KR20100039080A - Movement type apparatus for constructing and detaching frame panel of a steel box bridge - Google Patents

Movement type apparatus for constructing and detaching frame panel of a steel box bridge Download PDF

Info

Publication number
KR20100039080A
KR20100039080A KR1020080098297A KR20080098297A KR20100039080A KR 20100039080 A KR20100039080 A KR 20100039080A KR 1020080098297 A KR1020080098297 A KR 1020080098297A KR 20080098297 A KR20080098297 A KR 20080098297A KR 20100039080 A KR20100039080 A KR 20100039080A
Authority
KR
South Korea
Prior art keywords
formwork
steel box
horizontal
bridge
body frame
Prior art date
Application number
KR1020080098297A
Other languages
Korean (ko)
Other versions
KR101030053B1 (en
Inventor
황하수
Original Assignee
황하수
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 황하수 filed Critical 황하수
Priority to KR1020080098297A priority Critical patent/KR101030053B1/en
Publication of KR20100039080A publication Critical patent/KR20100039080A/en
Application granted granted Critical
Publication of KR101030053B1 publication Critical patent/KR101030053B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/04Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type

Abstract

PURPOSE: A movable form installation and dismantlement apparatus for a steel box bridge is provided to facilitate the installation and dismantlement of the form panel, reduce construction time and construction costs, and increase working efficiency. CONSTITUTION: A movable form installation and dismantlement apparatus for a steel box bridge comprises a body frame(10), a wheel(20), a workbench(30), a first form dismantling tool, a second form dismantling tool(50), a first form unit(60), and a second form unit(70). The body frame comprises a parallel horizontal beam(11) and a downstream vertical beam. The wheel is installed on the lower end of the parallel horizontal beam of the body frame. The wheel travels on the central part of a bridge deck slab(7) placed on the top of a steel box(5). The workbench is connected to a horizontal support(15) of a body frame. The first form dismantling tool is installed inside the horizontal support of the body frame. The second form dismantling tool is installed outside the horizontal support of the body frame. The first form unit is coupled with the first form dismantling tool. The second form unit is coupled with the second form dismantling tool.

Description

스틸박스 교량의 이동식 거푸집 설치 및 해체장치{MOVEMENT TYPE APPARATUS FOR CONSTRUCTING AND DETACHING FRAME PANEL OF A STEEL BOX BRIDGE}MOVEMENT TYPE APPARATUS FOR CONSTRUCTING AND DETACHING FRAME PANEL OF A STEEL BOX BRIDGE}

본 발명은 스틸박스 교량의 교량상판의 양측부를 콘크리트로 타설하고자 할 때 사용되는 거푸집패널을 설치 및 해체하는 데 사용되는 스틸박스 교량의 거푸집 설치 및 해체장치에 관한 것이다.The present invention relates to a formwork installation and dismantling device of the steel box bridge used to install and dismantle the formwork panel used when placing both sides of the bridge top plate of the steel box bridge to concrete.

일반적으로 교량은 그 상부구조에 따라 슬래브 교량, 거더교, 트러스교, 아치교, 라멘교, 현수교, 사장교로 구분되고, 이 중에서 거더 교량은 또 다시 T자형, 판형, 스틸박스형 등으로 구분되는데, 도 1에는 일반적인 스틸박스형 교량의 부분저면사시도가 도시된다.In general, bridges are divided into slab bridges, girder bridges, truss bridges, arch bridges, ramen bridges, suspension bridges, and cable-stayed bridges according to their superstructures. Among them, girder bridges are further divided into T-shape, plate shape, steel box type, and the like. Shows a partial bottom perspective view of a typical steel box-type bridge.

스틸박스형 교량(3)의 경우에는 도 1에 도시되는 바와 같이, 콘크리트 교각(4)의 상부에 교좌장치(도시되지 않음)를 설치한 후 이 교좌장치의 상부에 스틸박스(5)를 안착시킨 다음, 스틸박스(5)의 측면에 일정 등간격을 갖도록 가로빔(6a)과 세로빔(6b)으로 격자구조물(6)을 설치하여 전체 교량구조물을 구성하게 된다.In the case of the steel box-type bridge (3), as shown in Figure 1, after installing a bridge device (not shown) on the top of the concrete pier (4), the steel box (5) is placed on the top of the bridge device Next, the grating structure 6 is installed by the horizontal beam 6a and the vertical beam 6b so as to have a predetermined equal interval on the side of the steel box 5 to form the entire bridge structure.

또한 스틸박스형 교량(3)의 교량상판슬래브(7)의 타설에 있어서 그 중앙부는 스틸박스(5) 상에 직접 타설하면 되지만 그 양측부는 격자구조물(6)에 의해 형성되는 격자형 공간 상에 거푸집패널을 설치한 다음, 콘크리트를 부어 양생시켜 교량상판슬래브를 타설하여야 한다.In addition, in the placing of the bridge deck slab 7 of the steel box-type bridge 3, the center portion of the steel slab 7 may be directly placed on the steel box 5, but both sides thereof are formed in a grid-like space formed by the lattice structure 6. After installing the panels, the concrete should be poured and cured to pour the bridge deck slabs.

그러나 교량상판슬래브(7)의 양측부의 타설을 위한 거푸집을 설치하기 위해서는 비계구조물를 지면으로부터 거의 교량상판슬래브(7)의 바닥높이까지 쌓은 다음 장선과 멍에를 서로 교차되게 적층시키고, 그 상부에 합판 재질의 거푸집패널을 설치하여야 하고 교량상판슬래브(7)의 타설이 완성되면 모두 해체하여 다음의 구간에서 전술한 작업을 반복하여야 하므로, 작업효율성이 떨어질 뿐만 아니라 교량 전체의 시공기간 및 시공비가 많이 소요되며, 특히 거푸집패널의 해체작업이 매우 복잡한 문제점이 있으며, 해체작업시 낙하물에 의해 안전사고가 빈번하게 발생되고 있는 문제점이 있다.However, in order to install the formwork for placing both sides of the bridge slab (7), the scaffolding structure is piled up from the ground to almost the floor height of the bridge slab (7), and then the joists and yokes are laminated to each other, and the plywood material on top When the formwork panel is installed, and when the bridge deck slab is completed, it must be dismantled and the above-mentioned work must be repeated in the next section. Therefore, the work efficiency is reduced and the construction period and construction cost of the entire bridge are high. In particular, there is a problem that the dismantling work of the formwork panel is very complicated, and safety accidents are frequently caused by falling objects during the dismantling work.

본 발명의 목적은 교량상판슬래브의 양측부를 콘크리트로 타설함에 있어서 교량상판슬래브의 바닥높이까지 비계구조물을 설치할 필요없이 거푸집패널이 간단용이하게 설치될 수 있어 작업효율성이 대폭적으로 증대되고 전체 시공기간 및 시공비가 현저히 절감될 수 있도록 한 스틸박스 교량의 이동식 거푸집 설치 및 해체장치를 제공하기 위한 것이다.It is an object of the present invention that the formwork panel can be easily installed without the need to install the scaffolding structure up to the floor height of the bridge slab when placing both sides of the bridge slab into concrete, greatly increasing the work efficiency and the overall construction period and It is to provide a mobile formwork installation and dismantling device of a steel box bridge so that construction costs can be significantly reduced.

본 발명의 다른 목적은 거푸집패널의 해체작업이 더욱 용이하게 이루어질 수 있도록 한 스틸박스 교량의 이동식 거푸집 설치 및 해체장치를 제공하기 위한 것이다.Another object of the present invention is to provide a mobile formwork installation and dismantling device of the steel box bridge to be made easier to dismantle the formwork panel.

