KR101265098B1 - Assembly type guard rail - Google Patents

Assembly type guard rail Download PDF

Info

Publication number
KR101265098B1
KR101265098B1 KR1020110110290A KR20110110290A KR101265098B1 KR 101265098 B1 KR101265098 B1 KR 101265098B1 KR 1020110110290 A KR1020110110290 A KR 1020110110290A KR 20110110290 A KR20110110290 A KR 20110110290A KR 101265098 B1 KR101265098 B1 KR 101265098B1
Authority
KR
South Korea
Prior art keywords
support
rail
pattern plate
subrail
sides
Prior art date
Application number
KR1020110110290A
Other languages
Korean (ko)
Other versions
KR20130046005A (en
Inventor
유문식
Original Assignee
유문식
주식회사 브리텍
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 유문식, 주식회사 브리텍 filed Critical 유문식
Priority to KR1020110110290A priority Critical patent/KR101265098B1/en
Publication of KR20130046005A publication Critical patent/KR20130046005A/en
Application granted granted Critical
Publication of KR101265098B1 publication Critical patent/KR101265098B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • E04H17/1413Post-and-rail fences, e.g. without vertical cross-members
    • E04H17/1417Post-and-rail fences, e.g. without vertical cross-members with vertical cross-members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • E04H17/1413Post-and-rail fences, e.g. without vertical cross-members
    • E04H17/1447Details of connections between rails and posts
    • E04H17/1452Details of connections between rails and posts the ends of the rails are fixed on the lateral sides of the posts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • E04H17/1413Post-and-rail fences, e.g. without vertical cross-members
    • E04H17/1447Details of connections between rails and posts
    • E04H17/1482Details of connections between rails and posts the rails being attached to the tops of the posts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • E04H17/16Fences constructed of rigid elements, e.g. with additional wire fillings or with posts using prefabricated panel-like elements, e.g. wired frames
    • E04H17/165Fences constructed of rigid elements, e.g. with additional wire fillings or with posts using prefabricated panel-like elements, e.g. wired frames using panels with rigid filling and frame
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • E04H17/20Posts therefor
    • E04H17/22Anchoring means therefor, e.g. specially-shaped parts entering the ground; Struts or the like
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10STECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10S256/00Fences

Abstract

본 발명은 조립형 난간에 관한 것으로서, 난간의 조립식 구조를 이루어 현장설치 및 시공은 물론 부분 파손 발생시 교체작업이 용이하게 이루어질 수 있도록 하기 위한 것이다.
이를 실현하기 위한 본 발명은, 수평방향으로 설치되는 상부레일(10) 및 하부레일(20)과, 상기 상,하부레일(10,20)의 지지를 위해 일정 간격을 유지하며 수직방향으로 세워지는 지주(40)와, 상기 상부레일(10)과 하부레일(20) 사이에 설치되는 무늬판(50)으로 구성되는 난간에 있어서, 상기 상부레일(10)에는 지주(40)의 상단부에 삽입 결합되어지는 결합부(11)가 돌출 구성되어져 있으며; 상기 하부레일(20)은 양단부가 지주(40)의 하단부에 피스결합되어지고; 상기 하부레일(20) 상면에는 무늬판(50)의 하부가 삽입 지지되어질 수 있는 하부지지홈(21)이 형성되며; 상기 지주(40)는 앵커박스(60)의 상면에 지지되어지되, 상기 앵커박스(60) 상면에는 지주(40)의 슬라이딩 유동이 가능하도록 양측을 가이드하기 위한 가이드부(61)가 구성된 것을 특징으로 한다.
The present invention relates to an assembling handrail, to make a prefabricated structure of the handrail to facilitate the replacement work in the event of partial breakage as well as on-site installation and construction.
The present invention for realizing this, the upper rail 10 and the lower rail 20 is installed in the horizontal direction, the upper and lower rails (10, 20) to maintain a constant interval for the support of the erected in the vertical direction In the handrail composed of a support plate 40 and a pattern plate 50 installed between the upper rail 10 and the lower rail 20, the upper rail 10 is inserted into and coupled to the upper end of the support 40. Engaging portion 11 is configured to protrude; Both lower ends of the lower rail 20 is a piece coupled to the lower end of the support (40); A lower support groove 21 in which a lower portion of the pattern plate 50 can be inserted and supported is formed on an upper surface of the lower rail 20; The support 40 is supported on the upper surface of the anchor box 60, the upper surface of the anchor box 60 is characterized in that the guide portion 61 for guiding both sides to allow the sliding flow of the support 40 is configured It is done.

