KR20110047424A - Vegetation retaining wall using vegetation spaces formed by continuous connection of concrete files and constructing method thereof - Google Patents

Vegetation retaining wall using vegetation spaces formed by continuous connection of concrete files and constructing method thereof Download PDF

Info

Publication number
KR20110047424A
KR20110047424A KR1020090104046A KR20090104046A KR20110047424A KR 20110047424 A KR20110047424 A KR 20110047424A KR 1020090104046 A KR1020090104046 A KR 1020090104046A KR 20090104046 A KR20090104046 A KR 20090104046A KR 20110047424 A KR20110047424 A KR 20110047424A
Authority
KR
South Korea
Prior art keywords
vegetation
pile
retaining wall
concrete
groove
Prior art date
Application number
KR1020090104046A
Other languages
Korean (ko)
Other versions
KR101140725B1 (en
Inventor
김회준
김창래
김송이
Original Assignee
(주)에스앤씨산업
주식회사 젬콘
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)에스앤씨산업, 주식회사 젬콘 filed Critical (주)에스앤씨산업
Priority to KR1020090104046A priority Critical patent/KR101140725B1/en
Publication of KR20110047424A publication Critical patent/KR20110047424A/en
Application granted granted Critical
Publication of KR101140725B1 publication Critical patent/KR101140725B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • A01G9/022Pots for vertical horticulture
    • A01G9/025Containers and elements for greening walls
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • E02B3/14Preformed blocks or slabs for forming essentially continuous surfaces; Arrangements thereof
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/10Prefabricated parts, e.g. composite sheet piles made of concrete or reinforced concrete

Abstract

PURPOSE: A vegetation retaining wall and a construction method thereof using a vegetation space formed of consecutively installed concrete piles are provided to construct a retaining wall using concrete piles on a cut embankment surface and allow vegetation on the front and upper sides of the retaining wall. CONSTITUTION: A vegetation retaining wall comprises concrete piles(20) which are installed consecutively, vegetation spaces which are formed on both sides of the concrete piles and have ecological grooves facing each other, vegetation frames which are inserted in the vegetation spaces, vegetation grooves(17) which are formed by the adjacent concrete piles, a vegetation part(15) which is installed in a cap concrete(14), rubbles which are placed on the top of retained soil(11) of the concrete piles, and gap finishing materials which are installed in the vegetation grooves under the rubbles.

Description

콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽 및 이의 시공방법{Vegetation retaining wall using vegetation spaces formed by continuous connection of concrete files and constructing method thereof}Vegetation retaining wall using vegetation spaces formed by continuous connection of concrete files and constructing method

본 발명은 전면은 절토하거나 배면부에 성토를 하는 절토 및 성토면에 콘크리트파일을 다수개 연이어서 설치하되, 상기 콘크리트파일의 측면에 형성된 생태홈에 의하여 설치된 식생공간부에 식생틀을 삽입하여, 상기 파일의 길이방향으로 형성된 식생용홈을 통하여 식생되도록 하면서, 동시에 상기 옹벽의 상부에 설치된 안치콘크리트의 식생부에 식생되도록 한 식생옹벽의 시공방법에 관한 것이다.The present invention is to install a plurality of concrete piles in the front and the cut and fill surface to be cut in the front or back portion, inserting the vegetation frame in the vegetation space installed by the ecological groove formed on the side of the concrete pile, The present invention relates to a method for constructing a vegetation retaining wall, which is to be vegetated through a vegetation groove formed in the longitudinal direction of the pile, and at the same time, vegetated by a vegetation part of an anchor concrete installed on an upper portion of the retaining wall.

종래에는 절성토면에 콘크리트벽체의 옹벽을 설치하거나 잡석을 이용한 옹벽을 설치하여 옹벽의 벽면이 무채색의 콘크리트나 석재로 이루어져 있어 주변의 자연경관과 어울리지 못하는 문제점이 있어왔다.Conventionally, by installing a retaining wall of a concrete wall or installing a retaining wall using rubble on the surface of the cut soil, the wall surface of the retaining wall is made of achromatic concrete or stone, which has been incompatible with the surrounding natural landscape.

본 발명은 상기의 문제점을 개선하기 위하여, 절성토면에 콘크리트파일을 이용하여 옹벽을 설치하면서, 상기 설치된 옹벽의 전면에 식생이되도록 하면서 동시에 옹벽의 상부에도 식생이 가능하도록 하여 설치된 옹벽의 전면 및 상부가 푸른 녹색의 식생이 가능하도록 하여 녹색의 주변의 자연경관과 조화를 이루도록 한 것이다.In order to improve the above problems, while installing the retaining wall using a concrete pile on the surface of the cut soil, while maintaining the vegetation on the front of the retaining wall and at the same time the top of the retaining wall installed to enable the vegetation on the retaining wall and The upper green vegetation is possible to harmonize with the natural landscape around the green.

본 발명은 전면은 절토하거나 배면부에 성토를 하는 절토 및 성토면에 콘크리트파일을 다수개 연이어서 설치하되, 상기 콘크리트파일의 측면에 형성된 생태홈에 의하여 설치된 식생공간부에 식생틀을 다수개 삽입하되, 상기 식생틀 사이에 자갈층을 형성하고, 배면에도 일정 높이로 잡석을 충전하여 지속적으로 배면에서 수분공급이 가능하도록 하면서, 동시에 옹벽의 상부에 설치된 상치콘크리트에도 식생부를 설치하고, 상기 식생부의 하부에 자갈을 충전하고, 그 위에 필터매트를 설치하고 그 위에 토사를 채운 다음, 식생하되 상기 식생부에 설치된 자갈층이 식생틀과 연결되도록 하여, 상기 식생부를 통하여도 수분이 지속적으로 식생공간부내로 공급이되도록 하여 언제나 상기 식생부 및 식생공간부내에 설치된 식생틀에 의하여 설치된 식생이 푸르게 활착되도록 한 식생옹벽의 시공방법에 관한 것이다. The present invention is to install a plurality of concrete piles in the front and the cut and fill surface to be cut in the front or back portion, inserting a plurality of vegetation frame in the vegetation space installed by the ecological groove formed on the side of the concrete pile. Forming a gravel layer between the vegetation framework, filling the rubble to a certain height on the back to enable continuous supply of water from the back, and at the same time to install a vegetation on the upper concrete installed on the retaining wall, at the bottom of the vegetation part Fill the gravel, install a filter mat thereon and fill the earth and sand on it, and then vegetation, so that the gravel layer installed in the vegetation part is connected to the vegetation frame, the water is continuously supplied into the vegetation space through the vegetation part The vegetation installed by the vegetation framework installed in the vegetation section and the vegetation space section is always Differently to that of the construction method of the vegetation retaining wall survival.

본 발명은 절성토면에 설치된 옹벽의 전면 및 상부에 식생이 가능하도록 하 면서 동시에 상기 식생이 활착되어 언제나 푸른 상태가 지속되도록 하기 위한 수분공급체계를 갖도록 한 식생옹벽의 설치에 관한 방법인 것이다.The present invention relates to a method for installing a vegetation retaining wall having a water supply system for allowing vegetation to be possible on the front and top of the retaining wall installed on the cut surface, and at the same time, the vegetation is active.

상기와 같은 항상 푸른 상태의 식생이 유지되도록 한 식색옹벽을 설치하므로서 주변의 자연경관과 조화를 이루도록 하면서, 동시에 식생에 지속적인 수분을 공급하는 관리를 특별히 할 필요가 없는 식생관리에 소요되는 비용을 절감할 수 있다.By installing a color retaining wall to keep the vegetation in a green state as described above, it is in harmony with the surrounding natural landscape, and at the same time, it reduces the cost of vegetation management that does not require special management to continuously supply the vegetation. can do.

또한, 도시에 설치되는 옹벽인 경우에도 늘 푸른 식생이 가능하도록 하여 삭막한 도시미관을 푸른 환경으로 개선하므로서 현재 추진하고 있는 정부의 녹색환경추진시책에도 적극적으로 호응할 수 있는 매우 경제적이면서 친환경적인 시공방법인 것이다.In addition, even in the case of retaining wall installed in the city, green vegetation is always possible, and it is a very economical and eco-friendly construction method that can actively respond to the government's green environment promotion policy by improving the bleak urban aesthetic to a green environment. will be.

이하, 첨부된 도면에 의하여 본 발명의 구성과 작용을 설명하면 다음과 같다.Hereinafter, the configuration and operation of the present invention by the accompanying drawings as follows.

도 1은 본 발명의 식생옹벽을 전체적으로 보여주는 도면이며, 도 2는 본 발명의 PC콘크리트 파일을 전체적으로 보여주는 도면이며, 도 3(a)(b)는 본 발명의 콘크리트 파일 중에서 원심력 파일을 보여주는 도면이며, 도 4는 본 발명의 콘크리트 파일 중에서 철근콘크리트 파일을 보여주는 도면이며, 도 5는 본 발명의 콘크리트 파일 중에서 PC 파일을 보여주는 도면이며, 도 6는 본 발명의 콘크리트 파일 중에서 합성파일을 보여주는 도면이며, 도 7(a)(b)는 본 발명의 콘크리트 파일의 양측면에 설치된 생태홈에 의하여 형성된 식생공간부의 형태를 보여주는 도면이며, 도 8은 본 발명의 식생틀을 보여주는 도면이며, 도 9(a)(b)는 본 발명의 끼움재를 보여주는 도면이며, 도 10(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)는 본 발명의 식생옹벽을 단계적으로 설치하는 시공방법을 보여주는 도면이며, 도 11은 본 발명의 식생옹벽을 설치할 때 배면의 토사를 성토하는 경우에 설치하는 식생옹벽을 보여주는 도면이며, 도 12는 본 발명의 식생옹벽의 배면에 식생용홈에 직접 그라우팅을 하는 경우 그라우팅액이 식생공간부내로 투입되지 않는 식생용홈의 구조를 보여주는 도면이다.1 is a view showing the vegetation retaining wall of the present invention as a whole, Figure 2 is a view showing the PC concrete file of the present invention as a whole, Figure 3 (a) (b) is a view showing a centrifugal force file of the concrete file of the present invention 4 is a view showing a reinforced concrete file of the concrete file of the present invention, Figure 5 is a view showing a PC file of the concrete file of the present invention, Figure 6 is a view showing a composite file of the concrete file of the present invention, Figure 7 (a) (b) is a view showing the shape of the vegetation space formed by the ecological groove installed on both sides of the concrete pile of the present invention, Figure 8 is a view showing the vegetation framework of the present invention, Figure 9 (a) (b) is a view showing the fitting material of the present invention, Figure 10 (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) of the present invention Demonstrate the construction method of installing the vegetation retaining wall step by step 11 is a view showing the vegetation retaining wall to be installed in the case of laying the soil soil on the back when installing the vegetation retaining wall of the present invention, Figure 12 is a case of grouting directly to the vegetation groove on the back of the vegetation retaining wall of the present invention It is a view showing the structure of the vegetation groove that the grouting liquid is not introduced into the vegetation space.

본 발명은 도로개설, 주택단지 및 공단의 단지등의 조성을 위하여 해당부지의 절성토 단면에 옹벽을 설치할 때, 콘크리트파일(20)의 양측면에 설치된 생태홈(21)이 마주보고 설치될때 형성되는 식생공간부(18)내에 식생틀(30)을 삽입하고 수분이 배면으로부터 공급될 수 있도록 하여 상기 콘크리트파일(20)이 접하여 설치될때 형성되는 식생용홈(17)으로 상기 식생틀(30)에 포함된 종자(33)로부터 발아된 식생이 활착될 수 있도록 하며, 동시에 연이어서 설치되는 콘크리트파일(20)의 상부에 설치되는 상치콘크리트(14)에도 식생부(15)를 설치하여 식생이 활착할 수 있는 공간을 형성하면서 동시에 상기 식생부(15)를 통하여 상기 식생공간부(18)내로 수분이 지속적으로 공급될 수 있도록 한 식생옹벽(10)의 시공방법에 관한 것이다.The present invention is a vegetation formed when the ecological grooves 21 installed on both sides of the concrete pile 20 are installed facing each other when installing the retaining wall on the cut soil section of the site for the construction of roads, housing complexes and complexes. Inserting the vegetation framework 30 into the space portion 18 so that the moisture can be supplied from the back to the vegetation groove 30 is formed when the concrete pile 20 is in contact with the vegetation framework 30 included in The vegetation germinated from the seed 33 can be slid, and at the same time, the vegetation part 15 is also installed on the upper concrete 14 which is installed on the concrete pile 20 to be installed successively so that the vegetation can slid. The present invention relates to a method for constructing a vegetation retaining wall 10 to allow a continuous supply of water into the vegetation space portion 18 through the vegetation portion 15 while forming a space.

이하에서, 도면에 의하여 본 발명의 식생옹벽(10)의 시공방법에 대하여 상세히 설명하면 다음과 같다.Hereinafter, the construction method of the vegetation retaining wall 10 of the present invention according to the drawings in detail as follows.

도 1은 본 발명의 식생옹벽을 전체적으로 보여주는 것으로서,1 shows the vegetation retaining wall of the present invention as a whole,

지반에 연이어서 설치되는 콘크리트파일(20)과, 상기 콘크리트파일의 양측면에 설치된 생태홈(21)이 마주보고 설치되어 형성되는 식생공간부(18)와, 상기 식생공간부내에 삽입된 식생틀(30)과, 상기 콘크리트파일(20)이 접하여 설치될때 형성되는 식생용홈(17)과, 상기 연이어서 설치되는 콘크리트파일(20)의 상부에 설치되는 상치콘크리트(14)에 설치된 식생부(15)와, 상기 연이어서 설치되는 콘크리트파일(20)의 배면토(11)의 상부에 설치된 잡석(54)과, 상기 잡석(54) 하부에 상기 파일(20)의 식생용홈(17)에 간격마감재(70)를 설치하되, 전면지반(12) 하부의 식생용홈(17)까지 설치한 식생옹벽(10)인 것이다.The concrete pile 20 which is installed in succession to the ground, the vegetation space portion 18 is formed by facing the ecological grooves 21 provided on both sides of the concrete pile, and the vegetation frame inserted into the vegetation space portion ( 30), the vegetation groove (17) formed when the concrete pile 20 is in contact with the installation, and the vegetation portion (15) installed on the upper concrete 14 is installed on the concrete pile (20) that is subsequently installed And, the rubble 54 is installed in the upper portion of the back soil 11 of the concrete pile 20 to be installed in succession, the gap closure material in the vegetation groove 17 of the pile 20 in the lower rubble 54 ( 70) is installed, but the vegetation retaining wall (10) installed up to the vegetation groove 17 of the lower front ground (12).

상기 식생옹벽의 설치조건은 설치된 옹벽의 전면의 토사는 절토를 하여 전면의 옹벽파일이 외부로 노출되도록 하면서 동시에 배면의 배면토는 기존의 지반을 그대로 유지하도록 한 것이다.The installation condition of the vegetation retaining wall is that the earth and sand of the front of the retaining wall is cut so that the retaining wall pile of the front is exposed to the outside while the rear soil of the rear is maintained as it is.

또 다른 방법으로 상기 식생옹벽의 설치조건과 다르게, 이후에 설명되는 도 11의 식생옹벽은 설치된 콘크리트파일의 배면이 성토된 토사로 이루어진 것에서 다를뿐 설치하는 방법은 모두 동일한 것이다.In another way, unlike the installation conditions of the vegetation retaining wall, the vegetation retaining wall of FIG. 11 to be described later is the same method of installation except that the back surface of the installed concrete pile is made of earthen soil.

즉, 지반에 연이어서 설치되는 콘크리트파일(20)과, 상기 콘크리트파일의 양측면에 설치된 생태홈(21)이 마주보고 설치되어 형성되는 식생공간부(18)와, 상기 식생공간부내에 삽입된 식생틀(30)과, 상기 콘크리트파일(20)이 접하여 설치될때 형성되는 식생용홈(17)과, 상기 파일(20)의 식생용홈(17)에 설치된 간격마감재(70)와, 상기 연이어서 설치되는 콘크리트파일(20)의 상부에 설치되는 상치콘크리트(14)에 설치된 식생부(15)와, 상기 연이어서 설치되는 콘크리트파일(20)의 전면지반(12)까지 상기 파일의 배면에 잡석층(54)을 설치하고, 상기 파일의 배면에 성토되는 성토면과 접하는 상기 잡석층(54)면에 필터매트(58)를 설치한 후에, 성토를 하여 배면성토부(57)를 설치하여 도 11의 식생옹벽(10)을 설치한 것이다.That is, the vegetation space portion 18 is formed by facing the concrete pile 20 is installed in succession to the ground, the ecological groove 21 is provided on both sides of the concrete pile facing each other, and the vegetation inserted into the vegetation space portion The frame 30, the vegetation groove 17 is formed when the concrete pile 20 is in contact with the gap, the spacing material 70 is installed in the vegetation groove 17 of the pile 20, and the subsequent Rubble layer 54 on the back of the pile up to the vegetation portion 15 installed on the upper concrete 14, which is installed on the concrete pile 20, and the front ground 12 of the concrete pile 20 that is subsequently installed 11), and the filter mat 58 is installed on the surface of the rubble layer 54 which is in contact with the fill surface formed on the rear surface of the pile, and then the back fill soil portion 57 is installed to fill the vegetation of FIG. The retaining wall 10 is provided.

