KR20100040177A - Mat for construction on weak subgrade and construction method for foundation using the same - Google Patents

Mat for construction on weak subgrade and construction method for foundation using the same Download PDF

Info

Publication number
KR20100040177A
KR20100040177A KR1020080099277A KR20080099277A KR20100040177A KR 20100040177 A KR20100040177 A KR 20100040177A KR 1020080099277 A KR1020080099277 A KR 1020080099277A KR 20080099277 A KR20080099277 A KR 20080099277A KR 20100040177 A KR20100040177 A KR 20100040177A
Authority
KR
South Korea
Prior art keywords
soft ground
mat
ground work
work mat
main body
Prior art date
Application number
KR1020080099277A
Other languages
Korean (ko)
Other versions
KR101075198B1 (en
Inventor
정준교
이기웅
Original Assignee
정준교
이기웅
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 정준교, 이기웅 filed Critical 정준교
Priority to KR1020080099277A priority Critical patent/KR101075198B1/en
Publication of KR20100040177A publication Critical patent/KR20100040177A/en
Application granted granted Critical
Publication of KR101075198B1 publication Critical patent/KR101075198B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/28Stressing the soil or the foundation structure while forming foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • E02D2200/1678Shapes triangular
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • E02D2200/1692Shapes conical or convex
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/007Resins including glasfibers

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

PURPOSE: A mat for a weak soil foundation task and a basic method of construction using the same are provided to reduce the construction period and to reduce the construction costs by recycling material with durability. CONSTITUTION: A mat for a weak soil foundation task comprises an equipment supporting part(110) and a plurality of protrusions(120). The equipment supporting part is formed on top of the main body so that the construction machinery works. The protrusion is formed on the bottom surface of the main body. The basic method of construction is as follows. The mat for the weak soil foundation task is established in the upper side of the weak soil foundation. The soil is installed on top of the mat for the weak soil foundation task and forms a compaction layer. A board is established on top of the compaction layer.

Description

연약지반 작업용 매트 및 이를 이용한 기초 공법{MAT FOR CONSTRUCTION ON WEAK SUBGRADE AND CONSTRUCTION METHOD FOR FOUNDATION USING THE SAME}MAT FOR CONSTRUCTION ON WEAK SUBGRADE AND CONSTRUCTION METHOD FOR FOUNDATION USING THE SAME}

본 발명은 토목 분야에 관한 것으로서, 상세하게는 연약지반의 기초 공법에 관한 것이다.The present invention relates to the field of civil engineering, and more particularly, to a foundation method of soft ground.

건설공사의 초기 단계에서 수행되는 토공에는 대규모의 장비들이 사용되는데, 연약지반의 경우 이러한 장비의 중량을 지탱할 수 없으므로, 연약지반의 표면에 작업용 매트를 깔고 장비가 그 위를 운행하면서 작업을 진행하게 된다.Earthworks used in the early stages of construction work use large-scale equipment. Soft ground can't support the weight of such equipment, so put a work mat on the surface of the soft ground and make the equipment run on it. do.

도 1은 종래의 연약지반 작업용 매트(1)가 연약지반(10) 위에 설치된 구성을 간략히 도시한 것이다.1 briefly illustrates a configuration in which a conventional soft ground work mat 1 is installed on a soft ground 10.

종래의 연약지반 작업용 매트(1)는 나무, 합성수지 등의 재질에 의해 단순한 판형 구조로 이루어지는 것이 일반적이다.Conventional soft ground work mat (1) is generally made of a simple plate-shaped structure made of a material such as wood, synthetic resin.

그런데, 이러한 종래의 연약지반 작업용 매트(1)는 내구성이 좋지 않아 재활용이 어렵다는 점, 지지력 및 침하에 대한 안정성이 좋지 않다는 점, 작업성이 좋지 않다는 점 등의 문제가 제기되어 왔다.By the way, such a conventional soft ground work mat (1) has a problem that it is difficult to recycle because of poor durability, poor stability of support and settlement, poor workability and the like has been raised.

