KR20120036006A - Structure of vegetation mat and execution process - Google Patents
Structure of vegetation mat and execution process Download PDFInfo
- Publication number
- KR20120036006A KR20120036006A KR1020100097648A KR20100097648A KR20120036006A KR 20120036006 A KR20120036006 A KR 20120036006A KR 1020100097648 A KR1020100097648 A KR 1020100097648A KR 20100097648 A KR20100097648 A KR 20100097648A KR 20120036006 A KR20120036006 A KR 20120036006A
- Authority
- KR
- South Korea
- Prior art keywords
- vegetation mat
- layer
- ground
- support
- greening
- Prior art date
Links
Images
Classifications
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01C—PLANTING; SOWING; FERTILISING
- A01C1/00—Apparatus, or methods of use thereof, for testing or treating seed, roots, or the like, prior to sowing or planting
- A01C1/04—Arranging seed on carriers, e.g. on tapes, on cords ; Carrier compositions
- A01C1/044—Sheets, multiple sheets or mats
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G2/00—Vegetative propagation
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G20/00—Cultivation of turf, lawn or the like; Apparatus or methods therefor
- A01G20/20—Cultivation on mats
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G24/00—Growth substrates; Culture media; Apparatus or methods therefor
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Environmental Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Paleontology (AREA)
- Structural Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Botany (AREA)
- Developmental Biology & Embryology (AREA)
- Soil Sciences (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
- Cultivation Of Plants (AREA)
Abstract
Description
The present invention relates to a vegetation mat assembly, and more particularly, to an environment-friendly vegetation mat assembly and its construction method that can fix the vegetation mat on the ground with only an anchor without the need for a separate fastening means.
In order to prevent the loss of the slope of a river, a mountain, or a bank, conventionally, a method using a vegetation block or a vegetation mat is introduced with a seed spray.
Seed spraying is a method of preserving the vegetation base by spraying and preserving the vegetation base by spreading the roots of herbs. The seed spray method requires a large amount of alien herbaceous plants to prevent the erosion of the base, as well as the natural vegetation is difficult. In addition, large seeds are separated from the base or exposed to the outside, so the use of small seeds has a problem in the determination of seeds. In addition, because of the large amount of herbaceous vegetation, there is a problem that the native growth of the tree is not secured because the growth of woody plants is impossible. In addition, there is a risk of erosion because it is exposed to the surface of the growth base agent. In the cold and high cold regions, the growth base is weak in the East Sea, and there is a risk of erosion even during the thawing season.
In addition, the construction of the seed spray when the rain is practically impossible, there is a disadvantage that you need to use a separate soil. In addition, in order to seed spray, not only a separate large machine should be used, but also the work space should be large, and there is a problem in that scattering dust is generated due to a large amount of base material that wastewater is generated during work.
In conclusion, the loss of vegetation-based agent occurs, the germination rate is significantly different from site to site, and over time after construction, there is an aesthetic problem due to defoliation of herbaceous plants.
The vegetation block is generally used to form a small space for plants to grow in the center of the concrete block, and to grow the plants by planting the small space inside. However, this method is environmentally friendly today because the vegetation block itself is a concrete product, which has a negative effect on the plant, the number of planted plants is relatively small, and also has a certain limit on the growth of planted plants. It is not treated in a way.
On the other hand, the construction method using the vegetation mat is a light material and the installation speed is faster and simpler than other constructions.In addition, since the vegetation mat protects the existing vegetation, vegetation is possible even after several years. It has the advantage of being applicable regardless.
By the way, the construction method of the vegetation mat has the disadvantage that the vegetation mat can be stored indefinitely because the plants to be planted are included in the vegetation mat in advance, and also the plants grow arbitrarily inside the vegetation mat during storage. There are also disadvantages. In addition, the vegetation mat covering has a problem in that it is difficult to grow woody plants due to irregular component decomposition of the vegetation mat, while seed or vegetative supplements are produced by being injected into the vegetation mat by rainfall or heavy rain. The construction method of the problem is that there is a possibility of deviation of the form by wind or rainfall after construction. In the cold and high cold regions, the soil layer of the vegetation mat plays a role of a heat insulating agent, but there is a problem in that the thickness is thin and a large role cannot be expected.
On the other hand, if you look at the construction method of the slope, which is generally performed today, stop the slope, then put a vegetation mat on it, cover it again with a wire mesh, then fix it, plant it, etc. have.
This series of actions is incredibly difficult and difficult because workers must perform on slopes rather than plain ground.
In addition, the construction method of the vegetation mat has a problem in that it is not possible to construct in rainy weather, as well as to use a dedicated soil to cover the vegetation mat.
As described above, the conventional inclined surface construction method has a disadvantage in that the workers must proceed all the processes on the inclined surface having a predetermined angle.
