CN103708777A - Ecological recovery method with combination application of vegetation concrete and high-molecular aggregates - Google Patents

Ecological recovery method with combination application of vegetation concrete and high-molecular aggregates Download PDF

Info

Publication number
CN103708777A
CN103708777A CN201310651152.3A CN201310651152A CN103708777A CN 103708777 A CN103708777 A CN 103708777A CN 201310651152 A CN201310651152 A CN 201310651152A CN 103708777 A CN103708777 A CN 103708777A
Authority
CN
China
Prior art keywords
cover concrete
plant
plant cover
recovery method
weight part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310651152.3A
Other languages
Chinese (zh)
Inventor
车志庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Run Guo Ecological Technology Engineering Co Ltd
Original Assignee
Qingdao Run Guo Ecological Technology Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Run Guo Ecological Technology Engineering Co Ltd filed Critical Qingdao Run Guo Ecological Technology Engineering Co Ltd
Priority to CN201310651152.3A priority Critical patent/CN103708777A/en
Publication of CN103708777A publication Critical patent/CN103708777A/en
Pending legal-status Critical Current

Links

Abstract

The invention provides an ecological recovery method with combination application of vegetation concrete and high-molecular aggregates, and is applied to fields of riverway slope protection engineering, ecological recovery engineering, garden greening engineering and the like. The ecological recovery method comprises the following steps: first, vegetation concrete is prepared; second, high-molecular aggregates are prepared; third, a riverway or a slope is cleaned to meet construction requirements, a layer of nutrition earthwork cloth is laid on a construction surface first, then the vegetation concrete and high-molecular aggregates are mixed and stirred for half hour completely, and then subjected to pouring on the earthwork cloth, and the pouring thickness is 10-15 cm; fourth, after the vegetation concrete is poured for 4h, watering curing is started, according to local climate change, the curing state with water every day is kept until plants sprout, and then curing is continued for half month to a month. The problems that plants cannot survive because of too high dosage of vegetation concrete cement and the anti-scouring property of vegetation concrete is not enough because of too low dosage of cement are solved.

