Prior art keywords
plate
prefabricated
upper plate
unit
bridge
Prior art date
Application number
KR1020080044615A
Other languages
Korean (ko)
Inventor
이성기
김태균
Original Assignee
우정건설조경(주)
주식회사 우정랜드산업
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 우정건설조경(주), 주식회사 우정랜드산업 filed Critical 우정건설조경(주)
Priority to KR1020080044615A priority Critical patent/KR20090118682A/en
Publication of KR20090118682A publication Critical patent/KR20090118682A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D15/00Movable or portable bridges; Floating bridges
    • E01D15/14Floating bridges, e.g. pontoon bridges
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/34Pontoons

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

PURPOSE: A prefabricated pontoon bridge unit is provided to make installation process of the pontoon bridge easy by manufacturing unites with fixed length on the ground in advance. CONSTITUTION: A prefabricated pontoon bridge unit comprises an upper plate(110), a bridge railing(130), a floating body(150), an upper plate connecting bracket(160) and a connecting unit. The upper plate is supported with a main frame(120), a sub frame(122) and a strut(124). The bridge railing is installed in the longitudinal direction along both sides of the upper plate. The floating body is mounted on the lower part of the upper plate and keeps the upper plate on the water. The upper plate connecting bracket is mounted on the main frame and the sub frame and has a mounting plate and a key groove. The connecting unit connects the upper plate connecting brackets.

Description

조립식 부교 유닛{The floating bridge units}Prefabricated Bridge Units {The floating bridge units}

본 발명은 조립식 부교 유닛에 관한 것으로서, 더욱 상세하게는 강, 저수지, 호수 등의 수면 위로 부상시켜 사람들이 통행하는 가운데 주변의 경관을 관찰할 수 있도록 하는 부교를 시설하는 과정에서 지상에서 일정 크기의 단위체를 미리 제작한 후에 수상에서 기제작된 단위체를 쉽게 연결하여 설치할 수 있도록 한 조립식 부교 유닛에 관한 것이다.The present invention relates to a prefabricated pontoon unit, and more specifically, to a certain size on the ground in the process of installing the pontoon to float on the surface of the river, reservoirs, lakes, etc. so that people can observe the scenery around the traffic. The present invention relates to a prefabricated pontoon bridge unit that can be easily connected and installed after the unit is manufactured in advance.

최근 들어, 조경산업의 발달과 함께 환경보호의 중요성이 어느 때보다도 크게 다루어지면서 강, 저수지, 호수 등에는 자연의 훼손을 줄이면서 사람이 통행하는 가운데 주변 환경을 관찰할 수 있도록 하는 부교, 인공섬 등 수상시설물의 설치가 증가하고 있다.In recent years, with the development of the landscape industry, the importance of environmental protection has been dealt with more than ever, and rivers, reservoirs, lakes, etc., can be used to observe the surrounding environment while allowing people to observe the surrounding environment while reducing the damage to nature. The installation of water facilities is increasing.

한편, 관광 및 레저 산업의 발달과 함께 수상에서 즐길 수 있는 새로운 형태의 여가 문화가 계속하여 생겨나고 있으며, 특히 신도시 등을 건설하는 과정에서도 생태공원이나 인공호수 등과 같은 대규모의 인위적인 조경시설물을 짓는 것이 일반화되고 있다.On the other hand, with the development of tourism and leisure industry, new forms of leisure culture that can be enjoyed in the water are continually emerging, especially in the construction of new towns, it is necessary to build large-scale artificial landscaping facilities such as ecological parks and artificial lakes. It is becoming common.

부교는 전술한 바와 같이 보다 다각화되고 있는 조경시설물의 하나인데, 최 근의 부교는 단지 사람의 통행이나 물건의 소통만을 목적으로 하여 설치되는 것이 아니라 그 주변의 경관과 어우러져 더욱 다양한 경치를 제공할 뿐만 아니라 부교 주변의 생태계를 관찰할 수 있도록 하는 목적으로도 설치되고 있다.The pontoon bridge is one of the more diversified landscaping facilities as described above, and the recent pontoon bridge is not only installed for the purpose of communicating with people or objects but also provides more diverse scenery by combining with the surrounding landscape. It is also being installed for the purpose of observing the ecosystem around the bridge.

그런데 종래 대부분의 경우, 부교의 상판(deck)을 떠받쳐 주기 위한 지주가 물속 아래의 지면에 말뚝을 박는 방식으로 설치됨에 따라서 부교를 설치하는 과정이 무척 어렵게 진행되었을 뿐만 아니라 부교가 설치된 장소의 수심 변화에 따른 부교의 높이조절이 용이하게 이루어지지 못하는 등의 문제점이 있었다. 즉, 부교의 전체 길이가 하나의 구조물로 이루어지게 됨에 따라서 그 설치과정이 어렵게 진행되었을 뿐만 아니라 수심변화에 적절이 반응하지 못하였다.However, in most cases, as the props for supporting the decks of the pontoons are installed in the way under the ground, the process of installing the pontoons is made very difficult and the depth of the place where the pontoons are installed. There was a problem such that the height of the pontoon could not be easily adjusted according to the change. That is, as the entire length of the pontoon bridge was made up of one structure, the installation process was not only difficult but also did not respond appropriately to changes in depth.

한편, 전술한 바와 같이 물속 아래의 지면에 지주를 세우기 위해서 말뚝을 박는 과정에서는 수중 동식물 등에게 나쁜 영향을 미칠 수밖에 없는 문제점이 있었다.On the other hand, as described above, in the process of putting a pile in order to erect the prop in the ground under the water there was a problem that can only have a bad effect on underwater flora and fauna.

따라서 본 발명은 전술한 바와 같은 종래기술의 제반 문제점을 해결하기 위해서 창안된 것으로서, 일정 길이를 갖는 부교의 단위체를 지상에서 미리 제작한 후에 부교가 설치된 길이에 맞춰 기제작된 단위체를 수상에서 연결 설치할 수 있도록 하여 부교의 설치과정이 비교적 용이하게 이루어질 수 있게 한 조립식 부교 유닛을 제공함에 목적이 있다.Therefore, the present invention was devised to solve all the problems of the prior art as described above, after the pre-fabricated unit of a bridge having a certain length in advance on the ground after the pre-fabricated unit is installed in accordance with the length of the bridge is installed in the water It is an object of the present invention to provide a prefabricated girder unit that allows the girder to be installed relatively easily.

또한, 본 발명의 다른 목적은 설치과정에서 수중의 동식물에 영향을 끼치는 것을 최대한 줄일 수 있는 조립식 부교 유닛을 제공함에 있다.In addition, another object of the present invention is to provide a prefabricated girder unit that can minimize the impact on the flora and fauna underwater in the installation process.

또한, 본 발명의 다른 목적은 수상에 설치된 시설물이 수면의 높이 변화에 따라서 자연스럽게 유동될 수 있도록 한 조립식 부교 유닛을 제공함에 목적이 있다.In addition, another object of the present invention is to provide a prefabricated girder unit that allows the facilities installed in the water can flow naturally according to the change in the height of the water surface.

아울러, 본 발명의 다른 목적은 수상에 설치된 상판에 가해지는 하중의 불균형으로 인하여 상판이 전복되는 것이 방지되도록 한 조립식 부교 유닛을 제공함에 있다.In addition, another object of the present invention is to provide a prefabricated bridge unit to prevent the top plate from overturning due to the imbalance of the load applied to the top plate installed in the water phase.