본 발명은 상기와 같은 문제점을 해결하기 위하여 도출된 것으로서, 내구성이 우수하여 재활용이 가능함에 따라 공사비용을 줄일 수 있고, 지지력 및 침하에 대한 안정성이 우수하며, 작업성이 향상되어 공기를 단축할 수 있도록 하는 연약지반 작업용 매트 및 이를 이용한 기초 공법을 제시하는 것을 그 목적으로 한다.The present invention has been derived to solve the above problems, it is possible to reduce the construction cost as it can be recycled because of excellent durability, excellent stability for bearing capacity and settlement, improve workability and shorten the air The purpose of the present invention is to present a soft ground working mat and a basic construction method using the same.

본 발명은 상술한 바와 같은 목적을 달성하기 위하여, 건설장비가 작업할 수 있도록 본체의 상부에 형성된 장비 지지부(110); 상기 본체의 저면에 돌출형성된 다수의 돌기(120);를 포함하는 것을 특징으로 하는 연약지반 작업용 매트(100)를 제시한다.The present invention to achieve the object as described above, the equipment support 110 formed on the upper portion of the main body so that the construction equipment can work; It proposes a soft ground work mat (100) comprising a; a plurality of protrusions 120 protruding on the bottom of the main body.

상기 돌기(120)의 기저부는 뾰족한 것이 바람직하다.The base of the protrusion 120 is preferably pointed.

상기 돌기(120)의 횡단면은 삼각 형상인 것이 바람직하다.The cross section of the protrusion 120 is preferably triangular.

상기 돌기(120)는 피라미드 또는 원뿔 형상인 것이 바람직하다.The protrusion 120 is preferably a pyramid or cone shape.

상기 본체는 판형 구조를 취할 수 있다.The body may take the form of a plate.

상기 본체는 상기 돌기(120)의 상면에 요홈(130)이 형성된 것이 바람직하다.The main body is preferably a groove 130 is formed on the upper surface of the protrusion (120).

상기 요홈(130)의 내면은 상기 돌기(120)의 외면과 실질적으로 동일한 형상인 것이 바람직하다.The inner surface of the recess 130 is preferably the same shape as the outer surface of the protrusion 120.

상기 본체 중 상기 다수의 돌기(120)의 사이 영역에는 잔여공극 채움공(140)이 형성된 것이 바람직하다.It is preferable that the remaining gap filling hole 140 is formed in an area between the plurality of protrusions 120 of the main body.

상기 돌기(120)에는 물다짐공(121)이 형성된 것이 바람직하다.It is preferable that the projection 120 has a compaction hole 121 formed therein.

본 발명은 상기 목적을 달성하기 위한 또 다른 수단으로서, 연약지반(10) 상면에 상기 연약지반 작업용 매트(100)를 설치하는 단계; 상기 연약지반 작업용 매트(100)의 상부에 토사를 포설하고 다짐하여 다짐층(20)을 형성하는 단계; 상기 다짐층(20)의 상부에 판재(30)를 설치하는 단계;를 포함하는 기초 공법을 제시한다.The present invention as another means for achieving the above object, the step of installing the soft ground work mat 100 on the soft ground (10); Laying soil on top of the soft ground work mat (100) and compacting to form a compaction layer (20); Presenting a basic method comprising a; installing the plate material 30 on top of the compaction layer (20).

본 발명은 연약지반(10) 상면에 상기 연약지반 작업용 매트(100)를 설치하는 단계; 상기 연약지반 작업용 매트(100)의 상부에 토사를 포설하고 다짐하여 다짐층(20)을 형성하는 단계; 상기 다짐층(20)의 상부에 콘크리트(40)를 타설하는 단계;를 포함하는 기초 공법을 함께 제시한다.The present invention comprises the steps of installing the soft ground work mat 100 on the soft ground (10); Laying soil on top of the soft ground work mat (100) and compacting to form a compaction layer (20); Presenting a basic method including a; pouring the concrete 40 on top of the compaction layer (20).