Description

A kind of plant cover concrete be combined with polymer granule application ecological recovery method
Technical field
Be applied to the fields such as river course slope protection engineering, Ecological Restoration Works, landscape engineering.
Background technology
Plant cover concrete is to adopt specific concrete formulation and mixing to plant green seed, a kind of nascent state guard technology that rock slope is protected and afforested.Polymer granule is as a kind of artificial soil technology that is widely used in engineering practice, firm side slope, repaired exposed massif, and recover the original ecological balance is worked it out to contribution.
The matrix of plant cover concrete has certain mechanical strength after solidifying, and does not chap, and does not wash away, and does not run off.But in this technological method, added cement, if cement consumption is few, deficiency is so that matrix reaches enough intensity.If for construction intensity adds cement in a large number, grass can not have been survived again.In construction in the past, all to increase matrix fertilizer and reduce concrete alkalescence by the method for adding plant cover concrete green additive, so that plant cover concrete adapts to plant-growth more, but whether carry out in this way excessive reduction cement alkalescence, otherwise concrete mechanical strength does not reach requirement, also can produce crack performance, in the situation that both sides reach balance, plant variety that can Adaptable growth is limited.So want that in the situation that cement adding is appropriate solving matrix is not washed the difficult problem not running off, we have selected polymer granule, after its distinctive honeycomb structure and injection, can be adsorbed in rapidly the characteristic on massif surface, can both supply the shortcoming of plant cover concrete, and for plant-growth provides the sufficient nutrient of sending out, the slightly acidic of polymer own, has certain neutralization to the weakly alkaline of plant cover concrete, and more plant can be planted in this new ecological recovery method.
Summary of the invention
The invention provides a kind of plant cover concrete be combined with polymer granule application ecological recovery method, be applied to the fields such as river course slope protection engineering, Ecological Restoration Works, landscape engineering, it is characterized in that: comprise the following steps:
1., prepare plant cover concrete, by sandy loam 10 ~ 12 weight parts, cement 2 ~ 3 weight parts, Pericarppium arachidis hypogaeae 1 ~ 2 weight part, green additive 1 ~ 2 weight part, plant seed (by Bamboo resource and the planting density requirement interpolation of weighing), mixing water 12 ~ 15 weight parts stir;
2., prepare polymer granule, by silicon breeze 10 ~ 12 weight parts, rice husk 2 ~ 3 weight parts, chicken manure 1 ~ 2 weight part, turfy soil 2 ~ 3 weight parts, scrap steel 1 ~ 2 weight part, water-holding agent 1 ~ 2 weight part, stablizer 1 ~ 2 weight part, agent 1 ~ 2 weight part, mixing water 15 ~ 20 weight parts stir;
3., level river course or the domatic construction requirement that reaches, in construction surface, first lay one deck nutrition geotextile, then by described plant cover concrete and the abundant mix and blend of polymer granule after-pouring half an hour in geotextile, building thickness is 10 ~ 15cm;
4., plant cover concrete builds after 4 hours, starts water seasoning, according to local climate, changes, and keeps having every day the state of water curing until after plant germination, adheres to continuing maintenance two weeks to month, specifically looks plant-growth situation fixed.
As preferably, the sandy loam of described plant cover concrete is the ground surface soil after air-dry pulverizing and sieving, and sand grain content is no more than 5%, and maximum particle diameter is less than 8mm, and water content is no more than 20%; Described cement is 52.5 grades of silicate cements of P II.
As preferably, the silicon breeze of described polymer granule is 40 ~ 60 orders, it is Harbin that described turfy soil is selected the place of production, organic content 70%-80%, humic acid 40%-50%, pH value is 5.0-5.5, described scrap steel is the waste and old steel that the longest edge footpath of pulverizing is no more than 2 ~ 3cm, described water-holding agent is sodium polyacrylate High hydrophilous resin, and described stablizer is Vinyl Acetate Copolymer, and described agent is the agent of polypropylene-base granule.
As preferably, described green additive is CBS plant cover concrete green additive, and described plant seed will have necessarily alkali-proof, and selects according to construction ground and local climate.
By the enforcement of above method, 1, solved the too high plant of plant cover concrete cement consumption and cannot survive, the inadequate difficult problem of the too low plant cover concrete self of cement consumption scour resistance;
2, solved and in growing process, lacked enough nutrition and the technical barrier of moisture content.
Embodiment
Plant cover concrete be combined with polymer granule application an ecological recovery method, be applied to the fields such as river course slope protection engineering, Ecological Restoration Works, landscape engineering, it is characterized in that: comprise the following steps:
1., prepare plant cover concrete, by sandy loam 10 ~ 12 weight parts, cement 2 ~ 3 weight parts, Pericarppium arachidis hypogaeae 1 ~ 2 weight part, green additive 1 ~ 2 weight part, plant seed (by Bamboo resource and the planting density requirement interpolation of weighing), mixing water 12 ~ 15 weight parts stir;
2., prepare polymer granule, by silicon breeze 10 ~ 12 weight parts, rice husk 2 ~ 3 weight parts, chicken manure 1 ~ 2 weight part, turfy soil 2 ~ 3 weight parts, scrap steel 1 ~ 2 weight part, water-holding agent 1 ~ 2 weight part, stablizer 1 ~ 2 weight part, agent 1 ~ 2 weight part, mixing water 15 ~ 20 weight parts stir;
3., level river course or the domatic construction requirement that reaches, in construction surface, first lay one deck nutrition geotextile, then by described plant cover concrete and the abundant mix and blend of polymer granule after-pouring half an hour in geotextile, building thickness is 10 ~ 15cm;
4., plant cover concrete builds after 4 hours, starts water seasoning, according to local climate, changes, and keeps having every day the state of water curing until after plant germination, adheres to continuing maintenance two weeks to month, specifically looks plant-growth situation fixed.
As preferred embodiment, the sandy loam of described plant cover concrete is the ground surface soil after air-dry pulverizing and sieving, and sand grain content is no more than 5%, and maximum particle diameter is less than 8mm, and water content is no more than 20%; Described cement is 52.5 grades of silicate cements of P II.
As preferred embodiment, the silicon breeze of described polymer granule is 40 ~ 60 orders, it is Harbin that described turfy soil is selected the place of production, organic content 70%-80%, humic acid 40%-50%, pH value is 5.0-5.5, described scrap steel is the waste and old steel that the longest edge footpath of pulverizing is no more than 2 ~ 3cm, described water-holding agent is sodium polyacrylate High hydrophilous resin, and described stablizer is Vinyl Acetate Copolymer, and described agent is the agent of polypropylene-base granule.
As preferred embodiment, described green additive is CBS plant cover concrete green additive, and described plant seed will have necessarily alkali-proof, and selects according to construction ground and local climate.
By above method, realized more outstanding afforestation effect, and effectively solved soil erosion problem.

