CN209157006U - A kind of production system of pipe pile reinforcing bar cage - Google Patents
A kind of production system of pipe pile reinforcing bar cage Download PDFInfo
- Publication number
- CN209157006U CN209157006U CN201821708056.2U CN201821708056U CN209157006U CN 209157006 U CN209157006 U CN 209157006U CN 201821708056 U CN201821708056 U CN 201821708056U CN 209157006 U CN209157006 U CN 209157006U
- Authority
- CN
- China
- Prior art keywords
- reinforcing bar
- rebar
- lengths
- conveying device
- longitudinal guide
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of production systems of pipe pile reinforcing bar cage, reinforcing bar volume is placed on storage turntable, reinforcing bar is rolled up under the draw of traction mechanism, reinforcing bar is pulled out from storage turntable, after bar straightening mechanism straightening, sequentially enter guiding mechanism, in cutting mechanism and blanking mechanism, when the length of the lengths of rebar needed for reinforcing bar reaches, cutting mechanism is by bar cutting, the lengths of rebar come out is cut off to drop into the first conveying device by blanking mechanism, lengths of rebar is delivered to the pier nose station of reinforcing bar pier head machine by the first conveying device, after reinforcing bar pier head machine completes the pier nose process of lengths of rebar, first conveying device send lengths of rebar to the second conveying device, second conveying device send lengths of rebar to the clamping station of reinforcing bar contraposition punching machine, lengths of rebar is worn the work for being connected to reinforcing bar cage seam welding by reinforcing bar contraposition punching machine one by one In hole location.As it can be seen that the utility model, which provides one kind, can reduce labor intensity of workers, the production system of the pipe pile reinforcing bar cage of production efficiency is improved.
Description
Technical field
The utility model belongs to tubular pole production technical field, more specifically to a kind of production system of pipe pile reinforcing bar cage
System.
Background technique
Steel reinforcement cage is welded by main reinforcement and stirrup and is formed, and main reinforcement is that have to be spaced and formed in parallel circular cylindrical each other,
Stirrup is welded in the main reinforcement of circular cylindrical according to the screw pitch winding of setting.Steel reinforcement cage is determined by main reinforcement length, the general phase of main reinforcement
To relatively slightly, for storage, convenient transportation, main reinforcement is a length of 12 meters or so general, and the length of existing steel reinforcement cage is typically also 12 meters or so.
Fabrication of reinforcing cage will generally use reinforcing bar cage seam welding.
However, generally also needing to roll up feeding, straightening, cutting, conveying, pier nose by reinforcing bar in the production process of main reinforcement
Etc. processes, relevant device is more dispersed and takes up a large area, manpower and material resources are increased in reinforcing bar transfer process to a certain degree, increase
The labor intensity of worker, reduces production efficiency.
Utility model content
Technical problem to be solved in the utility model, which is to provide for one kind, can reduce labor intensity of workers, improve production
The production system of the pipe pile reinforcing bar cage of efficiency.
In order to solve the above-mentioned technical problem, the utility model provides a kind of production system of pipe pile reinforcing bar cage, including machine
Frame is successively arranged bar straightening disconnecting device, the first conveying device, the second conveying device and reinforcing bar pair along the transverse direction of the rack
Position punching machine, the bar straightening disconnecting device are successively arranged storage turntable, bar straightening mechanism, traction along the longitudinal direction of the rack
The longitudinal end of mechanism, guiding mechanism, cutting mechanism and blanking mechanism, first conveying device is equipped with reinforcing bar pier head machine, institute
The longitudinal end for stating reinforcing bar contraposition punching machine is equipped with reinforcing bar cage seam welding;Reinforcing bar volume is placed on the storage turntable, reinforcing bar
Under the draw of the traction mechanism, reinforcing bar pulls out volume from the storage turntable, after the bar straightening mechanism straightening,
It sequentially enters in the guiding mechanism, cutting mechanism and blanking mechanism, it is described when reinforcing bar reaches the length of required lengths of rebar
Bar cutting is cut off the lengths of rebar come out and drops into first conveying device by the blanking mechanism by cutting mechanism
In, lengths of rebar is delivered to the pier nose station of the reinforcing bar pier head machine by first conveying device, and the reinforcing bar pier head machine is completed
After the pier nose process of lengths of rebar, first conveying device send lengths of rebar to second conveying device, second conveying
Device send lengths of rebar to the clamping station of reinforcing bar contraposition punching machine, and the reinforcing bar aligns punching machine for lengths of rebar one
It wears in the work hole location for being connected to the reinforcing bar cage seam welding on piece ground of root.