즉, 상기와 같이 옹벽(10)의 전면의 콘크리트파일(20)이 외부로 노출되게되어 무채색의 콘크리트가 미관을 해치는 것을 방지하기 위하여 옹벽(10)의 전면에 녹색의 식생(16)이 자라도록 하면서 동시에 옹벽(10)의 상부에도 녹색의 식생(16)이 활착되어 옹벽(10)의 상부 및 전면에 모두 녹색의 식생(16)으로 뒤덮이도록 한 것이다.That is, as described above, the green pile vegetation 16 is grown on the front surface of the retaining wall 10 in order to prevent the concrete pile 20 on the front surface of the retaining wall 10 from being exposed to the outside. At the same time, the green vegetation 16 is attached to the upper portion of the retaining wall 10 so that both the upper and front surfaces of the retaining wall 10 are covered with green vegetation 16.

또한, 상기와 같이 옹벽(10)의 상부 및 전면에 녹색의 식생(16)이 활착상태를 유지하도록 하기 위하여 옹벽(10)의 배면의 상부에 옹벽면과 접하게 일정범위에 걸쳐 잡석(54)이 설치된 잡석층을 형성하거나, 배면의 전체에 걸쳐 옹벽면과 접하게 잡석(54)을 설치하고, 상기 잡석(54)이 형성된 하부로부터 옹벽 전면의 전면지반의 하부의 일정범위까지 상기 콘크리트파일(20)의 배면에 형성된 식생용홈(17)사이를 마감하거나, 상기 콘크리트파일(20)의 배면 전체에 형성된 식생용홈(17) 사이에 간격마감재(70)를 설치하도록 한 것이다.In addition, in order to maintain the green vegetation 16 on the upper and front surfaces of the retaining wall 10 as described above, the rubble 54 is disposed on the upper surface of the retaining wall 10 in contact with the retaining wall surface over a predetermined range. Form the rubble layer provided, or install the rubble 54 in contact with the retaining wall surface over the entire back surface, the concrete pile 20 from the lower portion where the rubble 54 is formed to a predetermined range of the lower part of the front ground in front of the retaining wall To finish between the vegetation grooves 17 formed on the back of the, or to install the gap closing material 70 between the vegetation grooves 17 formed on the entire back of the concrete pile 20.

도 2 내지 도 7은 본 발명의 식생옹벽에 사용되는 PC콘크리트파일의 일반적인 형태를 보여주고 있으며, 콘크리트파일의 종류에 대하여 설명하고 있고, 상기 콘크리트파일의 양측면에 설치된 생태홈이 연이어서 설치될때 형성되는 식생공간부의 형상에 대하여 설명한 것이다.2 to 7 show the general form of the PC concrete pile used in the vegetation retaining wall of the present invention, and describes the types of concrete piles, formed when the ecological grooves installed on both sides of the concrete piles are successively installed. It describes the shape of the vegetation space portion to be.

도 2는 PC콘크리트파일의 일반적인 형태를 보여주는 것이다.2 shows a general form of a PC concrete file.

일정길이를 갖도록 강선(23)과 철근(24)을 이용하여 직육면체 또는 원형 또는 정육면체로 설치하고, 콘크리트(22)를 타설양생하여 몸체(25)를 형성하되, 상기 몸체(25)의 양측면에 생태홈(21)이 설치되도록 하되, 일측면에 설치된 생태홈(21)의 좌우에 라운드부(63)를 설치하되, 배면부에 접하게 설치된 라운드부의 일부를 절삭한 절삭부(64)를 설치한 PC콘크리트파일(20)이다.       Using a steel wire 23 and the reinforcing bar 24 to have a predetermined length is installed in a rectangular parallelepiped or circular or cube, and cast the concrete 22 to form a body 25, the ecology on both sides of the body 25 PC concrete having a groove 21 is installed, but the round portion 63 is installed on the left and right sides of the ecological groove 21 installed on one side, but the cutting portion 64 cut a part of the round portion installed in contact with the rear surface portion. File 20.

또한, 상기 몸체의 단부에 쐐기형태의 선단부를 설치할 수도 있다.In addition, a tip of the wedge shape may be provided at the end of the body.

상기 생태홈(21)은 도 2 내지 7에서보는바와 같이 반원형, 반타원형, 시옷자형, 디귿자형등 다양한 형상으로 제작될 수 있다. The ecological groove 21 may be manufactured in various shapes such as a semi-circle, semi-ellipse, shiot-shaped, dished-shaped, as shown in FIGS.

도 3 내지 도 6은 상기 도 2의 일반적인 콘크리트 파일(20)을 어떠한 방법으로 제작한 파일인지를 보여주는 것이다.Figures 3 to 6 show how the file is produced by the general concrete pile 20 of FIG.

도 3의 도 (a)(b)는 일정길이를 갖도록 강선(23)과 철근(24)을 이용하여 직육면체 또는 원형 또는 정육면체로 설치하고, 콘크리트(22)를 타설하고, 원심력을 이용하여 제작한 후에 양생하여 몸체(25)를 형성하되, 상기 몸체(25)의 양측면에 생태홈(21)이 설치되도록 하되, 일측면에 설치된 생태홈(21)의 좌우에 라운드부(63)를 설치하되, 배면부에 접하게 설치된 라운드부의 일부를 절삭한 절삭부(64)를 설치한 원심력 파일인 것이다.(A) and (b) of FIG. 3 are installed in a rectangular parallelepiped or circular or cube using steel wires 23 and reinforcing bars 24 so as to have a predetermined length, and cast concrete 22 and manufactured using centrifugal force. After curing to form a body 25, the ecological groove 21 is installed on both sides of the body 25, but the round portion 63 is installed on the left and right of the ecological groove 21 installed on one side, It is a centrifugal force pile provided with the cutting part 64 which cut | disconnected a part of the round part provided in contact with a back part.

도 4는 일정길이를 갖도록 철근(24)을 이용하여 직육면체 또는 원형 또는 정육면체로 설치하고, 콘크리트(22)를 타설양생하여 몸체(25)를 형성하고, 상기 몸체(25)의 양측면에 생태홈(21)이 설치되도록 하되, 일측면에 설치된 생태홈(21) 의 좌우에 라운드부(63)를 설치하되, 배면부에 접하게 설치된 라운드부의 일부를 절삭한 절삭부(64)를 설치한 철근콘크리트 파일인 것이다.4 is installed in a rectangular parallelepiped or a circular or cube using a reinforcing bar 24 to form a certain length, the concrete 22 is poured in order to form a body 25, the ecological groove (on both sides of the body 25) 21) is installed, but the round portion 63 is installed on the left and right sides of the ecological groove 21 installed on one side, but is a reinforced concrete pile installed with a cutting portion 64 cut a part of the round portion installed in contact with the rear portion will be.

도 5는 일정길이를 갖도록 강선(23)과 철근(24)을 이용하여 직육면체 또는 원형 또는 정육면체로 설치하고, 콘크리트(22)를 타설양생하여 몸체(25)를 형성한 다음, 상기 강선(23)에 도입된 긴장력을 해제하여 몸체(25)에 프리스트레스를 도입하고, 상기 몸체(25)의 양측면에 생태홈(21)이 설치되도록 하되, 일측면에 설치된 생태홈(21)의 좌우에 라운드부(63)를 설치하되, 배면부에 접하게 설치된 라운드부의 일부를 절삭한 절삭부(64)를 설치한 PC파일인 것이다.5 is installed in a rectangular parallelepiped or a circular or cube using a steel wire 23 and a reinforcing bar 24 to have a predetermined length, and after pouring concrete 22 to form a body 25, the steel wire 23 The pre-stress is introduced into the body 25 by releasing the tension force introduced into the body 25, and ecological grooves 21 are installed on both sides of the body 25, and round portions are formed on the left and right sides of the ecological groove 21 installed on one side thereof. 63) is installed, but the PC file is provided with a cutting portion 64 cut a part of the round portion provided in contact with the rear portion.

도 6은 일정길이를 갖도록 H형강을 설치하고, 상기 H형강 주변에 강선(23)과 철근(24)을 설치하여 직육면체 또는 원형 또는 정육면체로 설치하고, 콘크리트(22)를 타설양생하여 몸체(25)를 형성하고, 상기 몸체(25)의 양측면에 생태홈(21)이 설치되도록 하되, 일측면에 설치된 생태홈(21)의 좌우에 라운드부(63)를 설치하되, 배면부에 접하게 설치된 라운드부의 일부를 절삭한 절삭부(64)를 설치한 프리플렉션 합성파일인 것이다.Figure 6 is installed to the H-shaped steel to have a certain length, the steel wire 23 and the reinforcing bar 24 is installed around the H-shaped steel is installed in a cuboid or circular or cube, and the concrete 22 is poured into the body (25) ) And the ecology grooves 21 are installed on both sides of the body 25, but the round parts 63 are installed on the left and right sides of the ecology grooves 21 installed on one side, but the round parts are provided in contact with the rear part. It is a preflection compound file in which the cutting part 64 which cut a part is provided.

도 7의 (a)(b)에서보는바와 같이, 생태홈(21)이 시옷자형 또는 디귿자형으로 형성되어, 상기 시옷자형 또는 디귿자형의 생태홈(21)이 마주보게되어 형성되는 형상은 다이아몬드형 또는 사각형의 식생공간부(18)가 설치되는 것을 보여주는 것이다.As shown in (a) and (b) of FIG. 7, the ecological groove 21 is formed in a sigot-shaped or dish-shaped shape, and the shape formed by facing the ecological groove 21 of the sifter-shaped or dish-shaped face is diamond. It shows that the vegetation space 18 of the type or quadrangle is installed.

상기 생태홈(21)은 도 2 내지 6에서보는바와 같이 반원형, 반타원형등 다양한 형상으로 제작되어 이들이 마주보면 원형, 타원형등의 식생공간부(18)가 형성되 는 것이다.The ecological groove 21 is made in a variety of shapes, such as semi-circular, semi-elliptic, as shown in Figures 2 to 6 are to form a vegetation space 18, such as circular, oval.

상기에서 예로든것 이외의 모든 형태의 생태홈(21)에 의하여 형성되는 식생공간부(18)의 형상을 포함하도록 한다.It is to include the shape of the vegetation space portion 18 formed by the ecological groove 21 of all forms other than the above.

상기 콘크리트파일(20)의 양측면에 설치된 생태홈(21)의 좌우에 형성된 라운드부(63)가 옹벽(10)이 설치되었을때 전면(13)에 노출되어 상기 생태홈(21)이 마주보게되어 식생용홈(17)이 설치되는 경우에는 라운드부(63)를 그대로 설치하고, 배면(11)에 접하는 라운드부(63)는 절삭부(64)를 설치하여 인접하여 설치된 생태홈(21)의 라운드부(63)와 식생용홈(17)이 도 12와 같이 설치되도록 한 후에 배면(13)의 절삭부(64)가 설치된 식생용홈(17)에는 그라우팅(53)을 하거나, 끼움재(40)를 설치하거나, 끼움재(40)를 설치하고, 그라우팅(53)을 실시한 한 것이다.Round parts 63 formed on the left and right sides of the ecological grooves 21 installed on both sides of the concrete pile 20 are exposed to the front surface 13 when the retaining wall 10 is installed, and the ecological grooves 21 face each other. When the vegetation groove 17 is installed, the round portion 63 is installed as it is, and the round portion 63 contacting the rear surface 11 is provided with a cutting portion 64 to round the ecological groove 21 installed adjacently. After the part 63 and the vegetation groove 17 are installed as shown in FIG. 12, the grouting 53 or the fitting material 40 is applied to the vegetation groove 17 provided with the cutting portion 64 of the rear surface 13. It installed, or the fitting material 40 was installed and grouting 53 was performed.

또 다른 방법으로 생태홈(21)의 좌우에 라운드부(63)를 그대로 설치하고 인접하여 설치되는 생태홈(21)의 좌우의 라운드부(63)도 절삭부(64)를 두지 않고, 그대로 접하게 하여 옹벽(10)을 설치하여 상기 마주보고 설치된 생태홈(21)의 사이에 형성된 식생용홈(17)에서 전면(13)에 노출된 것에는 식생(16)을 하고, 배면(11)에 설치된 식생용홈(17)에는 끼움재(40)를 설치하거나, 끼움재(40)를 설치하고, 동시에 그라우팅(53)을 실시하도록 한 것이다.As another method, the round portions 63 are installed on the left and right sides of the ecological groove 21 as they are, and the left and right round portions 63 of the ecological groove 21 are adjacent to each other without the cutting portion 64. By installing the retaining wall 10 to the vegetation grooves 17 formed between the ecological grooves 21 facing each other exposed to the front 13 to the vegetation 16, and the vegetation installed on the back 11 In the groove 17, the fitting material 40 is installed or the fitting material 40 is installed, and the grouting 53 is performed at the same time.

이와는 반대로, 파일(20)의 일측면에 설치된 생태홈(21)의 좌우에 설치된 라운드부(63)에 절삭부(64)를 설치하고, 타측면에는 라운드부(63)를 설치하고, 인접하여 설치되는 파일(20)의 라운드부(63)에는 절삭부(64)가 설치된 생태홈(21)이 접 하도록 하는 방법으로 옹벽(10)을 설치하여, 상기 마주보고 설치된 생태홈(21)의 사이에 형성된 식생용홈(17)에서 전면(13)에 노출된 것에는 식생(16)을 하고, 배면(11)에 접하게 설치된 식생용홈(17)에는 끼움재(40)를 설치하거나, 끼움재(40)를 설치하고, 동시에 그라우팅(53)을 실시하거나, 그라우팅(53)을 실시한 것이다.On the contrary, the cutting part 64 is provided in the round part 63 provided in the left and right of the ecological groove 21 provided in one side of the pile 20, and the round part 63 is provided in the other side, and it adjoins, In the round portion 63 of the pile 20 to be installed, the retaining wall 10 is installed in such a manner that the ecological groove 21 in which the cutting portion 64 is installed is in contact with each other. The vegetation grooves 17 formed in the vegetation grooves 16 are exposed to the front surface 13 and the vegetation grooves 17 installed in contact with the rear surface 11 are fitted with the fitting material 40 or the fitting material 40 ) And grouting 53 or grouting 53 at the same time.

상기와 같이 생태홈(21)의 좌우에 설치된 라운드부(63)에서 일측면에 설치된 라운드부(63)에만 절삭부(64)를 설치하면, 상기 도 10과 같이 케이싱(50)을 지반에 설치하고 파일(20)을 그 안에 설치한 후에 인접하여 설치되는 다음의 파일(20)설치를 위하여 케이싱(50)을 타입할 때 상기 절삭부(64)에 밀접하게 설치하여 케이싱(50)을 타입할 수 있으므로 향후에 설치되는 파일(20)과 기존의 파일(20)이 상기 접삭부(64)에의하여 상호 밀접하게 설치할 수 있는 장점이 있는 것이다.If the cutting portion 64 is installed only on the round portion 63 installed on one side of the round portion 63 installed on the left and right of the ecological groove 21 as described above, the casing 50 is installed on the ground as shown in FIG. When the casing 50 is typed for installation of the next pile 20 to be installed adjacently after the pile 20 is installed therein, the casing 50 may be installed by closely installing the cutting part 64. Since the file 20 and the existing file 20 to be installed in the future can be installed in close contact with each other by the gripping portion (64).

도 8은 본 발명의 파일(20)의 생태홈(21)이 마주보게될때 형성되는 식생공간부(18)내에 삽입되는 식생틀(30)이다.8 is a vegetation framework 30 inserted into the vegetation space 18 formed when the ecological groove 21 of the pile 20 of the present invention faces.

상기 식생틀(30)은 1 ~ 2m 의 길이로서, 망체(31) 내부의 하부에 자갈층을 설치하고, 길이방향의 내면의 일측면에는 필터섬유로 매트화한 투수유도자갈매트(56)를 삽입설치한 다음, 식생에 필요한 식생토(32)를 담되, 상기 식생토(32)내에 종자(33)를 포함시키도록 한 것이다.The vegetation framework 30 is a length of 1 ~ 2m, a gravel layer is installed in the lower portion of the inside of the net body 31, and one side of the inner surface in the longitudinal direction is inserted into a pitcher guide galvan mat 56 made of a filter fiber mat After installation, the vegetation soil 32 required for vegetation is contained, and the seed 33 is included in the vegetation soil 32.

