KR20110068249A - Fabrication type module for artificial turf installation - Google Patents

Fabrication type module for artificial turf installation Download PDF

Info

Publication number
KR20110068249A
KR20110068249A KR1020090125113A KR20090125113A KR20110068249A KR 20110068249 A KR20110068249 A KR 20110068249A KR 1020090125113 A KR1020090125113 A KR 1020090125113A KR 20090125113 A KR20090125113 A KR 20090125113A KR 20110068249 A KR20110068249 A KR 20110068249A
Authority
KR
South Korea
Prior art keywords
artificial turf
drain
fiber
block
filler
Prior art date
Application number
KR1020090125113A
Other languages
Korean (ko)
Other versions
KR101143428B1 (en
Inventor
이선건
Original Assignee
필드터프승목(주)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 필드터프승목(주) filed Critical 필드터프승목(주)
Priority to KR1020090125113A priority Critical patent/KR101143428B1/en
Priority to PCT/KR2010/008893 priority patent/WO2011074841A2/en
Publication of KR20110068249A publication Critical patent/KR20110068249A/en
Application granted granted Critical
Publication of KR101143428B1 publication Critical patent/KR101143428B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C13/00Pavings or foundations specially adapted for playgrounds or sports grounds; Drainage, irrigation or heating of sports grounds
    • E01C13/08Surfaces simulating grass ; Grass-grown sports grounds
    • E01C13/083Construction of grass-grown sports grounds; Drainage, irrigation or heating arrangements therefor
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C13/00Pavings or foundations specially adapted for playgrounds or sports grounds; Drainage, irrigation or heating of sports grounds
    • E01C13/08Surfaces simulating grass ; Grass-grown sports grounds
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C13/00Pavings or foundations specially adapted for playgrounds or sports grounds; Drainage, irrigation or heating of sports grounds
    • E01C13/02Foundations, e.g. with drainage or heating arrangements
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C13/00Pavings or foundations specially adapted for playgrounds or sports grounds; Drainage, irrigation or heating of sports grounds
    • E01C13/04Pavings made of prefabricated single units

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

PURPOSE: A prefabricated module for holding artificial turf is provided to enable unskilled person to easily and simply installed since the module can be continuously installed along a construction area. CONSTITUTION: A prefabricated module(1) for holding artificial turf comprises a fiber member, a granular filler, a thin film type of a guide tape and a drain block(30). A turf-like pile is planted on the fiber member. The filler is filled between piles on the fiber member and forms a filling layer on the fiber member. The guide tape is attached to the edge of the fiber member to prevent the filler from becoming separated. The drain block consists of a drain plate and a plurality of protrusions. The drain plate is attached to the bottom of the fiber member, collects rainwater from the fiber member and discharges it to the side.

Description

인조잔디 설치용 조립식 모듈{fabrication type module for artificial turf installation}Prefabricated module for artificial turf installation

본 발명은 본 발명은 인조잔디 설치용 조립식 모듈에 관한 것으로서, 좀더 상세하게는 부품을 조립하듯이 인조잔디를 지면에 조립식으로 설치할 수 있는 인조잔디 설치용 조립식 모듈에 관한 것이다.The present invention relates to a prefabricated module for artificial turf installation, and more particularly, to a prefabricated module for artificial turf installation that can be installed prefabricated on the ground as if the parts are assembled.

일반적으로 인조잔디는 천연잔디 생육이 불가능한 옥내정원이나 일조시간이 극히 제한된 고층건물의 북쪽에 접한 옥외지역과 같은 곳에 이용되고 있으며, 또한 옥내나 옥외지역을 막론하고 정서적으로 아름다운 경관이나 조경을 위해 설치하는 경우도 있다. 더욱이, 운동장에서 운동하는 선수들의 신체를 보호할 수 있는 천연잔디 대용으로도 널리 사용되고 있다.Generally, artificial turf is used in indoor gardens where natural grass is impossible to grow, or in outdoor areas facing north of high-rise buildings with very limited hours of sunshine, and it is installed for emotionally beautiful scenery or landscape regardless of indoor or outdoor areas. In some cases. In addition, it is widely used as a substitute for natural grass to protect the body of athletes exercising on the playground.

특히, 운동장과 같이 대체로 넓은 지역에 설치되는 인조잔디는 롤형태로 구비되는 바, 이와 같은 인조잔디 롤은 그 길이가 수십 미터 정도로 감겨 구비된다. 이러한 인조잔디 롤은 운동장과 같은 지면에 펼쳐져서 설치된다. 따라서, 지면은 인조잔디로 덮힌다.In particular, artificial turf that is installed in a large area, such as a sports ground is provided in the form of a roll, such artificial turf roll is provided is wound around several tens of meters in length. These artificial grass rolls are spread out on the ground, such as a playground. Thus, the ground is covered with artificial turf.

이러한 인조잔디는 운동장의 원활한 배수를 위하여 맹암거를 일정한 간격으 로 매립한 상태에서 그 상부에 자갈보조기층 및 물이 배수될 수 있도록 하기 위한 투수 아스콘 물질의 투수기층과 경기자의 부상을 방지하기 위하여 탄성층을 일정한 두께로 설치한 후 매트형태의 인조잔디를 설치한 다음, 인조잔디와 사용자를 보호하는 과립형태의 탄성재 알갱이를 포설하여 운동장 설비를 완료하였다.The artificial turf is designed to prevent the injury of the permeable layer and pitcher of the pitcher ascon material to allow the gravel auxiliary layer and the water to be drained on the upper part of the muddy ridge at regular intervals for smooth drainage of the playground. After installing the elastic layer to a certain thickness, the artificial turf of the mat type was installed, and then the artificial turf and granules of granular elastic material protecting the user were installed to complete the playground equipment.

따라서, 상기와 같은 설비를 하기 위해서는 많은 장비를 투입하여야 하고 이로 인한 소음발생과 비산먼지의 발생으로 인하여 환경오염을 가져왔고 인조잔디 경기장을 만들기 위해서는 상당한 기간이 소요되는 문제점이 발생하였다.Therefore, in order to make such a facility, a lot of equipment has to be put in and environmental pollution is caused by noise and scattering dust, and a long time is required to make artificial turf.

또한, 비가 왔을 경우 빗물이 스며들어 배수로까지 도달하여야 배수가 되므로 운동장에 빗물이 고이는 현상이 발생하고 비가 그친 후에도 바로 경기장을 사용할 수 없고 빗물이 완전히 스며든 후 배수가 이루어져야만 사용이 가능함으로 경기자는 비가 그쳤다 할지라도 수중에서 경기를 하는 것과 같아서 경기력이 저하되는 문제점이 발생하였다.In addition, when it rains, the rainwater soaks up to the drainage to drain, so that the rainwater collects on the playground and the stadium cannot be used immediately after the rain stops. Even if the rain had stopped, it was the same as playing underwater, resulting in a drop in performance.

따라서, 본 발명의 출원인은 이러한 문제를 해결하고자 "인조잔디 운동장용 배수블록 설치방법"을 대한민국 특허청에 특허출원하여 등록(등록 제10-621678호)된 바가 있다.Therefore, the applicant of the present invention has been filed (registered No. 10-621678) patent application to the Korean Intellectual Property Office to solve this problem, "how to install drainage block for artificial turf playground".

이러한 본 발명의 출원인에 의한 종래기술은 운동장의 중심에서 외곽으로 점점 낮아지는 미세 경사각을 가지도록 운동장의 지면을 단단히 다지는 단계; 지면의 상부에는 우천 시 원활한 배수를 위해 사각돌기가 전, 후, 좌, 우로 돌출 배열된 배수블록을 각각 전, 후, 좌, 우로 조립하여 설치하는 단계 및; 설치된 배수블록의 상부에 인조잔디를 설치하는 단계를 포함한다. 이러한 종래기술은 인조잔디에 스며 드는 물은 배수블록의 사각돌기 사이에 흘러 들어가며, 배수블록의 사각돌기 사이에 흘러 들어온 물은 다시 지면의 미세 경사각에 의해 운동장의 외곽으로 이동되면서 배수되는 장점이 있다.The prior art by the applicant of the present invention comprises the step of firmly grounding the ground of the playground to have a fine inclination angle gradually lowered from the center of the playground to the outside; A step of assembling and installing the drain blocks before and after the left and right, respectively, which are arranged at the top of the ground in order to smoothly drain in the rain; And installing artificial turf on top of the installed drain block. This conventional technology has the advantage that water penetrating into the artificial turf flows between the square projections of the drain block, water flowing between the square projections of the drain block is drained while being moved to the outside of the playground by a fine inclination angle of the ground again. .

