KR20070062746A - Temporary construction system using a steel pipe structure - Google Patents

Temporary construction system using a steel pipe structure Download PDF

Info

Publication number
KR20070062746A
KR20070062746A KR1020050122501A KR20050122501A KR20070062746A KR 20070062746 A KR20070062746 A KR 20070062746A KR 1020050122501 A KR1020050122501 A KR 1020050122501A KR 20050122501 A KR20050122501 A KR 20050122501A KR 20070062746 A KR20070062746 A KR 20070062746A
Authority
KR
South Korea
Prior art keywords
steel pipe
circular steel
transverse
circular
lower structure
Prior art date
Application number
KR1020050122501A
Other languages
Korean (ko)
Other versions
KR100732701B1 (en
Inventor
최현진
Original Assignee
(주)씨디텍엔지니어링
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)씨디텍엔지니어링 filed Critical (주)씨디텍엔지니어링
Priority to KR1020050122501A priority Critical patent/KR100732701B1/en
Publication of KR20070062746A publication Critical patent/KR20070062746A/en
Application granted granted Critical
Publication of KR100732701B1 publication Critical patent/KR100732701B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D15/00Movable or portable bridges; Floating bridges
    • E01D15/12Portable or sectional bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/28Concrete reinforced prestressed
    • E01D2101/285Composite prestressed concrete-metal

Abstract

A temporary construction system using a round steel pipe is provided to install a long-span temporary structure stably and economically by installing round steel pipes or horizontal connection members on the upper part of a lower structure containing temporary bents in the longitudinal direction and installing a deck plate containing perforated plates on the upper part of the round steel pipes. The temporary construction system using a round steel pipe is completed by installing an upper structure(300) between a lower structure(100) containing temporary bents installed on the ground at regular intervals in the longitudinal direction and a deck structure(200) containing perforated plates on the lower structure, wherein the upper structure contains round steel pipes(320) installed in a row on the upper part of the lower structure by fixtures composed of bolts and nuts and extended in the longitudinal direction, and horizontal connection members provided with steel bars coupled in the round steel pipes by connectors composed of nuts between the sides of the inner round steel pipes to restrain the round steel bars in the transverse direction.

Description

원형강관을 이용한 가설시스템{Temporary Construction System Using a Steel Pipe Structure}Temporary Construction System Using a Steel Pipe Structure}

도 1은 종래 원형강관을 이용한 가시설시스템을 도시한 것이다.1 shows a temporary system using a conventional circular steel pipe.

도 2a 및 도 2b는 본 발명의 가설시스템인 실시예 1을 사시도 및 횡단면도로 도시한 것이다.2A and 2B show a perspective view and a cross-sectional view of Embodiment 1 of the hypothesis system of the present invention.

도 3은 본 발명의 횡리브 설치상태를 도시한 것이다.Figure 3 shows the transverse rib installation of the present invention.

도 4a, 도 4b 및 도 4c는 본 발명의 가설시스템인 실시예 2의 사시도, 지점부 횡단면도, 중앙부 횡단면도를 도시한 것이다.4A, 4B and 4C show a perspective view, a point cross section and a center cross section of a second embodiment of the hypothesis system of the present invention.

도 5a 및 도 5b는 본 발명의 가설시스템인 실시예 3의 사시도 및 횡단면도를 도시한 것이다.5A and 5B show a perspective view and a cross-sectional view of Embodiment 3 which is a hypothesis system of the present invention.

도 6a 및 도 6b는 본 발명의 가설시스템인 실시예 4의 사시도 및 횡단면도를 도시한 것이다.6A and 6B show a perspective view and a cross-sectional view of Example 4 which is a hypothesis system of the present invention.

도 7a 및 도 7b는 본 발명의 가설시스템인 실시예 5의 지점부와 중앙부의 횡단면도이다.7A and 7B are cross-sectional views of the point portion and the center portion of the fifth embodiment of the hypothesis system of the present invention.

도 8은 본 발명의 가설시스템인 실시예 6의 정면도를 도시한 것이다.8 shows a front view of Embodiment 6 which is a hypothesis system of the present invention.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

100:하부구조물 200:상판구조물100: lower structure 200: top structure

300:상부구조물 320:원형강관(실시예 1)300: upper structure 320: circular steel pipe (Example 1)

340:횡방향연결부재 350:횡방향리브340: lateral connecting member 350: lateral rib

360:내측리브 370:긴장재정착박스용 콘크리트360: inner rib 370: concrete for tension fixing box

400:긴장수단 410:횡방향관통부재(실시예 2)400: tension means 410: transverse through member (Example 2)

420:긴장재정착박스 430:긴장재420: tension reset box 430: tension

500:아치형보강수단 510:횡방향관통부재(실시예 3)500: arch type reinforcing means 510: transverse through member (Example 3)

520:아치형보강부재 530:상하하중전달부재520: arch type reinforcing member 530: vertical load transfer member

540:중앙부위치구속부재 610:원형강관(실시예 4)540: center position binding member 610: round steel pipe (Example 4)

620:횡방향지지대 630:종방향지지대620: transverse support 630: longitudinal support

710:쉬스관 720:긴장재(실시예 5)710: sheath tube 720: tension member (Example 5)

810:횡방향관통부재(실시예 6) 820:아치형보강부재(실시예 6)810: transverse through member (Example 6) 820: arch type reinforcing member (Example 6)

830:연결지지부재830: connecting support member

본 발명은 원형강관을 이용한 가설시스템에 관한 것이다. 더욱 구체적으로 I형강빔 등을 이용하여 가설 동바리, 가설교량과 같이 임시적인 지지구조물을 가설하고, 교량 등을 포함하는 본 구조물을 설치한 이후, 해체되는 가설시스템에 관한 것이다.The present invention relates to a temporary system using a circular steel pipe. More specifically, the present invention relates to a temporary construction system that is to be dismantled after installing temporary structures such as temporary bridges and temporary bridges using I-beams and installing the present structures including bridges.

종래 원형강관을 가설시스템에 이용한 예가 도 1에 도시되어 있다. 즉 건축 물을 시공하기 위하여, 지반을 터파기한 후 내 측벽이 붕괴하지 않도록 터파기 내측벽면에 띠장(Wale,10) 및 버팀보(Strut, 스트러드,20)를 포함하는 가설 부재를 설치하게 되는데, 상기 띠장은 내측 벽면을 따라 수평 또는 수직으로 설치하게 되고, 버팀보는 띠장 사이 터파기 내측 공간을 횡단하도록 설치되어 내측 벽면으로부터 전달되는 토압을 지지토록 하고 있다. 이때, 통상 띠장 및 버팀보는 I,H 형강 빔을 사용하게 되는데 기성제품(롤빔)을 그대로 사용하게 된다. An example of using a conventional round steel pipe in a temporary system is shown in FIG. 1. That is, in order to construct a building, a temporary member including a stripe (Wale, 10) and a brace (Strut, stud, 20) is installed on the inner wall of the trench so that the inner side wall does not collapse after breaking the ground. The strip is installed horizontally or vertically along the inner wall surface, and the brace is installed to cross the inner space of the strip girder so as to support the earth pressure transmitted from the inner wall surface. At this time, the general strip and the brace is to use the I, H-beam beam, but the ready-made product (roll beam) is used as it is.

이때 이러한 H 형강 등은 품질관리가 비교적 우수한 기성제품을 그대로 구매하여 사용함으로서 나름 대로의 장점은 있으나, 약축(통상 Z축)을 기준으로 한 횡방향 좌굴이 크게 발생할 소지가 있으므로 약축 및 강축에 대한 구분이 없으면서도, 중간 수직 스트러트 및 브레이싱의 생략이 가능하여 시공성 및 경제성을 높일 수 있는 원형강관을 이용한 예가 도 1에 도시되어 있다.At this time, the H-beams have their own advantages by purchasing ready-made products with excellent quality control as they are, but there is a possibility of lateral buckling based on the weak axis (usually the Z axis). Without distinction, an example using a circular steel pipe which can omit intermediate vertical struts and bracing to improve workability and economy is shown in FIG. 1.

하지만 이러한 종래의 원형강관을 사용한 예는 원형강관의 양단부로부터 전달되는 축 부재용으로 사용되는 것으로서, 가설 시스템에 있어서 휨 부재용으로 사용하는 경우에 있어서는 달리 원형강관 부재를 사용한 예가 없어 이를 위한 기술개발의 필요성이 대두되었다.However, the example using the conventional circular steel pipe is used for the shaft member which is transmitted from both ends of the circular steel pipe, and in the case of using it for the bending member in the temporary system, there is no example of using the circular steel pipe member, so there is no technical development for this. The need has arisen.

이에 본 발명은 휨 부재로서의 원형강관을 가설시스템에 적용하기 위하여 원형강관의 횡방향 구속수단을 제공하고, 지점부, 중앙부에 발생하는 휨 강성을 보완하고, 상판구조물과 하부구조물과의 지지와 연결수단 및 하중의 분배를 위한 새로운 수단이 포함된 가설시스템을 새로이 개발하게 되었다.Accordingly, the present invention provides a transverse restraining means of the circular steel pipe in order to apply the circular steel pipe as a bending member to the temporary system, to compensate for the bending stiffness generated in the point portion, the central portion, and to support and connect the upper and lower structures A new hypothesis system was developed that included means and new means for the distribution of loads.

이로서 본 발명은 휨 부재로서 원형강관을 보다 효율적으로 가설시스템에 이용할 수 있도록 원형강관의 지점부 및 중앙부의 휨 강성 및 그 설치에 있어 보다 시공성이 뛰어나며, 하중분배에 효율적이며 경제적으로 설치할 수 있는 원형강관을 이용한 가설시스템을 제공하는 것을 그 목적으로 한다.As a result, the present invention provides a flexural stiffness at the point and the center of the circular steel pipe and its installation property, and can be efficiently and economically installed in the load distribution so that the circular steel pipe can be used as a bending member in a temporary system more efficiently. The purpose is to provide a temporary system using steel pipes.

상기 기술적과제를 달성하기 위하여, 본 발명은In order to achieve the above technical problem, the present invention

첫째, 가설시스템으로서 휨 부재로 원형강관(320)을 이용하였다. 즉 원형강관은 원형단면이므로 약축, 강축에 대한 휨에 대한 저항력이 매우 클 뿐만 아니라, 비틀림에 대한 영향이 적어 구조적으로 안전하다는 장점이 있기 때문이다.First, a circular steel pipe 320 was used as a bending member as a temporary system. That is, since the circular steel pipe is a circular section, the resistance to bending against weak axes and steel shafts is not only very large, but also has an advantage of being structurally safe due to its small influence on torsion.

둘째, 이러한 휨 부재용 원형강관은 지점부와 중앙부에서 각각 최대 휨 부모멘트, 최대 휨 정모멘트가 발생하므로, 휨 부재용 가설시스템에 있어서는 효율적인 휨 강성확보가 매우 중요하게 된다. Second, since the maximum bending parent moment and the maximum bending constant moment are generated at the point and the center of the circular steel pipe for the bending member, the efficient bending rigidity is very important in the temporary system for the bending member.