전술한 목적을 달성하기 위해 구성되는 본 발명은 다음과 같다. 즉, 본 발명에 따른 조립식 부교 유닛은 사람의 통행이 가능하게 수상에 설치되는 부교에 있어서, 일정 길이와 일정 폭을 갖으며 그 하부에 조립된 길이 방향의 메인 프레임과 폭 방향의 서브 프레임에 의해서 지탱되되 동일한 크기로 가공된 다수의 각재들이 나란히 배열설치된 상판; 상판의 양측에 일정 높이로 길게 설치되는 다리난간; 상판이 수면에 부상할 수 있도록 메인 프레임을 따라 상판 하부의 양측에 다수 설치되되 그 각각은 일정 길이를 갖는 물에 뜨는 재질로 원통 또는 원기둥 형상으로 형성된 부체; 상판의 전단 및 후단에 위치된 메인 프레임 또는 서브 프레임에 각각 고정설치되는 마운팅 플레이트의 외부면 상에 상부 및 정면 일부가 개방된 형태의 키이 홈이 돌출형성된 상판연결용 브라켓; 및 단위체를 이루며 나란히 배열된 상판의 전방 및 후방에 일정 간격을 두고 각각 위치된 연결 브라켓 사이를 연결하는 연결수단을 포함하여 이루어진다.The present invention configured to achieve the above object is as follows. That is, the prefabricated pontoon unit according to the present invention has a certain length and a predetermined width in the pontoon installed in the water to enable the passage of people, by the main frame in the longitudinal direction and the subframe in the width direction assembled in the lower portion A top plate which is supported but arranged in parallel with a plurality of lumbers processed to the same size; Bridge railings are installed on both sides of the upper plate to a certain height; A plurality of upper plate is installed on both sides of the lower portion of the upper plate along the main frame so as to float on the water surface, each of which is a floating material having a predetermined length in a cylindrical or cylindrical shape; A top plate connecting bracket having a key groove protruding from the top and front portions of the mounting plate on the outer surface of the mounting plate respectively fixed to the main frame or the sub frame positioned at the front and rear ends of the top plate; And it comprises a connecting means for connecting between the connection brackets respectively positioned at a predetermined interval in the front and rear of the upper plate arranged side by side forming a unit.

한편, 본 발명에 따른 조립식 부교 유닛에서 연결수단은 전방 및 후방 측에 일정 간격을 두고 위치된 키이 홈에 각각 삽입되도록 한 쌍으로 형성된 판 형상의 키이 플레이트 및 한 쌍의 키이 플레이트 사이에 배치되되 그 전후 양단은 각각 해당 키이 플레이트에 고정 설치되는 코일 상의 스프링으로 이루어진다.On the other hand, in the prefabricated girder unit according to the present invention, the connecting means is disposed between the plate-shaped key plate and a pair of key plate formed in a pair so that the keys positioned at a predetermined distance on the front and rear sides, respectively, into the groove, Both front and rear ends each consist of a spring on the coil fixed to the corresponding key plate.

또한, 본 발명에 따른 조립식 부교 유닛에서 연결수단의 스프링은 압축 스프링으로 이루어지되 그 전단 및 후단은 각각 해당 방향의 키이 플레이트 상에 일정 각도 간격을 두고 체결되는 U자형 볼트로써 고정설치될 수 있다.In addition, the spring of the connecting means in the prefabricated bridge unit according to the present invention is made of a compression spring, the front end and the rear end may be fixedly installed as a U-shaped bolt that is fastened at predetermined angle intervals on the key plate in the corresponding direction, respectively.

또한, 본 발명에 따른 조립식 부교 유닛에서 상판연결용 브라켓의 마운팅 플레이트의 내측면 상에는 길이방향으로 설치되는 메인 프레임의 양쪽 측면에 볼트로써 고정장착되기 위한 서브 마운팅 플레이트가 일정 길이로 돌출형성될 수 있다.In addition, on the inner surface of the mounting plate of the bracket for connecting the top plate in the prefabricated girder unit according to the present invention, the sub-mounting plate for fixed mounting with bolts on both sides of the main frame installed in the longitudinal direction may protrude to a predetermined length. .

그리고 본 발명에 따른 조립식 부교 유닛에서 다리난간은 상판의 양측에 일정 간격을 두고 세로로 고정설치되는 난간 지주와 난간 지주들끼리를 일정 높이로 연결하여 상판의 길이방향으로 길게 고정설치되는 난간 가로목으로 이루어지되, 다수의 난간 지주들 사이의 일정 위치에는 내부가 빈 파이프 형태로 이루어진 조명설치대가 형성되는 한편 그 조명설치대의 한쪽 도중에는 조명 설치공이 관통형성될 수 있다.And in the prefabricated girder bridge according to the present invention, the railing railing is a railing rail that is fixedly installed in the longitudinal direction of the upper plate by connecting the railing struts and railing struts fixedly installed vertically at both sides of the upper plate at a predetermined height. Consisting of, but a predetermined position between the plurality of handrail struts are formed in the interior of an empty pipe-shaped lighting installation while the lighting installation hole may be formed through one side of the lighting installation.

또한, 본 발명에 따른 조립식 부교 유닛에서 상판의 하부에는 일정 길이의 스테이가 하향설치되는 한편 그 스테이의 하단에는 상판의 유동시 뒤집히지 않도록 균형을 유지시켜주기 위한 중량체가 더 설치될 수 있다.In addition, in the prefabricated girder unit according to the present invention, a stay of a predetermined length is installed downward in the lower part of the upper plate, and a weight body for maintaining a balance so as not to be inverted during the flow of the upper plate may be further installed at the lower end of the stay.

또한, 본 발명에 따른 조립식 부교 유닛에서 상판의 측면에서 가해지는 외부 충격이 흡수되도록 상판의 양쪽 측면에는 완충부재가 더 구성될 수 있다.In addition, the shock absorbing member may be further configured on both sides of the top plate so that external impact applied from the side of the top plate is absorbed in the prefabricated girder unit according to the present invention.

또한, 본 발명에 따른 조립식 부교 유닛에서 난간 지주의 하부는 상판의 하측으로 일정 길이만큼 더 연장형성되어지되 그 하부로 연장된 난간 지주의 외부면 상에는 일정 폭을 갖는 다수의 각목이 부착되어 이루어진 하부 가림판이 설치될 수 있다.In addition, the lower portion of the handrail strut in the prefabricated girder unit according to the present invention is further extended by a predetermined length to the lower side of the upper plate, but the bottom is made of a plurality of squares having a certain width on the outer surface of the handrail extending to the bottom A blind plate may be installed.

아울러, 본 발명에 따른 조립식 부교 유닛에서 각각의 부체는 일정 간격을 두고 다수 설치된 메인 프레임들 중 좌우 외측에 위치된 외측 메인 프레임과, 각각의 외측 메인 프레임과 바로 이웃하는 내측 메인 프레임을 2개 1조로 하는 사이 공간에 설치되되 각각의 부체는 외측 및 내측 프레임에 그 외주가 접하는 상태에서 띠 상의 체결부재로써 외측 및 내측 프레임에 묶여 고정장착될 수 있다.In addition, in the prefabricated girder unit according to the present invention, each floating unit has two outer main frames positioned on the left and right sides of the plurality of main frames installed at regular intervals, and two inner main frames immediately adjacent to each outer main frame. It is installed in the space between the jaw, each of the floating body can be fixed and attached to the outer and inner frame as a fastening member on the belt in the state that the outer periphery is in contact with the outer and inner frame.

본 발명에 따르면 저수지, 호수, 강 등의 수면에 사람들이 통행하면서 주변을 관찰할 수 있도록 설치되는 부교를 일정 길이를 갖는 다수의 단위체로 지상에서 제작한 후에 부교의 전체 길이에 맞춰 단위체인 부교를 조립하여 설치할 수 있게 됨으로서 특히 수상에서 이루어지는 부교의 설치과정이 보다 쉽게 이루어질 수 있는 커다란 장점이 있는 것이다.According to the present invention, after the pontoon bridge is installed on the surface of a reservoir, a lake, a river, etc., people can observe the surroundings while making a number of units having a certain length on the ground, and then the pontoon bridge is made according to the entire length of the pontoon bridge. As it can be assembled and installed, there is a great advantage that the installation process of the pontoon bridge can be made especially easily in the water.

