KR20110005759U - A support gunny bag for construction - Google Patents

A support gunny bag for construction Download PDF

Info

Publication number
KR20110005759U
KR20110005759U KR2020090015717U KR20090015717U KR20110005759U KR 20110005759 U KR20110005759 U KR 20110005759U KR 2020090015717 U KR2020090015717 U KR 2020090015717U KR 20090015717 U KR20090015717 U KR 20090015717U KR 20110005759 U KR20110005759 U KR 20110005759U
Authority
KR
South Korea
Prior art keywords
construction
rod
retaining wall
reinforcing
reinforcement
Prior art date
Application number
KR2020090015717U
Other languages
Korean (ko)
Inventor
오수영
Original Assignee
오수영
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 오수영 filed Critical 오수영
Priority to KR2020090015717U priority Critical patent/KR20110005759U/en
Publication of KR20110005759U publication Critical patent/KR20110005759U/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0258Retaining or protecting walls characterised by constructional features
    • E02D29/0291Retaining or protecting walls characterised by constructional features made up of filled, bag-like elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0225Retaining or protecting walls comprising retention means in the backfill
    • E02D29/0241Retaining or protecting walls comprising retention means in the backfill the retention means being reinforced earth elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • E02D2200/1628Shapes rectangular
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0075Textiles
    • E02D2300/0076Textiles non-woven

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

본 고안의 한 실시예에 따른 건설용 보강 마대는 보강토 옹벽 공사에 사용될 수 있는 마대로서, 직사각의 부직포 형태로 형성되고 일단이 상기 마대의 일측에 고정되어 외측 방향으로 일정 폭만큼 길게 연장된 보강 부재를 포함하며, 상기 보강 부재는 보강토 옹벽 공사시 수평으로 펼쳐져서 사면에 매설되거나 상층으로 적층되는 다른 하나의 마대 상면에 포개지는 것을 특징으로 한다. 이에 의하면, 옹벽 시공시 적층이 용이하고 신속하며, 붕괴된 사면처리를 위한 옹벽 시공시 적층된 마대들의 무너짐 또는 흩어짐을 방지하기 위한 별도의 보강재가 생략될 수 있으며, 보강재의 생략에 따라 공사비가 절감될 수 있는 이점이 있다.Reinforcing rod for construction according to an embodiment of the present invention is a rod that can be used for reinforcement earth retaining wall construction, is formed in a rectangular non-woven form and one end is fixed to one side of the rod is extended by a certain width in the outward direction It includes, and the reinforcing member is laid out horizontally during construction of the reinforcement earth retaining wall is characterized in that it is superimposed on the upper surface of the other one is embedded on the slope or stacked in the upper layer. According to this, the lamination is easy and rapid when constructing the retaining wall, and a separate reinforcement for preventing collapse or scattering of the stacked slats may be omitted when constructing the retaining wall for the collapsed slope, and construction cost is reduced by omitting the reinforcing material. There is an advantage that can be.

마대, 보강 부재 Hemp, reinforcement

Description

건설용 보강 마대{A SUPPORT GUNNY BAG FOR CONSTRUCTION}Construction reinforcement rod {A SUPPORT GUNNY BAG FOR CONSTRUCTION}

본 고안은 건설용 보강 마대에 관한 것으로, 더욱 상세하게는 적층이 용이하고 신속하며, 옹벽 시공시 공사비가 절감될 수 있도록 한 건설용 보강 마대에 관한 것이다.The present invention relates to a reinforcing rod for construction, and more particularly, to a reinforcing rod for construction that can be easily and quickly laminated, the construction cost can be reduced when the retaining wall construction.

일반적으로 홍수나 다짐 부족으로 인하여 붕괴된 사면을 복원하기 위해 유실된 공간에 흙이나 돌망태 등으로 보수 작업을 실시하고 있으나, 흙이나 돌망태를 이용하는 경우 사면의 유실된 부분의 공간 다짐 작업을 완벽하게 하지 못하는 문제가 있었다. 그리고 돌망태 등은 자중 때문에 침하되어 무너지는 경우가 있고 사석을 채워 돌망태를 제작시에 공사비가 증대되는 문제점이 있었다.In general, to repair slopes collapsed due to flooding or lack of compaction, repair work is performed on the lost spaces with soil or gabions.However, when using soil or gabions, space compaction of lost parts of slopes is not perfect. There was no problem. In addition, gabions, etc., may be subsided and collapsed due to their own weight.