Description

조립형 난간{ASSEMBLY TYPE GUARD RAIL}Prefabricated Railing {ASSEMBLY TYPE GUARD RAIL}

본 발명은 난간에 관한 것으로서, 교량이나 도로변에 설치되는 난간의 결합구조를 조립형으로 개선하여 설치 및 교체작업이 용이하게 이루어질 수 있도록 하기 위한 조립형 난간 구조에 관한 것이다.The present invention relates to a railing, and more particularly to an assembly railing structure for improving a coupling structure of a railing installed on a bridge or roadside so as to facilitate installation and replacement work.

일반적으로 차도와 인도 사이에 설치되거나 언덕길에 설치되어 교통사고나 추락사고 등의 안전사고가 발생하는 것을 방지하는 역할을 하는 난간은 대부분 철재 또는 스테인레스 재질로 이루어져 있으며, 이러한 난간의 지주 및 난간대는 통상 용접에 의하여 결합되는 구조로 이루어져 있었으므로 설치현장에서의 작업공수가 많이 소요되는 문제점이 있었을 뿐만 아니라 용접기 및 전기를 사용하여야 했었으므로 행인의 통행에 지장을 주게 되고, 각종 설비를 설치현장까지 운반하여야 했으며 부대적인 소요비용이 추가되는 폐단이 있었다. 또한, 종래의 난간은 구조적으로도 각 부분이 용접에 의하여 결합되어 있었으므로 용접한 후의 후처리작업이 수반되어야 하며 하자보수시에도 많은 애로점이 있었다.In general, railings installed between roadways and sidewalks or on hillsides to prevent safety accidents such as traffic accidents and falls are mostly made of steel or stainless steel. As it was composed by welding, it was not only a problem that the labor of the installation site was required, but also had to use a welding machine and electricity, which would impede the passage of pedestrians and transported various facilities to the installation site. There was a dismissal that added additional expense. In addition, the conventional railings are structurally coupled to each part by welding, so the post-treatment work after welding must be accompanied, and there are many difficulties in repairing defects.

본 발명은 상기한 종래 난간 결합구조에 있어서의 문제점을 개선하기 위해 제안된 것으로서, 난간을 이루는 각 구조물간에 조립식 결합이 이루어질 수 있는 결합 구조를 제공함으로서 시공이 용이하며 부분 파손시 해당 부위의 교체작업이 용이하게 이루어질 수 있도록 하는데 목적이 있다.The present invention has been proposed to improve the problems in the conventional handrail coupling structure, by providing a coupling structure that can be prefabricated coupling between each structure constituting the railing is easy to construction and replacement of the corresponding part in case of partial breakage The purpose is to make this easy.