또한, 본 발명에 따른 조립식 부교 유닛은 그 제작과정의 대부분이 지상에서 이루어진 후에 그 설치과정만이 수상에서 이루어지기 때문에 부교의 설치과정에서 발생할 수 있는 수생 동식물의 피해를 줄일 수 있는 커다란 효과가 있다.In addition, the prefabricated pontoon bridge unit according to the present invention has a great effect to reduce the damage to aquatic flora and fauna that can occur during the installation process of the pontoon because only the installation process is made in the water after most of the manufacturing process is made on the ground. .

한편, 본 발명에 따른 조립식 부교 유닛은 다수의 단위체가 일정 간격을 두 고 이어져 조립되기 때문에 수면의 변화에 따른 높이 변화가 보다 자연스럽게 이루어질 수 있는 효과가 있는 것이다.On the other hand, the prefabricated pontoon bridge unit according to the present invention has the effect that the height change according to the change of the water surface can be made more naturally because a plurality of units are assembled at a constant interval.

이하에서는 본 발명에 따른 조립식 부교 유닛의 구성 및 설치상태에 따른 바람직한 실시 예를 첨부한 도면을 참조하면서 설명하기로 한다.Hereinafter, with reference to the accompanying drawings, preferred embodiments according to the configuration and installation state of the prefabricated girder unit according to the present invention will be described.

도 1 은 본 발명에 따른 조립식 부교 유닛의 사시도, 도 2 는 본 발명에 따른 조립식 부교 유닛의 평면 상태도, 도 3 은 본 발명에 따른 조립식 부교 유닛의 측면 상태도, 도 4 는 본 발명에 따른 조립식 부교 유닛의 정면도, 도 5 는 본 발명에 따른 조립식 부교 유닛이 설치된 상태를 보인 도면이다.1 is a perspective view of a prefabricated pontoon unit according to the present invention, Figure 2 is a plan view of the prefabricated pontoon unit according to the invention, Figure 3 is a side view of the prefabricated pontoon unit according to the present invention, Figure 4 is according to the present invention Front view of the prefabricated pontoon unit, Figure 5 is a view showing a state in which the prefabricated pontoon unit according to the present invention is installed.

한편, 도 6a 는 본 발명에 따른 상판연결용 브라켓의 정면 사시도, 도 6b 는 본 발명에 따른 상판연결용 브라켓의 배면 사시도, 도 6c 는 다른 실시 예에 따른 상판연결용 브라켓의 사시도, 도 7 은 본 발명에 따른 상판 연결수단의 구조를 설명하기 위한 도면이다.On the other hand, Figure 6a is a front perspective view of the top plate connection bracket according to the invention, Figure 6b is a rear perspective view of the top plate connection bracket according to the invention, Figure 6c is a perspective view of the top plate connection bracket according to another embodiment, Figure 7 Figure is a view for explaining the structure of the top plate connecting means according to the present invention.

도 1 내지 도 4 에 도시된 바와 같이 본 발명에 따른 조립식 부교 유닛(100)은 일정 길이 및 일정 폭을 갖는 단위체로 지상에서 제작된 후, 수상에 부교를 설치하는 과정에서 부교의 전체 길이에 맞추어 다수의 조립식 부교 유닛(100)이 이어져 설치되는 것이다. 이를 위해, 일정 단위로 제작된 조립식 부교 유닛(100) 각각의 전방 및 후방에는 서로 이웃하는 조립식 부교 유닛(100)들 사이가 연결될 수 있도록 하기 위한 연결수단이 구비된다.1 to 4, the prefabricated pontoon unit 100 according to the present invention is manufactured on the ground as a unit having a predetermined length and a predetermined width, and then in accordance with the entire length of the pontoon in the process of installing the pontoon on the water surface A plurality of prefabricated bridge unit 100 is to be installed. To this end, the front and rear of each of the prefabricated girder unit 100 manufactured in a predetermined unit is provided with a connecting means for connecting between the neighboring prefabricated girder units 100.

본 발명에 따라 일정 단위체로 구성되는 조립식 부교 유닛(100)은 통상의 부 교에서와 마찬가지로 사람 및 물건의 통행이 허용될 수 있도록 일정 길이와 일정 폭을 가진 상판(110)과 상판의 양측을 따라서 길이방향으로 길게 늘어선 다리난간(130)을 포함하여 구성된다. 또한, 부교로써의 기능이 수행될 수 있도록 하기 위한 수단으로서 상판(110)의 하부 측에는 상판(110)이 물에 뜬 상태로 유지될 수 있도록 하기 위한 부체(150)가 설치된다.Prefabricated girder unit 100 composed of a predetermined unit according to the present invention, along with both sides of the top plate 110 and the top plate having a predetermined length and a predetermined width so that the passage of people and objects is allowed as in the conventional pedestrian bridge It is configured to include a bridge railing 130 long lined in the longitudinal direction. In addition, as a means for performing a function as an girder, a lower body 150 is installed on the lower side of the upper plate 110 so that the upper plate 110 can be kept in a floating state.

우선, 상판(110)은 일정 간격을 두고 길이 방향으로 길게 늘어선 다수의 메인 프레임(120), 메인 프레임(120)들의 상부에 일정 간격을 두고 폭 방향으로 고정설치되는 다수의 서브 프레임(122) 및 서브 프레임(122)들의 상부에 일정 간격을 두고 길이 방향으로 고정설치되는 다수의 받침목(124)으로써 지탱된다. 즉, 상판(110)은 그 바로 아래 쪽에 일정 간격을 두고 길이 방향으로 길게 나열된 다수의 받침목(124)이 고정설치되고, 그 받침목(124)들은 그 아래 쪽에 일정 간격을 두고 폭 방향으로 길게 나열된 다수의 서브 프레임(122)에 고정설치되며, 그 서브 프레임(122)들은 그 아래 쪽에 일정 간격을 두고 길이방향으로 길게 나열된 다수의 메인 프레임(120)에 고정설치된다. 메인 프레임(120), 서브 프레임(122) 및 받침목(124)들은 통상의 건축 및 토목 자재의 경우와 마찬가지로 목재, 금속재, 합성수지재 등으로 이루어질 수 있으며, 각각의 부재들이 서로 접하는 부분에는 볼트, 못 등을 포함한 조립수단에 의해서 결합이 이루어진다. 한편, 상판(110)은 동일한 크기로 재단된 다수의 각재(112)들이 질서정연하게 배열되어 고정설치되는 것으로, 통상의 수상 다리 등을 건설하는 과정에서와 같은 방식으로 받침목(124)의 상부에 고정설치된다.First, the upper plate 110 includes a plurality of main frames 120 arranged in a longitudinal direction at regular intervals, a plurality of subframes 122 fixedly installed in a width direction at regular intervals on top of the main frames 120, and It is supported by a plurality of support necks 124 fixed in the longitudinal direction at regular intervals on the upper portion of the sub-frames (122). That is, the top plate 110 is fixed to a plurality of supporters 124 arranged in the longitudinal direction at a fixed interval immediately below the base, the support 124 is a plurality of long arranged in the width direction at regular intervals below It is fixed to the sub-frame 122 of the, the sub-frames 122 are fixed to the plurality of main frame 120 arranged in the longitudinal direction at regular intervals below it. The main frame 120, the sub-frame 122 and the support 124 may be made of wood, metal, synthetic resin, etc. as in the case of the general construction and civil engineering materials, bolts, nails in the parts that each member is in contact with each other The coupling is made by means of assembly, including the back. On the other hand, the top plate 110 is a plurality of cutting materials 112 cut to the same size is arranged in a fixed order and installed, in the same manner as in the process of building a conventional water bridge, etc. in the upper part of the support neck 124 It is fixedly installed.

