KR20110078408A - 방호쉴드를 이용한 초장대터널 굴착방법 - Google Patents
방호쉴드를 이용한 초장대터널 굴착방법 Download PDFInfo
- Publication number
- KR20110078408A KR20110078408A KR1020090135213A KR20090135213A KR20110078408A KR 20110078408 A KR20110078408 A KR 20110078408A KR 1020090135213 A KR1020090135213 A KR 1020090135213A KR 20090135213 A KR20090135213 A KR 20090135213A KR 20110078408 A KR20110078408 A KR 20110078408A
- Authority
- KR
- South Korea
- Prior art keywords
- tunnel
- pilot tunnel
- shield
- pilot
- blasting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 30
- 230000001681 protective effect Effects 0.000 title claims description 19
- 238000009412 basement excavation Methods 0.000 title abstract description 24
- 238000005422 blasting Methods 0.000 claims abstract description 40
- 238000010276 construction Methods 0.000 claims abstract description 31
- 238000009434 installation Methods 0.000 claims abstract description 21
- 238000004880 explosion Methods 0.000 claims description 12
- 230000035939 shock Effects 0.000 claims description 10
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 10
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 8
- 238000007664 blowing Methods 0.000 claims description 6
- 229910052742 iron Inorganic materials 0.000 claims description 4
- 230000005540 biological transmission Effects 0.000 claims description 3
- 230000000903 blocking effect Effects 0.000 claims description 3
- 239000000428 dust Substances 0.000 claims description 3
- 239000000463 material Substances 0.000 claims description 3
- 230000004888 barrier function Effects 0.000 claims description 2
- 238000007599 discharging Methods 0.000 claims description 2
- 230000002265 prevention Effects 0.000 claims description 2
- 230000005641 tunneling Effects 0.000 abstract description 3
- 239000010881 fly ash Substances 0.000 description 3
- 239000011798 excavation material Substances 0.000 description 2
- 239000002360 explosive Substances 0.000 description 2
- 206010000060 Abdominal distension Diseases 0.000 description 1
- 241001669679 Eleotris Species 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 208000024330 bloating Diseases 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000001012 protector Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/006—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by making use of blasting methods
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60B—VEHICLE WHEELS; CASTORS; AXLES FOR WHEELS OR CASTORS; INCREASING WHEEL ADHESION
- B60B17/00—Wheels characterised by rail-engaging elements
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F17/00—Methods or devices for use in mines or tunnels, not covered elsewhere
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F5/00—Means or methods for preventing, binding, depositing, or removing dust; Preventing explosions or fires
- E21F5/14—Fluid barriers or rock dusters made to work by, or at the same time as, shots or explosions
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42D—BLASTING
- F42D5/00—Safety arrangements
- F42D5/04—Rendering explosive charges harmless, e.g. destroying ammunition; Rendering detonation of explosive charges harmless
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Mechanical Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
Description
Claims (7)
- 장대터널을 굴착하는 방법에 있어서,TBM(tunnel boring machine)을 이용하여 형성하고자 하는 장대터널의 중앙부에 파일럿 터널을 형성하는 파일럿 터널 시공단계;상기 파일럿 터널 형성 시, 상기 TBM의 운영에 필요한 후방시설을 상기 파일럿 터널에 설치하는 후방시설 설치단계;설치된 상기 후방시설 및 그 주변 일정 공간을 보호하도록 상기 파일럿 터널에 방호쉴드를 설치하는 방호쉴드 설치단계;상기 방호쉴드가 설치되면, 상기 장대터널의 형성을 위해 파일럿 터널 주변을 발파하여 장대터널을 형성시키는 발파단계를 포함하여 이루어지고,상기 단계들을 장대터널 시공까지 반복하되, 상기 파일럿 터널 시공단계와 발파단계를 동시에 진행하는 것을 특징으로 하는 방호쉴드를 이용한 초장대터널 굴착방법.
