KR20060046914A - Drill jig for forming hole - Google Patents

Drill jig for forming hole Download PDF

Info

Publication number
KR20060046914A
KR20060046914A KR1020040092432A KR20040092432A KR20060046914A KR 20060046914 A KR20060046914 A KR 20060046914A KR 1020040092432 A KR1020040092432 A KR 1020040092432A KR 20040092432 A KR20040092432 A KR 20040092432A KR 20060046914 A KR20060046914 A KR 20060046914A
Authority
KR
South Korea
Prior art keywords
horizontal
drill
holder
handle
bush
Prior art date
Application number
KR1020040092432A
Other languages
Korean (ko)
Other versions
KR101144605B1 (en
Inventor
김영균
정종식
Original Assignee
한국항공우주산업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국항공우주산업 주식회사 filed Critical 한국항공우주산업 주식회사
Priority to KR1020040092432A priority Critical patent/KR101144605B1/en
Publication of KR20060046914A publication Critical patent/KR20060046914A/en
Application granted granted Critical
Publication of KR101144605B1 publication Critical patent/KR101144605B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25HWORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
    • B25H1/00Work benches; Portable stands or supports for positioning portable tools or work to be operated on thereby
    • B25H1/0021Stands, supports or guiding devices for positioning portable tools or for securing them to the work
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23BTURNING; BORING
    • B23B45/00Hand-held or like portable drilling machines, e.g. drill guns; Equipment therefor
    • B23B45/003Attachments
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23BTURNING; BORING
    • B23B47/00Constructional features of components specially designed for boring or drilling machines; Accessories therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25HWORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
    • B25H1/00Work benches; Portable stands or supports for positioning portable tools or work to be operated on thereby
    • B25H1/0021Stands, supports or guiding devices for positioning portable tools or for securing them to the work
    • B25H1/0042Stands
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23BTURNING; BORING
    • B23B2270/00Details of turning, boring or drilling machines, processes or tools not otherwise provided for
    • B23B2270/54Methods of turning, boring or drilling not otherwise provided for

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Drilling And Boring (AREA)

Abstract

본 발명은 각종 구조물의 소정부위에 드릴 가공 홀을 보다 효율적으로 형성할 수 있는 홀 가공용 드릴지그에 관한 것으로서, 본 발명의 홀 가공용 드릴지그는 이격된 상태로 지면과 수직하게 설치된 한 쌍의 수직 프레임과, 상기 수직 프레임을 상호 연결하여 이격된 상태로 유지하는 적어도 하나 이상의 수평 프레임과, 상기 수평 프레임을 따라 수평 이동 가능하게 설치되고 구조물을 클램핑하여 고정시키는 적어도 하나 이상의 수평 이동 클램프와, 상기 수평 프레임을 따라 수평 이동 가능하게 설치된 수평 이동바와, 상기 수평 이동바를 따라 수직 이동 가능하게 설치되고 상기 수평 이동 클램프에 의해 고정된 구조물에 홀 가공을 위한 드릴이 장착되는 드릴 장착부를 포함하는 것을 특징으로 한다.The present invention relates to a drill jig for drilling holes that can form a drilled hole more efficiently in a predetermined portion of various structures, the drill jig for drilling holes of the present invention is a pair of vertical frame installed perpendicular to the ground spaced apart And at least one horizontal frame interconnecting the vertical frames to keep them spaced apart, at least one horizontal moving clamp installed horizontally along the horizontal frame and clamping and fixing the structure; It characterized in that it comprises a horizontal mounting bar installed to be movable horizontally along the horizontal, and a drill mounting portion is mounted to the vertical movable along the horizontal moving bar and the drill for the hole processing on the structure fixed by the horizontal moving clamp.

홀, 드릴, 지그, 홀더, 클램프, 항공기        Hole, drill, jig, holder, clamp, aircraft

Description

홀 가공용 드릴지그{Drill jig for forming hole}       Drill jig for forming hole

도 1은 본 발명의 바람직한 실시예에 따른 홀 가공용 드릴지그를 도시한 사시도.       1 is a perspective view showing a drill jig for hole processing according to a preferred embodiment of the present invention.

도 2는 본 발명의 바람직한 실시예에 따른 홀 가공용 드릴지그에 구비된 수평 이동 클램프를 도시한 사시도.       Figure 2 is a perspective view showing a horizontal moving clamp provided in the drill jig for hole processing according to the preferred embodiment of the present invention.