더욱바람직하게는 상기 식생틀(30)내에 포함된 종자(33)는 상기 식생틀(30)이 식생공간부(18)내에 설치될때, 파일이 접하면서 발생되는 식생용홈(17)에 접하는 부분에 종자(33)가 집중적으로 포함되도록 하여 향후에 식생용홈(17)을 통하여 식생틀(30)에 포함된 종자(33)가 발아되어 식생(16)이 식생용홈(17)을 통하여 활착 하도록 하기 위한 것이다.More preferably, the seed 33 included in the vegetation framework 30 is in contact with the vegetation groove 17 generated while the pile is in contact with the vegetation framework 30 when the vegetation framework 30 is installed in the vegetation space portion 18. Seed 33 is concentrated to include the seed 33 contained in the vegetation framework 30 through the vegetation groove 17 in the future so that the vegetation 16 to slide through the vegetation groove 17 will be.

또한, 상기 식생틀(30)과 식생부(15)사이에 설치된 자갈층(55)과 식생틀(30)의 내부에 설치된 자갈층(55)은 식생틀(30)내의 일측면에 설치된 투수유도자갈매트(56)와 배면에 설치된 잡석층 또는 배면성토부(60)와 상호 연통되도록 하여 상부 및 배면에서 과다한 배출수가 발생될때 상기 배출수를 옹벽외부로 신속히 배출되도록 하여 과다한 토압이 옹벽에 발생되지 않도록 하기 위함도 있다.In addition, the gravel layer 55 installed between the vegetation framework 30 and the vegetation section 15 and the gravel layer 55 installed inside the vegetation framework 30 are permeable guide galvanized mat installed on one side in the vegetation framework 30. (56) and the rubble layer or rear soil layer 60 installed on the back so as to be discharged to the outside of the retaining wall quickly when the excess water is generated in the upper and rear to prevent excessive earth pressure is not generated in the retaining wall There is also.

또한, 상기 자갈층(55)과 잡석층(54) 및 투수유도자갈매트(56)는 침투되는 우수가 원활히 식생틀(30)에 전달되도록 하는 역할과 동시에 상기 자갈층 및 잡석층의 간극내에 다수의 수분이 함유되어 있어 상기 식생틀에 수분이 부족할 때 언제든지 수분을 공급할 수 있는 수분저장고의 역할도 동시에 할 수 있도록 하여 상시 식생옹벽에 식재된 식생이 늘 푸른상태를 유지하도록 한다.In addition, the gravel layer 55 and the rubble layer 54 and the pitcher guide galvanized mat 56 serves to ensure that the rainwater is easily transmitted to the vegetation framework 30 and at the same time a plurality of moisture in the gap between the gravel layer and the rubble layer. Is contained in the vegetation framework so that at any time when the lack of moisture can also serve as a water reservoir to supply moisture to ensure that the vegetation planted on the vegetation retaining wall always keeps blue.

상기 파일이 상호 접하여 설치되어도 일정한 간격이 발생되는데 이와 같은 간격이 식생용홈(17)이며, 간격의 범위는 3 ~ 7cm이다.Even if the pile is installed in contact with each other, a certain interval is generated, such a gap is a vegetation groove 17, the range of the interval is 3 ~ 7cm.

상기 도 1의 식생공간부내에 식생틀이 설치된 구조는 상기 식생공간부(18)내에 설치되는 식생틀의 내부의 일부분에 길이방향으로 설치된 투수유도자갈매트(56)는 배면토(11)의 잡석층(54)과 접하도록 설치하면서, 식생공간내에 다수개 식생틀(30)은 적층하여 자갈층(55)이 자연스럽게 반복적으로 설치되도록 하고, 상기 상치콘크리트(14)의 식생부(15)에 설치한 자갈층은 식생틀의 상부에 까지 연통되도록 설치한 것이다.1 is a structure in which the vegetation frame is installed in the vegetation space part of FIG. 1, and the pitcher guide galvan mat 56 installed in a longitudinal direction in a portion of the inside of the vegetation frame installed in the vegetation space part 18 is rubble of the rear soil 11. While installing in contact with the layer 54, a plurality of vegetation framework 30 is laminated in the vegetation space so that the gravel layer 55 is naturally and repeatedly installed, and installed in the vegetation part 15 of the upper concrete 14 The gravel layer is installed to communicate with the upper part of the vegetation framework.

또한, 도 11의 식생공간부내에 식생틀을 설치하는 구조는 상기 식생공간부(18)내에 설치되는 식생틀의 내부의 일부분에 길이방향으로 설치된 투수유도자갈매트(56)는 배면성토부(60)와 접하도록 설치하면서, 식생공간내에 다수개 식생틀(30)은 적층하여 자갈층(55)이 자연스럽게 반복적으로 설치되도록 하고, 상기 상치콘크리트(14)의 식생부(15)에 설치한 자갈층은 식생틀의 상부에 까지 연통되도록 설치한 것이다.In addition, the structure for installing the vegetation framework in the vegetation space of Figure 11 is a pitcher guide galvan mat 56 is installed in the longitudinal direction in a portion of the interior of the vegetation frame is installed in the vegetation space 18, the rear soil layer 60 ), While a plurality of vegetation frameworks 30 are stacked in the vegetation space so that the gravel layer 55 is naturally and repeatedly installed, and the gravel layer installed in the vegetation part 15 of the lettuce concrete 14 is vegetation. It is installed to communicate with the upper part of the frame.

도 9(a)(b)는 상기 콘크리트파일(20)이 연이서서 설치될때 파일(20)과 파일(20)사이에 공간인 식생용홈(17)이 형성되는데 상기 다수개 설치된 파일(20)의 후면에 형성된 식생용홈(17)에 설치되는 간격마감재(70)인 끼움재(40)를 보여주는 것이다.9 (a) and (b) shows that the vegetation groove 17 is a space between the pile 20 and the pile 20 when the concrete pile 20 is installed in succession of the plurality of piles 20 It shows the fitting material 40 which is the gap closing material 70 is installed in the vegetation groove 17 formed on the rear.

상기 끼움재(40)는 강재로서 L형강(42) 또는 원형의 강관(41)으로 일정길이를 갖는 것으로서, 상기 끼움재(40)의 단부를 쐐기형태로 절단한 선단부를 설치하고, 상기 선단부의 단면에 철판인 지압판(43)을 용접으로 부착한 것이다.The fitting material 40 is a steel material having a predetermined length as the L-shaped steel 42 or the circular steel pipe 41, and the front end portion is formed by cutting the end of the fitting material 40 in the shape of a wedge, The pressure plate 43, which is an iron plate, is attached to the cross section by welding.

또 다른 재질은 강성이 있는 프라스틱으로 L형 또는 원형관으로 제작한 것의 단부를 쐐기형태로 절단하여 설치하고, 상기 선단부의 단부에 지압판(43)을 부착설치한 것이다.Another material is a rigid plastic is cut and installed in the wedge-shaped end of the L-shaped or circular tube, and the pressure plate 43 is attached to the end of the tip portion.

상기 쐐기형태의 선단부에 지압판(43)을 설치하는 이유는 설치된 옹벽(10)의 후면에 설치된 식생용홈(17)에 상기 끼움재(40)를 배면토(11)내에 타입설치할 때 상기 지압판(43)에 삽입하는 힘에 의한 반발력이 끼움재를 밀어붙여 상기 지압판에 의하여 끼움재가 식생용홈에 밀착하여 진행하도록 하여 원하는 위치에 정확히 설치되도록 하기 위함이다.The reason why the acupressure plate 43 is installed at the tip of the wedge shape is that when the fitting member 40 is type-installed in the rearing soil 11 in the vegetation groove 17 installed at the rear of the retaining wall 10, the acupressure plate 43 is provided. The repulsive force by the force to be inserted into) pushes the fitting member so that the fitting member moves in close contact with the vegetation groove by the acupressure plate so as to be correctly installed in a desired position.

상기와 같이 설치된 파일(20)의 후면에 설치되는 식생용홈(17)에 간격마감재(70)로 끼움재(40)를 설치하는 방법이외에, 별도로 간격마감재(70)로서 그라우팅(57)을 상기 식생용홈(17)에 할 수도 있다.In addition to the method of installing the fitting material 40 as the gap finishing material 70 in the vegetation groove 17 is installed on the rear of the pile 20 installed as described above, the grouting 57 as the gap finishing material 70 separately. The groove 17 may also be used.

이때에는 그라우팅액이 상기 식생공간부(18)내에 투입되지 않도록 그라우팅압을 고려하여 상기 식생용홈(17)에서 일정거리 이격된 부분에 그라우팅(57)을 실시하며 동시에 도 12와 같이 그라우팅을 하는 식생용홈을 변형하여 설치하여 원하는 식생용홈(17)에 그라우팅(57)되도록 하면서 식생공간부(18)내에는 투입되지 않도록 한다.At this time, in consideration of the grouting pressure so that the grouting solution is not introduced into the vegetation space portion 18, the grouting is carried out at a portion spaced apart from the vegetation groove 17 by a grout as shown in FIG. It is installed so as to grout 57 in the desired vegetation groove 17 by modifying the dragon groove so as not to be introduced into the vegetation space 18.

상기와 같이 식생용홈(17)에 직접 그라우팅을 하는 경우에는 식생용홈의 구조를 변형하여 그라우팅액이 직접 식생공간부(18)내로 침투하지 못하도록 한다.When grouting directly to the vegetation groove 17 as described above to modify the structure of the vegetation groove so that the grouting liquid does not directly penetrate into the vegetation space portion 18.

그 구조를 보여주는 것이 도 12이며, 이를 설명하면, 파일(20)의 측면에 설치된 생태홈(21)의 좌우에 라운드부(63)가 설치되고, 상기 설치된 생태홈(21)의 반대편에 식생용홈(17)인 간격을 두고 설치된 다른 생태홈(21)의 좌우에 형성된 라운드부(63)에서 식생공간부(18)측에 인접한 라운드부(63)의 일정부분을 점선과 같이 절삭한 절삭부(64)를 형성하여 인접한 라운드부(63)의 곡면과 절삭부(64)의 곡면이 평행을 이루도록 한 구조이다.12 shows the structure, and when it is described, round parts 63 are installed at left and right sides of the ecological groove 21 installed on the side of the pile 20, and the vegetation groove is opposite to the installed ecological groove 21. Cutting portion cut part of the round portion 63 adjacent to the vegetation space portion 18 side as a dotted line in the round portion 63 formed on the left and right of the other ecological groove 21 provided at intervals (17) ( 64 is formed so that the curved surface of the adjacent round part 63 and the curved surface of the cutting part 64 become parallel.

상기와 같이 절삭부(64)의 곡면과 인접한 라운드부(63)의 곡면이 평행이 되면, 그라우팅 원중심(61)에서 절삭부측으로 일정부분 편심(e)되도록 그라우팅 편심중심(66)을 정하여 일정한 그라우팅반경(r)을 갖도록 주입되는 그라우팅액이 상기 라운드부(63)와 절삭부(64)의 곡면이 평행하므로 그라우팅액이 상기 라운드부(63) 에 부딪혀 식생공간부(18)내로 침투가 어렵게되는 것이다.As described above, when the curved surface of the cutting portion 64 and the curved surface of the adjacent round portion 63 are parallel to each other, the grouting eccentric center 66 is determined so as to be partially eccentrically e from the grouting center 61 to the cutting portion. Since the curved surface of the round portion 63 and the cutting portion 64 is parallel to the grouting liquid injected to have a grouting radius r, the grouting liquid collides with the round portion 63 so that it is difficult to penetrate into the vegetation space portion 18. Will be.

즉, 상기와 같이 그라우팅액이 식생공간부내로 투입되지 않도록 하기 위한 편심된 그라우팅의 편심중심(66) 까지의 길이(L)은 그라우팅반경(r)보다 먼 거리에 설정되도록 하되, 그라우팅원중심(61)에서 편심(e)만큼 이격된 곳에 위치하도록 하여 그라우팅작업을 실시 하여야 한다.That is, as described above, the length L up to the eccentric center 66 of the eccentric grouting for preventing the grouting solution from being introduced into the vegetation space portion is set to be farther than the grouting radius r, but the grouting center ( In 61), grouting work should be carried out with the eccentricity (e) spaced apart.

또 다른 방법으로는 상기 식생용홈(17)에 끼움재(40)를 먼저 설치하고, 상기 끼움재의 외부에 그라우팅(57)을 실시하여 이중으로 간격마감재(70)를 설치하는 방법이다.In another method, the fitting material 40 is first installed in the vegetation groove 17, and the grouting 57 is applied to the outside of the fitting material to doublely install the gap finishing material 70.

상기 도 11과 같이 옹벽(10)의 배면에 배면성토부(60)를 설치하는 경우에는 그라우팅(53) 실시하지 않을 수도 있다.11, the grouting 53 may not be performed when the backing soil portion 60 is installed on the rear surface of the retaining wall 10.

상기 상치콘크리트(14)는 파일(20)의 상부에 설치된 수직강재(51)를 다수개의 철근을 묶은 철근다발인 전단뿌리의 연결재(52)를 이용하여 상호 연결한 것을 포함하여 콘크리트로 설치하되, 파일(20)이 설치된 종방향으로 중앙에는 일정한 면적의 식생부(15)를 설치하되, 내부는 식생공간부(18)와 통하도록 한 것이다.The concrete concrete 14 is installed in concrete, including the interconnection of the vertical steel 51 installed on the upper portion of the pile 20 by using the connecting member 52 of the shear root, which is a bundle of reinforcing steel bars, In the longitudinal direction in which the pile 20 is installed, a vegetation part 15 having a predetermined area is installed in the center, but the inside thereof is in contact with the vegetation space part 18.

상기 식생부는 맨 위에 토사를 채우고, 상기 토사 아래에는 필터매트(58)를 설치하고, 상기 필터매트(58) 하부에는 자갈층(55)을 설치하되, 상기 자갈층은 식생공간부내에 설치된 식생틀과 통하도록 설치한 것이다. The vegetation portion fills the top and bottom, the filter mat 58 is installed below the soil, and the gravel layer 55 is installed below the filter mat (58), the gravel layer is a vegetation framework and barrel installed in the vegetation space portion It was installed to

다음은 본 발명의 식생옹벽(10)을 설치하는 시공방법에 관한 것으로 도 10과 같은 단계를 거쳐 시공하는 것이다.The following relates to a construction method for installing the vegetation retaining wall 10 of the present invention to be constructed through the same steps as in FIG. 10.