한편, 상판(110)의 양측에 길이방향으로 나란하게 다리난간(130)이 설치되는데, 이 다리난간(130)은 통상의 경우에서와 마찬가지로 상판(110) 위를 통행하는 사람들이 상판(110)을 벗어나 물에 빠지게 되는 것을 방지하기 위한 것이다. 이를 위해 구성되는 다리난간(130)은 일정 간격으로 두고 상판(110)의 양측에 세워지는 다수의 난간 지주(132)와 난간 지주(132)들끼리를 일정 높이를 연결하여 상판의 길이 방향으로 길게 설치되는 난간 가로목(134)을 포함하여 이루어진다. 즉, 일정 간격을 두고 설치된 다수의 난간 지주(132)들에 길이 방향으로 긴 난간 가로목(134)을 위치시킨 상태에서 양 부재가 서로 접하는 부분에 볼트, 못 등의 결합수단으로서 상호 결합된 상태가 유지되도록 구성된다.On the other hand, the leg rail 130 is installed side by side in the longitudinal direction on both sides of the upper plate 110, the leg rail 130 is the people passing through the upper plate 110 as in the usual case the upper plate 110 This is to prevent falling out of the water. The bridge railing 130 is configured to this end is a long interval in the longitudinal direction of the upper plate by connecting a certain height of a plurality of handrail struts 132 and handrail struts 132 built on both sides of the top plate 110 at regular intervals It comprises a railing rail 134 is installed. That is, in a state in which the long railing rails 134 in the longitudinal direction are positioned on the plurality of railing struts 132 installed at a predetermined interval, both members are coupled to each other as coupling means such as bolts and nails. Is configured to remain.

또한, 다리난간(130)의 상부에는 사람들의 통행하는 과정에서 손을 집을 수 있도록 핸드 레일(136)이 설치되는 것이 바람직하다.In addition, it is preferable that the hand rail 136 is installed at the upper portion of the leg rail 130 so as to pick up a hand during the passage of people.

특히, 본 발명에 따른 조립식 부교 유닛(100)에서는 다수의 난간 지주(132)들이 일정 간격을 두고 설치되는 과정에서 일정 위치에는 난간 지주(132)를 대신하여 내부가 빈 파이프 형태로 된 조명설치대(138)가 설치될 수 있다. 이 조명설치대(138)는 본 발명의 일 실시 예를 설명하기 위한 도면에서와 같이 난간 지주(132)의 형태에 맞추어 사각의 파이프 형태로 이루어질 수 있지만, 원기둥 또는 원통 형상 등 통상의 변경 가능한 범위 내에서는 얼마든지 그 변경실시될 수 있는 것이다. 그리고 조명설치대(138)의 한쪽 도중에는 전구 등의 시설물이 설치될 수 있도록 하는 조명 설치공(138a)이 형성된다.In particular, in the prefabricated girder bridge unit 100 according to the present invention in the process of installing a plurality of handrail struts 132 at regular intervals in place of the handrail struts 132 in the form of an empty pipe-shaped lighting installation ( 138 may be installed. The lighting mounting stand 138 may be made in the form of a square pipe in accordance with the shape of the handrail struts 132 as in the drawings for explaining an embodiment of the present invention, within the usual changeable range such as a cylinder or a cylindrical shape As many changes can be made as possible. And one side of the lighting installation stand 138 is formed with a light installation hole (138a) to be installed in the facility, such as a light bulb.

또한, 본 발명의 일 실시 예에 따른 다리난간(130)은 상판(110)을 구성하는 각 부재들의 경우와 마찬가지로 주로 목재로 이루어지는 것이 친환경적인 측면을 고려할 때 바람직하다.In addition, the bridge railing 130 according to an embodiment of the present invention is preferably made of wood, as in the case of each member constituting the top plate 110 when considering the environmentally friendly aspects.

그리고 난간 지주(132)는 설치시 상판(110)의 상부로 노출되는 구간 이외에 상판(110)의 하측으로 하향된 구간을 갖는 길이로 이루어지는데, 상판(110) 하측에 위치되는 난간 지주(132)의 하부 외측에는 도 3 에 도시된 바와 같이 하부 가림판(140)이 설치된다. 하부 가림판(140)은 도면과 같이 일정 폭을 갖는 다수의 마감용 각재들이 난간 지주(132)의 하부에 고정설치된 구조로 이루어진다.And handrail strut 132 is made of a length having a section downward to the lower side of the top plate 110 in addition to the section exposed to the top of the top plate 110 during installation, the handrail strut 132 is located below the top plate 110 The lower outer side of the lower blind plate 140 is installed as shown in FIG. The lower shielding plate 140 has a structure in which a plurality of finishing materials having a predetermined width as shown in the drawing are fixed to the lower portion of the handrail prop 132.

수상에 설치된 조립식 부교 유닛(100)이 물에 부상된 상태가 유지될 수 있도록 하기 위해 상판(110)의 하부에 고정설치되는 부체(150)는 물보다 비중이 작은 재질인 스티로폼 등으로 일정 크기로 성형된다. 즉, 하나의 조립식 부교 유닛(100)을 구성하는 상판(110)의 하부에는 다수의 부체(150)가 장착되는 것이다. 각각의 부체(150)는 중실의 원기둥 형상으로 형성되거나 중공의 원통 형상으로 형성되는 것이 수면과의 원활한 동작을 유도하는 측면에서 바람직하다.In order to maintain the prefabricated girder unit 100 installed in the water to be injured in water, the floating body 150 is fixed to the lower portion of the top plate 110 to a certain size, such as styrofoam material having a smaller specific gravity than water. Molded. That is, a plurality of floating bodies 150 are mounted at the lower portion of the upper plate 110 constituting one prefabricated bridge unit 100. Each body 150 is preferably formed in a solid cylindrical shape or a hollow cylindrical shape in terms of inducing a smooth operation with the water surface.

이때, 부체(150)는 상판(110) 하측에 위치된 메인 프레임(120)에 띠 상의 체결부재(152)를 묶어 고정되도록 하는데, 더욱 안정된 상태로 장착될 수 있도록 하기 위해서 2개 1조를 이루는 외측 메인 프레임(120a)과 내측 메인 프레임(120b) 사이에 부체(150)가 위치된다. 즉, 도 4 에 도시된 바와 같이 상판(110)의 하부에는 다수의 메인 프레임(120)이 일정 간격을 두고 설치되는데, 특히 좌우 양측에 각각 위치된 외측 메인 프레임(120a)과 그 각각의 외측 메인 프레임(120a)의 바로 내측에 위치된 내측 메인 프레임(120b) 사이에 각각 부체(150)가 설치되는 것이다. 본 발명의 실시 예를 설명하기 위한 도면의 경우에는 상판(110)의 중앙을 기준으로 한쪽에 2개의 메인 프레임(120)이 다른 한쪽의 또 2개의 메인 프레임(120)이 설치된 구조이다. 전술한 바와 같이 2개 1조를 이루는 메인 프레임(120a,120b)에 원통 형상의 부체(150)가 설치되는 과정에서 부체(150)의 외주는 각 메인 프레임(120)에 접할 수 있고, 이렇게 상호 접하게 된 상태에서 띠 형상의 체결부재(152)가 묶여 부체(150)는 상판의 하부에 부착된 상태가 된다.At this time, the floating body 150 is fixed to tie the fastening member 152 on the belt to the main frame 120 located on the lower side of the upper plate 110, forming a pair of two to be mounted in a more stable state The floating body 150 is positioned between the outer main frame 120a and the inner main frame 120b. That is, as shown in FIG. 4, a plurality of main frames 120 are installed at a lower portion of the upper plate 110 at regular intervals. In particular, the outer main frames 120a and the respective outer mains are respectively positioned on both left and right sides. The floating body 150 is installed between the inner main frame 120b located just inside the frame 120a. In the case of the drawings for describing an exemplary embodiment of the present invention, two main frames 120 are installed on one side with respect to the center of the upper plate 110, and two main frames 120 on the other side are installed. As described above, the outer circumference of the floating body 150 may be in contact with each main frame 120 in the process of installing the cylindrical floating body 150 on the two main frames 120a and 120b. In a state of being in contact with the belt-shaped fastening member 152 is tied, the floating body 150 is attached to the lower portion of the upper plate.