Accordingly, an object of the present invention is to provide a method for constructing an eco-friendly eco-friendly inclined surface which can minimize the work going on the inclined surface, and can be quickly and efficiently constructed in the vicinity of a river, embankment, highway, or mountain slope. .
In addition, another object of the present invention to provide a customized vegetation mat structure suitable for the above construction method.
In order to achieve the above object, the present invention, the vegetable fiber layer formed by forming the bottom layer in a layer of vegetable fibers, the greening agent layer formed on the vegetable fiber layer and composed of seeds for ground greening, the greening agent layer A vegetation mat including a culture soil layer formed to cover and a rope support net layer fixedly supporting the culture fiber layer on the vegetable fiber layer and the greening agent layer; And a longitudinal insertion anchor inserted through the vegetation mat and the ground to fix the vegetation mat to the ground, between the support extending in the vertical direction from the top of the anchor, and the other end of the end connected to the top of the anchor between the support. A vegetation mat structure comprising a fixed unit including a hook portion formed to extend a predetermined length downward and a plate-like support portion elastically coupled to the lower predetermined position of the anchor so as to be bent up and down like a wing Provide construction method.
Including the greening layer in the vegetation mat does not require the step of injecting the greening agent during construction, and it can shorten the air because it can be germinated in advance if necessary.
Various designs are applied to the greening layer to arrange seeds so that various designs can be applied to the slopes.
The use of natural plant materials can fundamentally block soil water pollution.
Since it can be firmly fixed by simply inserting the fixing unit, it is possible to omit a separate work, thereby simplifying construction.
1 is a side cross-sectional view showing a construction state of the vegetation mat according to an embodiment of the present invention,
Figure 2 is a side sectional view showing the installation state of the vegetation mat and the support net according to an embodiment of the present invention,
3 is an exploded perspective view of a vegetation mat according to an embodiment of the present invention;
Figure 4 is a front view showing an embodiment of a bamboo support net according to an embodiment of the present invention,
5 is a perspective view showing the fastening state of the manila rope support net of FIG.
6 is a cross-sectional view of the vegetation mat fixing unit according to the present invention,
7A to 7C are cross-sectional views illustrating an installation process of the fixing unit of FIG. 6, and
8 is a front view showing an embodiment of the support of the fixing unit of FIGS. 6 and 7.
Hereinafter, with reference to the accompanying drawings, the present invention will be described in more detail. However, the accompanying drawings are only for describing the technical idea of the present invention in more detail, and the technical idea of the present invention is not limited thereto.
1 is a cross-sectional view showing a construction state of the vegetation mat structure according to an embodiment of the present invention, Figure 2 is a side cross-sectional view showing in detail the installation state of the vegetation mat and the support net, Figure 3 is an exploded perspective view of the vegetation mat As shown, the vegetation mat structure is composed of a
The
The
The
The
The
The rope
Each layer constituting the vegetation mat is laminated and then coupled by a separate fastening means (not shown). It is preferable to use a hog ring (C ring).
Meanwhile, the
As shown in the drawing, the
The
The
A pair of blocking
The vegetation mat structure construction method configured as described above is as follows.
The vegetation mat is prepared in advance as described above, and the produced vegetation mat is placed on the ground for greening. The ground may be an inclined surface. Since the vegetation mat according to the present invention is flexible and can be stored and transported by folding or rolling, unlike the vegetation mat including metal or bamboo, there is an advantage of easy transportation and storage.
In order to fix the vegetation mat disposed on the ground, a fixing unit is inserted to pass through the
As shown in FIGS. 7A and 7B, as the fixing
When the pressurization is stopped, the
100: vegetation mat 110: vegetable fiber layer
120: greening layer 130: cultured soil
140: rope support net layer 142: X-shaped circular compression clip
500: fixed unit 510: insertion anchor
520: support interval 521: hook portion
530: stopper 550: support
Claims (4)
Vegetable fibrous layer formed by forming a bottom layer in a layer of vegetable fibers, a greening agent layer formed on the vegetable fibrous layer and composed of seeds for greening the ground, a culture soil layer formed to cover the greening agent layer, and the vegetable fiber layer And a vegetation mat including a rope support net layer fixedly supporting the culture soil layer on the greening agent layer; And
Longitudinal insertion anchor inserted through the vegetation mat and the ground to fix the vegetation mat to the ground, between the support extending in the vertical direction from the top of the anchor, the other end of the end connected to the top of the anchor between the support And a fixing unit including a hook portion formed to extend a predetermined length, and a plate-shaped support portion elastically coupled to the lower predetermined position of the anchor so as to be bent up and down like a wing. Structure.
Each layer constituting the vegetation mat is laminated, characterized in that joined by a C-type clip.