이에 지점부 및 중앙부에 있어 휨 강성확보를 위하여 본 발명에서는 강관 내부에 원형강관의 내부에 위치한 강관코아 및 상기 강관코아 외주면을 따라 돌출되어 원형강관의 내측면에 접하도록 설치된 날개판을 포함하는 내측리브(360) 또는 콘크리트(370)를 충전시킬 수 있도록 하여 원형강관의 휨 강성이 보완되도록 하였다.In the present invention, in order to secure the bending rigidity in the point and the center portion, the present invention includes a steel pipe core located inside the circular steel pipe inside the steel pipe and a wing plate protruding along the outer circumferential surface of the steel pipe core to be in contact with the inner surface of the circular steel pipe. The rib 360 or the concrete 370 can be filled to compensate for the bending rigidity of the round steel pipe.

셋째, 원형강관을 설치함에 있어서, 하부구조물인 가설벤트 위에 보다 시공성이 뛰어나면서도 가시설로서 해체가 용이하도록 가설벤트인 하부구조물과 원형강관(320)에 있어 원형강관 내측 및 외측 하부면 각각에 대응하는 형상으로 형성된 굴곡판으로 형성되며 볼트공이 형성된 하면접합판을 이용하여 볼트와 너트로 서로 체결되도록 하였다.Third, in the installation of the circular steel pipe, the lower structure and the circular steel pipe 320 corresponding to the inner and outer lower surfaces of the circular steel pipe in the temporary structure, so that the disassembly as easy to dismantle as a temporary facility on the temporary construction pipe is a lower structure corresponding to each It was formed as a bent plate formed in a shape to be fastened to each other by a bolt and a nut using a bottom bonded plate formed with a bolt hole.

넷째, 원형강관은 서로 길이방향으로 병렬로 다수 설치되도록 함에 따라 이에 따른 횡방향 구속을 위하여 원형강관 사이를 강봉을 포함하는 횡방향연결부재(340)를 이용하도록 하였다.Fourth, the circular steel pipe is to be installed in parallel with each other in the longitudinal direction, so that the transverse connection member 340 including the steel rod between the circular steel pipe for the transverse restraint accordingly.

다섯째, 원형강관(320)에 복공판과 상판구조물(200)이 용이하게 설치되도록 하고, 원형강관에 상판구조물의 자중 및 교통하중과 같은 외부하중을 원형강관에 효율적으로 전달시키기 위하여 강판을 포함하는 횡방향리브(350)를 원형강관 사이에 설치하고, 그 위에 L형강과 같은 상판지지부재를 설치하여 상판구조물이 보다 효율적으로 지지, 설치될 수 있도록 하였다.Fifth, the perforated plate and the upper plate structure 200 is easily installed in the circular steel pipe 320, and the horizontal steel pipe including a steel plate to efficiently transfer external loads such as self-load and traffic load of the upper plate structure to the circular steel pipe Directional ribs 350 are installed between the circular steel pipes, and upper plate supporting members such as L-shaped steel are installed thereon so that the upper plate structures can be more efficiently supported and installed.

여섯째, 복공판과 같은 상판구조물(200)로부터 전달되는 외부하중에 효율적으로 저항할 수 있도록 하면서, 시공성을 고려하여 특히 바깥쪽 원형강관의 측면으로 돌출되며 내측 원형강관을 횡방향으로 관통하여 설치되는 횡방향관통부재를 설치하고, 횡방향관통부재의 단부에 연결되어 바깥쪽 원형강관의 외측측면에 설치되어 외부하중이 전달될 수 있도록, 종방향으로 설치되는 아치형태의 아치형보강부재(520,820)를 위로 또는 아래로 솟음처리하여 설치하였으며, 이러한 아치형보강부재는 원형강관에 상하하중전달부재 또는 연결지지부재(830)로 서로 연결되도록 하였다.Sixth, while being able to effectively resist the external load transmitted from the upper plate structure 200, such as the perforated plate, in consideration of the construction properties in particular protrudes to the side of the outer circular steel pipe and transversely installed through the inner circular steel pipe in the transverse direction Directional through member is installed, and is connected to the end of the transverse through member is installed on the outer side of the outer circular steel pipe so that the external load can be transferred, the arch-shaped arch-shaped reinforcing members (520, 820) installed in the longitudinal direction up Or installed soaring down, these arch-shaped reinforcing members were to be connected to each other by a vertical load transfer member or a connecting support member 830 in the circular steel pipe.

일곱째, 상기 아치형보강부재의 역할로서 긴장재(430)를 이용하여 종방향으로 프리스트레스를 도입할 수 있도록, 긴장재정착박스(420)를 바깥쪽 원형강관의 외측측면에 설치하고, 상기 긴장재(430)가 원형강관의 외측측면 하부에 위치하지 않도록 하면서 종방향으로 배치되어 긴장 후 정착될 수 있도록 하거나, 긴장재가 원형강관 내부에 설치된 후 긴장 후 정착될 수 있도록 하였다.Seventh, in order to introduce the prestress in the longitudinal direction using the tension member 430 as a role of the arcuate reinforcing member, the tension reset box 420 is installed on the outer side of the outer circular steel pipe, the tension member 430 is While not located in the lower side of the outer side of the circular steel pipe is arranged in the longitudinal direction to be settled after the tension, or after the tension material is installed inside the round steel pipe to be settled after tension.

여덟째, 바깥쪽 원형강관 내측하부에 설치한 지지대에 양 단부가 고정지지되는 아치형태의 횡방향지지대(620) 및 상기 횡방향지지대를 지지하기 위한 종방향지지대(621)가 설치될 수 있도록 하여 원형강관과 함께 상판구조물로부터 전달되는 외부하중을 효과적으로 지지할 수 있도록 하였다.Eighth, an arch-shaped transverse support 620 in which both ends are fixed to the support installed in the inner lower portion of the outer circular steel pipe and a longitudinal support 621 for supporting the transverse support may be installed. Together with the steel pipes, it is possible to effectively support the external loads transmitted from the top structure.

본 발명을 보다 명확하고 용이하게 설명하기 위해서 이하 본 발명의 최선의 실시예를 첨부도면에 의하여 상세하게 설명하며, 본 발명에 따른 실시예는 여러 가지 다른 형태로 변형될 수 있으므로, 본 발명의 범위가 아래에서 설명되는 실시예에 한정되지 않는다.BRIEF DESCRIPTION OF DRAWINGS To describe the present invention more clearly and easily, the following describes the best embodiments of the present invention in detail with reference to the accompanying drawings, and embodiments according to the present invention may be modified in various other forms, and thus the scope of the present invention. Is not limited to the embodiment described below.

<실시예1>Example 1

상기 실시예 1의 가설시스템은 The hypothesis system of Example 1

지반에 종방향으로 이격 설치된 가설벤트를 포함하는 하부구조물(100)과 상기 하부구조물 상부에 복공판을 포함하는 상판구조물(200)이 설치되는 가설시스템에 있어서, 상기 하부구조물(100)과 상판구조물(200) 사이에,In the hypothesis system is provided with a lower structure 100 including a temporary vent installed longitudinally spaced on the ground and the upper structure 200 including a perforated plate on top of the lower structure, the lower structure 100 and the upper structure ( Between 200)

하부구조물 상부면에 볼트 및 너트를 포함하는 고정구(310)에 의하여 설치되되, 횡방향으로 적어도 1개 또는 다수가 병렬로 설치되며 종방향으로 연장설치된 원형강관(320) 및 상기 원형강관을 횡방향으로 구속시켜 주기 위하여 내측 원형강관 측면 사이에, 너트를 포함하는 연결구(330)에 의하여 그 양 단부가 원형강관 측 면을 관통하여 원형강관 내부에서 체결된 강봉을 포함하는 횡방향연결부재(340)를 포함하는 상부구조물(300)이 더 설치되도록 구성되며, 이하 실시예 1의 상부구조물이 하부구조물에 설치된 상태의 횡단면도 및 사시도인 도 2a 및 도 2b를 기준으로 설명한다.It is installed by a fastener 310 including bolts and nuts on the upper surface of the lower structure, at least one or more in parallel in the transverse direction and is installed in the longitudinal direction extending the longitudinal steel pipe 320 and the circular steel pipe in the transverse direction Between the inner side of the circular steel pipe in order to constrained by the cross-section connecting member 340 including a steel rod that is fastened in the circular steel pipe both ends thereof through the circular steel pipe side surface by a connector 330 including a nut The upper structure 300 is configured to be further installed, it will be described with reference to Figures 2a and 2b is a cross-sectional view and perspective view of the upper structure of the first embodiment is installed on the lower structure.

상기 하부구조물(100)은 ㄷ 형강을 이용하여 지반 위에 수직빔(110)을 설치하고, 상기 수직빔(110)의 상부에 다단으로 ㄷ 형강을 이용하여 수평빔(120)을 볼트 및 너트를 체결시켜 설치한 후, L 형강(130)인 경사빔(130)을 이용하여 수직빔(110) 및 수평빔(120)을 대각선형태로 보강함으로서 제작, 설치되고, 가설구조물이 설치되어야 길이방향으로 이격되어 다수가 설치될 수 있도록 한다.The lower structure 100 is installed vertical beam 110 on the ground using the c-beam, fastening the horizontal beam 120 bolts and nuts using the c-beam in multiple stages on top of the vertical beam (110). After the installation, the fabricated and installed by reinforcing the vertical beam 110 and the horizontal beam 120 in a diagonal shape by using the inclined beam 130, the L-shaped steel 130, and the temporary structure is installed spaced apart in the longitudinal direction So that many can be installed.

이러한 하부구조물(100)은 추후 해체가 가능하며, 후술되는 상부구조물(300)로부터 전달되는 하중을 지반에 전달하는 역할을 하는 것으로서 수직빔, 수평빔 및 경사빔의 형태가 아닌 형태로도 제작, 설치될 수 있다.The lower structure 100 can be later dismantled, and serves to transfer the load transmitted from the upper structure 300 to be described later to the ground, also manufactured in the form of a vertical beam, a horizontal beam and a sloped beam, Can be installed.

이러한 하부구조물(100)이 2개가 설치되고, 그 사이에 상부구조물(300)이 설치되는 경우를 단경간 가설시스템, 2개 이상이 설치되는 경우를 다경간 가설시스템이라고 한다. 이에 본 발명은 하부구조물의 설치개수에 따라 단경간 및 다경간 가설시스템으로 제작, 설치될 수 있다.When two such substructures 100 are installed, and the upper structure 300 is installed therebetween, a short span hypothesis system and a case where two or more are installed are referred to as a multi span hypothesis system. Accordingly, the present invention can be manufactured and installed in a short span and multi span temporary system according to the number of installation of the substructure.