한편, 부체(150)는 그 상부에 위치된 상판(110) 및 다리난간(130) 등의 시설물이 물에 충분하게 뜰 수 있을 정도의 부력을 갖는 스티로폼 등의 재질로 이루어지는 한편 그 외부면에는 FRP 등의 재질로 된 포장 시트 등으로 씌워져 마감될 수 있다.On the other hand, the floating body 150 is made of a material such as styrofoam having a buoyancy enough to float the facilities such as the top plate 110 and the bridge railing 130 is located on the top of the FRP on the outer surface It may be covered with a wrapping sheet made of a material such as a finish.

전술한 바와 같이 상판(110), 다리난간(130), 부체(150) 등이 적절히 조립된 단위체의 시설물이 전체적인 부교를 설치하는 과정에서 상호 연결될 수 있도록 하기 위해서 조립식 부교 유닛(100)의 전단 및 후단에 위치된 메인 프레임(120) 또는 서브 프레임(122)에는 각각 상판연결용 브라켓(160)이 장착된다. 이때, 상판연결용 브라켓(160)은 조립식 부교 유닛(100)의 사양 등을 고려하여 금속재로 형성되는 것이 바람직하다.As described above, the top plate 110, the bridge railing 130, the floating body 150, etc., the front end of the prefabricated girder unit 100 in order to be connected to each other in the process of installing the whole girder, the unit of the appropriate assembly The upper frame connecting brackets 160 are mounted on the main frame 120 or the sub frame 122 positioned at the rear end, respectively. At this time, the bracket for connecting the upper plate 160 is preferably formed of a metal material in consideration of the specifications of the prefabricated girder unit (100).

상판연결용 브라켓(160)는 도 6a 및 도 6b 에 도시된 바와 같이 메인 프레임(120) 또는 서브 프레임(122) 측에 접하도록 일정 면적을 갖는 판 형상의 마운팅 플레이트(162)와 마운팅 플레이트(162)의 전면이 되는 외측면에 돌출형성되되 그 상부 및 전면의 일부가 개방형성된 키이 홈(164)을 포함하여 구성된다. 또한, 마 운팅 플레이트(162)의 배면이 되는 내측면 상에는 길이방향으로 설치되는 메인 프레임(120)의 양쪽 측면에 핀, 볼트 등의 체결수단으로써 고정장착될 수 있도록 서브 마운팅 플레이트(166)가 돌출형성될 수 있다. 서브 마운팅 플레이트(166)는 마운팅 플레이트(162)와 일체로 이루어져 상판연결용 브라켓(160)이 더욱 견고하게 장착되도록 할 뿐만 아니라 마운팅 플레이트(162)의 강성을 보강하는 기능을 하게 된다.The upper plate connection bracket 160 has a plate-shaped mounting plate 162 and a mounting plate 162 having a predetermined area to be in contact with the main frame 120 or the sub-frame 122 as shown in FIGS. 6A and 6B. Protruding on the outer surface to be a front surface of the) is configured to include a key groove 164, the upper portion and a portion of the front opening is formed. In addition, the sub-mounting plate 166 protrudes from both sides of the main frame 120 installed in the longitudinal direction on the inner surface that is the rear surface of the mounting plate 162 so that the sub-mounting plate 166 may be fixedly mounted by fastening means such as pins and bolts. Can be formed. The sub-mounting plate 166 is integrally formed with the mounting plate 162 to allow the upper plate connection bracket 160 to be more firmly mounted, and to reinforce the rigidity of the mounting plate 162.

특히, 상판연결용 브라켓(160)이 철판으로 이루어질 경우, 마운팅 플레이트(162)에 서브 마운팅 플레이트(166)가 용접되어 일체화되는 과정에서는 보강 리브(166b)가 부가 설치될 수 있다. 또한, 마운팅 플레이트(162) 및 서브 마운팅 플레이트(166) 각각에는 상판연결용 브라켓(160)의 장착시 핀 또는 볼트 등의 체결수단이 끼워지기 위한 장착공(162a,166a)이 관통형성될 수 있다.In particular, when the upper plate connecting bracket 160 is made of an iron plate, the reinforcing rib 166b may be additionally installed in the process of welding the sub-mounting plate 166 to the mounting plate 162 to be integrated. In addition, mounting holes 162a and 166a may be formed in each of the mounting plate 162 and the sub-mounting plate 166 through which fastening means such as pins or bolts may be inserted when the upper plate connecting bracket 160 is mounted. .

한편, 마운팅 플레이트(162)의 전면에 돌출형성된 키이 홈(164)는 대략 'ㄱ'자 형상으로 된 한 쌍의 ㄱ자형강(164a)이 서로 '┏ ┓' 형태가 되도록 마주한 상태에서 마운팅 플레이트(162)에 용접되어 일체화되는 한편 그 개방된 하부는 별도의 철판 부재인 하부받침판(164b)으로 마감된 구조로 이루어질 수 있다. 즉, 키이 홈(164)의 개방된 상부를 통해서 연결수단(170)의 한쪽이 삽입되되 그 개방된 전방의 공간을 통해서는 삽입된 연결수단(170)의 한쪽이 빠지지 않도록 구성될 수 있는 것이다.On the other hand, the key groove 164 protruding from the front of the mounting plate 162 is a mounting plate 162 in a state in which the pair of the '-shaped steel 164a having a'-'shape so as to be in a' ┏ ┓ 'shape with each other. While being welded and integrated), the opened lower part may be made of a structure closed by a lower support plate 164b which is a separate iron plate member. That is, one side of the connecting means 170 is inserted through the open upper portion of the key groove 164, but may be configured so that one side of the inserted connecting means 170 is not removed through the open front space.

그리고 상판연결용 브라켓(160)은 도 6c 에 도시된 바와 같이 마운팅 플레이트(162)의 어느 한 쪽에 날개(168)가 덧붙여진 형상으로 형성될 수도 있다. 이는 상판연결용 브라켓(160)을 조립식 부교 유닛(100)의 전방 또는 후방에 장착시키는 과정에서 볼트 등의 체결수단이 체결되는 위치를 설정하는 측면에서 더욱 유리하게 할 수 있다.In addition, the upper plate connecting bracket 160 may be formed in a shape in which a wing 168 is attached to either side of the mounting plate 162 as shown in FIG. 6C. This may be more advantageous in terms of setting the position where the fastening means such as bolts are fastened in the process of mounting the upper plate connecting bracket 160 to the front or rear of the prefabricated girder unit 100.

그리고 전방의 조립식 부교 유닛(100)과 후방의 조립식 부교 유닛(100)에 각각 고정장착된 상판연결용 브라켓(160) 사이에 위치되어 다수의 조립식 부교 유닛(100)이 이어지도록 하기 위한 연결수단(170)은 도 7 에 도시된 바와 같이 구성된다. 본 발명의 일 실시 예에 따른 연결수단(170)은 전술한 키이 홈(164)에 끼워질 수 있는 면적을 가진 한 쌍의 키이 플레이트(172)가 일정 간격을 두고 전방 및 후방에 위치되고, 각각의 키이 플레이트(172)가 마주하는 사이의 간격에는 코일 상의 스프링(174)이 배치된다.And connecting means for connecting the plurality of prefabricated girder unit 100 is located between the prefabricated girder unit 100 in the front and the top plate connecting bracket 160 fixedly mounted to the assembled girder unit 100 in the rear ( 170 is configured as shown in FIG. 7. In the connecting means 170 according to an embodiment of the present invention, a pair of key plates 172 having an area that can be fitted into the key groove 164 described above are positioned at the front and the rear at a predetermined interval, respectively. At intervals between which the key plates 172 face each other, a spring 174 on the coil is disposed.