- 제1항에 있어서, 상기 후방시설 설치단계는,상기 파일럿 터널 길이방향을 따라 다수의 슬리퍼를 설치하되, 중앙부에 설치공간부를 형성하는 슬리퍼 설치단계;상기 설치공간부를 따라 전력케이블과 압송관, 송풍관, 송수관을 설치하되, 슬리퍼 중 어느 한 측부 또는 양측부에 설치되는 내설단계; 및상기 슬리퍼의 상면을 따라 일정 간격으로 레일을 설치하여 상기 TBM에 의해 굴착된 굴착물을 이송시키기 위한 광차가 이동되는 레일 설치단계를 포함하여 이루어지는 방호쉴드를 이용한 초장대터널 굴착방법.
- 제2항에 있어서,상기 슬리퍼의 상면 양측에 방지턱이 돌출 형성되어 설치된 상기 방호쉴드가 측방향으로 밀리는 것을 방지하는 것을 특징으로 하는 방호쉴드를 이용한 초장대터널 굴착방법.
- 제2항에 있어서,상기 전력케이블과 압송관, 송수관, 송풍관을 설치하기 위한 설치부가 더 구비되며,상기 설치부는,전력케이블과 압송관, 송수관, 송풍관의 상측을 보호하도록 보호판이 어느 한 슬리퍼의 측부에 구비되고, 상기 보호판의 하측에 상기 전력케이블을 거치시키기 위한 거치고리가 다수 개 구비되며, 상기 압송관, 송수관의 하측을 지지하는 상단선반이 구비되고, 상기 송풍관의 측면을 보호하도록 하단거치판이 상기 파일럿 터널의 저면에 더 구비되는 것을 특징으로 하는 방호쉴드를 이용한 초장대터널 굴착방법.
- 제1항에 있어서, 상기 방호쉴드 설치단계에서 방호쉴드는,상기 파일럿 터널 시공단계 전에 제작되며,하측으로 개방된 아치형의 방호관;상기 방호관의 양측 하단에 그 길이방향을 따라 일정 간격 이격되어 다수 개 구비되는 지지함체;상기 지지함체 하측에 구비되어 상기 파일럿터널 저면과의 충격을 완화시키는 제1충격흡수패드;상기 방호관의 내부 양측에 각각 구비되어 외측에서 전달되는 충격에 의해 방호관의 형상이 변형되는 것을 방지시키는 방지벽; 및상기 방지벽의 하단을 따라 구비되어 상기 후방시설과의 충격을 완화시키는 제2충격흡수패드를 포함하여 이루어지는 방호쉴드를 이용한 초장대터널 굴착방법.
- 제5항에 있어서,상기 방호쉴드를 파일럿 터널을 따라 이동시키는 다수의 이동수단이 더 구비되되,상기 이동수단은,상기 방호관 내부 양측 상단부에 각각 한 쌍으로 형성되어 방호관의 길이방향을 따라 다수 개 구비된 이동실린더; 및상기 이동실린더에 의해 그 길이방향으로 이동되어 상기 방호쉴드를 파일럿 터널 저면에서 이격시키는 이동로드를 포함하여 이루어지고,상기 파일럿 터널 형성 시, 발생된 굴착물을 이동시키기 위한 광차를 상기 이동실린더의 하측에 위치시킨 후, 상기 각 이동로드를 길이방향으로 이동시켜 광차의 상측과 접촉하되, 상기 방호쉴드가 파일럿 터널 저면 및 후방시설과 이격된 상태로 광차에 실린 다음, 광차가 이동함에 따라 상기 방호쉴드를 이동시키는 것을 특징으로 하는 방호쉴드를 이용한 초장대터널 굴착방법.