상기 목적을 이루기 위한 본 발명은, 수평방향으로 설치되는 상부레일 및 하부레일과, 상기 상,하부레일의 지지를 위해 일정 간격을 유지하며 수직방향으로 세워지는 지주와, 상기 상부레일과 하부레일 사이에 설치되는 무늬판으로 구성되는 난간에 있어서, 상기 상부레일에는 지주의 상단부에 삽입 결합되어지는 결합부가 돌출 구성되어져 있으며; 상기 하부레일은 양단부가 지주의 하단부에 피스결합되어지고; 상기 하부레일 상면에는 무늬판의 하부가 삽입 지지되어질 수 있는 하부지지홈이 형성되며; 상기 지주는 앵커박스의 상면에 지지되어지되, 상기 앵커박스 상면에는 지주의 슬라이딩 유동이 가능하도록 양측을 가이드하기 위한 가이드부가 구성된 것을 특징으로 한다.The present invention for achieving the above object, the upper rail and the lower rail is installed in a horizontal direction, the support for the vertical and maintaining a predetermined interval for the support of the upper, lower rail, and between the upper rail and the lower rail In the handrail is composed of a pattern plate is installed in the upper rail, the engaging portion is inserted into the upper end of the support is configured to protrude; The lower rail is piece-coupled at both ends to the lower end of the support; A lower support groove may be formed on the upper surface of the lower rail to insert and support the lower portion of the pattern plate; The support is supported on the upper surface of the anchor box, characterized in that the guide portion for guiding both sides to enable the sliding flow of the support on the anchor box upper surface.

이러한 본 발명은, 난간의 조립식 구조를 이루어 현장설치 및 시공은 물론 부분 파손 발생시 교체작업이 용이하게 이루어질 수 있게 되며, 이러한 부분 수리에 따른 비용을 절감시킬 수 있게 된다.The present invention, by making the prefabricated structure of the railing can be easily installed in the field installation and construction, as well as replacement work when the breakage occurs, it is possible to reduce the cost of repairing such a part.

또한, 무늬판이 피스나 볼트를 사용하지 않고 끼움 결합에 의한 설치가 이루어질 수 있게 됨으로 시공작업에서의 작업효율을 향상시킬 수 있게 됨을 알 수 있다.In addition, it can be seen that it is possible to improve the work efficiency in the construction work by the installation can be made by fitting the pattern plate without using pieces or bolts.

도 1은 본 발명의 일 실시 예에 따른 난간 설치상태 정면도.
도 2는 본 발명 난간의 상세도 및 부분 투시도.
도 3은 도 2의 A부 확대도.
도 4는 도 2의 B부 확대도.
도 5는 도 2의 C부 확대도.
도 6은 본 발명 난간의 지주부 단면 구조도.
도 7은 도 6의 D부 확대도.
도 8은 도 6의 E부 확대도.
도 9는 도 6의 F부 확대도.
도 10은 본 발명의 다른 실시 예에 따른 난간의 정면도 및 부분 투시도.
도 11은 도 10의 G부 확대도.
도 12는 본 발명 난간의 지주부 단면 구조도.
도 13은 도 12의 H부 확대도.
도 14는 본 발명에서의 무늬판 분리도.
도 15는 본 발명 무늬판의 지지상태 단면 상세도.
도 16은 본 발명 무늬판의 분해상태 단면도.
1 is a front view of a handrail installation state according to an embodiment of the present invention.
Figure 2 is a detailed and partial perspective view of the present invention railings.
3 is an enlarged view of part A of Fig.
4 is an enlarged view of a portion B in Fig.
5 is an enlarged view of a portion C of FIG. 2;
Figure 6 is a cross-sectional structure of the strut portion of the present invention railing.
FIG. 7 is an enlarged view of a portion D of FIG. 6; FIG.
8 is an enlarged view of a portion E of FIG. 6;
9 is an enlarged view of a portion F of FIG. 6;
10 is a front view and a partial perspective view of the handrail according to another embodiment of the present invention.
11 is an enlarged view of a portion G of FIG. 10.
12 is a cross-sectional structural view of the strut portion of the railing of the present invention.
FIG. 13 is an enlarged view of a portion H of FIG. 12; FIG.
Figure 14 is a pattern plate separation in the present invention.
Figure 15 is a detailed cross-sectional view of the support state of the pattern plate of the present invention.
Figure 16 is an exploded cross-sectional view of the pattern plate of the present invention.

