KR20090006429U - The stage for the cutting area checked out - Google Patents
The stage for the cutting area checked out Download PDFInfo
- Publication number
- KR20090006429U KR20090006429U KR2020070020639U KR20070020639U KR20090006429U KR 20090006429 U KR20090006429 U KR 20090006429U KR 2020070020639 U KR2020070020639 U KR 2020070020639U KR 20070020639 U KR20070020639 U KR 20070020639U KR 20090006429 U KR20090006429 U KR 20090006429U
- Authority
- KR
- South Korea
- Prior art keywords
- scaffold
- hinged
- support rod
- support
- clamp
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/02—Stairways; Layouts thereof
- E04F11/104—Treads
- E04F11/1041—Treads having means to adjust the height, the depth and/or the slope of the stair steps
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/02—Stairways; Layouts thereof
- E04F11/104—Treads
- E04F11/16—Surfaces thereof; Protecting means for edges or corners thereof
- E04F11/17—Surfaces
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Movable Scaffolding (AREA)
Abstract
본 고안은 발판의 각도 조절 범위가 극대화되면서 다수의 발판의 각도를 균일하게 조절하는 작업이 신속하고 간편하게 이루어지도록 한 절토부 점검용 발판에 관한 것으로, 더욱 상세하게는 서로 평행하게 이격되어 절토부에 지지되는 한 쌍의 지지봉과, 상기 지지봉의 사이에 고정되는 발판과, 상기 발판의 전방 양 측면에 힌지결합되고 상기 지지봉에 체결 고정되는 상부클램프와, 상기 지지봉에 상부클램프의 하부측으로 이격 체결되는 하부클램프와, 상단이 상기 발판의 후방 양 측면에 힌지결합되고 하단이 상기 하부클램프에 힌지결합되는 보조지지봉이 포함된 절토부 점검용 발판에 있어서, 상기 발판;은 상기 지지봉의 이격 거리와 대응되는 폭으로 형성되는 지지부와, 상기 지지부의 양 측면에 결합되고 상기 상부클램프 및 보조지지봉이 힌지결합되는 측판으로 구성되되, 상기 측판의 후방 양 측면에 일정 간격으로 이격 형성된 다수의 각도조절공이 형성되고, 상기 보조지지봉의 상단이 상기 각도조절공에 선택적으로 힌지결합되도록 구성된다.The present invention relates to a scaffold for scaffold check that allows for quick and easy operation of uniformly adjusting the angles of a plurality of scaffolds while maximizing the angle adjusting range of the scaffold, and more specifically, parallel to each other. A pair of support rods supported, a footrest fixed between the support rods, an upper clamp hinged to both front sides of the footrest and fastened to the support rod, and a lower portion spaced apart from the lower side of the upper clamp to the support rods. A cutout check scaffold comprising a clamp and an auxiliary support rod whose upper end is hinged to both rear sides of the scaffold and the lower end is hinged to the lower clamp, wherein the scaffold is a width corresponding to the separation distance of the support rod. The support portion is formed in, and coupled to both sides of the support portion and the upper clamp and the auxiliary support rod hinged Doedoe composed of the sum is side plate, a plurality of angle adjustment is formed spaced a predetermined interval on both sides of the rear side plate the ball is formed, the upper end of the auxiliary supporting bar is configured to be selectively hinged to the angle regulating ball.
이에 따라, 절토부의 경사도 변경에 따른 발판의 조절 작업이 간편하게 이루어져 사용이 더욱 편리해지는 효과를 가지게 된다.Accordingly, the adjustment operation of the scaffold according to the change of the inclination of the cut portion is made simple, and the use is more convenient.
절토부, 점검계단, 점검발판, 각도조절, 경사조절 Cut section, check step, check step, angle control, tilt control
Description
본 고안은 각종 토목 및 건설공사 현장에서 산이나 언덕 등을 절토하여 형성된 급경사면에 설치되어 절토부의 점검시에 작업자가 절토부를 안전하게 오르내릴 수 있도록 한 것으로서, 더욱 상세하게는 발판의 각도 조절 범위가 극대화되면서 다수의 발판의 각도를 균일하게 조절하는 작업이 신속하고 간편하게 이루어지도록 한 절토부 점검용 발판에 관한 것이다.The present invention is installed on a steep slope formed by cutting mountains or hills at various civil and construction sites, so that the operator can safely climb up and down the cut section, and more specifically, the angle adjustment range of the scaffold is The invention relates to a scaffold check scaffold that allows for quick and easy operation to uniformly adjust the angles of multiple scaffolds while maximizing.