도 3은 본 발명의 바람직한 실시예에 따른 홀 가공용 드릴지그에 구비된 드릴 장착부를 도시한 사시도.       Figure 3 is a perspective view showing a drill mounting portion provided in the drill jig for hole processing according to the preferred embodiment of the present invention.

도 4는 본 발명에 따른 홀 가공용 드릴지그를 이용하여 구조물에 홀을 가공하는 작업 예를 도시한 예시도.       Figure 4 is an exemplary view showing a working example for processing a hole in the structure using a drill jig for hole processing according to the present invention.

<도면의 주요 부분에 관한 부호의 설명><Explanation of symbols on main parts of the drawings>

101, 102 : 수직 프레임 104, 105 : 수평 프레임 101, 102: vertical frame 104, 105: horizontal frame

200 : 수평 이동 클램프 210 : 이동 본체 200: horizontal moving clamp 210: moving body

220, 311, 312 : 수평 롤러부 230 : 클램핑 수단 220, 311, 312: horizontal roller portion 230: clamping means

231 : 밀착판 232 : 절곡바 231: contact plate 232: bending bar

233 : 밀착 조절부 300 : 수평 이동바 233: close contact 300: horizontal movement bar

400 : 드릴 장착부 410 : 설치 본체 400: drill mounting portion 410: mounting body

420 : 수직 롤러부 430 : 축 420: vertical roller portion 430: shaft                 

440 : 드릴 홀더부 441 : 홀더 본체 440: drill holder portion 441: holder body

441a : 제 1홀더부시 441b : 제 2홀더부시 441a: 1st holder bush 441b: 2nd holder bush

441c : 제 3홀더부시 442 : 드릴 고정대 441c: 3rd holder bush 442: drill holder

442a : 드릴 홀더부시 450 : 핸들부 442a: drill holder bushing 450: handle part

450a : 제 1핸들부시 450b : 제 2핸들부시 450a: first handle bushing 450b: second handle bushing

451a : 제 1링크 451b : 제 2 링크 451a: first link 451b: second link

451c : 제 3링크 451d : 핸들 손잡이 451c: third link 451d: handle handle

460 : 탄성수단 460: elastic means

본 발명은 홀 가공용 드릴지그에 관한 것으로, 특히 각종 구조물의 소정부위에 드릴 가공 홀을 보다 효율적으로 형성할 수 있는 홀 가공용 드릴지그에 관한 것이다. BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a drill jig for hole machining, and more particularly, to a drill jig for drilling a hole which can more efficiently form a drilled hole in a predetermined portion of various structures.

일반적으로 장치를 구성하는 구조물의 경우 상기 구조물 상호간의 조립을 위하여 구조물에 드릴을 이용하여 소정의 홀을 가공 형성하게 되는데, 특히 항공기 제조분야에서는 항공기의 날개 구조물(vent box) 상호간의 조립 및 스트링어와 날개 스킨들의 조립 등을 위하여 구조물에 균일한 간격으로 다수개의 홀을 형성하는 경우가 많다. In general, in the case of the structure constituting the device to form a predetermined hole by using a drill in the structure for the assembly of the structure between the structures, in particular in the aircraft manufacturing field assembly and stringer between the wing structure (vent box) of the aircraft and In order to assemble wing skins and the like, a plurality of holes are often formed at uniform intervals in the structure.

종래에는 이러한 구조물에 홀을 가공 형성하기 위해서는 구조물을 소정형상 의 지그에 고정시킨 상태에서 작업자가 직접 에어드릴을 손으로 파지하여 홀을 가공 형성하고 있으며, 특히 구조물에 일정 간격으로 직각도를 유지하는 다수의 홀 가공 형성시 1차적으로 홀 간의 간격 및 직각도 조절이 이루어진 예비 홀을 가공 형성하고 2차적으로 최종 홀을 가공 형성했었다.Conventionally, in order to form a hole in such a structure, a worker directly grips an air drill by hand while fixing the structure to a jig having a predetermined shape, and forms a hole, and in particular, maintains a right angle at a predetermined interval in the structure. In forming a plurality of holes, a preliminary hole was formed to be formed, and the final hole was formed to be formed secondly.