이하, 본 발명의 구체적인 실시 예를 첨부 도면을 참조하여 상세히 살펴보기로 한다.Hereinafter, specific embodiments of the present invention will be described in detail with reference to the accompanying drawings.

먼저, 본 발명의 일 실시 예에 따른 조립식 난간의 구조를 도 1 내지 도 9를 통해 살펴보면, 상부레일(10)과 하부레일(20)이 수평방향으로 높이를 달리하여 설치되며, 이러한 상,하부레일(10,20)의 지지를 위해 일정 간격을 유지하며 수직방향으로 세워지는 지주(40)는 지면에 앵커볼트에 의해 고정 설치되는 앵커박스(60)에 지지되어지고, 상부레일(10)과 하부레일(20) 사이에 설치되는 무늬판(50)이 구비된 것을 확인할 수 있다.First, looking at the structure of the prefabricated handrail according to an embodiment of the present invention through Figs. 1 to 9, the upper rail 10 and the lower rail 20 is installed by varying the height in the horizontal direction, such upper, lower The support (40) standing in the vertical direction at regular intervals for supporting the rails (10, 20) is supported by the anchor box (60) fixed to the ground by anchor bolts, the upper rail (10) and It can be seen that the pattern plate 50 provided between the lower rails 20 is provided.

특히, 상부레일(10)에는 지주(40)의 상단부에 삽입 결합되어지는 결합부(11)가 돌출 구성되어져 있는데, 이러한 결합부(11) 내부에는 자체 강도보강을 위한 보강대(11a)가 양측에 일정 각도의 경사를 이루어 대칭형태로 구성되어져 있으며, 하부레일(20)은 양단부가 지주(40)의 하단부에 피스결합되어지고, 하부레일(20) 상면에는 무늬판(50)의 하부가 삽입 지지되어질 수 있는 하부지지홈(21)이 형성되는 조립식 구조를 이루게 된다.In particular, the upper rail 10 is configured to project the coupling portion 11 is inserted into the upper end of the support 40, the inside of the coupling portion 11, the reinforcing table (11a) for reinforcing its own strength on both sides It is formed in a symmetrical form by making an inclined angle, the lower rail 20 is both ends are coupled to the lower end of the support (40), the lower rail 20, the lower surface of the pattern plate 50 is inserted into the support It becomes a prefabricated structure in which the lower support groove 21 can be formed.

그리고, 앵커박스(60) 상면에는 지주(40)의 슬라이딩 유동이 가능하도록 양측을 가이드하기 위한 가이드부(61)가 구성되어지게 된다.And, the upper surface of the anchor box 60 is configured with a guide portion 61 for guiding both sides to enable the sliding flow of the support (40).

한편, 본 실시예에서는 무늬판(50)의 상단부를 지지하기 위한 서브레일(30)이 수평방향으로 더 구성되어지되, 상기 서브레일(30)은 양측이 지주(40)의 상부에 피스결합되어지고, 상기 서브레일(30) 하부에는 서브레일커버(32)가 구성되어지며, 상기 서브레일커버(32)에는 무늬판(50)의 상부가 삽입 지지되어질 수 있는 상부지지홈(33)이 형성된 것을 확인할 수 있다.On the other hand, in the present embodiment, the subrail 30 for supporting the upper end of the pattern plate 50 is further configured in the horizontal direction, the subrail 30 has both sides are coupled to the upper portion of the support (40) The subrail cover 32 is formed under the subrail 30, and the subrail cover 32 has an upper support groove 33 in which an upper portion of the pattern plate 50 can be inserted and supported. You can see that.

이와 같은 구조를 이루는 본 발명 조립식 난간의 설치 및 시공에 따른 작용효과를 살펴보기로 한다.The effect of the installation and construction of the present invention prefabricated handrail constituting such a structure will be described.

본 발명의 난간은 상부레일(10)과 하부레일(20), 서브레일(30), 지주(40), 무늬판(50) 및 앵커박스(60)가 현장에서 조립 설치가 가능한 조립형 구조를 이룸으로서 시공 및 시설물 관리가 용이하게 이루어질 수 있게 된다.The railing of the present invention has an assembly structure in which the upper rail 10 and the lower rail 20, the subrail 30, the support 40, the pattern plate 50, and the anchor box 60 can be assembled in the field. This makes construction and facility management easy.

즉, 지면에 앵커볼트를 이용하여 앵커박스(60)를 일정 간격으로 고정 설치한 후 가이드부(61) 사이에 지주(40)를 수직으로 세워서 안착시키고, 지주(40) 상부에는 상부레일(10)에 구비된 결합부(11)를 끼워서 피스로 고정시킴으로서 상호간에 지지상태를 이루게 된다. That is, the anchor box 60 is fixedly installed at regular intervals using anchor bolts on the ground, and then, the support pillars 61 are vertically seated between the guide portions 61, and the upper rail 10 is formed on the upper support pillars 10. By fitting the coupling part 11 provided in the) by a piece to achieve a mutual support state.

그리고, 하부레일(20)을 역시 피스로 고정시킨 후 하부레일(20)에 형성된 하부지지홈(21)에 일정 문양이 형성된 무늬판(50)을 끼워서 결합시킨 후 상부에는 서브레일(30)을 결합시킴으로서 무늬판(50)의 안정적인 지지가 이루어질 수 있게 된다.Then, after fixing the lower rail 20 by a piece, the pattern plate 50 having a predetermined pattern is coupled to the lower support groove 21 formed in the lower rail 20, and then the subrail 30 is attached to the upper portion. By combining, the stable support of the pattern plate 50 can be made.

특히, 서브레일(30) 하부에 결합된 서브레일커버(32)에는 상부지지홈(33)이 형성되어져 있기 때문에 무늬판(50)이 끼워지게 되며, 서브레일(30)의 양 단부는 도 4에서와 같이 앵커프레임(34)에 의해 지주(40)와 피스 고정이 이루어지게 됨을 알 수 있다.In particular, since the upper support groove 33 is formed in the subrail cover 32 coupled to the lower part of the subrail 30, the pattern plate 50 is fitted, and both ends of the subrail 30 are illustrated in FIG. 4. As can be seen in the anchor frame 34 is fixed to the support 40 and the piece is made.

따라서, 본 발명의 난간은 각 부품간 결합이 조립 방식에 의해 이루어질 수 있게 됨으로 설치가 용이하게 이루어질 수 있게 됨은 물론, 시설물 파손시 해당 부위의 부품 교체가 가능하게 됨으로 수리 및 관리 비용을 절감시키는 이점을 나타내게 된다.
Therefore, the railing of the present invention can be easily installed because the coupling between the parts can be made by the assembly method, as well as the advantage of reducing the repair and management costs by replacing the parts of the corresponding parts when the facility is damaged. Will be displayed.

한편, 도 10 내지 도 16은 본 발명의 다른 실시 예에 따른 조립식 난간 구조를 나타낸 것이다.On the other hand, Figures 10 to 16 shows a prefabricated handrail structure according to another embodiment of the present invention.

즉, 도시된 바와 같이 무늬판(50)의 상부 지지를 위한 별도의 서브레일을 구성시키지 않고, 상부레일(10) 하부에 상부레일커버(12)를 구성시킴에 있어, 상기 상부레일커버(12)에는 무늬판(50)의 상단부가 삽입 지지되어질 수 있는 상부지지홈(13)을 형성시킨 것이다.That is, as shown in the upper rail cover 12 in the lower portion of the upper rail 10, without configuring a separate subrail for the upper support of the pattern plate 50, the upper rail cover 12 ) Is to form an upper support groove 13 that can be inserted into the upper end of the pattern plate 50.

특히, 무늬판(50)은 투명유리판(51)이 중앙에 구비되고, 상기 투명유리판(51)의 보호를 위해 양측에 알루미늄 재질의 금속판(52)이 각각 구비되는 3층 구조를 이루되, 상부지지홈(13) 및 하부지지홈(21)은 각각 투명유리판(51)이 끼워지는 끼움홈(13a,21a)의 양측에 금속판(52)이 안착되는 안착홈(13b,21b)이 높이를 달리하는 계단형태로 형성시킨 것이다.In particular, the pattern plate 50 has a three-layer structure is provided with a transparent glass plate 51 in the center, each of which is provided with a metal plate 52 of aluminum material on both sides for the protection of the transparent glass plate 51, The support groove 13 and the lower support groove 21 are respectively different in height from the mounting grooves 13b and 21b in which the metal plates 52 are seated on both sides of the fitting grooves 13a and 21a into which the transparent glass plate 51 is fitted. It is formed in the form of stairs.

또한, 금속판(52)에는 일정 문양을 형성시키기 위한 통공(52a)이 구비됨으로서 통공(52a) 부위를 통해 주변 경관을 볼 수 있음과 함께 투명유리판(51)에 의해 추락 사고 발생이 방지되어질 수 있게 됨을 알 수 있다.In addition, the metal plate 52 is provided with a through hole 52a for forming a predetermined pattern so that the surrounding scenery can be seen through the through hole 52a and the fall accident can be prevented by the transparent glass plate 51. It can be seen that.

이와 같이 상부레일(10)에 무늬판(50)의 상부 지지를 위한 상부레일커버(12)를 구성시키게 되면, 무늬판(50)의 상부 지지를 위한 별도의 서브레일이 필요치 않게 되어 부품수 절감에 따른 시공 비용을 절감시킴과 함께 보다 신속한 설치가 이루어질 수 있게 된다.When the upper rail cover 12 for the upper support of the pattern plate 50 is configured on the upper rail 10 as described above, a separate subrail for the upper support of the pattern plate 50 is not required, thereby reducing the number of parts. The construction cost can be reduced and the installation can be made faster.

특히, 무늬판(50)의 지지를 위한 상부지지홈(13)과 하부지지홈(21)이 계단식 지지 구조를 이루게 됨으로, 별도의 피스나 볼트 등의 부재를 사용하지 않고 무늬판(50)의 설치가 가능하게 되어 난간 구조물의 구조적 안정성을 극대화할 수 있게 됨을 알 수 있다.
In particular, since the upper support groove 13 and the lower support groove 21 for the support of the pattern plate 50 forms a stepped support structure, without using a member such as a separate piece or bolt of the pattern plate 50 It can be seen that the installation can be maximized the structural stability of the railing structure.

10 : 상부레일 11 : 결합부
11a: 보강대 12 : 상부레일커버
20 : 하부레일 21 : 하부지지홈
30 : 서브레일 32 : 서브레일커버
33 : 상부지지홈 34 : 앵커프레임
40 : 지주 41 : 서브지주
50 : 무늬판 51 : 투명유리판
52 : 금속판 52a: 통공
60 : 앵커박스 61 : 가이드부
10: upper rail 11: coupling portion
11a: reinforcement stand 12: upper rail cover
20: lower rail 21: lower support groove
30: subrail 32: subrail cover
33: upper support groove 34: anchor frame
40: prop 41: sub holding
50: pattern plate 51: transparent glass plate
52 metal plate 52a: through hole
60: anchor box 61: guide part

Claims (5)

수평방향으로 설치되는 상부레일(10) 및 하부레일(20)과, 상기 상,하부레일(10,20)의 지지를 위해 일정 간격을 유지하며 수직방향으로 세워지는 지주(40)와, 상기 상부레일(10)과 하부레일(20) 사이에 설치되는 무늬판(50)으로 구성되는 난간에 있어서,
상기 상부레일(10)에는 지주(40)의 상단부에 삽입 결합되어지는 결합부(11)가 돌출 구성되어져 있으며;
상기 하부레일(20)은 양단부가 지주(40)의 하단부에 피스결합되어지고;
상기 하부레일(20) 상면에는 무늬판(50)의 하부가 삽입 지지되어질 수 있는 하부지지홈(21)이 형성되며;
상기 지주(40)는 앵커박스(60)의 상면에 지지되어지되, 상기 앵커박스(60) 상면에는 지주(40)의 슬라이딩 유동이 가능하도록 양측을 가이드하기 위한 가이드부(61)가 구성된 것을 특징으로 하는 조립형 난간.
The upper rail 10 and the lower rail 20 which are installed in the horizontal direction, the support 40 to stand in the vertical direction while maintaining a predetermined interval for the support of the upper and lower rails (10, 20), and the upper In the handrail composed of a pattern plate 50 provided between the rail 10 and the lower rail 20,
The upper rail (10) is configured to protrude the coupling portion 11 is inserted into the upper end of the support (40);
Both lower ends of the lower rail 20 is a piece coupled to the lower end of the support (40);
A lower support groove 21 in which a lower portion of the pattern plate 50 can be inserted and supported is formed on an upper surface of the lower rail 20;
The support 40 is supported on the upper surface of the anchor box 60, the upper surface of the anchor box 60 is characterized in that the guide portion 61 for guiding both sides to allow the sliding flow of the support 40 is configured Prefab railing made with.
청구항 1에 있어서,
상기 무늬판(50)의 상단부를 지지하기 위한 서브레일(30)이 더 구성되어지되, 상기 서브레일(30)은 양측이 지주(40)의 상부에 피스결합되어지고, 상기 서브레일(30) 하부에는 서브레일커버(32)가 구성되어지며, 상기 서브레일커버(32)에는 무늬판(50)의 상부가 삽입 지지되어질 수 있는 상부지지홈(33)이 형성된 것을 특징으로 하는 조립형 난간.
The method according to claim 1,
Subrail 30 for supporting the upper end of the pattern plate 50 is further configured, the subrail 30 is coupled to the upper side of the support 40, both sides of the subrail 30, the subrail 30 The subrail cover 32 is configured at the bottom, and the subrail cover 32 is assembled railing, characterized in that the upper support groove 33 is formed that can be inserted and supported the upper portion of the pattern plate (50).
청구항 1에 있어서,
상기 결합부(11) 내부에는 자체 강도보강을 위한 보강대(11a)가 양측에 일정 각도의 경사를 이루어 대칭형태로 구성된 것을 특징으로 하는 조립형 난간.
The method according to claim 1,
Inside the coupling portion 11, the reinforcement rails for reinforcing the strength of the self-assembled railings, characterized in that formed in a symmetrical form by making an angle of inclination at both sides.
청구항 1에 있어서,
상기 상부레일(10) 하부에는 상부레일커버(12)가 구성되어지며, 상기 상부레일커버(12)에는 무늬판(50)의 상단부가 삽입 지지되어질 수 있는 상부지지홈(13)이 형성된 것을 특징으로 하는 조립형 난간.
The method according to claim 1,
An upper rail cover 12 is formed below the upper rail 10, and an upper support groove 13 in which the upper end of the pattern plate 50 can be inserted and supported is formed in the upper rail cover 12. Prefab railing made with.
청구항 4에 있어서,
상기 무늬판(50)은 투명유리판(51)이 중앙에 구비되고, 상기 투명유리판(51)의 보호를 위해 양측에 금속판(52)이 각각 구비되는 3층 구조를 이루되, 상부지지홈(13) 및 하부지지홈(21)은 각각 투명유리판(51)이 끼워지는 끼움홈(13a,21a)의 양측에 금속판(52)이 안착되는 안착홈(13b,21b)이 높이를 달리하는 계단형태로 형성된 것을 특징으로 하는 조립형 난간.
The method of claim 4,
The pattern plate 50 is provided with a transparent glass plate 51 in the center, and forms a three-layer structure each provided with metal plates 52 on both sides for protection of the transparent glass plate 51, the upper support groove 13 ) And the lower support groove 21 is in the form of a staircase in which the mounting grooves 13b and 21b, in which the metal plates 52 are seated, are mounted on both sides of the fitting grooves 13a and 21a into which the transparent glass plate 51 is fitted. Assembly railings, characterized in that formed.
KR1020110110290A 2011-10-27 2011-10-27 Assembly type guard rail KR101265098B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110110290A KR101265098B1 (en) 2011-10-27 2011-10-27 Assembly type guard rail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110110290A KR101265098B1 (en) 2011-10-27 2011-10-27 Assembly type guard rail