Claims (4)

  1. Plant cover concrete be combined with polymer granule application an ecological recovery method, it is characterized in that: comprise the following steps:
    Prepare plant cover concrete, by sandy loam 10 ~ 12 weight parts, cement 2 ~ 3 weight parts, Pericarppium arachidis hypogaeae 1 ~ 2 weight part, green additive 1 ~ 2 weight part, some parts of plant seed, according to Bamboo resource and planting density, require to weigh interpolation, mixing water 12 ~ 15 weight parts stir;
    2., prepare polymer granule, by silicon breeze 10 ~ 12 weight parts, rice husk 2 ~ 3 weight parts, chicken manure 1 ~ 2 weight part, turfy soil 2 ~ 3 weight parts, scrap steel 1 ~ 2 weight part, water-holding agent 1 ~ 2 weight part, stablizer 1 ~ 2 weight part, agent 1 ~ 2 weight part, mixing water 15 ~ 20 weight parts stir;
    3., level river course or the domatic construction requirement that reaches, in construction surface, first lay one deck nutrition geotextile, then by described plant cover concrete and the abundant mix and blend of polymer granule after-pouring half an hour in geotextile, building thickness is 10 ~ 15cm;
    4., plant cover concrete builds after 4 hours, starts water seasoning, according to local climate, changes, and keeps having every day the state of water curing until after plant germination, adheres to continuing maintenance two weeks to month, specifically looks plant-growth situation fixed.
  2. Plant cover concrete as claimed in claim 1 be combined with polymer granule application ecological recovery method, it is characterized in that: the sandy loam of described plant cover concrete is the ground surface soil after air-dry pulverizing and sieving, sand grain content is no more than 5%, and maximum particle diameter is less than 8mm, and water content is no more than 20%; Described cement is 52.5 grades of silicate cements of P II.
  3. Plant cover concrete as claimed in claim 1 be combined with polymer granule application ecological recovery method, it is characterized in that: the silicon breeze of described polymer granule is 40 ~ 60 orders, described turfy soil organic content 70%-80%, humic acid 40%-50%, pH value is 5.0-5.5, described scrap steel is the waste and old steel that the longest edge footpath of pulverizing is no more than 2 ~ 3cm, described water-holding agent is sodium polyacrylate High hydrophilous resin, described stablizer is Vinyl Acetate Copolymer, and described agent is the agent of polypropylene-base granule.
  4. Plant cover concrete as claimed in claim 2 be combined with polymer granule application ecological recovery method, it is characterized in that: described green additive is CBS plant cover concrete green additive, described plant seed will have necessarily alkali-proof, and selects according to construction ground and local climate.
CN201310651152.3A 2013-12-08 2013-12-08 Ecological recovery method with combination application of vegetation concrete and high-molecular aggregates Pending CN103708777A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310651152.3A CN103708777A (en) 2013-12-08 2013-12-08 Ecological recovery method with combination application of vegetation concrete and high-molecular aggregates

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310651152.3A CN103708777A (en) 2013-12-08 2013-12-08 Ecological recovery method with combination application of vegetation concrete and high-molecular aggregates

Publications (1)

Publication Number Publication Date
CN103708777A true CN103708777A (en) 2014-04-09

Family

ID=50402173

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310651152.3A Pending CN103708777A (en) 2013-12-08 2013-12-08 Ecological recovery method with combination application of vegetation concrete and high-molecular aggregates

Country Status (1)

Country Link
CN (1) CN103708777A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104719116A (en) * 2015-04-20 2015-06-24 华北理工大学 Artificial soil matrix and preparation method and application for artificial soil matrix
CN105532300A (en) * 2015-12-31 2016-05-04 福州皇家地坪有限公司 Plant compatible type ecological concrete
CN107318515A (en) * 2017-07-14 2017-11-07 江苏建筑职业技术学院 A kind of Verticle afforestation planting die block concrete and collocation method
CN107459388A (en) * 2017-08-01 2017-12-12 三峡大学 It is a kind of using humic acid as ecological slope protection substrate of major ingredient and preparation method thereof
WO2017196163A3 (en) * 2016-05-10 2018-01-04 Blue Marble Technologies, S.A. De C.V. Method for producing additives in the form of tablets, capsules or pellets for use in the construction industry
CN108455962A (en) * 2018-02-11 2018-08-28 十九冶成都建设有限公司 Plant cover concrete and preparation method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1383712A (en) * 2002-04-25 2002-12-11 许文年 Concrete greening technology for cement side slope vegetation
CN101608446A (en) * 2009-07-08 2009-12-23 三峡大学 A kind of vegetative protection soil base material activation method
CN102369834A (en) * 2011-03-03 2012-03-14 袁彬鸿 Aggregate bio-substrate concrete (BSC) and preparation and construction method thereof
KR101140725B1 (en) * 2009-10-30 2012-05-15 주식회사 젬콘 Vegetation retaining wall using vegetation spaces formed by continuous connection of concrete piles and constructing method thereof
CN102491836A (en) * 2011-11-25 2012-06-13 韦书勇 Preparation method of improved greening additive for vegetation growing concrete
CN102518139A (en) * 2011-12-31 2012-06-27 董发达 Manufacture method for ecological vegetated protective slope
CN103283573A (en) * 2013-05-29 2013-09-11 哈尔滨工业大学宜兴环保研究院 Vegetation concrete and preparation method thereof