상기 원형강관(320)은 하부구조물(100) 사이 상부면에 도 2a 및 도 2b와 같이 종방향으로 연장되어 설치되며, 횡방향으로 병렬로 다수(도 2a, 도 2b에서는 5개)가 설치된다. 이러한 원형강관(320)은 소정의 지름을 가진 원형단면의 강관을 이용하여 설치하게 된다.The circular steel pipe 320 is installed to extend in the longitudinal direction on the upper surface between the lower structure 100, as shown in Figure 2a and 2b, a plurality in parallel in the transverse direction (five in Figure 2a, Figure 2b) is installed. . The circular steel pipe 320 is installed using a steel pipe of a circular cross section having a predetermined diameter.

이때, 하부구조물(100)의 이격된 거리에 따라, 다양한 길이를 가진 원형강관을 종방향으로 서로 연결하여 연장 설치할 수 있으며, 용접 등의 방법으로 서로 연결시킬 수 있으나, 이러한 용접의 한 방법이 도 2a의 발체도에 도시되어 있다.At this time, according to the spaced distance of the lower structure 100, it is possible to extend and install the circular steel pipes having various lengths to each other in the longitudinal direction, and can be connected to each other by a welding method, but such a method of welding It is shown in the body diagram of 2a.

즉, 서로 연결될 원형강관(320)의 단부(연결부)에 있어서, 단부의 내측면 및 외측면을 함께 감싸도록 설치된 이중접합관(321)이 원형강관(320)과 용접에 의하여 설치됨으로서, 종방향으로의 원형강관의 연장이 가능하게 된다.That is, in the ends (connections) of the circular steel pipe 320 to be connected to each other, the double joint pipe 321 is installed by welding with the circular steel pipe 320, the longitudinal direction is installed so as to surround the inner and outer surfaces of the end, the longitudinal direction It is possible to extend the circular steel pipe.

이러한 원형강관(320)은 하부구조물(100)과의 연결을 위하여 볼트 및 너트를 포함하는 고정구(310)를 이용하여 원형강관이 하부구조물 상부면에 고정 후 해체될 수 있도록 한다.The circular steel pipe 320 is to be dismantled after fixing the circular steel pipe on the upper surface of the lower structure by using a fastener 310 including a bolt and a nut for connection with the lower structure (100).

도 2b의 발췌도는 원형강관(320)과 하부구조물(100)과의 연결접합부를 도시한 것이다.Excerpt of Figure 2b shows a connection between the circular steel pipe 320 and the substructure 100.

즉, 원형강관 내측 및 외측 하부면 각각에 대응하는 형상으로 형성된 굴곡판인 하면접합판(311)을 원형강관 내측, 외측 하부면에 설치하고, 하면접합판(311)에 형성시킨 볼트공에 하면접합판과 접하는 하부구조물(100)의 상부면을 관통하도록 볼트(312)를 설치한 후, 너트로 체결시킴으로서 결국 원형강관(320)이 하부구조물(100) 상부면에 탈착이 가능하도록 설치될 수 있도록 한다.That is, the lower surface bonded plate 311, which is a curved plate formed in a shape corresponding to each of the inner and outer lower surfaces of the circular steel pipe, is installed on the inner and outer lower surfaces of the circular steel pipe, and the lower surface of the bolt hole formed on the lower bonded plate 311 After installing the bolt 312 to penetrate the upper surface of the lower structure 100 in contact with the bonding plate, and then tightened with a nut, the circular steel tube 320 can be installed to be detachable to the upper surface of the lower structure 100. Make sure

이러한 원형강관(320)은 도 2b와 같이 횡방향으로 다수가 병렬로 배치되어 설치되는데, 이러한 횡방향으로의 위치구속을 위하여 횡방향연결부재(340)가 더 설치된다.The circular steel pipe 320 is installed in a plurality in parallel in the horizontal direction as shown in Figure 2b, the horizontal connection member 340 is further installed for restraining the position in the horizontal direction.

상기 횡방향연결부재(340)는 내측 원형강관(320) 측면 사이에 설치되는 것으 로서,강봉(341)을 이용할 수 있다.The lateral connecting member 340 is to be installed between the inner circular steel pipe 320 side, it can use a steel bar 341.

즉, 강봉(341) 양 단부의 외주면을 나사산으로 형성시킨 후, 양 단부가 원형강관 각각의 측면을 관통하도록 설치하고, 원형강관의 내측면에서 강봉의 양 단부를 너트(331)를 포함하는 연결구(330)로 체결시키는 방식으로 상기 횡방향연결부재(340)를 설치하게 된다.That is, after forming the outer circumferential surfaces of both ends of the steel bar (341) with a screw thread, the two ends are installed so as to pass through each side of the circular steel pipe, and both ends of the steel bar on the inner surface of the circular steel pipe including a nut (331) The lateral connecting member 340 is installed in such a manner as to be fastened to 330.

이때, 원형강관의 내주면에 대응한 형상(반원형)으로 형성된 굴곡판인 측면접합판(342)를 이용하는 경우 너트(331)에 의하여 강봉(341)의 양 단부가 원형강관(320)의 내측면에 보다 효율적으로 체결될 수 있게 된다.At this time, when using the side joint plate 342, which is a curved plate formed in a shape (semi-circular) corresponding to the inner circumferential surface of the circular steel pipe, both ends of the steel bar (341) by the nut 331 to the inner surface of the circular steel pipe 320 It can be fastened more efficiently.

이러한 횡방향연결부재(340)는 도 2a 및 도 2b와 같이 원형강관(320) 사이에 다수가 이격되어 설치될 수 있으며, 이는 원형강관의 종방향 길이, 직경 등을 고려하여 결정하면 된다.The lateral connecting member 340 may be installed a plurality of spaced apart between the circular steel pipe 320, as shown in Figure 2a and 2b, this may be determined in consideration of the longitudinal length, diameter and the like of the circular steel pipe.

위와 같이 원형강관(320)이 설치되면, 원형강관(320) 상부에는 상판구조물(200)이 설치된다.When the circular steel pipe 320 is installed as above, the upper plate structure 200 is installed on the circular steel pipe 320.

가설교량을 위한 가교시스템의 경우에는 상판구조물(200)이 복공판(210)이 이용될 수 있으며, 교량의 상판을 위한 동바리용 가시설시스템의 경우에는 상판구조물(200)이 상판의 거푸집을 지지할 수 있는 지지대 등 여러 형태로 설치될 수 있으나, 본 발명의 경우에는 복공판인 경우를 기준으로 설명한다.In the case of a bridge system for the temporary bridge, the top plate structure 200 may be a double-hole plate 210, and in the case of the temporary system for the top plate of the bridge, the top plate structure 200 may support the formwork of the top plate. It can be installed in various forms such as a support, in the case of the present invention will be described on the basis of the case of a perforated plate.

복공판(210)의 경우에는 직육면체 박스형태로 제작되어 원형강관(320)의 상부면에 설치되는데, 원형강관(320) 상부면은 복공판(210)을 효과적으로 지지할 수 있도록 횡방향리브(350)를 도 3와 같이 설치한다.In the case of the perforated plate 210 is manufactured in the form of a rectangular box is installed on the upper surface of the circular steel pipe 320, the upper surface of the circular steel pipe 320 is to support the transverse plate 210, the transverse ribs 350 Install as shown in FIG.

상기 횡방향리브(350)는 결국 원형강관의 상부면이 굴곡되어 있으므로 복공판을 설치하기에 불편함을 위해 설치되는 것이기도 하지만, 복공판과 접하는 부위를 확장시킴으로서 복공판으로부터 전달되는 하중의 전달을 보다 효율적으로 분산시키는 역할도 가질 수 있도록 할 필요가 있다.The lateral ribs 350 are eventually installed for the inconvenience of installing the perforated plate because the upper surface of the circular steel pipe is bent, but by extending the portion in contact with the perforated plate to more effectively transfer the load transmitted from the perforated plate It also needs to be able to have a distributed role.

이에 본 발명에서는 횡방량리브(350)의 경우, 도 3과 같이 원형강관(320) 측면 사이에 횡방향으로 설치되며, 원형강관의 측면형상에 대응하는 형태로 절삭가공된 측면부를 가지도록 형성된 강판인 횡방향지지부재(351)로서 설치되도록 하였다.Accordingly, in the present invention, in the case of the transverse rib 350, the steel sheet is formed in the transverse direction between the side surfaces of the circular steel pipe 320 as illustrated in FIG. 3, and has a side portion that is cut in a shape corresponding to the side shape of the circular steel pipe. It was to be installed as the phosphorus transverse support member 351.

이러한 횡방향지지부재(351)는 강판을 수직으로 원형강관(320) 측면 사이에 설치한 것이므로, 횡방향지지부재 상부 사이에 종방향으로 상판구조물인 복공판(210)을 평면상태로 지지하기 위하여 설치된 L형강을 포함하는 상판지지부재(352)를 설치한다.Since the transverse support member 351 is installed between the side of the circular steel pipe 320 vertically, the steel plate, it is installed between the upper portion of the transverse support member in the planar state to support the perforated plate 210, the upper plate structure in the longitudinal direction An upper plate supporting member 352 including an L-shaped steel is installed.

이때 상기 L형강은 원형강관(320)에 하부면이 위치되어 설치되도록 하고, 상부면은 복공판을 지지할 수 있도록 평평한 면이 위치되도록 함이 바람직하다.At this time, the L-shaped steel is to be installed so that the lower surface is located in the circular steel pipe 320, the upper surface is preferably such that a flat surface is positioned to support the perforated plate.

이로서, 복공판(210)은 종방향으로 설치된 다수의 L형강에 의하여 지지될 수 있게 되며, 이러한 L형강에 의하여 수평으로 복공판이 효과적으로 지지되면서 그 자중을 포함한 외부하중이 원형강관에 효과적으로 분산되어 전달될 수 있게 된다.As a result, the perforated plate 210 can be supported by a plurality of L-shaped steel installed in the longitudinal direction, while the perforated plate is effectively supported by the L-shaped steel horizontally, the external load including its own weight can be effectively distributed and transmitted to the circular steel pipe. It becomes possible.

이로서, 원형강관(320)은 상판구조물(200)을 지지할 수 있도록 설치되는데, 휨부재용으로 사용되기 때문에 하부구조물(100)과 접하는 부위는 휨 부모멘트가 발생하게 되고, 이러한 휨 부모멘트에 효과적으로 저항하기 위하여 본 발명에서는 지점부에, 원형강관의 내부에 위치한 강관코아(361)가 강관코아 외주면을 따라 돌출 되어 원형강관의 내측면에 접하도록 설치된 날개판(362)을 포함하는 내측리브(360)가 설치되도록 하였다.As a result, the circular steel pipe 320 is installed to support the upper plate structure 200. Since the circular steel pipe 320 is used for the bending member, the portion in contact with the lower structure 100 is caused to have a bending parent moment. In order to effectively resist, in the present invention, the inner rib including a wing plate 362 installed in the point portion, the steel pipe core 361 located inside the circular steel pipe protrudes along the outer circumferential surface of the steel pipe core to contact the inner surface of the circular steel pipe ( 360) to be installed.