전술한 본 발명의 목적들은, 교각의 상부에 안착되는 스틸박스의 양측에 가로빔과 세로빔으로 형성되는 격자구조물 상에 교량상판슬래브의 양측부를 타설하기 위한 거푸집을 설치 및 해체하기 위한 스틸박스 교량의 거푸집 설치 및 해체장치에 있어서, 상기 교량상판슬래브를 가로질러 연장되는 평행수평보의 양단에 수평지지대가 구비된 하향수직보가 연결되고 상기 평행수평보와 하향수직보들은 각각 연결보강대에 의해 연결되어 형성되는 본체프레임과, 상기 본체프레임의 평행수평보의 하단에 설치되고 상기 스틸박스의 상부에 타설된 교량상판슬래브의 중앙부 상을 주행하는 휠과, 상기 본체프레임의 수평지지대에 양측 상단이 연결되어 상기 스틸박 스의 양측에 길이방향으로 설치되는 작업대와, 상기 본체프레임의 수평지지대의 내측에 설치되는 제 1 거푸집해체기구와, 상기 본체프레임의 수평지지대의 외측에 설치되는 제 2 거푸집해체기구와, 상기 제 1 거푸집해체기구에 결합되며 상기 스틸박스에 설치되는 격자구조물 중 서로 마주보는 가로빔에 걸쳐 설치되는 제 1 거푸집유닛과, 상기 제 2 거푸집해체기구에 결합되며 상기 스틸박스에 설치되는 격자구조물 중 세로빔의 외측에 설치되는 제 2 거푸집유닛을 포함하여 이루어지는 것을 특징으로 하는 스틸박스 교량의 이동식 거푸집 설치 및 해체장치를 제공함에 의해 달성된다.Objects of the present invention described above, the steel box bridge for installing and dismantling the formwork for placing both sides of the bridge deck slab on the lattice structure formed of horizontal beam and vertical beam on both sides of the steel box seated on the upper part of the bridge In the formwork installation and dismantling apparatus of the vertical horizontal beam is provided with horizontal support at both ends of the parallel horizontal beam extending across the bridge deck slab, the parallel horizontal beam and the down vertical beam are connected by connecting reinforcement, respectively The main frame is formed, a wheel installed at the lower end of the parallel horizontal beam of the main body frame and traveling on the center portion of the bridge deck slab mounted on the upper portion of the steel box, and the upper end of both sides connected to the horizontal support of the main frame Worktables installed in the longitudinal direction on both sides of the steel box, and installed inside the horizontal support of the main body frame The first formwork disassembling mechanism, the second formwork disassembling mechanism installed on the outside of the horizontal support of the main body frame, and the first formwork disassembly mechanism is coupled to the horizontal beam facing each other among the grid structure installed in the steel box The first formwork unit is installed over, and the second formwork unit is coupled to the second formwork disassembly mechanism and comprises a second formwork unit installed on the outside of the longitudinal beam of the grid structure installed in the steel box By providing a mobile formwork installation and dismantling device.

본 발명의 바람직한 특징에 따르면, 상기 본체프레임의 평행수평보는 각각 상기 교량상판슬래브의 폭에 따라 길이조절 가능하게 형성된다.According to a preferred feature of the invention, the parallel horizontal beam of the main body frame is formed to be adjustable in length in accordance with the width of the bridge deck slab, respectively.

본 발명의 바람직한 특징에 따르면, 상기 본체프레임의 하향수직보는 상기 본체프레임의 평행수평보의 양단에 힌지결합되고, 상기 본체프레임 상에는 상기 평행수평보에 대해 상기 하향수직보를 회동시키는 윈치기구가 구비되며, 상기 하향수직보가 연결되는 평행수평보의 양단에는 상기 하향수직보의 임의회동을 방지하는 회동방지핀이 결합된다.According to a preferred feature of the present invention, the downward vertical beam of the main body frame is hinged to both ends of the parallel horizontal beam of the main body frame, on the main body frame is provided with a winch mechanism for rotating the downward vertical beam relative to the parallel horizontal beam. The anti-rotation pins are coupled to both ends of the parallel horizontal beams to which the downward vertical beams are connected.

본 발명의 바람직한 특징에 따르면, 상기 제 1 및 제 2 거푸집해체기구는 나사봉의 조작에 의해 수직이동 가능하게 형성되는 공지된 마름모형 잭기구으로 형성된다.According to a preferred feature of the present invention, the first and second formwork disassembly mechanisms are formed of known rhombus jack mechanisms which are formed to be vertically movable by manipulating a screw rod.

본 발명의 바람직한 특징에 따르면, 상기 제 1 거푸집유닛은, 상기 스틸박스에 설치되는 격자구조물 중 서로 마주보는 가로빔의 하단에 각각 고정되는 제 1 및 제 2 클램프와, 상기 클램프의 상부에 각각 일체로 형성되어 수직으로 연장되며 길이조절 가능하게 형성되는 제 1 및 제 2 수직동바리와, 상기 제 1 및 제 2 수직동바리의 상측에 각각 일체로 형성되어 수평으로 연장되는 제 1 및 제 2 수평동바리와, 상기 제 1 및 제 2 수평동바리 상에 각각 설치되는 제 1 및 제 2 보조장선과, 상기 제 1 및 제 2 보조장선 상에 각각 설치되는 제 1 및 제 2 보조거푸집패널과, 상기 제 1 및 제 2 보조장선과 상기 제 1 및 제 2 보조거푸집패널을 상기 제 1 및 제 2 수평동바리에 분리가능하게 결합시키는 제 1 체결부재와, 상기 제 1 및 제 2 수평동바리에 걸쳐 설치되고 상기 제 1 거푸집해체기구의 상단이 결합되는 장선과, 상기 장선 상에 설치되는 제 1 거푸집패널과, 상기 장선과 상기 제 1 거푸집패널을 상기 제 1 및 제 2 수평동바리에 각각 분리가능하게 결합시키는 제 2 체결부재를 포함하여 이루어진다.According to a preferred feature of the invention, the first formwork unit, the first and second clamps are respectively fixed to the lower end of the horizontal beam facing each other among the grid structure installed in the steel box, respectively integrally on the upper portion of the clamp First and second vertical clubs which are formed to extend vertically and are adjustable in length, and are formed integrally on the upper side of the first and second vertical clubs and extend horizontally; And first and second auxiliary strip lines respectively installed on the first and second horizontal bars, first and second auxiliary formwork panels respectively installed on the first and second auxiliary strip lines, and the first and second auxiliary strip lines. A first fastening member for removably coupling a second auxiliary joist and said first and second auxiliary formwork panels to said first and second horizontal clubs, and installed over said first and second horizontal clubs A first joist coupled to the upper end of the formwork disassembly mechanism, a first formwork panel installed on the joist, and a second coupler that detachably couples the joist and the first formwork panel to the first and second horizontal clubs, respectively. It includes a fastening member.

본 발명의 더 바람직한 특징에 따르면, 상기 제 2 거푸집유닛은, 상기 교량상판슬래브의 타설 및 양생 후에는, 상기 제 1 및 제 2 수직동바리의 길이를 신축시키고 상기 제 1 및 제 2 체결부재의 해제에 의해 상기 제 1 및 제 2 보조장선과 제 1 및 제 2 보조거푸집패널을 해체한 후, 상기 제 1 및 제 2 수직동바리를 각각 상기 장선과 상기 제 1 거푸집패널 측으로 이동결합시킨 다음, 상기 제 1 거푸집해체기구의 조작을 통해 상기 제 1 거푸집유닛을 해체시킨다.According to a more preferred feature of the invention, the second formwork unit, after placing and curing the bridge slab slab, the length of the first and second vertical clubs stretch and the release of the first and second fastening members After dismantling the first and the second auxiliary main line and the first and second auxiliary formwork panel by, the first and the second vertical copper bar is moved to the long line and the first formwork panel, respectively, and then the first 1 The formwork disassembly mechanism is operated to disassemble the first formwork unit.

본 발명의 바람직한 특징에 따르면, 상기 스틸박스에 설치되는 격자구조물 중 세로빔의 외측 하단에 각각 고정되는 클램프와, 상기 클램프의 상부에 수직으로 연장되며 길이조절 가능하게 형성되는 수직동바리와, 상기 수직동바리의 상측에 결 합되며 상기 수직동바리의 외측이동결합을 위한 홈이 형성되는 수평동바리와,상기 수평동바리 상에 설치되고 상기 제 2 거푸집해체기구의 상단이 결합되는 장선과, 상기 장선 상에 설치되는 제 2 거푸집패널을 포함하여 이루어진다.According to a preferred feature of the present invention, a clamp fixed to each of the outer lower end of the longitudinal beam of the grid structure installed in the steel box, vertically extending vertically to the upper portion of the clamp and is adjustable in length, the vertical A horizontal barrier coupled to an upper side of the barrier and formed with a groove for outward movement coupling of the vertical barrier, a joist installed on the horizontal barrier and coupled with an upper end of the second formwork disassembly mechanism, and installed on the joist It is made including a second formwork panel.