도 (a)단계는 옹벽을 설치하고자 하는 지반에 내부가 빈 케이싱(50)을 타입 하고 케이싱(50) 내부의 토사를 제거하여 케이싱 내부를 빈 상태로 하고, Step (a) is to form a casing (50) inside the ground to install the retaining wall and to remove the soil inside the casing (50) to make the inside of the casing empty,

도 (b)단계는 상기 케이싱(50)의 내부에 콘크리트파일(20)을 삽입하고, 케이싱(50)을 인발하여 제거하고,Step (b) is to insert the concrete pile 20 in the casing 50, the casing 50 is removed by removing,

도 (c)단계는 상기 도 (a)(b)단계를 반복적으로 하여 원하는 폭으로 콘크리트파일(20)을 다수개 설치하고,Step (c) is to install a plurality of concrete piles 20 to a desired width by repeating the steps (a) (b),

도 (d)단계는 상기 다수개 연이어서 설치된 콘크리트파일(20)의 상부에 수직강재(51)를 설치하고, 상기 수직강재(51)를 관통하여 연결재(52)를 설치하여 파일(20)을 상호 연결하여 설치된 파일이 일체화하도록 하고,In the step (d), the vertical steel 51 is installed on the plurality of consecutively installed concrete piles 20, and the connection member 52 is installed through the vertical steels 51 to install the piles 20. To interconnect and ensure that the installed files are integrated,

도 (e), (f), (g), (h)단계는 지반에 다수개 연이어서 설치한 콘크리트파일(20)과의 사이에 식생용홈(17)이 형성되며, 동시에 상기 파일(20)의 측면에 형성된 생태홈(21)에 의하여 형성된 식생공간부(18)를 설치하고, 상기 식생공간부(18)내에, 식생틀의 내부의 일부분에 길이방향으로 설치된 투수유도자갈매트(56)는 배면토(11)의 잡석층(54)과 접하도록 설치하면서, 식생공간내에 다수개 식생틀(30)은 적층하여 자갈층(55)이 자연스럽게 반복적으로 설치되도록 하고, Figures (e), (f), (g), (h) step is a vegetation groove 17 is formed between the concrete pile 20 installed in succession on the ground, at the same time the pile 20 The vegetation space portion 18 formed by the ecological groove 21 formed on the side of the, and in the vegetation space portion 18, the pitcher guide galvan mat 56 is installed in the longitudinal direction in a portion of the inside of the vegetation frame is While installing so as to contact the rubble layer 54 of the rear soil 11, a plurality of vegetation framework 30 is laminated in the vegetation space so that the gravel layer 55 is naturally installed repeatedly,

상기 식생용홈(17)에 간격마감재(70)인 끼움재(40)를 타입설치하거나 상기 식생용홈(17)에 간격마감재(70)인 그라우팅(57)을 실시한 것이거나, 끼움재와 그라우팅을 동시에 실시하되, The vegetation groove 17 is provided with a type of fitting material 40, which is a gap finishing material 70, or a grouting 57, which is a gap finishing material 70, in the vegetation groove 17, or the fitting material and grouting at the same time. Do it,

상기 식생용홈(17)에 간격마감재(70)의 설치는 전면지반(12) 하부에 설치된 식생용홈(17)의 0.5 ~ 1m까지의 하부에까지 설치하고, Installation of the gap closing material 70 in the vegetation groove 17 is installed in the lower portion of the vegetation groove 17 installed in the lower portion of the front ground 12 to 0.5 ~ 1m,

또한, 상기 설치된 콘크리트파일(20)의 전면부(13)의 토사를 굴착하여 전면부의 옹벽(10)이 외부로 노출되도록 하고,In addition, the earth and sand of the front portion 13 of the installed concrete pile 20 is excavated so that the retaining wall 10 of the front portion is exposed to the outside,

상기 설치된 파일(20)의 상부에서 연결재(52)로 상호 연결한 부분을 포함하여 상치콘크리트(14)를 설치하고,Install the upper concrete 14, including the portion interconnected with the connecting member 52 from the upper portion of the installed pile 20,

도 (i) 단계는 상기 상치콘크리트(14)의 식생부(15)에 설치한 자갈층은 식생틀의 상부에 까지 연통되도록 설치하고, 상기 식생부(15)의 자갈층(55) 위에 필터매트(58)를 설치하고 상기 필터매트(58) 위에 토사(59)를 채우고,In step (i), the gravel layer installed on the vegetation part 15 of the upper concrete 14 is installed to communicate with the upper part of the vegetation frame, and the filter mat 58 on the gravel layer 55 of the vegetation part 15. ) And fill the earth and sand (59) on the filter mat (58),

도 (j)단계는 상기 설치된 식생옹벽(10)의 식생부(15)에 관목등과 같은 식생(16)을 식재하고, 상기 식생용홈(17)에는 상기 식생틀(30)에 포함된 종자(33)로부터 발아된 식생(16)이 활착되어 식생옹벽(10)의 측면에 활착된 상태를 보여주는 옹벽(10)을 설치하는 것이다. (J) step is planting the vegetation 16, such as shrubs in the vegetation portion 15 of the installed vegetation retaining wall 10, the vegetation grooves 17 in the seed (included in the vegetation framework 30) It is to install the retaining wall 10 showing the state of the vegetation 16 germinated from 33) to the side of the vegetation retaining wall (10).

상기 (e)와 (f)단계에서 간격마감재(70)를 설치할 때, 파일(20)의 후면에 설치되는 식생용홈(17)에 간격마감재(70)로 끼움재(40)를 설치하는 방법이외에, 별도로 간격마감재(70)로서 그라우팅(57)을 상기 식생용홈(17)에 한다.When installing the gap closing material 70 in the steps (e) and (f), in addition to the method of installing the fitting material 40 as the gap finishing material 70 in the vegetation groove 17 is installed on the rear of the pile 20. In addition, grouting (57) to the vegetation groove (17) as a gap finishing material (70).

이때에는 그라우팅액이 상기 식생공간부(18)내에 투입되지 않도록 그라우팅압을 고려하여 상기 식생용홈(17)에서 일정거리 이격된 부분에 그라우팅(57)을 실시하며 동시에 도 12와 같이 식생용홈의 형상을 변형설치하여 원하는 식생용홈(17)에 그라우팅(57)되도록 하면서 식생공간부(18)내에는 투입되지 않도록 한다.At this time, in consideration of the grouting pressure so that the grouting solution is not injected into the vegetation space portion 18, the grouting 57 is applied to a portion spaced from the vegetation groove 17 at a predetermined distance, and at the same time, the shape of the vegetation groove is shown in FIG. 12. By modifying the installation so that the grouting (57) in the desired vegetation groove (17) is not injected into the vegetation space portion 18.

또 다른 방법으로는, 상기 식생용홈(17)에 끼움재(40)를 설치하고, 그 외부에 그라우팅(57)을 실시하여 이중으로 간격마감재(70)를 설치하는 방법으로 한다.In another method, the fitting member 40 is installed in the vegetation groove 17, and the grouting 57 is applied to the outside of the vegetation groove 17, thereby providing a double gap finishing member 70.

이하에서 식생용홈의 구조로 간격마감재의 설치와 관련하여 상세히 설명하면, Hereinafter, described in detail with respect to the installation of the gap finishing material in the structure of the vegetation groove,

상기 콘크리트파일(20)의 양측면에 설치된 생태홈(21)의 좌우에 형성된 라운드부(63)가 옹벽(10)이 설치되었을때 전면(13)에 노출되어 상기 생태홈(21)이 마주보게되어 식생용홈(17)이 설치되는 경우에는 라운드부(63)를 그대로 설치하고, 배면(11)에 접하는 라운드부(63)는 식생공간부 측으로 절삭부(64)를 설치하여 인접하여 설치된 생태홈(21)의 라운드부(63)와 식생용홈(17)이 도 12와 같이 설치되도록 한 후에 배면(13)의 절삭부(64)가 설치된 식생용홈(17)에는 그라우팅(53)을 하거나, 끼움재(40)를 설치하거나, 끼움재(40)를 설치하고, 그라우팅(53)을 실시한 한 것이다.Round parts 63 formed on the left and right sides of the ecological grooves 21 installed on both sides of the concrete pile 20 are exposed to the front surface 13 when the retaining wall 10 is installed, and the ecological grooves 21 face each other. When the vegetation groove 17 is installed, the round portion 63 is installed as it is, and the round portion 63 in contact with the rear surface 11 is provided with an ecological groove installed adjacently by installing the cutting portion 64 toward the vegetation space portion. After the round portion 63 and the vegetation groove 17 of 21 are installed as shown in FIG. 12, the grouting 53 is applied or inserted into the vegetation groove 17 on which the cutting portion 64 of the rear surface 13 is installed. 40 is provided, the fitting material 40 was installed, and grouting 53 was performed.

또한, 상기 생태홈(21)의 좌우에 라운드부(63)를 그대로 설치하고 인접하여 설치되는 생태홈(21)의 좌우의 라운드부(63)도 절삭부(64)를 두지 않고, 그대로 접하게 하여 옹벽(10)을 설치하여 상기 마주보고 설치된 생태홈(21)의 사이에 형성된 식생용홈(17)에서 전면(13)에 노출된 것에는 식생(16)을 하고, 배면(11)에 설치된 식생용홈(17)에는 끼움재(40)를 설치하거나, 끼움재(40)를 설치하고, 동시에 그라우팅(53)을 실시하도록 한 것이다.In addition, the left and right round portions 63 are installed on the left and right sides of the ecological groove 21, and the left and right round portions 63 of the ecological groove 21 are adjacent to each other without leaving the cutting portion 64. The retaining wall 10 is provided with vegetation 16 in the vegetation grooves 17 formed between the ecological grooves 21 facing each other, and the vegetation grooves 16 are installed on the rear surface 11. In 17, the fitting material 40 is installed, or the fitting material 40 is installed and grouting 53 is performed simultaneously.

또는, 파일(20)의 일측면에 설치된 생태홈(21)의 좌우에 설치된 라운드부(63)에 절삭부(64)를 설치하고, 타측면에는 라운드부(63)를 설치하고, 인접하여 설치되는 파일(20)의 라운드부(63)에는 절삭부(64)가 설치된 생태홈(21)이 접하도록 하는 방법으로 옹벽(10)을 설치하여, 상기 마주보고 설치된 생태홈(21)의 사이에 형성된 식생용홈(17)에서 전면(13)에 노출된 것에는 식생(16)을 하고, 배면(11)에 접하게 설치된 식생용홈(17)에는 끼움재(40)를 설치하거나, 끼움재(40)를 설치하고, 동시에 그라우팅(53)을 실시하거나, 그라우팅(53)을 실시한 것이다.Alternatively, the cutting portion 64 is provided on the round portions 63 provided on the left and right sides of the ecological groove 21 provided on one side of the pile 20, and the round portion 63 is installed on the other side and adjacently installed. The retaining wall 10 is installed in the round portion 63 of the pile 20 to be in contact with the ecological groove 21 in which the cutting portion 64 is installed, and between the ecological grooves 21 facing each other. The vegetation grooves 17 formed in the vegetation grooves 17 are exposed to the front 13, and the vegetation grooves 17 installed in contact with the rear surface 11 is fitted with the fitting material 40, or the fitting material 40 And then, grouting 53 is performed at the same time, or grouting 53 is performed.

상기와 같이 생태홈(21)의 좌우에 설치된 라운드부(63)에서 일측면에 설치된 라운드부(63)에만 절삭부(64)를 설치하면, 상기 도 10과 같이 케이싱(50)을 지반에 설치하고 파일(20)을 그 안에 설치한 후에 인접하여 설치되는 다음의 파일(20)설치를 위하여 케이싱(50)을 타입할 때 상기 절삭부(64)에 밀접하게 설치하여 케이싱(50)을 타입할 수 있으므로 향후에 설치되는 파일(20)과 기존의 파일(20)이 상기 접삭부(64)에의하여 상호 밀접하게 설치할 수 있는 장점이 있는 것이다.If the cutting portion 64 is installed only on the round portion 63 installed on one side of the round portion 63 installed on the left and right of the ecological groove 21 as described above, the casing 50 is installed on the ground as shown in FIG. When the casing 50 is typed for installation of the next pile 20 to be installed adjacently after the pile 20 is installed therein, the casing 50 may be installed by closely installing the cutting part 64. Since the file 20 and the existing file 20 to be installed in the future can be installed in close contact with each other by the gripping portion (64).

상기 상치콘크리트(14)는 파일(20)의 상부에 설치된 수직강재(51)를 상호 연결한 연결재(52)를 포함하여 콘크리트로 설치하되, 파일(20)이 설치된 종방향으로 중앙에는 일정한 면적의 식생부(15)를 설치하되, 내부는 식생공간부(18)와 통하도록 한 것이다.The concrete concrete 14 is installed in concrete, including the connecting material 52 interconnecting the vertical steel 51 installed on the upper portion of the pile 20, but the pile 20 is installed in the longitudinal direction in the center of a constant area The vegetation part 15 is installed, but the inside is to communicate with the vegetation space part 18.

상기 연결재는 다수개의 철근을 다발로 묶어 전단뿌리로 만든 것이다.The connecting material is a bundle of a plurality of reinforcing bars made of shear roots.

상기와 같이 철근을 다발로 만든 전단뿌리를 수직강재를 관통하여 설치한 다음, 상치콘크리트를 타설하면 보다 강하게 부착되어 파일의 상부에서 파일의 설치위치 및 변형되는 것을 방지할 수 있도록 한 것이다.The shear roots made of reinforcing bars as described above are installed through the vertical steel, and when the concrete is poured, it is more strongly attached to prevent the installation position and deformation of the pile from the top of the pile.

다른 방법으로, 도 11과 같이 식생옹벽(10)을 설치하되, 콘크리트파일(20)의 배면이 성토된 배면토사부(60)로 이루어진 것이며, 그 이외의 설치과정은 상기 전면부(13)의 토사를 굴착하여 설치한 식생옹벽(10)의 설치방법과 동일하다.Alternatively, the vegetation retaining wall 10 is installed as shown in FIG. 11, but the rear surface of the concrete pile 20 is formed of the back soil portion 60 which is filled, and the other installation process of the front portion 13 is performed. It is the same as the installation method of the vegetation retaining wall 10 installed by excavating earth and sand.

즉, 도 11의 배면을 배면성토부(60)로 채운 식생옹벽(10)의 설치방법을 살펴보면 다음과 같다.That is, looking at the installation method of the vegetation retaining wall 10 filled with the back surface soil portion 60 of Figure 11 as follows.

옹벽을 설치하고자 하는 지반에 내부가 빈 케이싱(50)을 타입하고 케이싱 내부의 토사를 제거하여 케이싱 내부를 빈 상태로 하는 단계;Type an empty casing 50 in the ground to which the retaining wall is to be installed, and remove the earth and sand inside the casing to make the casing empty;

상기 케이싱(50)의 내부에 콘크리트파일(20)을 삽입하고, 케이싱(50)을 인발하여 제거하는 단계;Inserting the concrete pile 20 into the casing 50 and drawing and removing the casing 50;

상기 케이싱(50)설치 및 케이싱내부에 파일(20)을 삽입하고 케이싱을 인발하는 단계를 반복적으로 하여 원하는 폭으로 콘크리트파일(20)을 설치하는 단계;Installing the casing 50 and inserting the pile 20 into the casing and drawing the casing repeatedly to install the concrete pile 20 to a desired width;

상기 다수개 연이어서 설치된 콘크리트파일(20)의 상부에 수직강재(51)를 설치하고, 상기 수직강재(51)를 관통하여 연결재(52)를 설치하여 파일을 상호 연결하여 연결된 파일이 일체화되도록 하는 단계;The vertical steel 51 is installed on the plurality of consecutively installed concrete piles 20, and the connecting members 52 are installed through the vertical steel 51 to interconnect the piles so that the connected piles are integrated. step;

지반에 다수개 연이어서 설치한 콘크리트파일(20)과의 사이에 식생용홈(17)이 형성되며, 동시에 상기 파일(20)의 측면에 형성된 생태홈(21)에 의하여 형성된 식생공간부(18)를 설치하고, 상기 식생공간부(18)내에, 식생틀의 내부의 일부분에 길이방향으로 설치된 투수유도자갈매트(56)는 배면토(11)의 잡석층(54)과 접하도록 설치하면서, 식생공간내에 다수개 식생틀(30)은 적층하여 자갈층(55)이 자연스럽게 반복적으로 설치되도록 하고,Vegetation groove 17 is formed between the concrete pile 20 installed in succession on the ground, and at the same time the vegetation space portion 18 formed by the ecological groove 21 formed on the side of the pile 20 And, in the vegetation space portion 18, the permeation guide galvan mat 56 installed in the longitudinal direction in a portion of the inside of the vegetation frame is installed so as to contact the rubble layer 54 of the rear soil 11, A plurality of vegetation framework 30 in the space is laminated so that the gravel layer 55 is naturally installed repeatedly,

상기 식생용홈(17)에 간격마감재(70)인 끼움재(40)를 타입설치하거나 상기 식생용홈(17)에 간격마감재(70)인 그라우팅(57)을 실시한 것이거나, 끼움재와 그라우팅을 동시에 실시하는 단계;The vegetation groove 17 is provided with a type of fitting material 40, which is a gap finishing material 70, or a grouting 57, which is a gap finishing material 70, in the vegetation groove 17, or the fitting material and grouting at the same time. Performing;

상기 설치된 파일(20)의 상부에서 연결재(52)로 상호 연결한 부분을 포함하여 상치콘크리트(14)를 설치하는 단계;Installing the upper concrete 14 including a portion interconnected by a connecting member 52 from an upper portion of the installed pile 20;

상기 상치콘크리트(14)의 식생부(15)에 설치한 자갈층은 식생틀의 상부에 까지 연통되도록 설치하고, 상기 식생부(15)의 자갈층(55) 위에 필터매트(58)를 설치하고 상기 필터매트(58) 위에 토사(59)를 채우고,The gravel layer installed on the vegetation part 15 of the upper concrete 14 is installed to communicate with the upper part of the vegetation frame, and the filter mat 58 is installed on the gravel layer 55 of the vegetation part 15 and the filter Fill the soil (59) on the mat (58),

상기 연이어서 설치되는 콘크리트파일(20)의 전면지반(12)까지 상기 파일(20)의 배면에 잡석층(54)을 설치하고, 상기 잡석층(54)과 상기 파일(20)의 배면에 성토되는 배면성토부(60)와 접하는 잡석층(54)면에 필터매트(58)를 설치한 후에 성토하여 배면성토부(57)를 설치한 식생옹벽(10)을 설치하는 단계;The rubble layer 54 is installed on the rear surface of the pile 20 to the front ground 12 of the concrete pile 20 which is subsequently installed, and the rubble is deposited on the rear surface of the rubble layer 54 and the pile 20. Installing the vegetation retaining wall 10 having the backfilled soil portion 57 installed after the filter mat 58 is installed on the surface of the rubble layer 54 which is in contact with the backside soil portion 60 being formed;

상기 설치된 식생옹벽(10)의 식생부(15)에 관목등과 같은 식생(16)을 식재하고, 상기 식생용홈(17)에는 상기 식생틀(30)에 포함된 종자(33)로부터 발아된 식생(16)이 활착되어 식생옹벽(10)의 측면에 활착된 상태를 이루도록 하는단계를 거쳐 식생옹벽(10)을 설치하는 것이다.The vegetation 16, such as a shrub, is planted in the vegetation portion 15 of the installed vegetation retaining wall 10, and the vegetation germinated from the seeds 33 included in the vegetation framework 30 in the vegetation groove 17 (16) is to install the vegetation retaining wall (10) through the step to make a state in which the surface of the vegetation retaining wall (10).