이때, 스프링(174)의 양단은 각각 그 해당 방향의 키이 플레이트(172) 상에 대략 'U'자 형상으로 절곡형성된 U자형 볼트(176)로써 고정설치된다. 이를 위해, 키이 플레이트(172) 상에는 U자형 볼트(176)의 양단이 끼워질 수 있는 2개 1조의 볼트공이 관통형성되는데, 볼트공은 코일 상으로 형성된 스프링(174)의 일단이 보다 안정적으로 고정장착될 수 있도록 3점 위치에 형성되는 것이 바람직하다.At this time, both ends of the spring 174 is fixedly installed as a U-shaped bolt 176 bent in a substantially 'U' shape on the key plate 172 in the corresponding direction. To this end, two sets of bolt holes through which the two ends of the U-shaped bolts 176 can be fitted are formed on the key plate 172, and one end of the spring 174 formed on the coil is more stably fixed. It is desirable to be formed at the three-point position so that it can be mounted.

전술한 바와 같이 구성된 연결수단(170)으로써 전후방에 배치된 조립식 부교 유닛(100)은 상호 연결되는데, 이때 키이 홈(164)의 개방된 상부를 통해서 연결수단(170)의 키이 플레이트(172)가 각각 끼워진다. 이와 같이 전방 및 후방에 위치된 조립식 부교 유닛(100) 사이에 코일 상의 압축 스프링(174)이 개재되어 있기 때문에 어느 한쪽의 조립식 부교 유닛(100)으로부터 다른 한쪽의 부교 유닛(100)으로 충격이 전달되는 것이 완충될 수 있을 뿐만 아니라 기후 변화에 따른 이완 및 팽창에 대비할 수 있게 된다.Prefabricated pontoon unit 100 arranged in front and rear with the connecting means 170 configured as described above are connected to each other, the key plate 172 of the connecting means 170 through the open upper portion of the key groove 164 Each is fitted. Since the compression spring 174 on the coil is interposed between the prefabricated pontoon units 100 located in the front and the rear in this way, the shock is transmitted from one prefabricated pontoon unit 100 to the other pontoon unit 100. Not only can it be buffered, but it can also prepare for relaxation and expansion due to climate change.

한편, 본 발명에 따른 조립식 부교 유닛(100)의 상판(110) 하부부터 일정 간격 떨어진 위치에는 수면의 유동에 따라 상판이 흔들리는 과정에서 전복되지 않고 안정된 상태에 있도록 하기 위한 중량체(180)가 도 8a 및 도 8b 에 도시된 바와 같이 설치될 수 있다. 이 중량체(180)는 상판(110)의 하부로부터 일정 길이 하향 설치된 스테이(182)로써 지탱된다.On the other hand, the weight body 180 to be in a stable state not to overturn in the process of shaking the top plate in accordance with the flow of the water at a position spaced apart from the bottom of the top plate 110 of the prefabricated bridge unit 100 according to the present invention. It may be installed as shown in 8a and 8b. The weight body 180 is supported by the stay 182 installed downward from the lower portion of the upper plate 110 by a predetermined length.

또한, 상판(110)의 양쪽 측면에는 기후 변화 등에 따른 수면의 유동시 주변 시설물 등으로부터 전달되는 충격이 흡수될 수 있도록 하기 위한 완충부재(190)가 도 9a 및 도 9b 에 도시된 바와 같이 설치될 수 있다.In addition, both sides of the upper plate 110 may be provided with a shock absorbing member 190, as shown in Figures 9a and 9b for absorbing the shock transmitted from the surrounding facilities during the flow of the water surface due to climate change. Can be.

전술한 바와 같이 구성된 단위체로서의 조립식 부교 유닛(100)은 지상에서 제작된 후에 부교를 시공하는 과정에서 도 5 에 도시된 바와 같이 다수가 그 길이방향으로 나란하게 배열된다. 이때, 지상에서 기제작된 조립식 부교 유닛(100)의 단위체는 수상에 설치되는 과정에서 크레인 또는 견인선 등의 장비가 동원되어 설치 지점까지 이동될 수 있다.Prefabricated girder bridge unit 100 as a unit configured as described above is manufactured in the ground, and in the process of constructing the girder as shown in Figure 5 are arranged in parallel in the longitudinal direction of the plurality. At this time, the unit of the prefabricated girder unit 100 made on the ground may be moved to the installation point by mobilizing equipment such as a crane or a traction ship in the process of being installed in the water.

한편, 부교의 설치과정에 수상에 띄워진 각 조립식 부교 유닛(100)의 전방 및 후방에 각각 장착된 상판연결용 브라켓(160) 끼리는 연결수단(170)으로써 연결된다. 이와 같이 연결수단(170)으로써 전후방에 2개 이상의 조립식 부교 유닛(100)이 설치된 상태에서는 전후방에 위치된 상판(110)과 상판(110) 또는 난간(130)과 난간(130) 사이를 통한 안전사고가 발생하지 않도록 하기 위한 별도의 안전 시설물이 설치될 수 있다.On the other hand, the upper plate connecting brackets 160 mounted on the front and rear of each of the prefabricated girder unit 100 floated in the installation process of the girder are connected by the connecting means 170. Thus, when the two or more prefabricated girder unit 100 is installed in the front and rear as the connecting means 170, the safety between the top plate 110 and the top plate 110 or the handrail 130 and the handrail 130 located in the front and rear Separate safety facilities may be installed to prevent accidents.

전술한 바와 같이 구성된 단위체의 조립식 부교 유닛(100)은 저수지, 호수, 강 등의 양쪽 안(岸)을 연결하는 다리를 설치하는 데 적용될 수도 있고, 모터 보트 등 소형의 선박 등을 대기 위한 선창(pier) 구조물을 설치하는 데에도 적용될 수 있는 것이다.Prefabricated pontoon unit 100 of the unit configured as described above may be applied to install a bridge connecting both sides of the reservoir, lake, river, etc., the dock for waiting for a small vessel such as a motor boat ( pier) can also be used to install structures.

전술한 바와 같이 본 발명에 따른 조립식 부교 유닛(100)은 지상에서 미리 제작되고 수상에서는 비교적 간단히 이루어지는 조립작업을 통해서 설치됨에 따라서 종래기술의 경우와는 달리 부교가 설치될 저수지, 호수, 강 등에서의 작업공정이 최소화될 수 있다. 따라서, 종래의 경우에 부교의 설치과정에서 발생할 수밖에 없었던 환경 파괴를 줄일 수 있을 뿐만 아니라 수생 동식물의 식생에 미치는 영향을 줄일 수 있게 된다.As described above, the prefabricated girder bridge unit 100 according to the present invention is pre-fabricated on the ground and installed through a relatively simple assembly work in the water phase, so unlike in the case of the prior art, in the reservoir, lake, river, etc. to which the pontoon bridge will be installed. Work processes can be minimized. Therefore, in the conventional case, it is possible to reduce the environmental damage that had to occur in the installation process of the pontoon bridge as well as to reduce the impact on the vegetation of aquatic plants and animals.

또한, 본 발명에 따른 조립식 부교 유닛(100)은 상판(110)이 부체(150)에 의해서 수면에 뜬 상태로 있을 뿐만 아니라 일정 길이의 단위체로 구성됨에 따라서 수면의 변화에 적절히 반응하여 그 높이변화가 자연스럽게 이루어질 수 있게 된다.In addition, the prefabricated girder unit 100 according to the present invention is not only in the state in which the top plate 110 is floated on the water surface by the floating body 150, but also consists of a unit of a certain length, the height change in response to the change in the water surface Can be achieved naturally.