As a preferred embodiment of the present invention, the bar straightening mechanism includes at least two straightener cubes, and the straightener cube is set
There is a through-hole passed through for reinforcing bar, the tractive force direction of the through-hole and the traction mechanism is in eccentric setting.
As a preferred embodiment of the present invention, the traction mechanism includes about two material feeding pressing wheels arranged vertically,
It is linked between two material feeding pressing wheels by meshed gears, and having between two material feeding pressing wheels passes through reinforcing bar
Gap a, wherein material feeding pressing wheel is connected with the motor of its rotation of driving.
As a preferred embodiment of the present invention, the guiding mechanism includes guide pad, and the guide pad is equipped with for steel
The location hole that muscle passes through, the location hole is for preventing bar cutting moment from circular runout occurs.
As a preferred embodiment of the present invention, the cutting mechanism includes the reinforcing bar cutter being vertically arranged, the reinforcing bar
Cutter is equipped with for controlling its hydraulic cylinder to pump.
As a preferred embodiment of the present invention, the blanking mechanism includes the through slot being sent into for reinforcing bar, the through slot
Bottom be equipped with the lengths of rebar delivery outlet that cut-off lengths of rebar can be sent out, the lengths of rebar delivery outlet is equipped with openable and closable steel
Muscle section out gate, the lengths of rebar out gate are connected with the cylinder for controlling its folding.
As a preferred embodiment of the present invention, first conveying device includes between multiple vertical and horizontal along rack
The longitudinal direction placed for a lengths of rebar is formed every multiple longitudinally arranged V-shaped grooves on the V-shaped groove of arrangement, same straight line
Guide groove, the setting height of the longitudinal guide are lower than the setting height of the through slot, and the longitudinal guide is parallel with the through slot,
It is equipped between the through slot and first longitudinal guide and is slipped to first longitudinal direction guide groove from lengths of rebar delivery outlet for lengths of rebar
Oblique frame by side, between the bottom end of the oblique frame and first longitudinal guide, between laterally adjacent longitudinal guide, the last item
Multiple transverse conveying mechanisms, the transverse conveying mechanism are equipped between longitudinal guide and the feed side of second conveying device
Including arc-shaped transition plate and swinging plate, the arc-shaped transition plate be vertically disposed at the oblique frame and first longitudinal guide it
Between or laterally adjacent longitudinal guide between or the last item longitudinal guide and second conveying device between, it is described
Swinging plate is connected with the cylinder for controlling its upper and lower reciprocally swinging, and lengths of rebar is in the swing process of the swinging plate along described
Arc-shaped transition plate is transferred in first longitudinal guide from the bottom end of the oblique frame, or is shifted from the longitudinal guide of lateral side
Into the longitudinal guide of the lateral other side, or it is transferred to from the last item longitudinal guide the feed side of second conveying device
In.
As a preferred embodiment of the present invention, between the longitudinally arranged V-shaped groove of the every two of the last item longitudinal guide
Equipped with a longitudinal translating device associated, the longitudinal translating device associated includes the driving wheel and driven wheel of two left and right horizontals arrangement, institute
Driving wheel is stated to be connected with for controlling its motor rotated clockwise or counterclockwise, the driven wheel be connected with for control its to
The driving wheel side is close and clamps the cylinder of lengths of rebar, and the lengths of rebar in V-shaped groove is between the driving wheel and driven wheel
Tractive force effect under moved along the last item longitudinal guide;The end of the last item longitudinal guide and the reinforcing bar pier head machine
Pier nose station is opposite.
As a preferred embodiment of the present invention, second conveying device includes conveyor chain, drive sprocket and driven
Sprocket wheel, the conveyor chain are wound around between the drive sprocket and driven sprocket, and the drive sprocket is connected with for controlling
Its motor rotated, the conveying direction of the conveyor chain are the transverse direction of rack, and the conveyor chain is equipped with multiple edges
The detent of the length direction setting of conveyor chain placed for a lengths of rebar;The detent is by two perpendicular to the conveying
The gag lever post on the top of chain forms.
