KR20090012900A - Dredging construction method of drain pipe - Google Patents

Dredging construction method of drain pipe Download PDF

Info

Publication number
KR20090012900A
KR20090012900A KR1020070077125A KR20070077125A KR20090012900A KR 20090012900 A KR20090012900 A KR 20090012900A KR 1020070077125 A KR1020070077125 A KR 1020070077125A KR 20070077125 A KR20070077125 A KR 20070077125A KR 20090012900 A KR20090012900 A KR 20090012900A
Authority
KR
South Korea
Prior art keywords
air
sludge
sewer pipe
sewage
dredging
Prior art date
Application number
KR1020070077125A
Other languages
Korean (ko)
Other versions
KR100905302B1 (en
Inventor
김덕희
Original Assignee
김덕희
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김덕희 filed Critical 김덕희
Priority to KR1020070077125A priority Critical patent/KR100905302B1/en
Publication of KR20090012900A publication Critical patent/KR20090012900A/en
Application granted granted Critical
Publication of KR100905302B1 publication Critical patent/KR100905302B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F9/00Arrangements or fixed installations methods or devices for cleaning or clearing sewer pipes, e.g. by flushing
    • E03F9/002Cleaning sewer pipes by mechanical means
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes
    • E02F5/28Dredgers or soil-shifting machines for special purposes for cleaning watercourses or other ways
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F7/00Other installations or implements for operating sewer systems, e.g. for preventing or indicating stoppage; Emptying cesspools
    • E03F7/02Shut-off devices

Abstract

A dredging method of a sewer pipe is provided to remove sludge effectively from a sewer pipe or an intercepting sewer using sewage pressure and air, and to dredge sludge only by separating sludge and sewage from the lower part of a sewer pipe. A dredging method of a sewer pipe comprises the steps of expanding an air packer(60) moving along a sewer pipe(20) and stopping up the sewer pipe to let sewage flow in a gap between the air packer and the sewer pipe, jetting air to the lower part from a nozzle fixture(70) supporting the air packer, reciprocating along the sewer pipe and removing sludge of the sewer pipe, installing an isolator(80) which is settled on the sewer pipe by a counter weight and expanded by air to the downstream side of the sewer pipe, settling the sludge removed from the sewer pipe through the isolator and flowing sewage over the isolator, and dredging the sludge settled on the front of the isolator using a dredging hose(50).

Description

하수관로의 준설공법{Dredging construction method of drain pipe}Dredging construction method of drain pipe

본 발명은 하수관로의 준설공법에 관한 것으로, 특히 차집관로 또는 하수관로에 쌓인 슬러지를 손쉽게 준설하되 슬러지의 준설시 물의 량을 적게 하여 준설이 용이하게 이루어질 수 있도록 하는 것이다.The present invention relates to a dredging method of the sewage pipe, in particular to easily dredged sludge accumulated in the collecting pipe or sewage pipe so that the dredging can be easily made by reducing the amount of water when dredging the sludge.

하수관로 또는 차집관로에는 바닥에 슬러지 등의 퇴적물이 쌓이게 되고, 이러한 슬러지는 주기적으로 청소하여 제거해 주어야만 하수관로의 관경을 확보할 수 있게 되고, 이로 인하여 하수의 흐름이 원활히 이루어지게 할 수 있다.Sediment such as sludge is accumulated in the sewage pipe or the sewage pipe, and such sludge should be periodically cleaned and removed to secure the pipe diameter of the sewage pipe, thereby allowing the sewage to flow smoothly.

하수관로 또는 차집관로에 쌓인 슬러지를 제거하기 위해서는 먼저 하수관로를 따라서 퇴적되어 있는 슬러지를 제거해 주어야 하고, 슬러지의 제거가 완료되면 제거된 슬러지를 준설차를 이용하여 준설시켜야만 한다.In order to remove the sludge accumulated in the sewer pipe or the collecting pipe, the sludge deposited along the sewer pipe must be removed first, and when the sludge is completely removed, the sludge removed must be dredged using a dredging car.

하수관로에 쌓인 슬러지를 제거하기 위한 방법으로는 버킷을 하수관로 사이로 왕복 이동시키며 강제로 하수관로에 퇴적되어 있는 슬러지를 제거하는 방법을 사용하거나, 물 또는 에어를 하수관로의 관로 쪽으로 분사시켜 고압의 물이나 에어에 의해 퇴적물을 제거시키는 방법을 사용하고 있다.To remove the sludge accumulated in the sewer pipe, the bucket is reciprocated between the sewer pipes, and the sludge accumulated in the sewer pipes is forcibly removed, or water or air is injected into the sewer pipe to the high pressure water or air. To remove the sediment.