그러나, 이러한 종래의 홀 가공 형성 작업은 홀 간의 간격 및 직각도 조절, 예비 홀 가공 등과 같은 복잡한 사전 작업과정을 거칠뿐만 아니라 작업자의 숙련도에 크게 의존하므로 상당히 노동 집약적으로 작업이 이루어지고 있기 때문에 홀 가공 형성을 위한 작업시간이 많이 소요되어 작업의 효율성이 떨어지고, 각각의 홀 가공 형성에 따른 품질이 일정하지 않는 문제점이 있다.However, these conventional hole forming operations are not only subjected to complicated pre-working processes such as adjusting the spacing between each hole, right angles, and preliminary hole processing, but also highly dependent on the skill of the operator. It takes a lot of work time to form a decrease in the efficiency of the work, there is a problem that the quality of each hole forming is not constant.

또한, 작업자가 에어드릴을 이용하여 홀을 가공 형성함에 있어 오랜 시간동안 작업을 진행할 경우 불안정한 자세 때문에 작업자의 피로도가 증가하여 산업재해 발생의 위험을 내포하는 문제점도 있다.In addition, in the process of forming a hole using an air drill, when the worker is working for a long time, there is a problem that the fatigue of the worker increases due to an unstable posture, thereby including a risk of an industrial accident.

본 발명은 상기한 종래 기술의 문제점을 해결하기 위하여 안출된 것으로서, 구조물에 홀을 가공 형성함에 있어서 홀 간의 간격 및 직각도 조절, 예비 홀 가공 등과 같은 복잡한 사전 작업이 불필요하고 작업공정의 자동화에 따른 홀 가공 형성 작업의 효율성을 향상시킬 수 있으며 산업재해의 위험을 최소화시킬 수 있는 홀 가공용 드릴지그를 제공하는데 그 목적이 있다.The present invention has been made to solve the above-mentioned problems of the prior art, in the formation of a hole in a structure, complicated pre-working such as adjusting the spacing and right angle between the holes, preliminary hole processing, etc. is unnecessary and according to the automation of the work process The object of the present invention is to provide a drill jig for hole machining, which can improve the efficiency of hole forming work and minimize the risk of industrial accidents.

상기 목적을 달성하기 위하여, 본 발명에 따른 홀 가공용 드릴지그는 이격된 상태로 지면과 수직하게 설치된 한 쌍의 수직 프레임과, 상기 수직 프레임을 상호 연결하여 이격된 상태로 유지하는 적어도 하나 이상의 수평 프레임과, 상기 수평 프레임을 따라 수평 이동 가능하게 설치되고 구조물을 클램핑하여 고정시키는 적어도 하나 이상의 수평 이동 클램프와, 상기 수평 프레임을 따라 수평 이동 가능하게 설치된 수평 이동바와, 상기 수평 이동바를 따라 수직 이동 가능하게 설치되고 상기 수평 이동 클램프에 의해 고정된 구조물에 홀 가공을 위한 드릴이 장착되는 드릴 장착부를 포함하는 것을 특징으로 한다.In order to achieve the above object, the drill jig for drilling holes according to the present invention is a pair of vertical frame installed perpendicular to the ground in a spaced apart state, and at least one horizontal frame to maintain the spaced state by interconnecting the vertical frame And at least one horizontal moving clamp installed horizontally along the horizontal frame and clamping and fixing the structure, a horizontal moving bar installed horizontally along the horizontal frame, and vertically moving along the horizontal moving bar. It is characterized in that it comprises a drill mounting portion is installed and the drill for hole processing in the structure fixed by the horizontal moving clamp.

이하, 첨부된 도면을 참조하여 본 발명의 바람직한 실시예를 상세히 설명하기로 한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1 내지 도 3은 본 발명의 바람직한 실시예에 따른 홀 가공용 드릴지그를 도시한 도면으로, 도 1은 전체적인 구성을 도시한 사시도이고, 도 2는 도 1의 수평 이동 클램프를 도시한 사시도이고, 도 3은 도 1의 드릴 장착부를 도시한 사시도이다.       1 to 3 is a view showing a drill jig for hole processing according to a preferred embodiment of the present invention, Figure 1 is a perspective view showing the overall configuration, Figure 2 is a perspective view showing the horizontal moving clamp of Figure 1, 3 is a perspective view illustrating the drill mount of FIG. 1.