한편, 지면에 전술한 배수블록이 설치된 후, 배수블록의 상부에 인조잔디 매트를 설치하기 위해서는 우선, 잔디배치도(시방서 및 도면)에 따라 (1) 인조잔디 롤을 운반하여 지면에 순서대로 배열하고, (2) 인조잔디 롤을 순서대로 펼친 다음, (3) 서로 인접한 인조잔디와 인조잔디의 테두리를 중첩시킨 후, (4) 중첩된 테두리를 재봉하여 인조잔디들을 연결한다. 이렇게, 인조잔디를 재봉하기 위해서는 2대의 재봉기와 콤프레셔, 지게차, 트랙터, 에어호스 및 리드선, 그리고 카펫 집게 8명과 재봉사 1명, 에어호스 1명, 라인 및 재봉보조 1명, 지게차 운전사 1명, 운반요원 등 총 13명의 인원이 동원된다.On the other hand, after the above-mentioned drainage block is installed on the ground, in order to install the artificial turf mat on the upper part of the drainage block, (1) artificial turf rolls are transported and arranged in order on the ground according to the grass layout (specifications and drawings). , (2) spread the artificial turf rolls in order, (3) overlap the edges of artificial turf and artificial turf adjacent to each other, and (4) sew the overlapping edges to connect the artificial turf. In order to sew the artificial turf, two sewing machines, compressors, forklifts, tractors, air hoses and lead wires, eight carpet tongs, one sewing thread, one air hose, one line and sewing assistant, one forklift driver, and transportation A total of 13 personnel, including personnel, will be mobilized.

여기서, 재봉과정을 좀더 자세히 설명하면, 재봉을 하기 위해서는 우선 (5) 잔디 파일이 재봉라인에 걸리지 않도록 에어 콤프레셔를 이용하여 인조잔디 파일이 아래를 향하게 한 후, (6) 재봉라인이 일정하게 나오도록 카펫 집게를 이용하여 양쪽으로 팽팽하게 당긴 상태로 재봉기의 진행방향을 향해 차례대로 이동하여 재봉을 실시한다. 그리고, 전체 재봉이 완료되면 다시 (7) 반대쪽을 재봉하여 2중 재봉작업을 실시한 후, (8) 겹쳐져 있는 인조잔디를 곧게 펴준 다음 (9) 재봉라인이 표시나지 않도록 롤러를 이용하여 다림작업을 실시한다.Here, the sewing process in more detail, in order to sew first (5) so that the grass file is not caught on the sewing line by using the air compressor to the artificial grass file facing down, and (6) the sewing line comes out constantly Carry sewing by moving in the direction of the sewing machine in the direction of sewing machine in the state pulled tightly to both sides using the carpet tongs. Then, when the whole sewing is completed, (7) sew the other side again to perform double sewing work, (8) straighten the overlapped artificial turf, and then (9) ironing work using rollers so that the sewing line is not displayed. Conduct.

이렇게, 재봉작업에 의해 인조잔디들이 연결되면 다시 (10) 핫멜트 머신을 이용하여 인조잔디에 라인(파울라인, 주루라인 등)을 부착하고, (11) 과립형태의 충전재를 인조잔디에 충전한다. 이러한 충전작업은 우선 (12) 라인작업이 완료되어 누워있는 인조잔디의 파일을 브러쉬로 세워준 후 (13) 충전재로 1: 2: 1의 비율로 하부충전층(규사층)과 중간충전층(규사+고무칩) 및 상부충전층(고무칩)을 형성한 다음 (14) 고무칩의 유동을 억제하고 공의 방향성이 없도록 페이브레이션(노출된 파일을 여러가닥으로 만드는 작업)을 실시한다.Thus, when the artificial turf is connected by sewing work (10) again using a hot melt machine to attach a line (foul line, rubbing line, etc.) to the artificial turf, and (11) filling the granule-shaped filler in the artificial turf. This filling work is first done with (12) line work and the pile of artificial turf laid down with a brush. (+) Rubber chip) and upper filling layer (rubber chip), and then (14) restrain the flow of rubber chip and fade (working multiple strands of exposed pile) so that the ball is not directed.

여기서, 전술한 하부충전층은 살포기를 이용하여 인조잔디 전체에 균일하게 포설한 후, 규사가 파일 사이에 고르게 충전되도록 브러쉬를 이용하여 마무리한다.Here, the lower filling layer described above is uniformly installed on the entire artificial turf using a sprayer, and then finished using a brush so that the silica sand is evenly filled between the piles.

이상과 같은 과정에 의해 배수블럭은 상부에 인조잔디가 배치된다.By the above process, the artificial turf is disposed on the drain block.

그러나, 인조잔디를 설치하기 위해서는 앞서 설명한 바와 같은 (1) 내지 (13)의 과정을 거쳐야 인조잔디 구장이 완성되므로 많은 노동력과 시간 및 비용이 소요된다. 또한, 전술한 바와 같이 시공된 인조잔디는 부분적인 보수가 어려워 전체를 한꺼번에 교체해야 하므로 예산을 낭비할 수도 있다.However, in order to install artificial turf, the artificial turf field is completed only through the process (1) to (13) as described above, which requires a lot of labor, time and cost. In addition, the artificial turf constructed as described above is difficult to partially repair, so it may waste the budget because the whole must be replaced at once.

따라서, 본 발명의 출원인은 지면 토목공사를 생략할 수 있는 등록된 전술한 특허를 이용하여 좀더 간편하게 인조잔디 구장을 시공하거나 보수할 수 있는 방법을 연구하였으며, 장기간의 연구 끝에 본 발명이 개발됨에 따라 본 발명을 출원하게 되었다.Therefore, the applicant of the present invention has studied a method for more easily constructing or repairing artificial turf fields using the above-described patents, which can omit the ground works. The present invention has been filed.

한편, 인조잔디 제품 중에는 가로 및 세로의 길이가 수십 센티미터의 단위블록 형태로 이루어진 매트형 인조잔디도 있으나, 이러한 매트형 인조잔디는 사실상 경관용이나 골프연습용으로 제조됨에 따라 아파트의 베란다와 같은 활동량이 적은 공간에는 적합하지만, 활동량이 많은 운동장과 같은 공간에는 설치할 수 없다.On the other hand, some artificial turf products have mat-shaped turf in the form of unit blocks of several tens of centimeters in length and width, but such mat-type turf is actually manufactured for landscape or golf practice. It is suitable for small spaces, but it cannot be installed in a space such as an active playground.

본 발명은 이러한 종래기술의 문제점을 해결하기 위해 창출된 것으로서, 투수성 및 쿠션을 갖는 아스콘 형태의 기층과 배수블럭 및 인조잔디가 일체로 구성되어 연속적인 상태를 이루면서 운동장에 설치되는 인조잔디 설치용 조립식 모듈을 제공하기 위함이 그 목적이다.The present invention has been created to solve the problems of the prior art, the artificial grass installation prefabricated to be installed on the playground while forming a continuous state consisting of a substrate and drainage blocks and artificial turf having a water permeability and cushion integrally The purpose is to provide a module.

특히, 맹암거를 설치하거나 골재를 넣는 것과 같은 토목작업을 생략하고, 단순히 지면을 평탄화 및 구배 작업만 실시한 후 조립식으로 인조잔디를 설치할 수 있는 인조잔디 설치용 조립식 모듈을 제공하기 위함이 그 목적이다.In particular, the purpose is to provide a prefabricated module for artificial turf installation that can be installed artificial turf after preparatory to simply ground flattening and grading work, omission of civil work such as installing a blind culvert or aggregate.

또한, 서로 조립되는 구조를 갖는 인조잔디 설치용 조립식 모듈을 제공하기 위함이 다른 목적이다.In addition, another object is to provide a prefabricated module for artificial turf installation having a structure that is assembled to each other.

또, 과립형태의 충전재를 인조잔디에 충전한 상태로 격리시킬 수 있는 인조잔디 설치용 조립식 모듈을 제공하기 위함이 또 다른 목적이다.In addition, another object of the present invention is to provide a prefabricated module for artificial turf installation that can be isolated in a state in which granular filler is filled in artificial turf.

또한, 충격을 흡수하면서 기층을 형성하는 부재가 여러 개의 배수블럭들을 하나로 결속하면서 충격을 흡수할 수 있는 인조잔디 설치용 조립식 모듈을 제공하기 위함이 다른 목적이다.In addition, another object of the present invention is to provide a prefabricated module for installing artificial turf that can absorb shock while the member forming the base layer while absorbing the shock binds multiple drainage blocks into one.