본 발명의 더 바람직한 특징에 따르면, 상기 교량상판슬래브의 타설 및 양생 후에는, 상기 수직동바리의 길이를 신축시키고 상기 클램프를 제거한 후, 상기 수직동바리를 상기 수평동바리의 홈을 통해 외측으로 이동결합시킨 다음, 상기 제 2 거푸집해체기구의 조작을 통해 상기 제 2 거푸집유닛을 해체시킨다.According to a more preferred feature of the present invention, after placing and curing the bridge deck slab, the length of the vertical club and the clamp is removed, the vertical club is coupled to the outside through the groove of the horizontal club Next, the second formwork unit is dismantled by operating the second formwork disassembly mechanism.

본 발명에 따른 스틸박스 교량의 이동식 거푸집 설치 및 해체장치에 의하면, 작업자가 작업대에 탑승한 상태에서 스틸박스의 상부에 타설된 교량상판슬래브의 중앙부 상을 작업구간 별로 단계적으로 주행하면서 그 양측부에 거푸집을 설치하고 양생후 해체하는 작업을 반복하면서 교량상판슬래브의 양측부의 콘크리트로 간단용이하게 타설할 수 있어, 작업효율성이 대폭적으로 증대되고 전체 시공기간 및 시공비가 현저히 절감될 수 있으며 거푸집의 해체작업이 더욱 용이하게 이루어질 수 있는 탁월한 효과가 있다. According to the mobile formwork installation and dismantling device of the steel box bridge according to the present invention, while the operator is riding on the workbench while traveling on the central portion of the bridge deck slab mounted on the upper part of the steel box step by step for each work section As the formwork is installed and dismantled after curing, it can be easily and easily placed on the concrete of both sides of the bridge slab slab, which greatly increases the work efficiency and significantly reduces the overall construction period and construction cost. There is an excellent effect that can be made more easily.

이하에는, 본 발명의 바람직한 실시예를 첨부도면을 참조하여 상세하게 설명하되, 이는 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자가 본 발명을 용 이하게 실시할 수 있을 정도로 상세하게 설명하기 위한 것이지, 이로 인해 본 발명의 기술적인 사상 및 범주가 한정되는 것을 의미하지는 않는다.Hereinafter, with reference to the accompanying drawings, preferred embodiments of the present invention will be described in detail, which will be described in detail so that those skilled in the art can easily carry out the present invention. This does not mean that the technical spirit and scope of the present invention are limited.

도 2에는 본 발명에 따른 스틸박스 교량의 이동식 거푸집 설치 및 해체장치의 사시도가 도시되고, 도 3에는 본 발명에 따른 스틸박스 교량의 이동식 거푸집 설치 및 해체장치의 단면도가 도시되며, 도 4에는 제 1 거푸집유닛의 설치 및 해체를 설명하는 도면이 도시되고, 도 5에는 제 2 거푸집유닛의 설치 및 해체를 설명하는 도면이 도시되며, 도 6a 내지 도 6d에는 본 발명에 따른 스틸박스 교량의 이동식 거푸집 설치 및 해체장치의 작동도가 도시된다. 여기서 도면의 이해를 위해 도 2 및 도 6d에서 세로빔(6b)에 대한 가로빔(6a)의 길이가 도 1에 비해 축소되어 있음을 미리 밝혀둔다. Figure 2 is a perspective view of a mobile formwork installation and dismantling device of the steel box bridge according to the present invention, Figure 3 is a cross-sectional view of the mobile formwork installation and dismantling device of the steel box bridge according to the invention, Figure 4 1 is a view illustrating the installation and disassembly of the formwork unit is shown, Figure 5 is a view illustrating the installation and disassembly of the second formwork unit, Figure 6a to 6d is a mobile formwork of a steel box bridge according to the present invention The operation diagram of the installation and dismantling device is shown. 2 and 6d, the length of the horizontal beam 6a relative to the vertical beam 6b is reduced in comparison with FIG. 1.

본 발명에 따른 스틸박스 교량의 이동식 거푸집 설치 및 해체장치(1)는 교각(4)의 상부에 안착되는 스틸박스(5)의 양측에 가로빔(6a)과 세로빔(6b)으로 형성되는 격자구조물(6) 상에 교량상판슬래브(7)의 양측부를 타설하기 위한 거푸집을 설치 및 해체하기 위한 것(도 1 참조)으로, 도 2 내지 도 6d에 도시되는 바와 같이, 교량상판슬래브(7)를 가로질러 연장되는 평행수평보(11)의 양단에 수평지지대(15)가 구비된 하향수직보(13)가 연결되고 평행수평보(11)와 하향수직보들(13)은 각각 연결보강대(17)에 의해 연결되어 형성되는 본체프레임(10)과, 본체프레임(10)의 평행수평보(11)의 하단에 설치되고 스틸박스(5)의 상부에 타설된 교량상판슬래브(7)의 중앙부 상을 주행하는 휠(20)과, 본체프레임(10)의 수평지지대(15)에 양측 상단이 연결되어 스틸박스(5)의 양측에 길이방향으로 설치되는 작업대(30)와, 본체프레임(10)의 수평지지대(15)의 내측에 설치되는 제 1 거푸집해체기구(40)와, 본체프레임(10)의 수평지지대(15)의 외측에 설치되는 제 2 거푸집해체기구(50)와, 제 1 거푸집해체기구(40)에 결합되며 스틸박스(5)에 설치되는 격자구조물(6) 중 서로 마주보는 가로빔(6a)에 걸쳐 설치되는 제 1 거푸집유닛(60)과, 제 2 거푸집해체기구(50)에 결합되며 스틸박스(5)에 설치되는 격자구조물(6) 중 세로빔(6b)의 외측에 설치되는 제 2 거푸집유닛(70)을 포함하여 이루어진다.The mobile formwork installation and dismantling apparatus 1 of the steel box bridge according to the present invention is a grating formed of a horizontal beam (6a) and a vertical beam (6b) on both sides of the steel box (5) seated on top of the bridge (4) Bridge deck slab 7 as shown in FIGS. 2-6D, for installing and dismantling formwork for placing both sides of the bridge deck slab 7 on the structure 6 (see FIG. 1). Downward vertical beams 13 having horizontal supports 15 are connected to both ends of the parallel horizontal beams 11 extending across the parallel horizontal beams 11 and the downward vertical beams 13 respectively. On the central portion of the bridge frame slab (7) installed on the lower end of the main body frame 10 and the parallel horizontal beam 11 of the main body frame (10) and placed on top of the steel box (5) Both ends of the wheel 20 and the horizontal support 15 of the main body frame 10 is connected to the upper side of the steel box 5 On the worktable 30 which is installed in the direction, the first formwork disassembly mechanism 40 which is installed inside the horizontal support 15 of the main body frame 10, and the outside of the horizontal support 15 of the main body frame 10. The second formwork disassembly mechanism 50 and the first formwork disassembly mechanism 40, which is installed across the horizontal beam (6a) facing each other among the grid structure (6) installed in the steel box (5) A second formwork unit 70 coupled to the formwork unit 60 and the second formwork disassembly mechanism 50 and installed outside the longitudinal beam 6b of the grid structure 6 installed in the steel box 5. It is made, including.

여기서, 본체프레임(10)은 본 발명에 따른 스틸박스 교량의 이동식 거푸집 설치 및 해체장치(1)의 틀을 형성하는 것으로, 교량상판슬래브(7)를 가로질러 연장되는 평행수평보(11)의 양단에 수평지지대(15)가 구비된 하향수직보(13)가 연결되고 평행수평보(11)와 하향수직보들(13)은 각각 연결보강대(17)에 의해 연결되어 형성된다.Here, the body frame 10 forms the frame of the mobile formwork installation and dismantling apparatus 1 of the steel box bridge according to the present invention, the parallel horizontal beam of 11 extending across the bridge deck slab (7) Downward vertical beams 13 having horizontal supports 15 are connected at both ends, and parallel horizontal beams 11 and downward vertical beams 13 are connected to each other by connecting reinforcing bars 17.

본체프레임(10)의 평행수평보(11)는 작업구간에 해당하는 간격을 두고 서로 떨어져서 평행하게 연장되고, 각각의 평행수평보(11)는 그 중앙이 나사봉(11a)에 의해 서로 연결되어 교량상판슬래브(7)의 전체 폭에 따라 길이조절 가능하게 형성되는 것이 바람직하다. 따라서 평행수평보(11)의 길이는 나사봉(11a)의 회전방향에 따라 그 길이가 신축됨에 따라 교량상판슬래브(7)의 전체 폭보다 더 길게 조정될 수 있다.The parallel horizontal beams 11 of the main body frame 10 extend in parallel to each other at a distance corresponding to the work interval, and the parallel horizontal beams 11 are connected to each other by a screw rod 11a at the center thereof. The length of the bridge deck slab 7 is preferably formed to be adjustable in length. Therefore, the length of the parallel horizontal beam 11 can be adjusted longer than the total width of the bridge deck slab 7 as the length is stretched in accordance with the rotation direction of the screw rod (11a).

