KR20090114242A - Work Condition Analysis System - Google Patents
Work Condition Analysis System Download PDFInfo
- Publication number
- KR20090114242A KR20090114242A KR1020080040082A KR20080040082A KR20090114242A KR 20090114242 A KR20090114242 A KR 20090114242A KR 1020080040082 A KR1020080040082 A KR 1020080040082A KR 20080040082 A KR20080040082 A KR 20080040082A KR 20090114242 A KR20090114242 A KR 20090114242A
- Authority
- KR
- South Korea
- Prior art keywords
- work
- list
- weekly
- condition analysis
- daily
- Prior art date
Links
- 238000004458 analytical method Methods 0.000 title claims description 61
- 230000003442 weekly effect Effects 0.000 claims abstract description 49
- 238000000034 method Methods 0.000 claims abstract description 34
- 238000010276 construction Methods 0.000 claims description 27
- 239000000463 material Substances 0.000 claims description 11
- 238000013475 authorization Methods 0.000 claims description 3
- 230000001934 delay Effects 0.000 description 7
- 238000007726 management method Methods 0.000 description 4
- 238000013461 design Methods 0.000 description 3
- 238000012546 transfer Methods 0.000 description 3
- 230000005540 biological transmission Effects 0.000 description 2
- 238000004891 communication Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000010295 mobile communication Methods 0.000 description 2
- 238000004904 shortening Methods 0.000 description 2
- 230000000977 initiatory effect Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000012552 review Methods 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/109—Time management, e.g. calendars, reminders, meetings or time accounting
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/04—Manufacturing
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Theoretical Computer Science (AREA)
- Economics (AREA)
- Marketing (AREA)
- Entrepreneurship & Innovation (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Data Mining & Analysis (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Manufacturing & Machinery (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
본 발명은 작업 여건 분석 시스템에 관한 것으로 특히, 시공 과정에서의 작업 신뢰도 향상을 통해 효율적인 공정진행 및 공기 준수를 달성할 수 있도록 작업 계획 수립 전부터 작업이 수행되기 전까지 계획된 작업의 수행 가능성 및 수행 여부를 확인하여 작업의 수행 여부에 따라 공정 계획을 수정함으로써 건설 공사의 전체 공기를 줄일 수 있는 작업 여건 분석 시스템에 관한 것이다.The present invention relates to a work condition analysis system, and in particular, whether the planned work can be performed and whether or not the planned work is performed before the work is carried out so as to achieve efficient process progress and air compliance by improving work reliability in the construction process. It relates to a work condition analysis system that can reduce the overall air of construction work by checking and modifying the process plan according to the performance of work.
건설 프로젝트에서 건축 공정계획은 효율적인 공정 진행 및 공기 단축을 위해 필수적이다.In construction projects, building process planning is essential for efficient process progress and shortening of air.
이에 따라, 건설 프로젝트를 관리하는 관리자들은 효율적인 공정 진행 및 공기 단축을 위해 많은 노력을 기울이고 있으나 수많은 건설 프로젝트에서 공기 초과 또는 마감 직전의 돌관 공사와 같은 공정 관리 실패가 발생 되고 있다.As a result, managers who manage construction projects are making great efforts for efficient process progress and shortening of air, but many construction projects are failing process management, such as overtime or short-term stone construction.
일반적으로, 건설 프로젝트의 공기 지연은 특별하고 큰 사건으로부터 발생하는 것이 아니라 개별 작업에서 발생하는 작은 작업 지연들이 모여 여유시간을 다 소모함으로써 건설 프로젝트 전체의 공기 지연을 유발하게 된다.In general, air delays in construction projects do not arise from special and large events, but rather cause small delays in individual tasks to gather up and run out of spare time, causing air delays throughout the construction project.
이때, 건설 프로젝트의 공기에 영향을 미치는 지연들은 작업 계획단계에서부 터 수행될 작업들의 여러 가지 지연 요소들을 제대로 확인하지 못하기 때문에 발생한다.Delays affecting the air of the construction project are caused by the failure to identify various delays of the work to be performed from the work planning stage.