그러나 하수관로의 슬러지를 제거할 때 하수의 흐름을 다른 곳으로 돌릴 수 없어 슬러지 제거 작업에 어려움이 있게 되고, 특히 상기 된 방식으로 하수관로의 슬러지를 제거한 경우 슬러지는 하수와 함께 하부로 흐르게 되며, 하수관로의 하부에서 준설차를 이용하여 제거된 슬러지를 준설시키게 되므로, 슬러지의 준설시 많은 량의 하수를 준설하게 되어 준설 효율이 크게 떨어지는 것이었다.However, when the sludge in the sewer pipe is removed, the sewage flow cannot be turned elsewhere, which makes it difficult to remove the sludge. In particular, when the sludge is removed from the sewer pipe in the manner described above, the sludge flows downward with the sewage. Since the dredging car is dredged from the lower part, the dredging efficiency of dredging sludge is greatly reduced.

즉 하수관로나 차집관로의 슬러지를 제거하고 준설하는 경우 하수의 량이 많아 슬러지의 제거에 어려움을 겪는 한편 슬러지와 함께 하수를 준설하게 되므로, 슬러지의 준설시 과도한 하수의 준설로 인하여 준설시간이 많이 걸리고, 준설 효율도 크게 떨어지는 것이었다.In other words, when the sludge is removed and dredged in the sewage pipe or drainage pipe, it is difficult to remove the sludge due to the large amount of sewage while dredging the sewage with the sludge, so that dredging takes much time due to excessive dredging of the sludge. Dredging efficiency was also greatly reduced.

본 발명은 상기와 같은 종래의 문제점을 해소하기 위한 것으로, 본 발명의 목적은 하수관로나 차집관로에서 하수 압력과 에어를 이용하여 슬러지를 효과적으로 제거하는 한편 하수관로의 하부에서 슬러지와 하수를 분리하여 슬러지만 준설될 수 있도록 함으로써 준설 효율을 높이도록 하는 것이다.The present invention is to solve the conventional problems as described above, the object of the present invention is to effectively remove the sludge by using the sewage pressure and air in the sewage pipe or collecting pipe, while separating the sludge and sewage from the bottom of the sewage pipe, but By dredging, the dredging efficiency is increased.

본 발명은 하수관로를 타고 이동하는 에어패커를 팽창시켜 하수관로를 막아 하수가 에어패커와 하수관로의 틈새로 흐르게 하고, 상기 에어패커를 받쳐주는 노즐고정대에서 하측으로 에어를 분사시켜 하수관로의 슬러지를 제거하는 과정을 하수관로를 거슬러가며 시행한 후 하수관로를 따라서 내려가며 시행하게 하며, 상기 하수관로의 하부에는 차단구를 설치하여 하수관로의 하부를 막아 슬러지는 걸리고 하수만 월류하게 하고, 상기 차단구에 걸린 슬러지는 준설함으로써 이루어지는 것이다.The present invention is the process of removing the sludge in the sewage pipe by inflating the air packer moving in the sewer pipe to block the sewer pipe so that the sewage flows into the gap between the air packer and the sewer pipe, and spraying the air to the lower side from the nozzle fixing base supporting the air packer After going back to the sewage pipe line and going down along the sewage pipe line, it is to be carried out by installing a blockage in the lower part of the sewage pipe to block the lower part of the sewage pipe so that sludge is caught and only the sewage is overflowed, and the sludge caught in the block is dredged. It is done.

본 발명은 하수의 수압과 에어를 이용하여 하수관로의 슬러지를 제거하도록 하고, 하수와 함께 배출되는 슬러지는 차단구에 막혀 침전된 후 준설호스로 준설이 이루어지게 하는 것으로, 최소한의 하수와 함께 슬러지의 준설이 이루어지게 되어 준설효율을 높일 수 있는 것이다.The present invention is to remove the sludge in the sewage pipe by using the water pressure and air of the sewage, and the sludge discharged with the sewage is to be dredged in the dredging hose after the sediment is blocked by the blocking port, the sludge of the sludge with the minimum sewage Dredging will be made to increase dredging efficiency.