뿐만 아니라, 상판(110)의 하부에 중량체(180)가 더 설치된 경우에는 기후 변화 등에 따라서 수면의 급격히 변하거나 심한 바람이 불게 되더라도 물속에 위치된 중량체(180)에 의해서 상판(110)이 전복되거나 요동이 심하게 되는 현상 등이 방지될 수 있다.In addition, when the weight body 180 is further installed in the lower portion of the upper plate 110, even if the surface of the water 110 suddenly changes or severe wind blows due to climate change, etc., the upper plate 110 by the weight body 180 located in the water Overturning or severe shaking may be prevented.

본 발명에 따른 조립식 부교 유닛은 전술한 실시 예에 국한되지 않고 본 발명의 기술사상이 허용하는 범위 내에서 다양하게 변형하여 실시할 수가 있다.Prefabricated girder unit according to the present invention is not limited to the embodiment described above can be carried out in a variety of modifications within the scope allowed by the technical idea of the present invention.

도 1 은 본 발명에 따른 조립식 부교 유닛의 사시도.1 is a perspective view of a prefabricated pier unit according to the present invention.

도 2 는 본 발명에 따른 조립식 부교 유닛의 평면 상태도.Figure 2 is a plan view of the prefabricated pontoon bridge unit according to the present invention.

도 3 은 본 발명에 따른 조립식 부교 유닛의 측면 상태도.Figure 3 is a side view of the prefabricated pontoon unit according to the present invention.

도 4 는 본 발명에 따른 조립식 부교 유닛의 정면도.4 is a front view of the prefabricated pier unit according to the present invention.

도 5 는 본 발명에 따른 조립식 부교 유닛이 설치된 상태를 보인 도면.5 is a view showing a state in which the prefabricated girder unit is installed in accordance with the present invention.

도 6a 는 본 발명에 따른 상판연결용 브라켓의 정면 사시도.Figure 6a is a front perspective view of the bracket for connecting the top plate according to the present invention.

도 6b 는 본 발명에 따른 상판연결용 브라켓의 배면 사시도.Figure 6b is a rear perspective view of the bracket for connecting the top plate according to the present invention.

도 6c 는 다른 실시 예에 따른 상판연결용 브라켓의 사시도.Figure 6c is a perspective view of the bracket for connecting the top plate according to another embodiment.

도 7 은 본 발명에 따른 상판 연결수단의 구조를 설명하기 위한 도면.7 is a view for explaining the structure of the top plate connecting means according to the present invention.

도 8a 및 도 8b 는 본 발명에 따른 조립식 부교 유닛에 중량체가 부설된 상태의 도면ZZZ.8A and 8B are views ZZZ in a state in which a weight is placed in the prefabricated pier unit according to the present invention.

도 9a 및 도 9b 본 발명에 따른 조립식 부교 유닛에 완충부재가 부설된 상태의 도면.9a and 9b is a view of a state in which a buffer member is installed in the prefabricated girder unit according to the present invention.

[도면의 주요부분에 대한 부호의 설명][Explanation of symbols on the main parts of the drawings]

100. 조립식 부교 유닛 110. 상판100. Prefabricated Floating Unit 110.

120. 메인 프레임 122. 서브 프레임120. Main Frame 122. Subframe

124. 받침목 130. 다리난간124. Supporters 130. Bridge Railings

134. 난간 가로목 138. 조명설치대134. Railing Rails 138. Lighting Mounts

138a. 조명설치공 140. 하부 가림판138a. Lighting installer 140. Lower panel

150. 부체 152. 체결부재150. Floating body 152. Fastening member

160. 상판연결용 브라켓 162. 마운팅 플레이트160. Mounting bracket for the top plate 162. Mounting plate

164. 키이 홈 166. 서브 마운팅 플레이트164. Key Grooves 166. Submounting Plate

170. 연결수단 172. 키이 플레이트170. Connection means 172. Key plate

174. 스프링 176. U자형 볼트174. Spring 176. U-bolt

180. 중량체 190. 완충부재180. Weight 190. Shock absorbing member

Claims (9)