이에 따라, 작업 지연을 막기 위해서는 작업 계획단계에서부터 작업 수행 전까지 건설 생산 프로세스에서 발생 가능한 지연 요소들과 작업들 간의 상호 의존성을 충분히 검토하여 계획된 작업(공정 계획)의 실행 가능성을 높여야 한다.Therefore, in order to prevent the delay of work, it is necessary to fully review the interdependencies between the work and the delay factors that may occur in the construction production process from the work planning stage until the work is performed to increase the feasibility of the planned work (process plan).
그러나, 현재에는 작업의 수행 가능성을 검토하고 관리하는 체계가 미흡하기 때문에 건설 프로젝트의 작업 신뢰도가 저하될 뿐만 아니라 건설 프로젝트의 효율적인 공정진행 및 공기 준수를 달성할 수 없는 문제가 있다.However, at present, due to the lack of a system for reviewing and managing the feasibility of the work, not only the work reliability of the construction project is lowered, but also the efficient process progress and air compliance of the construction project cannot be achieved.
따라서, 본 발명은 상술한 문제점을 해결하기 위한 것으로 시공 과정에서의 작업 신뢰도 향상을 통해 효율적인 공정진행 및 공기 준수를 달성할 수 있도록 작업 계획 수립 전부터 작업이 수행되기 전까지 계획된 작업의 수행 가능성 및 수행 여부를 확인하여 작업의 수행 여부에 따라 공정 계획을 수정함으로써 건설 공사의 전체 공기를 줄일 수 있는 작업 여건 분석 시스템을 제공하는 것을 목적으로 한다.Accordingly, the present invention is to solve the above-mentioned problems and to perform the process and the air compliance before the operation is carried out before the operation is carried out so as to achieve efficient process progress and air compliance by improving the work reliability in the construction process The purpose of this study is to provide a working condition analysis system that can reduce the overall air of construction work by modifying the process plan according to whether the work is performed.
본 발명의 실시 예에 따른 작업 여건 분석 시스템은 건설 프로젝트의 전체 공정 계획, 상기 공정 계획에 따른 월간 작업 리스트, 상기 월간 작업 리스트에 따른 주간 작업 리스트, 상기 주간 작업 리스트에 따른 일간 작업 리스트가 저장됨과 아울러 주간 작업 리스트 및 일간 작업 리스트에 따른 선행 작업의 작업 진행 현황 정보, 해당 작업에서 사용될 장비 및 공구의 사용 가능 정보, 해당 작업에 투입되는 인원 현황, 작업 공간, 작업의 허가/승인 여부를 포함하는 작업 여건 정보가 저장된 작업 여건 분석 서버; 상기 작업 여건 분석 서버로부터 상기 작업 여건 정보를 입력할 수 있는 작업 여건 입력창을 제공받아 주간 작업 리스트 및 일간 작업 리스트에 따른 해당 작업의 작업 수행 정보를 상기 작업 여건 분석 서버에 제공하는 현장 관리자 단말기; 및 상기 작업 여건 분석 서버에 상기 공정 계획, 월간 작업 리스트, 주간 작업 리스트 및 일간 작업 리스트를 제공함과 아울러 주간 작업 리스트 및 일간 작업 리스트에 포함된 작업들의 작업 여건에 따라 상기 주간 작업 리스트 및 월간 작업 리스트를 수정하여 상기 작업 여건 분석 서버에 제공하는 시스템 관리자 단말기를 포함하는 것을 특징으로 한다.Work condition analysis system according to an embodiment of the present invention is the overall process plan of the construction project, the monthly work list according to the process plan, the weekly work list according to the monthly work list, the daily work list according to the weekly work list is stored and In addition, the work progress information of the predecessor work according to the weekly work list and the daily work list, the available information of the equipment and tools to be used in the work, the status of the personnel involved in the work, the work space, and whether the work is permitted or approved A job condition analysis server storing job condition information; A field manager terminal receiving a work condition input window for inputting the work condition information from the work condition analysis server and providing the work condition analysis server of the work according to the weekly work list and the daily work list to the work condition analysis server; And providing the process plan, the monthly work list, the weekly work list, and the daily work list to the work condition analysis server, and according to the work conditions of the work included in the weekly work list and the daily work list. It is characterized in that it comprises a system administrator terminal for providing to the work condition analysis server by modifying.