즉, 강관코아(361)는 원형강관(320)의 지름보다 작은 크기의 강관을 이용하되, 그 위치구속 및 지점부보강을 위하여 강관코아(361) 외주면으로부터 방사형으로 돌출되어 그 단부가 원형강관의 내측면에 접하도록 형성된 날개판(362)이 추가로 더 형성된다.That is, the steel pipe core (361) uses a steel pipe of a smaller size than the diameter of the circular steel pipe 320, and protrudes radially from the outer circumferential surface of the steel pipe core (361) for its position restraint and point reinforcement, the end of the circular steel pipe A wing plate 362 formed to be in contact with the inner side is further formed.

이로서 속이 빈 원형강관의 지점부는 내측리브(360)에 의하여 휨 부모멘트에 효과적으로 저항할 수 있게 된다.As a result, the point portion of the hollow circular steel pipe may be effectively resisted by the bending ribs by the inner rib 360.

상기 내측리브(360)는 원형강관의 지점부에 더하여 중앙부에도 설치될 수 있다. 이러한 중앙부의 내측리브는 지점부와는 달리 휨 정모멘트에 저항하기 위한 것이다.The inner rib 360 may be installed at the center portion in addition to the point portion of the circular steel pipe. The inner ribs of the center portion are for resisting the bending static moment, unlike the point portion.

상기 내측리브(360)를 설치할 수도 있지만, 각 지점부 및 중앙부의 원형강관 내부에는 미도시된 충전판을 이격시켜 설치한 후, 그 내부에 콘크리트(370)를 충전시킴으로서 각 지점부와 중앙부의 강성을 보강할 수 있다.The inner ribs 360 may be provided, but the inner spaces of the circular steel pipes of the respective branch portions and the central portion may be spaced apart from each other, and the rigidity of each of the branch portions and the central portion may be filled by filling the concrete 370 therein. Can be reinforced.

<실시예2>Example 2

상기 실시예 2의 가설시스템은 The hypothesis system of Example 2 is

상기 실시예 1에서 살펴본 하부구조물(100)과 상판구조물(200) 사이에 원형강관(320) 및 횡방향연결부재(340)를 포함하는 상부구조물(300)이 설치된 상태에서,In the state in which the upper structure 300 including the circular steel pipe 320 and the transverse connecting member 340 is installed between the lower structure 100 and the upper plate structure 200 described in Example 1,

원형강관 중앙부와 지점부에 해당되는 부위에, 원형강관을 횡방향으로 일체 로 관통하면서 바깥쪽 양 원형강관의 외측측면으로 돌출되도록 설치된 강봉을 포함하는 횡방향관통부재(410); Circular transverse member 410, including a steel bar installed to protrude to the outer side of the outer both circular steel pipe while integrally penetrating the circular steel pipe in the transverse direction at a portion corresponding to the central portion and the branch portion;

상기 바깥쪽 양 원형강관 외측면에 설치된 박스체로서, 상기 횡방향관통부재의 단부가 횡방향으로 관통되어 박스체에 체결되며, 그 내부에 모르타르를 포함하는 충진재가 충전된 긴장재정착박스(420); 및 The box body is installed on both outer side of the outer circular steel pipe, the end of the transverse through member is penetrated in the transverse direction and fastened to the box body, the tension reset box 420 is filled with a filler containing mortar therein ; And

양 단부가 긴장재정착박스에 설치된 정착장치에 긴장 후 정착되고, 전체적으로 포물선형태로 종방향으로 설치되되, 바깥쪽 양 원형강관의 하부면 이하로 위치되지 않도록 배치된 PC강선을 포함하는 긴장재(430);로 이루어진 긴장수단(400)이 추가로 더 설치된 경우이다.Tension member 430 including a PC steel wire which is installed at both ends after being tensioned in a fixing device installed in the tension reset box, and is installed in the longitudinal direction as a whole as a parabola, and is not located below the lower surface of both outer circular steel pipes. If the tension means made of 400 is further installed.

실시예 2는 그 사시도, 지점부 횡단면도 및 중앙부 횡단면도인 도 4a, 도 4b 및 도 4c와 같이, 실시예 1과 비교하여 PC 강선을 포함한 긴장재(430)가 바깥쪽 원형강관에 긴장 후 정착됨으로서, 원형강관에 일종의 압축프리스트레가 도입되도록 하여 휨 부재용 원형강관의 휨 저항능력을 보강한 것에 1차적인 기술적 특징이 있다.Example 2 has a tension member 430 including the PC steel wire settled after tension in the outer circular steel pipe as compared to Example 1, as shown in Figure 4a, 4b and 4c, the perspective view, the point cross section and the center cross-sectional view thereof, It is a primary technical feature to reinforce the bending resistance of the circular steel pipe for bending members by introducing a kind of compression prestress to the circular steel pipe.

이때, 원형강관 각각에 대하여 긴장재(430)를 설치하는 경우 그 시공성, 경제성때문에 본 발명에서는 맨 바깥쪽 원형강관에 긴장재가 설치되도록 하였으며, 또한 긴장재가 원형강관보다 더 하부 쪽으로 늘어져 설치되는 경우 하부구조물과의 간섭등에 의하여 그 설치 및 작업이 용이하지 않다는 점을 고려하여 긴장재의 설치위치를 바깥쪽 원형강관의 측면에 위치하도록 하였다는 점에 2차적인 기술적 특징이 있다.At this time, in the present invention, when the tension member 430 is installed for each of the circular steel pipes, the tension member is installed in the outermost circular steel pipe because of its workability and economic feasibility, and the lower structure when the tension member is installed to be stretched further downward than the circular steel pipe. The second technical feature is that the installation position of the tension member is located on the side of the outer circular steel pipe in consideration of the fact that its installation and work are not easy due to interference with the light.

상기 횡방향관통부재(410)는 원형강관(320)의 지점부 및/또는 중앙부를 관통하여 일체로 설치된다는 점에서, 원형강관의 횡방향 위치를 구속시키기 위한 횡방향연결부재(340)와 차이가 있다.The transverse transmissive member 410 is different from the transverse connecting member 340 for restraining the transverse position of the circular steel tube in that it is integrally installed through the point portion and / or the central portion of the circular steel tube 320. There is.

이러한 횡방향관통부재(410)로서 강봉을 이용할 수 있으며, 각 원형강관의 지점부 및/또는 중앙부를 관통하여 그 양 단부가 바깥쪽 원형강관의 측면으로 돌출되도록 설치된다. 이때 강봉은 일체로 제작된 것을 이용함으로서 강봉자체의 강성을 이용할 수 있도록 한다.Steel rods may be used as the transverse through-member 410, and both ends of the circular steel pipes may protrude toward the side of the outer circular steel pipe. At this time, the steel bar is to be able to use the rigidity of the steel bar itself by using the one made integrally.

이때, 지점부에 돌출된 횡방향관통부재(410)의 양 단부에는 긴장재(430)가 긴장 후 정착되는 긴장재정착박스(420)가 설치된다.At this time, both ends of the transverse through-member 410 protruding from the point portion is provided with a tension reset box 420, the tension member 430 is fixed after the tension.

긴장재정착박스(420)는 바깥쪽 원형강관 측면에 부착되도록 설치되므로, 횡방향관통부재(410)가 그 내부를 관통하여 긴장재정착박스 바깥쪽 측면에서 너트에 의하여 체결될 수 있도록 한다.Since the tension reset box 420 is installed to be attached to the outer side of the circular steel pipe, the transverse through member 410 penetrates therein so that the tension reset box 420 may be fastened by a nut at the outer side of the tension reset box.

이로서 횡방향관통부재(410)에 의하여 긴장재정착박스(420)가 바깥쪽 원형강관에 고정되는데, 지점부에 위치한 긴장재정착박스(420) 상부에는 긴장재(430)가 긴장 후 정착될 수 있도록 정착장치(421)가 위치할 수 있도록 한다.As a result, the tension reset box 420 is fixed to the outer circular steel pipe by the transverse through member 410, and the fixing device 430 is fixed to the top of the tension reset box 420 located at the point. 421 may be located.

이때 긴장재정착박스(420)는 원형강관의 설치 높이보다 상방으로 더 돌출되는 높이를 가지도록 함으로서, 긴장재의 처짐(세그)량을 고려하더라도 긴장재가 원형강관의 측면 아래로 위치하지 않도록 한다. 이는 긴장재가 원형강관 하부에 위치하여 긴장재의 긴장, 정착작업이 원형강관의 하부공간에서 이루어지는 경우 그 작업을 위한 설비가 필요 하는 등 그 시공성 및 작업성에 있어 비효율적이기 때문 이다.At this time, the tension reset box 420 has a height which protrudes upward more than the installation height of the circular steel pipe, so that even if the deflection (segment) of the tension material is considered, the tension member is not located below the side of the circular steel pipe. This is because when the tension material is located under the circular steel pipe, the tension material and the fixing work are performed in the lower space of the circular steel pipe.

나아가 긴장재정착박스(420)는 빈 박스체이므로 긴장재(430)이 긴장 후 정착될 때의 정착지지부의 역할을 할 수 있도록 콘크리트를 포함하는 충전재(422)가 충진될 수 있도록 한다.Furthermore, since the tension reset box 420 is an empty box body, the filler 422 including concrete may be filled to serve as a fixing support when the tension member 430 is fixed after tension.

결국, 긴장재정착박스(420)는 횡방향관통부재(410)에 의하여 바깥쪽 원형강관의 측면에 고정되어, 긴장재에 의한 압축 프리스트레스 도입 시, 긴장재(430)를 지지하는 역할도 하게 된다.As a result, the tension reset box 420 is fixed to the side of the outer circular steel pipe by the transverse through member 410, and also serves to support the tension member 430 when the compression prestress is introduced by the tension member.

긴장재(430)는 원형강관의 지점부에 속하는 양 단부에 설치된 긴장재정착박스(420)의 정착장치(421) 사이에 긴장 후 정착되는데, 전체적으로 종방향으로 포물선형태로 늘어져 설치되며, 도 2a와 같이 긴장재정착박스(420)쪽으로 연장된 단부는 다시 원형강관(320)을 관통하도록 설치된 횡방향관통부재의 양단부에 고정될 수 있도록 한다. 이때 이러한 긴장재(430)는 원형강관의 중앙부를 횡방향으로 관통하도록 설치된 추가적인 횡방향관통부재(410)에 의하여 지지되는 긴장재정착박스(420)를 경유하도록 설치하여 긴장재(430)가 종방향으로 늘어져 설치되더라도 원형강관의 하부로 늘어지지 않도록 한다.The tension member 430 is settled after tension between the fixing device 421 of the tension reset box 420 installed at both ends belonging to the branch portion of the circular steel pipe, is installed in a parabolic form in the longitudinal direction as a whole, as shown in Figure 2a An end extending toward the tension reset box 420 may be fixed to both ends of the transverse through member installed to penetrate the circular steel pipe 320 again. In this case, the tension member 430 is installed to pass through the tension reset box 420 supported by the additional transverse through member 410 installed to penetrate the central portion of the circular steel tube in the transverse direction, so that the tension member 430 stretches in the longitudinal direction. Even if installed, it should not be drooped under the round steel pipe.