하향수직보(13)에 구비되는 수평지지대(15)는 차후에 설명될 작업대(30)의 결합을 가능하게 함과 동시에 차후에 설명될 제 1 및 제 2 거푸집해체기구(40 및 50)의 설치를 가능하게 하는 것으로, 하향수직보(13)의 하측에 수직으로 절곡되어 스틸박스(5) 쪽으로 연장된다.The horizontal support 15 provided in the downright vertical beam 13 enables the coupling of the work bench 30 to be described later, and at the same time enables the installation of the first and second formwork disassembly mechanisms 40 and 50 to be described later. In this way, it is bent vertically to the lower side of the vertical beams 13 extends toward the steel box (5).

연결보강대(17)는 서로 이격된 평행수평보(11)를 서로 연결함과 동시에 그 양측에 서로 이격된 하향수직보(13)를 서로 연결하여 본체프레임(10)을 일체화 하는 것으로, 보강이 가능하도록 금속강재로 형성되는 것이 바람직하다. The connecting reinforcement 17 is connected to the parallel horizontal beams 11 spaced apart from each other and at the same time by connecting the vertical beams 13 spaced apart from each other on both sides to integrate the body frame 10, reinforcement is possible It is preferably formed of a metal steel material.

또한 본체프레임(10)의 하향수직보(13)는 본체프레임(10)의 평행수평보(11)의 양단에 일체로 고정될 수도 있으나, 실시예에 따라서는 본체프레임(10)의 평행수평보(11)의 양단에 회동가능하게 힌지결합될 수도 있는데, 이 경우에 도 6d에 도시되는 바와 같이 본체프레임(10) 상에는 평행수평보(11)에 대해 하향수직보(13)를 회동시키는 윈치기구(19)가 구비되는 것이 바람직하다. In addition, the downward vertical beam 13 of the main body frame 10 may be integrally fixed to both ends of the parallel horizontal beam 11 of the main body frame 10, depending on the embodiment, the horizontal horizontal beam of the main body frame 10 It can also be pivotally hinged to both ends of the (11), in this case winch mechanism for rotating the downward vertical beam 13 relative to the parallel horizontal beam 11 on the main body frame 10, as shown in Figure 6d It is preferable that 19 is provided.

윈치기구(19)는 평행수평보(11) 상에 설치되는 구동모터(19a)와, 평행수평보(11) 상에 설치되고 구동모터(19a)에 의해 회전구동되는 권취보빈(19b)와, 하향수직보(13) 상에 설치되는 도르레(19c)와, 일단은 귄취보빈(19b)에 권취되고 타단은 도르레(19c)를 거쳐 하향수직보(13)의 단부측에 고정되는 와이어(19d)를 포함하여 이루어질 수 있다.The winch mechanism 19 includes a drive motor 19a installed on the parallel horizontal beams 11, a winding bobbin 19b installed on the parallel horizontal beams 11 and rotationally driven by the drive motor 19a; A pulley 19c provided on the downward vertical beam 13 and a wire 19d, one end of which is wound around the gusset bobbin 19b and the other end of which is fixed to the end side of the downward vertical beam 13 via the pulley 19c. It may be made, including.

또한 본체프레임(10)의 하향수직보(13)가 윈치기구(19)에 의해 회동가능하게 평행수평보(11)에 연결될 경우에, 평행수평보(11)와 하향수직보(13)의 연결부위에는 작업시 하향수직보(13)의 임의회동을 방지하는 회동방지핀(18)이 결합되는 것이 바람직하다.In addition, when the downward vertical beam 13 of the main body frame 10 is connected to the parallel horizontal beam 11 to be rotatable by the winch mechanism 19, the connection of the parallel horizontal beam 11 and the downward vertical beam 13 The site is preferably coupled to the anti-rotation pin 18 to prevent the random rotation of the downward vertical beam (13) during operation.

전술한 본체프레임(10)의 평행수평보(11)의 하단에는 휠(20)이 설치되는데, 이 휠(20)은 스틸박스(5)의 상부에 타설된 교량상판슬래브(7)의 중앙부 상을 주행함으로써, 본 발명에 따른 스틸박스 교량의 이동식 거푸집 설치 및 해체장치(1)의 이동을 가능하게 하는 것으로, 통상의 금속바퀴로 형성되는 것이 바람직하며, 실시예에 따라서는 스틸박스(5)의 상부에 타설된 교량상판슬래브(7)의 중앙부 상에 설치된 가이드레일(도시되지 않음)을 따라 구름주행되는 것이 바람직하다.The wheel 20 is installed at the lower end of the parallel horizontal beam 11 of the body frame 10 described above, and the wheel 20 is located on the center of the bridge deck slab 7 which is placed on the upper portion of the steel box 5. By moving the, it is possible to move the movable formwork and dismantling device 1 of the steel box bridge according to the present invention, it is preferably formed of ordinary metal wheels, according to an embodiment the steel box (5) It is preferable to roll along the guide rail (not shown) installed on the center portion of the bridge deck slab 7 which is placed on the upper portion of the slab.

전술한 본체프레임(10)의 수평지지대(15)의 하부에는 작업대(30)의 양측 상단이 연결되는 것이 바람직한데, 이 작업대(30)는 작업자가 탑승하여 차후에 설명될 제 1 및 제 2 거푸집유닛(60 및 70)의 설치 및 해체를 위한 작업을 가능하게 하는 것으로, 안전난간 형태의 함체 형상으로 형성되는 것이 바람직하며, 스틸박스(5)를 기준으로 그 양측에서 작업이 가능하도록 스틸박스(5)를 기준으로 그 양측에 각각 1개씩 길이방향으로 설치된다. It is preferable that the upper end of both sides of the work bench 30 is connected to the lower portion of the horizontal support 15 of the main body frame 10, the work platform 30 is a first and second formwork unit to be described later by the operator To enable the work for the installation and disassembly (60 and 70), it is preferable to be formed in the shape of the enclosure of the safety railings, the steel box (5) to enable the work on both sides of the steel box (5) 1) are installed on each side of each side in the length direction.

전술한 본체프레임(10)의 수평지지대(15)의 내측에는 제 1 거푸집해체기구(40)가 설치되는데, 이 제 1 거푸집해체기구(40)는 그 상단은 차후에 설명될 제 1 거푸집유닛(60)에 결합되고 그 하단은 수평지지대(15)에 결합됨에 따라, 교량상판슬래브(7)의 양측부의 콘크리트 타설 및 양생시에는 그 길이가 신장되어 제 1 거푸집유닛(60)을 지지하는 역할을 수행하지만, 일정 작업구간의 교량상판슬래브(7)의 양측부의 타설이 완료될 경우에는 작업자의 조작을 통해 신축되면서 제 1 거푸집유닛(60)을 하부로 잡아당겨 분리하는 역할을 하는 것으로, 나사봉의 조작에 의해 수직이동 가능하게 형성되는 공지된 마름모형 잭기구으로 형성되는 것이 바람직하다.The first formwork disassembling mechanism 40 is installed inside the horizontal support 15 of the main body frame 10, and the first formwork disassembling mechanism 40 has a first formwork unit 60 whose upper end will be described later. And coupled to the lower end is coupled to the horizontal support (15), during the concrete casting and curing of both sides of the bridge deck slab (7) the length thereof is extended to serve to support the first formwork unit (60) However, when the casting of both sides of the bridge deck slab 7 of a certain working period is completed by the operation of the operator to serve to pull the first formwork unit 60 to the bottom to separate, the operation of the screw rod It is preferable to be formed of a known rhombus jack mechanism that is formed to be vertically movable by.