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1383712A (en) * 2002-04-25 2002-12-11 许文年 Concrete greening technology for cement side slope vegetation
CN101608446A (en) * 2009-07-08 2009-12-23 三峡大学 A kind of vegetative protection soil base material activation method
KR101140725B1 (en) * 2009-10-30 2012-05-15 주식회사 젬콘 Vegetation retaining wall using vegetation spaces formed by continuous connection of concrete piles and constructing method thereof
CN102369834A (en) * 2011-03-03 2012-03-14 袁彬鸿 Aggregate bio-substrate concrete (BSC) and preparation and construction method thereof
CN102491836A (en) * 2011-11-25 2012-06-13 韦书勇 Preparation method of improved greening additive for vegetation growing concrete
CN102518139A (en) * 2011-12-31 2012-06-27 董发达 Manufacture method for ecological vegetated protective slope
CN103283573A (en) * 2013-05-29 2013-09-11 哈尔滨工业大学宜兴环保研究院 Vegetation concrete and preparation method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
何萍等: "道路护坡用植被混凝土研究与应用", 《安徽农业科学》, no. 28, 1 October 2008 (2008-10-01) *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104719116A (en) * 2015-04-20 2015-06-24 华北理工大学 Artificial soil matrix and preparation method and application for artificial soil matrix
CN104719116B (en) * 2015-04-20 2017-06-27 华北理工大学 A kind of artificial soil matrix and its compound method and application
CN105532300A (en) * 2015-12-31 2016-05-04 福州皇家地坪有限公司 Plant compatible type ecological concrete
CN105532300B (en) * 2015-12-31 2018-06-08 福州皇家地坪有限公司 Plant Containing Kind of Ecological Soil
WO2017196163A3 (en) * 2016-05-10 2018-01-04 Blue Marble Technologies, S.A. De C.V. Method for producing additives in the form of tablets, capsules or pellets for use in the construction industry
CN107318515A (en) * 2017-07-14 2017-11-07 江苏建筑职业技术学院 A kind of Verticle afforestation planting die block concrete and collocation method
CN107318515B (en) * 2017-07-14 2020-05-26 江苏建筑职业技术学院 Vertical greening planting module concrete and configuration method
CN107459388A (en) * 2017-08-01 2017-12-12 三峡大学 It is a kind of using humic acid as ecological slope protection substrate of major ingredient and preparation method thereof
CN108455962A (en) * 2018-02-11 2018-08-28 十九冶成都建设有限公司 Plant cover concrete and preparation method thereof

Similar Documents

Publication Publication Date Title
CN103708777A (en) Ecological recovery method with combination application of vegetation concrete and high-molecular aggregates
CN107700429B (en) Slope runoff erosion preventing device and slope runoff erosion preventing method
CN103643684B (en) Exposed slope ecological restoration construction method taking fermented sludge as matrix
CN103708776A (en) Ecological recovery method with combination application of planting ecological concrete and high-molecular aggregates
CN102656971B (en) Production method and application of sandy land conditioner made from bentonite
WO2015101295A1 (en) Water and soil conservation and ecological restoration method of high and steep, abandoned slag piles at high elevation with large temperature differential in dry, hot valley
CN101536634B (en) Method for remediation of ecological slope protection vegetation of riverways in villages and towns
CN102986418B (en) Spray-seeding base material for southern side slope and preparation method of spray-seeding base material
CN1974497A (en) Sludge-spraying and seeding afforesting matrix
CN1383714A (en) Mixed planting material for rocky slope and its prepn and construction process
CN102511213A (en) Bentonite as sandy soil improver and application thereof
CN102754559A (en) Method for rapidly planting vegetation in saline-alkali bare land
CN102010155A (en) High-strength plant growing type porous concrete and preparation method thereof
CA2888422C (en) Method for preventing soil erosion
CN111802183A (en) Ecological slope protection and vertical greening process
CN114642134B (en) Sustainable flexible slope protection method and system for vegetation greening of high steep slope of arsenic sandstone
CN103724107A (en) Method for preparing plant nutrient substrate dedicated for plant growth ecological concrete
KR101654044B1 (en) Afforestation Method for face of slope Using plant soil compostion for afforestation
CN110240451B (en) Greening concrete and construction method thereof
CN109618874B (en) Phosphogypsum vegetation and preparation method thereof
JP2019024328A (en) Waterside planting method, planting base
CN111484278A (en) Ecological concrete, ecological protection slope and construction method of ecological protection slope
KR100860241B1 (en) Afforesting method of sloping surface
CN102422761A (en) Method for planting sedum lineare on slope
CN113089693B (en) Measure for ecological slope protection of abrupt-slope bermuda grass and preparation method of anti-abrupt plant-growing concrete

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140409