한편 흙과 돌망태를 이용하는 것 이외에 소정 크기의 블록들, 기타의 구조물들을 이용하는 경우에는 자재비, 공사비 등이 증가되는 문제가 있었으며, 보수를 위한 사면의 형태에 용이하게 적용하기에는 다소 어려움이 있었다.On the other hand, when using blocks and other structures of a predetermined size in addition to using soil and gabions, there was a problem in that the material cost, construction cost, etc. was increased, and it was difficult to easily apply to the shape of the slope for repair.

이와 같은 문제를 해결하기 위하여 최근에는 토사를 채워 축조할 수 있는 마대를 이용한 보강토 공법이 활용되고 있으나 마대를 쌓아 올릴시 마대의 적층 상태가 견고하지 못하여 쉽게 무너지거나 흩어지는 현상이 발생되었다.In order to solve such a problem, reinforcement earth method using a sack that can be built up and filled with soil has been used recently, but when stacking stools, the stacking state of the stalks is not strong and easily collapses or scatters.

이러한 종래의 문제를 해결하기 위하여 다양한 형태의 마대들이 고안되고 있으며, 대한민국 실용신안출원 제20??2008??0004118호 건설용 보강 마대가 고안된바 있다.In order to solve this conventional problem, various types of rods have been devised, and the Korean Utility Model Application No. 20 ?? 2008 ?? 0004118 construction reinforcing rods have been devised.

상기 종래의 건설용 보강 마대는 마대의 상, 하면에 암, 수의 벨크로 테이프를 부착하여 마대의 적층시 벨크로 테이프들에 의해 마대들이 결합되도록 하여 마대의 적층 상태가 견고해지도록 하였다.The conventional construction reinforcing rods are attached to the upper and lower legs of the female and male Velcro tapes so that the stacking state of the rods is firmly coupled by the Velcro tapes when stacking the rods.

그러나 종래의 건설용 보강 마대는 마대의 적층시 암, 수의 벨크로 테이프들을 정확이 대응시켜야하는 번거러움이 있었고, 암, 수의 벨크로 테이프들이 정확히 상호 부착되지 못하는 경우에는 다시 분리하여 부착하여야 하며, 한번 부착된 벨크로 테이프들이 쉽게 떨어지지 않는 등의 문제가 있었다.However, the conventional construction reinforcement rod has the trouble of accurately matching the male and male velcro tapes when stacking the stools, and if the female and male velcro tapes cannot be correctly attached to each other, they must be detached and attached again. There was a problem that the attached Velcro tapes did not fall easily.

따라서, 마대의 적층시 비교적 신속하지 못하고, 마대를 적층하는 작업이 용이하지 못하였다.Therefore, the stacking of the stacks is relatively quick and the stacking of stacks is not easy.

따라서 본 고안이 해결하고자 하는 과제는 옹벽 시공시 적층이 용이하고 신속하며, 적층된 상태를 견고히 할 수 있도록 한 건설용 보강 마대를 제공하는데 있다.Therefore, the problem to be solved by the present invention is to provide a reinforcing rod for construction to facilitate the stacking when the retaining wall construction, it is possible to solidify the stacked state.

상술한 과제를 해결하기 위한 본 고안의 한 실시예에 따른 건설용 보강 마대는 보강토 옹벽 공사에 사용될 수 있는 마대로서, 직사각의 부직포 형태로 형성되고 일단이 상기 마대의 일측에 고정되어 외측 방향으로 일정 폭만큼 길게 연장된 보강 부재를 포함하며, 상기 보강 부재는 보강토 옹벽 공사시 수평으로 펼쳐져서 사면에 매설되거나 상층으로 적층되는 다른 하나의 마대 상면에 포개지는 것을 특징으로 한다.Construction reinforcing rod according to an embodiment of the present invention for solving the above problems is a rod that can be used for reinforcement retaining wall construction, is formed in a rectangular non-woven fabric and one end is fixed to one side of the rod is constant in the outward direction The reinforcing member extends as long as the width, wherein the reinforcing member is laid out horizontally during construction of the reinforcement soil retaining wall is characterized in that it is superimposed on the other top of the ridge embedded in the slope or stacked in the upper layer.

상기 보강 부재는 일단이 상기 마대의 좌측 또는 우측의 마감 테두리에 재봉되어 상기 마대에 고정되는 것을 특징으로 한다.The reinforcing member is characterized in that one end is sewn to the finishing edge of the left or right of the stem is fixed to the stem.