본 발명은 연약지반(10) 상면에 상기 연약지반 작업용 매트(100)를 설치하는 단계; 상기 연약지반 작업용 매트(100)의 상부에 토사를 포설하고 다짐하여 다짐층(20)을 형성하는 단계; 상기 다짐층(20)의 상부에 토사를 포설하여 포설층(21)을 형성하는 단계; 상기 포설층(21)의 상부에 또 다른 상기 연약지반 작업용 매트(100a)를 설치하는 단계; 상기 또 다른 연약지반 작업용 매트(100a)의 상부에 2차로 토사를 포설하고 다짐하여 2차 다짐층(22)을 형성하는 단계; 상기 2차 다짐층(22)의 상부에 콘크리트(40)를 타설하는 단계;를 포함하는 기초 공법을 함께 제시한다.The present invention comprises the steps of installing the soft ground work mat 100 on the soft ground (10); Laying soil on top of the soft ground work mat (100) and compacting to form a compaction layer (20); Laying soil on top of the compaction layer (20) to form a laying layer (21); Installing another soft ground work mat (100a) on top of the laying layer (21); Laying second soil on the top of the another soft ground work mat (100a) and compacting to form a second compaction layer (22); Presenting a foundation method including a; pouring the concrete 40 on top of the second compaction layer (22).

본 발명은 내구성이 우수하여 재활용이 가능함에 따라 공사비용을 줄일 수 있고, 지지력 및 침하에 대한 안정성이 우수하며, 작업성이 향상되어 공기를 단축 할 수 있도록 하는 연약지반 작업용 매트 및 이를 이용한 기초 공법을 제시한다.The present invention has excellent durability and can be recycled to reduce the construction cost, excellent bearing capacity and stability against settlement, and improved workability to reduce the air for soft ground work mat and basic construction method using the same To present.

이하, 첨부도면을 참조하여 본 발명의 실시예에 관하여 상세히 설명한다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 2 이하에 도시된 바와 같이, 본 발명에 의한 연약지반 작업용 매트(100)는 기본적으로, 건설장비가 작업할 수 있도록 본체의 상부에 형성된 장비 지지부(110); 본체의 저면에 돌출형성된 다수의 돌기(120);를 포함하는 것을 특징으로 한다.As shown in Figure 2 below, the soft ground work mat 100 according to the present invention is basically, the equipment support 110 formed on the upper portion of the main body so that construction equipment can work; It characterized in that it comprises a; a plurality of protrusions 120 protruding on the bottom of the main body.

즉, 종래의 연약지반 작업용 매트(1)와 같이 단순한 판형 구조를 취하는 것이 아니라, 본체의 저면에 돌출형성된 다수의 돌기(120)가 형성된 구조를 취함으로써, 매트(100)를 연약지반 위에 놓는 것만으로 일종의 팽이기초 구조물이 형성되도록 한 것이다.That is, rather than taking a simple plate-like structure like the conventional soft ground work mat (1), by taking a structure formed with a plurality of protrusions 120 protruding on the bottom of the main body, it is only to place the mat 100 on the soft ground As a result, a kind of creeper base structure is formed.

이는 FRP, 재생압축 플라스틱 등의 합성수지 재질에 의해 형성하는 경우 내구성이 우수하여 재활용이 가능함에 따라 공사비용을 줄일 수 있다는 효과가 있다.This has the effect of reducing the construction cost as it can be recycled because of excellent durability when formed by synthetic resin materials such as FRP, recycled compressed plastics.

또한, 본체의 저면에 형성된 돌기(120)는 팽이기초와 같이 하중분산효과를 일으키므로, 지지력 및 침하에 대한 안정성이 우수하다는 장점이 있다.In addition, the protrusion 120 formed on the bottom surface of the main body has a load dispersing effect like the entangled grass, and thus has an advantage of excellent bearing capacity and stability against settlement.

나아가, 단지 매트(100)를 연약지반 상면에 놓는 것만으로 위와 같은 효과를 얻을 수 있는바, 작업성이 향상되어 공기를 단축할 수 있다는 효과를 추가로 얻도록 한다.Furthermore, by simply placing the mat 100 on the soft ground, the above effects can be obtained, and thus the workability is improved to further reduce the air.

