KR20110033986A - Construction method and structure for bridge's footpath - Google Patents

Construction method and structure for bridge's footpath Download PDF

Info

Publication number
KR20110033986A
KR20110033986A KR1020110018849A KR20110018849A KR20110033986A KR 20110033986 A KR20110033986 A KR 20110033986A KR 1020110018849 A KR1020110018849 A KR 1020110018849A KR 20110018849 A KR20110018849 A KR 20110018849A KR 20110033986 A KR20110033986 A KR 20110033986A
Authority
KR
South Korea
Prior art keywords
horizontal support
bridge
plate
fixing
anchor bolt
Prior art date
Application number
KR1020110018849A
Other languages
Korean (ko)
Inventor
고재용
Original Assignee
고재용
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 고재용 filed Critical 고재용
Priority to KR1020110018849A priority Critical patent/KR20110033986A/en
Publication of KR20110033986A publication Critical patent/KR20110033986A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/10Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
    • E01D19/103Parapets, railings ; Guard barriers or road-bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

PURPOSE: A construction method and a structure for a pedestrian passage on a bridge are provided to remarkably reduce construction costs by installing a horizontal support without special equipment. CONSTITUTION: A construction method for a pedestrian passage on a bridge is as follows. Anchor bolts(500), installed on the outer top surface of a safety fence(20) at uniform intervals, are fixed to the holes formed in a horizontal plate(112). A retention frame(210) of a temporary scaffold member is installed in a fixing bracket. A scaffold is installed in the retention frame. Holes are perforated on the side surface of a bridge deck(10), and the anchor bolts are installed in the holes. Fastening holes(122), formed on the top of a fixing flange(121) of a horizontal support(120) are united with the holes formed in a vertical plate(111) of the fixing bracket using bolts(400).

Description

Construction method and structure for bridge's footpath

The present invention relates to a pedestrian path that is constructed so that people can safely walk the bridge on which the vehicle runs, and more particularly, there is a difficulty in adding equipment when trying to establish a pedestrian bridge on a bridge that is constructed without securing a pedestrian path. The present invention relates to a method of constructing a pedestrian bridge for the bridge and a structure thereof so that the pedestrian can be easily installed on the bridge.

As the industrial society develops, numerous roads are opened for smooth transportation of logistics, and many roads are still being opened.

The road that is opened as described above may be constructed using the natural terrain as it is, but in order to maximize the use efficiency of the road to build a bridge across the stream or river to increase the use efficiency of the road.

Bridges constructed as described above have been constructed mainly for the purpose of vehicle traffic.

The reason is that in the past, the emphasis was placed on improving economic development, and it was not possible to go back to the historical phenomenon in which all the facilities were constructed.

However, with the recent increase in the quality of life, all the facilities have required people-centered facilities that are not comfortable for human use, and one of them is a footpath ("India") that can safely walk the bridge on foot. Is).

The pedestrian walkway may be constructed along with the bridge construction, or may be constructed in addition to the bridge in use.

The pedestrian walkway in this case is a pedestrian path that is additionally constructed for most old bridges, where there is no pedestrian path and no pedestrians can guarantee safety when crossing the bridge.

There are various ways to secure a pedestrian path on a bridge constructed without a pedestrian path. One of the methods is to divide a portion of the edge of the top plate, which is a roadway in which a vehicle operates, by using a railing, etc., to use it as a pedestrian path.

However, bridges that divide roadways into railings for use as sidewalks have the disadvantage that the distance between pedestrians and vehicles is too close to ensure the safety of pedestrians from vehicles, and the lane width is narrowed by securing the sidewalks. The result is that the bottleneck of the vehicle is being caused, resulting in the closure.

Pedestrian (India), which solves the shortcomings of securing roads by dividing the roadway of bridges, lays down pedestrians on the side of the top of the bridge.

Although the above method can guarantee the safety of pedestrians, various special equipments are required for construction, and special equipments are not only a main cause of the increase of construction cost per hour, but also a special equipment for equipment supply. Not only this was not smooth, but also had difficulty in quick input, which could not shorten the air due to construction.

As described above, a new way of constructing a pedestrian path toward the side of the top plate of a bridge by inserting special equipment is usually performed while the input of special equipment is put under the bridge, and the input of the equipment is performed under the surrounding conditions and the bridge. In some cases, it may be difficult to input the equipment.