도 1 내지 도 3에 도시된 바와 같이, 본 발명의 홀 가공용 드릴지그는 수직 프레임(101, 102), 수평 프레임(104, 105), 수평 이동 클램프(200), 수평 이동바(300) 및 드릴 장착부(400)를 포함하여 구성된다.       As shown in Figures 1 to 3, the drill jig for drilling holes of the present invention is a vertical frame (101, 102), horizontal frame (104, 105), horizontal moving clamp 200, horizontal moving bar 300 and drill It is configured to include a mounting portion (400).

수직 프레임(101, 102)은 이격된 상태로 지면과 수직하게 좌우 한 쌍으로 이루어지고, 수평 프레임(104, 105)은 수직 프레임(101, 102)을 상호 연결하여 이격된 상태로 수직 상태를 유지하도록 적어도 하나 이상으로 이루어지며, 바람직하게 수평 프레임(104, 105)은 수직 프레임(101. 102)의 상단과 상단 그리고 하단과 하단을 각각 연결하는 상하 한 쌍으로 이루어져 수평 프레임(104, 105)과 수직 프레임(101, 102)으로 연결 구성되는 프레임(100)이 사각형상으로 형성된다. 그리고 수직 프레임(101, 102)의 하부에는 지면과 평행하게 베이스 프레임(107, 108)이 결합되고 베이스 프레임(107, 108)의 하부에는 캐스터(107a, 108a)가 장착되어 프레임(100)의 이동이 가능하다. 한편 수직 프레임(101, 102)과 베이스 프레임(107, 108)에 양단이 각각 연결되어 후술하는 수평 이동 클램프(200)에 의해 클램핑된 구조물의 하중에 따른 프레임의 지지력을 보강하기 위한 보강 프레임(111, 112)이 구비된다.       The vertical frames 101 and 102 are formed in a pair left and right perpendicular to the ground in a spaced apart state, and the horizontal frames 104 and 105 maintain the vertical state in spaced states by interconnecting the vertical frames 101 and 102. It is made of at least one, so that the horizontal frame (104, 105) preferably consists of a horizontal frame (104, 105) consisting of a pair of upper and lower, respectively connecting the top and top and the bottom and bottom of the vertical frame (101.102) and The frame 100, which is connected to the vertical frames 101 and 102, is formed in a quadrangular shape. Base frames 107 and 108 are coupled to the lower portions of the vertical frames 101 and 102, and casters 107a and 108a are mounted to the lower portions of the base frames 107 and 108 to move the frame 100. This is possible. On the other hand, the reinforcement frame 111 for reinforcing the support force of the frame according to the load of the structure clamped by the horizontal moving clamp 200 to be described later, both ends are connected to the vertical frame (101, 102) and the base frame (107, 108), respectively. 112).