본체의 저면에 형성되는 돌기(120)는 다양한 구조를 취할 수 있는데, 팽이기초와 같은 하중분산효과를 얻기 위해서는, 돌기(120)의 기저부가 뾰족한 것이 좋 고, 나아가 돌기(120)의 횡단면이 삼각 형상을 취하는 것이 더욱 좋다.The protrusions 120 formed on the bottom of the main body may have various structures. In order to obtain a load-dispersing effect such as a entanglement, the base of the protrusions 120 may be sharp, and the cross section of the protrusions 120 may be triangular. Better to take shape.

즉, 돌기(120)는 피라미드 또는 원뿔 형상을 취하는 것이 바람직한 것이다.That is, the protrusion 120 preferably takes the shape of a pyramid or a cone.

도 3에 도시된 바와 같이 본체가 판형 구조를 취하는 경우, 장비 지지부(110)는 그 본체의 편평한 상면에 의해 형성된다.When the main body has a plate-like structure as shown in Fig. 3, the equipment support 110 is formed by the flat top surface of the main body.

다만, 연약지반의 표면에서 이루어지는 토공은 대규모 공사이고, 따라서 작업용 매트도 대단히 많은 수가 필요한바, 매트의 제조비용을 절감하기 위해서는, 도 4에 도시된 바와 같이, 본체 중 돌기(120)의 상면에 요홈(130)이 형성된 구조를 취하는 것이 바람직하다.However, the earthwork made on the surface of the soft ground is a large-scale construction, and therefore a very large number of work mats are required. In order to reduce the manufacturing cost of the mat, as shown in FIG. 4, the upper surface of the protrusion 120 of the main body is shown. It is preferable to take the structure in which the groove 130 is formed.

이 경우 본체의 상면에 토사를 채우고 그 위를 장비들이 운행하면 되므로, 매트의 제조비용을 절감하면서도, 연약지반 상면의 작업성 제고라는 목적을 충분히 달성할 수 있기 때문이다.In this case, it is necessary to fill the earth and sand on the upper surface of the main body to operate the equipment thereon, while reducing the manufacturing cost of the mat, while achieving the purpose of improving the workability of the upper surface of the soft ground.

이러한 취지로 요홈(130)은 가능한 한 크게 형성되는 것이 바람직한바, 도 4와 같이 요홈(130)의 내면이 돌기(120)의 외면과 실질적으로 동일한 형상을 취하도록 하는 것이 좋다.For this purpose, the groove 130 is preferably formed as large as possible. As shown in FIG. 4, the inner surface of the groove 130 may have a shape substantially the same as the outer surface of the protrusion 120.

또한 이 경우, 도 5와 같이 다수의 매트(100,100a)의 단부가 상호 접촉하도록 연결하여 사용할 수도 있고, 도 6과 같이 다수의 매트(100,100a)의 단부가 상호 겹이음되도록 연결하여 사용할 수도 있다.In this case, as shown in FIG. 5, the ends of the plurality of mats 100 and 100a may be connected to each other, or as shown in FIG. 6, the ends of the plurality of mats 100 and 100a may be connected to overlap each other. .

후자의 경우, 연약지반의 연약도가 크거나, 장비의 중량이 큰 경우 효과적으로 활용될 수 있다.In the latter case, when the softness of the soft ground is large or the weight of the equipment is large, it can be effectively used.

이하, 위와 같은 구조를 취하는 본 발명에 의한 연약지반 작업용 매트(100) 를 이용한 기초공법에 대하여 설명한다.Hereinafter, the basic construction method using the soft ground work mat 100 according to the present invention having the above structure will be described.

상술한 바와 같이, 본 발명에 의한 연약지반 작업용 매트(100)는 그 자체가 팽이기초에 의한 하중분산효과의 원리를 채용한 것이므로, 이를 이용하여 기초 구조물을 형성할 수 있다.As described above, the soft ground work mat 100 according to the present invention employs the principle of the load distribution effect due to the entanglement of the ground, so that it can form a basic structure by using the same.

도 7은 본 발명에 의한 기초공법의 제1실시예를 설명하기 위한 것이다.7 is for explaining the first embodiment of the foundation method according to the present invention.