본 고안의 다른 실시예에 따른 건설용 보강 마대는 보강 부재는 일단이 상기 마대의 전면 또는 후면의 중앙에 재봉되어 상기 마대에 고정되는 것을 특징으로 한다.The reinforcing rod for construction according to another embodiment of the present invention is characterized in that the reinforcing member is fixed to the rod by one end is sewn in the center of the front or rear of the rod.

본 고안에 따른 건설용 보강 마대에 의하면, 옹벽 시공시 적층이 용이하고 신속하며, 적층된 상태를 견고히 할 수 있으며, 붕괴된 사면처리를 위한 옹벽 시공 시 적층된 마대들의 무너짐 또는 흩어짐을 방지하기 위한 별도의 보강재가 생략될 수 있으며, 보강재의 생략에 따라 공사비가 절감될 수 있는 효과가 있다.According to the reinforcing rod for construction according to the present invention, it is easy and rapid lamination during the construction of the retaining wall, it is possible to solidify the stacked state, and to prevent the collapse or scattering of the stacked slats during the construction of the retaining wall for the collapsed slope treatment Separate reinforcement can be omitted, there is an effect that the construction cost can be reduced by the omission of the reinforcement.

기타 실시예의 구체적인 사항들은 상세한 설명 및 도면들에 포함되어 있다.Specific details of other embodiments are included in the detailed description and drawings.

본 고안의 이점 및 특징, 그리고 그것들을 달성하는 방법은 첨부되는 도면과 함께 상세하게 후술되어 있는 실시예를 참조하면 명확해질 것이다.BRIEF DESCRIPTION OF THE DRAWINGS The advantages and features of the present invention, and how to accomplish them, will become apparent with reference to the embodiments described in detail below with reference to the accompanying drawings.

그러나 본 고안은 이하에서 개시되는 실시예에 한정되는 것이 아니라 서로 다른 다양한 형태로 구현될 것이며, 단지 본 실시예는 본 고안의 개시가 완전하도록 하며, 본 고안이 속하는 기술분야에서 통상의 지식을 가진 자에게 고안의 범주를 완전하게 알려주기 위해 제공되는 것이며, 본 고안은 청구항의 범주에 의해 정의될 뿐이다.However, the present invention is not limited to the embodiments disclosed below, but will be implemented in various different forms, only this embodiment is to make the disclosure of the present invention is complete, and having ordinary skill in the art It is provided to inform the full disclosure of the scope of the invention, and the invention is defined only by the scope of the claims.

이하, 첨부된 도면을 참조로 하여 본 고안에 따른 건설용 보강 마대에 대하여 상세히 설명한다.Hereinafter, with reference to the accompanying drawings will be described in detail for the reinforcing rod for construction according to the present invention.

도 1은 본 고안의 한 실시예에 따른 건설용 보강 마대를 나타낸 사시도이다.1 is a perspective view showing a reinforcing rod for construction according to an embodiment of the present invention.

본 고안에 따른 마대(10)는 부직포 형태로 형성되며 폴리프로필렌(PP) 및 폴리에티렌(PE)와 같은 다양한 합성수지사를 이용하여 제직되어 있으며, 카본이 2.5%이상 혼합되는 것이 바람직하다. 그리고 상호 포개진 두 부직포의 상단을 제외한 삼방향의 테두리(12)가 재봉되어 상단에는 토사를 투입할 수 있는 투입구(11)가 형성되어 있다.The stem 10 according to the present invention is formed in a nonwoven fabric and is woven using various synthetic resins such as polypropylene (PP) and polystyrene (PE), and carbon is preferably mixed at least 2.5%. And the edge 12 of the three directions excluding the top of the two overlapping non-woven fabric is sewn so that the top is formed with an inlet 11 for injecting the soil.

한편, 마대(10)의 우측 테두리(12)에는 보강 부재(13)가 구비되어 있다. 보강 부재(13)는 마대(10)와 동일한 재질 및 직사각의 부직포 형태로 형성되며, 일단이 마대(10)의 우측 테두리(12)에 재봉되어 고정되며 다른 일단이 외측 방향을 향하여 일정 폭만큼 길게 연장되어 있다.On the other hand, the reinforcing member 13 is provided in the right edge 12 of the stem 10. The reinforcing member 13 is formed of the same material and rectangular nonwoven fabric as the stem 10, and one end is sewn and fixed to the right edge 12 of the stem 10, the other end is extended by a predetermined width toward the outer direction It is extended.