As a preferred embodiment of the present invention, the reinforcing bar contraposition punching machine includes two for clamping reinforcing bar section
Lengths of rebar is simultaneously worn the manipulator in the work hole location for being connected to the reinforcing bar cage seam welding by latter end, and the manipulator includes cantilever
Frame, clamp hand mechanism and three axis mobile mechanisms, three axis mobile mechanism are arranged on the cantilever shalving, the clamp hand mechanism setting
It around in three axis mobile mechanism and by three axis mobile mechanism's drives edge, moves up and down, second conveying
The exit side of device is equipped with for facilitating the clamp hand mechanism clamping lengths of rebar for the overhead positioning truss of the latter end of lengths of rebar.
Implement a kind of production system of pipe pile reinforcing bar cage of the utility model, compared with prior art, have has as follows
Beneficial effect:
The utility model passes through bar straightening disconnecting device, the first conveying device, the second conveying device, reinforcing bar contraposition perforation
Reinforcing bar volume feeding, straightening, cutting, primary conveying, pier are realized in the combination of device, reinforcing bar pier head machine and reinforcing bar cage seam welding
The integrated processes such as head, second-pumping, contraposition perforation, roll welding, optimize the layout of each device, reduce entire production system
Occupied area, while the labor intensity of worker is reduced, improve the production efficiency of steel reinforcement cage.
Detailed description of the invention
In order to illustrate more clearly of the technical solution of the utility model embodiment, the attached drawing of embodiment will be made below simple
Ground introduction.
Fig. 1 is a kind of structural schematic diagram of the production system of pipe pile reinforcing bar cage provided by the utility model.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without creative efforts
Every other embodiment obtained, fall within the protection scope of the utility model.
As shown in Figure 1, a kind of preferred embodiment of the production system of pipe pile reinforcing bar cage provided by the utility model, including machine
Frame is successively arranged bar straightening disconnecting device 1, the first conveying device 2, the second conveying device 3 and steel along the transverse direction of the rack
Muscle aligns punching machine 4, and the bar straightening disconnecting device 1 is successively arranged storage turntable 5, straightener along the longitudinal direction of the rack
The longitudinal end of structure 6, traction mechanism 7, guiding mechanism 8, cutting mechanism 9 and blanking mechanism 10, first conveying device 2 is equipped with
The longitudinal end of reinforcing bar pier head machine 11, the reinforcing bar contraposition punching machine 4 is equipped with reinforcing bar cage seam welding 12;Reinforcing bar volume is placed on institute
It states on storage turntable 5, reinforcing bar is rolled up under the draw of the traction mechanism 7, and reinforcing bar is pulled out from the storage turntable 5, warp
It after crossing 6 straightening of bar straightening mechanism, sequentially enters in the guiding mechanism 8, cutting mechanism 9 and blanking mechanism 10, when reinforcing bar arrives
Up to required lengths of rebar 27 length when, the cutting mechanism 9 by bar cutting, be cut off the lengths of rebar 27 come out pass through it is described
Blanking mechanism 10 drops into first conveying device 2, and lengths of rebar 27 is delivered to the reinforcing bar by first conveying device 2
The pier nose station 13 of pier head machine 11, after the reinforcing bar pier head machine 11 completes the pier nose process of lengths of rebar 27, the first conveying dress
It sets 2 to send lengths of rebar 27 to second conveying device 3, second conveying device 3 send lengths of rebar 27 to the reinforcing bar pair
The clamping station of position punching machine 4, the reinforcing bar contraposition punching machine 4 wears lengths of rebar one by one is connected to the steel reinforcement cage
In the work hole location 14 of seam welder 12.
Therefore, the utility model passes through bar straightening disconnecting device 1, the first conveying device 2, the second conveying device 3, reinforcing bar
The combination of punching machine 4, reinforcing bar pier head machine 11 and reinforcing bar cage seam welding 12 is aligned, reinforcing bar volume feeding is realized, straightening, cuts
The integrated processes such as disconnected, primary conveying, pier nose, second-pumping, contraposition perforation, roll welding, optimize the layout of each device, reduce
The occupied area of entire production system, while the labor intensity of worker is reduced, improve the production efficiency of steel reinforcement cage.