본 발명의 실시 예에 따른 작업 여건 분석 시스템에서 상기 시스템 관리자 단말기는 상기 작업 여건 분석 서버로부터 전송되는 상기 주간 작업 리스트 및 일간 작업 리스트에 포함된 작업들의 선행 작업 수행 여부, 해당 작업에 사용될 도구나 공구의 사용 가능 여부, 해당 작업에 사용될 자재의 입고 여부, 해당 작업의 허가/승인 여부에 따라 상기 주간 작업 리스트 및 일간 작업 리스트에 포함된 작업들의 작업 순서를 변경하여 상기 주간 작업 리스트 및 일간 작업 리스트를 수정한다.In the system for analyzing a work condition according to an embodiment of the present invention, the system manager terminal performs a preliminary work on the work included in the weekly work list and the daily work list transmitted from the work condition analysis server, and a tool or tool to be used for the work. Change the work order of the jobs included in the weekly work list and the daily work list according to the availability of the materials, the receipt of the materials to be used for the work, and the permission / approval of the work. Correct it.
본 발명의 실시 예에 따른 작업 여건 분석 시스템에서 상기 시스템 관리자 단말기는 상기 주간 작업 리스트 및 일간 작업 리스트에 포함된 작업들이 해당 작업을 수행할 준비가 되어 있거나 작업 시간 전까지 해당 작업의 작업 수행 준비가 완료될 수 있을 경우 해당 작업이 수행되도록 작업 허가/승인 정보를 상기 작업 여건 분석 서버에 전송한다.In the system for analyzing a work condition according to an embodiment of the present invention, the system manager terminal is ready to perform the work included in the weekly work list and the daily work list or is ready to perform the work before the work time. If possible, the task permission / approval information is transmitted to the task condition analysis server so that the task can be performed.
본 발명의 실시 예에 따른 작업 여건 분석 시스템에서 상기 시스템 관리자 단말기는 상기 주간 작업 리스트 및 일간 작업 리스트에 포함된 작업들이 해당 작업을 수행할 준비가 되어 있지 않을 경우 다음날 일간 작업 리스트 및 주간 작업 리스트에 포함되도록 상기 주간 작업 리스트를 수정한다.In the work condition analysis system according to an embodiment of the present invention, the system administrator terminal may be included in the work list and the weekly work list the next day when the work included in the weekly work list and the daily work list is not ready to perform the corresponding work. Modify the weekly work list to include it.
본 발명의 실시 예에 따른 작업 여건 분석 시스템에서 상기 작업 여건 분석 서버는 상기 현장 관리자 단말기로부터 작업 수행 정보가 전송될 경우 해당 작업의 인원 대비 시간에 따른 최적의 작업량과 시간 대비 인원에 따른 평균 작업량을 계 산하여 그 내부에 저장한다.In the work condition analysis system according to an embodiment of the present invention, when the work condition information is transmitted from the field manager terminal, the work condition analysis server may determine an optimal amount of work according to time and a mean amount of work according to time of the corresponding person. Calculate and store inside.