- 제1항에 있어서, 상기 방호쉴드 설치단계는,상기 TBM에 의해 굴착되는 방향에 위치된 방호쉴드 일단부 외측을 감싸도록 방폭압쉴드가 탈부착 가능하게 더 구비되며,상기 방폭압쉴드는,상기 방호쉴드 일단부 외측에 구비되어 팽창 및 수축되는 탄성튜브;상기 탄성튜브 양단에 구비되어 그 내부를 폐쇄시키는 한 쌍의 철판거더; 및폐쇄된 상기 탄성튜브에 압축공기를 공급 또는 배출시켜 팽창 또는 축소시키는 압축공기공급부를 포함하여 이루어지고,공급되는 압축공기에 의해 팽창되어 상기 방호쉴드와 파일럿 터널 사이 공간을 차단시킴에 따라 발파 시 발생되는 폭음 폭압과 유해가스 및 분진의 이동을 차단시키는 것을 특징으로 하는 방호쉴드를 이용한 초장대터널 굴착방법.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020090135213A KR101144905B1 (ko) | 2009-12-31 | 2009-12-31 | 방호쉴드를 이용한 초장대터널 굴착방법 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020090135213A KR101144905B1 (ko) | 2009-12-31 | 2009-12-31 | 방호쉴드를 이용한 초장대터널 굴착방법 |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20110078408A true KR20110078408A (ko) | 2011-07-07 |
KR101144905B1 KR101144905B1 (ko) | 2012-05-14 |
Family
ID=44917874
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020090135213A Active KR101144905B1 (ko) | 2009-12-31 | 2009-12-31 | 방호쉴드를 이용한 초장대터널 굴착방법 |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101144905B1 (ko) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101224880B1 (ko) * | 2010-12-21 | 2013-01-22 | (주)엘티엠 | 발파보호대와 대차를 이용한 티비엠 굴착과 확대발파 시공방법 및 관련장치 |
CN106640093A (zh) * | 2017-01-11 | 2017-05-10 | 中铁四局集团第工程有限公司 | 一种隧道掌子面爆破施工方法 |
CN109915179A (zh) * | 2019-03-29 | 2019-06-21 | 中国水利水电第三工程局有限公司 | 一种敞开式tbm撑靴辅助顶压减流隧洞堵水方法 |
KR102009896B1 (ko) * | 2018-04-13 | 2019-08-13 | 주식회사경도 | 티비엠 굴착과 확대발파를 병행한 나틈터널 굴착방법 |
CN111663960A (zh) * | 2019-09-27 | 2020-09-15 | 华北水利水电大学 | 一种采用爆破解决盾构机受困的方法 |
KR20200140680A (ko) | 2019-06-07 | 2020-12-16 | 강릉건설 주식회사 | 신축 세그먼트 및 신축 세그먼트를 이용한 쉴드 tbm 터널 뒷채움 방법 |
KR20220051720A (ko) | 2020-10-19 | 2022-04-26 | 강릉건설 주식회사 | 뒤채움부재의 역류방지부재를 구비한 터널굴착구조 |
CN114812325A (zh) * | 2022-03-23 | 2022-07-29 | 中铁开发投资集团有限公司 | 一种可抗冲击的隧道爆破施工用防护装置 |
CN114961854A (zh) * | 2022-06-16 | 2022-08-30 | 侨智建设有限公司 | 一种复杂软弱围岩隧道爆破施工减震装置及施工方法 |
KR102456753B1 (ko) | 2021-11-17 | 2022-10-21 | 강릉건설 주식회사 | 티비엠 굴착과 확대발파 병행을 위한 터널 굴착장치 및 터널 굴착방법 |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105736000B (zh) * | 2016-03-08 | 2018-12-21 | 北京住总集团有限责任公司 | 一种静态爆破拆除盾构成型隧道零环管片的施工方法 |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2996097B2 (ja) * | 1994-07-18 | 1999-12-27 | 株式会社大林組 | トンネル掘削工法 |
KR100351270B1 (ko) * | 1999-08-06 | 2002-09-05 | (주)엘티엠 | 3차원적 다단계 터널굴착방법 및 장치 |
JP2003239676A (ja) | 2002-02-12 | 2003-08-27 | Public Works Research Institute | 既設トンネルの拡幅装置 |
JP3856301B2 (ja) | 2002-03-19 | 2006-12-13 | 独立行政法人土木研究所 | 移動式作業構台を用いる既設トンネルの拡大工法 |
-
2009
- 2009-12-31 KR KR1020090135213A patent/KR101144905B1/ko active Active