수평 이동 클램프(200)는 수평 프레임(104, 105)을 따라 수평 이동 가능하게 설치되고 구조물을 클램핑하여 고정시키는 적어도 하나 이상으로 이루어지며, 바람직하게는 상하 수평 프레임(104, 105) 각각의 좌우측에 설치된다. 이에 대해 보다 구체적으로 설명하면, 수평 이동 클램프(200)는 수평 프레임(104, 105)의 일측면에 위치하는 이동 본체(210)와, 이동 본체(210)의 일측면에 구비되며 수평 프레임(104, 105)과 접촉되는 상측과 하측의 수평부위에 롤러 베어링(220a)이 각각 설치되어 수평 프레임(104, 105) 상에서 수평방향으로 구름 운동하는 수평 롤러부(220)와, 이동 본체(210)에 구비되어 구조물을 이동 본체(210)의 타측면에 밀착시켜 클램핑하는 클램핑 수단(230)으로 구성된다. 여기서 클램핑 수단(230)은 이동 본체(210)의 타측면에 대향되게 위치하는 밀착판(231)과, 외주면에 수나사가 형성된 일단이 이동 본체(210)의 중앙에 형성된 관통홀(210a)을 관통하여 노출되고 타단에 밀착판(231)이 결합되도록 절곡된 절곡바(232)와, 내주면에 암나사가 형성되 어 절곡바(232)의 수나사에 회전 가능하게 체결되고 회전방향을 선택적으로 조절하여 이동 본체(210)의 타측면과 밀착판(231)의 근접 간격을 조절할 수 있도록 절곡바(232)를 전후 방향으로 이동 가능하게 하는 밀착 조절부(233)로 이루어진다. 또한 절곡바(232)의 일단에 고정너트(235)가 체결되어 밀착 조절부(233)가 절곡바(232)로부터 이탈되지 않도록 한다. 한편 도면에 도시된 바는 없지만 이동 본체(210)의 관통홀(210a)을 관통하는 절곡바(232)의 측면부위에 길이 방향으로 회전방지 홈(미도시)이 형성되고 이동 본체(210)의 일측에 형성된 고정홀(미도시)에 고정핀(미도시)이 삽입되어 상기 고정핀의 단부가 상기 회전방지 홈에 끼워져서 밀착 조절부(233)를 회전시키더라도 절곡바(232)가 회전되지 않고 전후 방향으로만 이동되도록 한다.       The horizontal moving clamp 200 is installed to be movable horizontally along the horizontal frame (104, 105) and consists of at least one clamping and fixing the structure, preferably on the left and right sides of each of the upper and lower horizontal frame (104, 105) Is installed. In more detail, the horizontal moving clamp 200 is provided on the moving body 210 located on one side of the horizontal frames 104 and 105, and on the one side of the moving body 210, and the horizontal frame 104. Roller bearings 220a are installed at upper and lower horizontal portions in contact with each other, 105, respectively, and horizontal rollers 220 and horizontally move on horizontal frames 104 and 105 and the moving body 210. It is provided with a clamping means 230 for clamping the structure in close contact with the other side of the moving body (210). Here, the clamping means 230 is a close contact plate 231 positioned to face the other side of the moving body 210, and one end is formed with a male screw on the outer peripheral surface penetrates the through hole 210a formed in the center of the moving body 210 Bending bar 232 is bent to be exposed and coupled to the other end close contact plate 231 and the female thread is formed on the inner circumferential surface is rotatably fastened to the male screw of the bending bar 232 and selectively adjust the direction of rotation to the moving body The other side of the 210 and the close contact plate 231 is made of a close adjustment portion 233 to be able to move the bending bar 232 in the front and rear directions. In addition, the fixing nut 235 is fastened to one end of the bending bar 232 so that the close adjustment part 233 is not separated from the bending bar 232. Meanwhile, although not shown in the drawing, an anti-rotation groove (not shown) is formed in the longitudinal direction at the side portion of the bending bar 232 passing through the through hole 210a of the moving body 210 and the moving body 210 A fixing pin (not shown) is inserted into a fixing hole (not shown) formed at one side so that the end of the fixing pin is inserted into the anti-rotation groove so that the bending bar 232 is not rotated even when the close adjustment part 233 is rotated. To move only in the forward and backward directions.

수평 이동바(300)는 상하 수평 프레임(104, 105)과 각각 접촉되는 수평부위에 롤러 베어링이 장착된 수평 롤러부(311, 312)가 구비되어 수평 프레임(104, 105)을 따라 수평 이동 가능하게 설치된다. 여기서, 수평 롤러부(311, 312)는 수평 이동 클램프(200)의 수평 롤로부(220)와 그 구성이 동일하므로 구체적인 설명은 생략하기로 한다. 또한 수평 이동바(300)는 수직방향으로 장공(300a)이 형성되어 후술하는 드릴 장착부(400)에 장착된 드릴의 선단이 장공(300a)을 관통하도록 배치된다.        The horizontal moving bar 300 is provided with horizontal roller parts 311 and 312 equipped with roller bearings in horizontal portions in contact with the upper and lower horizontal frames 104 and 105, respectively, so that the horizontal moving bars 300 can move horizontally along the horizontal frames 104 and 105. Is installed. Here, since the horizontal roller portions 311 and 312 have the same configuration as the horizontal roll portion 220 of the horizontal moving clamp 200, detailed description thereof will be omitted. In addition, the horizontal moving bar 300 has a long hole (300a) is formed in the vertical direction is disposed so that the tip of the drill mounted in the drill mounting portion 400 to be described later penetrates the long hole (300a).