본 발명은 하수관로에 퇴적된 슬러지를 효과적으로 제거하고, 하수관로에서 제거된 슬러지를 하수에서 분리시켜 준설되게 하는 것으로, 하수관로에서 노즐고정대를 타고 이동하는 에어패커를 팽창시켜 하수가 하수관로와 에어패커 사이의 틈새를 통하여 빠르게 흐를 수 있도록 하는 한편 노즐 고정대에서 슬러지를 향하여 에어를 분사시킴으로써 하수관로에 퇴적된 슬러지를 제거할 수 있도록 하고, 하수관로의 하부에는 차단구를 설치하여 하수와 함께 흘러내리는 슬러지는 차단구에 걸려 침전되게 하는 한편 하수는 월류 되게 한 후 차단구에 걸린 슬러지를 준설함으로써 적은량의 하수 준설로 슬러지를 준설할 수 있도록 하는 것이다.The present invention is to effectively remove the sludge deposited in the sewer pipe, to remove the sludge removed from the sewage pipe from the sewage, dredging, by expanding the air packer moving through the nozzle station in the sewer pipe sewage between the sewer pipe and the air packer Through the air flow from the nozzle holder to the sludge to remove the sludge deposited in the sewage pipe, and the sludge flowing down with the sewage is installed in the lower part of the sewer pipe On the other hand, sewage can be overflowed and dredged by the blockage, so that the sludge can be dredged with a small amount of dredging.

하수관로 또는 차집관거에 퇴적되는 슬러지는 바닥에 가라앉는 형태로 퇴적이 이루어지게 되고, 이러한 슬러지는 퇴적된 시간이 경과 할수록 굳어지게 되어 쉽사리 하수관로에서 이탈되지 않게 되므로, 본 발명에서는 하수관로의 내부에서 에어패커를 팽창시켜 하수가 에어패커와 하수관로 사이의 틈새를 빠르게 지나가게 하여 슬러지가 제거될 수 있도록 하는 한편 에어노즐에서 에어를 슬러지로 분사시켜 퇴적된 슬러지가 하수관로에서 제거될 수 있도록 한다.The sludge deposited in the sewer pipe or drainage pipe is deposited in the form of sinking to the bottom, and this sludge becomes hardened as the deposited time elapses so that it is not easily released from the sewer pipe. Inflation allows the sewage to quickly pass through the gap between the air packer and the sewer pipe so that the sludge can be removed, while the air is sprayed into the sludge from the air nozzle so that the deposited sludge can be removed from the sewer pipe.

즉 에어패커로 하수관로를 막아 하수가 에어패커에 차단되면서 수위가 상승되어 에어패커와 하수관로 사이로 빠르게 지나가게 하여 유속으로 인한 슬러지의 제거가 이루어지도록 하는 한편 에어노즐에서 에어를 분사시켜 슬러지를 제거할 수 있도록 하는 것이다.In other words, by blocking the sewage pipe with an air packer, the sewage is blocked by the air packer so that the water level rises and passes quickly between the air packer and the sewer line so that the sludge due to the flow rate can be removed and the sludge can be removed by injecting air from the air nozzle. To ensure that

그리고 하수관로에서 제거된 슬러지는 하수와 함께 흘러내려 하수관로의 하부에 설치된 차단구에 걸려 슬러지는 차단구의 전면에 퇴적되게 되고, 하수는 차단구를 넘어 하부로 흐르게 된다.The sludge removed from the sewer pipe flows down with the sewage, and the sludge is caught in the block installed in the lower part of the sewer pipe, and the sludge is deposited on the front of the block, and the sewage flows downward through the block.

이때 차단구의 전단에 준설차량의 준설호스를 설치하여 차단구에 걸려 침전되는 슬러지를 준설할 수 있도록 함으로써 적은 량의 하수와 함께 준설이 이루어지도록 한다.At this time, the dredging hose of dredging vehicle is installed at the front end of the block so that dredging sludge caught in the block can be dredged together with a small amount of sewage.

이러한 본 발명을 첨부도면에 의거 상세히 설명하기로 한다.The present invention will be described in detail with reference to the accompanying drawings.

본 발명은 맨홀(10)과 맨홀(11) 사이의 하수관로(20)를 청소하게 되는 것으로, 상류 측의 맨홀(10) 외부에 와이어(31)를 당기는 윈치(30)를 설치하고, 하류 측의 맨홀(11) 외부에 와이어(32)를 당기는 윈치(33)를 설치하는 한편 에어 호스(41)(42)로 에어를 공급하는 콤프레서(40)를 설치하며, 도시되지 아니한 준설차량을 위치시킨다.The present invention is to clean the sewage pipe 20 between the manhole 10 and the manhole 11, install a winch 30 for pulling the wire 31 on the outside of the manhole 10 on the upstream side, While installing the winch 33 for pulling the wire 32 to the outside of the manhole 11, a compressor 40 for supplying air to the air hoses 41 and 42 is installed, and the dredging vehicle (not shown) is positioned.