Illustratively, the bar straightening mechanism 6 includes at least two straightener cubes, and the straightener cube is equipped with and passes through for reinforcing bar
The tractive force direction of through-hole, the through-hole and the traction mechanism 7 is in eccentric setting, so as to preferably by bar straightening.
Illustratively, the traction mechanism 7 includes about two material feeding pressing wheels arranged vertically, two material feeding pressing wheels
Between by meshed gears link, and between two material feeding pressing wheels have pass through reinforcing bar gap, wherein a feeding
Pinch roller is connected with the motor of its rotation of driving.
Illustratively, the guiding mechanism 8 includes guide pad, and the guide pad is equipped with the location hole passed through for reinforcing bar,
The location hole is for preventing bar cutting moment from circular runout occurs.
Illustratively, the cutting mechanism 9 includes the reinforcing bar cutter being vertically arranged, and the reinforcing bar cutter is equipped with for controlling
Its hydraulic cylinder to pump is made, speed is fast, reduces the generation of iron filings.
Illustratively, the blanking mechanism 10 includes the through slot 15 being sent into for reinforcing bar, and the bottom of the through slot is equipped with energy
The lengths of rebar delivery outlet that cut-off lengths of rebar 27 is sent out, the lengths of rebar delivery outlet are exported equipped with openable and closable lengths of rebar
Door, the lengths of rebar out gate is connected with the cylinder for controlling its folding, so that lengths of rebar be facilitated to send out.
Illustratively, first conveying device 2 includes the spaced apart V-shaped groove of multiple vertical and horizontal along rack
16, multiple longitudinally arranged V-shaped grooves 16 on same straight line form the longitudinal guide 17a placed for a lengths of rebar,
The setting height of the longitudinal guide 17a is lower than the setting height of the through slot 15, the longitudinal guide 17a and the through slot 15
In parallel, vertical equipped with being slipped to first from lengths of rebar delivery outlet for lengths of rebar 27 between the through slot 15 and first longitudinal guide
Oblique frame 18 by the side of guide groove, between the bottom end and first longitudinal guide of the oblique frame 18, laterally adjacent longitudinal guide
Between, between the last item longitudinal guide 17b and the feed side of second conveying device 3 be equipped with multiple cross conveyors
Structure, the transverse conveying mechanism include arc-shaped transition plate 19 and swinging plate 20, and the arc-shaped transition plate 19 is vertically disposed at institute
It states between oblique frame 18 and first longitudinal guide or between laterally adjacent longitudinal guide or the last item longitudinal guide
Between 17a and second conveying device 3, the swinging plate 20 is connected with the cylinder for controlling its upper and lower reciprocally swinging, steel
Muscle section 27 is transferred to from the bottom end of the oblique frame 18 along the arc-shaped transition plate 19 in the swing process of the swinging plate 20
In one longitudinal guide, perhaps from the longitudinal guide that the longitudinal guide of lateral side is transferred to the lateral other side or from most
Latter longitudinal guide 17a is transferred in the feed side of second conveying device 3.Pass through above-mentioned transverse conveying mechanism as a result,
Design, enable lengths of rebar cross drive in an orderly manner.
Illustratively, a longitudinal direction is equipped between the longitudinally arranged V-shaped groove 16 of the every two of the last item longitudinal guide 17a
Conveying mechanism 21, the longitudinal translating device associated 21 include the driving wheel and driven wheel of two left and right horizontals arrangement, the driving wheel
It is connected with for controlling its motor rotated clockwise or counterclockwise, the driven wheel is connected with for controlling it to the active
Wheel side is close and clamps the cylinder of lengths of rebar 27, and the lengths of rebar 27 in V-shaped groove 16 is between the driving wheel and driven wheel
It is moved under tractive force effect along the last item longitudinal guide 17b;The end of the last item longitudinal guide 17b and the reinforcing bar pier nose
The pier nose station 13 of machine 11 is opposite.As a result, by the design of above-mentioned longitudinal translating device associated, enable lengths of rebar longitudinal in an orderly manner
Transmission facilitates lengths of rebar to be sent into the pier nose station of reinforcing bar pier head machine.