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101224880B1 (ko) * | 2010-12-21 | 2013-01-22 | (주)엘티엠 | 발파보호대와 대차를 이용한 티비엠 굴착과 확대발파 시공방법 및 관련장치 |
US9568295B2 (en) | 2010-12-21 | 2017-02-14 | Chan Woo Lee | Method and related devices for carrying out TBM excavation and expansion blasting using a blast protector and a cart |
CN106640093A (zh) * | 2017-01-11 | 2017-05-10 | 中铁四局集团第工程有限公司 | 一种隧道掌子面爆破施工方法 |
KR102009896B1 (ko) * | 2018-04-13 | 2019-08-13 | 주식회사경도 | 티비엠 굴착과 확대발파를 병행한 나틈터널 굴착방법 |
CN109915179A (zh) * | 2019-03-29 | 2019-06-21 | 中国水利水电第三工程局有限公司 | 一种敞开式tbm撑靴辅助顶压减流隧洞堵水方法 |
KR20200140680A (ko) | 2019-06-07 | 2020-12-16 | 강릉건설 주식회사 | 신축 세그먼트 및 신축 세그먼트를 이용한 쉴드 tbm 터널 뒷채움 방법 |
CN111663960A (zh) * | 2019-09-27 | 2020-09-15 | 华北水利水电大学 | 一种采用爆破解决盾构机受困的方法 |
KR20220051720A (ko) | 2020-10-19 | 2022-04-26 | 강릉건설 주식회사 | 뒤채움부재의 역류방지부재를 구비한 터널굴착구조 |
KR102456753B1 (ko) | 2021-11-17 | 2022-10-21 | 강릉건설 주식회사 | 티비엠 굴착과 확대발파 병행을 위한 터널 굴착장치 및 터널 굴착방법 |
CN114812325A (zh) * | 2022-03-23 | 2022-07-29 | 中铁开发投资集团有限公司 | 一种可抗冲击的隧道爆破施工用防护装置 |
CN114812325B (zh) * | 2022-03-23 | 2024-05-24 | 中铁开发投资集团有限公司 | 一种可抗冲击的隧道爆破施工用防护装置 |
CN114961854A (zh) * | 2022-06-16 | 2022-08-30 | 侨智建设有限公司 | 一种复杂软弱围岩隧道爆破施工减震装置及施工方法 |
Also Published As
Publication number | Publication date |
---|---|
KR101144905B1 (ko) | 2012-05-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101144905B1 (ko) | 방호쉴드를 이용한 초장대터널 굴착방법 | |
CN110985025B (zh) | 一种改建盾构隧道进行矿山法施工的方法 | |
KR101054380B1 (ko) | 터널굴착공법 | |
KR101817316B1 (ko) | 터널 굴착 작업자 보호 장치(가이드루프) | |
US10662771B2 (en) | Drill and blast method and apparatus for the same | |
US9568295B2 (en) | Method and related devices for carrying out TBM excavation and expansion blasting using a blast protector and a cart | |
EA037982B1 (ru) | Способ бесцеликовой разработки с самосохраняющейся подготовительной выработкой без проходки подготовительной выработки на участке горных работ | |
KR20100003061A (ko) | Tbm을 이용한 파일롯터널 굴착, 확대발파, 라이닝병행시공 터널굴착 방법 및 장치 | |
AU2014292699A1 (en) | Temporary supporting and permanent supporting parallel operation excavating technology for crawler-type hydraulic combination bracket and equipment using same | |
CN108386199B (zh) | 高瓦斯突出煤层盾构安全高效掘进方法及装置 | |
JP6405768B2 (ja) | トンネルの断面拡大工法 | |
JP6972668B2 (ja) | 防護扉、トンネル坑内の発破防護方法及びガントリー | |
KR102009896B1 (ko) | 티비엠 굴착과 확대발파를 병행한 나틈터널 굴착방법 | |
CN112593961A (zh) | 巷道掘进方法 | |
KR101921925B1 (ko) | 터널 굴착 공법 및 시스템 | |
JP2020159061A (ja) | 山岳トンネル工事における作業坑交差部の施工方法 | |
CN102383795A (zh) | 综合机械化岩巷掘进工艺 | |
KR100844147B1 (ko) | 비대칭 지지벽을 구비한 2아치 터널 및 이의 시공방법 | |
RU2153582C2 (ru) | Комплекс для проходки горных выработок | |
US9810024B2 (en) | Drill system | |
KR101170011B1 (ko) | 터널시공장치 및 이를 이용한 급속 터널시공방법 | |
JP2003227288A (ja) | 既存トンネルの断面拡幅工法と断面拡幅装置 | |
KR102456753B1 (ko) | 티비엠 굴착과 확대발파 병행을 위한 터널 굴착장치 및 터널 굴착방법 | |
EP0153935A1 (en) | CIRCULAR EXCAVATOR MACHINE. | |
KR101604705B1 (ko) | 이중 프로텍터를 이용한 철도터널 확폭 방법 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
PA0109 | Patent application |
Patent event code: PA01091R01D Comment text: Patent Application Patent event date: 20091231 |
|
PA0201 | Request for examination | ||
PG1501 | Laying open of application | ||
PE0902 | Notice of grounds for rejection |
Comment text: Notification of reason for refusal Patent event date: 20111110 Patent event code: PE09021S01D |
|
E701 | Decision to grant or registration of patent right | ||
PE0701 | Decision of registration |
Patent event code: PE07011S01D Comment text: Decision to Grant Registration Patent event date: 20120427 |
|
GRNT | Written decision to grant | ||
PR0701 | Registration of establishment |
Comment text: Registration of Establishment Patent event date: 20120503 Patent event code: PR07011E01D |
|
PR1002 | Payment of registration fee |
Payment date: 20120503 End annual number: 3 Start annual number: 1 |
|
PG1601 | Publication of registration | ||
FPAY | Annual fee payment |
Payment date: 20150504 Year of fee payment: 4 |
|
PR1001 | Payment of annual fee |
Payment date: 20150504 Start annual number: 4 End annual number: 4 |
|
FPAY | Annual fee payment |
Payment date: 20160502 Year of fee payment: 5 |
|
PR1001 | Payment of annual fee |
Payment date: 20160502 Start annual number: 5 End annual number: 5 |
|
FPAY | Annual fee payment |
Payment date: 20170502 Year of fee payment: 6 |
|
PR1001 | Payment of annual fee |
Payment date: 20170502 Start annual number: 6 End annual number: 6 |
|
FPAY | Annual fee payment |
Payment date: 20180424 Year of fee payment: 7 |
|
PR1001 | Payment of annual fee |
Payment date: 20180424 Start annual number: 7 End annual number: 7 |
|
FPAY | Annual fee payment |
Payment date: 20190425 Year of fee payment: 8 |
|
PR1001 | Payment of annual fee |
Payment date: 20190425 Start annual number: 8 End annual number: 8 |
|
PR1001 | Payment of annual fee |
Payment date: 20200429 Start annual number: 9 End annual number: 9 |
|
PR1001 | Payment of annual fee |
Payment date: 20210503 Start annual number: 10 End annual number: 10 |
|
PR1001 | Payment of annual fee |
Payment date: 20220427 Start annual number: 11 End annual number: 11 |