전술한 본체프레임(10)의 수평지지대(15)의 외측에는 제 2 거푸집해체기구(50)가 설치되는데, 이 제 2 거푸집해체기구(50)는 그 상단은 차후에 설명될 제 2 거푸집유닛(70)에 결합되고 그 하단은 수평지지대(15)에 결합됨에 따라, 교량상판슬래브(7)의 양측부의 콘크리트 타설 및 양생시에는 그 길이가 신장되어 제 2 거푸집유닛(70)을 지지하는 역할을 수행하지만, 일정 작업구간의 교량상판슬래브(7)의 양측부의 타설이 완료될 경우에는 작업자의 조작을 통해 신축되면서 제 2 거푸집유닛(70)을 하부로 잡아당겨 분리하는 역할을 하는 것으로, 제 1 거푸집해체기구(40)와 마찬가지로 나사봉의 조작에 의해 수직이동 가능하게 형성되는 공지된 마름모형 잭기구으로 형성되는 것이 바람직하다.The second formwork disassembly mechanism 50 is installed on the outer side of the horizontal support 15 of the body frame 10 described above, the second formwork disassembly mechanism 50 is the upper end of the second formwork unit 70 will be described later. And coupled to the lower end is coupled to the horizontal support 15, during the concrete casting and curing of both sides of the bridge deck slab 7 its length is extended to support the second formwork unit (70) However, when the casting of both sides of the bridge deck slab 7 of the predetermined working period is completed by the operator's operation to expand the second formwork unit 70 by pulling down to remove the first formwork. Like the dismantling mechanism 40, it is preferable that it is formed of the well-known rhombus jack mechanism formed so that a vertical movement is possible by the operation of a screw rod.

전술한 제 1 거푸집해체기구(40)의 상단에는 제 1 거푸집유닛(60)이 결합되는데, 이 제 1 거푸집유닛(60)은 스틸박스(5)에 설치되는 격자구조물(6) 중 서로 마주보는 가로빔(6a)에 걸쳐 설치되어 그 상부에 타설될 교량상판슬래브(7)를 지지하는 것으로, 도 4에 도시되는 바와 같이, 스틸박스(5)에 설치되는 격자구조물(6) 중 서로 마주보는 가로빔(6a)의 하단에 각각 고정되는 제 1 및 제 2 클램프(61a; 61b)와, 제 1 및 제 2 클램프(61a; 61b)의 상부에 각각 일체로 형성되어 수직으로 연장되며 길이조절 가능하게 형성되는 제 1 및 제 2 수직동바리(62a; 62b)와, 제 1 및 제 2 수직동바리(62a; 62b)의 상측에 각각 일체로 형성되어 수평으로 연장되는 제 1 및 제 2 수평동바리(63a; 63b)와, 제 1 및 제 2 수평동바리(63a; 63b) 상에 각각 설치되는 제 1 및 제 2 보조장선(64a; 64b)과, 제 1 및 제 2 보조장선(64a; 64b) 상에 각각 설치되는 제 1 및 제 2 보조거푸집패널(65a; 65b)과, 제 1 및 제 2 보조장선(64a; 64b)과 제 1 및 제 2 보조거푸집패널(65a; 65b)을 제 1 및 제 2 수평동바리(63a; 63b)에 분리가능하게 결합시키는 제 1 체결부재(66a; 66b)와, 제 1 및 제 2 수평동바리(63a; 63b)에 걸쳐 설치되고 제 1 거푸집해체기구(40)의 상단이 결합되는 장선(67)과, 장선(67) 상에 설치되는 제 1 거푸집패널(68)과, 장선(67)과 제 1 거푸집패널(68)을 제 1 및 제 2 수평동바리(63a; 63b)에 각각 분리가능하게 결합시키는 제 2 체결부재(69)를 포함하여 이루어진다. The first formwork unit 60 is coupled to an upper end of the above-mentioned first formwork disassembly mechanism 40, and the first formwork unit 60 faces each other among the grid structures 6 installed in the steel box 5. Supporting the bridge slab 7 to be installed over the horizontal beam (6a) to be placed thereon, as shown in Figure 4, facing each other of the grid structure (6) installed in the steel box (5) The first and second clamps 61a and 61b fixed to the lower ends of the horizontal beam 6a and the upper portions of the first and second clamps 61a and 61b are integrally formed to extend vertically and are adjustable in length. First and second vertical clubs 62a and 62b formed so as to be formed on the upper side of the first and second vertical clubs 62a and 62b, respectively. 63b), first and second auxiliary main lines 64a and 64b provided on the first and second horizontal clubs 63a and 63b, respectively, and the first and second First and second auxiliary formwork panels 65a; 65b and first and second auxiliary formwork lines 64a; 64b and first and second auxiliary formwork panels 65a respectively provided on the jangjoe lines 64a and 64b. A first fastening member (66a; 66b) detachably coupling the first and second horizontal clubs (63a; 63b) to the first and second horizontal clubs (63a; 63b); The first formwork 67 to which the upper end of the formwork disassembly mechanism 40 is coupled, the first formwork panel 68 installed on the joist 67, and the first formwork 67 and the first formwork panel 68 are firstly formed. And a second fastening member 69 detachably coupled to the second horizontal clubs 63a and 63b, respectively.

전술한 제 1 거푸집유닛(60)은 교량상판슬래브(7)의 양측부의 타설을 위한 콘크리트를 지지하기 위한 거푸집으로서 제 1 거푸집패널(68)과 보조거푸집패널(65a; 65b)을 분할 형성함에 그 특징이 있다. 따라서 해당 작업구간의 교량상판슬래브(7)의 양측부의 타설 및 양생 후에는, 도 4에 도시되는 바와 같이, 제 1 및 제 2 보조장선(64a; 64b)과 제 1 및 제 2 보조거푸집패널(65a; 65b)을 일순위로 제거함에 따라 제 1 거푸집유닛(60)이 서로 마주보는 가로빔(6a) 사이에서 그 길이가 축소됨에 따라, 제 1 거푸집해체기구(40)의 조작에 의한 해체가 용이하게 이루어질 수 있다.The first formwork unit 60 is a formwork for supporting concrete for placing concrete on both sides of the bridge slab 7. The first formwork unit 60 is formed by dividing the first formwork panel 68 and the auxiliary formwork panels 65a; There is a characteristic. Therefore, after placing and curing both sides of the bridge deck slab 7 of the work section, as shown in FIG. 4, the first and second auxiliary joists 64a and 64b and the first and second auxiliary formwork panels ( As the length of the first formwork unit 60 is reduced between the horizontal beams 6a which face each other as the first form 65a; 65b is removed, dismantling by manipulating the first formwork disassembly mechanism 40 is performed. It can be done easily.

도 4를 참조하여 이를 좀 더 상세히 설명하면, 본 발명에 따른 스틸박스 교량의 이동식 거푸집 설치 및 해체장치(1)를 통해 교량상판슬래브(7)의 양측부까지 콘크리트로 타설되고 양생된 경우에, 우선 작업대(30) 상에서 제 1 및 제 2 수직동바리(62a, 62b)의 길이를 신축시키고 제 1 체결부재(66a; 66b) 및 제 2 체결부재(69)의 체결을 해제하고 예를 들어 해체용 잭기구를 이용하여 제 1 및 제 2 보조장선(64a; 64b)과 제 1 및 제 2 보조거푸집패널(65a; 65b)을 해체한 후, 제 1 및 제 2 수직동바리(62a, 62b)를 각각 장선(67)과 제 1 거푸집패널(68) 측으로 이동시킨 다음, 제 1 거푸집해체기구(40)를 조작하여 하부로 잡아당김에 따라 제 1 거푸집유닛(60)을 해체시킬 수 있다.Referring to this in more detail with reference to Figure 4, in the case of being cast and cured to both sides of the bridge deck slab 7 through the mobile formwork installation and dismantling device 1 of the steel box bridge according to the present invention, First, the lengths of the first and second vertical clubs 62a and 62b on the work table 30 are expanded and released, and the first fastening members 66a and 66b and the second fastening member 69 are released, for example, for dismantling. After disassembling the 1st and 2nd auxiliary main lines 64a and 64b and the 1st and 2nd auxiliary formwork panels 65a and 65b using a jack mechanism, the 1st and 2nd vertical copper legs 62a and 62b were respectively removed. After moving to the joist 67 and the first formwork panel 68, the first formwork unit 60 may be dismantled as the first formwork dismantling mechanism 40 is pulled downward.