Publications (2)

Publication Number Publication Date
KR20130046005A KR20130046005A (en) 2013-05-07
KR101265098B1 true KR101265098B1 (en) 2013-05-16

Family

ID=48657800

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110110290A KR101265098B1 (en) 2011-10-27 2011-10-27 Assembly type guard rail

Country Status (1)

Country Link
KR (1) KR101265098B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101457633B1 (en) * 2014-05-12 2014-11-07 주식회사 이진 Guardrail having tilt ability cope with slope way and height adjusting
KR102066048B1 (en) 2019-07-26 2020-01-14 주식회사 리더스산업 Handrails and construction method for reinforcing vertical and hirizontal loads

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102417163B1 (en) * 2021-06-29 2022-07-05 (주)케이앤에스테크 Mixture structure

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100750709B1 (en) 2006-11-22 2007-08-22 박종섭 Closing structure of fabricated balustrade

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100750709B1 (en) 2006-11-22 2007-08-22 박종섭 Closing structure of fabricated balustrade

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101457633B1 (en) * 2014-05-12 2014-11-07 주식회사 이진 Guardrail having tilt ability cope with slope way and height adjusting
KR102066048B1 (en) 2019-07-26 2020-01-14 주식회사 리더스산업 Handrails and construction method for reinforcing vertical and hirizontal loads

Also Published As

Publication number Publication date
KR20130046005A (en) 2013-05-07

Similar Documents

Publication Publication Date Title
KR101215330B1 (en) Angle assembly type bridge inspection passage
KR200490153Y1 (en) Hanger type check equipment for bridge
KR101275100B1 (en) Prefabricated Handrail
KR101018637B1 (en) A constructed foodway
KR102221132B1 (en) Cut-off slope inspection road and its construction method
KR101116740B1 (en) Sidewalk bridge having service hole
KR200441895Y1 (en) Wood guardrail assembling structure
KR102157134B1 (en) Railing structure that can be assembled
KR101265098B1 (en) Assembly type guard rail
KR100989111B1 (en) Tilting access stairway structure for approaching bridge inspection passage
KR200439417Y1 (en) Prefabricated balustrade
CN206015531U (en) Quick assembled type ladder cage
KR101168205B1 (en) Bridge maintenance and administrative passage and constructing method thereof
CN202337942U (en) Movable overpass
CN205475250U (en) Pin -connected panel steel stair in foundation ditch
KR100977482B1 (en) Pedestrian bridges where installation is easy for existence road slope
CN203742205U (en) Temporary stand
CN107227839B (en) Integrated support construction safety platform and installation method
KR101045828B1 (en) Bridge inspection passage
KR101111581B1 (en) Hand rail
KR200490448Y1 (en) Prefabricated Hand Rails for Stairs
KR101073527B1 (en) A sidewalk enlargement installation
KR20100119690A (en) Installation structure of screening panel for construction site
CN209907266U (en) Prefabricated combined reinforced concrete isolation guardrail
KR102079617B1 (en) Combined structure of column and cap

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20160511

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20170522

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20180717

Year of fee payment: 6