Illustratively, second conveying device 3 includes conveyor chain 22, drive sprocket and driven sprocket, the conveying
Chain is wound around between the drive sprocket and driven sprocket, and the drive sprocket is connected with the motor for controlling its rotation,
The conveying direction of the conveyor chain 22 is the transverse direction of rack, and the conveyor chain 22 is equipped with multiple along conveyor chain
The detent 23 of length direction setting placed for a lengths of rebar 27;The detent 23 is by two perpendicular to the conveyor chain
The gag lever post 24 on 22 top forms.As a result, by the design of above-mentioned second conveying device, enable lengths of rebar horizontal in an orderly manner
Punching machine is aligned to reinforcing bar is transmitted to.
Illustratively, reinforcing bar contraposition punching machine 4 includes two for the latter end of clamping reinforcing bar section 27 and by reinforcing bar
Section 27 wears the manipulator 25 being connected in the work hole location 14 of the reinforcing bar cage seam welding 12, and the manipulator includes cantilever shalving, folder
Mobile phone structure and three axis mobile mechanisms, three axis mobile mechanism are arranged on the cantilever shalving, and the clamp hand mechanism is arranged in institute
It states in three axis mobile mechanisms and by three axis mobile mechanism drives edge front and rear, left and right, moves up and down, so as to accurately will
Lengths of rebar is worn in the work hole location for being connected to reinforcing bar cage seam welding.More preferably, the exit side of second conveying device 3 is equipped with and is used for
By the overhead positioning truss 26 of the latter end of lengths of rebar 27, facilitate the clamp hand mechanism clamping lengths of rebar.
Above disclosed is only the preferred embodiment of the utility model, certainly cannot be practical new to limit this with this
The interest field of type, therefore equivalent variations made according to the patent scope of the utility model still belong to the utility model and are covered
Range.
Claims (10)
1. a kind of production system of pipe pile reinforcing bar cage, which is characterized in that including rack, the transverse direction along the rack is successively arranged steel
Muscle straightening and abscinding device, the first conveying device, the second conveying device and reinforcing bar align punching machine, the bar straightening cutting dress
It sets and is successively arranged storage turntable, bar straightening mechanism, traction mechanism, guiding mechanism, cutting mechanism and blanking along the longitudinal direction of the rack
Mechanism, the longitudinal end of first conveying device are equipped with reinforcing bar pier head machine, the longitudinal end of the reinforcing bar contraposition punching machine
Equipped with reinforcing bar cage seam welding;Reinforcing bar volume is placed on the storage turntable, and reinforcing bar is rolled up under the draw of the traction mechanism,
Reinforcing bar is pulled out from the storage turntable, after the bar straightening mechanism straightening, sequentially enters the guiding mechanism, cutting mechanism
In blanking mechanism, when reinforcing bar reaches the length of required lengths of rebar, bar cutting is cut off and is come out by the cutting mechanism
Lengths of rebar dropped into first conveying device by the blanking mechanism, first conveying device conveys lengths of rebar
To the pier nose station of the reinforcing bar pier head machine, after the reinforcing bar pier head machine completes the pier nose process of lengths of rebar, first conveying
Device send lengths of rebar to second conveying device, and lengths of rebar is sent to the reinforcing bar to align and be perforated by second conveying device
The clamping station of device, the reinforcing bar contraposition punching machine wears lengths of rebar one by one is connected to the reinforcing bar cage seam welding
In the hole location that works.
2. a kind of production system of pipe pile reinforcing bar cage as described in claim 1, which is characterized in that the bar straightening mechanism includes extremely
Few two straightener cubes, the straightener cube are equipped with the through-hole passed through for reinforcing bar, the tractive force of the through-hole and the traction mechanism
Direction is in eccentric setting.
3. a kind of production system of pipe pile reinforcing bar cage as described in claim 1, which is characterized in that the traction mechanism includes two
A material feeding pressing wheel arranged vertically up and down is linked between two material feeding pressing wheels by meshed gears, and sent described in two
There is the gap for passing through reinforcing bar between material pinch roller, wherein a material feeding pressing wheel is connected with the motor of its rotation of driving.