For example, there is a building around the bridge, which makes it difficult to secure access roads, or the destruction of a well-maintained park is inevitable when the equipment is turned on due to the parkization of the river floor.

In addition, a conventional bridge pedestrian path is constructed with the same height as the floor surface on which the safety fence is installed and the floor of the pedestrian path.

If the pedestrian walkway is installed at the same height as the floor surface on which the safety fence of the bridge is installed, it is not only able to prevent foreign objects from jumping from the lane to the pedestrian path, but also due to lack of attention, such as children in pedestrians, they may slip or At the same time, the safety problem of falling into the space between the safety fence of the bridge occurred, and when the portable goods carried by pedestrians were displaced around, the portable goods could not be prevented from rolling into the driveway.

This led to the construction of a pedestrian walkway that is more easily constructed and secured by the applicant.

The present invention has been developed in order to solve the conventional disadvantage of the pedestrian path that is laid on the side of the top plate of the conventional bridge, the purpose is to install a fixed bracket consisting of a vertical plate and a horizontal plate on the outside of the safety fence installed on both sides of the bridge top plate In the state where the temporary scaffold for horizontal support installation is fixed to the fixing bracket, the worker climbs on the scaffold of the temporary scaffold member to install anchor bolts necessary to fix the horizontal support, and to fasten the fixing flange to the fixing bracket installed, and thus the main work of the walkway. The horizontal support corresponding to the process can be installed without the need for special equipment, making it possible to construct a pedestrian path on a bridge where it is difficult to put the equipment under the bridge, and to easily construct a pedestrian path. The work by construction is simple, so the air By reducing the use of special equipment that is expensive to operate, and by eliminating the use of special equipment that is expensive to operate, it is possible to significantly reduce other construction costs in the construction of pedestrian paths, and it is possible to construct a pedestrian path without damaging the parked river floor. It can prevent the destruction of the surrounding facilities of the bridge, and the fixed bracket with the horizontal support is the boundary between the roadway and the sidewalk to block foreign substances from the roadway, and the child with low thinking ability slips while walking. The present invention provides a bridge construction method and a method for constructing a bridge that solves the problem of falling into or dropping a portable article that is being carried, thereby causing the portable article to roll into a driveway.

The present invention for achieving the above object, by inserting the hole formed in the horizontal plate 112 in the anchor bolt 500 is formed at equal intervals on the outer upper surface of the safety fence installed on both sides of the bridge top plate and the anchor bolt A fixing bracket installation step (S1) of fixing the fixing bracket by fastening the tightening nut to the 500; The mounting bracket 120 constituting the temporary scaffolding member 200 is installed on the fixing bracket 110 fixed in the preceding step, and the scaffolding 220 is installed on the mounting frame 210 to support the horizontal support without using special equipment. Installation step (S2) of the temporary scaffold member to enable the installation of; Work is put up on the installed scaffolding and drills a hole in the side of the top plate to install the anchor bolt in the perforated hole, the anchor bolt 300 is completed in the state of the fixing flange 121 of the horizontal support 120 is completed In the state where the fastening hole 122 is matched with the hole formed in the vertical plate 111 of the fixing bracket 110, the nut 400 is fastened to the anchor bolt 300 fitted with the fastening hole 123 at the same time. A horizontal support installation step (S3) of fixing the horizontal support 120 by fastening the same and separating and moving the temporary scaffold member 200 for installation of the next horizontal support 120; And the dead wood installation step (S4) for installing the dead wood 151, the deck plate 150 is installed neatly arranged on the horizontal support 120 is installed; Temporary plate member for dismantling the temporary scaffold member 200 after finishing the installation of the wood block 150, the deck plate 150 is installed on the upper portion of the horizontal support 120 installed at equal intervals along the bridge top plate (10) A demolition step (S5); A cover assembly step (S6) of covering the upper part of the fixing plate 121 of the fixing bracket 110 and the fixing flange 121 of the horizontal support 120 with the cover 130 to make the appearance beautiful; A deck plate assembly step (S7) of arranging the deck plates 150 sequentially on the lumber 151 installed at the upper portion of the horizontal support 120 to form a scaffold to be fixed by fixing pins to allow walking; Balustrade installation step of installing the railing 140 to prevent the fall of the pedestrian after installing the square steel pipe 141 at the end 124 of the horizontal support 120 in the state of the deck plate 150 is completed. The construction method of the pedestrian bridge of the bridge characterized by including (S8),