제 2 거푸집해체기구(50)에는 제 2 거푸집유닛(70)가 결합되는데, 이 제 2 거푸집유닛(70)은 스틸박스(5)에 설치되는 격자구조물(6) 중 세로빔(6b)의 외측에 설치되어 그 상부에 타설될 교량상판슬래브(7)를 지지하는 것으로, 도 5에 도시되는 바와 같이, 스틸박스(5)에 설치되는 격자구조물(6) 중 세로빔(6b)의 외측 하단에 각각 고정되는 클램프(71)와, 클램프(71)의 상부에 수직으로 연장되며 길이조절 가능하게 형성되는 수직동바리(72)와, 수직동바리(72)의 상측에 결합되며 수직동바리(72)의 외측이동결합을 위한 홈(73a)이 형성되는 수평동바리(73)와, 수평동바리(73) 상에 설치되고 제 2 거푸집해체기구(50)의 상단이 결합되는 장선(74)과, 장선(74) 상에 설치되는 제 2 거푸집패널(75)을 포함하여 이루어지며, 실시예에 따라서는 그 양단이 클램프(71)와 수평동바리(73)에 각각 회동가능하게 연결되며 길이조절가능하게 형성되는 경사지지대(76)을 더 포함하여 구성되는 것이 바람직하다.A second formwork unit 70 is coupled to the second formwork disassembly mechanism 50, and the second formwork unit 70 is the outer side of the longitudinal beam 6b of the grid structure 6 installed in the steel box 5. To support the bridge deck slab (7) to be installed on the upper portion, as shown in Figure 5, the outer bottom of the longitudinal beam (6b) of the lattice structure (6) installed in the steel box (5) Clamps 71 fixed to each, a vertical grouping 72 extending vertically to the upper portion of the clamp 71 and formed to be adjustable in length, coupled to the upper side of the vertical grouping 72, the outer side of the vertical grouping 72 Horizontal clubs 73 formed with grooves 73a for movable coupling, joists 74 installed on the horizontal clubs 73, and upper ends of the second formwork disassembly mechanisms 50, and joists 74 It comprises a second formwork panel 75 is installed on the top, according to the embodiment, both ends of the clamp 71 and the horizontal clubs 73 It is configured to enable connection of each pivot is adjustable possibly further comprising a tilt support (76) is formed is preferable.

따라서 해당 작업구간의 교량상판슬래브(7)의 양측부의 타설 및 양생 후에는, 도 5에 도시되는 바와 같이, 수직동바리(72)의 길이를 신축시키고 클램프(71)를 세로빔(6b)의 외측 하단으로부터 제거한 후, 수직동바리(72)를 수평동바리(73)의 홈(73a)을 통해 외측으로 이동결합시킨 다음, 제 2 거푸집해체기구(50)의 조작을 통해 제 2 거푸집유닛(70)을 하부로 잡아당겨 해체할 수 있게 된다.Therefore, after placing and curing both sides of the bridge slab 7 of the work section, as shown in FIG. 5, the length of the vertical club 72 is stretched and the clamp 71 is moved outside the vertical beam 6b. After removing from the lower end, the vertical circle 72 is moved outward through the groove 73a of the horizontal circle 73, and then the second formwork unit 70 is operated by the operation of the second form disassembly mechanism 50. It can be disassembled by pulling it downward.

이하, 도 6a 내지 도 6d을 참조하여 본 발명에 따른 스틸박스 교량의 이동식 거푸집 설치 및 해체장치(1)의 전체작동을 설명하면 다음과 같다:Hereinafter, the overall operation of the mobile formwork installation and dismantling device 1 of the steel box bridge according to the present invention with reference to Figure 6a to 6d as follows:

우선 시공구간의 스틸박스(5)의 상부에 교량상판슬래브(7)의 중앙부를 타설한 후 이 상부에 크레인을 이용하여 본 발명에 따른 스틸박스 교량의 이동식 거푸집 설치 및 해체장치(1)를 위치시킨다. 이 경우에 윈치기구(19)를 작동시켜 도 6d에 도시되는 바와 같이, 하향수직보(13)을 상방으로 회동시킨 상태로 설치한 후, 윈치기구(19)를 반대로 작동시켜 하향수직보(13)을 하방으로 다시 회동시킨 후 회동방지핀(18)을 결합하여 그 상태를 고정하여야 한다.First, the central part of the bridge deck slab 7 is poured into the upper part of the steel box 5 in the construction section, and then the mobile formwork installation and dismantling device 1 of the steel box bridge according to the present invention is positioned by using the crane on the upper part. Let's do it. In this case, the winch mechanism 19 is operated to install the downwardly vertical beam 13 in a state of upwardly rotating as shown in FIG. 6D, and then the winch mechanism 19 is operated in reverse to the downwardly vertical beam 13. ) And then rotated downward again to fix the state by combining the anti-rotation pin (18).

이 상태에서 작업자는 이동사다리나 고소차 등을 이용하여 작업대(30)로 탑승하여 스틸박스(5) 양측의 가로빔(6a)과 세로빔(6b)으로 이루어지는 격자구조물(6)에 제 1 및 제 2 거푸집유닛(60 및 70)을 설치한다.In this state, the worker rides on the work bench 30 by using a moving ladder or a high-altitude vehicle, and the first and the grid structure 6 including the horizontal beams 6a and the vertical beams 6b on both sides of the steel box 5. The second formwork units 60 and 70 are installed.

교량상판슬래브(7)의 양측부의 콘크리트를 타설하고 양생이 완료되면 작업자는 다시 작업대(30) 상에서 제 1 및 제 2 거푸집해체기구(40 및 50)을 작동시켜 제 1 및 제 2 거푸집유닛(60 및 70)을 해체하면 되며, 휠(20)의 구동을 통해 다음 시공구간으로 본 발명에 따른 스틸박스 교량의 이동식 거푸집 설치 및 해체장치(1)를 이동시킨 후 전술한 작업을 반복하면 된다.When the concrete is poured on both sides of the bridge deck slab 7 and the curing is completed, the operator operates the first and second formwork disassembling mechanisms 40 and 50 on the worktable 30 again to form the first and second formwork units 60. And 70), the movable formwork and dismantling apparatus 1 of the steel box bridge according to the present invention may be moved to the next construction section through the driving of the wheel 20, and then the above operation may be repeated.

전체 시공이 완료되면, 윈치기구(19)를 작동시켜 도 6d에 도시되는 바와 같이, 하향수직보(13)을 상방으로 회동시킨 상태로 크레인을 이용하여 본 발명에 따른 스틸박스 교량의 이동식 거푸집 설치 및 해체장치(1)를 분리하면 된다. When the whole construction is completed, by operating the winch mechanism 19, as shown in Figure 6d, the movable formwork of the steel box bridge according to the present invention using a crane with the downward vertical beam 13 is rotated upwards And the dismantling device 1 may be separated.

따라서 본 발명에 따른 스틸박스 교량의 이동식 거푸집 설치 및 해체장치(1) 를 사용할 경우에는, 작업자가 작업대(30)에 탑승한 상태에서 스틸박스(5)의 상부에 타설된 교량상판슬래브(7)의 중앙부 상을 작업구간 별로 단계적으로 주행하면서 그 양측부에 거푸집을 설치하고 양생후 해체하는 작업을 반복하면서 교량상판슬래브(7)의 양측부의 콘크리트로 간단용이하게 타설할 수 있어, 작업효율성이 대폭적으로 증대되고 전체 시공기간 및 시공비가 현저히 절감될 수 있으며 거푸집의 해체작업이 더욱 용이하게 이루어질 수 있게 된다. Therefore, when using the mobile formwork installation and dismantling device (1) of the steel box bridge according to the present invention, the bridge deck slab (7) placed in the upper portion of the steel box (5) in the state that the operator boarded on the work table (30) It is possible to simply pour the concrete on both sides of the bridge slab (7), while repeatedly installing the formwork on both sides and dismantling after disassembly while driving the central part of each step by step. It can be increased and the overall construction period and construction cost can be significantly reduced, and the dismantling work of the formwork can be made more easily.

도 1은 일반적인 스틸박스형 교량의 부분저면사시도.1 is a partial bottom perspective view of a typical steel box bridge.

도 2는 본 발명에 따른 스틸박스 교량의 이동식 거푸집 설치 및 해체장치의 사시도.Figure 2 is a perspective view of a mobile formwork installation and dismantling device of the steel box bridge according to the present invention.

도 3은 본 발명에 따른 스틸박스 교량의 이동식 거푸집 설치 및 해체장치의 단면도.Figure 3 is a cross-sectional view of the mobile formwork installation and dismantling apparatus of the steel box bridge according to the present invention.

도 4는 본 발명에 따른 스틸박스 교량의 이동식 거푸집 설치 및 해체장치에 있어서, 제 1 거푸집유닛의 설치 및 해체를 설명하는 도면.4 is a view for explaining the installation and disassembly of the first formwork unit in the mobile formwork installation and dismantling apparatus of the steel box bridge according to the present invention.