4. a kind of production system of pipe pile reinforcing bar cage as described in claim 1, which is characterized in that the guiding mechanism includes leading
To block, the guide pad is equipped with the location hole passed through for reinforcing bar, and the location hole is for preventing bar cutting moment from diameter occurs
To bounce.
5. a kind of production system of pipe pile reinforcing bar cage as described in claim 1, which is characterized in that the cutting mechanism includes perpendicular
The reinforcing bar cutter being directly arranged, the reinforcing bar cutter are equipped with for controlling its hydraulic cylinder to pump.
6. a kind of production system of pipe pile reinforcing bar cage as described in claim 1, which is characterized in that the blanking mechanism includes can
For the through slot that reinforcing bar is sent into, the bottom of the through slot is equipped with the lengths of rebar delivery outlet that can send out cut-off lengths of rebar, described
Lengths of rebar delivery outlet is equipped with openable and closable lengths of rebar out gate, and the lengths of rebar out gate is connected with the gas for controlling its folding
Cylinder.
7. a kind of production system of pipe pile reinforcing bar cage as claimed in claim 6, which is characterized in that the first conveying device packet
Multiple spaced apart V-shaped grooves of the vertical and horizontal along rack are included, multiple longitudinally arranged V-shaped groove compositions one on same straight line
The longitudinal guide that item is placed for a lengths of rebar, the setting height of the longitudinal guide are lower than the setting height of the through slot,
The longitudinal guide is parallel with the through slot, is equipped between the through slot and first longitudinal guide for lengths of rebar from lengths of rebar
Delivery outlet is slipped to the oblique frame by the side of first longitudinal direction guide groove, between the bottom end of the oblique frame and first longitudinal guide, laterally
Multiple cross are equipped between adjacent longitudinal guide, between the last item longitudinal guide and the feed side of second conveying device
To conveying mechanism, the transverse conveying mechanism includes arc-shaped transition plate and swinging plate, and the arc-shaped transition plate is vertically disposed at
Between the oblique frame and first longitudinal guide or between laterally adjacent longitudinal guide or the last item longitudinal guide
Between second conveying device, the swinging plate is connected with the cylinder for controlling its upper and lower reciprocally swinging, and lengths of rebar exists
It is transferred in first longitudinal guide along the arc-shaped transition plate from the bottom end of the oblique frame in the swing process of the swinging plate,
Perhaps turn from the longitudinal guide that the longitudinal guide of lateral side is transferred to the lateral other side or from the last item longitudinal guide
It moves on in the feed side of second conveying device.
8. a kind of production system of pipe pile reinforcing bar cage as claimed in claim 7, which is characterized in that the last item longitudinal guide
A longitudinal translating device associated is equipped between the longitudinally arranged V-shaped groove of every two, the longitudinal translating device associated includes two or so water
The driving wheel and driven wheel that plain cloth is set, the driving wheel are connected with for controlling its motor rotated clockwise or counterclockwise, institute
Driven wheel is stated to be connected with for close to the driving wheel side and clamp the cylinder of lengths of rebar, the reinforcing bar in V-shaped groove that controls it
Section moves under the tractive force effect between the driving wheel and driven wheel along the last item longitudinal guide;The last item is longitudinally led
The end of slot is opposite with the pier nose station of the reinforcing bar pier head machine.
9. a kind of production system of pipe pile reinforcing bar cage as described in claim 1, which is characterized in that the second conveying device packet
Conveyor chain, drive sprocket and driven sprocket are included, the conveyor chain is wound around between the drive sprocket and driven sprocket, institute
Drive sprocket to be stated to be connected with for controlling its motor rotated, the conveying direction of the conveyor chain is the transverse direction of rack,
The conveyor chain is equipped with the detent placed for a lengths of rebar that multiple length directions along conveyor chain are arranged;It is described
Detent is made of the gag lever post on two top perpendicular to the conveyor chain.