Bolting holes 111a for fixing the upper portion of the fixing flange 121 of the horizontal support 120 to the outside of the safety fence 20 installed on both sides of the bridge 10 of the bridge, etc. A fixed bracket (111) formed at intervals and a horizontal plate (112) formed at right angles to the vertical plate (111) to form a needle-shaped shape are installed via an anchor bolt (500). 110); A fastening hole 122 is formed at an upper portion thereof to coincide with the bolt fastening hole 111 a of the fixing bracket 110, and an anchor bolt 300 is installed into a hole formed in the side surface of the bridge upper plate 10. A horizontal support 120 comprising a fixing flange 121 in which the anchor bolt fastening holes 123 are mixed and formed; A cover body 130 which covers the vertical plate 111 of the fixing bracket 110 and the fixing flange 121 of the horizontal support 120 to make the coupling part look beautiful; Handrail 140 is installed with a square steel pipe 141 which is installed at the end 124 of the horizontal support 120 to allow pedestrians to safely walk without risk of falling: and on the upper portion of the horizontal support 120 It is achieved by the pedestrian walkway of the bridge, characterized in that consisting of a deck plate 150, which is sequentially placed on the top of the wood block 151, which is fixedly arranged by a fixed pin and constitutes a walking floor.

The walkway construction method and the structure of the bridge of the present invention described above, the fixing bracket consisting of a vertical plate 111 and a horizontal plate 112 on the outside of the safety fence 20 installed on both sides of the upper plate 10 of the bridge ( 110 to fix the bolt holes formed in the upper portion of the frame 211 of the temporary scaffold member 200 for the horizontal support 120 installation to the bolt fastening holes 111a formed in the fixing bracket 110 to be fixed by fixing bolts. After the installation, the worker climbs on the scaffold 220 of the temporary scaffold member 200, which is constructed by placing the scaffold 220 on the horizontal support section 212, and installs the anchor bolt 300 necessary for fixing the horizontal support 120. By fastening the fixing flange 121 to the fixing bracket 110 is installed so that the horizontal support 120 corresponding to the main work fixing of the pedestrian path 100 can be installed without the input of special equipment,

First, the construction of the pedestrian path 100 in the bridge that is difficult to put the equipment down to the bridge not only made it easy to construct, but also easy to work according to the construction of the pedestrian path 100, laying the pedestrian path 100 It is possible to shorten the air according to this;

Second, by excluding the use of special equipment expensive operation costs can significantly reduce the construction costs associated with the construction of the pedestrian path (100);

Third, all the work is done in the bridge deck 10 can be installed without the breakage of the parked river floor construction can prevent the destruction of the surrounding facilities of the bridge that can be caused by the construction of the walkway;

The fixed bracket 110 to which the horizontal support 120 is fixed serves as a boundary between the roadway and the sidewalk to block foreign substances from entering the roadway, and a child with low thinking power slips while walking, and the foot falls into the roadway, or is carried. It is a very useful invention that solves the problem of dropping a portable article and rolling the article into a driveway.

1 is a pedestrian construction method process diagram of the bridge according to the present invention.
Figure 2 is an exemplary diagram of a state in which the fixing bracket is installed on the upper plate as one step of the construction method of the bridge walkway according to the present invention.
Figure 3 is an exemplary view of the state of the construction of a temporary scaffold member on the fixed bracket installed on the upper plate as a two-step construction method of the bridge according to the present invention.
Figure 4 is a three-stage of the construction method of the walkway of the bridge according to the present invention, an example of a state in which the worker puts up the temporary scaffold member to install a horizontal support which is the main component of the walkway.
Figure 5 is a four step of the pedestrian construction method of the bridge according to the present invention, an exemplary view of a state in which the stump is installed on the upper surface of the horizontal support installed at equal intervals on the side of the upper plate.
6 is an exemplary diagram of a state in which the cover plate covers the upper portion of the fixing flange of the vertical plate and the horizontal support of the fixing bracket as a six-step construction method of the bridge according to the present invention.
Figure 7 is an illustration of a state of constructing a deck plate on the stumps installed on the upper surface of the horizontal support as the seven steps of the construction method of the bridge walkway according to the present invention.
8 is a perspective view of a step of installing a railing at the end of the horizontal support as the eight steps of the construction method of the bridge walkway according to the present invention.
9 is a perspective configuration diagram of a pedestrian path constructed by the method for constructing a pedestrian bridge according to the present invention.

Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

The construction method of the present invention will be described in detail for each step as follows.

1) Fastening nut to the anchor bolt 500 by inserting a hole formed in the horizontal plate (112) to the anchor bolt 500 that is perforated at equal intervals on the outer upper surface of the safety fence 20 installed on both sides of the bridge top plate Fixing bracket installation step (S1) for fixing the fixing bracket by fastening the fastening;

A hole (not shown) for mounting the anchor bolt 500 on the outer top plate 10 of the safety fence 20 is formed by using a drill drill.

The hole is formed to have a distance corresponding to the hole formed at equal intervals on the horizontal plate 112 of the fixing bracket 110 having a long length.

After positioning the anchor bolt 500 in the hole formed as described above, the fastening hole (not shown in the drawing) formed in the horizontal plate 112 of the fixing bracket 110 is fastened to the nut.

The anchor bolt 500 to which the nut is fastened is firmly fixed to the hole of the upper plate 10, and the horizontal plate 112 is tightly and firmly fixed to the bridge case 10 by the fastening nut. .

As described above, the vertical plate 111 of the fixing bracket 110 installed at the edge of the upper plate 10 is installed to form side by side with respect to the side of the upper plate 10 (see Fig. 2).

2) Install the mounting frame 120 constituting the temporary scaffolding member 200 in the fixing bracket 110 is fixed in the preceding step, and installed the scaffold 220 in the mounting frame 210 without using special equipment An installation step (S2) of the temporary scaffold member to allow installation of the horizontal support;

When the installation of the fixing bracket 110 on the upper plate 10 of the bridge is completed in the preceding step, the temporary scaffold member so that the construction of the horizontal support 120, which is the main component of the pedestrian path 100, can be installed without the input of special equipment ( Hypothesis 200).

The hypothesis of the temporary scaffold member 200 is a bolt fastening hole (111a) formed in the vertical plate 111 of the fixing bracket 110 to the hole formed in the upper portion of the vertical bar 211 of the mounting frame 210 as shown in FIG. ), And fasten the bolts for tightening (not designated by special code) to tighten the nuts.

In the state in which the mounting frame 210 is installed as described above, the footrest 220 to enable the worker to work on the horizontal support section 212 provided with the footrest prevention prevention piece 213 under the vertical bar 211. Install it.

The scaffold 220 is a worker that is fixed by the bolt nut as a fixing means in the horizontal support section 212 is to be able to install the horizontal support 120 while drilling a hole for fixing the anchor bolt 300 in a stable sense. .

The temporary scaffold member 200 may be hypothesized as shown in the drawing, and after the hypothesis is made to have a length corresponding to the bridge, the construction of the walkway 100 is performed.

3) the work rises on the installed scaffolding and drills a hole in the side of the top plate to install the anchor bolt in the perforated hole, and the fixing flange 121 of the horizontal support 120 in the state that the mounting of the anchor bolt 300 is completed An anchor bolt 300 fitted with a fastening hole 123 at the same time as fastening the bolt 400 in a state in which the fastening hole 122 formed to match the hole formed in the vertical plate 111 of the fixing bracket 110. A horizontal support installation step (S3) of fixing the horizontal support member 120 by fastening the nut to the horizontal support member and separating and moving the temporary scaffold member 200 for installation of the next horizontal support member 120;

As described above, when the temporary scaffold member 200 is temporarily installed through the installation step of the temporary scaffold member, the worker climbs on the scaffold 220 and uses the drill bolt on the side of the top plate 10 to anchor the anchor bolt 300. Perforate the hole where it is installed (not specified in the drawing).

After inserting and mounting the anchor bolt 300 in the perforated hole as described above, the fastening hole formed toward the upper side of the fixing flange 121 by placing the fixing flange 121 of the horizontal support 120 on the side of the upper plate 10. The reference numeral 122 is fixed by fastening a nut to the bolt 400 penetrated by coinciding with the bolt fastening hole 111a formed in the vertical plate 111 of the fixing bracket 110.

The anchor bolt fastening hole 123 formed below the fixing flange 121 is fastened to the anchor bolt 300 installed at the side of the upper plate 10.

By fastening the nut in the state in which the fastening hole 123 is positioned in the fixing flange 121 to the anchor bolt 300, the anchor bolt 300 is firmly fixed to the top plate 10 and the fixing flange 121 is It is firmly fixed.

The horizontal support 120 to be fixed as described above is to be installed a plurality of equal intervals along the length of the top plate 10 of the bridge.

4) a high wood installation step (S4) for installing the wood block 151, the deck plate 150 is installed in order to arrange the horizontal support 120 is installed;

On the upper surface of the horizontal support 120, which is installed through the horizontal support installation step (S3) to install the wood block 151 supporting the deck plate 150,

The wood block 151 is formed in a predetermined interval, as shown in Figure 5, a number of which is installed, the number may be added or subtracted.

The wood 151 is fixed to the horizontal support 120 by welding or fixing pieces.

When installing the stump 151, a square steel pipe 141 is installed together with the handrail 140 is installed at the end 124 of the horizontal support 120.

5) The hypothesis to remove the temporary scaffold member 200 after finishing the installation of the stump 150 is installed deck plate 150 on the upper portion of the horizontal support 120 installed at equal intervals along the bridge top plate (10) Plate member removal step (S5) and;

When the installation of the horizontal support 120 to be the main component of the pedestrian path 100 by using the temporary temporary plate member 200, the temporary scaffold member 200 is removed.

Demolition is made in the reverse order when the hypothesis, first separating the scaffold 220 is fixed to the horizontal support section 212 of the mounting frame 200 by the fixing means and then the outer surface.

After that, the fixing bracket 110 is to remove the vertical bar (211) installed through the fixing bolt as a medium.

6) cover assembly step (S6) to cover the upper surface of the fixing flange 121 of the vertical plate 111 and the horizontal support 120 of the fixing bracket 110 with a beautiful cover (S6);

When the horizontal support 120 is installed on the side of the bridge upper plate 10, and the installation of the stump wood 151 is completed on the upper surface of the horizontal support 120, the vertical plate 111 of the fixed plaque 110. ) And the upper portion of the fixing flange 12 of the horizontal support 120 to cover the cover 130 to make the appearance beautiful.

The cover body 130 is fixed to the surface located toward the pedestrian path 100 to form a vertical plane (not designated by the reference numerals) while the lower end formed between the stump wood 151 and the deck plate 150. It is done.

The cover piece extending from the upper part of the vertical plane (not designated in the drawing) has a rounded surface (see Fig. 5).

7) the deck plate assembly step (S7) to form a footrest to allow the walking by arranging the deck plate 150 in order to sequentially arrange the deck plate 150 in the lumber 151 installed in the upper portion of the horizontal support (120);

When the installation of the cover body 130 is completed, the deck plate 150 is sequentially formed on the top of the wood block 151 to form a footrest portion of the walking path 100. The deck plate 150 is The unit yarns are meshed with each other to form a solid coupling, and fixed to the stump 151 using a fixing pin or the like (see FIG. 6).

8) After installing the square steel pipe 141 at the end 124 of the horizontal support 120 in the state that the assembly of the deck plate 150 is completed, the handrail to install the railing 140 to prevent the pedestrians fall. Installation step (S8);

Install the wood block 151 on the horizontal support 120, the vertical plate 111 of the fixing bracket 110 and the top of the fixing flange 121 of the horizontal support 120 covered with a cover body 130, When the installation of the deck plate 150 on the wood block 151 is completed, the handrail 140 is installed in the rectangular steel pipe 141 installed as the end 124 of the horizontal support 120.

The handrail 140 is to fix the lower flange (not specified in the drawings by a specific reference) by a conventional handrail fixing method.

Pedestrian path 100 of the bridge constructed by the construction method as described above is fixed to the bracket 11, the horizontal support 120 is fixed to the fixed bracket 110, the upper and the horizontal of the fixed bracket 110 The cover 130 covers the upper portion of the fixing flange 121 of the support 120 and the deck plate 150 and the handrail 140 are installed to the upper portion of the horizontal support 120.

The fixing bracket 110, the upper side of the fixing flange 121 of the horizontal support 120, the bolt 400 is fixed to the outside of the safety fence 20 installed on both sides of the bridge 10 of the bridge. The vertical plate 111 in which the bolt fastening holes 111a are formed at equal intervals, and the horizontal plate 112 formed at right angles to the vertical plate 111 to form a needle shape form the anchor bolt 500. It is intended to be installed by mediation.

The horizontal support 120 fixed to the fixing bracket 110 has a fastening hole 122 corresponding to the bolt fastening hole 111a of the fixing bracket 110, and formed on the upper portion of the bridge upper plate 10. An anchor bolt fastening hole 123 into which the anchor bolt 300 to be installed as a hole punched by the side is fitted, and includes a fixed flange 121.

The upper portion of the vertical plate 111 and the fixing flange 121 in a state in which the fixing flange 121 of the horizontal support 120 is installed via the bolt 400 on the vertical plate 111 of the fixing bracket 110. Wrap the cover body 130 to make the appearance of the completed walkway 100 completed.

The deck plate 150 installed above the horizontal support 120 on which the cover body 130 is installed is sequentially placed on the top of the wood 151 to form a scaffold.

Deck plate 150 is made of a railing 140 to be installed to the square steel pipe 141 which is installed on the end 124 of the horizontal support 120 is installed pedestrians can safely walk without risk of falling.

The walkway 100 constructed as described above has a vertical plate 111 of the fixing bracket 110 installed outside the safety fence 20 of the top plate 10 by the bottom surface of the top plate 10 and the deck plate 150. It is formed higher than the bottom height of the formed walkway 100, the upper portion is covered by the cover body 130 to form a beautiful wall, thereby blocking the inflow of foreign matters of the walkway 100 from the roadway, It is possible to prevent the foot from falling off the side of the road when slipping while walking.

In addition, when the portable goods dropped while walking on the pedestrian walk, the portable goods can be prevented from rolling down the roadway and being damaged by the vehicle driving on the roadway.

10: top plate 20: safety fence
100: walkway 110: fixed bracket
111: vertical plate 111a: bolted hole
112: horizontal plate 120: horizontal support
121: fixed flange 122: fastening hole
123: anchor bolt fastening 124: terminal
130: cover body 140: handrail
150 deck plate 151
200: temporary scaffold installation member 210: mounting frame
211: vertical bar 212: horizontal support
220: scaffold

Claims (2)

Fixing bracket by fastening the tightening nut to the anchor bolt 500 by inserting holes formed in the horizontal plate 112 in the anchor bolt 500 installed at equal intervals on the outer upper surface of the safety fence installed on both sides of the bridge top plate. Fixing bracket installation step (S1) for fixing the installation;
The mounting bracket 120 constituting the temporary scaffolding member 200 is installed on the fixing bracket 110 fixed in the preceding step, and the scaffolding 220 is installed on the mounting frame 210 to support the horizontal support without using special equipment. Installation step (S2) of the temporary scaffold member to enable the installation of;
Work is put up on the installed scaffolding and drills a hole in the side of the top plate to install the anchor bolt in the perforated hole, the anchor bolt 300 is completed in the state of the fixing flange 121 of the horizontal support 120 is completed In the state where the fastening hole 122 is matched with the hole formed in the vertical plate 111 of the fixing bracket 110, the nut 400 is fastened to the anchor bolt 300 fitted with the fastening hole 123 at the same time. A horizontal support installation step (S3) of fixing the horizontal support 120 by fastening the same and separating and moving the temporary scaffold member 200 for installation of the next horizontal support 120;
And the dead wood installation step (S4) for installing the dead wood 151, the deck plate 150 is installed neatly arranged on the horizontal support 120 is installed;
Temporary plate member for dismantling the temporary scaffold member 200 after finishing the installation of the wood block 150, the deck plate 150 is installed on the upper portion of the horizontal support 120 installed at equal intervals along the bridge top plate (10) A demolition step (S5);
A cover assembly step (S6) of covering the upper part of the fixing plate 121 of the fixing bracket 110 and the fixing flange 121 of the horizontal support 120 with the cover 130 to make the appearance beautiful;
A deck plate assembly step (S7) of arranging the deck plates 150 sequentially on the lumber 151 installed at the upper portion of the horizontal support 120 to form a scaffold to be fixed by fixing pins to allow walking;
Balustrade installation step of installing the railing 140 to prevent the fall of the pedestrian after installing the square steel pipe 141 at the end 124 of the horizontal support 120 in the state of the deck plate 150 is completed. Pedestrian bridge construction method characterized in that it comprises a (S8).
In the pedestrian walkway to allow pedestrians to walk the bridge safely by installing on the side of the upper plate, which is an upper structure to be supported by the bridge device installed in the bridge piers at regular intervals,
Bolting holes 111a for fixing the upper portion of the fixing flange 121 of the horizontal support 120 to the outside of the safety fence 20 installed on both sides of the bridge 10 of the bridge, etc. A fixed bracket (111) formed at intervals and a horizontal plate (112) formed at right angles to the vertical plate (111) to form a needle-shaped shape are installed via an anchor bolt (500). 110);
A fastening hole 122 is formed at an upper portion thereof to coincide with the bolt fastening hole 111 a of the fixing bracket 110, and an anchor bolt 300 is installed into a hole formed in the side surface of the bridge upper plate 10. A horizontal support 120 comprising a fixing flange 121 in which the anchor bolt fastening holes 123 are mixed and formed;
A cover body 130 which covers the vertical plate 111 of the fixing bracket 110 and the fixing flange 121 of the horizontal support 120 to make the coupling part look beautiful;
Handrail 140 is installed with a square steel pipe 141 which is installed at the end 124 of the horizontal support 120 to allow pedestrians to safely walk without risk of falling:
Bridge of the bridge characterized in that consisting of a deck plate 150 constituting a floor that is sequentially placed on the top of the wood 151, which is fixedly arranged by a fixing pin at a predetermined interval on the top of the horizontal support 120 Footpath.


