KR20090120754A - 교량구조물의 교량받침 배치방법 - Google Patents
교량구조물의 교량받침 배치방법 Download PDFInfo
- Publication number
- KR20090120754A KR20090120754A KR1020080046709A KR20080046709A KR20090120754A KR 20090120754 A KR20090120754 A KR 20090120754A KR 1020080046709 A KR1020080046709 A KR 1020080046709A KR 20080046709 A KR20080046709 A KR 20080046709A KR 20090120754 A KR20090120754 A KR 20090120754A
- Authority
- KR
- South Korea
- Prior art keywords
- bridge
- lead
- bridge structure
- bearing
- arranging
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/04—Bearings; Hinges
- E01D19/041—Elastomeric bearings
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
Description
Claims (4)
- 교량구조물의 중간구간에 다수의 납면진받침을 배치하고, 상기 중간구간의 양단부측 구간에는 교축의 일방향 가동형 납면진받침을 다수 배치한 것을 특징으로 한 교량구조물의 교량받침 배치방법.
- 제1항에 있어서,상기 납면진받침은 쐐기를 갖는 상부판이 탄성체 상에 미끄럼 접촉하도록 구성된 것을 특징으로 한 교량구조물의 교량받침 배치방법.
- 교량구조물의 중간구간에 다수의 납면진받침을 배치하고, 상기 중심구간의 양단부측 구간에는 교축의 일방향 가동형 탄성받침을 다수 배치한 것을 특징으로 한 교량구조물의 교량받침 배치방법.
- 제3항에 있어서,상기 탄성받침은 쐐기를 갖는 상부판이 탄성체 상에 미끄럼 접촉하도록 구성된 것을 특징으로 한 연속장대교의 교량받침 배치방법.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020080046709A KR101008665B1 (ko) | 2008-05-20 | 2008-05-20 | 교량구조물의 교량받침 배치방법 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020080046709A KR101008665B1 (ko) | 2008-05-20 | 2008-05-20 | 교량구조물의 교량받침 배치방법 |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20090120754A true KR20090120754A (ko) | 2009-11-25 |
KR101008665B1 KR101008665B1 (ko) | 2011-01-17 |
Family
ID=41603949
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020080046709A KR101008665B1 (ko) | 2008-05-20 | 2008-05-20 | 교량구조물의 교량받침 배치방법 |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101008665B1 (ko) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101536756B1 (ko) * | 2013-10-25 | 2015-07-16 | 아이컨 주식회사 | 교량 구조물의 수직 단차를 고려한 마찰 진자형 지진 격리받침 배치 구조 |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101317464B1 (ko) * | 2011-07-15 | 2013-10-11 | 포인텍이앤씨(주) | 교량용 슬라이딩 탄성받침 및 이를 이용한 슬라이딩 받침방법 |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100254739B1 (ko) * | 1998-02-28 | 2000-05-01 | 유광준 | 올리고당 고추장의 제조방법 |
JP2001003314A (ja) | 1999-06-22 | 2001-01-09 | Kaimon:Kk | 橋梁用弾性支承装置における弾性支承体の取付装置 |
JP4428238B2 (ja) | 2005-01-12 | 2010-03-10 | 横浜ゴム株式会社 | すべりゴム支承装置 |
KR100845028B1 (ko) * | 2007-09-19 | 2008-07-09 | 유니슨 주식회사 | 기존교량의 내진보강공법 |
-
2008
- 2008-05-20 KR KR1020080046709A patent/KR101008665B1/ko active IP Right Review Request
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101536756B1 (ko) * | 2013-10-25 | 2015-07-16 | 아이컨 주식회사 | 교량 구조물의 수직 단차를 고려한 마찰 진자형 지진 격리받침 배치 구조 |
Also Published As
Publication number | Publication date |
---|---|
KR101008665B1 (ko) | 2011-01-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101008664B1 (ko) | 일방향 가동형 납면진받침 | |
CN202543794U (zh) | 一种组合型超高阻尼隔震橡胶支座 | |
CN103469896A (zh) | 抗拉拔隔震橡胶支座 | |
CN102061666A (zh) | 铁路桥梁专用隔震减震支座 | |
KR20090127692A (ko) | 교량용 면진 신축이음장치 | |
CN105442440A (zh) | 交联式弯梁桥组合伸缩缝 | |
CN202117191U (zh) | 一种与叠层橡胶隔震支座联合使用的抗风载装置 | |
KR101008665B1 (ko) | 교량구조물의 교량받침 배치방법 | |
CN102677774A (zh) | 双导向型抗拉防倾覆隔震橡胶支座 | |
CN101487229A (zh) | 带有摩擦副的铅芯橡胶支座组件及其安装使用方法 | |
CN202530572U (zh) | 一种带限位装置的高阻尼隔震橡胶支座 | |
CN111119034B (zh) | 拉索限位刚度差异组合橡胶减震支座 | |
CN205804154U (zh) | 桥梁碰撞缓冲抗震构造 | |
CN205529861U (zh) | 高阻尼橡胶拉压耗能型易修复减隔震支座 | |
CN106351118A (zh) | 一种减隔震结构及其减震方法 | |
CN206143625U (zh) | 一种减隔震结构 | |
KR101386048B1 (ko) | 스페리칼 받침 | |
CN201165635Y (zh) | 带有摩擦副的铅芯橡胶支座组件 | |
KR101317464B1 (ko) | 교량용 슬라이딩 탄성받침 및 이를 이용한 슬라이딩 받침방법 | |
KR20160109284A (ko) | 교량용 탄성 받침 | |
KR102152740B1 (ko) | 교량구조물의 교량받침 배치방법 | |
JP4581832B2 (ja) | 複合型粘弾性ダンパ− | |
CN201581345U (zh) | 桥梁铅芯橡胶支座滑移组件 | |
CN103147392A (zh) | 一种钢桥功能分离式减震支座 | |
KR101409400B1 (ko) | 모자형 강재댐퍼를 구비한 고무탄성받침 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
J204 | Invalidation trial for patent | ||
J121 | Written withdrawal of request for trial | ||
FPAY | Annual fee payment |
Payment date: 20140113 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20150106 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20160107 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20170106 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20180109 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20190109 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20200103 Year of fee payment: 10 |