23)에 의해 절단된 철근(B)은 절단데스크(30) 일측에 임시로 누적되는데, 이는 상기 압쇄기(20)에 의해 야적장소로 이동하게 된다.
As described above, the reinforcing bars B cut by the cutter 23 of the crusher 20 are temporarily accumulated on one side of the cutting desk 30, which is moved to the yard by the crusher 20.

다음은 상기 절단된 철근(B)을 압쇄기(20)로 운반하여 지정된 장소에 적층시키는 단계(S3)가 진행된다.Next, a step (S3) of transporting the cut bar B to the crusher 20 and stacking it at a designated place is performed.

압쇄기(20)에 의해 반복적으로 절단된 철근(B)들은 도 14와 같이 절단데스크(30) 일측에 누적된다. 압쇄기(20)는 철근(B) 절단작업이 완료된 후 즉시 상기 누적된 철근(B)을 파지한 상태에서 이동하여 절단데스크(30) 근방에 위치한 야적장소에 하역하여 절단된 철근(B)들을 쌓아 보관하게 된다.
Rebars B repeatedly cut by the crusher 20 are accumulated on one side of the cutting desk 30 as shown in FIG. 14. The crusher 20 moves in the state of holding the accumulated reinforcing bars B immediately after completion of cutting of the reinforcing bar B, and unloads the cut bar 30 by stacking the reinforcing bar B near the cutting desk 30. Will be kept.

이상과 같이 폐지주(A)를 파쇄하고 절단하여 야적 장소에 적층하는 압쇄기(20)는 굴삭기(10)에 장착되어 굴삭기(10)의 유압으로 구동된다.
As described above, the crusher 20 that crushes and cuts the waste paper column A and stacks the waste paper A at the yard is mounted on the excavator 10 and driven hydraulically by the excavator 10.

또한, 본 발명은 폐지주를 파쇄하여 철근을 분리하는 단계(S1), 분리된 철근을 절단하는 단계(S2), 및 절단된 철근을 적층하는 단계(S3)는 굴삭기(10)가 한 장소에 위치된 상태에서 유압에 의한 압쇄기(20)의 구동에 의해 진행되는 것이 바람직하다. 이러한 이유는 압쇄기(20)가 폐지주(A)를 파쇄하고 절단된 철근(B)을 야적장소에 적층시키는 일련의 단계(S1)(S2)(S3)에서 굴삭기(10)가 위치 이동하게 되면 동선(動線)이 발생하게 되는데, 동선의 진행되는 시간만큼 작업시간이 더 소요되어 철근(B) 분리 효율이 저하된다.
In addition, the present invention is a step (S1) to separate the rebar by crushing the waste paper (S1), the step of cutting the separated reinforcement (S2), and the step of laminating the cut reinforcement (S3) in the excavator 10 in one place It is preferable to proceed by the drive of the crusher 20 by hydraulic pressure in the positioned state. This is because when the excavator 10 is moved in a series of steps S1, S2, and S3 in which the crusher 20 crushes the waste paper A and stacks the cut bar B in the yard. The copper wire is generated, and the working time is further increased as the time of the copper wire is advanced, thereby reducing the reinforcing bar (B) separation efficiency.

이러한 본 발명은 도 8 내지 도 15의 사진에서 구체적으로 파악할 수 있는데, 굴삭기(10)가 현재 위치에서 움직이지 않고 정지된 상태에서 폐지주(A) 더 자세하게는 폐전주를 파쇄하여 그 내부에 매립된 철근(B)을 분리하고 절단한 후 야적장소에 적층하는 공정을 보이고 있고, 이러한 본 발명은 종래 발명과 현저히 대비되는 유익한 발명이다.
The present invention can be understood in detail in the picture of Figures 8 to 15, the excavator (10) in a state in which the stationary state does not move in the stopped state (A) in more detail to crush the waste pole embedded in the interior After separating and cutting the reinforcing bar (B) is shown a process of laminating in the yard, this invention is an advantageous invention that is significantly contrasted with the conventional invention.