본 발명은 시공 과정에서의 작업 신뢰도 향상을 통해 효율적인 공정진행 및 공기(공사기간) 준수를 달성할 수 있도록 작업 계획 수립 전부터 작업이 수행되기 전까지 계획된 작업의 수행 가능성 및 수행 여부를 확인하여 작업의 수행 여부에 따라 공정 계획을 수정하기 때문에 작업 지연을 사전에 차단할 수 있게 되므로 건설 프로젝트의 전체 공기를 줄일 수 있다.The present invention performs the work by confirming the feasibility and performance of the planned work before the work plan is established until the work is carried out to achieve efficient process progress and air (construction period) through the improvement of work reliability in the construction process By modifying the process plan depending on whether or not it is possible to prevent work delays in advance, the overall air of the construction project can be reduced.
이하, 첨부된 도면을 참조하여 본 발명의 바람직한 실시 예를 상세하게 설명한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.
도 1은 본 발명의 실시 예에 따른 작업 여건 분석 시스템을 나타내는 도면이다.1 is a view showing a work condition analysis system according to an embodiment of the present invention.
도 1을 참조하면, 본 발명의 실시 예에 따른 작업 여건 분석 시스템은 작업 여건 분석 서버(2), 시스템 관리자 단말기(4) 및 현장 관리자 단말기(6)를 포함한다.Referring to FIG. 1, a work condition analysis system according to an exemplary embodiment of the present invention includes a work
작업 여건 분석 서버(2)는 유/무선 네트워크 통신망을 통해 시스템 관리자 단말기(4)로부터 전송되는 건설 프로젝트의 전체 공정 계획(Master Schedule), 상기 공정 계획에 따른 월간 작업 리스트, 상기 월간 작업 리스트에 따른 주간 작업 리스트, 상기 주간 작업 리스트에 따른 일간 작업 리스트가 저장된다.Work condition analysis server (2) is according to the overall process plan (Master Schedule) of the construction project transmitted from the
이때, 유/무선 네트워크 통신망은 인터넷, 전용선, 공중망 및 이동통신망으 로 이루어진다.At this time, the wired / wireless network communication network is composed of the Internet, leased line, public network and mobile communication network.
여기서, 인터넷망은 TCP/IP 프로토콜 및 그 상위 계층에 존재하는 여러 서비스 또는 시스템, 즉, HTTP(HyperText Transfer Protocol), 텔넷, FTP(File Transfer Protocol), DNS(Domain Name System), SMTP(Simple Mail Transfer Protocol), SNMP(Simple Network Management Protocol), NFS(Network FileService), NIS(Network Information Service)를 제공하는 전 세계적인 개방형 컴퓨터 네트워크 구조를 의미한다.Here, the Internet network is a service or system existing in the TCP / IP protocol and its upper layers, that is, HyperText Transfer Protocol (HTTP), Telnet, File Transfer Protocol (FTP), Domain Name System (DNS), and Simple Mail (SMTP). The global open computer network architecture that provides the Transfer Protocol (SMP), Simple Network Management Protocol (SNMP), Network File Service (NFS), and Network Information Service (NIS).