일반적으로, 건설공사 현장이나 토목공사 현장에서는 산이나 언덕 등을 절토하여 공사를 진행하는 경우, 절토면이 급경사로 형성되는데, 이러한 절토면을 작업자가 오르내리거나 점검하기 위해서는 계단 형상의 점검용 발판이 설치되어진다.In general, when a construction site or a civil engineering site cuts a mountain or a hill, the cut surface is formed to have a steep slope, and in order to climb or check the cut surface, a step-shaped check scaffold is installed. It is done.
이러한 점검용 발판은 도 3 및 도 4에서 보인 것과 같이 절토부에 지지되고 한 쌍이 평행하게 이격 배치된 지지봉(100)과, 상기 지지봉(100) 사이에 고정 배치되는 다수의 발판(200)과, 상기 발판(200)의 전방 양 측면에 힌지결합되고 상기 지지봉(100)에 체결 고정되는 상부클램프(300)와, 상기 발판(200)의 후방 양 측면에 힌지결합되는 보조지지봉(500) 및 보조지지봉(500)의 하단에 힌지결합되고, 상기 지지봉(100)에 체결 고정되는 하부클램프(400)로 구성된다.3 and 4, the inspection scaffold is supported by the cut portion and the pair is spaced apart in parallel to the
이에 따라, 지지봉을 절토부에 거치시켜 고정시킨 후에, 하부클램프를 지지봉을 따라 움직여 발판이 적정 각도를 이루도록 하고, 하부클램프를 지지봉에 견고히 체결시킴으로써, 절토부의 경사도에 따라 발판의 각도를 조절할 수 있게 되어 작업자가 발판을 이용하여 안전하게 절토부를 오르내릴 수 있게 되는 것이다.Accordingly, after the support rod is fixed to the cut section, the lower clamp is moved along the support rod to achieve a proper angle, and the lower clamp is firmly fastened to the support rod, so that the angle of the footrest can be adjusted according to the inclination of the cut section. Thus, the operator can use the scaffold to safely move up and down the cut.
하지만, 상기와 같은 종래의 경사지 점검용 발판은 하부클램프를 움직여 발판의 각도를 조절함에 따라 하부클램프를 풀고 잠그는 작업이 매우 번거로울 뿐만 아니라, 양 측의 하부클램프의 위치 및 지지봉을 따라 배치된 다수의 하부클램프의 각도를 균일하게 조절하기가 매우 힘든 문제점이 있었을 뿐만 아니라, 발판의 조절 가능한 경사각에도 한계가 발생하여 경사도가 매우 큰 절토면에는 발판을 적정 각도로 설치하기가 매우 힘든 문제점이 있었다.However, the conventional slope check footing as described above is not only very troublesome to loosen and lock the lower clamp by moving the lower clamp to adjust the angle of the footrest, a plurality of arranged along the position and support rods of the lower clamp on both sides Not only there was a problem that it is very difficult to uniformly adjust the angle of the lower clamp, there was also a limit in the adjustable inclination angle of the scaffolding, there was a problem that it is very difficult to install the scaffold at an appropriate angle on the cut surface with a very high inclination.
뿐만 아니라, 상기와 같은 종래의 발판은 작업자의 미끄러짐을 방지하기 위하여 철판의 상면에 엠보싱 형상의 돌기나 상면으로 돌출된 관통공 등으로 형성된 미끄럼 방지부(201)를 형성하고 있는데, 이 또한 한 장의 철판에 돌기를 형성함에 따라 마찰력에 한계가 있었고, 발판의 무게가 무거워 경사 조절 및 이동이 매우 힘들면서도 지지 가능한 하중에 한계가 발생되는 문제점이 있었다.In addition, the conventional scaffold as described above forms an
이에 본 고안은 상기와 같은 종래의 제반 문제점을 해결하기 위하여 안출된 것으로, 그 목적은 발판의 각도 조절 범위가 극대화되면서 다수의 발판의 각도를 균일하게 조절하는 작업이 신속하고 간편하게 이루어지도록 함에 있다.The present invention is devised to solve the conventional problems as described above, the purpose is to make the operation of adjusting the angle of the plurality of scaffold uniformly quickly and easily while maximizing the angle adjustment range of the scaffold.
또한, 본 고안의 목적은 발판의 하중 지지력이 극대화되면서 발판의 중량이 감소되도록 함에 있다.In addition, the object of the present invention is to reduce the weight of the scaffold while maximizing the load bearing capacity of the scaffold.