도시된 바와 같이, 이는 연약지반(10) 상면에 연약지반 작업용 매트(100)를 설치하고, 그 연약지반 작업용 매트(100)의 상부에 토사를 포설하고 다짐하여 다짐층(20)을 형성한 후, 다짐층(20)의 상부에 철판 등의 판재(30)를 설치함으로써 이루어진다.As shown, this is to install the soft ground work mat 100 on the upper surface of the soft ground (10), after laying the soil on the top of the soft ground working mat 100 and compacted to form a compacting layer (20) And the plate material 30, such as an iron plate, is provided in the upper part of the compaction layer 20. FIG.

이 위에서 장비의 작업을 진행할 수도 있고, 기초가 견고할 필요없는 간이 구조물을 이 위에 축조할 수도 있다.The work of the equipment can be carried out on this, and a simple structure can be constructed on this, where the foundation does not need to be solid.

도 8에 도시된 바와 같이, 연약지반 작업용 매트(100)의 다수의 돌기(120)의 사이 영역에 잔여공극 채움공(140)이 형성되는 경우, 이를 통해 토사를 추가로 채워줌으로써 더욱 견고한 기초 구조물을 이룰 수 있다는 장점이 있다.As shown in Figure 8, when the remaining void filling hole 140 is formed in the area between the plurality of protrusions 120 of the soft ground work mat 100, through this to further fill the soil through the more solid foundation structure There is an advantage that can be achieved.

또한, 도 9에 도시된 바와 같이, 돌기(120)에 다수의 물다짐공(121)이 형성되는 경우, 이를 통해 물을 부어 매트(100)의 하부에 물다짐을 수행할 수 있다는 장점이 추가된다.In addition, as shown in FIG. 9, when a plurality of compaction holes 121 are formed in the protrusions 120, the advantage of adding compaction to the lower portion of the mat 100 may be performed by pouring water therethrough. do.

도 10은 본 발명에 의한 기초공법의 제2실시예를 설명하기 위한 것이다.10 is for explaining the second embodiment of the foundation method according to the present invention.

이는 연약지반(10) 상면에 연약지반 작업용 매트(100)를 설치하고, 연약지반 작업용 매트(100)의 상부에 토사를 포설하고 다짐하여 다짐층(20)을 형성한 후, 그 다짐층(20)의 상부에 콘크리트(40)를 타설하는 것이다.This is to install the soft ground work mat 100 on the upper surface of the soft ground (10), and to form a compaction layer (20) by laying the soil on the top of the soft ground working mat 100 and compaction, the compaction layer (20) The concrete 40 is poured on top.

이 또한 기초가 견고할 필요없는 간이 구조물의 축조에 활용될 수 있다.This can also be used for construction of simple structures where the foundation does not have to be rigid.

도 11은 본 발명에 의한 기초공법의 제3실시예를 설명하기 위한 것이다.11 is for explaining the third embodiment of the foundation method according to the present invention.

연약지반(10) 상면에 연약지반 작업용 매트(100)를 설치하고, 연약지반 작업용 매트(100)의 상부에 토사를 포설하고 다짐하여 다짐층(20)을 형성한 후, 다짐층(20)의 상부에 토사를 포설하여 포설층(21)을 형성한다.After installing the soft ground work mat 100 on the upper surface of the soft ground 10, laying the soil on the top of the soft ground work mat 100, and compacting to form the compaction layer 20, the compaction layer 20 The soil layer is laid on the upper part to form the laying layer 21.

그 포설층(21)의 상부에 또 다른 상기 연약지반 작업용 매트(100a)를 설치하고, 그 연약지반 작업용 매트(100a)의 상부에 2차로 토사를 포설하고 다짐하여 2차 다짐층(22)을 형성한 후, 2차 다짐층(22)의 상부에 콘크리트(40)를 타설한다.Another soft ground work mat 100a is installed on the laying layer 21, and the second soil compaction layer 22 is laid and compacted on the top of the soft ground work mat 100a. After the formation, the concrete 40 is poured on the second compaction layer 22.

즉, 이는 2층의 연약지반 작업용 매트(100,100a)가 사용되고, 2차에 걸친 다짐이 수행되는 견고한 기초 공법으로서, 간이 구조물뿐만 아니라 어느 정도의 하중을 부담하는 구조물의 기초로서도 활용될 수 있는 것이다.That is, this is a solid foundation method using two layers of soft ground work mats (100, 100a) and compaction is carried out two times, can be used as a foundation of a structure that bears a certain load as well as a simple structure. .