또, 배수블럭과 인조잔디 사이에 충격을 흡수하는 부재가 마련된 인조잔디 설치용 조립식 모듈을 제공하기 위함이 또 다른 목적이다.Another object of the present invention is to provide a prefabricated module for installing artificial turf having a member for absorbing shock between the drainage block and the artificial turf.

또한, 라인이 형성되어 조립식으로 라인을 형성할 수 있는 인조잔디 설치용 조립식 모듈을 제공하기 위함이 또 다른 목적이다.In addition, another object of the present invention is to provide a prefabricated module for artificial turf installation in which a line is formed to form a line in a prefabricated manner.

이와 같은 목적을 달성하기 위한 본 발명에 의한 인조잔디 설치용 조립식 모듈은, 인조잔디의 설치에 이용되는 모듈에 있어서, 잔디형태의 파일이 식모된 섬유기포지; 상기 섬유기포지 상의 파일 사이에 충전되어 섬유기포지 상에 충전층을 형성하면서 쿠션을 제공하는 과립형태의 충전재; 상기 충전재의 충전 높이에 대응하는 높이로 이루어져서 상기 섬유기포지의 테두리를 따라 부착되고, 박막형태로 형성되어 충전재가 충전층을 형성하는 것을 가이드하면서 충전재가 섬유기포지의 외부로 이탈되는 것을 방지하는 가이드 테이프 및; 상기 가이드 테이프가 설치된 상기 섬유기포지의 하면에 고정부착되어 섬유기포지를 지지하면서 섬유기포지에서 적하되는 우수를 집수하여 배수하는 배수블록;을 포함하며, 상기 배수블록은, 상기 섬유기포지의 하부에 설치되어 우수를 집수하여 측방으로 배수하는 배수판 및; 상기 배수판상에 돌출형성되어 상기 섬유기포지의 하면에 고정부착되고, 복수개로 구성되어 서로의 이격된 공간을 통해 우수를 배수하는 돌기;를 포함하는 인조잔디 설치용 조립식 모듈에 의해 달성된다.Prefabricated module for artificial turf installation according to the present invention for achieving the above object, the module used for the installation of artificial turf, grass-fiber pile fiber planting; A filler in the form of granules which is filled between the piles on the fiber foam to provide a cushion while forming a filling layer on the fiber foam; Consists of a height corresponding to the filling height of the filler to be attached along the edge of the fiber foam, and formed in a thin film form to guide the filler to form the filling layer while preventing the filler from being separated out of the fiber foam. Guide tape and; And a drainage block fixedly attached to a lower surface of the fiber bubble cloth having the guide tape installed thereon to support the fiber bubble paper and to collect and drain rainwater dropped from the fiber bubble paper, wherein the drain block includes a lower portion of the fiber bubble paper. A drain plate installed at the drain and draining laterally; Protruding on the drainage plate is fixed to the lower surface of the fiber bubble paper, is composed of a plurality of projections for draining the rain through the spaces spaced from each other; achieved by the prefabricated module for artificial turf installation comprising a.

상기 배수판은, 일측의 단부에 연결고리가 돌출형성되며, 타측의 단부에 상기 연결고리와 대응하는 연결공이 형성되어 연결고리 및 연결공을 통해 조립식 연결이 가능한 구조를 갖도록 구성할 수 있다.The drain plate, the connecting ring is formed at the end of one side, the connecting hole corresponding to the connecting ring is formed at the other end can be configured to have a structure capable of prefabricated connection through the connecting ring and the connecting hole.

본 발명은, 상기 배수블록의 하면에 일체적으로 성형되어 배수블록에 가해지는 충격을 흡수하는 쇼크패드;를 더 포함한다.The present invention further includes a shock pad formed integrally with the lower surface of the drain block to absorb the shock applied to the drain block.

상기 쇼크패드는, 상기 연결고리 및 연결공에 의해 서로 연결되면서 복수개 가 한 조를 이루는 상기 배수블록의 하면에 동일체로 성형되어 복수개의 배수블록들을 일체적으로 연결하면서 배수블록에 가해지는 충격을 흡수하며, 접착바인더가 혼합됨에 따라 판상으로 형성되는 과립형태의 탄성재 칩으로 이루어질 수 있다.The shock pad is formed in the same body on the lower surface of the drain block forming a plurality of sets while being connected to each other by the connecting ring and the connection hole to absorb the shock applied to the drain block while integrally connecting the plurality of drain blocks. And, it may be made of a granular elastic material chip formed in a plate shape as the adhesive binder is mixed.

상기 배수블록은 상기 연결고리 및 연결공에 의해 9개 내지 18개가 한조를 이루도록 구성할 수 있다.The drain block may be configured to form a set of nine to eighteen by the connecting ring and the connection hole.

본 발명은, 상기 섬유기포지 및 배수블록 사이에 마련되어 섬유기포지의 충격을 흡수하는 투수성 완충패드;를 더 포함하며, 상기 완충패드는, 접착바인더가 혼합됨에 따라 판상으로 형성되는 과립형태의 탄성재 칩으로 이루어지도록 구성할 수 있다.The present invention further includes a permeable buffer pad provided between the fiber foam paper and the drainage block to absorb the impact of the fiber foam paper, wherein the buffer pad has a granular form formed in a plate shape as the adhesive binder is mixed. It can be configured to be made of an elastic chip.

상기 파일은 일부의 파일이 다른 파일들과 이종의 색상을 갖는 이종파일로 구성되어 상기 섬유기포지상에 라인이나 문양을 형성하는 것을 특징으로 하는 인조잔디 설치용 조립식 모듈.The pile is a prefabricated module for artificial turf installation, characterized in that a portion of the pile is composed of a heterogeneous file having a different color and different files to form a line or pattern on the fiber bubble paper.

본 발명에 의한 인조잔디 설치용 조립식 모듈은, 시공면적에 따라 다수의 조립식 모듈을 연속적으로 설치함으로써 다수의 조립식 모듈을 시공면적에 따라 유연하게 설치할 수 있으므로 숙련된 작업자가 아니더라도 일반인들이 얼마든지 간편하게 설치할 수 있으며, 하나의 유니트 단위로 구성되므로 운반이 용이할 뿐만 아니라 설치가 용이하다.Prefabricated module for artificial turf installation according to the present invention, by installing a plurality of prefabricated modules in sequence according to the construction area can be installed flexibly according to the construction area, a large number of prefabricated modules can be easily installed by the general public, even if not skilled workers In addition, since it is composed of one unit, it is easy to carry and easy to install.

특히, 연속설치방식으로 인조잔디를 시공하므로 종래와 같이 많은 인력이 필요하지 않을 뿐만 아니라 시공이 간편하여 단시간에 시공을 완료할 수 있으며, 훼 손시 훼손된 부분만 새것으로 교체하면 되므로 관리비 및 유지비를 대폭적으로 절감할 수 있다.In particular, since the artificial turf is constructed in a continuous installation method, not only manpower is required as in the prior art but also the construction can be completed in a short time because the construction is simple, and only the damaged part needs to be replaced with a new one, thus greatly reducing management and maintenance costs. Can be reduced.

또, 배수블럭의 연결고리를 연결공에 단순히 끼워 결합할 수 있으므로 배수블럭을 견고하게 연결할 수 있다.In addition, since the connecting ring of the drain block can be simply inserted into the connection hole, the drain block can be firmly connected.

더욱이, 종래와 같은 재봉작업이나 파일을 세우거나 다림질하는 작업 및 충전재를 충전하는 작업, 그리고 페이브레이션 작업이 완료된 상태로 세트화되므로 전술한 종래의 시공공정을 생략할 수 있다.Furthermore, the conventional construction process as described above is set in a state in which a sewing operation, a file erecting or ironing operation, a filling operation of a filling material, and a paving operation are completed.

또, 가이드테이프가 충전재를 구속하므로 충전재를 용이하게 충전할 수 있고, 충전재가 쿠션을 제공하므로 사용자의 부상을 방지할 수 있으며, 배수블럭이 돌기들 간의 공간을 통해 우수를 배수하므로 신속한 배수가 가능하고, 쇼크패드가 충격을 흡수하므로 배수블록의 피로파괴를 방지할 수 있는을 뿐만 아니라, 가이드 테이프가 박막식으로 형성되므로 충전재의 충전 공간을 충분히 제공할 수 있을 뿐만 아니라, 인조잔디를 사용하는 사용자가 파일을 밟을 경우 파일과 함께 눕혀지면서 사용자의 발이 걸리는 것을 방지할 수 있다.In addition, the guide tape restrains the filling material so that the filling material can be easily filled, and the filling material provides a cushion to prevent injuries of the user, and the draining block drains rainwater through the space between the protrusions, thereby allowing quick drainage. In addition, the shock pad absorbs the shock, thereby preventing fatigue of the drainage block. In addition, the guide tape is formed in a thin film type to provide sufficient space for filling the filler, and to use the artificial turf. Stepping on the file will lie down with the file and prevent the user's foot from being caught.