도 5는 본 발명에 따른 스틸박스 교량의 이동식 거푸집 설치 및 해체장치에 있어서, 제 2 거푸집유닛의 설치 및 해체를 설명하는 도면.5 is a view for explaining the installation and disassembly of the second formwork unit in the mobile formwork installation and dismantling apparatus of the steel box bridge according to the present invention.

도 6a 내지 도 6d는 본 발명에 따른 스틸박스 교량의 이동식 거푸집 설치 및 해체장치의 작동도.6a to 6d is an operation of the mobile formwork installation and dismantling device of the steel box bridge according to the present invention.

* 도면의 주요부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

1 : 본 발명에 따른 스틸박스 교량의 이동식 거푸집 설치 및 해체장치1: mobile formwork installation and dismantling device of the steel box bridge according to the present invention

3 : 스틸박스형 교량3: Steel box type bridge

4 : 교각4: pier

5 : 스틸박스5: Steel Box

6 : 격자구조물6: lattice structure

6a : 가로빔6a: horizontal beam

6b : 세로빔6b: vertical beam

7 : 교량상판슬래브7: bridge deck slab

10 : 본체프레임10: main frame

11 : 평행수평보11: parallel horizontal beam

13 : 하향수직보13: downward vertical beam

15 : 수평지지대15: horizontal support

17 : 연결보강대17: connecting reinforcement

19 : 윈치기구19: winch mechanism

20 : 휠20: wheel

30 : 작업대30: work table

40 : 제 1 거푸집해체기구40: first formwork dismantling mechanism

50 : 제 2 거푸집해체기구50: second formwork dismantling mechanism

60 : 제 1 거푸집유닛60: first formwork unit

70 : 제 2 거푸집유닛70: second formwork unit

Claims (8)

교각의 상부에 안착되는 스틸박스의 양측에 가로빔과 세로빔으로 형성되는 격자구조물 상에 교량상판슬래브의 양측부를 타설하기 위한 거푸집을 설치 및 해체하기 위한 스틸박스 교량의 거푸집 설치 및 해체장치에 있어서,In the formwork and dismantling device of the steel box bridge for installing and dismantling the formwork for placing both sides of the bridge slab slab on the lattice structure formed of horizontal beam and vertical beam on both sides of the steel box seated on the upper part of the bridge , 상기 교량상판슬래브를 가로질러 연장되는 평행수평보의 양단에 수평지지대가 구비된 하향수직보가 연결되고 상기 평행수평보와 하향수직보들은 각각 연결보강대에 의해 연결되어 형성되는 본체프레임;A body frame having horizontal support beams connected to both ends of the parallel horizontal beams extending across the bridge deck slab, wherein the parallel horizontal beams and the vertical beams are connected to each other by connecting reinforcing bars; 상기 본체프레임의 평행수평보의 하단에 설치되고 상기 스틸박스의 상부에 타설된 교량상판슬래브의 중앙부 상을 주행하는 휠;A wheel installed at a lower end of the parallel horizontal beam of the main body frame and traveling on a central portion of the bridge slab mounted on the steel box; 상기 본체프레임의 수평지지대에 양측 상단이 연결되어 상기 스틸박스의 양측에 길이방향으로 설치되는 작업대;Workbenches installed on both sides of the steel box in the longitudinal direction is connected to the upper end of the horizontal support of the main body frame; 상기 본체프레임의 수평지지대의 내측에 설치되는 제 1 거푸집해체기구;A first formwork disassembly mechanism installed inside the horizontal support of the main body frame; 상기 본체프레임의 수평지지대의 외측에 설치되는 제 2 거푸집해체기구;A second formwork disassembling mechanism installed outside the horizontal support of the main body frame; 상기 제 1 거푸집해체기구에 결합되며 상기 스틸박스에 설치되는 격자구조물 중 서로 마주보는 가로빔에 걸쳐 설치되는 제 1 거푸집유닛; 및A first formwork unit coupled to the first formwork disassembling mechanism and installed over horizontal beams facing each other among the grid structures installed in the steel box; And 상기 제 2 거푸집해체기구에 결합되며 상기 스틸박스에 설치되는 격자구조물 중 세로빔의 외측에 설치되는 제 2 거푸집유닛;을 포함하여 이루어지는 것을 특징으로 하는 스틸박스 교량의 이동식 거푸집 설치 및 해체장치.And a second formwork unit coupled to the second formwork disassembling mechanism and installed on an outer side of the longitudinal beam among the grid structures installed in the steel box. 2. 청구항 1에 있어서,The method according to claim 1, 상기 본체프레임의 평행수평보는 각각 상기 교량상판슬래브의 폭에 따라 길이조절 가능하게 형성되는 것을 특징으로 하는 스틸박스 교량의 이동식 거푸집 설치 및 해체장치.The horizontal horizontal beam of the main body frame, the movable formwork installation and dismantling device of the steel box bridge, characterized in that the length is formed to be adjustable in accordance with the width of the bridge top slab. 청구항 1에 있어서,The method according to claim 1, 상기 본체프레임의 하향수직보는 상기 본체프레임의 평행수평보의 양단에 힌지결합되고, 상기 본체프레임 상에는 상기 평행수평보에 대해 상기 하향수직보를 회동시키는 윈치기구가 구비되며, 상기 하향수직보가 연결되는 평행수평보의 양단에는 상기 하향수직보의 임의회동을 방지하는 회동방지핀이 결합되는 것을 특징으로 하는 스틸박스 교량의 이동식 거푸집 설치 및 해체장치.The downward vertical beam of the main body frame is hinged to both ends of the parallel horizontal beam of the main body frame, a winch mechanism for rotating the downward vertical beam relative to the parallel horizontal beam is provided on the main body frame, parallel to which the downward vertical beam is connected Mobile formwork installation and dismantling device of the steel box bridge, characterized in that the anti-rotation pin is coupled to both ends of the horizontal beam to prevent the random rotation of the downward vertical beam. 청구항 1에 있어서,The method according to claim 1, 상기 제 1 및 제 2 거푸집해체기구는 나사봉의 조작에 의해 수직이동 가능하게 형성되는 공지된 마름모형 잭기구으로 형성되는 것을 특징으로 하는 스틸박스 교량의 이동식 거푸집 설치 및 해체장치.The first and second formwork disassembly mechanism is a movable formwork installation and dismantling device of the steel box bridge, characterized in that formed by a known rhombus jack mechanism that is formed to be movable vertically by the operation of the screw rod. 청구항 1에 있어서, The method according to claim 1, 상기 제 1 거푸집유닛은, 상기 스틸박스에 설치되는 격자구조물 중 서로 마주보는 가로빔의 하단에 각각 고정되는 제 1 및 제 2 클램프와, 상기 클램프의 상부에 각각 일체로 형성되어 수직으로 연장되며 길이조절 가능하게 형성되는 제 1 및 제 2 수직동바리와, 상기 제 1 및 제 2 수직동바리의 상측에 각각 일체로 형성되어 수평으로 연장되는 제 1 및 제 2 수평동바리와, 상기 제 1 및 제 2 수평동바리 상에 각각 설치되는 제 1 및 제 2 보조장선과, 상기 제 1 및 제 2 보조장선 상에 각각 설치되는 제 1 및 제 2 보조거푸집패널과, 상기 제 1 및 제 2 보조장선과 상기 제 1 및 제 2 보조거푸집패널을 상기 제 1 및 제 2 수평동바리에 분리가능하게 결합시키는 제 1 체결부재와, 상기 제 1 및 제 2 수평동바리에 걸쳐 설치되고 상기 제 1 거푸집해체기구의 상단이 결합되는 장선과, 상기 장선 상에 설치되는 제 1 거푸집패널과, 상기 장선과 상기 제 1 거푸집패널을 상기 제 1 및 제 2 수평동바리에 각각 분리가능하게 결합시키는 제 2 체결부재를 포함하여 이루어지는 것을 특징으로 하는 스틸박스 교량의 이동식 거푸집 설치 및 해체장치.The first formwork unit includes first and second clamps fixed to lower ends of horizontal beams facing each other among grid structures installed in the steel box, and are integrally formed on the upper portions of the clamps and vertically extended. First and second vertical clubs which are formed to be adjustable, first and second horizontal clubs which are formed integrally on the upper sides of the first and second vertical clubs, respectively, and extend horizontally, and the first and second horizontal bars First and second auxiliary joists, respectively installed on the copper bar, first and second auxiliary formwork panels respectively installed on the first and second auxiliary joists, the first and second auxiliary joists and the first And a first fastening member for detachably coupling a second auxiliary formwork panel to the first and second horizontal clubs, and installed over the first and second horizontal clubs, and having an upper end of the first formwork disassembly mechanism coupled thereto. A joist, a first formwork panel installed on the joist, and a second fastening member for detachably coupling the joist and the first formwork panel to the first and second horizontal clubs, respectively. Mobile formwork installation and dismantling device of steel box bridge. 청구항 5에 있어서The method according to claim 5 상기 교량상판슬래브의 타설 및 양생 후에는, 상기 제 1 및 제 2 수직동바리의 길이를 신축시키고 상기 제 1 및 제 2 체결부재의 해제에 의해 상기 제 1 및 제 2 보조장선과 제 1 및 제 2 보조거푸집패널을 해체한 후, 상기 제 1 및 제 2 수직동바리를 각각 상기 장선과 상기 제 1 거푸집패널 측으로 이동결합시킨 다음, 상기 제 1 거푸집해체기구의 조작을 통해 상기 제 1 거푸집유닛을 해체시키는 것을 특징으로 하는 스틸박스 교량의 이동식 거푸집 설치 및 해체장치.After placing and curing the bridge deck slab, the first and second auxiliary joists and the first and second auxiliary lines are extended by stretching the lengths of the first and second vertical clubs and releasing the first and second fastening members. After dismantling the auxiliary formwork panel, the first and the second vertical movement are coupled to the joist and the first formwork panel, respectively, and then the first formwork unit is dismantled by operating the first formwork disassembly mechanism. Mobile formwork installation and dismantling device of the steel box bridge, characterized in that. 청구항 1 에 있어서, 상기 제 2 거푸집유닛은,The method according to claim 1, wherein the second formwork unit, 상기 스틸박스에 설치되는 격자구조물 중 세로빔의 외측 하단에 각각 고정되는 클램프와, 상기 클램프의 상부에 수직으로 연장되며 길이조절 가능하게 형성되는 수직동바리와, 상기 수직동바리의 상측에 결합되며 상기 수직동바리의 외측이동결합을 위한 홈이 형성되는 수평동바리와,상기 수평동바리 상에 설치되고 상기 제 2 거푸집해체기구의 상단이 결합되는 장선과, 상기 장선 상에 설치되는 제 2 거푸집패널을 포함하여 이루어지는 것을 특징으로 하는 스틸박스 교량의 이동식 거푸집 설치 및 해체장치.Clamps fixed to the outer lower end of the vertical beam of the grating structure installed in the steel box, a vertical swivel extending vertically on the upper portion of the clamp and adjustable in length, coupled to the upper side of the vertical swivel and the vertical It comprises a horizontal copper bar which is formed with a groove for the outer movable coupling of the copper bar, the joist is installed on the horizontal bar and the upper end of the second formwork disassembly mechanism is coupled, and the second formwork panel installed on the joist Mobile formwork installation and dismantling device of the steel box bridge, characterized in that. 청구항 7에 있어서, The method of claim 7, 상기 교량상판슬래브의 타설 및 양생 후에는, 상기 수직동바리의 길이를 신축시키고 상기 클램프를 제거한 후, 상기 수직동바리를 상기 수평동바리의 홈을 통해 외측으로 이동결합시킨 다음, 상기 제 2 거푸집해체기구의 조작을 통해 상기 제 2 거푸집유닛을 해체시키는 것을 특징으로 하는 스틸박스 교량의 이동식 거푸집 설치 및 해체장치.After placing and curing the bridge slab, the length of the vertical club is stretched and the clamp is removed, and the vertical club is moved outward through the groove of the horizontal club, and then the second formwork disassembly mechanism Mobile formwork installation and dismantling device of the steel box bridge, characterized in that for dismantling the second formwork unit through the operation.
KR1020080098297A 2008-10-07 2008-10-07 Movement type apparatus for constructing and detaching frame panel of a steel box bridge KR101030053B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080098297A KR101030053B1 (en) 2008-10-07 2008-10-07 Movement type apparatus for constructing and detaching frame panel of a steel box bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080098297A KR101030053B1 (en) 2008-10-07 2008-10-07 Movement type apparatus for constructing and detaching frame panel of a steel box bridge