그리고 하수관로(20)에는 에어패커(60)가 탑재된 노즐고정대(70)를 위치시키고, 상기 노즐고정대(70)에는 전방 하측으로 에어를 분사시키는 에어노즐(71)을 설 치하며, 상기 노즐고정대(70)에 탑재된 에어패커(60)의 양측 및 상측으로는 가이드 날개(61)를 설치하여 하수관로(20)의 내부에서 가이드날개(61)가 닿도록 한다.In addition, the sewer pipe 20 is provided with a nozzle holder 70 on which the air packer 60 is mounted, and the nozzle holder 70 is provided with an air nozzle 71 for injecting air to the front lower side. On both sides and the upper side of the air packer 60 mounted on the 70 to install the guide blades 61 so that the guide wings 61 in the interior of the sewer pipe 20.

이때 가이드날개(61)를 설치하지 않고, 가이드 롤러를 설치하여도 무방한 것으로, 상기 가이드날개(61)및 가이드롤러는 에어패커(60)의 팽창시 하수관로(20)의 내벽에 닿아 에어패커(60)가 팽창된 상태로 하수관로(20)를 타고 이동할 수 있도록 한다.At this time, the guide blade 61 may be installed, and the guide roller may be installed. The guide blade 61 and the guide roller come into contact with the inner wall of the sewer pipe 20 when the air packer 60 is inflated. 60) to move in the sewage pipe 20 in an expanded state.

상기 에어패커(60)와 노즐고정대(70)에는 에어 콤프레서(40)에서 에어호스(41)(42)를 통하여 각각 고압의 압축공기가 공급될 수 있도록 하고, 여기서 에어패커(60)로 공급된 공기는 에어패커(60)를 일정크기로 팽창되어 있도록 하며, 노즐고정대(70)로 공급된 에어는 에어노즐(71)을 통하여 하수관로(20)의 바닥 쪽으로 분사되게 된다.The air packer 60 and the nozzle holder 70 may be supplied to the compressed air of high pressure through the air hose 41, 42 from the air compressor 40, where the air packer 60 is supplied Air causes the air packer 60 to be expanded to a certain size, and the air supplied to the nozzle holder 70 is injected toward the bottom of the sewer pipe 20 through the air nozzle 71.

그리고 노즐고정대(70)의 전방과 후방에는 안정되게 노즐고정대(70)를 당길 수 있도록 와이어(31)(32)가 고정되고, 상기 와이어(31)(32)는 각각 윈치(30)(33)에 결합되어 윈치(30)에서 와이어(31)를 당길 때 노즐고정대(70)와 에어패커(60)는 상류 쪽으로 이동하고, 윈치(33)에서 와이어(32)를 당기면 노즐고정대(70)와 에어패커(60)가 하류 쪽으로 이동하게 된다.The wires 31 and 32 are fixed to the front and rear of the nozzle holder 70 so as to stably pull the nozzle holder 70, and the wires 31 and 32 are respectively winches 30 and 33. And the nozzle holder 70 and the air packer 60 move upstream when the wire 31 is pulled from the winch 30, and when the wire 32 is pulled from the winch 33, the nozzle holder 70 and the air are pulled. Packer 60 is moved downstream.

한편 맨홀(11)의 하부에 설치되는 차단구(80)는 에어호스(81)를 통하여 에어를 공급받아 팽창하도록 고무로 제작되고, 상기 차단구(80)의 하측으로 차단구(80)를 바닥에 가라앉히는 무게추(90)를 설치하게 되는 것으로, 상기 차단구(80)는 무게추(90)에 의해 하수관로(20)의 바닥에 가라앉은 상태로 에어를 공급받게 되며, 에어를 공급받은 차단구(80)는 팽창되면서 하수관로(20)를 일정 높이로 막아주게 되고, 그러면 슬러지는 차단구(80)에 막혀 침전되게 되며, 하수는 차단벽(80)을 넘어 월류하게 된다.Meanwhile, the blocking hole 80 installed at the lower portion of the manhole 11 is made of rubber to expand and receive air through the air hose 81, and bottoms the blocking hole 80 to the lower side of the blocking hole 80. It is to be installed in the weight (90) to sink in, the blocking hole (80) is supplied to the air in the state sinked to the bottom of the sewer pipe 20 by the weight (90), the air is blocked Sphere 80 is expanded to block the sewage pipe 20 to a certain height, then the sludge is blocked by the blockage 80 is settled, sewage will flow beyond the blocking wall 80.