아울러, 쇼크패드가 상부의 충격을 완충할 뿐만 아니라 탄성재 칩으로 구성되어 탄성재 칩들의 미세한 틈사이로 원활하게 우수를 배수하며, 특히 복수개의 배수블록에 쇼크패드가 한장의 단일체로 성형될 경우 배수블록들이 분리되는 것을 방지할 수 있을 뿐만 아니라 복수개의 배수블록을 견고하게 결속할 수 있으며, 또한 복수개의 배수블록들을 하나의 유니트로 구성할 수 있으므로 운반이나 설치를 좀더 용이하게 실시할 수 있다. In addition, the shock pad not only cushions the impact of the upper portion, but also is composed of an elastic material chip to smoothly drain the rainwater between the fine gaps of the elastic material chips, especially when the shock pad is formed in a single piece in a plurality of drain blocks. Not only can the blocks be prevented from being separated, but a plurality of drainage blocks can be firmly bound, and a plurality of drainage blocks can be configured as a single unit, so that carrying or installing can be performed more easily.

특히, 쇼크패드를 접착바인더가 혼합된 과립형태의 탄성재 칩으로 구성할 경우 쇼크패드를 용이하게 성형할 수 있는 장점도 있으며, 쇼크패드를 통해 복수개의 배수블록들을 하나의 유니트로 구성할 수 있으므로 운반이나 설치를 좀더 용이하게 실시할 수 있다.In particular, when the shock pad is composed of a granular elastic chip in which an adhesive binder is mixed, the shock pad can be easily formed, and a plurality of drain blocks can be configured as a unit through the shock pad. Transport and installation can be done more easily.

게다가, 쇼크패드의 하부에 요철을 형성할 경우 쇼크패드가 상부의 충격에 의해 미끄러지는 것을 방지할 수 있다.In addition, when the irregularities are formed in the lower portion of the shock pad, the shock pad can be prevented from slipping by the impact of the upper portion.

이에 더하여, 쇼크패드가 복수개의 배수블록에 성형될 경우 배수블록들을 견고하게 결속시킬 수 있을 뿐만 아니라, 섬유기포지가 찢기는 것을 방지할 수 있다.In addition, when the shock pad is formed in a plurality of drain blocks, not only the drain blocks can be tightly bound but also the fiber foam paper can be prevented from being torn.

더 나아가, 배수블록 및 섬유기포지 사이에 완충패드를 마련할 경우 충격을 더욱 완화시킬 수 있을 뿐만 아니라, 충전재를 경우에 따라 생략할 수도 있다.Furthermore, in the case of providing a buffer pad between the drainage block and the fiber foam, not only the shock can be further alleviated, but also the filler may be omitted in some cases.

또한, 이종파일을 섬유기포지에 식모할 경우 인조잔디를 시공하는 동시에 인조잔디 구장에 라인이나 문양을 제공할 수 있다.In addition, when planting heterogeneous piles into fiber bubble paper, it is possible to construct artificial turf and provide lines or patterns to artificial turf ground.

이하, 첨부된 도면을 참조하여 본 발명에 의한 인조잔디 설치용 조립식 모듈을 설명하면 다음과 같으며, 첨부된 도 1은 본 발명에 따른 인조잔디 설치용 조립식 모듈을 도시한 단면도; 도 2는 도 1에 도시된 배수블록의 조립상태를 도시한 평면도; 도 3은 도 2에 도시된 배수블록에 쇼크패드가 설치된 것을 도시한 단면도 ; 도 4는 도 1에 도시된 배수블록 및 쇼크패드의 부분확대도 및; 도 5는 도 1에 도시된 배수블록의 상부에 완충패드가 부착된 것을 도시한 단면도이다.Hereinafter, with reference to the accompanying drawings illustrating a prefabricated module for artificial turf installation according to the present invention, the accompanying Figure 1 is a cross-sectional view showing a prefabricated module for artificial turf installation according to the present invention; 2 is a plan view showing the assembled state of the drain block shown in FIG. 3 is a cross-sectional view showing that the shock pad is installed in the drain block shown in FIG. 4 is an enlarged partial view of the drain block and the shock pad shown in FIG. 1; FIG. 5 is a cross-sectional view illustrating a buffer pad attached to an upper portion of the drain block shown in FIG. 1.

본 발명의 인조잔디 설치용 조립식 모듈(1)은 도 1에 도시된 바와 같이, 잔 디형태의 파일(11)이 식모된 섬유기포지(10)와, 상기 섬유기포지(10) 상의 파일(11) 사이에 충전되어 섬유기포지(10)상에 충전층을 형성하는 과립형태의 충전재(20)와, 상기 섬유기포지(10)의 테두리에 부착되는 박막형의 가이드 테이프(21)와, 상기 섬유기포지(10)의 하면에 고정부착되는 배수블록(30)을 포함하여 구성된다.As shown in FIG. 1, the prefabricated module 1 for artificial turf installation according to the present invention includes a fiber base paper 10 into which a pile 11 of a grass shape is implanted, and a pile 11 on the fiber base paper 10. ) And a granular filler 20 to form a filling layer on the fiber substrate 10, a thin film-shaped guide tape 21 attached to the edge of the fiber substrate 10, and the fibers. It is configured to include a drain block 30 is fixed to the lower surface of the bubble paper (10).

상기 섬유기포지(10)는 섬유재 원단으로서, 부직포나 팰트로 구성될 수 있다. 그리고, 상기 파일(pile)(11)은 일반적으로 폴리에틸렌 재질의 섬유로 세섬유화(세로 방향으로 갈라지는 것, fibrillation) 특성을 갖는 섬유파일(pile)을 37∼65㎜ 높이로 직조되고, 직조된 파일(11)을 단일구조(겉잔디만으로 구성) 또는 이중구조(겉잔디와 속잔디로 구성)로 구성된다.The fiber base paper 10 is a fabric material, it may be composed of a non-woven fabric or felt. In addition, the pile (11) is generally made of polyethylene fiber, the fiber pile (pile) having a fibrillation (vertical splitting in the vertical direction, fibrillation) characteristics are woven to a height of 37 to 65 mm, the woven pile (11) consists of a single structure (consisting of only grass) or a double structure (consisting of grass and inner grass).

충전재(20)는 도시된 바와 같이 규사(20a) 및/또는 고무칩(20b)으로 이루어질 수 있으며, 도시된 바와 같이 섬유기포지(10)상에 복층의 구조로 충전될 수 있다. 충전재(20)는 섬유기포지(10)의 상부에 부상방지를 위한 쿠션을 제공하고, 파일(11)들을 수직으로 세워주는 기능을 제공한다. 즉, 파일(11)은 밟혀도 충전재(20)에 의해 눕혀지지 않는다.The filler 20 may be made of silica sand 20a and / or rubber chip 20b as shown, and may be filled in a multi-layered structure on the fiber substrate 10 as shown. The filler 20 provides a cushion for preventing injury on the upper portion of the fibrous cloth 10 and provides a function of vertically standing the piles 11. That is, even if the pile 11 is stepped on, it is not laid down by the filler 20.

가이드 테이프(21)는 도시된 바와 같이 섬유기포지(10)의 테두리 즉 외측면에 상부로 수직하게 돌출상태로 설치된다. 가이드 테이프(21)는 충전재(20)에 대향하는 일면이 접착면(21a)으로 구성된다. 따라서, 가이드 테이프(21)는 접착면(21a)을 통해 섬유기포지(10)의 테두리에 부착될 뿐만 아니라 접착면(21a)에 충전재(20)들이 부착된다. 물론, 가이드 테이프(21)는 접착면(21a)에 충전재(20)들이 부착되 면서 강성이 확보되므로 도시된 바와 같은 수직상태를 유지한다.As shown, the guide tape 21 is installed to protrude vertically upwardly on the edge of the fiber bubble paper 10, that is, the outer surface. One side of the guide tape 21 facing the filler 20 is composed of an adhesive surface 21a. Therefore, the guide tape 21 is not only attached to the edge of the fibrous paper 10 through the adhesive surface 21a, but also the fillers 20 are attached to the adhesive surface 21a. Of course, the guide tape 21 maintains the vertical state as shown because the rigidity is secured as the filler 20 is attached to the adhesive surface (21a).