상기 식생공간부(18)내에 식생틀을 설치하는 방법은 상기 식생공간부내에 설치되는 식생틀의 내부의 일부분에 길이방향으로 설치된 투수유도자갈매트(56)는 배면성토부(60)와 접하도록 설치하면서, 식생공간내에 다수개 식생틀(30)은 적층하여 자갈층(55)이 자연스럽게 반복적으로 설치되도록 하고, 상기 상치콘크리트(14)의 식생부(15)에 설치한 자갈층은 식생틀의 상부에 까지 연통되도록 설치한 것이다.Method for installing the vegetation framework in the vegetation space portion 18 is a pitcher guide galvan mat (56) installed in a longitudinal direction in a portion of the inside of the vegetation frame is installed in the vegetation space portion so as to contact the back soil soil (60). During installation, a plurality of vegetation frameworks 30 are stacked in the vegetation space so that the gravel layer 55 is naturally and repeatedly installed, and the gravel layer provided in the vegetation section 15 of the lettuce concrete 14 is located on the upper part of the vegetation framework. It was installed to communicate with.

또한, 상기 식생부(15)의 자갈층(55) 위에 필터매트(58)를 설치하고, 상기 필터매트(58) 위에 토사(59)를 채우고, 상기 연이어서 설치되는 콘크리트파일(20) 의 전면지반(12)까지 상기 파일(20)의 배면에 잡석층(54)을 설치하고, 상기 잡석층(54)과 상기 파일(20)의 배면에 성토되는 배면성토부(60)와 접하는 잡석층(54)면에 필터매트(58)를 설치한 후에 성토하여 배면성토부(57)를 설치한 식생옹벽(10)을 설치하는 것이다.In addition, the filter mat 58 is installed on the gravel layer 55 of the vegetation part 15, the soil layer 59 is filled on the filter mat 58, and the front ground of the concrete pile 20 which is subsequently installed. The rubble layer 54 is provided on the rear surface of the pile 20 up to (12), and the rubble layer 54 is in contact with the backfill soil 60 deposited on the rear surface of the rubble layer 54 and the pile 20. After the filter mat 58 is installed on the c) surface, the vegetation retaining wall 10 in which the back fill soil portion 57 is installed is installed.

상기 설치된 파일(20)과 파일(20)이 설치될때 발생되는 간격인 식생용홈(17)에 간격마감재(70)를 설치하는 단계에서, 상기 파일(20)의 후면에 설치되는 식생용홈(17)에 간격마감재(70)로 끼움재(40)를 설치하는 방법이외에, 별도로 간격마감재(70)로서 그라우팅(57)을 상기 식생용홈(17)에 실시할 수 있다.In the step of installing the gap closing material 70 in the vegetation groove 17 is an interval generated when the installed file 20 and the file 20 is installed, the vegetation groove 17 is installed on the rear of the file 20 In addition to the method of installing the fitting material 40 into the gap finishing material 70, the grouting 57 may be separately applied to the vegetation groove 17 as the gap finishing material 70.

이때에는 그라우팅액이 상기 식생공간부(18)내에 투입되지 않도록 그라우팅압을 고려하여 상기 식생용홈(17)에서 일정거리 이격된 부분에 그라우팅(57)을 실시하며 도 12와 같이 식생용홈의 형태를 변형하여 설치하여 원하는 식생용홈(17)에 그라우팅(57)되도록 하면서 식생공간부(18)내에는 투입되지 않도록 한다.At this time, in consideration of the grouting pressure so that the grouting solution is not introduced into the vegetation space portion 18, the grouting 57 is applied to a portion spaced from the vegetation groove 17 at a predetermined distance. Deformed and installed so that the grouting 57 in the desired vegetation groove 17 is not injected into the vegetation space 18.

상기와 같이 식생용홈(17)에 직접 그라우팅을 하는 경우에는 식생용홈(17)의 구조를 변형하여 그라우팅액이 직접 식생공간부(18)내로 침투하지 못하도록 한다.When grouting directly to the vegetation groove 17 as described above, the structure of the vegetation groove 17 is modified to prevent the grouting liquid from penetrating directly into the vegetation space portion 18.

그 구조를 보여주는 것이 도 12이며, 이를 설명하면, 파일(20)의 측면에 설치된 생태홈(21)의 좌우에 라운드부(63)가 설치되고, 상기 설치된 생태홈(21)의 반대편에 식생용홈(17)인 간격을 두고 설치된 다른 생태홈(21)의 좌우에 형성된 라운드부(63)에서 식생공간부(18)측에 인접한 라운드부(63)의 일정부분을 점선과 같이 절삭한 절삭부(64)를 형성하여 인접한 라운드부(63)의 곡면과 절삭부(64)의 곡면이 평행을 이루도록한 구조이다.12 shows the structure, and when it is described, round parts 63 are installed at left and right sides of the ecological groove 21 installed on the side of the pile 20, and the vegetation groove is opposite to the installed ecological groove 21. Cutting portion cut part of the round portion 63 adjacent to the vegetation space portion 18 side as a dotted line in the round portion 63 formed on the left and right of the other ecological groove 21 provided at intervals (17) ( 64 is formed so that the curved surface of the adjacent round part 63 and the curved surface of the cutting part 64 are in parallel.

상기와 같이 절삭부(64)의 곡면과 인접한 라운드부(63)의 곡면이 평행이 되면, 그라우팅원중심(61)에서 편심(e)만큼 이격된 부분에 그라우팅편심중심(66)을 두고 그라우팅반경(r)을 갖도록 하여 주입되는 그라우팅액이 상기 라운드부(63)와 절삭부(64)의 곡면이 평행하므로서 그라우팅액이 상기 라운드부(63)에 부딪혀 식생공간부(18)내로 침투가 어렵게되는 것이다.As described above, when the curved surface of the cutting portion 64 and the curved surface of the adjacent round portion 63 are parallel to each other, the grouting radius is placed in the grouting center 61 with the grouting eccentric center 66 spaced apart by the eccentricity e. The grouting liquid injected to have (r) is parallel to the curved surface of the round portion 63 and the cutting portion 64, so that the grouting liquid strikes the round portion 63, making it difficult to penetrate into the vegetation space portion 18. will be.

즉, 상기와 같이 그라우팅액이 식생공간부내로 투입되지 않도록 하기 위한 그라우팅의 편심중심(66) 까지의 길이(L)은 그라우팅반경(r) 보다 먼 거리에 설정 되도록 하되, 그라우팅원중심(61)에서 편심(e)만큼 이격된 곳에 위치하도록하여 그라우팅 작업을 실시하여야 한다.That is, the length (L) to the eccentric center 66 of the grouting so that the grouting solution is not introduced into the vegetation space portion as described above to be set at a distance farther than the grouting radius (r), the grouting center (61) The grouting work should be carried out so that it is located at a distance from the eccentricity (e).

또 다른 방법으로는, 상기 식생용홈(17)에 끼움재(40)를 설치하고 그 외부에 그라우팅(57)을 실시하여 이중으로 간격마감재(70)를 설치하는 방법을 할 수도 있다.As another method, the fitting member 40 may be installed in the vegetation groove 17, and the grout 57 may be applied to the outside thereof, thereby providing a method of installing the gap finishing member 70.

이하에서 식생용홈의 구조에 따라 간격마감재의 실시행태를 설명하면 다음과 같다.Hereinafter, the implementation behavior of the gap finishing material according to the structure of the vegetation groove is as follows.

상기 콘크리트파일(20)의 양측면에 설치된 생태홈(21)의 좌우에 형성된 라운드부(63)가 옹벽(10)이 설치되었을때 전면(13)에 노출되어 상기 생태홈(21)이 마주보게되어 식생용홈(17)이 설치되는 경우에는 라운드부(63)를 그대로 설치하고, 배면(11)에 접하는 라운드부(63)는 식생공간부 측으로 절삭부(64)를 설치하여 인접하여 설치된 생태홈(21)의 라운드부(63)와 식생용홈(17)이 도 12와 같이 설치되도록 한 후에 배면(13)의 절삭부(64)가 설치된 식생용홈(17)에는 그라우팅(53)을 하거나, 끼움재(40)를 설치하거나, 끼움재(40)를 설치하고, 그라우팅(53)을 실시한 한 것이다.Round parts 63 formed on the left and right sides of the ecological grooves 21 installed on both sides of the concrete pile 20 are exposed to the front surface 13 when the retaining wall 10 is installed, and the ecological grooves 21 face each other. When the vegetation groove 17 is installed, the round portion 63 is installed as it is, and the round portion 63 in contact with the rear surface 11 is provided with an ecological groove installed adjacently by installing the cutting portion 64 toward the vegetation space portion. After the round portion 63 and the vegetation groove 17 of 21 are installed as shown in FIG. 12, the grouting 53 is applied or inserted into the vegetation groove 17 on which the cutting portion 64 of the rear surface 13 is installed. 40 is provided, the fitting material 40 was installed, and grouting 53 was performed.

또는, 상기 생태홈(21)의 좌우에 라운드부(63)를 그대로 설치하고 인접하여 설치되는 생태홈(21)의 좌우의 라운드부(63)도 절삭부(64)를 두지 않고, 그대로 접하게 하여 옹벽(10)을 설치하여 상기 마주보고 설치된 생태홈(21)의 사이에 형성된 식생용홈(17)에서 전면(13)에 노출된 것에는 식생(16)을 하고, 배면(11)에 설치된 식생용홈(17)에는 끼움재(40)를 설치하거나, 끼움재(40)를 설치하고, 동시에 그라우팅(53)을 실시하도록 한 것이다. Alternatively, the left and right round portions 63 are installed on the left and right sides of the ecological groove 21, and the left and right round portions 63 of the ecological groove 21 are adjacent to each other without being cut. The retaining wall 10 is provided with vegetation 16 in the vegetation grooves 17 formed between the ecological grooves 21 facing each other, and the vegetation grooves 16 are installed on the rear surface 11. In 17, the fitting material 40 is installed, or the fitting material 40 is installed and grouting 53 is performed simultaneously.

또는, 상기 파일(20)의 일측면에 설치된 생태홈(21)의 좌우에 설치된 라운드부(63)에 절삭부(64)를 설치하고, 타측면에는 라운드부(63)를 설치하고, 인접하여 설치되는 파일(20)의 라운드부(63)에는 절삭부(64)가 설치된 생태홈(21)이 접하도록 하는 방법으로 옹벽(10)을 설치하여, 상기 마주보고 설치된 생태홈(21)의 사이에 형성된 식생용홈(17)에서 전면(13)에 노출된 것에는 식생(16)을 하고, 배면(11)에 접하게 설치된 식생용홈(17)에는 끼움재(40)를 설치하거나, 끼움재(40)를 설치하고, 동시에 그라우팅(53)을 실시하거나, 그라우팅(53)을 실시한 것이다.Alternatively, the cutting unit 64 may be installed in the round parts 63 provided on the left and right sides of the ecological groove 21 installed on one side of the pile 20, and the round part 63 may be installed on the other side of the pile 20. In the round portion 63 of the pile 20 to be installed, the retaining wall 10 is installed in such a manner that the ecological groove 21 in which the cutting portion 64 is installed is in contact with each other. The vegetation grooves 17 formed in the vegetation grooves 16 are exposed to the front surface 13 and the vegetation grooves 17 installed in contact with the rear surface 11 are fitted with the fitting material 40 or the fitting material 40 ) And grouting 53 or grouting 53 at the same time.

상기와 같이 생태홈(21)의 좌우에 설치된 라운드부(63)에서 일측면에 설치된 라운드부(63)에만 절삭부(64)를 설치하면, 상기 도 10과 같이 케이싱(50)을 지반에 설치하고 파일(20)을 그 안에 설치한 후에 인접하여 설치되는 다음의 파일(20)설치를 위하여 케이싱(50)을 타입할 때 상기 절삭부(64)에 밀접하게 설치하여 케이싱(50)을 타입할 수 있으므로 향후에 설치되는 파일(20)과 기존의 파일(20)이 상기 접삭부(64)에의하여 상호 밀접하게 설치할 수 있는 장점이 있는 것이다.If the cutting portion 64 is installed only on the round portion 63 installed on one side of the round portion 63 installed on the left and right of the ecological groove 21 as described above, the casing 50 is installed on the ground as shown in FIG. When the casing 50 is typed for installation of the next pile 20 to be installed adjacently after the pile 20 is installed therein, the casing 50 may be installed by closely installing the cutting part 64. Since the file 20 and the existing file 20 to be installed in the future can be installed in close contact with each other by the gripping portion (64).

상기 상치콘크리트(14)는 파일(20)의 상부에 설치된 수직강재(51)를 상호 연결한 연결재(52)를 포함하여 콘크리트로 설치하되, 파일(20)이 설치된 종방향으로 중앙에는 일정한 면적의 식생부(15)를 설치하되, 상기 식생부의 내부는 식생공간부(18)와 통하도록 한 것이다.The concrete concrete 14 is installed in concrete, including the connecting material 52 interconnecting the vertical steel 51 installed on the upper portion of the pile 20, but the pile 20 is installed in the longitudinal direction in the center of a constant area The vegetation part 15 is installed, but the inside of the vegetation part is to communicate with the vegetation space part 18.

상기 연결재는 다수개의 철근을 다발로 묶어 전단뿌리로 만든 것이다.The connecting material is a bundle of a plurality of reinforcing bars made of shear roots.

상기와 같이 철근을 다발로 만든 전단뿌리를 수직강재를 관통하여 설치한 다음, 상치콘크리트를 타설하면 보다 강하게 부착되어 파일의 상부에서 파일의 설치위치 및 변형되는 것을 방지할 수 있도록 한 것이다.The shear roots made of reinforcing bars as described above are installed through the vertical steel, and when the concrete is poured, it is more strongly attached to prevent the installation position and deformation of the pile from the top of the pile.

상기 식생틀(30)과 식생부(15)사이에 설치된 자갈층(55)과 식생틀(30)과 식생틀(30)사이에 설치된 자갈층(55)과 식생틀의 내측 일측면에 설치된 투수유도자갈매트(56)는 배면성토부(60) 또는 배면의 잡석층과 상호 연통되도록 하여 식생틀에 수분이 공급되도록 하면서, 상부 및 배면에서 과다한 배출수가 발생될때 이를 옹벽외부로 배출되도록 하여 과다한 토압이 옹벽에 발생되지 않도록 한 것이다.A gravel layer 55 installed between the vegetation framework 30 and the vegetation section 15 and a gravel layer 55 installed between the vegetation framework 30 and the vegetation framework 30 and a permeable guided gravel installed on one inner side of the vegetation framework The mat 56 communicates with the rear soil layer 60 or the rubble layer on the rear surface to supply water to the vegetation framework, and when excessive discharge water is generated from the upper and rear surfaces, the mat 56 is discharged to the outside of the retaining wall so that the excessive earth pressure retains the retaining wall. So that it does not occur.

상기 자갈층(55)과 잡석층(54) 및 투수유도자갈매트는 침투되는 우수가 원활히 식생틀(30)에 전달되도록 하는 역할과 동시에 상기 자갈층 및 잡석층의 간극내에 다수의 수분이 함유되어 있어 상기 식생틀에 수분이 부족할 때 언제든지 수분을 공급할 수 있는 수분저장고의 역할도 동시에 할 수 있도록 하여 상시 식생옹벽에 식재된 식생이 늘 푸른상태를 유지하도록 한다.The gravel layer 55 and the rubble layer 54 and the permeable induction galvanizing mat is a role that ensures that the rainwater is smoothly transmitted to the vegetation framework 30 and at the same time contains a plurality of moisture in the gap between the gravel layer and the rubble layer When there is not enough water in the vegetation frame, it can also serve as a water reservoir to supply water at any time, so that the vegetation planted on the vegetation retaining wall is always kept blue.