10. a kind of production system of pipe pile reinforcing bar cage as described in claim 1, which is characterized in that the reinforcing bar contraposition perforation
Device includes two for the latter end of clamping reinforcing bar section and lengths of rebar is worn to the work hole location for being connected to the reinforcing bar cage seam welding
Manipulator, the manipulator includes cantilever shalving, clamp hand mechanism and three axis mobile mechanisms, and three axis mobile mechanism is arranged in institute
State on cantilever shalving, the clamp hand mechanism be arranged in three axis mobile mechanism and by three axis mobile mechanism drives edge before
Afterwards, left and right, move up and down, the exit side of second conveying device is equipped with for by the overhead locating slot of the latter end of lengths of rebar
Frame facilitates the clamp hand mechanism clamping lengths of rebar.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821708056.2U CN209157006U (en) | 2018-10-19 | 2018-10-19 | A kind of production system of pipe pile reinforcing bar cage |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821708056.2U CN209157006U (en) | 2018-10-19 | 2018-10-19 | A kind of production system of pipe pile reinforcing bar cage |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209157006U true CN209157006U (en) | 2019-07-26 |
Family
ID=67334508
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821708056.2U Active CN209157006U (en) | 2018-10-19 | 2018-10-19 | A kind of production system of pipe pile reinforcing bar cage |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209157006U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108941396A (en) * | 2018-10-19 | 2018-12-07 | 广东华岩建材有限公司 | A kind of production system of pipe pile reinforcing bar cage |
CN111993086A (en) * | 2020-07-31 | 2020-11-27 | 四川宏量基筑建材有限公司 | Rapid forming system for reinforcing steel bar net rack in autoclaved aerated concrete slab |
-
2018
- 2018-10-19 CN CN201821708056.2U patent/CN209157006U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108941396A (en) * | 2018-10-19 | 2018-12-07 | 广东华岩建材有限公司 | A kind of production system of pipe pile reinforcing bar cage |
CN111993086A (en) * | 2020-07-31 | 2020-11-27 | 四川宏量基筑建材有限公司 | Rapid forming system for reinforcing steel bar net rack in autoclaved aerated concrete slab |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107253053B (en) | Integral net welding machine | |
CN108941396A (en) | A kind of production system of pipe pile reinforcing bar cage | |
CN108756251A (en) | A kind of reinforced mesh binding machine | |
CN209157006U (en) | A kind of production system of pipe pile reinforcing bar cage | |
CN105773275B (en) | Feeding pipe installation in full-automatic loading and unloading one pipe cutting machine | |
CN105397495A (en) | Novel numerical control silicon steel sheet transverse shearing line device | |
CN110405386B (en) | Numerical control full-automatic welding machine for steel bar welding mesh | |
CN201267896Y (en) | ERW welded tube production chain transverse weld crescent edge punching device | |
CN109079064B (en) | Full-automatic processing equipment for welding closed stirrups | |
CN104384937B (en) | A kind of plane girder welding production line | |
CN103264049A (en) | Subdivision heavy volume check production device and process | |
CN105750982A (en) | Feeding device in full-automatic feeding and discharging integrated pipe cutting machine | |
CN106141290A (en) | A kind of steel plate crushes cutting system | |
CN202461961U (en) | Device for forming steel wire mesh and net rack | |
CN104909148A (en) | C-shaped steel overlapping and buckling conveying system | |
CN108941391A (en) | A kind of bar cutting, conveying, pier nose all-in-one machine | |
CN202039504U (en) | Insertion pipe positioning wire inserting mechanism used in steel wire mesh composite wallboard prefabricating process | |
CN203610963U (en) | Semi-automatic production machine set for corrugated web H-shaped steel | |
CN209156990U (en) | A kind of bar cutting, conveying, pier nose all-in-one machine | |
CN107017731B (en) | A kind of construction steel strand wires automation cutting equipment | |
CN209157438U (en) | A kind of feeding system for reinforcing bar cage seam welding | |
CN202411294U (en) | Continuous automatic group welding machine | |
CN202683872U (en) | Automatic feeding device used on hoop bending machine | |
CN209156991U (en) | A kind of bar cutting feed device | |
CN204737381U (en) | C shaped steel turns over transferred and send system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: A production system of pipe pile reinforcement cage Effective date of registration: 20221207 Granted publication date: 20190726 Pledgee: China Co. truction Bank Corp Jiangmen branch Pledgor: GUANGDONG HUAYAN BUILDING MATERIAL Co.,Ltd. Registration number: Y2022980025530 |