드릴 장착부(400)는 수평 이동바(300)를 따라 수직 이동 가능하게 설치되고 수평 이동 클램프(200)에 의해 고정된 구조물에 홀 가공을 위한 드릴이 장착된다. 이에 대해 보다 구체적으로 설명하면, 드릴 장착부(400)는 수평 이동바(300)의 일 측면에 위치하는 설치 본체(410)와, 설치 본체(410)의 일측면에 구비되며 수평 이동바(300)와 접촉되는 좌측과 우측의 수직부위에 롤러 베어링(420a)이 각각 설치되어 수평 이동바(300) 상에서 수직방향으로 구름 운동하는 수직 롤러부(420)와, 설치 본체(410)에 수직방향으로 장착되어 고정된 축(430)과, 축(430)에 외삽되어 설치되고 일측에 드릴이 장착되는 드릴 홀더부(440)와, 드릴 홀더부(440)를 축(430) 상에서 전후 방향으로 이동 가능하게 동작시키는 핸들부(450)와, 축(430) 상에 설치되어 핸들부(450)의 전후 복원 동작에 필요한 탄성력을 제공하는 탄성수단(460)으로 구성된다. 여기서 드릴 홀더부(440)는 축(430)에 서로 이격되어 순차적으로 외삽된 제 1홀더부시(441a), 제 2홀더부시(441b) 및 제 3홀더부시(441c)를 서로 연결한 홀더 본체(441)와, 홀더본체(441)에 결합되고 드릴을 삽입하여 고정하는 드릴 홀더부시(442a)가 구비된 드릴 고정대(442)로 이루어진다. 그리고 핸들부(450)는 제 1홀더부시(441a)와 제 2홀더부시(441b) 사이의 축(430)에 외삽되어 고정된 제 1핸들부시(450a)와, 제 2홀더부시(441b)와 제 3홀더부시(441c) 사이의 축(430)에 외삽된 제 2핸들부시(450b)와, 일단이 제 1핸들부시(450a)에 고정 결합된 제 1링크(451a)와, 일단이 제 1링크(451a)의 타단에 링크 결합된 제 2링크(451b)와, 일단이 제 2링크(451b)의 타단에 링크 결합되고 중간부위가 제 2핸들부시(450b)에 힌지(h) 결합되며 타단에 핸들 손잡이(451d)가 구비된 제 3링크(451c)로 이루어진다. 그리고 탄성수단(460)은 제 1핸들부시(450a)와 제 2홀더부시(441b) 사이의 축(430)에 외삽되어 장착된 탄성체(예 : 압축 코일스프링)인 것을 특징으로 한다.       The drill mounting unit 400 is installed to be movable vertically along the horizontal moving bar 300 and the drill for hole processing is mounted on the structure fixed by the horizontal moving clamp 200. In more detail, the drill mounting unit 400 is provided on one side of the installation main body 410 and the installation main body 410 located on one side of the horizontal moving bar 300, and the horizontal moving bar 300. The roller bearings 420a are respectively installed on the left and right vertical portions in contact with the vertical rollers, and are vertically mounted on the mounting body 410 and the vertical rollers 420 rolling in the vertical direction on the horizontal moving bar 300. And a fixed shaft 430, a drill holder portion 440 which is extrapolated to the shaft 430 and is installed on one side, and the drill holder portion 440 is movable on the shaft 430 in the front-rear direction. It is composed of a handle portion 450 to operate, and an elastic means 460 is provided on the shaft 430 to provide the elastic force required for the front and rear restoring operation of the handle portion 450. Here, the drill holder part 440 is a holder main body which connects the first holder bush 441a, the second holder bush 441b, and the third holder bush 441c which are sequentially spaced apart from each other on the shaft 430 to each other. 441 and a drill holder 442 coupled to the holder body 441 and provided with a drill holder bush 442a for inserting and fixing the drill. In addition, the handle part 450 may include the first handle bush 450a and the second holder bush 441b that are extrapolated and fixed to the shaft 430 between the first holder bush 441a and the second holder bush 441b. A second handle bush 450b extrapolated to the shaft 430 between the third holder bushes 441c, a first link 451a fixedly coupled to the first handle bush 450a, and one end of which is first The second link 451b coupled to the other end of the link 451a, one end of which is linked to the other end of the second link 451b, and the middle portion of the second handle bush 450b is hinged to the other end (h) The third link 451c is provided with a handle knob 451d. In addition, the elastic means 460 is an elastic body (eg, a compression coil spring) that is extrapolated and mounted on the shaft 430 between the first handle bush 450a and the second holder bush 441b.

상기와 같이 구성되는 본 발명에 따른 홀 가공용 드릴지그의 작용을 설명하 면 다음과 같다.Referring to the operation of the drill jig for hole processing according to the present invention configured as described above are as follows.