그 외, 실시예 1에서 살펴본 횡방량리브(350), 내측리브(360) 및 콘크리트(370)은 동일하게, 원형강관(320)에 설치될 수 있다.In addition, the transverse rib 350, the inner rib 360 and the concrete 370 described in the first embodiment may be installed in the same, the circular steel pipe 320.

<실시예3>Example 3

상기 실시예 3의 가설시스템은 The hypothesis system of Example 3

상기 실시예 1에서 살펴본 하부구조물(100)과 상판구조물(200) 사이에 원형 강관(320) 및 횡방향연결부재(340)를 포함하는 상부구조물(300)이 설치된 상태에서, 실시예 3의 사시도 및 정면도인 도 5a 및 도 5b와 같이The perspective view of the third embodiment in a state in which the upper structure 300 including the circular steel pipe 320 and the transverse connecting member 340 is installed between the lower structure 100 and the upper plate structure 200 described in the first embodiment And as shown in FIGS. 5A and 5B, which are front views.

원형강관 중앙부와 지점부에 해당되는 부위에, 원형강관을 횡방향으로 일체로 관통하면서 바깥쪽 양 원형강관의 외측측면으로 돌출되도록 설치된 강봉을 포함하는 횡방향관통부재(510) 및 상기 지점부로부터 돌출된 횡방향관통부재의 단부에 양 단부가 연결되어 중앙부가 위로 솟음처리되어 종방향으로 설치된 원형강관을 포함하는 아치형보강부재(520)를 포함하는 아치형보강수단(500)이 추가로 더 설치된 경우이다.The transverse through-member 510 and the branch portion which include steel bars which protrude to the outer side surfaces of both outer circular steel pipes while integrally penetrating the circular steel pipes in the transverse direction and corresponding to the circular steel pipe center and the branch portion. When the both ends are connected to the end of the protruding transverse through member is further provided with an arcuate reinforcing means 500 including an arcuate reinforcing member 520 including a circular steel pipe installed in the longitudinal direction with the center portion raised upwards. to be.

실시예 3은 실시예 2와 비교하여 아치형보강부재(520)가 긴장재(430)가 설치된 긴장재정착박스(420)를 대체하여 설치된 것을 그 기술적 특징으로 한다.Embodiment 3 is characterized in that the arch-shaped reinforcing member 520 is installed in place of the tension reset box 420, the tension member 430 is installed compared to the second embodiment.

이에 실시예 2에서 살펴본 것과 같이, 횡방향관통부재(510)는 원형강관의 양 단부인 지점부와 중앙부에 설치될 수 있으며,As described in Example 2, the transverse through-member 510 may be installed at both the point and the center portion of both ends of the circular steel pipe,

상기 아치형보강부재(520)는 중앙부가 위로 솟음 처리되어, 그 최대 상면부가 원형강관(320)의 높이보다 더 높이 위치하도록 하여 복공판인 상판구조물(200)과 접하도록 설치됨으로서 상판구조물(200)로부터 전달되는 외부하중이 직접 아치형보강부재(520)에 전달되고, 외부하중이 아치형보강부재(520)의 아칭효과에 의하여 분산되어, 최종적으로 횡방향관통부재 및 원형강관에 전달되도록 한다.The arcuate reinforcement member 520 is the center portion is raised upwards, so that the maximum upper surface portion is positioned higher than the height of the circular steel pipe 320 is installed to contact the upper plate structure 200 which is a perforated plate from the upper plate structure 200 The external load being transmitted is directly transmitted to the arcuate reinforcement member 520, and the external load is distributed by the arching effect of the arcuate reinforcement member 520, and finally is transmitted to the transverse through member and the circular steel pipe.

이때, 아치형보강부재(520)는 횡방향관통부재(510)에 의하여 그 양 단부가 지지되도록 설치되게 되며, 예컨대 힌지상태로 아치형보강부재의 다누가 횡방향관통부재와 서로 연결되도록 하여 회전을 구석하지 않도록 할 수 있다.At this time, the arcuate reinforcement member 520 is installed so that both ends thereof are supported by the transverse through member 510, for example, the hinge of the arch reinforcement member to be connected to the transverse through member and the corners of the corners to rotate the corner You can do it.

나아가 상기 외부하중의 분산효과를 증진시키기 위하여, 본 발명에서는 상기 아치형보강부재(520)와 바깥쪽 원형강관(320) 사이에 걸쳐 다수의 강봉을 소정간격으로 이격시킨 상하하중전달부재(530)가 더 설치되도록 할 수 있으며,Furthermore, in order to enhance the dispersion effect of the external load, in the present invention, the vertical load transfer member 530 is spaced apart a plurality of steel rods at predetermined intervals between the arcuate reinforcement member 520 and the outer circular steel pipe 320 Can be installed more,

이때, 아치형보강부재(520)의 위치구속을 위하여 추가로 상기 상하하중전달부재(530)와 함께 양 단부가 상기 아치형보강부재의 중앙부 바깥측면과 바깥쪽 원형강관의 중앙부 바깥측면에 볼트 등을 이용하여 상하로 설치시킨 강봉을 포함하는 중앙부위치구속부재(540)를 더 설치할 수 있다.At this time, in order to constrain the position of the arcuate reinforcement member 520, the both ends together with the vertical load transfer member 530, both ends of the arcuate reinforcement member and the outer side of the central portion of the outer circular steel pipe using a bolt or the like The center portion restraint member 540 including the steel rods installed up and down may be further installed.

이러한 아치형보강부재(520)는 실시예 2에 의한 긴장재(430)과 비교하여 그 설치가 용이하며, 고가의 PC강선을 이용하지 않아도 되는 장점이 있게 된다.The arcuate reinforcement member 520 is easier to install than the tension member 430 according to the second embodiment, there is an advantage that does not have to use expensive PC steel wire.

상기 상하하중전달부재(530)의 경우, 용접에 의하여 설치될 수 있으며, 중앙부위치구속부재(540)의 경우 힌지형태로 설치될 수도 있다.In the case of the vertical load transfer member 530, it may be installed by welding, in the case of the central position restraint member 540 may be installed in a hinge form.

그 외, 실시예 1,2에서 살펴본 횡방량리브(350), 내측리브(360) 및 콘크리트(370)은 동일하게, 원형강관(320)에 설치될 수 있다.In addition, the horizontal ribs 350, the inner ribs 360, and the concrete 370 described in Embodiments 1 and 2 may be installed in the same way as the circular steel pipe 320.

<실시예4>Example 4

상기 실시예 4의 가설시스템은 The hypothesis system of Example 4

상기 실시예 1에서 살펴본 하부구조물(100)과 상판구조물(200) 사이에 그 사시도 및 종단면도와 같이 도 6a 및 도 6b와 같이6A and 6B as a perspective view and a longitudinal sectional view between the lower structure 100 and the upper plate structure 200 described in the first embodiment

하부구조물 상부면에 볼트 및 너트를 포함하는 고정구에 의하여 설치되되, 횡방향으로 적어도 1개 또는 다수가 병렬로 설치되며 종방향으로 연장설치된 원형강관(610);Circular steel pipe 610 is installed by a fixture including a bolt and nut on the upper surface of the lower structure, at least one or more in parallel in the transverse direction and installed in the longitudinal direction;

바깥쪽 원형강관(610) 내측 하면에 설치된 지지대(621)에 양 단부가 지지되어 횡방향으로 아치형태로 설치된 원형강관을 포함하는 횡방향지지대(620);A transverse support 620 including a circular steel pipe having both ends supported by a support 621 installed on an inner lower surface of the outer circular steel pipe 610 and arched in a transverse direction;

상기 횡방향지지대 중앙부 하면과 하부구조물 상면에 접하여 횡방향지지대를 하부에서 지지하도록 종방향으로 설치된 원형강관을 포함하는 종방향지지대(630)를 포함하도록 하였다.It was to include a longitudinal support 630 including a circular steel tube installed in the longitudinal direction to support the transverse support from the bottom in contact with the lower surface of the central portion and the lower structure of the transverse support.

실시예 4에 의한 가설시스템은 실시예 1,2,3과 비교하여 병렬로 설치된 원형강관을 횡방향으로 구속시키기 위한 횡방향연결부재(340)를 내측 원형강관 사이에 설치하지 않고, 대신 아치형태의 원형강관인 횡방향지지대(620)를 설치한다는 데 그 기술적 특징이 있다.The hypothesis system according to the fourth embodiment does not have a transverse connecting member 340 between the inner circular steel pipes for restraining the circular steel pipes installed in parallel in comparison with the first, second and third embodiments, instead of the arch shape. There is a technical feature of installing the horizontal support 620 of the circular steel pipe.

이러한 횡방향지지대(620)는 그 양단부가, 원형강관 내측 하면에 강판을 절곡하여 형성시킨 지지대(621)에 지지되어 그 중앙부가 위로 솟음 처리되어 상판구조물(200)의 하부면에 접하도록 설치된 아치형태의 관을 이용하도록 한다. The transverse support 620 is an arch provided so that both ends thereof are supported by a support 621 formed by bending a steel plate on the inner lower surface of a circular steel pipe so that its center portion is raised upward to contact the lower surface of the upper plate structure 200. Use a form of tube.

이로서 횡방향지지대(620)는 단순히 원형강관을 횡방향으로 위치 구속시켜 주는 역할 이외에 상판구조물(200)을 직접 지지하는 역할을 하게 된다.As a result, the transverse support 620 serves to directly support the upper plate structure 200 in addition to merely restraining the circular steel pipe in the transverse direction.

이때, 횡방향지지대 중앙부 하부공간은 이격된 빈 공간으로 형성되므로 횡방향지지대(620)를 하부에서 지지하여 주기 위하여 그 하부에 하부구조물(100)과 접하도록 원형강관을 포함하는 종방향지지대(621)를 설치한다.At this time, since the lower space of the central portion of the transverse support is formed as spaced spaces spaced apart, the longitudinal support 621 including a circular steel tube to contact the lower structure 100 in the lower portion in order to support the transverse support 620 at the bottom thereof. Install).

이러한 횡방향지지대(620)는 상부면이 굴곡 처리되어 있으므로, 상판구조물(200)의 하부면과 접하는 부위가 적게 된다는 문제점이 있을 수 있어, 횡방향지지대(620) 상부면으로부터 상판구조물 하부면 사이에 접하여 강관을 포함하는 상판구 조물지지대(630)를 더 설치함으로서 보다 안정적으로 횡방향지지대(620)에 상판구조물(200)이 지지설치될 수 있도록 한다.Since the upper surface of the lateral support 620 is bent, there may be a problem in that a portion of the upper surface structure 200 is in contact with the lower surface, so that the upper surface of the lateral support 620 is lower between the upper surface of the upper structure. By installing the upper plate support member 630 including the steel pipe in contact with the top plate structure 200 to be more stably supported on the transverse support 620.