가이드 테이프(21)는 도시된 바와 같이 충전재(20)의 충전 높이, 즉 충전층의 높이에 대응하는 높이로 이루어진다. 따라서, 가이드 테이프(21)는 도시된 바와 같이 충전재(20)가 섬유기포지(10)의 외부로 이탈되는 것을 방지하여 충전재(20)가 섬유기포지(10)상에 충전층을 형성하는 것을 가이드한다. 물론, 충전재(20)는 가이드 테이프(21)에 의해 원하는 높이로 용이하게 충전된다.Guide tape 21 is made of a height corresponding to the filling height of the filler 20, that is, the height of the filling layer as shown. Accordingly, the guide tape 21 prevents the filler 20 from escaping to the outside of the fiber bubble paper 10 as shown, thereby forming the filler layer on the fiber bubble paper 10. Guide. Of course, the filler 20 is easily filled to the desired height by the guide tape 21.

배수블록(30)은 예컨대, 도시된 바와 같이 섬유기포지(10)의 하면에 설치되어 섬유기포지에서 적하되는 우수를 집수하여 측방으로 배수하는 배수판(30a) 및; 배수판(30a)의 상부에 이격상태로 돌출형성되는 다수의 돌기(31)를 포함하여 구성할 수 있다. 상기 돌기(31)는 도시된 바와 같이 상면이 섬유기포지(10)의 하면에 접하여 섬유기포지(10)를 지지하게 된다. 이때, 상기 돌기(31)의 상면은 섬유기포지(10)의 하면에 본딩 등의 접착수단으로 고정부착된다.The drainage block 30 may include, for example, a drainage plate 30a installed at a lower surface of the fiber bubble paper 10 to collect rainwater dropped from the fiber bubble paper and drained to the side; It may be configured to include a plurality of protrusions 31 protruding to be spaced apart on the upper portion of the drain plate (30a). As shown in the projection 31, the upper surface of the protrusion 31 is in contact with the lower surface of the fiber bubble paper 10 to support the fiber bubble paper (10). At this time, the upper surface of the protrusion 31 is fixedly attached to the lower surface of the fiber bubble paper 10 by bonding means such as bonding.

배수블록(30)은 배수판(30a)의 상부로 우수를 집수하여 측방으로 배수한다. 이때, 배수블록(30)은 배수판(30a)에 형성된 돌기(31) 사이의 이격 공간을 통해 우수를 배수한다. 즉, 배수블록(30)은 돌기(31) 사이의 배수홈(32)을 통해 우수를 배수한다.The drain block 30 collects rainwater to the upper portion of the drain plate 30a and drains it laterally. At this time, the drain block 30 drains the rainwater through the spaced space between the projections 31 formed in the drain plate (30a). That is, the drain block 30 drains rainwater through the drain groove 32 between the projections 31.

배수블록(30)은 인접한 다른 조립식 모듈(1)의 배수블록(30)과 연속적으로 연결되도록 연결수단(A)이 구성된다.The drain block 30 is configured to connect the connection means (A) to be continuously connected to the drain block 30 of the other prefabricated module (1).

상기 연결수단(A)은 배수블록(30)의 대칭되는 양단부에는 각각 돌출된 연결고리(33)와 이와 결합되는 연결공(34)으로 구성되어, 인접한 다른 조립식 모듈(1) 의 배수블록(30)을 도 2에서와 같이 연속적으로 연결한다.The connecting means (A) is composed of a connecting ring 33 and a connecting hole 34 which are protruded from each of the symmetrical ends of the drain block 30, respectively, the drain block 30 of the other prefabricated module (1) ) Are continuously connected as shown in FIG. 2.

이때, 상기 연결고리(33)는 배수블록(30) 일측의 2변에 형성되고, 상기 연결공(34)은 연결고리(33)가 형성되지 않은 나머지 2변에 형성된다. 즉, 상기 연결고리(33)는 배수블록(30)의 일측 테두리에 형성되고, 상기 연결공(34)은 배수블록(30)의 타측 테두리에 형성된다. 연결고리(33) 및 연결공(34)은 도 1의 하부에 확대 도시된 바와 같이 배수블록(30)의 테두리를 따라 형성되는 플랜지형태의 단턱에 형성된다. 연결공(34)이 형성된 단턱은 확대 도시된 바와 같이 연결고리(33)의 결합시 연결고리(33)가 형성된 단턱의 하부를 지지한다.At this time, the connecting ring 33 is formed on two sides of one side of the drain block 30, the connecting hole 34 is formed on the other two sides of the connection ring 33 is not formed. That is, the connection ring 33 is formed on one side edge of the drain block 30, the connection hole 34 is formed on the other side edge of the drain block (30). The connecting ring 33 and the connecting hole 34 are formed in a stepped flange, which is formed along the edge of the drainage block 30 as shown in the lower portion of FIG. 1. The stepped hole formed with the connection hole 34 supports the lower portion of the stepped hole formed when the connection ring 33 is coupled as shown in the enlarged view.

한편, 상기 연결고리(33)는 배수블록(30)의 외측으로 돌출된 "ㄱ"자 형상으로 형성되는 한편 그 단부에는 연결공(34)의 내경보다 큰 직경을 갖도록 외향 돌출된 돌출부(33a)가 형성되고, 이에 대응한 연결공(34)은 배수블록(30)의 외주연부에 수직상태로 천공되어 형성된다. 따라서, 상기 연결고리(33)는 그 단부의 돌출부(33a)로 인해서 연결공(34)에 압입된 상태로 끼워지고, 압입 후에는 연결고리(33)의 돌출부(33a)가 연결공(34)을 관통하여 연결공(34)의 하단부에 걸림됨으로써 견고한 결합상태를 유지할 수 있게 된다.On the other hand, the connecting ring 33 is formed in a "b" shape protruding to the outside of the drainage block 30, while the end of the protrusion 33a protruding outward to have a diameter larger than the inner diameter of the connection hole 34 Is formed, the corresponding connection hole 34 is formed by drilling in a vertical state on the outer peripheral edge of the drain block (30). Therefore, the connecting ring 33 is fitted in the press-fitted state into the connecting hole 34 due to the protrusion 33a of the end, and after the press-in the protrusion 33a of the connecting ring 33 is the connecting hole 34 By penetrating through the lower end of the connection hole 34 it is possible to maintain a firm coupling state.

그리고, 이와 같은 배수블록(30) 간의 연결을 통해서 다수의 조립식 모듈(1)은 도 2에서와 같이 연속적으로 연결된다. 그리고, 이와 같이 연결되는 조립식 모듈(1)은 시공면적에 따라 그 크기를 얼마든지 가변시킬 수 있으므로 시공면적에 구애받지 않고 유연하게 대처하여 시공할 수 있다.In addition, the plurality of prefabricated modules 1 are continuously connected as shown in FIG. 2 through the connection between the drainage blocks 30. In addition, the prefabricated module 1 connected in this way can vary in size depending on the construction area, so that the construction can be flexibly handled regardless of the construction area.

한편, 배수블록(30)은 도시된 바와 같이 하면에 쇼크패드(40)가 마련될 수 있다. 쇼크패드(40)는 탄성을 갖는 재질로 구성되며, 접착바인더가 혼합됨에 따라 판상으로 형성되는 과립형태의 탄성재 칩(예: 고무알갱이나 우레탄 알갱이 또는 EVA-Ethylene.Vinyl.Acetat-등)으로 이루어지는 것이 바람직하다. 쇼크패드(40)는 다수의 탄성재 칩이 접착바인더에 의해 결속되므로 탄성재 칩들 사이에 미세한 틈새가 형성된다. 따라서, 쇼크패드(40)는 탄성재 칩 사이의 틈새를 통해 우수를 배수한다. 즉, 쇼크패드(40)는 탄성력을 갖는 다공의 투수재이다.On the other hand, the drain block 30 may be provided with a shock pad 40 on the lower surface as shown. The shock pad 40 is made of a material having elasticity, and is formed of a granular elastic material chip (for example, rubber granules or urethane granules or EVA-Ethylene.Vinyl.Acetat-, etc.) formed in a plate shape as the adhesive binder is mixed. It is preferable to make. In the shock pad 40, since a plurality of elastic material chips are bound by an adhesive binder, minute gaps are formed between the elastic material chips. Therefore, the shock pad 40 drains rainwater through the gap between the elastic material chips. That is, the shock pad 40 is a porous water permeable material having an elastic force.

쇼크패드(40)는 도 1에 도시된 바와 같이 배수블록(30)의 하면에 배수블록(30)에 대응한 면적으로 성형될 수 있으며, 이와 달리 도 3에서 처럼 연결고리(33) 및 연결공(34)에 의해 서로 연결되면서 복수개가 한 조를 이루는 배수블록(30)의 하면에 성형될 수도 있다. 즉, 쇼크패드(40)는 하나의 배수블록(30)에 하나씩 성형될 수 있으며, 이와 달리 여러 개의 배수블록(30)에 하나로 성형될 수도 있다.As shown in FIG. 1, the shock pad 40 may be formed in an area corresponding to the drain block 30 on the bottom surface of the drain block 30. Alternatively, the shock pad 40 and the connection hole 33 and the connection hole may be formed as shown in FIG. 3. It may be formed on the lower surface of the drain block 30, which is connected to each other by the 34 to form a group. That is, the shock pads 40 may be molded one by one in one drain block 30, or alternatively, the shock pads 40 may be molded in one in several drain blocks 30.

특히, 쇼크패드(40)는 도 2에 도시된 바와 같이 9개의 배수블록(30)의 하부에 일체로 성형되어 한장(1개)으로 형성되는 것이 바람직하다. 이때, 배수블록(30)은 연결고리(33) 및 연결공(34)에 의해 도 2에 도시된 바와 같이 9개 내지 18개가 한조로 조립된 후 뒤집힌 상태로 쇼크패드(40)가 성형된다. 따라서, 쇼크패드(40)는 9개의 배수블록(30)들을 일체적으로 연결하면서 배수블록(30)에 가해지는 충격을 흡수한다. 또, 쇼크패드(40)는 복수의 배수블록(30)들이 분리되는 것을 방지하여 섬유기포지(10)가 찢어지지 않도록 보호한다.In particular, it is preferable that the shock pad 40 is integrally formed at the bottom of the nine drainage blocks 30 as shown in FIG. 2 and formed in one piece. In this case, as shown in FIG. 2, the drain block 30 has the shock pad 40 formed in an inverted state by assembling a pair of nine to eighteen as shown in FIG. 2. Therefore, the shock pad 40 absorbs the shock applied to the drain block 30 while integrally connecting the nine drain blocks 30. In addition, the shock pad 40 prevents the plurality of drain blocks 30 from being separated, thereby protecting the fiber bubble paper 10 from being torn.

한편, 쇼크패드(40)는 도 4에 도시된 바와 같이 하부에 요철(40a)이 형성될 수 있다. 이러한 요철(40a)은 배수블럭(30)의 상부에서 가해지는 충격에 의해 쇼크패드(40)가 지면에서 미끌어지는 것을 방지한다. 즉, 요철(40a)은 쇼크패드(40)의 슬림을 방지한다.On the other hand, the shock pad 40, as shown in Figure 4 may be formed in the bottom unevenness (40a). The unevenness 40a prevents the shock pad 40 from sliding off the ground due to the impact applied from the upper portion of the drain block 30. That is, the unevenness 40a prevents the slimming of the shock pad 40.

또 한편, 충전재(20)는 파일(11)의 높이에 의해 충전 높이가 결정된다. 그리고, 상기 가이드 테이프(21)는 충전재(20)의 충전 높이 보다 약간 낮은 높이로 형성된다.On the other hand, the filling height of the filler 20 is determined by the height of the pile 11. The guide tape 21 is formed to a height slightly lower than the filling height of the filler 20.

다른 한편, 배수블록(30)은 도 5에 도시된 바와 같이 돌기(31)의 상부에 섬유기포지(10)가 곧바로 부착되지 않고, 완충패드(50)가 부착된 후 섬유기포지(10)가 부착될 수 있다. 완충패드(50)는 전술한 쇼크패드(40)와 동일한 재질로 구성하는 것이 바람직하다. 즉, 완충패드(50)는 충격흡수재로 구성된다. 완충패드(50)는 재질특성에 의해 충격완화 기능을 갖는다. 이러한 완충패드(50)는 섬유기포지(10)에 충전재(20)가 충전되지 않을 경우 효과적이다. 즉, 완충패드(50)는 섬유기포지(10)에 충전재(20)가 충전되지 않을 경우 적용된다. 완충패드(50)는 모듈(1)의 전체적인 무게를 고려해 약 3mm 내지 20mm의 두께로 구성하는 것이 효율적이다.On the other hand, the drain block 30 is not immediately attached to the fibrous bubble 10 on the top of the projection 31, as shown in Figure 5, after the buffer pad 50 is attached to the fibrous bubble 10 Can be attached. The shock absorbing pad 50 is preferably made of the same material as the shock pad 40 described above. That is, the shock absorbing pad 50 is made of an impact absorbing material. The shock absorbing pad 50 has a shock absorbing function by material properties. The buffer pad 50 is effective when the filler 20 is not filled in the fiber foam 10. That is, the buffer pad 50 is applied when the filler 20 is not filled in the fiber foam 10. The buffer pad 50 may be configured to have a thickness of about 3 mm to 20 mm in consideration of the overall weight of the module 1.

또 다른 한편, 섬유기포지(10)는 도 5에 도시된 바와 같이 식모된 파일(11)들 중에서 일부가 색상이 상이한 이종의 이종파일(11a)로 구성될 수 있다. 이종파일(11a)은 섬유기포지(10)상에 라인이나 문양을 형성한다. 이러한 이종파일(11a)은 초록색과 대비되는 흰색이나 노란색으로 구성하는 것이 바람직하다.On the other hand, the fiber base paper 10 may be composed of a heterogeneous heterogeneous pile (11a) of some of the piled pile 11 as shown in FIG. The different piles 11a form a line or a pattern on the fiber base paper 10. The hetero file 11a is preferably composed of white or yellow as opposed to green.

전술한 바와 같은 본 발명의 실시예에 의한 모듈(1)은 시공현장에 운반된 후 잔디배치도(시방서 및 도면)의 순서에 따라 연속적으로 지면에 배치되면서 연결된 다. 이러한 모듈(1)은 약 2명 내지 4명에 의해 운반되어 시공된다.The module 1 according to the embodiment of the present invention as described above is connected to the ground while being continuously disposed on the ground in the order of the grass arrangement diagram (specifications and drawings). This module 1 is carried and constructed by about 2 to 4 people.

이상과 같이 구성된 본 발명의 인조잔디 설치용 조립식 모듈(1)은 시공면적에 따라 다수의 조립식 모듈(1)을 도 1에서와 같이 배수블록(30)의 연결고리(33)와 연결공(34)을 통해서 연속적으로 연결함으로써 다수의 조립식 모듈(1)을 시공면적에 따라 유연하게 설치할 수 있을 뿐만 아니라 연결고리(33)를 연결공(34)에 단순히 끼워 결합하는 작업만으로 인조잔디를 설치할 수 있으므로 숙련된 작업자가 아니더라도 일반인들이 얼마든지 간편하게 설치할 수 있으며, 하나의 유니트 단위로 구성되므로 운반이 용이할 뿐만 아니라 설치가 용이하다.Artificial grass installation prefabricated module (1) of the present invention configured as described above is a plurality of prefabricated modules (1) according to the construction area as shown in Figure 1 connecting ring 33 and the connection hole 34 of the drainage block (30) Through the continuous connection through the multiple prefabricated module (1) can be installed flexibly according to the construction area, as well as the artificial turf can be installed by simply inserting the connecting ring 33 into the connection hole 34, the coupling operation Even if it is not a worker, it can be easily installed by the general public, and it is easy to carry as well as easy to install because it is composed of one unit unit.

특히, 유니트화된 모듈(1)을 조립식으로 결합하여 인조잔디를 시공하므로 종래와 같이 많은 인력이 필요하지 않을 뿐만 아니라 시공이 간편하여 단시간에 시공을 완료할 수 있으며, 훼손시 훼손된 부분만 새것으로 교체하면 되므로 관리비 및 유지비를 대폭적으로 절감할 수 있다.In particular, since the artificial turf is constructed by combining the unitized module 1 in a prefabricated manner, not only does not require a lot of manpower as in the prior art but also the construction is simple, so that the construction can be completed in a short time, and only the damaged part is damaged when new. The replacement can significantly reduce the maintenance and maintenance costs.

더욱이, 종래와 같은 재봉작업이나 파일(11)을 세우거나 다림질하는 작업 및 충전재를 충전하는 작업, 그리고 페이브레이션 작업이 완료된 상태로 세트화되므로 전술한 종래의 시공공정을 생략할 수 있다.Further, the conventional construction process as described above is set in a state in which a sewing operation or a file 11 is erected or ironed, a filling operation of a filling material, and a paving operation are completed.

또, 이와 같이 연결되는 다수의 조립식 모듈(1)을 도 2에서와 같이 정사각형이나 직사각형 형태로 미리 조립하여 세트화하면, 인조잔디를 더 편리하게 설치할 수 있다.In addition, when the plurality of prefabricated modules 1 connected in this way are assembled and set in a square or rectangular shape as shown in FIG. 2, the artificial turf can be installed more conveniently.

그리고, 이와 같이 설치된 조립식 모듈(1)은 우천시 섬유기포지(10)를 통해 배수블록(30)으로 배수되고, 배수블록(30)으로 배수된 물은 배수블록(30)의 배수 홈(32)을 타고 지면으로 배수된다.In addition, the prefabricated module 1 installed as described above is drained to the drain block 30 through the fiber bubble paper 10 during rain, and the water drained to the drain block 30 is the drain groove 32 of the drain block 30. Is drained to the ground.

또한, 가이드 테이프(21)가 박막식으로 형성되므로 충전재(20)의 충전 공간을 충분히 제공할 수 있을 뿐만 아니라, 인조잔디를 사용하는 사용자가 파일(11)을 밟을 경우 파일(11)과 함께 눕혀지면서 사용자의 발이 걸리는 것을 방지한다.In addition, since the guide tape 21 is formed in a thin film form, not only can provide a sufficient space for filling the filler 20, but also when the user using the artificial turf steps on the pile 11, it is laid down together with the pile 11. Prevents your foot from getting caught.

아울러, 쇼크패드(40)가 상부의 충격을 완충할 뿐만 아니라 탄성재 칩으로 구성되어 탄성재 칩들의 미세한 틈사이로 원활하게 우수를 배수하며, 특히 복수개의 배수블록(30)에 쇼크패드(40)가 한장의 단일체로 성형될 경우 배수블록(30)들이 분리되는 것을 방지할 수 있을 뿐만 아니라 복수개의 배수블록(30)을 견고하게 결속할 수 있으며, 또한 복수개의 배수블록(30)들을 하나의 유니트로 구성할 수 있으므로 운반이나 설치를 좀더 용이하게 실시할 수 있다.In addition, the shock pad 40 not only cushions the impact of the upper portion, but also is composed of an elastic material chip to smoothly drain the fine water between the fine gaps of the elastic material chips, in particular, the shock pad 40 in the plurality of drain blocks 30. Is formed into a single unit, it is possible to prevent the drainage blocks 30 from being separated, as well as to firmly bind the plurality of drainage blocks 30, and also to connect the plurality of drainage blocks 30 to one unit. Since it can be configured as a can be carried out more easily carrying or installation.

게다가, 쇼크패드(40)의 하부에 요철(40a)을 형성할 경우 쇼크패드(40)가 상부의 충격에 의해 미끄러지는 것을 방지할 수 있다.In addition, when the unevenness 40a is formed below the shock pad 40, the shock pad 40 can be prevented from slipping due to the impact of the upper part.

이에 더하여, 쇼크패드(40)가 복수개의 배수블록(30)에 성형될 경우 배수블록(30)들을 견고하게 결속시킬 수 있을 뿐만 아니라, 섬유기포지가 찢기는 것을 방지할 수 있다.In addition, when the shock pad 40 is formed in the plurality of drain blocks 30, the shock blocks 40 may be firmly bound to the drain blocks 30, and the fiber bubble paper may be prevented from being torn.

더 나아가, 배수블록(30) 및 섬유기포지(10) 사이에 완충패드(50)를 마련할 경우 충격을 더욱 완화시킬 수 있을 뿐만 아니라, 충전재(20)를 경우에 따라 생략할 수도 있다.Furthermore, when the buffer pad 50 is provided between the drainage block 30 and the fibrous foam 10, the shock may be further reduced, and the filler 20 may be omitted in some cases.

또한, 이종파일(11a)을 섬유기포지(10)에 식모할 경우 인조잔디를 시공하는 동시에 인조잔디 구장에 라인이나 문양을 제공할 수 있다.In addition, when planting the different pile (11a) to the fiber bubble paper 10, it is possible to provide a line or pattern to the artificial turf at the same time to construct artificial turf.

전술한 실시예는 본 발명의 바람직한 실시예를 설명한 것에 불과하므로, 본 발명의 적용 범위는 이와 같은 것에 한정되지 않으며, 동일 사상의 범주내에서 적절한 변경이 가능하다. 따라서, 본 발명의 실시예에 나타난 각 구성 요소의 형상 및 구조는 변형하여 실시할 수 있으므로, 이러한 형상 및 구조의 변형은 첨부된 본 발명의 특허청구범위에 속함은 당연한 것이다.Since the above-described embodiments are merely illustrative of the preferred embodiments of the present invention, the scope of application of the present invention is not limited to the above, and appropriate modifications are possible within the scope of the same idea. Therefore, since the shape and structure of each component shown in the embodiment of the present invention can be carried out by deformation, it is natural that the modification of the shape and structure belong to the appended claims of the present invention.

도 1은 본 발명에 따른 인조잔디 설치용 조립식 모듈을 도시한 단면도;1 is a cross-sectional view showing a prefabricated module for artificial turf installation according to the present invention;

도 2는 도 1에 도시된 배수블록의 조립상태를 도시한 평면도;2 is a plan view showing the assembled state of the drain block shown in FIG.

도 3은 도 2에 도시된 배수블록에 쇼크패드가 설치된 것을 도시한 단면도;3 is a cross-sectional view showing that the shock pad is installed in the drain block shown in FIG.

도 4는 도 1에 도시된 배수블록 및 쇼크패드의 부분확대도; 및4 is an enlarged partial view of the drain block and the shock pad shown in FIG. 1; And

도 5는 도 1에 도시된 배수블록의 상부에 완충패드가 부착된 것을 도시한 단면도.5 is a cross-sectional view showing that the buffer pad is attached to the upper portion of the drain block shown in FIG.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

1 : 조립식 모듈 10 : 섬유기포지1: prefabricated module 10: fiber bubble paper

11 : 파일 20 : 충전재11: file 20: fillings

21 : 가이드 테이프 21a : 접착면21: guide tape 21a: adhesive surface

30 : 배수블록 31 : 돌기30: drain block 31: projection

32 : 배수홈 33 : 연결고리32: drain groove 33: hook

33a : 돌출부 34 : 연결공33a: protrusion 34: connection hole

40 : 쇼크패드40: shock pad

Claims (7)