그리고, 이동통신망은 음성통화를 위한 통상적인 망, 즉 기지국(BS : Base Station), 이동전화 교환국(MTSO : Mobile Telephone Switching Office), 홈 위치 등록기(HLR : Home Location Register), 망관리 시스템(NMS : Network Management System) 등을 구비하고, 무선 패킷 데이터의 송수신을 가능하게 하는 WAP 게이트웨이, PDSN(Packet Data Serving Node) 등과 같은 구성요소를 추가로 포함하고 있어 HTTP, SMTP, FTP 등과 같은 산업 표준의 전송 프로토콜 지원과 HTML, SMTP, XML,HDML 또는 일반 문서파일 등의 문서 교환 프레임워크를 지원하는 것에 의해 결과적으로 모바일폰(mobile phone), PDA(Personal Didital Assistant), 개인용 컴퓨터(PC), 핸드PC, 노트북 등으로 구성된 시스템 관리자 단말기(4) 및 현장 관리자 단말기(6)와 작업 여건 분석 서버(2) 사이에서 작업 수행 정보나 작업 여건 분석 정보 등을 송수신 가능하게 한다.In addition, the mobile communication network is a conventional network for voice calls, that is, a base station (BS), a mobile telephone switching office (MTSO), a home location register (HLR), a network management system (NMS). : Network Management System, etc., and additional components such as WAP gateway, PDSN (Packet Data Serving Node), etc. to enable the transmission and reception of wireless packet data, and the transmission of industry standards such as HTTP, SMTP, FTP, etc. Support for protocols and document exchange frameworks such as HTML, SMTP, XML, HDML, or general document files results in mobile phones, personal assistants, personal computers, handheld PCs, It is possible to send and receive work performance information and work condition analysis information between the
또한, 작업 여건 분석 서버(2)에는 주간 작업 리스트 및 일간 작업 리스트에 따른 해당 작업에 필요한 자재 입고 현황, 선행 작업의 진행 현황, 작업 공간, 해 당 작업에 필요한 공구 및 장비, 해당 작업에 투입되는 공구 및 장비의 사용 시간, 해당 작업에 투입되는 공구 및 장비의 사용 가능 여부, 설계 도서, 해당 작업에 인원이 투입되는 시간, 해당 작업에 투입되는 노무자(또는 작업자) 정보(인원 현황), 해당 작업의 허가/승인 여부, 해당 작업 지시 여부, 해당 작업을 진행하는 협력업체 정보, 해당 작업에 대한 안전 사항 확인 여부, 해당 작업에 대한 위험사항(Risk) 확인 여부 등이 저장됨과 아울러 해당 작업의 진행 상황에 따른 각 작업의 인원 대비 시간에 대한 최적 작업량과 시간 대비 인원에 대한 평균 작업량이 저장된다.In addition, the work condition analysis server (2) is input to the work received, the work progress, the work space, the tools and equipment necessary for the work, the work required according to the weekly work list and the daily work list Hours of use of tools and equipment, availability of tools and equipment in the work, design books, time spent on the work, information on laborers (or workers) in the work (people's status), work Permission, approval of the work ordered, information on the partners who work on the work, whether the work safety is checked, and whether the work has been checked for risks. The optimal amount of work for each person and the average amount of work over time is stored.
이때, 작업 여건 분석 서버(2)는 표 1에 도시된 바와 같이 9가지 작업 여건 항목에 따라 작업의 수행 가능 여부 즉, 작업 여건을 분석하여 저장한다.At this time, the job
여기서, 작업 여건 분석이라 함은 해당 작업을 수행하기 일주일 전 주간 작업 계획의 여건 분석부터 일일 단위의 작업 계획의 수행 가능 여부를 확인하는 작업 여건 확인까지의 작업 여건을 분석하는 것을 의미한다.Here, the work condition analysis means analyzing the work conditions from the analysis of the weekly work plan condition one week before the work is performed to the check of the work condition for confirming whether the daily work plan can be performed.