여기서, 보강 부재(13)의 연장된 폭은 마대(10) 내부에 토사를 채워서 적층할 때 상층으로 적층되는 마대(10)의 일부에 포개질 수 있는 정도의 길이일 수 있다.Here, the extended width of the reinforcing member 13 may be such that the length of the reinforcing member 13 can be superimposed on a portion of the muck 10 to be stacked in the upper layer when the soil filling in the muck 10 is stacked.

이하에서는 본 고안에 따른 건설용 보강 마대의 특징 및 이점이 더욱 부각될 수 있도록 본 고안의 마대(10)를 이용한 보강토 옹벽 시공 과정을 중심으로 설명한다.Hereinafter will be described focusing on the reinforced soil retaining wall construction process using the pole 10 of the present invention so that the features and advantages of the reinforcing rod for construction according to the present invention can be further highlighted.

먼저, 토사가 채워진 마대(10)를 다수 준비한 후, 붕괴된 사면의 전방에서 최하층에 상기 마대(10)를 일정 거리만큼 이격시켜서 위치시킨다. 이때, 마대(10)의 일측에 구비된 보강 부재(13)를 사면측으로 펼쳐 놓는다.First, after preparing a large number of sack 10 filled with earth and sand, the stool 10 is positioned at a distance from the front of the collapsed slope to the lowest layer. At this time, the reinforcing member 13 provided on one side of the stem 10 is spread to the slope side.

그리고 마대(10)의 후방, 즉 마대(10)와 사면 사이에 뒷채움흙(1)을 채워서 다짐하면서 보강 부재(13)가 뒷채움흙(1) 내에 묻혀서 눌리도록 한다.And while filling the back filling soil (1) between the rear of the spigot 10, that is, between the pod 10 and the slope, the reinforcing member 13 is buried in the back filling soil (1) to be pressed.

다음으로 최하층 마대(10)의 상층에 추가의 마대(10)를 쌓아 올린다. 이때, 마대(10)의 일측의 보강 부재(13)를 사면측으로 펼쳐서 최하층의 뒷채움흙(1) 상부에 놓이게 하며, 이 상태로 마대(10)와 사면 사이에 다시 뒷채움흙(1)을 채워서 다짐하면서 보강 부재(13)가 뒷채움흙(1) 내에 묻혀서 눌리도록 한다.Next, an additional sack 10 is piled up on the uppermost stratum 10. At this time, unfold the reinforcing member 13 on one side of the sack 10 to the slope side to be placed on the top of the back filling soil (1) of the lowest layer, in this state to fill the back filling soil (1) between the stool 10 and the slope again. While the reinforcing member 13 is buried in the backfill soil (1) to be pressed.

이와 같이 마대(10) 일측의 보강 부재(13)가 펼쳐진 상태로 다수의 마대(10)를 순차적으로 쌓아 올리면서 뒷채움흙(1)을 채움 및 다지는 작업을 반복적으로 실시하면서 도 2와 같이 옹벽시공을 완료한다.As such, while the reinforcing member 13 on one side of the rod 10 is unfolded, a plurality of rods 10 are sequentially stacked while repeatedly filling and compacting the backfilling soil 1 while retaining wall construction as shown in FIG. 2. To complete.

상술한 옹벽 시공 과정과 같이 옹벽을 시공하면 마대(10)를 쌓을 때 보강 부재(13)가 뒷채움흙(1)에 묻혀서 눌리면서 고정되므로 순차적으로 적층된 마대(10)들의 고정상태가 견고해질 수 있다. When the retaining wall is constructed as in the above-described retaining wall construction process, the reinforcing member 13 is fixed while being buried in the back-filling soil 1 when the sack 10 is stacked, and thus the fixed state of the sequential stacks 10 that are sequentially stacked may be firmly fixed. .

따라서, 붕괴된 사면처리를 위한 옹벽 시공시 적층된 마대(10)들의 무너짐 또는 흩어짐을 방지하기 위한 별도의 보강재가 생략될 수 있으며, 보강재의 생략에 따라 공사비가 절감될 수 있다.Therefore, a separate reinforcement for preventing collapse or scattering of the stacked stems 10 when constructing the retaining wall for collapsed slope treatment may be omitted, and construction cost may be reduced by omitting the reinforcement.