A pair of nuts are installed at predetermined lower positions of the insertion anchor spaced apart from each other, the vegetation mat structure, characterized in that the support is coupled between the pair of nuts.
The fixing unit of claim 1 is inserted into a predetermined position of the vegetation mat so as to penetrate the vegetation mat and the ground, and the insertion unit and the hook portion are inserted at a position capable of fixing a part of the net of the support net layer. Method for constructing vegetation mat structure comprising the step of pressing the upper portion of the fixing unit downward so that the support interval of the bending upward.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020100097648A KR20120036006A (en) | 2010-10-07 | 2010-10-07 | Structure of vegetation mat and execution process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020100097648A KR20120036006A (en) | 2010-10-07 | 2010-10-07 | Structure of vegetation mat and execution process |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20120036006A true KR20120036006A (en) | 2012-04-17 |
Family
ID=46137754
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020100097648A KR20120036006A (en) | 2010-10-07 | 2010-10-07 | Structure of vegetation mat and execution process |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20120036006A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103924605A (en) * | 2014-04-25 | 2014-07-16 | 湖北工业大学 | Sash girder ecological slope protection structure and construction method thereof |
CN105145107A (en) * | 2015-10-19 | 2015-12-16 | 长江水资源保护科学研究所 | Stable vegetation ecological establishing method for hill type reservoir entry estuarine wetland |
CN109440788A (en) * | 2018-11-16 | 2019-03-08 | 安徽国祯环境修复股份有限公司 | A kind of surface mine rock side slope stereo ecological restorative procedure |
CN114375632A (en) * | 2021-12-28 | 2022-04-22 | 北京市勘察设计研究院有限公司 | Novel mine slope and ecological restoration method thereof |
KR102412520B1 (en) * | 2021-11-10 | 2022-06-23 | 대양에스씨 주식회사 | Hanger Rack for Laver Seed Culture Net |
-
2010
- 2010-10-07 KR KR1020100097648A patent/KR20120036006A/en active IP Right Grant
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103924605A (en) * | 2014-04-25 | 2014-07-16 | 湖北工业大学 | Sash girder ecological slope protection structure and construction method thereof |
CN105145107A (en) * | 2015-10-19 | 2015-12-16 | 长江水资源保护科学研究所 | Stable vegetation ecological establishing method for hill type reservoir entry estuarine wetland |
CN109440788A (en) * | 2018-11-16 | 2019-03-08 | 安徽国祯环境修复股份有限公司 | A kind of surface mine rock side slope stereo ecological restorative procedure |
KR102412520B1 (en) * | 2021-11-10 | 2022-06-23 | 대양에스씨 주식회사 | Hanger Rack for Laver Seed Culture Net |
CN114375632A (en) * | 2021-12-28 | 2022-04-22 | 北京市勘察设计研究院有限公司 | Novel mine slope and ecological restoration method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2009062758A (en) | Natural vegetation inducing net, and natural vegetation inducing structure for slope | |
KR200447372Y1 (en) | Afforestation of Inclined Plane for planting Mat | |
KR100839669B1 (en) | Planting mat for afforested slope and executing structure thereof | |
KR20120036006A (en) | Structure of vegetation mat and execution process | |
KR100556096B1 (en) | Sloping ground construction work method and sloping grdoud construction fixed tool | |
KR20120036001A (en) | Structure of vegetation mat and execution process | |
JP5466492B2 (en) | Slope stabilization system | |
JP6750343B2 (en) | Mat for greening | |
CN109618741B (en) | Greening grid device for rock slope and construction method thereof | |
KR100930833B1 (en) | Mat for growing up plant | |
KR20120036009A (en) | Structure of vegetation mat and execution process | |
CN208415279U (en) | The anti-erosion structure of civil engineering slope protection | |
CN207228135U (en) | Horizontal hedge blocks native ecological slope protection structure | |
KR100731759B1 (en) | Planting mat for using a naturally degradable material | |
JP2010213622A (en) | Planting mat for wall surface, and method for greening wall surface | |
KR20080092594A (en) | A slope greening method using porous material and planting mat | |
JP4452316B1 (en) | Tree planting method for mortar and concrete slope | |
CN210562230U (en) | High steep slope planting technique structure | |
KR101007023B1 (en) | Vegetation net of a inclined plane for afforestation | |
JP4611124B2 (en) | Natural restoration method | |
KR101108002B1 (en) | Eco-Friendly Afforestation Method | |
CN212452691U (en) | Ecological side slope | |
CN217128264U (en) | Rock slope ecological protection structure | |
KR101464925B1 (en) | Scouring Preventing Method by Using Planted Chip-Concrete Gabion | |
JP5964367B2 (en) | Tree planting method on retaining wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
N231 | Notification of change of applicant | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
NORF | Unpaid initial registration fee |