상기 차단구(80)에 막혀 침전된 슬러지는 준설호스(50)를 이용하여 준설차량에서 준설될 수 있도록 하여, 슬러지를 준설할 때 적은 량의 하수를 준설하게 되어 준설 효율을 높일 수 있게 된다.The sludge blocked by the blocking port 80 can be dredged in the dredging vehicle using the dredging hose 50, when dredging the sludge dredged a small amount of sewage can increase the dredging efficiency.

이러한 본 발명은 하수관로(20)의 하류 쪽에서 에어패커(60)가 탑재된 노즐고정대(70)를 설치하되 노즐고정대(70)의 전방에 연결된 와이어(31)는 맨홀(10) 외부에 놓인 윈치(30)로 당겨지게 하고, 노즐 고정대(70)의 후방에 연결된 와이어(32)는 맨홀(11)의 외부에 놓인 윈치(33)로 당겨질 수 있도록 한다.The present invention is installed on the downstream side of the sewer pipe 20, the nozzle holder 70 is mounted on the air packer 60, the wire 31 connected to the front of the nozzle holder 70 is a winch (outside the manhole 10) 30), and the wire 32 connected to the rear of the nozzle holder 70 can be pulled into the winch 33 placed outside of the manhole 11.

그리고 에어패커(60)와 노즐고정대(70)에는 각각 에어호스(41)(42)를 연결하게 되고, 에어패커(60)와 노즐고정대(70)로 고압의 에어를 공급하여 에어패커(60)는 팽창되게 하고, 노즐고정대(70)의 에어노즐(71)에서 에어를 분사시키도록 한다.Then, the air hoses 41 and 42 are connected to the air packer 60 and the nozzle holder 70, respectively, and the air packer 60 is supplied by supplying high pressure air to the air packer 60 and the nozzle holder 70. To expand and to inject air from the air nozzle (71) of the nozzle holder (70).

에어패커(60)가 팽창하면 가이드날개(61)가 하수관로(20)의 내벽에 닿도록 하여 에어패커(60)의 과도한 팽창을 방지하는 한편 에어패커(60)가 하수관로(20)를 따라 이동할 때 원활히 이동될 수 있도록 하며, 에어패커(60)와 하수관로(20) 사이에는 적은 틈새가 형성되게 하여 하수가 그 틈새로 빠르게 흐르도록 한다.When the air packer 60 is inflated, the guide blade 61 is brought into contact with the inner wall of the sewer pipe 20 to prevent excessive expansion of the air packer 60 while the air packer 60 moves along the sewer pipe 20. It can be moved smoothly, so that a small gap is formed between the air packer 60 and the sewer pipe 20 so that the sewage flows quickly into the gap.

즉 에어패커(60)를 팽창시키면 하수관로(20)를 따라 흐르는 하수의 흐름이 막히게 되고, 하수는 에어패커(60)와 하수관로(20)의 틈새를 빠르게 흘러나가게 되며, 이로 인하여 하수관로(20)에 퇴적되어 있는 슬러지가 제거되게 된다.That is, when the air packer 60 is inflated, the flow of sewage flowing along the sewage pipe 20 is blocked, and the sewage flows quickly through the gap between the air packer 60 and the sewage pipe 20, and thus, to the sewage pipe 20. The sludge deposited will be removed.

그리고 이와 동시에 노즐고정대(70)의 에어노즐(71)에서 에어를 분사시켜 슬러지를 제거하게 되므로, 하수관로(20)의 내벽에 퇴적되어 있는 슬러지가 제거되게 된다.At the same time, since the sludge is removed by injecting air from the air nozzle 71 of the nozzle holder 70, the sludge accumulated on the inner wall of the sewage pipe 20 is removed.

이와 같이 에어패커(60)를 팽창시켜 하수가 에어패커(60)와 하수관로(20) 사이를 흐르는 유속에 의해 슬러지를 제거하는 한편 에어노즐(71)에서 분사되는 에어로 슬러지를 제거하게 되며, 하수관로(20)의 하류에서 상류로 이동하면서 슬러지를 제거하게 된다.As such, the air packer 60 is expanded to remove the sludge by the flow rate of the sewage flowing between the air packer 60 and the sewer pipe 20, and to remove the air sludge injected from the air nozzle 71. The sludge is removed while moving upstream from 20).

즉 윈치(30)로 와이어(31)를 당기면 슬러지를 제거하면서 에어패커(60)가 장착된 노즐고정대(70)가 하수관로(20)의 상류로 이동하게 된다.That is, when the wire 31 is pulled by the winch 30, the nozzle holder 70 on which the air packer 60 is mounted is moved upstream of the sewer pipe 20 while removing sludge.

이때 제거된 슬러지는 하수에 의해 하류 쪽으로 흐르게 된다.The sludge removed then flows downstream by the sewage.