도 4는 본 발명에 따른 홀 가공용 드릴지그를 이용하여 구조물에 홀을 가공하는 작업 예를 도시한 예시도로서, 작업자는 본 발명에 따른 홀 가공용 드릴지그를 이용하여 구조물에 원하는 홀을 가공 형성하기 위해서는 먼저 수직 프레임(101, 102)과 수평 프레임(104, 105)으로 이루어진 프레임(100) 구조물의 후방면에 구조물(1)을 근접시킨 상태에서 수평 프레임(104, 105) 상에 구비된 다수의 수평 이동 클램프(200)를 구조물(1)의 각 모서리 부분에 위치하도록 수평 프레임(104, 105) 상에서 수평방향으로 이동시켜 안정적으로 구조물(1)을 클램핑하여 고정시키게 되는데, 이 경우 각각의 이동 본체의 타측면과 밀착판의 이격 공간 사이에 구조물(1)의 각 모서리 부위를 위치한 상태에서 절곡바(232)의 일단에 구비된 밀착 조절부(233)를 어느 한쪽 방향 예를 들어, 시계 방향으로 회전시키면 절곡바(232)는 상호 체결부위의 나사 운동에 의해 후진 동작하게 됨에 따라 절곡바(232)의 타단에 결합된 밀착판(231)이 이동 본체(210)의 타측면에 대향되게 근접하여 구조물(1)을 클램핑하게 된다.       Figure 4 is an exemplary view showing a working example for processing a hole in the structure using a hole drilling drill jig according to the present invention, the worker to form a desired hole in the structure using the hole drilling drill jig according to the present invention In order to close the structure (1) to the rear surface of the frame 100 structure consisting of the vertical frame (101, 102) and the horizontal frame (104, 105), The horizontal movement clamp 200 is moved horizontally on the horizontal frames 104 and 105 so as to be positioned at each corner portion of the structure 1 to stably clamp and fix the structure 1, in which case each moving body For example, in a clock room, the adhesion control unit 233 provided at one end of the bending bar 232 in a state where each corner portion of the structure 1 is located between the other side of the space and the space of the contact plate. When rotated by the bending bar 232 is moved backward by the screw movement of the mutual fastening portion as the close contact plate 231 coupled to the other end of the bending bar 232 is opposite to the other side of the moving body 210 Thereby clamping the structure 1.

상기와 같이 수평 이동 클램프(200)에 의해 구조물(1)이 클램핑되면 구조물(1)의 소정부위에 홀(1')을 가공 형성하게 되는데, 이 경우 작업자는 홀(1') 가공 형성 지점과 동일한 수직선 상에 위치되도록 수평 이동바(300)를 수평 이동시키고 수평 이동바(300) 상에 설치된 드릴 장착부(400)를 수직 이동시켜 원하는 홀(1') 가공 형성 지점에 드릴(3)이 위치되도록 한 후 핸들부(450)를 조작하여 구조물(1)의 원하는 지점에 홀(1')을 가공 형성하게 된다. 즉 작업자는 구조물(1)의 소정부 위에 홀(1')을 가공 형성하고자 할 경우 핸들부(450)의 핸들 손잡이(451d)를 전방 구조물 방향으로 밀게 되는 바, 이에 따라 드릴(3)이 장착된 드릴 장착부(400)의 드릴 홀더부(440)는 축(430) 상에서 구조물(1) 측으로 근접하게 되어 드릴(3)에 의해 구조물(1)에 홀(1')이 가공 형성된다. 여기서 핸들부(450)의 조작에 의한 드릴 홀더부(440)의 전진 동작을 보다 구체적으로 설명하면, 핸들 손잡이(451d)가 구비된 제 3링크(451c)를 작업자가 전방으로 밀면 제 3링크(451c)의 중간부위에 힌지(h) 결합된 제 2핸들부시(450b)는 축(430) 상에서 전진 동작되고 제 2핸들부시(450b)의 전진 동작에 의해 제 2홀더부시(441b)가 전진 동작함에 따라 드릴 홀더부(440)는 구조물(1) 측으로 근접하게 되는데, 이때 축(430)에 외삽되어 고정된 제 1핸들부시(450a)에 결합된 제 1링크(451a)와 제 1링크(451b)의 타단에 링크 결합된 제 2링크(451b)는 힌지(h) 부위를 중심으로 핸들 손잡이(451d)의 작동방향과 반대방향으로 작동하게 된다. 또한 제 1핸들부시(450a)와 제 2홀더부시(441b) 사이의 축(430)에 외삽되어 장착된 압축 코일 스프링은 제 2홀더부시(441b)가 전진 동작함에 따라 압축된다.        As described above, when the structure 1 is clamped by the horizontal moving clamp 200, the hole 1 ′ is formed in a predetermined portion of the structure 1, in which case the worker has a hole 1 ′ formed point and The drill 3 is positioned at the desired hole 1 'machining forming point by horizontally moving the horizontal moving bar 300 so as to be positioned on the same vertical line, and vertically moving the drill mounting unit 400 installed on the horizontal moving bar 300. After the operation, the handle portion 450 is manipulated to form a hole 1 ′ at a desired point of the structure 1. That is, when the worker intends to form the hole 1 ′ on the predetermined portion of the structure 1, the worker pushes the handle handle 451d of the handle portion 450 in the direction of the front structure. Accordingly, the drill 3 is mounted. The drill holder portion 440 of the drill mounting portion 400 is brought closer to the structure 1 side on the shaft 430, the hole 1 'is formed in the structure 1 by the drill (3). Herein, the forward operation of the drill holder 440 by the manipulation of the handle part 450 will be described in more detail. When the operator pushes the third link 451c provided with the handle handle 451d forward, the third link ( The second handle bush 450b hinged to the middle portion of the 451c is moved forward on the shaft 430 and the second holder bush 441b moves forward by the forward motion of the second handle bush 450b. As the drill holder portion 440 is closer to the structure (1), the first link (451a) and the first link (451b) coupled to the first handle bush (450a) that is extrapolated and fixed to the shaft (430) The second link 451b coupled to the other end of the second side 451b operates in a direction opposite to the operating direction of the handle handle 451d about the hinge h portion. In addition, the compression coil spring that is extrapolated to the shaft 430 between the first handle bush 450a and the second holder bush 441b is compressed as the second holder bush 441b moves forward.