나아가, 상기와 같이 잔여공극 채움공(140), 물다짐공(121)이 형성된 매트(100)를 이용하는 경우, 더욱 견고한 기초 구조를 이룰 수 있음은 물론이다.Furthermore, in the case of using the mat 100 having the remaining void filling hole 140 and the compaction hole 121 as described above, it is a matter of course that a more solid base structure can be achieved.

이상은 본 발명에 의해 구현될 수 있는 바람직한 실시예의 일부에 관하여 설명한 것에 불과하므로, 주지된 바와 같이 본 발명의 범위는 위의 실시예에 한정되어 해석되어서는 안 될 것이며, 위에서 설명된 본 발명의 기술적 사상과 그 근본을 함께 하는 기술적 사상은 모두 본 발명의 범위에 포함된다고 할 것이다.Since the above has been described only with respect to some of the preferred embodiments that can be implemented by the present invention, the scope of the present invention, as is well known, should not be construed as limited to the above embodiments, the present invention described above It will be said that both the technical idea and the technical idea which together with the base are included in the scope of the present invention.

도 1은 종래의 연약지반 작업용 매트의 설치상태를 도시한 단면도.1 is a cross-sectional view showing an installation state of a conventional soft ground work mat.

도 2 내지 9는 본 발명에 의한 연약지반 작업용 매트의 실시예를 도시한 것으로서,2 to 9 show an embodiment of the soft ground work mat according to the present invention,

도 2는 제1실시예의 사시도.2 is a perspective view of a first embodiment;

도 3은 제1실시예의 단면도.3 is a cross-sectional view of the first embodiment.

도 4는 제2실시예의 단면도.4 is a sectional view of a second embodiment;

도 5는 제2실시예의 제1사용상태도.5 is a first use state diagram of the second embodiment;

도 6은 제2실시예의 제2사용상태도.6 is a second use state diagram of the second embodiment;

도 7은 제2실시예의 제3사용상태도.Fig. 7 is a third use state diagram of the second embodiment.

도 8은 제3실시예의 사시도.8 is a perspective view of a third embodiment;

도 9는 제4실시예의 단면도.9 is a sectional view of a fourth embodiment.

도 10은 본 발명에 의한 기초 공법의 제1실시예에 관한 단면도.10 is a cross-sectional view relating to a first embodiment of the foundation method according to the present invention.

도 11은 본 발명에 의한 기초 공법의 제2실시예에 관한 단면도.11 is a cross-sectional view relating to a second embodiment of the foundation method according to the present invention.

**도면의 주요부분에 대한 부호의 설명**** Description of the symbols for the main parts of the drawings **

10 : 연약지반 20 : 다짐층10: soft ground 20: compacted layer

21 : 포설층 22 : 2차 다짐층21: laying layer 22: second compaction layer

30 : 판재 40 : 콘크리트30: plate 40: concrete

100,100a : 연약지반 작업용 매트 110 : 장비 지지부100,100a: soft ground work mat 110: equipment support

120 : 돌기 121 : 물다짐공120: protrusion 121: compaction ball

130 : 요홈 140 : 잔여공극 채움공130: groove 140: remaining void filling hole

Claims (12)