이러한 상판구조물지지대는 횡방향지지대 상부면에 대응하는 형태로 하부면이 형성되도록 하는 것이 바람직하다.The upper plate support is preferably such that the lower surface is formed in a form corresponding to the upper surface of the transverse support.

그 외, 위 실시예들에서 살펴본 내측리브(360) 및 콘크리트(370)은 동일하게, 원형강관(610)에 설치될 수 있다.In addition, the inner rib 360 and the concrete 370 described in the above embodiments may be installed in the same, the circular steel pipe 610.

<실시예5>Example 5

상기 실시예 5의 가설시스템은, 실시예 2의 변형례라고 볼 수 있다.The hypothesis system of the fifth embodiment can be regarded as a modification of the second embodiment.

즉, 실시예 2와 같이 긴장재(430)를 이용하지만 긴장재가 바깥쪽 원형강관(320)의 측면에 종방향으로 설치되도록 하는 것이 아니라, 각 원형강관(320) 내부를 종방향으로 관통하도록 배치시킨 것에 그 기술적 특징이 있다.That is, the tension member 430 is used as in the second embodiment, but the tension member is not installed in the longitudinal direction on the outer side of the outer circular steel tube 320, but disposed to penetrate the inner side of each circular steel tube 320 in the longitudinal direction. There is a technical characteristic to it.

이에 실시예 5는 하부구조물(100)과 상판구조물(200) 사이에 원형강관(320) 및 횡방향연결부재(340)를 포함하는 상부구조물(300)이 설치된 상태에서,Embodiment 5 is a state in which the upper structure 300 including a circular steel pipe 320 and the transverse connecting member 340 is installed between the lower structure 100 and the upper plate structure 200,

원형강관의 내부에 종방향으로 설치된 쉬스관(710);Sheath pipe 710 installed in the longitudinal direction inside the circular steel pipe;

상기 쉬스관(710) 내부에 배치된 PC강선을 포함하는 긴장재(720);가 추가로 더 설치된 경우이다.The tension member 720 including a PC steel wire disposed inside the sheath tube 710; is further installed.

실시예 2는 그 지점부 횡단면도 및 중앙부 횡단면도인 도 7a, 도 7b 와 같이, 실시예 2와 비교하여 PC 강선을 포함한 긴장재(720)가 원형강관 내부에 설치되어 긴장 후 정착됨으로서, 원형강관 각각에 압축프리스트레가 도입되도록 한 것이다.In the second embodiment, as shown in Figs. 7A and 7B, which are the pointed cross section and the center cross section, the tension member 720 including the PC steel wire is installed inside the circular steel pipe and settled after tension as compared with the second embodiment, so that each circular steel pipe is fixed to each other. Compression prestress is introduced.

쉬스관(710)은 긴장재를 수용하는 관으로서 강관 등이 이용될 수 있다. 이러한 쉬스관은 종방향으로 포물선 형태로 설치되는데, 원형강관의 양 단부인 지점부의 경우에는 원형강관의 상측에, 중앙부의 경우에는 원형강관의 하측에 설치되도록 한다.The sheath pipe 710 may be a steel pipe or the like as a tube for receiving the tension material. The sheath tube is installed in a parabolic form in the longitudinal direction, in the case of the point portions of both ends of the circular steel pipe to be installed on the upper side of the circular steel pipe, in the case of the central portion to be installed below the circular steel pipe.

긴장재(430)는 쉬스관 내부에 삽입관통되어 그 양 단부가 쉬스관(710)의 양 단부면에 설치한 정착장치(예컨대 원형강관의 단부에 설치한 원형 뚜껑형 마감캡에 통상의 정착장치를 설치할 수 있다.)에 긴장 후 정착되도록 하여 설치된다.The tension member 430 is inserted through the sheath tube so that both ends of the fixing apparatus installed at both end faces of the sheath tube 710 (for example, a circular cap-type closing cap installed at the end of the circular steel tube is provided with a conventional fixing apparatus) Can be installed.)

나아가, 쉬스관(710) 내부에 모르타르와 같은 충진재를 충전(그라우팅)시킬 수 있다.Furthermore, a filler such as mortar may be filled (grouting) in the sheath tube 710.

그 외, 실시예 1에서 살펴본 횡방량리브(350), 내측리브(360) 및 콘크리트(370)은 동일하게, 원형강관(320)에 설치될 수 있다.In addition, the transverse rib 350, the inner rib 360 and the concrete 370 described in the first embodiment may be installed in the same, the circular steel pipe 320.

<실시예6>Example 6

상기 실시예 6의 가설시스템은, 실시예 3의 변형례라고 볼 수 있다.The hypothesis system of the sixth embodiment can be regarded as a modification of the third embodiment.

즉, 실시예 3과 같이 아치형보강부재를 이용하지만 아치형보강부재가 원형강관의 위쪽으로 솟음처리되어 설치되는 것이 아니라, 아래쪽으로 솟음처리되어 설치되고, 원형강관(320)의 하부면과, 아치형보강부재(820) 상부면 사이에 연결지지부재(830)를 설치한 것에 그 기술적 특징이 있다.That is, the arched reinforcing member is used as in the third embodiment, but the arched reinforcing member is not installed to rise above the circular steel pipe, but is installed to rise downward and the bottom surface of the circular steel pipe 320 and the arched reinforcement. The technical features of the connection member 830 between the upper surface of the member 820 is provided.

상기 실시예 1에서 살펴본 하부구조물(100)과 상판구조물(200) 사이에 원형강관(320) 및 횡방향연결부재(340)를 포함하는 상부구조물(300)이 설치된 상태에서, 실시예 3의 정면도인 도 8과 같이Front view of the third embodiment in a state in which the upper structure 300 including the circular steel pipe 320 and the transverse connecting member 340 is installed between the lower structure 100 and the upper plate structure 200 described in Example 1 As shown in Figure 8

원형강관 지점부에 해당되는 부위에, 원형강관을 횡방향으로 일체로 관통하면서 바깥쪽 양 원형강관의 외측측면으로 돌출되도록 설치된 강봉을 포함하는 횡방향관통부재(810) 및 상기 지점부로부터 돌출된 횡방향관통부재의 단부에 양 단부가 연결되어 중앙부가 아래로 솟음처리되어 종방향으로 설치된 원형강관을 포함하는 아치형보강부재(820);On the portion corresponding to the circular steel pipe point portion, the transverse through-member 810 including a steel bar installed to protrude to the outer side of both outer circular steel pipe while integrally penetrating the circular steel pipe in the transverse direction and protruded from the point portion An arch-shaped reinforcing member 820 including a circular steel pipe installed in a longitudinal direction by connecting both ends thereof to the ends of the transverse through-members so that the center portion thereof rises downward;

상기 중앙부를 포함하는 원형강관의 하부면과 아치형보강부재(820)의 상부면 사이에 H형강을 포함하는 연결지지부재(830);를 포함하는 아치형보강수단(800)이 추가로 더 설치된 경우이다.The arcuate reinforcement means 800 is further installed between the lower surface of the circular steel pipe including the central portion and the upper surface of the arcuate reinforcement member 820 comprising a connection support member 830. .

이에 실시예 3에서 살펴본 것과 같이, 횡방향관통부재(810)는 원형강관의 양 단부인 지점부에 설치될 수 있으며,As described in Example 3, the transverse through-member 810 may be installed at the point portions of both ends of the circular steel pipe,

상기 아치형보강부재(820)는 중앙부가 아래로 솟음 처리되어, 그 최대 하면부가 원형강관(320)의 하부보다 낮은 높이에 위치하도록 설치된다.The arcuate reinforcing member 820 is the center portion is raised to the bottom, the maximum lower surface portion is installed so as to be located at a lower level than the lower portion of the circular steel pipe (320).

이에 상판구조물(200)로부터 전달되는 외부하중이 원형강관 하부에 위치한 아치형보강부재에 전달되도록 원형강관(320)과 아치형보강부재(820)사이에 하중전달의 역할을 하는 부재를 설치하게 되는데, 이러한 부재가 바로 연결지지부재(830)이다. The external load transmitted from the upper plate structure 200 is installed to the member of the circular steel pipe 320 and the arcuate reinforcing member 820 to transfer the load so as to be transmitted to the arch-shaped reinforcing member located below the circular steel pipe, such a The member is the connection supporting member 830.

이러한 연결지지부재(830)로서 횡방향으로 설치하는 H형강을 이용하되, 상하로 접하여 설치할 수 있도록 할 수 있으며, 복수 부위에 설치할 수도 있다.As the connection support member 830, but using the H-shaped steel installed in the transverse direction, it can be installed in contact with the up and down, may be installed in a plurality of parts.

즉, 작용하는 외부하중은 상판구조물(200)로부터 연결지지부재(830)를 경유하여 아치형보강부재(820)의 아칭효과에 의하여 분산되어, 최종적으로 횡방향관통 부재 및 원형강관에 전달되도록 하는 것이다.That is, the external load acting is distributed by the arching effect of the arcuate reinforcing member 820 via the connecting support member 830 from the upper plate structure 200, and finally to be transmitted to the transverse through member and the circular steel pipe. .

이때, 아치형보강부재(820)는 횡방향관통부재(810)에 의하여 그 양 단부가 지지되도록 설치되게 되며, 예컨대 힌지상태로 아치형보강부재의 다누가 횡방향관통부재와 서로 연결되도록 하여 회전을 구석하지 않도록 함은 실시예 3과 동일하다.At this time, the arcuate reinforcement member 820 is installed so that both ends thereof are supported by the transverse through member 810, for example, the hinge of the arch reinforcement member is connected to the transverse through member and the corners of the corners to rotate the corner Not to be the same as in Example 3.

이러한 실시예 6에서는 실시예 3과 같은 상하하중전달부재 또는 중앙부위치구속부재를 설치할 수 있으나, 도 8a, 도 8b에서는 미도시하였다.In Example 6, the same load and load transfer member or center position restraint member as in Example 3 may be provided, but not shown in FIGS. 8A and 8B.

그 외, 실시예 3에서 살펴본 횡방량리브(350), 내측리브(360) 및 콘크리트(370)은 동일하게, 원형강관(320)에 설치될 수 있다.In addition, the transverse rib 350, the inner rib 360 and the concrete 370 described in the third embodiment may be installed in the same, the circular steel pipe 320.

이러한 아치형보강부재(820)는 도 8의 경우 원형강관 양 외측면에 1개씩 설치될 수 있으며, 횡방향관통부재(810)를 따라 횡방향으로 다수를 설치할 수 도 있으며, 이는 원형강관과 원형강관의 사이에 위치한 횡방향관통부재의 노출부위에 설치할 수 있을 것이다.Such an arcuate reinforcement member 820 may be installed one by one on both outer surfaces of the circular steel pipe in Figure 8, may be installed in a transverse direction along the transverse through member 810, which is a circular steel pipe and a circular steel pipe It may be installed at the exposed part of the transverse through-member located between the.