인조잔디의 설치에 이용되는 모듈에 있어서,In the module used for the installation of artificial turf, 잔디형태의 파일이 식모된 섬유기포지;Fiber foam paper in which grass piles are planted; 상기 섬유기포지 상의 파일 사이에 충전되어 섬유기포지 상에 충전층을 형성하면서 쿠션을 제공하는 과립형태의 충전재;A filler in the form of granules which is filled between the piles on the fiber foam to provide a cushion while forming a filling layer on the fiber foam; 상기 충전재의 충전 높이에 대응하는 높이로 이루어져서 상기 섬유기포지의 테두리를 따라 부착되고, 박막형태로 형성되어 충전재가 충전층을 형성하는 것을 가이드하면서 충전재가 섬유기포지의 외부로 이탈되는 것을 방지하는 가이드 테이프; 및Consists of a height corresponding to the filling height of the filler to be attached along the edge of the fiber foam, and formed in a thin film form to guide the filler to form the filling layer while preventing the filler from being separated out of the fiber foam. Guide tape; And 상기 가이드 테이프가 설치된 상기 섬유기포지의 하면에 고정부착되어 섬유기포지를 지지하면서 섬유기포지에서 적하되는 우수를 집수하여 배수하는 배수블록;을 포함하며,And a drainage block fixedly attached to the lower surface of the fiber bubble paper with the guide tape installed thereon to support and collect the water drops from the fiber bubble paper to collect and drain the rainwater dropped from the fiber bubble paper. 상기 배수블록은,The drain block, 상기 섬유기포지의 하부에 설치되어 우수를 집수하여 측방으로 배수하는 배수판; 및A drain plate installed at a lower portion of the fiber cloth and collecting rainwater and draining laterally; And 상기 배수판상에 돌출형성되어 상기 섬유기포지의 하면에 고정부착되고, 복수개로 구성되어 서로의 이격된 공간을 통해 우수를 배수하는 돌기;를 포함하는 인조잔디 설치용 조립식 모듈.Protruding on the drainage plate is fixedly attached to the lower surface of the fiber bubble paper, consisting of a plurality of projections for draining the rain through the spaces spaced from each other; prefabricated module for artificial turf installation. 제 1 항에 있어서,The method of claim 1, 상기 배수판은, 일측의 단부에 연결고리가 돌출형성되며, 타측의 단부에 상기 연결고리와 대응하는 연결공이 형성되어 연결고리 및 연결공을 통해 조립식 연결이 가능한 구조를 갖는 것을 특징으로 하는 인조잔디 설치용 조립식 모듈.The drain plate, the connecting ring is formed at the end of one side, the connection hole corresponding to the connecting ring is formed at the end of the other side is artificial turf for installation characterized in that it has a structure capable of prefabricated connection through the connecting ring and the connection hole. Prefabricated module. 제 1 항에 있어서,The method of claim 1, 상기 배수블록의 하면에 일체적으로 성형되어 배수블록에 가해지는 충격을 흡수하는 쇼크패드;를 더 포함하는 인조잔디 설치용 조립식 모듈.The prefabricated module for artificial turf installation further comprising; a shock pad integrally formed on the bottom surface of the drain block and absorbing a shock applied to the drain block. 제 3 항에 있어서, 상기 쇼크패드는,The method of claim 3, wherein the shock pad, 상기 연결고리 및 연결공에 의해 서로 연결되면서 복수개가 한 조를 이루는 상기 배수블록의 하면에 동일체로 성형되어 복수개의 배수블록들을 일체적으로 연결하면서 배수블록에 가해지는 충격을 흡수하며, 접착바인더가 혼합됨에 따라 판상으로 형성되는 과립형태의 탄성재 칩으로 이루어진 것을 특징으로 하는 인조잔디 설치용 조립식 모듈.Is connected to each other by the connecting ring and the connection hole is formed in the same body on the lower surface of the drain block forming a plurality of groups to connect the plurality of drain blocks integrally while absorbing the impact applied to the drain block, the adhesive binder Prefabricated module for artificial turf installation, characterized in that made of a granular elastic chip formed in a plate shape as it is mixed. 제 3 항에 있어서,The method of claim 3, wherein 상기 배수블록은 상기 연결고리 및 연결공에 의해 9개 내지 18개가 한조를 이루는 것을 특징으로 하는 인조잔디 설치용조립식 모듈.The drainage block is a prefabricated module for artificial turf installation, characterized in that nine to eighteen pairs by the connecting ring and the connection hole. 제 1 항에 있어서,The method of claim 1, 상기 섬유기포지 및 배수블록 사이에 마련되어 섬유기포지의 충격을 흡수하는 투수성 완충패드;를 더 포함하며,A permeable buffer pad is provided between the fiber foam and the drainage block to absorb the impact of the fiber foam; 상기 완충패드는, 접착바인더가 혼합됨에 따라 판상으로 형성되는 과립형태의 탄성재 칩으로 이루어진 것을 특징으로 하는 인조잔디 설치용 조립식 모듈.The buffer pad is a prefabricated module for artificial turf installation, characterized in that made of a granular elastic chip formed in a plate shape as the adhesive binder is mixed. 제 1 항 내지 제 6 항 중 어느 한 항에 있어서,7. The method according to any one of claims 1 to 6, 상기 파일은 일부의 파일이 다른 파일들과 이종의 색상을 갖는 이종파일로 구성되어 상기 섬유기포지상에 라인이나 문양을 형성하는 것을 특징으로 하는 인조잔디 설치용 조립식 모듈.The pile is a prefabricated module for artificial turf installation, characterized in that a portion of the pile is composed of a heterogeneous file having a different color and different files to form a line or pattern on the fiber bubble paper.
KR1020090125113A 2009-12-15 2009-12-15 fabrication type module for artificial turf installation KR101143428B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
KR1020090125113A KR101143428B1 (en) 2009-12-15 2009-12-15 fabrication type module for artificial turf installation
PCT/KR2010/008893 WO2011074841A2 (en) 2009-12-15 2010-12-13 Fabrication module for installing artificial grass turf

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090125113A KR101143428B1 (en) 2009-12-15 2009-12-15 fabrication type module for artificial turf installation

Publications (2)

Publication Number Publication Date
KR20110068249A true KR20110068249A (en) 2011-06-22
KR101143428B1 KR101143428B1 (en) 2012-05-22

Family

ID=44167844

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090125113A KR101143428B1 (en) 2009-12-15 2009-12-15 fabrication type module for artificial turf installation

Country Status (2)

Country Link
KR (1) KR101143428B1 (en)
WO (1) WO2011074841A2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016060327A1 (en) * 2014-10-16 2016-04-21 이정민 Modular artificial turf
KR101639561B1 (en) * 2016-01-20 2016-07-14 문진호 The structure for artificial turf drainage
KR20180124580A (en) * 2017-05-12 2018-11-21 코오롱글로텍주식회사 Artificial turf structure

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2803643C (en) * 2010-06-30 2018-05-29 Advantage Cochrane Sport Inc. Padding layer for multi-layered sports playing field
DE102011003402A1 (en) * 2011-01-31 2012-08-02 Possehl Spezialbau Gmbh Covering unit for e.g. roads, has adhesive layer arranged between base layer and cover layer for forwarding forces and moments into base layer, where adhesive layer includes multiple bodies extended between base and cover layers
WO2013138947A1 (en) * 2012-03-19 2013-09-26 Zang Xiaosong Spliced artificial turf
GB2584628A (en) * 2019-05-28 2020-12-16 England Hockey Temporary sports pitch assembly

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4129094B2 (en) 1999-01-18 2008-07-30 宏三郎 林 Board
JP2004124417A (en) 2002-09-30 2004-04-22 Molten Corp Resin-made shock absorbing mat
KR200333897Y1 (en) 2003-08-14 2003-11-20 이우태 A mat using artificial turf instead of the lawn
KR200413552Y1 (en) 2006-01-18 2006-04-07 심화택 Grass protection mat

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016060327A1 (en) * 2014-10-16 2016-04-21 이정민 Modular artificial turf
KR101639561B1 (en) * 2016-01-20 2016-07-14 문진호 The structure for artificial turf drainage
KR20180124580A (en) * 2017-05-12 2018-11-21 코오롱글로텍주식회사 Artificial turf structure

Also Published As

Publication number Publication date
WO2011074841A2 (en) 2011-06-23
WO2011074841A3 (en) 2011-11-10
KR101143428B1 (en) 2012-05-22

Similar Documents

Publication Publication Date Title
KR101143428B1 (en) fabrication type module for artificial turf installation
ES2322074T3 (en) SYNTHETIC LAWN PAVEMENT AND PLACEMENT PROCEDURE OF THE SAME.
US7166340B1 (en) Artificial turf system
JP6333647B2 (en) Artificial grass structure
KR20120134433A (en) Method for constructing of artificial turf stadium
KR101819041B1 (en) Environmental mat assembly for small drainage and construction method thereof
WO1989001076A1 (en) Turf surfaces
KR100839233B1 (en) A matrix fabric sheet and method for installing a erosion defence using the same
US8127448B2 (en) Method for making drainage element
KR100907494B1 (en) Artificial turf-formed mat for preventing growing weeds
ITMI20062400A1 (en) ARTIFICIAL GRASS CARPET ARTIFICIAL GRASS WEIGHT STRUCTURE INCLUDING THE CARPET AND METHOD OF MANUFACTURING THE CARPET
CN206607473U (en) A kind of gardens road surface stone material laying structure
KR20160121192A (en) Artifical lawn ground for water reuse and method for construction thereof
KR100788201B1 (en) A drain plate and it&#39;s manufacturing method
KR20130044675A (en) Drain board
KR101482203B1 (en) Structure of slantface tree-planted and plant method thereof
AU2010212281A1 (en) Artificial grass
US20070284302A1 (en) Water permeable composite material for preventing migration of soil and/or sand particles into drainage system
AU2011101368B4 (en) Artificial grass
KR102229358B1 (en) Boundary stone support frame with improved fixation
JP5520165B2 (en) Artificial lawn laying structure
KR102366447B1 (en) Eco-friendly natural grass mat
JP2019143434A (en) Paving panel and paving panel laying method
CN217052906U (en) Tree pool communicating structure
JP2588097B2 (en) Artificial turf structure and construction method using it

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20160726

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20170502

Year of fee payment: 6