상기 식생용홈에 끼움재로서 L형강 또는 L형의 부재를 설치할 때 모서리부가 상기 식생용홈에 접하도록 설치하여 식생용홈의 간격에 상기 끼움재가 밀착되어 설치되도록 한다.When installing the member of the L-shaped steel or L-shaped as the fitting material for the vegetation groove is installed so that the corner portion is in contact with the vegetation groove so that the fitting material is in close contact with the spacing of the vegetation groove.

상기 콘크리트파일의 양측면에 생태홈을 설치하되, 일측의 생태홈의 좌우의 라운드부의 일부를 절삭한 절삭부를 설치한 이유는 상기에서 설명한바와 같이 그라우팅을 실시할 때 그라우팅액이 식생공간부내로 침투되는 것을 방지하기 위함인 것 이외에, 지반에 파일을 설치하기 위하여 케이싱을 설치할 때 이미 설치된 파일의 측면에 밀착되게 설치가 가능하게 하기 위함인 것이다.The ecological grooves are installed on both sides of the concrete pile, but the reason why the cutting part is formed by cutting a part of the left and right round parts of the ecological groove on one side is that the grouting liquid penetrates into the vegetation space part when grouting as described above. In addition to the purpose of preventing the damage, when installing the casing to install the file on the ground is to enable the installation to be in close contact with the side of the already installed file.

그 이유는 도 10과 도 11에서보는바와 같이, 파일의 절삭부면에 밀착되어 케이싱이 설치되는 것을 볼 수 있다. 이는 만약 라운드부가 설치되어 있다면, 인접한 파일의 라운드부에 접하게 케이싱을 설치하더라도 일정한 간격을 둘 수 밖에 없는데, 반대로 절삭부를 설치하면서 상기 절삭부에 바로 케이싱의 측면을 접하게 설치할 수 있기 때문에 보다 밀착되게 인접하여 설치된 파일의 측면에 설치할 수 있기 때문이다.The reason is that as shown in Figs. 10 and 11, it can be seen that the casing is in close contact with the cutting surface of the pile. If the round part is installed, even if the casing is installed in contact with the round part of the adjacent pile, there is only a certain interval. On the contrary, the side of the casing can be directly contacted to the cutting part while the cutting part is installed. Because it can be installed on the side of the installed file.

도 1은 본 발명의 식생옹벽을 전체적으로 보여주는 도면.1 is a view showing the vegetation retaining wall of the present invention as a whole.

도 2는 본 발명의 PC콘크리트 파일을 전체적으로 보여주는 도면.Figure 2 is a view showing the PC concrete file of the present invention as a whole.

도 3(a)(b)는 본 발명의 콘크리트 파일 중에서 원심력 파일을 보여주는 도면.Figure 3 (a) (b) is a view showing a centrifugal force pile of the concrete pile of the present invention.

도 4는 본 발명의 콘크리트 파일 중에서 철근콘크리트 파일을 보여주는 도면.Figure 4 is a view showing a reinforced concrete file of the concrete pile of the present invention.

도 5는 본 발명의 콘크리트 파일 중에서 PC 파일을 보여주는 도면.5 is a view showing a PC file of the concrete file of the present invention.

도 6는 본 발명의 콘크리트 파일 중에서 합성파일을 보여주는 도면.6 is a view showing a composite file of the concrete file of the present invention.

도 7(a)(b)는 본 발명의 콘크리트 파일의 양측면에 설치된 생태홈에 의하여 형성된 식생공간부의 형태를 보여주는 도면.Figure 7 (a) (b) is a view showing the shape of the vegetation space formed by the ecological groove installed on both sides of the concrete pile of the present invention.

도 8은 본 발명의 식생틀을 보여주는 도면.8 is a view showing the vegetation framework of the present invention.

도 9(a)(b)는 본 발명의 끼움재를 보여주는 도면.Figure 9 (a) (b) is a view showing the fitting material of the present invention.

도 10(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)는 본 발명의 식생옹벽을 단계적으로 설치하는 시공방법을 보여주는 도면.(A) (b) (c) (d) (e) (f) (g) (h) (i) (j) is a view showing a construction method for installing the vegetation retaining wall of the present invention in stages.

도 11은 본 발명의 식생옹벽을 설치할 때 배면의 토사를 성토하는 경우에 설치하는 식생옹벽을 보여주는 도면.11 is a view showing the vegetation retaining wall to be installed in the case of laying the soil of the back when installing the vegetation retaining wall of the present invention.

도 12는 본 발명의 식생옹벽의 배면에 식생용홈에 직접 그라우팅을 하는 경우 그라우팅액이 식생공간부내로 투입되지 않는 식생용홈의 구조를 보여주는 도면.12 is a view showing the structure of the vegetation groove is not added to the vegetation space when grouting the vegetation groove on the back of the vegetation retaining wall of the present invention.

<도면의 주요부분에 대한 설명><Description of main parts of drawing>

10 ; 식생옹벽 11 ; 배면토10; Vegetation retaining wall 11; Cotton soil

12 ; 전면지반 13 ; 전면부 12; Front ground 13; Front

14 ; 상치콘크리트 15 ; 식생부 14; Upper concrete 15; Vegetation

16 ; 식생 17 ; 식생용홈16; Vegetation 17; Vegetation Home

18 ; 식생공간부 18; Vegetation space department

20 ; 콘크리트 파일 21 ; 생태홈 20; Concrete pile 21; Eco home

22 ; 콘크리트 23 ; 강선22; Concrete 23; Liner

24 ; 철근 25 ; 몸체24; Rebar 25; Body

30 ; 식생틀 31 ; 망체30; Vegetation framework 31; Manche

32 ; 식생토 33 ; 종자32; Vegetation soil 33; strain

40 ; 끼움재 41 ; 모서리부40; Fitting material 41; Corner

42 ; L형강 43 ; 지압판42; L-shaped steel 43; Acupressure plate

44 ; 선단부44; Tip

50 ; 케이싱 51 ; 수직강재50; Casing 51; Vertical steel

52 ; 연결재 53 ; 그라우팅52; Connecting member 53; Grouting

54 ; 잡석층 55 ; 자갈층54; Rubble layer 55; Gravel layer

56 ; 투수유도자갈매트 56; Pitcher Juggernaut Mat

58 ; 필터매트 59 ; 토사58; Filter mat 59; Tosa

60 ; 배면성토부 61 ; 그라우팅원중심60; Rear soil layer 61; Grouting Center

62 ; 그라우팅반경 63 ; 라운드부62; Grouting radius 63; Round part

64 ; 절삭부 64; Cutting

65 ; 그라우팅반경 보다 먼 길이65; Longer distance than grouting radius

66 ; 그라우팅편심중심 66; Grouting Eccentric

Claims (43)