Publications (2)

Publication Number Publication Date
KR20100039080A true KR20100039080A (en) 2010-04-15
KR101030053B1 KR101030053B1 (en) 2011-04-21

Family

ID=42215708

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080098297A KR101030053B1 (en) 2008-10-07 2008-10-07 Movement type apparatus for constructing and detaching frame panel of a steel box bridge

Country Status (1)

Country Link
KR (1) KR101030053B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104532732A (en) * 2014-12-23 2015-04-22 上海市城市建设设计研究总院 Self-anchorage type suspension bridge of fish bone beam structure
EP3951117A1 (en) * 2020-08-07 2022-02-09 Peri AG Striking tool and method
CN114960481A (en) * 2022-06-15 2022-08-30 中建八局第三建设有限公司 Large-span Bailey beam portal unloading and dismantling construction method
KR102451807B1 (en) * 2021-10-19 2022-10-06 박종하 Cantilever frame unit for concrete pouring and expansion and repair method using of the same

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102490192B1 (en) * 2021-11-26 2023-01-20 주식회사 길교이앤씨 Bridge upper structure and the method constructing bridge upper structure using the same

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4873738A (en) 1988-09-29 1989-10-17 Cfc Fabrication Corporation Apparatus for stripping concrete forms from bridge structures
JPH10204833A (en) * 1997-01-24 1998-08-04 Takanosu Kogyo Kk Concrete flattener and rainproof and heat insulating umbrella

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104532732A (en) * 2014-12-23 2015-04-22 上海市城市建设设计研究总院 Self-anchorage type suspension bridge of fish bone beam structure
CN104532732B (en) * 2014-12-23 2016-03-30 上海市城市建设设计研究总院 The self-anchored suspension bridge of fish spine structure
EP3951117A1 (en) * 2020-08-07 2022-02-09 Peri AG Striking tool and method
US11834852B2 (en) 2020-08-07 2023-12-05 Peri Se Striking tool and method
KR102451807B1 (en) * 2021-10-19 2022-10-06 박종하 Cantilever frame unit for concrete pouring and expansion and repair method using of the same
CN114960481A (en) * 2022-06-15 2022-08-30 中建八局第三建设有限公司 Large-span Bailey beam portal unloading and dismantling construction method

Also Published As

Publication number Publication date
KR101030053B1 (en) 2011-04-21

Similar Documents

Publication Publication Date Title
KR101030053B1 (en) Movement type apparatus for constructing and detaching frame panel of a steel box bridge
JP2010048060A (en) Construction method of structure
JP4777922B2 (en) Mobile suspension support
CN110409319B (en) Bracket for large-span steel-concrete composite beam cast-in-place bridge deck and construction method
JPH0841826A (en) Erection method of bridge and equipment thereof and main girder unit
KR200443605Y1 (en) Frame panel supporting apparatus for concrete casting a bridge structure
JP4329535B2 (en) Mobile work vehicle for overhanging slabs
JP3804883B2 (en) Concrete high structure construction apparatus and concrete oblique column construction method
KR20110105489A (en) High-rise structure construction method by lifting up table-form
JPH0868198A (en) Moving type suspended scaffold device
JP2000087316A (en) Method and device for construction of floor slab
JP4980257B2 (en) Construction method for column head construction, method for constructing mobile work vehicle using part thereof, and method for extending bridge
JP5356091B2 (en) Crane girder exchanging method and crane girder exchanging apparatus
JP4080070B2 (en) Floor slab construction method and apparatus
JP7116583B2 (en) Suspended scaffolding for beam construction
JP5437876B2 (en) Method of dismantling and removing support members in the construction process of RC RC ramen structure viaduct
JP2000087314A (en) Method and device for construction of floor slab
KR20100042377A (en) Device for supporting the die for forming slab
KR20020054259A (en) Bridge inspection device and construction method
CN214737495U (en) Positioning trolley for arch culvert
JPH1088786A (en) Scaffold for columnar structure
JP5400829B2 (en) Temporary pier construction method and scaffolding equipment for construction of temporary pier
JP2992882B2 (en) Beam formwork device
CN114104939B (en) Steel framework hoisting process, hoisting equipment and auxiliary device
JP7339477B2 (en) Concrete column formwork construction device and concrete column formwork construction method using the same

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee