KR20110073761A - Railing pillar establishment system of timber trestle bridge - Google Patents

Railing pillar establishment system of timber trestle bridge Download PDF

Info

Publication number
KR20110073761A
KR20110073761A KR1020090130494A KR20090130494A KR20110073761A KR 20110073761 A KR20110073761 A KR 20110073761A KR 1020090130494 A KR1020090130494 A KR 1020090130494A KR 20090130494 A KR20090130494 A KR 20090130494A KR 20110073761 A KR20110073761 A KR 20110073761A
Authority
KR
South Korea
Prior art keywords
railing
plate
column
upper plate
pillar
Prior art date
Application number
KR1020090130494A
Other languages
Korean (ko)
Other versions
KR101159684B1 (en
Inventor
배대환
Original Assignee
수풍산업 주식회사
배대환
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 수풍산업 주식회사, 배대환 filed Critical 수풍산업 주식회사
Priority to KR1020090130494A priority Critical patent/KR101159684B1/en
Publication of KR20110073761A publication Critical patent/KR20110073761A/en
Application granted granted Critical
Publication of KR101159684B1 publication Critical patent/KR101159684B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/10Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
    • E01D19/103Parapets, railings ; Guard barriers or road-bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/10Wood

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Steps, Ramps, And Handrails (AREA)

Abstract

PURPOSE: A railing column installation system of a timber trestle bridge is provided to maintain the solidity of a railing for a long time using screw coupling units. CONSTITUTION: A railing column installation system of a timber trestle bridge comprises a female screw pipe(10), holes(103',104'), and a column coupler(20). The female screw pipe is fixed to the top surface of an H-beam(101). The holes are formed in an upper plate coupling board(103) and an upper plate(104) to be connected to the female screw pipe. The column coupler comprises a plate(21), a male screw rod(22), and an insertion pipe(23). The male screw rod is connected to the female screw pipe through the hole of the upper plate. The bottom end of a railing column(105) is inserted into the insertion pipe.

Description

목교의 난간기둥 설치 장치{Railing pillar establishment system of timber trestle bridge}Railing pillar establishment system of timber trestle bridge

본 발명은 주로 강의 폭보다 좁은 내나 습지의 가에 설치하여 경관을 보기 위한 일명 데크 로드라고 칭하는 목교의 난간기둥을 설치하기 위한 목교의 난간기둥 설치 장치에 관한 것으로서, 좀 더 상세하게는 목교의 상판 양변에 설치하는 난간의 기둥을 설치하는 것에 있어서, 교각 상단에 설치하는 에이취빔 상면에 암나사관을 고정하고, 상기 암나사관을 관통하는 구멍을 구비한 체결장식판넬과 상판을 에이취빔 상에 설치하여 상기한 암나사관에 나사체결되는 숫나사봉과 난간기둥을 삽착하는 삽착관을 구비한 기둥체결구를 상기 암나사관에 나사식 체결하여 고정시켜 난가기둥을 기둥체결구의 삽착관에 삽착 고정하여, 종래 난간기둥을 상판에 못이나 나사못 등으로 고정설치 하였던 것보다는 장기간 사용하여도 견고함을 유지하도록 하는 것을 목적으로 한 목교의 난간기둥 설치 장치를 제공하기 위한 것이다. The present invention relates to a wooden railing pillar installation device for installing a railing column of a wooden bridge, called deck road, which is mainly installed in a narrow area of a river or a wetland side to view a landscape, and more specifically, a top plate of a wooden bridge. In installing the pillars of railings installed on both sides, the female threaded pipe is fixed to the upper surface of the beam beam installed at the upper end of the piers, and a fastening decorative panel and a top plate provided with holes through the female threaded pipe are installed on the beam. A column fastener having a male threaded rod screwed to the female threaded pipe and an insertion tube for inserting a railing column is screwed into the female threaded tube to be fixed to the female threaded pipe to insert and fix the egg post to the inserting tube of the column fastener, and the conventional handrail Rather than fixing the column with nails or screws on the top plate, It is to provide a railing pillar mounting device of a wooden bridge.

일반적으로 목교는 교각 상단에 고정한 에이취빔 위에 체결판과 상판을 설치 한 다음 상기 상판의 양 변에 난간의 기둥을 못이나 나사못 등을 박아 난간기둥을 상판 위에 설치하였다.In general, the wooden bridge was installed on the Hig beam fixed to the top of the piers and the top plate was installed on both sides of the top plate of the railing pillars nails or screws to install the railing column on the top plate.

그런데 목교를 건너다니는 사람들의 습성은 난간을 손으로 스치거나 또는 잠시 기대는 경우가 허다하여 이럴 때마다 난간에 인체의 힘이 가하여져 못이나 나사못의 박힘이 느슨해져 난간이 오래 버티지 못하므로 수시로 보수와 수리하여야 하는 문제점이 있는 것이다. However, the habits of people crossing wood bridges often touch the railing by hand or lean on it for a while.At this time, the human body is applied to the railing and the nail or screw is loosened, so the railing does not last long. There is a problem that needs to be repaired.

본 발명은 상기와 같은 종래의 문제점을 해결하여 난간 기둥을 장기간 사용하여도 견고함이 위지 되도록 하기 위하여 교각에 설치된 에이취빔 상면과 상판의 상면 사이에 암수나사결합으로 체결되는 나사체결수단을 구비시켜 상기 나사체결수단에 난간기둥을 직접 체결하도록 하여 장기간의 세월이 지나도 난간기둥의 견고함이 유지되도록 하는 것을 목적으로 한 목교의 난간기둥 설치장치를 제공하는 데 있다. The present invention provides a screw fastening means for fastening by male and female coupling between the upper surface of the H-beam beam and the upper plate installed in the piers in order to solve the conventional problems as described above, so that even if the railing pillar is used for a long time. It is to provide a railing pillar installation device for the purpose of maintaining the firmness of the railing pillar even after a long period of time by fastening the railing pillar directly to the screw fastening means.

상기 본 발명에 맞추어 기재된 목적을 제공하는 목교의 난간기둥 설치장치는 교각 상단에 설치되는 에이취빔의 상면에 암나사관을 고정하고, 상기 에이취빔 상면에 설치하는 체결장시판넬과 상판에 상기 암나사관과 연통되는 구멍을 뚫어 상기 구멍을 통하여 암나사관에 나사체결되는 숫나사봉과 난간기둥을 삽착하는 삽착관을 구비한 기둥체결구를 상판에 고정하여 에치취빔에 고정한 암나사관과 기둥체결구로 난간기둥을 설치하는 기둥체결 수단과, 상기 에이취빔 상에 설치되는 장식체결판넬과 상판을 목교의 폭의 방향으로 받혀주어 상판의 견고함을 유지시키기 위한 상판 받침 수단으로 되는 앵글과 받침대를 에이취빔에 직각 방향으로 연결하여 구성된 것이다. The railing column installation apparatus of the wooden bridge providing the object described in accordance with the present invention is fixed to the upper surface of the H-beam beam is installed on the top of the pier, and the female screw pipe on the fastening panel and the upper plate installed on the H-beam beam upper surface A handrail pillar is installed with a female screw tube and a column fastener fixed to an etched beam by fixing a column fastener having a male threaded rod screwed into a female threaded pipe and an insertion tube for inserting a railing column through the hole through which the hole is connected. The angle fastening means and the pedestal means for supporting the decorative fastening panel and the top plate installed on the H-beam beam in the direction of the width of the wooden bridge to maintain the rigidity of the top plate in the direction perpendicular to the H-beam. It is configured by connection.

이상과 같이 된 본 발명은 에이취빔 상면에 고정한 암나사관에 기둥체결구의 숫나사봉이 나사끼움되어 기둥체결구의 설치 자체가 견고한 상태에서 난간기둥의 하단을 상기 기둥체결구의 삽착관에 삽착한 것이므로, 종래 못이나 나사못 등으로 상판에 난간기둥을 직접 체결한 것보다는 장기간의 세월이 지나도 난간의 견고함이 유지되는 효과가 있는 것이며, 상기한 상판을 In the present invention as described above, the male threaded rod of the column fastener is screwed into the female screw fixed to the upper surface of the H-beam beam, so that the lower end of the railing column is inserted into the insertion pipe of the column fastener while the installation of the column fastener itself is solid, Rather than fastening the railing column directly to the top plate with screws or screws, it is more effective to maintain the durability of the railing even after a long period of time.

도 1은 본 발명의 분해 사시도 이며, 도 2는 본 발명의 종단면도로, 이를 참조 하여 보면, 교각(100)의 상단에 설치한 에이취빔(101)의 외면에 장치대(102)를 삽착하고, 상기 에이취빔(101)의 상면에 상판체결대(103)과 상기 상판체결판(103) 상면에 목교의 상판(104)을 부착하며, 상판(104) 상면 좌우 변에 다수의 난간기둥(105)을 설치하는 것에 있어서, 상기 에이취빔(101)의 외측과 내측 측에 보강 편(110)과 연결편(111)을 용접으로 연결하여 상기 연결편(111)에 협착판(112)를 볼트로 연결하도록하여 상기의 보강편(110)과 협착판(112)이 상판체결대(103)을 협착 고정되게 한다.Figure 1 is an exploded perspective view of the present invention, Figure 2 is a longitudinal cross-sectional view of the present invention, referring to this, inserting the device table 102 on the outer surface of the H-beam 101 installed on the top of the pier 100, The upper plate fastening stand 103 and the upper plate fastening plate 103 are attached to the upper surface of the H-beam beam 101, and a plurality of handrail pillars 105 are disposed on the left and right sides of the upper plate 104. In the installation, by connecting the reinforcing piece 110 and the connecting piece 111 to the outer side and the inner side of the H-beam 101 by welding to connect the narrowing plate 112 to the connecting piece 111 with a bolt. The reinforcing piece 110 and the narrowing plate 112 is fixed to the upper plate fastening stand 103.

상기 이에취빔(101)의 내면에 직각방향으로 앵글(120)을 연결하여 앵글(120)의 상면 중간 중간에 협착편(121)(122)을 부착하여 협착편(121)(122) 사이에 보강대(123)를 고정하여 상판(104)의 중간 중간을 보강대(123)로 받쳐 상판(104)의 견고함을 보강하는 상판 받침 수단을 구성한다.The angle 120 is connected to the inner surface of the blow beam 101 at right angles so that the stenosis pieces 121 and 122 are attached to the middle of the upper surface of the angle 120 to reinforce between the stenosis pieces 121 and 122. The upper plate supporting means for fixing the 123 to support the middle of the upper plate 104 with the reinforcing table 123 to reinforce the firmness of the upper plate 104.

또한, 상기 에이취빔(101)의 상면에 암나사관(10)을 용접하여 고정하며, 상판체결판(103)과 상판(104)에 상기한 암나사관(10)을 관통하는 구멍(103')(104')을 천공한다.In addition, the female threaded pipe 10 is welded and fixed to the upper surface of the H-beam beam 101, and the upper plate fastening plate 103 and the upper plate 104 through the hole (103 ') through the female threaded pipe (10) ( 104 ').

상기 상판(104)의 구멍(104')이 천공된 상면에 기둥체결구(20)를 얹은 상태에서, 기둥체결구(20)를 암나사관(10)에 연결하는데, 상기 기둥체결구(20)는 플레이트(21) 저면에는 숫나사봉(22)을 형성하고, 상면에는 삽착관(23)을 형성하여서 된 것으로서, 상기 숫나사봉(22)을 구멍(103')(104')을 통하여 암나사관(10)에 끼워 기둥체결구(20)를 암나사관(10)에 연결한 다음 삽착관(23)에 난간기둥(105)의 하단을 삽착하여 상판(104) 좌우 변에 다수의 난간기둥(105)을 설치하는 기둥 체결수단을 구성하여서 된 것이다.The column fastener 20 is connected to the female screw tube 10 in a state where the column fastener 20 is placed on the upper surface of the hole 104 ′ of the upper plate 104. The male screw rod 22 is formed on the bottom surface of the plate 21, and an insertion tube 23 is formed on the upper surface of the plate 21, and the male screw rod 22 is formed through a hole 103 'and 104'. 10) the column fasteners 20 are connected to the female screw tube 10, and then the lower end of the handrail pillar 105 is inserted into the insertion tube 23, and a plurality of handrail pillars 105 are disposed on the left and right sides of the top plate 104. It is to configure the pole fastening means for installing.

이상과 같이 된 본 발명의 기둥 체결수단은 숫나사봉(22)을 암나사관(10)에 나사 끼움 할 때에 상판(104)의 상면에 플레이트(21)가 밀착된 상태로 기둥체결구(20)가 고정되기 때문에 기둥체결구(20)가 매우 견고하게 체결된 상태에서 난간 기둥(105)이 삽착관(23)에 체결되어 난간기둥(105)이 매우 견고하게 설치되는 것이다. The pillar fastening means of the present invention as described above is the column fastener 20 in the state in which the plate 21 is in close contact with the upper surface of the upper plate 104 when screwing the male threaded rod 22 to the female threaded pipe (10) Since it is fixed, the handrail pillars 105 are fastened to the insertion tube 23 in the state in which the fastener 20 is very firmly fastened so that the handrail pillars 105 are very firmly installed.

도 1은 본 발명의 분해 사시도.1 is an exploded perspective view of the present invention.

도 2는 본 발명의 종단면도.2 is a longitudinal sectional view of the present invention;

도면의 주요 부분에 대한 부호의 설명Explanation of symbols for the main parts of the drawings

10......암나사관. 20.......기둥체결구. 21......플레이트.10 ...... Female thread. 20 ....... Pillar fasteners. 21 ...... plate.

22......숫나사봉. 23.......삽착관. 100.....교각.22 ...... Male thread. 23 ....... Intubation tube. 100 ..... piers.

101......에이취빔. 102......장치대. 103.......상판체결대.101 ...... Aich Beam. 102 ...... 103 ....... Tops.

104......상판. 103', 104'......구멍. 105....... 난간기둥. 104 ...... 103 ', 104' ...... holes. 105 ....... A handrail column.

110.....보강편. 111.....연결편. 112.......협착판. 110 ..... Enhancements. 111 .... Connections. 112 ....

120......앵글. 121, 122.....협착편. 123.....보강대.120 ...... Angle. 121, 122 ..... Stenosis. 123 ....

Claims (2)

에이취빔(101) 상면에 고정하는 암나사관(10)과;A female screw tube 10 fixed to the H-beam beam 101; 상기 암나사관(10)관 연통은 상판체결대(103)와, 상판(104)에 천공한 구멍(103')(104')과;The female threaded pipe (10) tube communication is the top plate fastening stand 103, the hole 103 '(104') perforated in the top plate 104; 상기 상판(104)의 구멍(104')을 통하여 암나사관(10)에 연결하는 숫나사봉(22)과 난간기둥(105)의 하단을 삽착하는 삽착관(23)을 플레이트(21) 상면과 밑면에 구비한 기둥체결구(20)을 형성하여, 숫나사봉(22)을 암나사관(10)에 끼워 상판에 플레이트(21)가 상판(104)에 밀착된 상태로 암나사관(10)과 기둥체결구(20)가 연결하게 되는 기둥 체결수단을 구성하여서 되는 것을 특징으로 하는 목교의 난간기둥 설치장치.An insertion tube 23 for inserting the lower end of the male threaded rod 22 and the handrail pillar 105 connected to the female threaded tube 10 through the hole 104 'of the upper plate 104 and the upper surface of the plate 21. Form the column fastener 20 provided on the bottom, the male threaded rod 22 is inserted into the female threaded pipe 10, the plate 21 on the upper plate in close contact with the upper plate 104, the female threaded pipe 10 and the pillar The railing pillar installation device of the wooden bridge, characterized in that by configuring the fastener 20 is connected to the column fastening means. 청구항 1에 있어서,The method according to claim 1, 에이취빔(101)의 내측에 직각 방향으로 앵글(120)을 연결하여 상기 앵글(120) 상면 중간 중간에 협착편(121)(122)을 부착하여 상기 협착편(121)(122) 사이에 상판(104)의 중간을 받치는 보강대(123)를 다수 삽착 설치하여서 되는 것을 특징으로 하는 목교의 난간기둥설치장치.An angle 120 is connected to the inside of the H-beam 101 at a right angle to attach the stenosis pieces 121 and 122 to the middle of the upper surface of the angle 120 so as to form a top plate between the stenosis pieces 121 and 122. A railing pillar mounting apparatus for wood bridges, characterized in that a plurality of reinforcement stands 123 supporting the middle of the installation are inserted.
KR1020090130494A 2009-12-24 2009-12-24 Railing pillar establishment system of timber trestle bridge KR101159684B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090130494A KR101159684B1 (en) 2009-12-24 2009-12-24 Railing pillar establishment system of timber trestle bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090130494A KR101159684B1 (en) 2009-12-24 2009-12-24 Railing pillar establishment system of timber trestle bridge

Publications (2)

Publication Number Publication Date
KR20110073761A true KR20110073761A (en) 2011-06-30
KR101159684B1 KR101159684B1 (en) 2012-06-26

Family

ID=44404234

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090130494A KR101159684B1 (en) 2009-12-24 2009-12-24 Railing pillar establishment system of timber trestle bridge

Country Status (1)

Country Link
KR (1) KR101159684B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103225256A (en) * 2012-01-27 2013-07-31 水豊产业株式会社 Wooden deck with wider handrail and improved appearance

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09209537A (en) * 1996-02-01 1997-08-12 Binifureemu Kogyo Kk Erecting method for handrail stanchion
JPH10212843A (en) * 1997-01-30 1998-08-11 Matsushita Electric Works Ltd Support structure of external structural column
KR20090118682A (en) * 2008-05-14 2009-11-18 우정건설조경(주) The floating bridge units

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103225256A (en) * 2012-01-27 2013-07-31 水豊产业株式会社 Wooden deck with wider handrail and improved appearance
CN103225256B (en) * 2012-01-27 2017-03-01 水豊产业株式会社 Widen railing wide cut and improve the waterside wooden footway of the aesthetic property of bridge

Also Published As

Publication number Publication date
KR101159684B1 (en) 2012-06-26

Similar Documents

Publication Publication Date Title
KR101769884B1 (en) A Deckboard Installing Device
US20050188627A1 (en) Ground anchor for securement of lumber products
KR100933528B1 (en) Prefabricated structure using profile
KR100968216B1 (en) Assembly type roof structure
ATE527416T1 (en) FOUNDATION, IN PARTICULAR CONCRETE FOUNDATION, WITH A FOUNDATION SHOE FOR FIXING A CONCRETE SUPPORT
KR101791144B1 (en) a arch type wooden bridge
KR101159684B1 (en) Railing pillar establishment system of timber trestle bridge
KR20090007770U (en) Fixing structure for handrail
KR200335406Y1 (en) Sectional inspection traveller for bridge
KR200443024Y1 (en) Stanchion for stairs
KR100726278B1 (en) Rail post assembly for rail fence
KR20100001977U (en) Fixing structure for handrail
KR101878647B1 (en) Handrail post apparatus
KR101712430B1 (en) Beam-Slab Pannel Joint Structure
KR20170007194A (en) Wooden Bridge Structure for Biosphere Preservationa Construction Method Thereof
KR102031079B1 (en) Lower part assembly of deckroad handrail
AU2007101088C4 (en) A Clamp
JP2007303214A (en) Wooden wall
KR101026147B1 (en) Railing for sidewalk and assembling method thereof
CN110359577B (en) Connecting structure of multifunctional steel structure and precast concrete board
CN221741591U (en) Connection base for assembled steel structure building
KR20130104946A (en) Handrail bracket and jig for assembling the handrail
KR200404105Y1 (en) A external panel assembly of bridge
JP2018084089A (en) Step floor support leg and step floor structure using the same
JP2001140463A (en) Scaffolding board bearing

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E90F Notification of reason for final refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20150615

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20160603

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20170602

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20190603

Year of fee payment: 8