지반에 연이어서 설치되는 콘크리트파일(20)과, 상기 콘크리트파일의 양측면에 설치된 생태홈(21)이 마주보고 설치되어 형성되는 식생공간부(18)와, 상기 식생공간부내에 삽입된 식생틀(30)과, 상기 콘크리트파일(20)이 접하여 설치될때 형성되는 식생용홈(17)과, 상기 연이어서 설치되는 콘크리트파일(20)의 상부에 설치되는 상치콘크리트(14)에 설치된 식생부(15)와, 상기 연이어서 설치되는 콘크리트파일(20)의 배면토(11)의 상부에 설치된 잡석(54)과, 상기 잡석(54) 하부에 상기 파일(20)의 식생용홈(17)에 간격마감재(70)를 설치하되, 전면지반(12) 하부의 식생용홈(17)까지 설치한 식생옹벽(10)인 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽.The concrete pile 20 which is installed in succession to the ground, the vegetation space portion 18 is formed by facing the ecological grooves 21 provided on both sides of the concrete pile, and the vegetation frame inserted into the vegetation space portion ( 30), the vegetation groove (17) formed when the concrete pile 20 is in contact with the installation, and the vegetation portion (15) installed on the upper concrete 14 is installed on the concrete pile (20) that is subsequently installed And, the rubble 54 is installed in the upper portion of the back soil 11 of the concrete pile 20 to be installed in succession, the gap closure material in the vegetation groove 17 of the pile 20 in the lower rubble 54 ( 70) is installed, but the vegetation retaining wall using the vegetation space portion installed by the subsequent installation of the concrete pile characterized in that the vegetation retaining wall 10 is installed to the vegetation groove (17) in the lower front ground (12). 지반에 연이어서 설치되는 콘크리트파일(20)과, 상기 콘크리트파일의 양측면에 설치된 생태홈(21)이 마주보고 설치되어 형성되는 식생공간부(18)와, 상기 식생공간부내에 삽입된 식생틀(30)과, 상기 콘크리트파일(20)이 접하여 설치될때 형성되는 식생용홈(17)과, 상기 파일(20)의 식생용홈(17)에 설치된 간격마감재(70)와, 상기 연이어서 설치되는 콘크리트파일(20)의 상부에 설치되는 상치콘크리트(14)에 설치된 식생부(15)와, 상기 연이어서 설치되는 콘크리트파일(20)의 전면지반(12)까지 상기 파일의 배면에 잡석층(54)을 설치하고, 상기 파일의 배면에 성토되는 성토면과 접하는 상기 잡석층(54)면에 필터매트(58)를 설치한 후에 성토를 하여 배면성 토부(57)를 설치하여 식생옹벽(10)을 설치한 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽.The concrete pile 20 which is installed in succession to the ground, the vegetation space portion 18 is formed by facing the ecological grooves 21 provided on both sides of the concrete pile, and the vegetation frame inserted into the vegetation space portion ( 30), the vegetation groove 17 formed when the concrete pile 20 is in contact with the installation, the gap finishing material 70 is installed in the vegetation groove 17 of the pile 20, and the concrete pile is installed subsequently Rubble layer 54 on the back of the pile up to the vegetation portion 15 provided on the upper concrete 14, which is installed on the upper portion of the 20, and the front ground 12 of the concrete pile 20 that is subsequently installed After installing the filter mat (58) on the surface of the rubble layer (54) in contact with the fill surface of the pile on the back of the pile, and then the back soil (57) is installed by installing the vegetation retaining wall (10) Plant vegetation installed by subsequent installation of concrete piles characterized by one Vegetation retaining wall using cadre. 제 1항 또는 제2항에 있어서The method according to claim 1 or 2 상기 콘크리트 파일(20)은 일정길이를 갖도록 강선(23)과 철근(24)을 이용하여 직육면체 또는 원형 또는 정육면체로 설치하고, 콘크리트(22)를 타설양생하여 몸체(25)를 형성하고, 상기 몸체(25)의 양측면에 생태홈(21)이 설치되도록 하면서, 일측면에 설치된 생태홈(21)의 좌우에 라운드부(63)를 설치하되, 배면부에 접하게 설치된 라운드부의 일부에는 절삭부(64)를 설치한 PC콘크리트파일(20)인 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽.The concrete pile 20 is installed in a rectangular parallelepiped or circular or cube using a steel wire 23 and the reinforcement 24 to have a predetermined length, and cast the concrete 22 to form a body 25, the body While the ecological groove 21 is installed on both sides of the 25, round parts 63 are installed on the left and right sides of the ecological groove 21 installed on one side, and the cutting part 64 is disposed on a part of the round part that is in contact with the rear part. The vegetation retaining wall using the vegetation space portion installed by the subsequent installation of the concrete pile characterized in that the concrete concrete pile 20 is installed. 제3항에 있어서The method of claim 3, 상기 생태홈(21)의 형상은 반원형 또는 반타원형 또는 시옷자형 또는 디귿자형중에서 어느 한가지 인 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽.The ecological groove 21 is a vegetation retaining wall using a vegetation space portion installed by successive installation of a concrete pile, characterized in that any one of a semi-circle or semi-ellipse or sigot-shaped or Di-shaped. 제3항에 있어서The method of claim 3, 상기 콘크리트 파일(20)은 원심력을 이용하여 제작한 원심력 파일인 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식 생옹벽.The concrete pile 20 is a food retaining wall using the vegetation space portion installed by the subsequent installation of the concrete pile, characterized in that the centrifugal force produced by using the centrifugal force. 제3항에 있어서The method of claim 3, 상기 콘크리트 파일(20)은 철근(24)과 콘크리트를 이용하여 제작한 철근콘크리트 파일인 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽.The concrete pile 20 is a vegetation retaining wall using the vegetation space portion installed by the subsequent installation of the concrete pile characterized in that the reinforced concrete pile produced using the reinforcement 24 and concrete. 제3항에 있어서The method of claim 3, 상기 콘크리트파일(20)은 프리스트레스를 도입한 PC파일인 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽.The concrete pile 20 is a vegetation retaining wall using the vegetation space portion installed by successive installation of the concrete pile characterized in that the PC pile introduced pre-stress. 제3항에 있어서The method of claim 3, 상기 콘크리트파일(20)은 H형강을 이용하여 제작하되, 프리플렉션이 도입된 합성파일인 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽.The concrete pile 20 is produced using H-shaped steel, the vegetation retaining wall using the vegetation space portion installed by the subsequent installation of the concrete pile characterized in that the pre-introduced synthetic pile. 제1항 또는 제2항에 있어서The method according to claim 1 or 2 상기 식생공간부(18)의 형상은 다이아몬드형 또는 사각형 또는 원형 또는 타원형중의 어느 한가지인 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽. The vegetation space portion 18 is a vegetation retaining wall using the vegetation space portion installed by the successive installation of a concrete pile characterized in that any one of diamond or square or circular or oval. 제1항 또는 제2항에 있어서The method according to claim 1 or 2 상기 식생틀(30)은 1 ~ 2m 의 길이로서, 망체(31)내의 하부에 자갈층을 설치하고, 내부의 일측면에 투수유도자갈매트를 길이방향으로 설치하고, 식생에 필요한 식생토(32)를 담되, 상기 식생토(32)내에 종자(33)를 포함시키도록 한 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽.The vegetation framework 30 is a length of 1 ~ 2m, a gravel layer is installed in the lower portion of the net body 31, a pitcher guide galvanic mat is installed on one side of the inside in the longitudinal direction, the vegetation soil 32 required for vegetation But, vegetation retaining wall using the vegetation space portion installed by the subsequent installation of the concrete pile characterized in that the seed 33 in the vegetation soil (32). 제1항 또는 제2항에 있어서The method according to claim 1 or 2 상기 식생용홈(17)은 파일이 상호 접하여 설치될때 발생되는 간격으로, 간격의 범위는 3 ~ 7cm인 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽.The vegetation groove 17 is a vegetation retaining wall using the vegetation space portion installed by the successive installation of the concrete pile, characterized in that the interval is generated when the pile is in contact with each other, the range of the interval is 3 ~ 7cm. 제1항 또는 제2항에 있어서The method according to claim 1 or 2 상기 간격마감재(70)는 끼움재 또는 그라우팅 또는 끼움재와 그라우팅을 동시에 한 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽.The gap finishing material 70 is a vegetation retaining wall using the vegetation space portion installed by the subsequent installation of the concrete pile, characterized in that the fitting material or grouting or the fitting material and grouting at the same time. 제12항에 있어서The method of claim 12, 상기 끼움재(40)는 L형강(42) 또는 원형의 강관(41)으로서, 상기 끼움재(40) 의 단부는 쐐기형태로 절단하여 선단부를 설치하고, 상기 선단부의 쐐기형상의 단면에 철판인 지압판(43)을 용접으로 부착한 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽.The fitting material 40 is an L-shaped steel 42 or a circular steel pipe 41, the end of the fitting material 40 is cut into a wedge shape to install the tip portion, the end portion of the wedge-shaped cross section of the iron plate Vegetation retaining wall using the vegetation space portion installed by successive installation of the concrete pile characterized in that the acupressure plate 43 is attached by welding. 제12항에 있어서The method of claim 12, 상기 끼움재(40)의 재질은 강성이 있는 프라스틱으로서, L형 또는 원형관으로 제작한 것의 단부를 쐐기형태의 선단부로 설치하고, 상기 쐐기형태의 선단부에 지압판(43)을 부착설치한 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽.The material of the fitting member 40 is a rigid plastic, and the end of the L-shaped or circular tube is installed at the tip of the wedge shape, and the pressure plate 43 is attached to the tip of the wedge shape. Vegetation retaining wall using the vegetation space portion installed by successive installation of concrete piles. 제12항에 있어서The method of claim 12, 상기 식생용홈(17)에 간격마감재로 직접 그라우팅을 하는 경우에, 파일(20)의 일측면에 설치된 생태홈(21)의 좌우에 라운드부(63)가 설치되고, 상기 설치된 생태홈(21)의 반대편에 식생용홈(17)인 간격을 두고 설치된 다른 파일(20)의 생태홈(21)의 좌우에 형성된 라운드부(63)에서 배면부(11)에 접하게 설치되는 라운드부(63)의 일정부분을 점선과 같이 절삭한 절삭부(64)를 형성하여 인접한 라운드부(63)의 곡면과 절삭부(64)의 곡면이 평행을 이루도록 한 구조인 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽.In the case of grouting directly to the vegetation groove 17 as a gap closing material, round portions 63 are installed at left and right sides of the ecological groove 21 installed on one side of the pile 20, and the installed ecological groove 21 is provided. Part of the round portion 63 is installed in contact with the rear portion 11 in the round portion 63 formed on the left and right of the ecological groove 21 of the other pile 20 installed at intervals that are the vegetation groove 17 on the other side of the Vegetation installed by successive installation of concrete piles, characterized in that the cutting portion 64 is cut as shown by the dotted line so that the curved surface of the adjacent round portion 63 and the curved surface of the cutting portion 64 parallel to each other Vegetation retaining wall using space part. 제1항 또는 제2항에 있어서The method according to claim 1 or 2 상기 상치콘크리트(14)는 파일(20)의 상부에 설치된 수직강재(51)를 상호 연결한 연결재(52)를 포함하여 콘크리트로 설치하되, 파일(20)이 설치된 종방향으로 중앙에는 일정한 면적의 식생부(15)를 설치하되, 상기 식생부의 내부는 식생공간부(18)와 통하도록 한 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽.The concrete concrete 14 is installed in concrete, including the connecting material 52 interconnecting the vertical steel 51 installed on the upper portion of the pile 20, but the pile 20 is installed in the longitudinal direction in the center of a constant area The vegetation part 15 is installed, but the vegetation retaining wall using the vegetation space part installed by successive installation of a concrete pile characterized in that the inside of the vegetation part is in communication with the vegetation space part 18. 제16항에 있어서The method of claim 16 상기 식생부는 맨 위에 토사를 채우고, 상기 토사 아래에는 필터매트(58)를 설치하고, 상기 필터매트(58) 하부에는 자갈층(55)을 설치하되, 상기 자갈층은 식생공간부(18)내에 설치된 식생틀(30)과 통하도록 설치한 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽.The vegetation portion fills the top and bottom, the filter mat 58 is installed below the soil, and the gravel layer 55 is installed below the filter mat 58, the gravel layer is a vegetation installed in the vegetation space 18 Vegetation retaining wall using the vegetation space portion installed by successive installation of the concrete pile characterized by being installed to communicate with the frame (30). 제16항에 있어서The method of claim 16 상기 연결재는 다수개의 철근을 다발로 묶어 전단뿌리로 만든 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽.The connecting member is a vegetation retaining wall using a vegetation space portion installed by successive installation of a concrete pile characterized in that the bundle of a plurality of reinforcing bundles made of shear roots. 제1항 또는 제2항에 있어서The method according to claim 1 or 2 상기 식생공간부내에 식생틀이 설치된 구조는 상기 식생공간부(18)내에 설치되는 식생틀의 내부에서 길이방향으로 일정범위에 설치된 투수유도자갈매트(56)는 배면토(11)의 잡석층(54)과 접하도록 설치하면서, 상기 식생공간부(18)내에 다수개 식생틀(30)을 적층하여 자갈층(55)이 자연스럽게 반복적으로 설치되도록 하면서, 동시에 상기 투수유도자갈매트(56)도 상기 자갈층(55)과 상호 연통되도록 하고, 상기 상치콘크리트(14)의 식생부(15)에 설치한 자갈층(55)은 식생틀(30)의 상부에 까지 연통되도록 설치한 구조인 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽.The vegetation framework is installed in the vegetation space portion is a permeation guide galvan mat (56) installed in a predetermined range in the longitudinal direction in the vegetation framework is installed in the vegetation space 18, the rubble layer (11) 54) while being installed in contact with the vegetation space part 18, a plurality of vegetation framework 30 is laminated so that the gravel layer 55 is repeatedly installed naturally, and at the same time the pitcher guide galvan mat (56) also the gravel layer To communicate with each other 55, the gravel layer 55 installed in the vegetation portion 15 of the upper concrete 14 is a concrete pile characterized in that the structure is installed so as to communicate to the upper portion of the vegetation framework 30 Vegetation retaining wall using the vegetation space portion installed by successive installation of. 제1항 또는 제2항에 있어서The method according to claim 1 or 2 상기 식생용홈(17)의 구조는 파일의 일측면에 설치된 생태홈의 좌우에 설치된 라운드부(63)를 그대로 설치하고, 인접하여 설치되는 다른 파일의 일측면에 설치된 생태홈의 좌우의 라운드부중에서 배면(11)에 접하는 라운드부(63)는 식생공간부측으로 절삭부(64)를 설치한 구조로 이루어진 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽.The vegetation groove 17 has a round portion 63 installed on the left and right sides of the ecological groove installed on one side of the pile as it is, and among the left and right round portions of the ecological groove installed on one side of the other pile installed adjacently. The round portion 63 in contact with the rear surface 11 is a vegetation retaining wall using the vegetation space portion installed by successive installation of the concrete pile, characterized in that the cutting portion 64 is formed in the vegetation space portion side. 제1항 또는 제2항에 있어서The method according to claim 1 or 2 상기 식생용홈의 구조는 생태홈(21)의 좌우에 라운드부(63)를 그대로 설치하고, 인접하여 설치되는 파일의 생태홈(21)의 좌우의 라운드부(63)도 절삭부(64)를 두지 않은 구조로 설치된 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽.The vegetation groove has a round portion 63 on the left and right sides of the ecological groove 21 as it is, and the left and right round portions 63 of the ecological groove 21 of the pile to be installed adjacently also have the cutting portion 64. Vegetation retaining wall using the vegetation space part installed by successive installation of concrete piles characterized by being installed in a structure not placed. 제1항 또는 제2항에 있어서The method according to claim 1 or 2 또는, 상기 파일(20)의 일측면에 설치된 생태홈(21)의 좌우에 설치된 라운드부(63)에 절삭부(64)를 설치하고, 인접하여 설치되는 파일(20)의 일측면에 설치된 생태홈(21)의 좌우에 설치된 라운드부(63)에도 절삭부(64)가 설치된 구조인 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽.Alternatively, the cutting unit 64 is installed in the round portion 63 provided on the left and right sides of the ecological groove 21 installed on one side of the pile 20, and the ecology installed on one side of the pile 20 adjacently installed. Vegetation retaining wall using the vegetation space portion installed by the subsequent installation of the concrete pile, characterized in that the cutting portion 64 is also provided in the round portion 63 provided on the left and right of the groove 21. 도 (a)단계는 옹벽을 설치하고자 하는 지반에 내부가 빈 케이싱(50)을 타입하고 케이싱(50) 내부의 토사를 제거하여 케이싱 내부를 빈 상태로 하고, Step (a) is to form a casing (50) inside the ground on which you want to install the retaining wall and to remove the soil inside the casing (50) to make the inside of the casing empty, 도 (b)단계는 상기 케이싱(50)의 내부에 콘크리트파일(20)을 삽입하고, 케이싱(50)을 인발하여 제거하고,Step (b) is to insert the concrete pile 20 in the casing 50, the casing 50 is removed by removing, 도 (c)단계는 상기 도 (a)(b)단계를 반복적으로 하여 원하는 폭으로 콘크리트파일(20)을 다수개 설치하고,Step (c) is to install a plurality of concrete piles 20 to a desired width by repeating the steps (a) (b), 도 (d)단계는 상기 다수개 연이어서 설치된 콘크리트파일(20)의 상부에 수직강재(51)를 설치하고, 상기 수직강재(51)를 관통하여 연결재(52)를 설치하여 파일(20)을 상호 연결하여 설치된 파일이 일체화하도록 하고,In the step (d), the vertical steel 51 is installed on the plurality of consecutively installed concrete piles 20, and the connection member 52 is installed through the vertical steels 51 to install the piles 20. To interconnect and ensure that the installed files are integrated, 도 (e), (f), (g), (h)단계는 지반에 다수개 연이어서 설치한 콘크리트파일(20)과의 사이에 식생용홈(17)이 형성되며, 동시에 상기 파일(20)의 측면에 형성된 생태홈(21)에 의하여 형성된 식생공간부(18)를 설치하고, 상기 식생공간부(18)내에, 식생틀의 내부의 일부분에 길이방향으로 설치된 투수유도자갈매트(56)는 배 면토(11)의 잡석층(54)과 접하도록 설치하면서, 식생공간내에 다수개 식생틀(30)은 적층하여 자갈층(55)이 자연스럽게 반복적으로 설치되도록 하고,Figures (e), (f), (g), (h) step is a vegetation groove 17 is formed between the concrete pile 20 installed in succession on the ground, at the same time the pile 20 The vegetation space portion 18 formed by the ecological groove 21 formed on the side of the, and in the vegetation space portion 18, the pitcher guide galvan mat 56 is installed in the longitudinal direction in a portion of the inside of the vegetation frame is While installing so as to contact the rubble layer 54 of the backing soil 11, a plurality of vegetation framework 30 is laminated in the vegetation space so that the gravel layer 55 is naturally installed repeatedly, 상기 식생용홈(17)에 간격마감재(70)인 끼움재(40)를 타입설치하거나 상기 식생용홈(17)에 간격마감재(70)인 그라우팅(57)을 실시한 것이거나, 끼움재와 그라우팅을 동시에 실시하되,The vegetation groove 17 is provided with a type of fitting material 40, which is a gap finishing material 70, or a grouting 57, which is a gap finishing material 70, in the vegetation groove 17, or the fitting material and grouting at the same time. Do it, 상기 식생용홈(17)에 간격마감재(70)의 설치는 전면지반(12) 하부에 설치된 식생용홈(17)의 0.5 ~ 1m까지의 하부에까지 설치하고,Installation of the gap closing material 70 in the vegetation groove 17 is installed in the lower portion of the vegetation groove 17 installed in the lower portion of the front ground 12 to 0.5 ~ 1m, 또한, 상기 설치된 콘크리트파일(20)의 전면부(13)의 토사를 굴착하여 전면부의 옹벽(10)이 외부로 노출되도록 하고, In addition, the earth and sand of the front portion 13 of the installed concrete pile 20 is excavated so that the retaining wall 10 of the front portion is exposed to the outside, 상기 설치된 파일(20)의 상부에서 연결재(52)로 상호 연결한 부분을 포함하여 상치콘크리트(14)를 설치하고, Install the upper concrete 14, including the portion interconnected with the connecting member 52 from the upper portion of the installed pile 20, 도 (i) 단계는 상기 상치콘크리트(14)의 식생부(15)에 설치한 자갈층은 식생틀의 상부에 까지 연통되도록 설치하고, 상기 식생부(15)의 자갈층(55) 위에 필터매트(58)를 설치하고 상기 필터매트(58) 위에 토사(59)를 채우고,In step (i), the gravel layer installed on the vegetation part 15 of the upper concrete 14 is installed to communicate with the upper part of the vegetation frame, and the filter mat 58 on the gravel layer 55 of the vegetation part 15. ) And fill the earth and sand (59) on the filter mat (58), 도 (j)단계는 상기 설치된 식생옹벽(10)의 식생부(15)에 관목등과 같은 식생(16)을 식재하고, 상기 식생용홈(17)에는 상기 식생틀(30)에 포함된 종자(33)로부터 발아된 식생(16)이 활착되어 식생옹벽(10)의 측면에 활착된 상태를 보여주도록 하는 단계를 거쳐 설치한 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽의 시공방법.(J) step is planting the vegetation 16, such as shrubs in the vegetation portion 15 of the installed vegetation retaining wall 10, the vegetation grooves 17 in the seed (included in the vegetation framework 30) The vegetation retaining wall using the vegetation space part installed by the subsequent installation of the concrete pile characterized in that installed through the step to show the state that is attached to the side of the vegetation retaining wall 10 is attached to the vegetation 16 germinated from 33). Construction method. 옹벽을 설치하고자 하는 지반에 내부가 빈 케이싱(50)을 타입하고 케이싱 내부의 토사를 제거하여 케이싱 내부를 빈 상태로 하는 단계;Type an empty casing 50 in the ground to which the retaining wall is to be installed, and remove the earth and sand inside the casing to make the casing empty; 상기 케이싱(50)의 내부에 콘크리트파일(20)을 삽입하고, 케이싱(50)을 인발하여 제거하는 단계;Inserting the concrete pile 20 into the casing 50 and drawing and removing the casing 50; 상기 케이싱(50)설치 및 케이싱내부에 파일(20)을 삽입하고 케이싱을 인발하는 단계를 반복적으로 하여 원하는 폭으로 콘크리트파일(20)을 설치하는 단계;Installing the casing 50 and inserting the pile 20 into the casing and drawing the casing repeatedly to install the concrete pile 20 to a desired width; 상기 다수개 연이어서 설치된 콘크리트파일(20)의 상부에 수직강재(51)를 설치하고, 상기 수직강재(51)를 관통하여 연결재(52)를 설치하여 파일을 상호 연결하여 연결된 파일이 일체화되도록 하는 단계;The vertical steel 51 is installed on the plurality of consecutively installed concrete piles 20, and the connecting members 52 are installed through the vertical steel 51 to interconnect the piles so that the connected piles are integrated. step; 지반에 다수개 연이어서 설치한 콘크리트파일(20)과의 사이에 식생용홈(17)이 형성되며, 동시에 상기 파일(20)의 측면에 형성된 생태홈(21)에 의하여 형성된 식생공간부(18)를 설치하고, 상기 식생공간부(18)내에, 식생틀의 내부의 일부분에 길이방향으로 설치된 투수유도자갈매트(56)는 배면토(11)의 잡석층(54)과 접하도록 설치하면서, 식생공간내에 다수개 식생틀(30)은 적층하여 자갈층(55)이 자연스럽게 반복적으로 설치되도록 하고,Vegetation groove 17 is formed between the concrete pile 20 installed in succession on the ground, and at the same time the vegetation space portion 18 formed by the ecological groove 21 formed on the side of the pile 20 And, in the vegetation space portion 18, the permeation guide galvan mat 56 installed in the longitudinal direction in a portion of the inside of the vegetation frame is installed so as to contact the rubble layer 54 of the rear soil 11, A plurality of vegetation framework 30 in the space is laminated so that the gravel layer 55 is naturally installed repeatedly, 상기 식생용홈(17)에 간격마감재(70)인 끼움재(40)를 타입설치하거나 상기 식생용홈(17)에 간격마감재(70)인 그라우팅(57)을 실시한 것이거나, 끼움재와 그라우팅을 동시에 실시하는 단계;The vegetation groove 17 is provided with a type of fitting material 40, which is a gap finishing material 70, or a grouting 57, which is a gap finishing material 70, in the vegetation groove 17, or the fitting material and grouting at the same time. Performing; 상기 설치된 파일(20)의 상부에서 연결재(52)로 상호 연결한 부분을 포함하여 상치콘크리트(14)를 설치하는 단계; Installing the upper concrete 14 including a portion interconnected by a connecting member 52 from an upper portion of the installed pile 20; 상기 상치콘크리트(14)의 식생부(15)에 설치한 자갈층은 식생틀의 상부에 까지 연통되도록 설치하고, 상기 식생부(15)의 자갈층(55) 위에 필터매트(58)를 설치하고 상기 필터매트(58) 위에 토사(59)를 채우고,The gravel layer installed on the vegetation part 15 of the upper concrete 14 is installed to communicate with the upper part of the vegetation frame, and the filter mat 58 is installed on the gravel layer 55 of the vegetation part 15 and the filter Fill the soil (59) on the mat (58), 상기 연이어서 설치되는 콘크리트파일(20)의 전면지반(12)까지 상기 파일(20)의 배면에 잡석층(54)을 설치하고, 상기 잡석층(54)과 상기 파일(20)의 배면에 성토되는 배면성토부(60)와 접하는 잡석층(54)면에 필터매트(58)를 설치한 후에 성토하여 배면성토부(57)를 설치한 식생옹벽(10)을 설치하는 단계; The rubble layer 54 is installed on the rear surface of the pile 20 to the front ground 12 of the concrete pile 20 which is subsequently installed, and the rubble is deposited on the rear surface of the rubble layer 54 and the pile 20. Installing the vegetation retaining wall 10 having the backfilled soil portion 57 installed after the filter mat 58 is installed on the surface of the rubble layer 54 which is in contact with the backside soil portion 60 being formed; 상기 설치된 식생옹벽(10)의 식생부(15)에 관목등과 같은 식생(16)을 식재하고, 상기 식생용홈(17)에는 상기 식생틀(30)에 포함된 종자(33)로부터 발아된 식생(16)이 활착되어 식생옹벽(10)의 측면에 활착된 상태를 이루도록 하는 단계를 거쳐 설치하는 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽의 시공방법.The vegetation 16, such as a shrub, is planted in the vegetation portion 15 of the installed vegetation retaining wall 10, and the vegetation germinated from the seeds 33 included in the vegetation framework 30 in the vegetation groove 17 The construction method of the vegetation retaining wall using the vegetation space portion installed by successive installation of the concrete pile characterized in that the installation through the step of making the (16) to stick to the side of the vegetation retaining wall (10). 제23항 또는 제24항에 있어서The method according to claim 23 or 24. 상기 식생틀(30)과 식생부(15)사이에 설치된 자갈층(55)과 식생틀(30)과 식생틀(30)사이에 설치된 자갈층(55)은 식생공간부(18)내의 배면토(11)와 접하는 부분에 설치된 투수유도자갈매트(56)와 상호 연결되도록 한 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽의 시공방법. The gravel layer 55 installed between the vegetation framework 30 and the vegetation section 15 and the gravel layer 55 installed between the vegetation framework 30 and the vegetation framework 30 are the back soil 11 in the vegetation space section 18. The method of constructing the vegetation retaining wall using the vegetation space portion installed by successive installation of the concrete pile characterized in that the interconnection with the pitcher guide galvan mat (56) installed in the contact portion. 제23항 또는 제24항에 있어서The method according to claim 23 or 24. 상기 콘크리트 파일(20)은 일정길이를 갖도록 강선(23)과 철근(24)을 이용하여 직육면체 또는 원형 또는 정육면체로 설치하고, 콘크리트(22)를 타설양생하여 몸체(25)를 형성하고, 상기 몸체(25)의 양측면에 생태홈(21)이 설치되도록 하면서, 일측면에 설치된 생태홈(21)의 좌우에 라운드부(63)를 설치하되, 배면부에 접하게 설치된 라운드부의 일부에는 절삭부(64)를 설치한 PC콘크리트파일(20)인 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽의 시공방법.The concrete pile 20 is installed in a rectangular parallelepiped or circular or cube using a steel wire 23 and the reinforcement 24 to have a predetermined length, and cast the concrete 22 to form a body 25, the body While the ecological groove 21 is installed on both sides of the 25, round parts 63 are installed on the left and right sides of the ecological groove 21 installed on one side, and the cutting part 64 is disposed on a part of the round part that is in contact with the rear part. The construction method of the vegetation retaining wall using the vegetation space portion installed by the subsequent installation of the concrete pile characterized in that the PC concrete pile (20) installed. 제26항에 있어서The method of claim 26 상기 생태홈(21)의 형상은 반원형 또는 반타원형 또는 시옷자형 또는 디귿자형중에서 어느 한가지 인 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽의 시공방법.The ecological groove 21 is a semi-circular or semi-elliptic or sikimyeo or dimple shape of the vegetation retaining wall using a vegetation space portion installed by the subsequent installation of a concrete pile characterized in that. 제26항에 있어서The method of claim 26 상기 콘크리트 파일(20)은 원심력을 이용하여 제작한 원심력 파일인 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽의 시공방법.The concrete pile 20 is a method of constructing a vegetation retaining wall using the vegetation space portion installed by the subsequent installation of the concrete pile characterized in that the centrifugal force file produced using a centrifugal force. 제26항에 있어서The method of claim 26 상기 콘크리트 파일(20)은 철근(24)과 콘크리트를 이용하여 제작한 철근콘크리트 파일인 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽의 시공방법.The concrete pile 20 is a method of constructing a vegetation retaining wall using the vegetation space portion installed by the subsequent installation of the concrete pile characterized in that the reinforced concrete pile made using the reinforcement 24 and concrete. 제26항에 있어서The method of claim 26 상기 콘크리트파일(20)은 프리스트레스를 도입한 PC파일인 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽의 시공방법.The concrete pile 20 is a construction method of the vegetation retaining wall using the vegetation space portion installed by the subsequent installation of the concrete pile characterized in that the PC pile introduced pre-stress. 제26항에 있어서The method of claim 26 상기 콘크리트파일(20)은 H형강을 이용하여 제작하되, 프리플렉션이 도입된 합성파일인 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽의 시공방법.The concrete pile 20 is manufactured by using the H-shaped steel, the construction method of the vegetation retaining wall using the vegetation space portion installed by the subsequent installation of the concrete pile characterized in that the pre-introduced synthetic pile. 제23항 또는 제24항에 있어서The method according to claim 23 or 24. 상기 식생공간부의 형상은 다이아몬드형 또는 사각형 또는 원형 또는 타원형중의 어느 한가지인 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽의 시공방법.The vegetation space portion is a shape of the vegetation retaining wall using the vegetation space portion installed by successive installation of a concrete pile characterized in that any one of diamond or square or circular or oval. 제23항 또는 제24항에 있어서The method according to claim 23 or 24. 상기 식생틀(30)은 1 ~ 2m 의 길이로서, 망체(31)내에 식생에 필요한 식생토(32)를 담되, 상기 식생토(32)내에 종자(33)를 포함시키도록 한 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽의 시공방법.The vegetation framework 30 has a length of 1 to 2m, and the vegetation soil 32 necessary for vegetation is contained in the net body 31, and the seed 33 is included in the vegetation soil 32. Construction method of vegetation retaining wall using vegetation space part installed by successive installation of concrete pile. 제23항 또는 제24항에 있어서The method according to claim 23 or 24. 상기 식생용홈(17)은 파일이 상호 접하여 설치될때 발생되는 간격으로, 간격의 범위는 2 ~ 3cm인 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽의 시공방법.The vegetation groove (17) is an interval generated when the piles are installed in contact with each other, the range of the interval is a construction method of the vegetation retaining wall using the vegetation space portion installed by successive installation of the concrete pile characterized in that the range. 제23항 또는 제24항에 있어서The method according to claim 23 or 24. 상기 간격마감재(70)는 끼움재 또는 그라우팅 또는 끼움재와 그라우팅을 동시에 한 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽의 시공방법.The gap finishing material 70 is a method of constructing a vegetation retaining wall using the vegetation space portion installed by the subsequent installation of the concrete pile, characterized in that the fitting material or grouting or the fitting material and grouting at the same time. 제35항에 있어서36. The method of claim 35 wherein 상기 끼움재(40)는 강재로서, L형강(42) 또는 원형의 강관(41)으로서, 상기 끼움재(40)의 단부는 쐐기형태로 절단하여 선단부를 설치하고, 상기 쐐기형상의 단면의 선단부에는 철판인 지압판(43)을 용접으로 부착한 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽의 시공방법.The fitting material 40 is a steel material, L-shaped steel 42 or a circular steel pipe 41, the end portion of the fitting material 40 is cut into a wedge shape to install the tip portion, the tip portion of the wedge-shaped cross section The construction method of the vegetation retaining wall using the vegetation space portion installed by the subsequent installation of the concrete pile, characterized in that the acupressure plate 43, which is an iron plate, by welding. 제35항에 있어서36. The method of claim 35 wherein 상기 끼움재(40)의 재질은 강성이 있는 프라스틱으로서, L형 또는 원형관으로 제작한 것의 단부를 쐐기형태로 절단하여 선단부를 설치하고, 상기 쐐기형태의 선단부에 지압판(43)을 부착설치한 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽의 시공방법.The material of the fitting member 40 is a plastic having rigidity, and the end portion of the L-shaped or circular tube is cut into a wedge shape to install a tip portion, and the pressure plate 43 is attached to the wedge-shaped tip portion. A method of constructing a vegetation retaining wall using a vegetation space part installed by successive installation of concrete piles characterized in that. 제23항 또는 제24항에 있어서The method according to claim 23 or 24. 상기 상치콘크리트(14)는 파일(20)의 상부에 설치된 수직강재(51)를 상호 연결한 연결재(52)를 포함하여 콘크리트로 설치하되, 파일(20)이 설치된 종방향으로 중앙에는 일정한 면적의 식생부(15)를 설치하되, 상기 식생부의 내부는 식생공간부(18)와 통하도록 한 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽의 시공방법.The concrete concrete 14 is installed in concrete, including the connecting material 52 interconnecting the vertical steel 51 installed on the upper portion of the pile 20, but the pile 20 is installed in the longitudinal direction in the center of a constant area Installing a vegetation part 15, wherein the inside of the vegetation part of the vegetation retaining wall construction method using the vegetation space part installed by the subsequent installation of the concrete pile characterized in that the communication with the vegetation space part (18). 제35항에 있어서36. The method of claim 35 wherein 상기 식생용홈(17)에 간격마감재로 직접 그라우팅을 하는 경우, 그라우팅편심 중심의 길이(L)는 그라우팅반경(r)보다 떨어진 범위에 설정하도록 하되, 그라우팅원중심(61)에서 편심(e)만큼 이격된 곳에 위치한 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽의 시공방법.In the case of grouting directly to the vegetation groove 17 as a gap finishing material, the length of the center of the grouting eccentricity (L) is to be set in a range away from the grouting radius (r), as much as the eccentricity (e) in the grouting center (61) A method of constructing a vegetation retaining wall using a vegetation space part installed by successive installation of concrete piles characterized by being located at a spaced place. 제23항 또는 제24항에 있어서The method according to claim 23 or 24. 상기 연결재는 다수개의 철근을 다발로 묶어 전단뿌리로 만든 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽의 시공방법.The connecting material is a method of constructing a vegetation retaining wall using the vegetation space portion installed by the successive installation of a concrete pile characterized in that the bundle of a plurality of reinforcing bar bundles made of shear roots. 제23항 또는 제24항에 있어서The method according to claim 23 or 24. 상기 식생용홈(17)의 구조는 파일의 일측면에 설치된 생태홈의 좌우에 설치된 라운드부(63)를 그대로 설치하고, 인접하여 설치되는 다른 파일의 일측면에 설치된 생태홈의 좌우의 라운드부중에서 배면(11)에 접하는 라운드부(63)는 식생공간부측으로 절삭부(64)를 설치한 구조로 이루어진 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽.The vegetation groove 17 has a round portion 63 installed on the left and right sides of the ecological groove installed on one side of the pile as it is, and among the left and right round portions of the ecological groove installed on one side of the other pile installed adjacently. The round portion 63 in contact with the rear surface 11 is a vegetation retaining wall using the vegetation space portion installed by successive installation of the concrete pile, characterized in that the cutting portion 64 is formed in the vegetation space portion side. 제23항 또는 제24항에 있어서The method according to claim 23 or 24. 상기 식생용홈의 구조는 생태홈(21)의 좌우에 라운드부(63)를 그대로 설치하고, 인접하여 설치되는 파일의 생태홈(21)의 좌우의 라운드부(63)도 절삭부(64)를 두지 않은 구조로 설치된 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽.The vegetation groove has a round portion 63 on the left and right sides of the ecological groove 21 as it is, and the left and right round portions 63 of the ecological groove 21 of the pile to be installed adjacently also have the cutting portion 64. Vegetation retaining wall using the vegetation space part installed by successive installation of concrete piles characterized by being installed in a structure not placed. 제23항 또는 제24항에 있어서The method according to claim 23 or 24. 또는, 상기 파일(20)의 일측면에 설치된 생태홈(21)의 좌우에 설치된 라운드 부(63)에 절삭부(64)를 설치하고, 인접하여 설치되는 파일(20)의 일측면에 설치된 생태홈(21)의 좌우에 설치된 라운드부(63)에도 절삭부(64)가 설치된 구조인 것에 특징이 있는 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽.Alternatively, the cutting unit 64 is installed in the round portion 63 provided on the left and right sides of the ecological groove 21 installed on one side of the pile 20, and the ecology installed on one side of the pile 20 adjacently installed. Vegetation retaining wall using the vegetation space portion installed by the subsequent installation of the concrete pile, characterized in that the cutting portion 64 is also provided in the round portion 63 provided on the left and right of the groove 21.
KR1020090104046A 2009-10-30 2009-10-30 Vegetation retaining wall using vegetation spaces formed by continuous connection of concrete piles and constructing method thereof KR101140725B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090104046A KR101140725B1 (en) 2009-10-30 2009-10-30 Vegetation retaining wall using vegetation spaces formed by continuous connection of concrete piles and constructing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090104046A KR101140725B1 (en) 2009-10-30 2009-10-30 Vegetation retaining wall using vegetation spaces formed by continuous connection of concrete piles and constructing method thereof