건설장비가 작업할 수 있도록 본체의 상부에 형성된 장비 지지부(110);Equipment support 110 formed on the upper portion of the main body so that construction equipment can work; 상기 본체의 저면에 돌출형성된 다수의 돌기(120);를A plurality of protrusions 120 protruding from the bottom of the main body; 포함하는 것을 특징으로 하는 연약지반 작업용 매트(100).Soft ground work mat, characterized in that it comprises a (100). 제1항에 있어서,The method of claim 1, 상기 돌기(120)의 기저부는 뾰족한 것을 특징으로 하는 연약지반 작업용 매트(100).The base of the protrusion 120 is a soft ground work mat, characterized in that the point 100. 제2항에 있어서,The method of claim 2, 상기 돌기(120)의 횡단면은 삼각 형상인 것을 특징으로 하는 연약지반 작업용 매트(100).Cross section of the protrusion 120 is a soft ground work mat, characterized in that the triangular shape. 제3항에 있어서,The method of claim 3, 상기 돌기(120)는 피라미드 또는 원뿔 형상인 것을 특징으로 하는 연약지반 작업용 매트(100).The protrusion 120 is a soft ground work mat, characterized in that the pyramid or cone shape. 제1항에 있어서,The method of claim 1, 상기 본체는 판형 구조인 것을 특징으로 하는 연약지반 작업용 매트(100).The main body is a soft ground work mat (100), characterized in that the plate-shaped structure. 제1항에 있어서,The method of claim 1, 상기 본체는 상기 돌기(120)의 상면에 요홈(130)이 형성된 것을 특징으로 하는 연약지반 작업용 매트(100).The main body is a soft ground work mat (100), characterized in that the groove 130 is formed on the upper surface of the protrusion (120). 제6항에 있어서,The method of claim 6, 상기 요홈(130)의 내면은 상기 돌기(120)의 외면과 실질적으로 동일한 형상인 것을 특징으로 하는 연약지반 작업용 매트(100).The inner surface of the groove 130 is a soft ground work mat (100), characterized in that the shape substantially the same as the outer surface of the projection (120). 제6항에 있어서,The method of claim 6, 상기 본체 중 상기 다수의 돌기(120)의 사이 영역에는 잔여공극 채움공(140)이 형성된 것을 특징으로 하는 연약지반 작업용 매트(100).Soft ground work mat (100), characterized in that the remaining gap filling hole 140 is formed in the area between the plurality of protrusions 120 of the main body. 제6항에 있어서,The method of claim 6, 상기 돌기(120)에는 물다짐공(121)이 형성된 것을 특징으로 하는 연약지반 작업용 매트(100).The projection 120 is a soft ground work mat (100), characterized in that the compaction hole 121 is formed. 연약지반(10) 상면에 제6항 내지 제9항 중 어느 한 항의 연약지반 작업용 매트(100)를 설치하는 단계;Installing the soft ground work mat (100) of any one of claims 6 to 9 on the upper surface of the soft ground (10); 상기 연약지반 작업용 매트(100)의 상부에 토사를 포설하고 다짐하여 다짐 층(20)을 형성하는 단계;Laying soil on top of the soft ground work mat (100) and compacting to form a compaction layer (20); 상기 다짐층(20)의 상부에 판재(30)를 설치하는 단계;를Installing a plate 30 on the top of the compaction layer 20; 포함하는 기초 공법.Foundation method to include. 연약지반(10) 상면에 제6항 내지 제9항 중 어느 한 항의 연약지반 작업용 매트(100)를 설치하는 단계;Installing the soft ground work mat (100) of any one of claims 6 to 9 on the upper surface of the soft ground (10); 상기 연약지반 작업용 매트(100)의 상부에 토사를 포설하고 다짐하여 다짐층(20)을 형성하는 단계;Laying soil on top of the soft ground work mat (100) and compacting to form a compaction layer (20); 상기 다짐층(20)의 상부에 콘크리트(40)를 타설하는 단계;를Pouring concrete 40 on top of the compaction layer 20; 포함하는 기초 공법.Foundation method to include. 연약지반(10) 상면에 제6항 내지 제9항 중 어느 한 항의 연약지반 작업용 매트(100)를 설치하는 단계;Installing the soft ground work mat (100) of any one of claims 6 to 9 on the upper surface of the soft ground (10); 상기 연약지반 작업용 매트(100)의 상부에 토사를 포설하고 다짐하여 다짐층(20)을 형성하는 단계;Laying soil on top of the soft ground work mat (100) and compacting to form a compaction layer (20); 상기 다짐층(20)의 상부에 토사를 포설하여 포설층(21)을 형성하는 단계;Laying soil on top of the compaction layer (20) to form a laying layer (21); 상기 포설층(21)의 상부에 또 다른 상기 연약지반 작업용 매트(100a)를 설치하는 단계;Installing another soft ground work mat (100a) on top of the laying layer (21); 상기 또 다른 연약지반 작업용 매트(100a)의 상부에 2차로 토사를 포설하고 다짐하여 2차 다짐층(22)을 형성하는 단계;Laying second soil on the top of the another soft ground work mat (100a) and compacting to form a second compaction layer (22); 상기 2차 다짐층(22)의 상부에 콘크리트(40)를 타설하는 단계;를Pouring concrete 40 on top of the second compaction layer 22; 포함하는 기초 공법.Foundation method to include.
KR1020080099277A 2008-10-09 2008-10-09 Mat for construction on weak subgrade and construction method for foundation using the same KR101075198B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080099277A KR101075198B1 (en) 2008-10-09 2008-10-09 Mat for construction on weak subgrade and construction method for foundation using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080099277A KR101075198B1 (en) 2008-10-09 2008-10-09 Mat for construction on weak subgrade and construction method for foundation using the same