이러한, 작업 여건 분석 서버(2)는 도 2 내지 도 6에 도시된 바와 같이 주간 작업 리스트 및 일간 작업 리스트에 포함된 작업들에 대한 작업 여건 분석 정보를 시스템 관리자 단말기(4) 및 현장 관리자 단말기(6)에 제공한다.Such a job
즉, 작업 여건 분석 서버(2)는 도 2 내지 도 6에 도시된 바와 같이 건설 프로젝트를 수행하는 협력업체별 작업 정보와 해당 협력업체가 수행해야할 세부 작업 내역, 작업 기간, 작업이 수행되어야 할 날짜(착수시점), 해당 작업을 진행하기 전에 수행되어야 할 선행 작업 내역 및 선행 작업의 수행 완료 여부, 해당 작업에 투입될 인원 현황 및 해당 작업에 투입되는 장비 내역, 자재 현황 정보, 작업 공간, 해당 작업에 투입되는 인원 현황, 해당 작업의 허가/승인 여부 등을 포함하는 작업 여건 분석 정보를 시스템 관리자 단말기(4) 및 현장 관리자 단말기(6)에 제공한다.In other words, the job
그리고, 작업 여건 분석 서버(2)는 현장 관리자가 현장 관리자 단말기(6)를 통해 현장에서 진행되고 있는 작업의 안전사항이나 위험사항에 대한 확인 여부, 해당 작업의 수행 확인 여부(일간 및 주간), 선행 작업의 수행 여부, 해당 작업에 투입될 자재 입고 확인 여부, 해당 작업에 투입될 자재 물량, 작업 공간, 해당 작업이 행해질 시간(투입 시간), 해당 작업에 투입될 인원, 해당 작업에 투입될 장비나 도구 물량(투입 물량), 해당 작업에 투입될 장비 및 도구 내역 등을 포함하는 작업 여건을 입력할 수 있도록 도 4 내지 도 7과 같은 작업 여건 입력 창을 현장 관리자 단말기(6)에 제공한다.In addition, the work
시스템 관리자 단말기(4)는 건설 프로젝트의 전체 공정 계획, 월간 작업 리스트, 주간 작업 리스트 및 일간 작업 리스트를 작업 여건 분석 서버(2)에 전송함과 아울러 작업 여건 분석 서버(2)로부터 전송되는 작업 여건 분석 정보에 따라 주간 작업 리스트 및 일간 작업 리스트를 수정하여 시스템 관리자 단말기(4)에 전송한다.The
즉, 시스템 관리자 단말기(4)는 작업 여건 분석 서버(2)로부터 전송되는 주간 작업 리스트 및 일간 작업 리스트에 포함된 작업들의 선행 작업 수행 여부, 해당 작업에 사용될 도구나 공구의 사용 가능 여부, 해당 작업에 사용될 자재의 입고 여부, 해당 작업의 허가/승인 여부에 따라 주간 작업 리스트 및 일간 작업 리스트에 포함된 작업들의 작업 순서를 변경하여 주간 작업 리스트 및 일간 작업 리스트를 수정한다.That is, the
이때, 시스템 관리자 단말기(4)는 주간 작업 리스트 및 일간 작업 리스트에 포함된 작업들이 해당 작업을 수행할 준비가 되어 있거나 작업 시간 전까지 해당 작업의 작업 수행 준비가 완료될 수 있을 경우 해당 작업이 수행되도록 작업 허가/승인 정보를 작업 여건 분석 서버(2)에 전송한다.In this case, the
또한, 시스템 관리자 단말기(4)는 주간 작업 리스트 및 일간 작업 리스트에 포함된 작업들이 해당 작업을 수행할 준비가 되어 있지 않을 경우 다음날 일간 작업 리스트 및 주간 작업 리스트에 포함되도록 주간 작업 리스트를 수정한다.In addition, the
현장 관리자 단말기(6)는 작업 여건 분석 서버(2)로부터 작업 여건을 입력할 수 있는 도 4 내지 도 7과 같은 작업 여건 입력창을 전송받아 해당 작업의 안전사항이나 위험사항에 대한 확인 여부, 해당 작업의 수행 확인 여부(일간 및 주간), 선행 작업의 수행 여부, 해당 작업에 투입될 자재 입고 확인 여부, 해당 작업에 투입될 자재 물량, 작업 공간, 해당 작업이 행해질 시간(투입 시간), 해당 작업에 투입될 인원, 해당 작업에 투입될 장비나 도구 물량(투입 물량), 해당 작업에 투입될 장비 및 도구 내역 등을 작업 여건 분석 서버(2)에 전송한다.The
이때, 작업 여건 분석 서버(2)는 현장 관리자 단말기(6)를 통해 작업 여건이 입력되면 해당 작업에 대한 인원 대비 시간에 대한 최적 작업량과 시간 대비 인원에 대한 평균 작업량을 계산하여 그 내부에 저장함과 아울러 시스템 관리자 단말기(4)나 현장 관리자 단말기(6)로부터 작업량 정보 요청 시 시스템 관리자 단말기(4)나 현장 관리자 단말기(6)로 최적 작업량 및 평균 작업량을 전송한다.At this time, when the work condition is input through the