본 발명은 상기와 같이 하수관로(20)의 슬러지를 제거하도록 노즐고정대(70)를 하류에서 상류로 이동시키고, 다시 상류에서 하류로 이동시키는 과정을 반복하여 하수관로(20)에 퇴적된 슬러지를 제거하게 된다.The present invention is to remove the sludge deposited in the sewage pipe 20 by repeating the process of moving the nozzle fixture 70 upstream and downstream from the downstream to remove the sludge of the sewage pipe 20 as described above. do.

이와 같이 본 발명은 에어패커(60)가 장착된 노즐 고정대(70)를 이동시켜 슬러지를 제거하게 되고, 제거된 슬러지는 차단구(80)에 막혀 침전되게 한 후 준설호스(50)를 대고 준설하게 된다.Thus, in the present invention, the sludge is removed by moving the nozzle holder 70 on which the air packer 60 is mounted, and the removed sludge is blocked by the blocking port 80 to settle and dredging the dredging hose 50. Done.

본 발명의 차단구(80)는 내부에 에어가 채워지면 일정 높이로 세워지게 되고, 상기 차단구(80)의 하부에는 무게추(90)를 설치하여 하수관로(20)의 바닥에 세워져 있도록 하며, 무게추(90)로 하수관로(20)의 바닥에 닿은 상태에서 차단구(80)를 팽창시켜 하수관로(20)의 일부를 막아주도록 함으로써 슬러지가 포함된 하수가 흘러내릴 때 무거운 슬러지는 차단구(80)에 막혀 차단구(80)의 전단에 침전되게 되고, 하수는 차단구(80)를 월류하여 흐르게 된다.Blocking hole 80 of the present invention is built to a certain height when the air is filled in, the lower portion of the block 80 to install a weight 90 so as to stand on the bottom of the sewer pipe 20, Heavy sludge is blocked when the sewage containing sludge flows by blocking the portion 80 of the sewage pipe 20 by expanding the block 80 in the state of touching the bottom of the sewer pipe 20 with the weight 90. ) Is blocked in the front end of the block 80, sewage flows through the block 80.

즉 슬러지는 차단구(80)를 넘지 못하고 차단구(80)의 전방에 쌓이게 되고, 하수만 월류하여 흐르게 되므로, 준설호스(50)를 차단구(80)의 전방에 대고 준설을 하게 되면 최소한의 하수흡입과 함께 슬러지의 준설이 이루어지게 된다.That is, the sludge does not exceed the block 80, but is accumulated in front of the block 80, and only the sewage flows in excess, so that dredging hose 50 to the front of the block 80 to dredge the minimum Sewage is dredged along with sewage suction.

이후 본 발명은 상기에서 설명된 바와 같이 슬러지를 제거하는 과정을 반복함으로써 하수관로(20)에 퇴적되어 있는 슬러지를 단계적으로 깨끗하게 제거할 수 있게 된다.Since the present invention by repeating the process of removing the sludge as described above it is possible to remove the sludge deposited in the sewage pipe 20 step by step clean.

이와 같이 본 발명은 기존에 슬러지와 함께 배출되는 하수를 모두 준설하여 슬러지를 제거하게 되므로, 과다한 량의 하수를 준설하는 모순을 없애기 위하여 최소한의 하수와 함께 슬러지의 준설이 이루어지게 하는 것으로써, 준설효율을 높일 수 있는 것이다.As described above, the present invention dredged all the sewage discharged with the sludge to remove the sludge, so that the dredging of the sludge with the minimum sewage in order to eliminate the contradiction of dredging the excessive amount of sewage, dredging You can increase the efficiency.

한편 본 발명은 상기 실시예를 적절히 변형하여 동일하게 응용할 수 있음이 명확하므로, 상기 기재 내용은 하기 특허청구범위의 한계에 의해 정해지는 본 발명의 범위를 한정하는 것이 아니다.On the other hand, it is clear that the present invention can be applied in the same manner by appropriately modifying the above embodiments, and the above description does not limit the scope of the present invention defined by the limitations of the following claims.

도 1은 본 발명의 설치상태 단면도1 is a cross-sectional view of the installation state of the present invention

도 2는 본 발명의 노즐고정대와 에어패커 측면도Figure 2 is a side view of the nozzle holder and air packer of the present invention

도 3은 본 발명의 노즐고정대와 에어패커 정면도Figure 3 is a front view of the nozzle holder and the air packer of the present invention

도 4는 본 발명의 전진시 슬러지 제거상태 단면도Figure 4 is a cross-sectional view of the sludge removal state of the present invention

도 5는 본 발명의 후진시 슬러지 제거상태 단면도Figure 5 is a cross-sectional view of the sludge removal state when the reverse

도 6은 본 발명의 하수관로 슬러지 제거 상태 단면도Figure 6 is a cross-sectional view of the sludge removal state of the sewer pipe of the present invention

도 7은 본 발명의 에어패커 팽창 전 설치상태 정단면도Figure 7 is a front sectional view of the installation state before expansion of the air packer of the present invention

도 8은 본 발명의 에어패커 팽창 후 설치 상태 정단면도Figure 8 is a front sectional view of the installed state after the air packer expansion of the present invention

도 9는 본 발명의 에어패커 팽창 전 설치상태 측단면도Figure 9 is a side cross-sectional view of the installation state before expansion of the air packer of the present invention

도 10은 본 발명의 에어패커 팽창 후 설치상태 측단면도Figure 10 is a side cross-sectional view of the installed state after the air packer expansion of the present invention

도 11은 본 발명의 차단구 설치상태 단면도11 is a cross-sectional view of the block installation state of the invention

도 12는 본 발명의 차단구에 의해 침전된 슬러지 준설 상태 단면도12 is a cross-sectional view of the sludge dredging state precipitated by the blocking device of the present invention.

[도면의 주요 부분에 대한 부호의 설명][Description of Symbols for Main Parts of Drawing]

10,11 : 맨홀 20 : 하수관로10,11 manhole 20 sewer pipe

30,33 : 윈치 40 : 콤프레서30,33: winch 40: compressor

50 : 준설호스 60 : 에어패커50: dredge hose 60: air packer

70 : 노즐고정대 71 : 에어노즐70 nozzle nozzle 71 air nozzle

80 : 차단구 90 : 무게추80: block 90: weight

Claims (2)

하수관로를 타고 이동하는 에어패커를 팽창시켜 하수관로를 막아 하수가 에어패커와 하수관로의 틈새로 흐르게 하는 과정과,The process of inflating the air packer traveling in the sewer pipe to block the sewer pipe so that the sewage flows into the gap between the air packer and the sewer pipe, 상기 에어패커를 받쳐주는 노즐고정대에서 하측으로 에어를 분사시켜 가며 하수관로를 왕복하며 하수관로의 슬러지를 제거하는 과정과,The process of removing the sludge in the sewage pipe by reciprocating the sewage pipe while injecting air downward from the nozzle fixture for supporting the air packer, 상기 하수관로의 하류에는 무게추에 의해 하수관로에 가라앉고 에어로 팽창되는 차단구를 설치하는 과정과,Downstream of the sewer pipe process of sinking in the sewer pipe by the weight and installing a block for expanding with air, 하수관로에서 제거된 슬러지는 상기 차단구에 걸려 침전되고 하수는 차단구를 월류하여 흐르게 하는 과정과,The sludge removed from the sewer pipe is sedimented by the block and the sewage flows through the block overflow; 상기 차단구의 전단에 침전된 슬러지를 준설호스로 준설하는 과정을 수행하여 이루어지는 것을 특징으로 하는 하수관로의 준설공법.Dredging method of the sewer pipe, characterized in that the process of dredging the sludge precipitated in the front end of the block with a dredging hose. 제1항에 있어서, 에어패커에는 하수관로의 내벽을 받치는 가이드날개가 설치되는 한편 에어패커와 노즐고정대에는 별도의 에어호스를 통하여 에어가 공급되게 하고, 상기 노즐고정대는 전후방에 각각 연결된 와이어를 당김에 따라 하수관로를 왕복하며, 차단구에는 별도의 에어호스에 의해 에어가 공급되는 것을 특징으로 하는 하수관로의 준설공법.According to claim 1, The air packer is provided with a guide wing for supporting the inner wall of the sewer pipe while the air packer and nozzle holder to supply air through a separate air hose, the nozzle holder is to pull the wires connected to the front and rear respectively According to the sewage pipe reciprocating, the dredging method of the sewer pipe, characterized in that the air is supplied to the block by a separate air hose.
KR1020070077125A 2007-07-31 2007-07-31 Dredging construction method of drain pipe KR100905302B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070077125A KR100905302B1 (en) 2007-07-31 2007-07-31 Dredging construction method of drain pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070077125A KR100905302B1 (en) 2007-07-31 2007-07-31 Dredging construction method of drain pipe

Publications (2)

Publication Number Publication Date
KR20090012900A true KR20090012900A (en) 2009-02-04
KR100905302B1 KR100905302B1 (en) 2009-07-02

Family

ID=40683599

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070077125A KR100905302B1 (en) 2007-07-31 2007-07-31 Dredging construction method of drain pipe

Country Status (1)

Country Link
KR (1) KR100905302B1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101283394B1 (en) * 2011-07-27 2013-07-08 최인환 A dredging method including spim-dry and precipition for Vacuum tanck
KR20160087544A (en) * 2015-01-14 2016-07-22 웅진고분자 주식회사 An Apparatus for Perforating a Closed Discharging Duct
CN107761938A (en) * 2017-11-02 2018-03-06 湖北文理学院 Sideway launching road dredging system and dredging method
CN110761392A (en) * 2019-10-17 2020-02-07 上海市基础工程集团有限公司 Desilting device and construction method for large-diameter sewage curve pipeline in operating state
CN111794516A (en) * 2020-07-28 2020-10-20 浙江润泰建设有限公司 Indoor decoration method

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101636033B1 (en) * 2016-03-10 2016-07-06 주식회사 보람 Eco-friendly water and sewer conduit pipe
KR102114302B1 (en) 2018-06-11 2020-05-22 (주)신정개발 Dredging robot for small pipe and its driving method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07119203A (en) * 1992-04-07 1995-05-09 Kido Kensetsu Kogyo Kk Pipe inside cleaning method
JPH08246545A (en) * 1995-03-09 1996-09-24 Yokoshima:Kk Method of cleaning inside of duct
JPH1018406A (en) 1996-06-28 1998-01-20 Yokoshima:Kk Dredging method for earth and sand built up in pipeline
KR100690956B1 (en) 2005-01-31 2007-03-09 주식회사 한강개발 Dredging construction method of pipe using water pressure

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101283394B1 (en) * 2011-07-27 2013-07-08 최인환 A dredging method including spim-dry and precipition for Vacuum tanck
KR20160087544A (en) * 2015-01-14 2016-07-22 웅진고분자 주식회사 An Apparatus for Perforating a Closed Discharging Duct
CN107761938A (en) * 2017-11-02 2018-03-06 湖北文理学院 Sideway launching road dredging system and dredging method
CN107761938B (en) * 2017-11-02 2023-12-05 湖北文理学院 Transverse sewer dredging system and dredging method
CN110761392A (en) * 2019-10-17 2020-02-07 上海市基础工程集团有限公司 Desilting device and construction method for large-diameter sewage curve pipeline in operating state
CN111794516A (en) * 2020-07-28 2020-10-20 浙江润泰建设有限公司 Indoor decoration method

Also Published As

Publication number Publication date
KR100905302B1 (en) 2009-07-02

Similar Documents

Publication Publication Date Title
KR100905302B1 (en) Dredging construction method of drain pipe
US10954661B2 (en) Apparatus for cleaning pipes having pumping and vacuuming capability
CN103669557B (en) Underground conduit dredging engineering method
KR101030055B1 (en) Non-digging sewerage treatment contamination sediment dredging and conduit device its manufacturing method
KR20140038713A (en) Siphon facility having siphon operation initiating unit
US9796003B2 (en) Dripless expanding tubes for combination truck
KR100876911B1 (en) Horizontal water-gathering pipeand aquifer cleaner for under water purifier
JP4782059B2 (en) Pumping sand transport device and pumping sand transport method
JP2011052376A (en) Method for cleaning buried pipe for sewage
KR100953397B1 (en) Infiltration system with cleaning system using riverbed filtration
JP6097525B2 (en) Pipe cleaning method and pipe cleaning system
JP2002292209A (en) Sand collector of sedimentation basin
JP4181595B2 (en) Dam dredging equipment
CN215352262U (en) Integrated pump station processing device
KR100690956B1 (en) Dredging construction method of pipe using water pressure
JP2005220598A (en) Equipment for cleaning accumulated sediment on bottom of river
KR101239754B1 (en) Lie-down type precipitation facility
CN104963383B (en) A kind of pressure conduit inverted siphon hydraulic automatism erosion and deposition device
CN220335329U (en) Multistage recovery system of electroplating diamond wire diamond grains
CN216663786U (en) Horizontal formula drain pipe pull throughs of highway bridge
CN220013976U (en) Auxiliary mud pumping device of pipeline dredging and soil sucking vehicle
JP4293096B2 (en) In-pipe turbidity removal device
CN210386735U (en) Desilting flushing device
CN215026247U (en) Device for carrying out precipitation separation on water for cleaning concrete pump and pipe
CN220220687U (en) Water resource cyclic utilization carwash platform equipment suitable for engineering project

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130624

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20140618

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20150514

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20170413

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20180417

Year of fee payment: 10