사람의 통행이 가능하게 수상에 설치되는 부교에 있어서,In the pontoon bridge which a traffic of person is installed in the water surface, 일정 길이와 일정 폭을 갖으며 그 하부에 조립된 길이 방향의 메인 프레임과 폭 방향의 서브 프레임에 의해서 지탱되되 동일한 크기로 가공된 다수의 각재들이 나란히 배열설치된 상판;A top plate having a predetermined length and a predetermined width and supported by a main frame in a longitudinal direction and a subframe in a width direction assembled thereon, and having a plurality of angle members arranged side by side and arranged in parallel; 상기 상판의 양측에 일정 높이로 길게 설치되는 다리난간;Bridge railings are installed on both sides of the top plate to a certain height; 상기 상판이 수면에 부상할 수 있도록 상기 메인 프레임을 따라 상판 하부의 양측에 다수 설치되되 그 각각은 일정 길이를 갖는 물에 뜨는 재질로 원통 또는 원기둥 형상으로 형성된 부체;A plurality of floats installed on both sides of the lower portion of the upper plate along the main frame so that the upper plate floats on the surface, each of which is formed of a floating material having a predetermined length in a cylindrical or cylindrical shape; 상기 상판의 전단 및 후단에 위치된 메인 프레임 또는 서브 프레임에 각각 고정설치되는 마운팅 플레이트의 외부면 상에 상부 및 정면 일부가 개방된 형태의 키이 홈이 돌출형성된 상판연결용 브라켓; 및A top plate connecting bracket on which a key groove of an upper part and a front part is opened on an outer surface of a mounting plate fixed to a main frame or a sub frame positioned at front and rear ends of the upper plate, respectively; And 단위체를 이루며 나란히 배열된 상판의 전방 및 후방에 일정 간격을 두고 각각 위치된 상기 연결 브라켓 사이를 연결하는 연결수단을 포함하여 구성된 것을 특징으로 하는 조립식 부교 유닛.Prefabricated bridge unit characterized in that it comprises a connecting means for connecting between the connecting brackets respectively positioned at a predetermined interval in the front and rear of the top plate arranged side by side unit. 제 1 항에 있어서, 상기 연결수단은 전방 및 후방 측에 일정 간격을 두고 위치된 키이 홈에 각각 삽입되도록 한 쌍으로 형성된 판 형상의 키이 플레이트 및 상기 한 쌍의 키이 플레이트 사이에 배치되되 그 전후 양단은 각각 해당 키이 플레이 트에 고정 설치되는 코일 상의 스프링으로 이루어진 것을 특징으로 하는 조립식 부교 유닛.The method of claim 1, wherein the connecting means is disposed between the plate-shaped key plate and the pair of key plate formed in a pair so that the keys positioned at a predetermined distance on the front and rear sides, respectively, into the groove, the front and rear both ends Prefabricated bridge unit is characterized in that each made of a spring on the coil is fixed to the key plate. 제 2 항에 있어서, 상기 스프링은 압축 스프링으로 이루어지되 그 전단 및 후단은 각각 해당 방향의 키이 플레이트 상에 일정 각도 간격을 두고 체결되는 U자형 볼트로써 고정설치된 것을 특징으로 하는 조립식 부교 유닛.The method of claim 2, wherein the spring is made of a compression spring, the front end and the rear end of the prefabricated girder unit, characterized in that fixedly installed with a U-shaped bolt that is fastened at predetermined angle intervals on the key plate in the corresponding direction, respectively. 제 1 항에 있어서, 상기 상판연결용 브라켓의 마운팅 플레이트의 내측면 상에는 길이방향으로 설치되는 메인 프레임의 양쪽 측면에 볼트로써 고정장착되기 위한 서브 마운팅 플레이트가 일정 길이로 돌출형성된 것을 특징으로 하는 조립식 부교 유닛.According to claim 1, Prefabricated pontoons characterized in that the sub-mounting plate protruding to a predetermined length on the inner surface of the mounting plate of the upper plate connecting bracket for fixing by bolts on both sides of the main frame installed in the longitudinal direction unit. 제 1 항 내지 제 4 항 중 어느 한 항에 있어서, 상기 다리난간은 상판의 양측에 일정 간격을 두고 세로로 고정설치되는 난간 지주와 상기 난간 지주들끼리를 일정 높이로 연결하여 상판의 길이방향으로 길게 고정설치되는 난간 가로목으로 이루어지되, 상기 다수의 난간 지주들 사이의 일정 위치에는 내부가 빈 파이프 형태로 이루어진 조명설치대가 형성되는 한편 그 조명설치대의 한쪽 도중에는 조명 설치공이 관통형성된 것을 특징으로 하는 조립식 부교 유닛.The bridge rail according to any one of claims 1 to 4, wherein the bridge railings are connected in lengthwise direction by connecting the railing pillars and the railing pillars fixedly installed at a predetermined height on both sides of the upper plate at a predetermined height. It is made of a long railing rail that is fixedly installed, the predetermined position between the plurality of rail holding struts are formed in the form of an empty pipe in the interior of the light installation, characterized in that the light installation hole is formed through one side of the lighting installation Prefabricated pontoon unit. 제 5 항에 있어서, 상기 난간 지주의 하부는 상판의 하측으로 일정 길이만큼 더 연장형성되어지되 그 하부로 연장된 난간 지주의 외부면 상에는 일정 폭을 갖는 다수의 각목이 부착되어 이루어진 하부 가림판이 설치된 것을 특징으로 하는 조립식 부교 유닛.According to claim 5, wherein the lower portion of the handrail is further extended by a predetermined length to the lower side of the upper plate, but the lower screen plate is formed on the outer surface of the handrail extending to the bottom is attached a plurality of squares having a certain width Prefabricated pontoon unit characterized in that. 제 5 항에 있어서, 상기 상판의 하부에는 일정 길이의 스테이가 하향설치되는 한편 그 스테이의 하단에는 상판의 유동시 뒤집히지 않도록 균형을 유지시켜주기 위한 중량체가 더 설치된 것을 특징으로 하는 조립식 부교 유닛.6. The prefabricated girder bridge according to claim 5, wherein a stay of a predetermined length is installed downward in the lower portion of the upper plate, and a weight body is installed at the lower end of the stay so as to maintain a balance so as not to be inverted during the flow of the upper plate. 제 5 항에 있어서, 상기 상판의 측면에서 가해지는 외부 충격이 흡수되도록 상기 상판의 양쪽 측면에는 완충부재가 더 구성된 것을 특징으로 하는 조립식 부교 유닛.The method of claim 5, Prefabricated bridge unit characterized in that the shock absorbing member is further configured on both sides of the top plate to absorb the external impact applied to the side of the top plate. 제 5 항에 있어서, 상기 각각의 부체는 일정 간격을 두고 다수 설치된 메인 프레임들 중 좌우 외측에 위치된 외측 메인 프레임과, 각각의 외측 메인 프레임과 바로 이웃하는 내측 메인 프레임을 2개 1조로 하는 사이 공간에 설치되되 각각의 부체는 외측 및 내측 프레임에 그 외주가 접하는 상태에서 띠 상의 체결부재로써 외측 및 내측 프레임에 묶여 고정장착된 것을 특징으로 하는 조립식 부교 유닛.The apparatus of claim 5, wherein each of the floating bodies includes two outer main frames positioned at left and right outer sides of a plurality of main frames at regular intervals, and two inner main frames immediately adjacent to each outer main frame. Prefabricated bridge unit is installed in the space, each floating body is fixed to the outer and inner frame by a fastening member on the belt in the state that the outer periphery is in contact with the outer and inner frame.
KR1020080044615A 2008-05-14 2008-05-14 The floating bridge units KR20090118682A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080044615A KR20090118682A (en) 2008-05-14 2008-05-14 The floating bridge units

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080044615A KR20090118682A (en) 2008-05-14 2008-05-14 The floating bridge units

Publications (1)

Publication Number Publication Date
KR20090118682A true KR20090118682A (en) 2009-11-18

Family

ID=41602620

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080044615A KR20090118682A (en) 2008-05-14 2008-05-14 The floating bridge units

Country Status (1)

Country Link
KR (1) KR20090118682A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100969826B1 (en) * 2009-12-24 2010-07-13 주식회사 세인 The deckrod system
KR101159684B1 (en) * 2009-12-24 2012-06-26 배대환 Railing pillar establishment system of timber trestle bridge
KR200461138Y1 (en) * 2010-01-27 2012-06-28 홍기대 Safety structure of breakwater or tetrapod
KR101221604B1 (en) * 2012-06-12 2013-01-14 주종대 Prefabricated float of pipe type
KR102186820B1 (en) * 2020-03-19 2020-12-04 김택수 Anchor type floating deck rod and its construction method
WO2022090751A1 (en) * 2020-11-02 2022-05-05 Pokrajcic Frano Mobile berth for berth and anchoring small boats and boats

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100969826B1 (en) * 2009-12-24 2010-07-13 주식회사 세인 The deckrod system
KR101159684B1 (en) * 2009-12-24 2012-06-26 배대환 Railing pillar establishment system of timber trestle bridge
KR200461138Y1 (en) * 2010-01-27 2012-06-28 홍기대 Safety structure of breakwater or tetrapod
KR101221604B1 (en) * 2012-06-12 2013-01-14 주종대 Prefabricated float of pipe type
KR102186820B1 (en) * 2020-03-19 2020-12-04 김택수 Anchor type floating deck rod and its construction method
WO2022090751A1 (en) * 2020-11-02 2022-05-05 Pokrajcic Frano Mobile berth for berth and anchoring small boats and boats

Similar Documents

Publication Publication Date Title
ES2776798T3 (en) Construction, Assembly, and Launch Method of a Floating Wind Turbine Platform
ES2342190T3 (en) SEMISUMERGIBLE FLOATING STRUCTURE OF ARMOR FOR HIGH SEA.
ES2303376T3 (en) SEMISUMERGIBLE OPEN SEA STRUCTURE OF GRAN CALADO.
CA2480148C (en) Floating structures
KR20090118682A (en) The floating bridge units
KR200432359Y1 (en) Floating bridge using HDPE pipes as floating material
CN204452864U (en) Prevent that the semisubmersible high stability ecological, environmental protective wind-proof and wave-proof of swinging plate floats platform with damping
NO150874B (en) FLOATING PLATFORM CONSTRUCTION, CONSTRUCTION UNIT FOR PREPARING A FLOATING PLATFORM CONSTRUCTION AND PROCEDURE FOR PREPARING A FLOATING PLATFORM CONSTRUCTION IN ARMED CONCRETE
AU655755B2 (en) Inflatable housing structure
JPH11503383A (en) Floating equipment
CN109505227B (en) Marine floating highway
JP6630105B2 (en) Connecting structure of floating body for floating pier
CN101230558A (en) Floating type landscape stayd-cable bridge
WO2020136288A1 (en) Floating platform for high-power wind turbines
RU40061U1 (en) FLOATING PLATFORM OF RESIDENTIAL OR CULTURAL AND ENTERTAINMENT COASTAL COMPLEX
CN211370307U (en) Multifunctional offshore installation platform
CN208533350U (en) Environmental plank road structure that a kind of wetland height is adjustable
CN218969958U (en) Assembled ocean platform module and ocean platform
JP3377756B2 (en) Bridge
CN212634772U (en) Self-floating welding machine supporting platform
CN212375795U (en) Structure of underwater ground anchor type yacht wharf
CN221316599U (en) Construction platform for water ascending operation
CN213389590U (en) Wetland ecotype plank road structure
KR102289188B1 (en) Deck foot on water
SU1721169A1 (en) Built-up hydraulic structure

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application