이와 같은 본 발명의 실시 예에 따른 작업 여건 분석 시스템은 도 8에 도시된 바와 같이 건설 프로젝트에 관련된 관리자들이 시스템 관리자 단말기(4)를 통해 해당 건설 프로젝트의 마스터 스케쥴을 설정한 후 마스터 스케쥴에 따른 월간 작업 리스트와 주간 작업 리스트를 작성한다(S101 내지 S103).As shown in FIG. 8, in the work condition analysis system according to the embodiment of the present invention, after the managers related to the construction project set the master schedule of the corresponding construction project through the
이때, 작업 여건 분석 서버(2)는 시스템 관리자 단말기(4)를 통해 마스터 스케쥴, 월간 작업 리스트 및 주간 작업 리스트를 제공받아 그 내부에 저장한다.At this time, the work
이후, 시스템 관리자 단말기(4)는 주간 작업 리스트에 포함된 작업들이 해당 작업을 수행할 수 있는 작업 여건이 갖추어졌는지 확인한 후 해당 작업을 수행할 준비가 되어 있을 경우 일일 작업 리스트에 포함된 작업들의 작업 여건을 확인한 후 해당 작업을 수행할 준비가 되어 있을 경우 해당 작업을 수행하여 작업을 완료한다(S104 내지 S111).Thereafter, the
이때, 시스템 관리자 단말기(4)는 주간 작업 리스트에 포함된 작업들이 해당 작업을 수행할 수 있는 작업 여건이 갖추어져 있지 않을 경우 주간 작업 리스트를 수정한다.At this time, the
또한, 시스템 관리자 단말기(4)는 일간 작업 리스트에 포함된 작업들이 해당 작업을 수행할 수 있는 작업 여건이 갖추어져 있지 않을 경우 주간 작업 리스트를 수정한다(S112).In addition, the
이와 같이 본 발명의 실시 예에 따른 작업 여건 분석 시스템은 시공 과정에서의 작업 신뢰도 향상을 통해 효율적인 공정진행 및 공기(공사기간) 준수를 달성할 수 있도록 작업 계획 수립 전부터 작업이 수행되기 전까지 계획된 작업의 수행 가능성 및 수행 여부를 확인하여 작업의 수행 여부에 따라 공정 계획을 수정하기 때문에 작업 지연을 사전에 차단할 수 있게 되므로 건설 프로젝트의 전체 공기를 줄일 수 있게 된다.As described above, the work condition analysis system according to the embodiment of the present invention is designed so that the operation of the planned work can be performed from before the work plan is established until the work is carried out so that efficient process progress and air (construction period) can be achieved by improving work reliability in the construction process. By checking the feasibility and performance, the process plan is modified according to whether or not the work is carried out, so that work delays can be prevented in advance, thereby reducing the overall air of the construction project.
도 1은 본 발명의 실시 예에 따른 작업 여건 분석 시스템을 나타내는 도면이다.1 is a view showing a work condition analysis system according to an embodiment of the present invention.
도 2 및 도 3은 도 1에 도시된 작업 여건 분석 서버에서 제공하는 작업 여건 확인 창을 나타내는 도면이다.2 and 3 are diagrams illustrating a work condition check window provided by the work condition analysis server illustrated in FIG. 1.
도 4 내지 도 7은 도 1에 도시된 작업 여건 분석 서버에서 제공하는 작업 여건 입력창을 나타내는 도면이다.4 to 7 are diagrams illustrating a work condition input window provided by the work condition analysis server illustrated in FIG. 1.
도 8은 도 1에 도시된 작업 여건 분석 시스템의 작업 지연 원인 기반 작업 여건 분석 방법을 나타내는 흐름도이다.FIG. 8 is a flowchart illustrating a method for analyzing job delay based job conditions of the job condition analysis system illustrated in FIG. 1.