따라서, 본 발명은 굴삭기(10) 유압에 의해 구동되는 압쇄기(20)의 작업반경 내부에 입고된 폐지주(A), 절단데스크(30), 및 야적장소가 위치시키면, 굴삭기(10)는 위치를 이동하지 않고 정지된 상태에서 상기 압쇄기(20)를 구동시켜 철근(B)을 분리 및 절단하고, 절단된 철근(B)을 야적장소에 효율적으로 적층시킬 수 있게 된다.
Therefore, in the present invention, when the waste paper holder A, the cutting desk 30, and the yard are placed in the working radius of the crusher 20 driven by the excavator 10, the excavator 10 is positioned. By driving the crusher 20 in the stopped state without moving the bar (B) to separate and cut, it is possible to efficiently cut the cut bar (B) in the yard.

10 : 굴삭기 20 : 압쇄기
21 : 고정부재 22 : 구동부재
23 : 커터 S1 : 철근분리단계
S2 : 철근절단단계 S3 : 철근적층단계
10: excavator 20: crusher
21: fixing member 22: driving member
23: cutter S1: rebar separation step
S2: Rebar cutting step S3: Rebar stacking step

Claims (5)

입고된 폐지주(A)를 굴삭기(10)에 창착된 압쇄기(20)로 파쇄하여 파쇄된 콘크리트 내부에 매립된 철근(B)을 분리시키는 단계(S1);
상기 분리된 철근(B)을 상기 압쇄기(20)에 장착된 커터(23)를 이용하여 일정한 크기로 절단하는 단계(S2);
상기 절단된 철근(B)을 상기 압쇄기(20)로 운반하여 지정된 장소에 적층시키는 단계(S3);를 포함하는 것을 특징으로 하는 폐지주의 철근 수거방법.
Crushing the received waste paper (A) with the crusher 20 mounted on the excavator 10 to separate the reinforcing bar (B) embedded in the crushed concrete (S1);
Cutting the separated reinforcing bars (B) into a predetermined size using a cutter (23) mounted to the crusher (20) (S2);
Transporting the cut reinforcing bars (B) to the crusher (20) and stacking them at a designated place (S3).
청구항 1에 있어서, 상기 철근을 분리시키는 단계(S1)는 상기 압쇄기(20)를 이용하여 폐지주(A)의 길이방향 복수 곳을 먼저 파쇄한 후 상기 파쇄부를 절곡시켜 1개의 폐지주(A)를 2겹이상 겹치게 한 상태에서 파쇄하는 것을 특징으로 하는 폐지주의 철근 수거방법.
The method of claim 1, wherein the step of separating the reinforcing bars (S1) by using the crusher 20 first crushing a plurality of places in the longitudinal direction of the waste paper (A) and then bending the crushing portion to one waste paper (A) Reinforcing bar collection method characterized in that the crushing in a state in which two or more overlapping.
청구항 1에 있어서, 상기 철근을 절단하는 단계(S2)는 수납공간(31)을 갖는 절단데스크(30)를 절단 장소에 매립하여 철근(B)을 절단할 때 압쇄기(20)가 분리된 철근(B)을 상기 절단데스크(30)의 수납공간(31) 상부에 가로질러 거치한 상태에서 상기 압쇄기(20)가 수납공간(31) 내부로 삽입되어 커터(23)의 절단 영역에 상기 거치된 철근(B)이 삽입되면 상기 커터(23)가 구동하여 철근(B)을 절단하는 것을 특징으로 하는 폐지주의 철근 수거방법.
The method of claim 1, wherein the cutting of the reinforcing bar (S2) is embedded in the cutting desk 30 having a storage space 31 in the cutting place to cut the reinforcing bar (B) when the reinforcing bar 20 is separated ( B) the crusher 20 is inserted into the storage space 31 in a state in which the cutting desk 30 is mounted across the storage space 31 in the upper portion of the cutting desk 30 so as to be mounted in the cutting area of the cutter 23. When (B) is inserted, the cutter 23 is driven to cut the reinforcing bar (B) characterized in that the reinforcing bar collection method.
청구항 1에 있어서, 상기 압쇄기(20)는 굴삭기(10)에 장착되어 유압으로 구동되는 것을 특징으로 하는 폐지주의 철근 수거방법.
The method of claim 1, wherein the crusher (20) is mounted on an excavator (10), characterized in that the reinforcing bar collection method characterized in that it is driven hydraulically.
청구항 1에 있어, 폐지주를 파쇄하여 철근을 분리하는 단계(S1), 분리된 철근을 절단하는 단계(S2), 및 절단된 철근을 적층하는 단계(S3)는 굴삭기(10)가 한 장소에 위치된 상태에서 유압에 의한 압쇄기(20)의 구동에 의해 진행되는 것을 특징으로 하는 폐지주의 철근 수거방법.
The method of claim 1, wherein the step of crushing the waste paper (S1), the step of cutting the separated reinforcement (S2), and the step of laminating the cut reinforcement (S3) is the excavator 10 in one place Reinforcing bar collection method characterized in that the proceeding by the drive of the crusher 20 by the hydraulic pressure in the positioned state.
KR1020110116395A 2011-11-09 2011-11-09 Method collecting iron bar in disused ferro-concrete pole KR20130051187A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110116395A KR20130051187A (en) 2011-11-09 2011-11-09 Method collecting iron bar in disused ferro-concrete pole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110116395A KR20130051187A (en) 2011-11-09 2011-11-09 Method collecting iron bar in disused ferro-concrete pole

Publications (1)

Publication Number Publication Date
KR20130051187A true KR20130051187A (en) 2013-05-20

Family

ID=48661259

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110116395A KR20130051187A (en) 2011-11-09 2011-11-09 Method collecting iron bar in disused ferro-concrete pole

Country Status (1)

Country Link
KR (1) KR20130051187A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20220072416A (en) 2020-11-25 2022-06-02 조수호 Auto crush-separation method and auto crush-separation equipment for waste-reinforced concrete

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20220072416A (en) 2020-11-25 2022-06-02 조수호 Auto crush-separation method and auto crush-separation equipment for waste-reinforced concrete

Similar Documents

Publication Publication Date Title
CN102974420B (en) Cut roll crusher and construction waste roll-in crushing station based on same
CN104984808B (en) Reinforced concrete crushing treatment system
CN104707702B (en) The recovery and treatment method and device of a kind of Thistle board
US20170065983A1 (en) Jaw crusher and crushing plant
CN108704748A (en) A kind of automatical and efficient broken armored concrete cutting material block device
CN106141290A (en) A kind of steel plate crushes cutting system
CN108941396A (en) A kind of production system of pipe pile reinforcing bar cage
CN110152783A (en) A kind of railway contact line concurrent grinding device
KR20130051187A (en) Method collecting iron bar in disused ferro-concrete pole
CN204816803U (en) Portable building rubbish sorting machine
CN112547752A (en) Method and equipment for recycling main reinforcing steel bars in concrete beam
CN209157006U (en) A kind of production system of pipe pile reinforcing bar cage
CN202097181U (en) Crawler type construction waste treatment combined equipment capable of removing lightweight impurities
CN207823107U (en) Dedusting is dust-proof and is convenient for the building rubbish treatment device of feeding
CN106049503A (en) Pretreatment method for blasting demolition of reinforced concrete supporting beam in foundation pit
CN104649065B (en) Removable portable tie cutting machine
CN114226398A (en) Hydraulic crushing and separating system applicable to strip-shaped reinforced concrete
CN108941391A (en) A kind of bar cutting, conveying, pier nose all-in-one machine
CN210230107U (en) Building rubbish collecting and treating pool
KR100470678B1 (en) Heading management equipment and heading processing unit of concrete base file
CN202411289U (en) Heading machine for reinforcing steel bars of concrete pipe piles
JP2007168969A (en) Stage type scrap disposal yard
CN213349245U (en) Jaw crushing station feeding structure
CN218654843U (en) Building waste separation equipment
CN201012408Y (en) Oscillating type top cropping shear

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application