Publications (2)

Publication Number Publication Date
KR20110047424A true KR20110047424A (en) 2011-05-09
KR101140725B1 KR101140725B1 (en) 2012-05-15

Family

ID=44238730

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090104046A KR101140725B1 (en) 2009-10-30 2009-10-30 Vegetation retaining wall using vegetation spaces formed by continuous connection of concrete piles and constructing method thereof

Country Status (1)

Country Link
KR (1) KR101140725B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101382179B1 (en) * 2012-10-15 2014-04-07 주식회사 젬콘 Vegetation retaining wall and its construction method
CN106869080A (en) * 2015-12-14 2017-06-20 关隆股份有限公司 Dyke greening method and dyke
CN109930594A (en) * 2018-07-20 2019-06-25 嘉兴五丰生态环境科技有限公司 It is a kind of ecology stake and its composition integrated barricade
GB2571052A (en) * 2016-12-22 2019-08-21 Flora Fanatica Ltd Inhibiting plant growth

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101316721B1 (en) * 2012-12-31 2013-10-10 주식회사 성원안전 Terraced breast wall structure and construction method
CN103708777A (en) * 2013-12-08 2014-04-09 青岛润国生态科技工程有限公司 Ecological recovery method with combination application of vegetation concrete and high-molecular aggregates

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100217845B1 (en) * 1996-04-03 1999-09-01 최종환 Construction process of underground structure
JPH1096220A (en) * 1996-09-20 1998-04-14 Maruei Concrete Kogyo Kk Method for attaching plantation block to steel sheet pile for revetment
KR100584867B1 (en) * 2003-06-03 2006-06-07 (주)스틸엔콘크리트 Shear reinforcing member for improving adhesive power between concrete and steel beam in complexed structure composed of concrete and steel beam, and method for constructing complexed structure using the shear reinforcing member
KR100819453B1 (en) * 2006-12-28 2008-04-04 (주)스틸엔콘크리트 Method for manufacturing a prestressed concrete composition pile filled with a weight reducing material in concrete section

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101382179B1 (en) * 2012-10-15 2014-04-07 주식회사 젬콘 Vegetation retaining wall and its construction method
CN106869080A (en) * 2015-12-14 2017-06-20 关隆股份有限公司 Dyke greening method and dyke
GB2571052A (en) * 2016-12-22 2019-08-21 Flora Fanatica Ltd Inhibiting plant growth
CN109930594A (en) * 2018-07-20 2019-06-25 嘉兴五丰生态环境科技有限公司 It is a kind of ecology stake and its composition integrated barricade

Also Published As

Publication number Publication date
KR101140725B1 (en) 2012-05-15

Similar Documents

Publication Publication Date Title
KR100813236B1 (en) The structure for a slope reinforcement and eco slope reinforcement method
KR101140725B1 (en) Vegetation retaining wall using vegetation spaces formed by continuous connection of concrete piles and constructing method thereof
KR101162547B1 (en) Reinforcement mattress gabion for afforestation environment and construction method
CN117926849A (en) Construction method and application of high-strength gravity retaining wall
KR100737768B1 (en) Environmental vegetation mat pannels
CN210104786U (en) Road shoulder retaining component capable of greening
KR100674635B1 (en) Plantable block with environmental conformity for a retaining wall
KR20100092836A (en) Plantable block and a plantable retaining wall construction method which uses the plantable block
KR102310272B1 (en) Slope reinforcement construction method using vegetation soil and perforated metal plate and slope reinforcement construction
KR100654936B1 (en) Method for constructing retaining wall
KR101382179B1 (en) Vegetation retaining wall and its construction method
KR20100092837A (en) Plantable block and a plantable retaining wall construction method which uses the plantable block
KR200345937Y1 (en) Precast concrete block for retaining wall
JP2006037700A (en) Block for retaining wall and retaining wall structure
KR200442424Y1 (en) The block for a breast wall with grass growing structure
KR101334749B1 (en) Vegetation block in tiers for retaining wall and method for construction of retaining wall using the same
CN113322895A (en) Three-dimensional water and soil protection revetment and construction method thereof
CN210086289U (en) Reinforced embankment earth retaining member capable of greening
KR101055295B1 (en) Revetment construction method using revetment structure of vegetational gabion with grid in a body and vegetational gabion therewith
KR200357964Y1 (en) Block for retaining wall
KR100946224B1 (en) Soil mass block for front side vegetation and Retaining wall using the same
KR100951125B1 (en) Environment-friendly built-up-type revetment block having straw layer
KR100843331B1 (en) The block construction method for protecting bank
KR100641583B1 (en) The method of building the reinforced earth wall
KR102581619B1 (en) a functional gabion block

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20190329

Year of fee payment: 8