실시예 6의 변형례로서, 횡방향관통부재(810) 및 연결지지부재(830)의 설치는 동일하게 한 상태에서, 상기 아치형보강부재(820)를 미도시 하였으나, 실시예 5와 같이 내부에 긴장재가 배치된 쉬스관으로 대체시킬 수 있다.As a modification of the sixth embodiment, the installation of the transverse through member 810 and the connecting support member 830 in the same state, the arc-shaped reinforcing member 820 is not shown, but as shown in the fifth embodiment It can be replaced by a sheath tube with a tension member.

위에서 살펴본 원형강관을 이용한 가설시스템은The hypothesis system using the circular steel pipe

가설교량을 위한 가교의 형태로 이용될 수도 있지만, 여러 형태의 교량상판을 설치하기 위한 동바리시스템으로도 충분히 이용할 수 있게 된다.Although it can be used in the form of bridges for temporary bridges, it can be sufficiently used as a copper bar system for installing various types of bridge decks.

또한 원형강관을 이용하기 때문에 곡선형태의 가시설 시스템으로 제작하는 경우 종래 직선형태의 가설시스템의 적용의 제한을 뛰어넘을 수 있게 되며, 장지간의 가설시스템을 비교적 안정적으로 경제적으로 설치할 수 있어 매우 효율적인 가설시스템의 제작이 가능하게 된다.In addition, since the circular steel pipe is used, it is possible to overcome the limitation of the application of the conventional straight-type temporary system in the case of the curved type temporary facility system. Can be made.

앞에서 설명되고, 도면에 도시된 본 발명의 일 실시예는 본 발명의 기술적사상을 한정하는 것으로 해석되어서는 안 된다. 본 발명의 보호범위는 청구범위에 기재된 사항에 의하여만 제한되고, 본 발명의 기술분야에서 통상의 지식을 가진 자는 본 발명의 기술적 사상을 다양한 형태로 개량 변경하는 것이 가능하다. 따라서 이러한 개량 및 변경은 통상의 지식을 가진 자에게 자명한 것인 한 본 발명의 보호범위에 속하게 된다.An embodiment of the present invention described above and illustrated in the drawings should not be construed as limiting the technical spirit of the present invention. The protection scope of the present invention is limited only by the matters described in the claims, and those skilled in the art can change and change the technical idea of the present invention in various forms. Therefore, such improvements and modifications fall within the protection scope of the present invention as long as it will be apparent to those skilled in the art.

Claims (15)

지반에 종방향으로 이격 설치된 가설벤트를 포함하는 하부구조물과 상기 하부구조물 상부에 복공판을 포함하는 상판구조물이 설치되는 가설시스템에 있어서, 상기 하부구조물과 상판구조물 사이에,In the hypothesis system is provided with a lower structure including a temporary vent installed longitudinally spaced on the ground and the upper structure including a perforated plate on top of the lower structure, between the lower structure and the upper structure, 하부구조물 상부면에 볼트 및 너트를 포함하는 고정구에 의하여 설치되되, 횡방향으로 적어도 1개 또는 다수가 병렬로 설치되며 종방향으로 연장설치된 원형강관 및 상기 원형강관을 횡방향으로 구속시켜 주기 위하여 내측 원형강관 측면 사이에, 너트를 포함하는 연결구에 의하여 그 양 단부가 원형강관 측면을 관통하여 원형강관 내부에서 체결된 강봉을 포함하는 횡방향연결부재를 포함하는 상부구조물이 더 설치되는 것을 특징으로 하는 원형강관을 이용한 가설시스템.It is installed by a fixture including a bolt and a nut on the upper surface of the lower structure, at least one or more are installed in parallel in the transverse direction and installed in the longitudinal direction to restrain the circular steel pipe and the circular steel pipe in the transverse direction Between the side of the circular steel pipe, the upper structure comprising a transverse connecting member including a steel rod that is fastened inside the circular steel pipe, both ends thereof through the circular steel pipe side by a connector including a nut is further installed. Temporary system using round steel pipe. 제 1항에 있어서, 원형강관 중앙부와 지점부에 해당되는 부위에, 원형강관을 횡방향으로 일체로 관통하면서 바깥쪽 양 원형강관의 외측측면으로 돌출되도록 설치된 강봉을 포함하는 횡방향관통부재; 상기 바깥쪽 양 원형강관 외측면에 설치된 박스체로서, 상기 횡방향관통부재의 단부가 횡방향으로 관통되어 박스체에 체결되며, 그 내부에 모르타르를 포함하는 충진재가 충전된 긴장재정착박스; 및 양 단부가 긴장재정착박스에 설치된 정착장치에 긴장 후 정착되고, 전체적으로 포물선형태로 종방향으로 설치되되, 바깥쪽 양 원형강관의 하부면 이하로 위치되지 않도록 배치된 PC강선을 포함하는 긴장재로 이루어진 긴장수단;이 추가로 더 설치되는 것을 특징으로 하는 원형강관을 이용한 가설시스템.According to claim 1, Transverse through-member comprising a steel bar protruding to the outer side surface of both the outer circular steel pipe while integrally penetrating the circular steel pipe in the transverse direction at the portion corresponding to the central portion and the circular steel pipe; A box body provided on both outer side outer circular steel pipes, wherein an end portion of the lateral through member penetrates in a horizontal direction and is fastened to the box body, and a tension resealing box filled with a filler including mortar therein; And a tension member including a PC steel wire both ends of which are fixed after being fixed to a fixing device installed in the tension reset box, and which are installed in a longitudinal direction as a whole as a parabola, and are not positioned below the lower surface of both outer circular steel pipes. Tension means; Temporary system using a circular steel pipe, characterized in that further installed. 제 1항에 있어서, 원형강관의 내부에 종방향으로 설치된 쉬스관; 및 상기 쉬스관 내부에 배치된 PC강선을 포함하는 긴장재;가 추가로 더 설치되는 것을 특징으로 하는 원형강관을 이용한 가설시스템.According to claim 1, Sheath pipe installed in the longitudinal direction inside the circular steel pipe; And a tension member including a PC steel wire disposed inside the sheath pipe. 제 1항에 있어서, 원형강관 중앙부와 지점부에 해당되는 부위에, 원형강관을 횡방향으로 일체로 관통하면서 바깥쪽 양 원형강관의 외측측면으로 돌출되도록 설치된 강봉을 포함하는 횡방향관통부재; 및 상기 지점부로부터 돌출된 횡방향관통부재의 단부에 양 단부가 연결되어 중앙부가 위로 솟음처리되어 종방향으로 설치된 원형강관을 포함하는 아치형보강부재;를 포함하는 아치형보강수단이 추가로 더 설치되는 것을 특징으로 하는 원형강관을 이용한 가설시스템.According to claim 1, Transverse through-member comprising a steel bar protruding to the outer side surface of both the outer circular steel pipe while integrally penetrating the circular steel pipe in the transverse direction at the portion corresponding to the central portion and the circular steel pipe; And an arcuate reinforcement member including an arcuate reinforcement member including a circular steel tube installed at both ends of the transverse through member protruding from the point portion and having a central portion so as to rise upward. Temporary system using a circular steel pipe, characterized in that. 제 4항에 있어서, 상기 아치형보강부재와 바깥쪽 원형강관 사이에 걸쳐 강봉을 포함하는 상하하중전달부재가 더 설치되거나, 상기 상하방향하중전달부재와 함께 양 단부가 상기 아치형보강부재의 중앙부와 바깥쪽 원형강관의 중앙부에 연결되어 상하로 설치된 강봉을 포함하는 중앙부위치구속부재가 더 설치되는 것을 특징으로 하는 원형강관을 이용한 가설시스템.According to claim 4, Between the arcuate reinforcing member and the outer circular steel pipe is installed between the upper and lower load transfer member including a steel rod, or both ends together with the vertical load transfer member in the center and the outer portion of the arcuate reinforcement member Temporary system using a circular steel pipe, characterized in that the central portion of the circular steel pipe is connected to the central portion of the circular steel pipe is installed further comprising a central position restraining member. 제 1항에 있어서, 원형강관 지점부에 해당되는 부위에, 원형강관을 횡방향으 로 일체로 관통하면서 바깥쪽 양 원형강관의 외측측면으로 돌출되도록 설치된 강봉을 포함하는 횡방향관통부재; 및 상기 지점부로부터 돌출된 횡방향관통부재의 단부에 양 단부가 연결되어 중앙부가 아래로 솟음처리되어 종방향으로 설치된 원형강관 또는 긴장재가 내부에 배치된 쉬스관을 포함하는 아치형보강부재; 및 상기 중앙부를 포함하는 원형강관의 하부면과 아치형보강부재의 상부면 사이에 H형강을 포함하는 연결지지부재;를 포함하는 아치형보강수단이 추가로 더 설치되는 것을 특징으로 하는 원형강관을 이용한 가설시스템.According to claim 1, Transverse through-member comprising a steel bar protruding to the outer side of the outer both circular steel pipe while integrally penetrating the circular steel pipe in the transverse direction at a portion corresponding to the circular steel pipe point; And an arch-shaped reinforcing member including a sheath pipe in which both ends are connected to an end portion of the transverse through member projecting from the point portion, and a central steel is raised downward and a longitudinally installed circular steel pipe or tension member is disposed therein. And an arch-shaped reinforcing means further comprising a connection supporting member including an H-shaped steel between the lower surface of the circular steel pipe including the central portion and the upper surface of the arch-shaped reinforcing member. system. 지반에 종방향으로 이격 설치된 가설벤트를 포함하는 하부구조물과 상기 하부구조물 상부에 복공판을 포함하는 상판구조물이 설치되는 가설시스템에 있어서, 상기 하부구조물과 상판구조물 사이에,In the hypothesis system is provided with a lower structure including a temporary vent installed longitudinally spaced on the ground and the upper structure including a perforated plate on top of the lower structure, between the lower structure and the upper structure, 하부구조물 상부면에 볼트 및 너트를 포함하는 고정구에 의하여 설치되되, 횡방향으로 적어도 1개 또는 다수가 병렬로 설치되며 종방향으로 연장설치된 원형강관 바깥쪽 원형강관 내측 하면에 설치된 지지대에 양 단부가 지지되어 횡방향으로 아치형태로 설치된 원형강관을 포함하는 횡방향지지대; 및 상기 횡방향지지대 중앙부 하면과 하부구조물 상면에 접하여 횡방향지지대를 하부에서 지지하도록 종방향으로 설치된 원형강관을 포함하는 종방향지지대;를 포함하는 것을 특징으로 하는 원형강관을 이용한 가설시스템.It is installed by a fixture including a bolt and a nut on the upper surface of the lower structure, at least one or more in parallel in the transverse direction is installed in both sides of the circular steel pipe outside the circular steel pipe extending in the longitudinal direction both ends are supported A transverse support including a circular steel pipe supported and installed in a transverse arch shape; And a longitudinal support including a circular steel pipe installed in a longitudinal direction to support the transverse support from the bottom in contact with the lower surface of the central portion of the transverse support and the upper surface of the lower structure. 제 7항에 있어서, 상기 원형강관 상부면에 상판구조물을 지지,고정시키기 위 하여,According to claim 7, To support and secure the upper plate structure on the upper surface of the circular steel pipe, 횡방향지지대 상부면에 대응하는 형태로 하부면이 형성되어 상부면에 상판구조물이 지지되는 강관을 포함하는 상판구조물지지대;가 상기 횡방향지지대와 상판구조물 사이에 더 설치되는 것을 특징으로 하는 원형강관을 이용한 가설시스템.A top plate support comprising a steel pipe on which a bottom surface is formed in a shape corresponding to the top surface of the transverse support, the top structure being supported on the upper surface; a circular steel pipe further installed between the transverse support and the top structure Hypothesis system. 제 1항 내지 제 6항 중 어느 한 항에 있어서, 상기 원형강관 상부면에 상판구조물을 지지,고정시키기 위하여,The method according to any one of claims 1 to 6, in order to support and fix the upper plate structure on the upper surface of the circular steel pipe, 원형강관 측면 사이에 횡방향으로 설치되며, 원형강관의 측면형상에 대응하는 형태로 절삭가공된 측면부를 가지도록 형성된 강판을 포함하는 횡방향지지부재 및 상기 횡방향지지부재 상부 사이에 종방향으로 상판구조물을 평면상태로 지지하기 위하여 설치된 L형강을 포함하는 상판지지부재를 포함하는 횡방향리브가 더 설치되는 것을 특징으로 하는 원형강관을 이용한 가설시스템.It is installed in the transverse direction between the side of the circular steel pipe, the upper plate in the longitudinal direction between the transverse support member and the transverse support member including a steel plate formed to have a side portion cut in a shape corresponding to the side shape of the circular steel pipe Temporary system using a circular steel pipe, characterized in that the transverse ribs further comprising a top plate support member including an L-shaped steel installed to support the structure in a planar state. 제 1항 내지 제 8항 중 어느 한 항에 있어서, 하부구조물의 상면과 원형강관이 접하는 부위인 지점부와 원형강관의 중앙부에는 원형강관의 내부에 위치한 강관코아 및 상기 강관코아 외주면을 따라 돌출되어 원형강관의 내측면에 접하도록 설치된 날개판을 포함하는 내측리브가 더 설치되는 것을 특징으로 하는 원형강관을 이용한 가설시스템.The method according to any one of claims 1 to 8, wherein the upper portion of the lower structure and the central portion of the circular steel pipe and the point of contact with the steel pipe core located inside the circular steel pipe and protrudes along the outer circumferential surface of the steel pipe core Temporary system using a circular steel pipe, characterized in that the inner rib further comprises a wing plate installed to contact the inner surface of the circular steel pipe. 제 1항 내지 제 8항 중 어느 한 항에 있어서, 하부구조물의 상면과 원형강관 이 접하는 부위인 지점부에는 원형강관의 내부 사이를 충전판으로 막아 그 내부에 콘크리트를 더 충전시키는 것을 특징으로 하는 원형강관을 이용한 가설시스템.The method according to any one of claims 1 to 8, wherein the upper part of the lower structure and the point portion where the circular steel pipe is in contact with each other, the interior of the circular steel pipe is blocked with a filling plate to further fill the concrete therein. Temporary system using round steel pipe. 제 1항 내지 제 8항 중 어느 한 항에 있어서, 상기 원형강관의 연장설치는According to any one of claims 1 to 8, wherein the extension installation of the round steel pipe 원형강관의 연결부 내측면과 외측면을 함께 감싸도록 설치된 이중접합관이 원형강관과의 용접에 의하여 이루어지는 것을 특징으로 하는 원형강관을 이용한 가설시스템.Temporary system using a circular steel pipe, characterized in that the double-junction pipe is installed to surround the inner and outer surfaces of the connection portion of the circular steel pipe by welding with the circular steel pipe. 제 1항 내지 제 6항 중 어느 한 항에 있어서, 상기 횡방향연결부재의 설치는 The method of any one of claims 1 to 6, wherein the installation of the lateral connecting member 나사산이 양 단부 외주면에 형성된 강봉의 양 단부를 원형강관의 측면에 형성시킨 관통공에 삽입시킨 후, 원형강관의 내부에서 상기 관통공에 대응하는 삽입공이 형성되며 원형강관의 내주면에 대응한 형상으로 형성된 굴곡판으로 형성된 측면접합판을 너트를 이용하여 체결시켜 이루어지는 것을 특징으로 하는 원형강관을 이용한 가설시스템.After inserting the both ends of the steel rod formed on the outer peripheral surface of both ends into the through hole formed on the side of the circular steel pipe, the insertion hole corresponding to the through hole is formed inside the circular steel pipe and has a shape corresponding to the inner circumferential surface of the circular steel pipe. Temporary system using a circular steel pipe, characterized in that the side joint plate formed by the formed bending plate is fastened using a nut. 제 1항 내지 제 8항 중 어느 한 항에 있어서, 상기 원형강관의 하부구조물 상면 설치는 According to any one of claims 1 to 8, wherein the upper structure of the lower structure of the circular steel pipe 원형강관 내측 및 외측 하부면 각각에 대응하는 형상으로 형성된 굴곡판으로 형성되며 볼트공이 형성된 하면접합판 및 상기 하면접합판과 접하는 하부구조물의 상부를 관통하도록 볼트를 설치한 후 너트로 체결시킴으로서 이루어지는 것을 특징 으로 하는 원형강관을 이용한 가설시스템.It is formed by a bent plate formed in a shape corresponding to each of the inner and outer lower surface of the circular steel pipe, and is made by fastening with a nut after installing the bolt so as to pass through the upper surface of the lower structure and the lower structure in contact with the lower surface bonded plate Temporary system using circular steel pipe. 제 1항 내지 제 8항 중 어느 한 항에 있어서,The method according to any one of claims 1 to 8, 상기 상부구조물은 지반에 2개가 설치된 하부구조물 상면 사이 또는 적어도 3개가 설치된 하부구조물 상면 사이에 단경간 또는 다경간으로 설치되는 것을 특징으로 하는 원형강관을 이용한 가설시스템.The upper structure is a hypothetical system using a circular steel pipe, characterized in that installed in the short or multi-span between the upper surface of the two lower structure is installed on the ground or between the upper surface of the lower structure is installed at least three.
KR1020050122501A 2005-12-13 2005-12-13 Temporary Construction System Using a Steel Pipe Structure KR100732701B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050122501A KR100732701B1 (en) 2005-12-13 2005-12-13 Temporary Construction System Using a Steel Pipe Structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050122501A KR100732701B1 (en) 2005-12-13 2005-12-13 Temporary Construction System Using a Steel Pipe Structure