KR1020110018849A 2011-03-03 2011-03-03 Construction method and structure for bridge's footpath KR20110033986A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110018849A KR20110033986A (en) 2011-03-03 2011-03-03 Construction method and structure for bridge's footpath

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110018849A KR20110033986A (en) 2011-03-03 2011-03-03 Construction method and structure for bridge's footpath

Publications (1)

Publication Number Publication Date
KR20110033986A true KR20110033986A (en) 2011-04-04

Family

ID=44042675

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110018849A KR20110033986A (en) 2011-03-03 2011-03-03 Construction method and structure for bridge's footpath

Country Status (1)

Country Link
KR (1) KR20110033986A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102470469B1 (en) * 2022-05-13 2022-11-25 (주)한맥기술 Cantilever structure for bridge

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102470469B1 (en) * 2022-05-13 2022-11-25 (주)한맥기술 Cantilever structure for bridge

Similar Documents

Publication Publication Date Title
AU2011100489B4 (en) System and components for safely enclosing handrails, stairways, walkways and platforms
KR100998631B1 (en) Sidewalk for bridge
KR101230336B1 (en) Deck fix device for deckrod system
US20080157046A1 (en) Reusable fall restrain supports and fall arrestor
KR101271446B1 (en) Washer platr of construction sidewalk for bridge
KR100889022B1 (en) Bridge constructing method
CN104131688B (en) The special external hanging type job platform of assembled architecture and method of operating thereof
US8632056B1 (en) Safety rail system
KR101129698B1 (en) Hanger type temporary resources for cantilever and method for construction of cantilever part of bridge using the temporary resources
KR101202609B1 (en) A Sidewalk Enlargement Installation for Slope Way
KR101295823B1 (en) Extension sidewalk and constuction method
CN110805289A (en) Plug-in type discharging platform and construction method
CN204001653U (en) The special-purpose external hanging type job platform of assembled architecture
KR200361531Y1 (en) A checking stand for bridge maintenance care with three steps separation type
KR20110033986A (en) Construction method and structure for bridge's footpath
CA2648177C (en) Integrated walkway system
KR20180008165A (en) Assembly type hand rail
CN207314692U (en) A kind of precast stair
KR100504426B1 (en) Movable Bridge Inspection Device
KR101265098B1 (en) Assembly type guard rail
KR101867332B1 (en) Method for installing assembly type hand rail
KR102008616B1 (en) Support for rail
KR20190094675A (en) Passage for inspection on bridge
CN109267820B (en) Modular movable enclosure with additional visiting walkways and installation method
KR200395096Y1 (en) Length-adjustable guardrail

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
AMND Amendment
E601 Decision to refuse application
AMND Amendment