<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>
2 : 작업 여건 분석 서버 4 : 시스템 관리자 단말기2: work condition analysis server 4: system administrator terminal
6 : 현장 관리자 단말기6: field manager terminal
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020080040082A KR20090114242A (en) | 2008-04-29 | 2008-04-29 | Work Condition Analysis System |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020080040082A KR20090114242A (en) | 2008-04-29 | 2008-04-29 | Work Condition Analysis System |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20090114242A true KR20090114242A (en) | 2009-11-03 |
Family
ID=41555496
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020080040082A KR20090114242A (en) | 2008-04-29 | 2008-04-29 | Work Condition Analysis System |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20090114242A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102315373B1 (en) * | 2021-05-20 | 2021-10-19 | 씨제이대한통운 (주) | Construction process navigation providing method |
KR20210154794A (en) * | 2017-10-11 | 2021-12-21 | 양경옥 | Method for Safety Information Generation by Reading Schedule Bar Charts in Construction and Industrial Project |
KR102453832B1 (en) * | 2022-04-07 | 2022-10-12 | 한전케이디엔주식회사 | Apparatus, method and program for providing advanced metering infrastructure construction management services |
-
2008
- 2008-04-29 KR KR1020080040082A patent/KR20090114242A/en not_active Application Discontinuation
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20210154794A (en) * | 2017-10-11 | 2021-12-21 | 양경옥 | Method for Safety Information Generation by Reading Schedule Bar Charts in Construction and Industrial Project |
KR102315373B1 (en) * | 2021-05-20 | 2021-10-19 | 씨제이대한통운 (주) | Construction process navigation providing method |
KR102453832B1 (en) * | 2022-04-07 | 2022-10-12 | 한전케이디엔주식회사 | Apparatus, method and program for providing advanced metering infrastructure construction management services |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8265970B2 (en) | Systems and methods for managing business processes in an enterprise | |
JP2005513602A (en) | Method and system for managing asset transition projects | |
US20050021428A1 (en) | Time management system for mobile employees | |
EP1399862A2 (en) | System and method for automatically allocating and de-allocating resources and services | |
KR20090129247A (en) | Method for network-based facilities integration management and system thereto | |
CN110895606B (en) | Internal system management method and device suitable for newly-built account and storage medium | |
US20030028410A1 (en) | Method and apparatus for wireless workforce mobilization and management | |
US20040215701A1 (en) | Mobile contractor performance evaluation system and method | |
KR101776228B1 (en) | Electronic rental contract system for construction equipment | |
KR20110055561A (en) | The development, test, and demonstration of automation solutions using web-based virtual computers and vpn tunneling | |
US20070094377A1 (en) | System and Method for Documenting Delays Associated with a Project | |
CN112085225A (en) | Operation and maintenance system and method for user side power equipment | |
JP2008501158A (en) | System and method for workflow-enabled link activation | |
KR20090114242A (en) | Work Condition Analysis System | |
CN114757634A (en) | Portable high-integration mobile office platform as a service (PaaS) | |
JP2010039786A (en) | Information sharing system and user registration method | |
JP3373844B1 (en) | Construction work process management system, construction work process management method, computer program for construction work process management, and server device for construction work process management | |
KR20100100217A (en) | System for estimating a performance | |
Ivkic et al. | On the cost of cyber security in smart business | |
JP2008262345A (en) | Remote management network system for building management work | |
CN104408568A (en) | Method and device for processing task information of owner project department | |
KR20170066121A (en) | Method for electronic issuing pay slip using mobile phone | |
JP2004295286A (en) | Gas fitting work management system | |
KR20040057068A (en) | Integration and superintendence managing system and its method of construction in the network configuration | |
JP2008129879A (en) | System, program, and method for television interview |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E601 | Decision to refuse application |