Publications (2)

Publication Number Publication Date
KR20070062746A true KR20070062746A (en) 2007-06-18
KR100732701B1 KR100732701B1 (en) 2007-06-27

Family

ID=38362984

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050122501A KR100732701B1 (en) 2005-12-13 2005-12-13 Temporary Construction System Using a Steel Pipe Structure

Country Status (1)

Country Link
KR (1) KR100732701B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720138A (en) * 2012-06-29 2012-10-10 中铁大桥局集团有限公司 Steel truss girder erecting system and method and lifting station
CN103821073A (en) * 2014-03-14 2014-05-28 张美娇 Small-sized bridge and construction method thereof
CN109722991A (en) * 2018-11-29 2019-05-07 唐峰 A kind of self-balancing type integral assembling Construction of Steel Structure platform waterborne and its erection method

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101229472B1 (en) * 2011-11-16 2013-02-07 한우물중공업 주식회사 Steel pipe girder for bridge
US9228302B2 (en) * 2013-12-03 2016-01-05 Omega Trestle Llc Elongate pipe-based temporary bridge for supporting heavy loads

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100270102B1 (en) * 1997-12-22 2000-10-16 이구택 Circular steel pipe girder of bridge
KR100499019B1 (en) * 2002-05-09 2005-07-07 비비엠코리아(주) Concrete-Filled Steel Pipe Girder
KR20050081796A (en) * 2004-02-16 2005-08-19 (주)건영엔지니어링 Construction of p.s girder bridge using filler and method for the same
KR100572860B1 (en) * 2005-01-11 2006-04-26 (주)리튼브릿지 A Long-distance-pier temporary bridge Using Cross Beam Having Through-holes

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720138A (en) * 2012-06-29 2012-10-10 中铁大桥局集团有限公司 Steel truss girder erecting system and method and lifting station
CN103821073A (en) * 2014-03-14 2014-05-28 张美娇 Small-sized bridge and construction method thereof
CN103821073B (en) * 2014-03-14 2018-08-28 江苏四通路桥工程有限公司 A kind of small bridge and its construction method
CN109722991A (en) * 2018-11-29 2019-05-07 唐峰 A kind of self-balancing type integral assembling Construction of Steel Structure platform waterborne and its erection method

Also Published As

Publication number Publication date
KR100732701B1 (en) 2007-06-27

Similar Documents

Publication Publication Date Title
KR101728700B1 (en) Reinforcement apparatus for earth retaining temporary facility and temporary structure having the same
KR100997509B1 (en) Flange-reinforced composite member and strut structure of retaining wall using the same
KR100732701B1 (en) Temporary Construction System Using a Steel Pipe Structure
KR102387052B1 (en) End Reinforced half preecast concrete beam and construction method of the same
KR20090130798A (en) Temporary bridge construction system using a steel pipe structure
KR101255445B1 (en) Active deflection control prestressed beam
KR200417902Y1 (en) Anchor frame assembly of tower crane
KR20080100976A (en) Temporary bridge with truss type substructure and construction method using the same
KR101483173B1 (en) Corrugated steel plate web-PSC composite beam and Construction method of corrugated steel plate web-PSC composite beam
KR102137126B1 (en) aluminium truss bridge
KR101732719B1 (en) Hybrid beam having tube-type flanges
KR102268895B1 (en) Bridge support structure that can prevent rotation, flow, and conduction, and ramen bridge using it
KR20090067927A (en) Reinforcement structure of outrigger using vertical steel wire
KR20130000775U (en) Construction structure for joining steel or reinforced steel concrete column and beam with reinforcing end part
KR100957864B1 (en) A lattlce type girder for bridge
KR20120123917A (en) Concrete block for seismic reinforcement of H-shaped column and seismic reinforcing method using the same
KR20150035060A (en) Reinforcing structure for concrete box-type body and reinforcing method
KR20100114966A (en) Composite bridge and hybrid girder for construction composite bridge and method thereof
KR100729370B1 (en) Composite beam for girder
KR100983085B1 (en) Composite member with tensile flange of closed and prestressed pipe type and the structure construction method
KR100668593B1 (en) Anchor frame assembly of tower crane
CN210067133U (en) Main transformer framework jointly built with firewall
KR102244365B1 (en) Extradosed bridge structure
JP7430623B2 (en) equipment support structure
KR100740512B1 (en) Composite beam for girder

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
G170 Publication of correction
FPAY Annual fee payment

Payment date: 20100618

Year of fee payment: 4

LAPS Lapse due to unpaid annual fee