이하에서는 본 고안의 다른 실시예에 따른 건설용 보강마대를 도 3을 참조하여 본 고안의 한 실시예에 따른 건설용 보강마대와의 차이점을 중심으로 설명한다. 도 3은 본 고안의 다른 실시예에 따른 건설용 보강마대를 나타낸 사시도이다. Hereinafter, with reference to Figure 3 to the construction reinforcing rod according to another embodiment of the present invention will be described centering on the difference from the construction reinforcing rod according to an embodiment of the present invention. 3 is a perspective view showing a reinforcing rod for construction according to another embodiment of the present invention.

본 고안의 다른 실시예에 따른 건설용 보강마대(20)는 보강 부재(23)의 일단이 마대(20)의 전면 또는 후면의 중앙에 재봉되어 마대(20)에 고정되는 것을 제외하고는 본 고안의 한 실시예에 따른 건설용 보강마대(10)와 동일하다.Construction reinforcing rod 20 according to another embodiment of the present invention is the present invention except that one end of the reinforcing member 23 is sewn in the center of the front or rear of the stem 20 is fixed to the stem 20 The same as the construction reinforcing rod 10 according to one embodiment of the.

이러한 본 고안의 다른 실시예에 따른 건설용 보강마대(20)는 협소한 공간에서 마대(20)들 간의 적층 상태를 견고하게 하면서 옹벽 시공이 가능하다.Construction reinforcing rod 20 according to another embodiment of the present invention can be installed in the retaining wall while making the stacking state between the rods 20 in a narrow space.

즉, 붕괴된 사면처리를 위한 옹벽 시공시 마대(20)를 쌓기 위한 공간이 협소하여 보강 부재(23)를 펼칠 수 있는 공간이 확보되지 못하는 경우, 도 4와 같이 먼저 사면에 근접하게 최하층의 마대(20)를 위치시키고, 최하층의 마대(20) 상층으로 추가의 마대(20)를 쌓아올리며, 이때 최하층 마대(20) 상면 중앙 부위에 고정된 보강 부재(23)를 상층에 적층된 마대(20)가 감싸지도록 상층 마대(20)의 상면으로 감아올린다.That is, when the space for stacking the sack 20 for the construction of the collapsed slope treatment is not enough to secure the space to expand the reinforcing member 23, as shown in FIG. 4, the bottom stool is close to the slope first. Position the 20, and pile up the additional spigot 20 to the upper stratum 20 of the lowest tier, at this time the stiffening member 23 fixed to the central portion of the upper surface of the lowest spigot 20, the lap 20 laminated ) Is rolled up to the upper surface of the upper spigot 20 so as to be wrapped.

그리고 다시 추가의 마대(20)를 쌓아 올리고, 다시 마대(20)의 보강 부재(23)는 다음으로 쌓아 올려지는 마대(20)의 상면으로 감아 올려진다.And again pile up the sack 20, the reinforcing member 23 of the sack 20 is rolled up to the upper surface of the sack 20 to be stacked next.

이와 같은 과정을 반복하여 좁은 공간에서 옹벽을 시공할 수 있으며, 마대(20)의 보강 부재(23)들이 상층의 마대(20)에 감싸져서 고정되므로 마대(20)의 적층된 상태가 견고해질 수 있다.By repeating this process, the retaining wall can be constructed in a narrow space, and the stacking state of the stem 20 can be firmly fixed because the reinforcing members 23 of the stem 20 are wrapped and fixed to the stem 20 of the upper layer. have.

도 1은 본 고안의 한 실시예에 따른 건설용 보강 마대의 구성을 나타낸 사시도.1 is a perspective view showing the configuration of a reinforcing rod for construction according to an embodiment of the present invention.

도 2는 본 고안의 한 실시예에 따른 건설용 보강 마대의 적층 상태를 나타낸 개략적 측면도.Figure 2 is a schematic side view showing a laminated state of the reinforcing rod for construction according to an embodiment of the present invention.

도 3은 본 고안의 다른 실시예에 따른 건설용 보강 마대의 구성을 나타낸 사시도.Figure 3 is a perspective view showing the configuration of the reinforcing rod for construction according to another embodiment of the present invention.

도 4는 본 고안의 다른 실시예에 따른 건설용 보강 마대의 적층 상태를 나타낸 개략적 측면도.Figure 4 is a schematic side view showing a laminated state of the reinforcing rod for construction according to another embodiment of the present invention.