Publications (2)

Publication Number Publication Date
KR20100040177A true KR20100040177A (en) 2010-04-19
KR101075198B1 KR101075198B1 (en) 2011-10-19

Family

ID=42216367

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080099277A KR101075198B1 (en) 2008-10-09 2008-10-09 Mat for construction on weak subgrade and construction method for foundation using the same

Country Status (1)

Country Link
KR (1) KR101075198B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103410139A (en) * 2013-08-20 2013-11-27 深圳市市政工程总公司 Backfill compacting method of narrow region of foundation pit
KR101408049B1 (en) * 2012-08-30 2014-06-18 삼원실업 주식회사 A process of reinforcing soft ground

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101899797B1 (en) * 2016-07-21 2018-09-19 주식회사 엘림종합건설 Mat

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101408049B1 (en) * 2012-08-30 2014-06-18 삼원실업 주식회사 A process of reinforcing soft ground
CN103410139A (en) * 2013-08-20 2013-11-27 深圳市市政工程总公司 Backfill compacting method of narrow region of foundation pit
CN103410139B (en) * 2013-08-20 2015-08-26 深圳市市政工程总公司 Foundation ditch narrow zone backfill densification process

Also Published As

Publication number Publication date
KR101075198B1 (en) 2011-10-19

Similar Documents

Publication Publication Date Title
KR101591812B1 (en) Block-type reinforced earth retaining wall construction method and steel rod grid reinforcing material is installed
KR100933642B1 (en) A reinforcement method and that of structure using very soft ground
CN100549310C (en) The apparatus and method that are used for tower reinforcing foundation
KR102265384B1 (en) Foundation structure for photovoltaic power generator and construction method thereof
KR101075198B1 (en) Mat for construction on weak subgrade and construction method for foundation using the same
KR20090069477A (en) Precast block temporary road construction method using uniformly distributed load
KR101394208B1 (en) The eco-friendly stone net for protecting riverbank and sloping surface structure
JP2013087533A (en) Foundation block for soft ground
KR101401730B1 (en) Reinforcing method of bearing power for soft ground and reinforcing apparatus used in the same method
JP5800546B2 (en) Precast foundation plates, foundations for precast structures and construction methods for earth retaining structures
EA014868B1 (en) Support structure for a soft ground
KR101065726B1 (en) Prefabricated retaining wall
CN207244615U (en) A kind of friction pile is combined into one structure with structure pile
KR101198703B1 (en) Method for draining soft ground
CN207714341U (en) A kind of double-row pile formula pile plate wall slope retaining structure
CN206245321U (en) Cut slope composite supporting construction
KR101214375B1 (en) Backhoe Vibrating Method of Top Pile Foundation
KR101625652B1 (en) Ground structure for walkway and construction method of the same
KR100787099B1 (en) Method for manufacturing retaining wall and retaining wall manufactured thereof
KR20140036766A (en) Railway roadbed having seismic structure
JP2013221347A (en) Ground structure and ground improvement method
CN109339030A (en) A kind of ground setting method of skyscraper
CN111764218B (en) Overhead sidewalk floor tile laying structure
CN212128698U (en) Foam light soil abutment backfill embankment
JP4187781B1 (en) Road surface drainage zone

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20141010

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20151005

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20170608

Year of fee payment: 6

R401 Registration of restoration
FPAY Annual fee payment

Payment date: 20181015

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20190820

Year of fee payment: 9