또한, 본 고안의 목적은 발판의 미끄럼방지력이 더욱 증대되도록 함에 있다.In addition, the object of the present invention is to further increase the sliding force of the scaffold.
상기와 같은 목적을 달성하기 위하여, 본 고안은 서로 평행하게 이격되어 절토부에 지지되는 한 쌍의 지지봉과, 상기 지지봉의 사이에 고정되는 발판과, 상기 발판의 전방 양 측면에 힌지결합되고 상기 지지봉에 체결 고정되는 상부클램프와, 상기 지지봉에 상부클램프의 하부측으로 이격 체결되는 하부클램프와, 상단이 상기 발판의 후방 양 측면에 힌지결합되고 하단이 상기 하부클램프에 힌지결합되는 보조지지봉이 포함된 절토부 점검용 발판에 있어서, 상기 발판;은 상기 지지봉의 이격 거리와 대응되는 폭으로 형성되는 지지부와, 상기 지지부의 양 측면에 결합되고 상기 상부클램프 및 보조지지봉이 힌지결합되는 측판으로 구성되되, 상기 측판의 후방 양 측면에 일정 간격으로 이격 형성된 다수의 각도조절공이 형성되고, 상기 보조지지봉의 상단이 상기 각도조절공에 선택적으로 힌지결합되도록 구성된다.In order to achieve the above object, the present invention is a pair of support rods that are spaced in parallel to each other and supported by the cut portion, a footrest fixed between the support rods, hinged to both front sides of the footrest and the support rods The upper clamp is fastened to the fixed clamp, the lower clamp is fastened spaced apart to the lower side of the upper clamp to the support rod, and the upper end is hinged to both rear sides of the scaffold and the lower support hinge is coupled to the lower clamp cut In the sub-checking scaffolding, the scaffolding; is composed of a support portion formed in a width corresponding to the separation distance of the support rod, the side plate is coupled to both sides of the support portion and the upper clamp and the auxiliary support rod hinged, A plurality of angle adjusting holes are formed on both rear sides of the side plate at regular intervals, and the upper side of the auxiliary support rod It is configured to be selectively hinged to the said angle adjustment ball.
또한, 상기 지지부는, 양 단이 상기 측판에 고정되고, 상기 지지봉과 직교하 는 방향으로 평행하게 이격 배치된 다수의 하중지지편으로 구성된 것을 특징으로 한다.In addition, the support portion is characterized in that the both ends are fixed to the side plate, consisting of a plurality of load supporting pieces spaced apart in parallel in the direction orthogonal to the support bar.
또한, 상기 하중지지편의 상면으로 돌출되는 다수의 미끄럼방지 돌기가 구비된 것을 특징으로 한다.In addition, a plurality of anti-slip projections protruding to the upper surface of the load supporting piece is characterized in that it is provided.
이에, 본 고안은 발판의 측판에 다수의 각도조절공을 형성하여 발판의 각도 조절 범위가 극대화되면서 다수의 발판의 각도를 균일하게 조절하는 작업이 신속하고 간편하게 이루어지도록 함으로써, 절토부의 경사도 변경에 따른 발판의 조절 작업이 간편하게 이루어져 사용이 더욱 편리해지는 효과를 가지게 된다.Thus, the present invention is to form a plurality of angle adjustment holes in the side plate of the scaffold to maximize the angle adjustment range of the scaffold to make the operation of adjusting the angle of the plurality of scaffolding quickly and simply, according to the change of the slope of the cut It is easy to adjust the operation of the scaffold will have the effect of more convenient.
또한, 본 고안은 지지부가 다수의 하중지지편으로 구성되도록 하여 발판의 하중 지지력이 극대화되면서 발판의 중량이 감소되도록 함으로써, 절토부 점검용 발판의 설치작업이 다욱 간편하게 이루어질 뿐만 아니라, 발판의 각도조절 등이 더욱 간편하게 이루어지는 효과를 가지게 된다.In addition, the present invention is to make the support portion composed of a plurality of load support pieces to reduce the weight of the scaffold while maximizing the load bearing capacity of the scaffold, the installation work of the scaffold check step is made much easier, as well as adjusting the angle of the scaffold Etc., the effect is made more easily.
또한, 본 고안은 하중지지편에 미끄럼방지 돌기를 형성하여 발판의 미끄럼방지력이 더욱 증대되도록 함으로써, 눈이나 얼음, 빗물 등에 의한 미끄러짐을 더욱 효과적으로 방지하여 발판의 안전성이 더욱 증대되는 효과를 가지게 된다.In addition, the present invention is to form a non-slip protrusion on the load supporting piece to further increase the anti-skid force of the scaffold, to more effectively prevent the sliding caused by snow, ice, rain water, etc. has the effect of further increasing the safety of the scaffold. .
도 1은 본 고안의 일 실시예를 보인 요부의 사시도로서, 도시된 것과 같이 본 고안은 건설 및 토목공사 현장에서 산이나 언덕 등을 절토하여 급경사가 형성된 절토부에 설치되어 작업자가 절토부를 간편하고 안전하게 오르내릴 수 있도록 한 것으로서, 절토부에 지지되어 고정되는 한 쌍의 지지봉(10)과, 양 측면이 각각 이격된 지지봉(10)에 고정되는 발판(20) 및 발판(20)이 지지봉(10)에 분리와 결합이 가능하게 고정되도록 하는 상부클램프(30)와 하부클램프(40) 및 경사지게 고정된 지지봉(10)에 발판(20)이 평탄한 상태를 유지하면서 고정되도록 하는 보조지지봉(50)으로 구성된 발판(20)에 관한 것으로서, 특히 발판(20)의 측판(22)이 다수의 각도조절공(221)이 형성되고, 상기 보조지지봉(50)의 상단이 상기 각도조절공(221)에 선택적으로 힌지결합되도록 하여 발판(20)의 각도 조절 범위가 극대화되면서 다수의 발판(20)의 각도를 균일하게 조절하는 작업이 신속하고 간편하게 이루어지도록 한다.1 is a perspective view of the main part showing an embodiment of the present invention, as shown in the present invention is installed in the cut portion formed by the steep slope to cut the mountains or hills at the construction and civil engineering site, the operator is easy to cut In order to safely climb up and down, a pair of
상기 지지봉(10)은 절토부의 높이와 대응되게 한 쌍이 구비되어 평행하게 배치되고, 절토부의 전면에 경사지게 거치되면서 다수의 발판(20)이 일체로 견고하게 고정되도록 함과 동시에 작업자의 하중을 견고하게 지지하도록 한다.The
상기 발판(20)은 양 측면이 상기 지지봉(10)에 고정되어 작업자가 절토부를 오르내릴 때 계단 역할을 수행하는 것으로서, 상술한 지지봉(10)의 이격 거리와 대응되는 폭으로 형성되는 지지부(21)와, 상기 지지부(21)의 양 측면에 세로 방향으로 결합되고 후술되는 상부클램프(30) 및 보조지지봉(50)이 결합되는 측판(22)으로 구성된다.The
상기 상부클램프(30)는 발판(20)의 전방 양 측면이 상술한 지지봉(10)에 회동 가능하게 고정되도록 하는 것으로서, 금속파이프에 체결 고정되는 통상의 클램프로 형성되되, 일측면이 측판(22)의 전방 양 측에 각각 힌지결합되도록 함으로써, 발판(20)의 각도를 조절할 때 상부클램프(30)를 기준으로 발판(20)이 회동되도록 한다.The
상기 하부클램프(40)는 상기 지지봉(10) 상에 상술한 상부클램프(30)의 하부측으로 이격되어 고정되면서 발판(20)의 후방 양 측면이 지지되도록 함과 동시에 발판(20)의 1차적인 각도 조절이 이루어지도록 하는 것으로서, 지지봉(10)을 따라 이동되면서 일정 위치에서 견고히 체결 고정되는 통상의 클램프로 형성된다.The
상기 보조지지봉(50)은 상술한 발판(20)의 후방 양 측면이 하부클램프(40)에 결합되어 지지되도록 함과 동시에 작업자의 체중을 안정적으로 지지하여 지지봉(10)으로 전달되도록 하는 것으로서, 상단이 상기 지지봉(10)의 후방 양 측면에 힌지결합되도록 하고, 하단은 상술한 하부클램프(40)에 힌지결합되도록 하여 하부클램프(40)가 지지봉(10)을 따라 이동하면 보조지지봉(50)과 발판(20) 사이의 각도가 변화되면서 지지봉(10)을 기준으로 한 발판(20)의 배치 각도가 조절되도록 한다.The
상기 각도조절공(221)은 발판(20)과 보조지지봉(50) 사이의 힌지결합 위치를 이동시켜 발판(20)의 2차적인 각도 조절이 가능해지도록 한 것으로서, 상술한 측판(22)에 발판(20)의 후방 측으로 다수개가 이격되어 관통 형성되도록 하고, 상술한 보조지지봉(50)의 상단이 다수의 각도조절공(221)에 선택적으로 힌지결합되도록 한다.The
이에 따라, 절토부 점검용 발판이 설치된 상태에서 공사의 진척에 의해 절토부의 경사각이 변화되는 경우에는 각각의 하부클램프(40)를 이동시키는 번거로움이 없이 보조지지봉(50)이 힌지결합되는 각도조절공(221)의 위치만 변경시키는 것 만으로도 다수의 발판(20)의 각도를 균일하게 조절할 수 있게 되어 발판(20)의 각도 조절 작업이 더욱 간편하게 이루어지게 되는 것이다.Accordingly, when the inclination angle of the cut portion is changed by the progress of construction in the state in which the foothold for checking the cut portion is installed, the angle adjustment in which the auxiliary supporting
이 때, 상술한 보조지지봉(50)과 각도조절공(221)은 통상의 핀 또는 나사 등으로 형성된 결합부재(51)에 의해 결합되도록 함으로써, 보조지지봉(50)이 작업자의 하중을 견고하게 지지하면서도 간편한 각도 조절 작업이 이루어지도록 하는 것이 바람직하다.At this time, the auxiliary supporting
더불어, 상술한 지지부(21)는 양 단부가 각각 상술한 측판(22)에 용접 등에 의해 일체로 고정되고, 지지봉(10)과 수직 방향으로 평행하게 이격되고, 지면과 수직 방향으로 배치된 다수의 하중지지편(11)으로 구성되도록 함으로써, 눈이나 얼음 및 빗물 등이 각각의 하중지지편 사이 공간으로 원활하게 배출되면서 눈과 얼음 및 빗물 등에 의해 작업자가 미끄러지는 것을 방지할 수 있을 뿐만 아니라, 종래의 철판으로 형성된 발판(20)에 비해 발판(20)의 전체적인 중량을 감소시킬 수 있게 되어 절토부 점검용 발판의 설치작업 및 발판(20)의 각도 조절 작업이 더욱 간편하고 원활하게 이루어지면서도 안정적으로 하중을 지지할 뿐만 아니라, 이격된 하중지지편(11)의 각각의 모서리에 의한 마찰 효과가 발생되어 작업자가 발판(20)을 밟고 오르내릴 때 미끄러짐이 방지되도록 하는 것이 바람직하다.In addition, the above-described
또한, 상술한 하중지지편(11)은 금속 판재로 형성되도록 하되, 지면과 수직 방향으로 배치되도록 하여 하중지지편(11)과 작업자의 발이 닿는 면적을 최소화하여 미끄러짐을 방지함과 동시에 마찰력이 극대화되도록 하는 것이 바람직하며, 하 중지지편의 상면 또는 하중지지편의 사이 공간에 하중지지편의 상면으로 돌출되는 다수의 미끄럼방지 돌기(212)를 구비함으로써, 작업자의 미끄러짐을 더욱 효과적으로 방지하여, 절토부 점검용 발판에서 발생되는 안전사고를 더욱 효율적으로 방지할 수 있도록 하는 것도 무방하다.In addition, the above-mentioned load supporting piece 11 is formed of a metal plate, but is disposed in the vertical direction with the ground to minimize the area between the load supporting piece 11 and the operator's foot to prevent slipping and at the same time maximize the friction force Preferably, a plurality of
도 2는 본 고안의 사용상태를 보인 것으로서, 도 2a는 완만한 경사를 갖는 지역에서의 설치 상태를 보인 측면도이고, 도 2b는 가파른 경사를 갖는 지역에서의 설치 상태를 보인 측면도로서, 상술한 바와 같이 구성된 본 고안은 최초에 절토부 점검용 발판을 절토부에 설치할 때에는 지상에서 하부클램프(40)를 이동시켜 전체적인 발판(20)의 경사가 균일해지도록 한 후에 설치하고, 토목 및 건축공사의 진척에 의해 절토부의 경사각이 변화하는 경우에는 각각의 하부클램프(40)를 풀어내고 이동시키는 번거로움이 없이 보조지지봉(50)의 상단을 측판(22)에서 분리한 후에, 각도조절공(221)의 위치를 이동시킨 후 힌지 결합 함으로써, 간편한 각도 조절 작업이 이루어지게 되는 것이다.2 is a view showing a state of use of the present invention, Figure 2a is a side view showing the installation state in a region having a gentle slope, Figure 2b is a side view showing an installation state in a region having a steep slope, as described above The present invention, which is configured as described above, first installs the cut for checking the cut part in the cut part by moving the
도 1은 본 고안의 일 실시예를 보인 요부의 사시도.1 is a perspective view of a main portion showing an embodiment of the present invention.
도 2는 본 고안의 사용상태를 보인 것으로서,Figure 2 shows the state of use of the subject innovation,
도 2a는 완만한 경사를 갖는 지역에서의 설치 상태를 보인 측면도, Figure 2a is a side view showing the installation state in a region with a gentle slope,
도 2b는 가파른 경사를 갖는 지역에서의 설치 상태를 보인 측면도. Figure 2b is a side view showing the installation state in a region having a steep slope.
도 3은 종래 경사지 점검용 발판의 일 예를 보인 요부의 사시도.Figure 3 is a perspective view of the main portion showing an example of a foothold for checking the conventional slope.
도 4는 도 3의 사용상태를 보인 측면도.Figure 4 is a side view showing a state of use of FIG.
※ 도면의 주요 부분에 대한 부호의 설명※ Explanation of codes for main parts of drawing
10 : 지지봉10: support rod
20 : 발판20: scaffolding
21 : 지지부 11 : 하중지지편 21: support portion 11: load supporting piece
212 : 미끄럼방지 돌기 22 : 측판 212: non-slip projection 22: side plate
221 : 각도조절공 221: angle adjustment hole
30 : 상부클램프30: upper clamp
40 : 하부클램프40: lower clamp
50 : 보조지지봉 51 : 결합부재50: auxiliary support rod 51: coupling member
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2020070020639U KR20090006429U (en) | 2007-12-24 | 2007-12-24 | The stage for the cutting area checked out |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2020070020639U KR20090006429U (en) | 2007-12-24 | 2007-12-24 | The stage for the cutting area checked out |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20090006429U true KR20090006429U (en) | 2009-06-29 |
Family
ID=41323162
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR2020070020639U KR20090006429U (en) | 2007-12-24 | 2007-12-24 | The stage for the cutting area checked out |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20090006429U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101668977B1 (en) * | 2016-02-03 | 2016-11-09 | 공준혁 | Safety stairs of adjustable scaffold and handrail corresponding to slopeway |
KR20180001941U (en) * | 2016-12-20 | 2018-06-28 | 주식회사 두산 | Side Step for Forklift |
-
2007
- 2007-12-24 KR KR2020070020639U patent/KR20090006429U/en not_active Application Discontinuation
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101668977B1 (en) * | 2016-02-03 | 2016-11-09 | 공준혁 | Safety stairs of adjustable scaffold and handrail corresponding to slopeway |
KR20180001941U (en) * | 2016-12-20 | 2018-06-28 | 주식회사 두산 | Side Step for Forklift |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20240060320A1 (en) | Safety rail system | |
CA2313513C (en) | Scaffolding | |
US20080105489A1 (en) | Roofmates gablemaster ladder support | |
US6247273B1 (en) | Adjustable form brace | |
US20110067954A1 (en) | Ladder Safety Device | |
US8382056B2 (en) | Safety device | |
US20170175443A1 (en) | Ladder brace | |
US20080000721A1 (en) | Ladder safety device | |
KR100989111B1 (en) | Tilting access stairway structure for approaching bridge inspection passage | |
KR200483776Y1 (en) | Wall form supporter | |
JP2020007792A (en) | Stepladder serving as simple scaffold | |
KR20090006429U (en) | The stage for the cutting area checked out | |
US8360204B2 (en) | Self-adjusting ladder leveling device | |
KR200442222Y1 (en) | ladder for control step angle | |
GB2556327A (en) | Universal eye bolt actuated leveller and extendable stabiliser system for ladders and small deck structures | |
EP3359768B1 (en) | Device for the nivellation of ladders | |
KR20100055605A (en) | Improved model assembly stairway | |
JP4476044B2 (en) | Ladder scaffolding | |
KR20140046237A (en) | Ladder with controlable footsteps | |
KR200483777Y1 (en) | Wall form supporter | |
JP3981604B2 (en) | Temporary staircase landing | |
KR20200099867A (en) | Assistance leg and scaffolding comprising the same | |
AU2011253570A1 (en) | Ladder stabilising assembly | |
JP3152342U (en) | Ladder fixing jig and ladder device | |
EP3957807B1 (en) | A scaffolding support structure and a method for assembling scaffolding |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E601 | Decision to refuse application |