* 도면의 주요 부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

10, 20 : 마대 11 : 투입구10, 20: Stable 11: Inlet

12 : 테두리 13, 23 : 보강 부재12: border 13, 23: reinforcement member

Claims (3)

보강토 옹벽 공사에 사용될 수 있는 마대로서,As a harness that can be used for reinforcement retaining wall construction, 직사각의 부직포 형태로 형성되고 일단이 상기 마대의 일측에 고정되어 외측 방향으로 일정 폭만큼 길게 연장된 보강 부재를 포함하며,A reinforcing member formed in the form of a rectangular nonwoven fabric and having one end fixed to one side of the fork and extending for a predetermined width in an outward direction, 상기 보강 부재는 보강토 옹벽 공사시 수평으로 펼쳐져서 사면에 매설되거나 상층으로 적층되는 다른 하나의 마대 상면에 포개지는 것을 특징으로 하는 건설용 보강 마대.The reinforcing member is a reinforcing rod for construction, characterized in that when the reinforcement earth retaining wall construction is horizontally laid on the other top of the other buried buried in the slope or stacked in the upper layer. 제1항에 있어서,The method of claim 1, 상기 보강 부재는 일단이 상기 마대의 좌측 또는 우측의 마감 테두리(12)에 재봉되어 상기 마대에 고정되는 것을 특징으로 하는 건설용 보강 마대.The reinforcing member is a reinforcing rod for construction, characterized in that the one end is sewn to the left or right of the finishing rim 12 is fixed to the rod. 제1항에 있어서,The method of claim 1, 상기 보강 부재는 일단이 상기 마대의 전면 또는 후면의 중앙에 재봉되어 상기 마대에 고정되는 것을 특징으로 하는 건설용 보강 마대.The reinforcing member is a reinforcing rod for construction, characterized in that one end is sewn to the center of the front or rear of the rod is fixed to the rod.
KR2020090015717U 2009-12-03 2009-12-03 A support gunny bag for construction KR20110005759U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020090015717U KR20110005759U (en) 2009-12-03 2009-12-03 A support gunny bag for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020090015717U KR20110005759U (en) 2009-12-03 2009-12-03 A support gunny bag for construction

Publications (1)

Publication Number Publication Date
KR20110005759U true KR20110005759U (en) 2011-06-10

Family

ID=49295081

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020090015717U KR20110005759U (en) 2009-12-03 2009-12-03 A support gunny bag for construction

Country Status (1)

Country Link
KR (1) KR20110005759U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102017113B1 (en) * 2018-11-27 2019-09-02 박광명 Objects Internet-based industrial pouch

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102017113B1 (en) * 2018-11-27 2019-09-02 박광명 Objects Internet-based industrial pouch

Similar Documents

Publication Publication Date Title
KR100924933B1 (en) Construction method of retaining wall using soil sack block for vegetation and fixed device and Structure for installation thereof
US8182179B2 (en) Support structure and method of installing the structure
KR101301915B1 (en) Method for reinforcing slope using gabion
KR100679873B1 (en) Construction method of breast wall for tree planting
JP5714338B2 (en) Embankment reinforced earth wall construction method and temporary restraint material for embankment reinforced earth wall used therefor
KR101221944B1 (en) Gabion
KR101175098B1 (en) Fill-up structure for back-area of rigid wall structure and construction method of the same
JP2009281104A (en) Reinforcement banking construction method
KR20110005759U (en) A support gunny bag for construction
CN112049134A (en) Grid for ecological slope protection and construction method thereof
JP5868352B2 (en) How to lay a road on the slope
JPH05171652A (en) Slope stability method
KR101799952B1 (en) Water preloading method using steel system wall
KR102194293B1 (en) Breast wall structure
KR100995097B1 (en) Method for constructing wall block
KR101184831B1 (en) Slope reinforcing bag with environment-friendly by coir
KR101385025B1 (en) Method for reinforcing slope using gabion
TWI558887B (en) Construction methods and filling methods for weak sites and sites with liquefaction concerns, as well as structural bags
KR20080000510U (en) A support gunny bag for construction
KR20140123350A (en) Soil bag for vegetation and the fence building method which uses
JPH04108914A (en) Structure for reinforced banking body
JP2000319884A (en) Reinforced mud wall structure
KR101188230B1 (en) Retaining wall used soil bag block, and building a retaining wall
JP2023544968A (en) retaining wall structure
KR101073972B1 (en) External member, retaing wall for planting using the same and construction method thereof

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application