한편, 구조물(1)에 대한 드릴 가공 홀 완료 후 핸들 손잡이(451d)에 외력을 제거하게 되면 압축 코일 스프링의 복원력에 의해 드릴 홀더부(440)와 핸들 손잡이(451d)가 후방으로 복원됨에 따라 드릴 홀더부(440)의 드릴 홀더부시(442a)에 장착된 드릴(3)은 구조물(1) 측으로부터 멀어지게 된다.        On the other hand, when the external force is removed from the handle knob 451d after completion of the drill processing hole for the structure 1, the drill holder 440 and the handle knob 451d are restored to the rear by the restoring force of the compression coil spring. The drill 3 mounted to the drill holder bush 442a of the holder portion 440 is moved away from the structure 1 side.

그리고, 작업자는 수평 이동바(300)와 드릴 장착부(400)를 구조물(1)의 다음 목표의 홀 가공 형성 지점으로 이동시키면서 핸들부(450)를 조작하게 되면 손쉽 게 연속적으로 홀을 가공 형성할 수 있게 된다.        And, when the operator operates the handle portion 450 while moving the horizontal moving bar 300 and the drill mounting portion 400 to the hole forming point of the next target of the structure (1) can easily form a continuous hole processing easily It becomes possible.

또한, 드릴 홀더부시(442a)에 장착되는 드릴(3)을 작업 사양에 맞도록 필요에 따라 교체 가능하기 때문에 드릴 가공 홀의 직경을 상이한 형태로 형성할 수 있게 된다.       In addition, since the drill 3 mounted on the drill holder bush 442a can be replaced as necessary to meet the working specifications, the diameter of the drill hole can be formed in a different form.

본 발명에 따른 홀 가공용 드릴지그를 예시된 도면을 참조로 설명하였으나, 본 명세서에 개시된 실시예와 도면에 의해 본 발명은 한정되지 않으며 그 발명의 기술사상 범위내에서 당업자에 의해 다양한 변형이 이루어질 수 있음은 물론이다.Although the drill jig for machining a hole according to the present invention has been described with reference to the illustrated drawings, the present invention is not limited by the embodiments and drawings disclosed herein, and various modifications may be made by those skilled in the art within the scope of the technical idea of the present invention. Of course.

상기한 바와 같은 본 발명의 홀 가공용 드릴지그는 드릴이 장착된 드릴 장착부를 홀 가공 형성지점에 위치되도록 수평 및 수직 이동시키면서 구조물에 홀을 가공 형성하기 때문에 홀 간의 간격 및 직각도 조절, 예비 홀 가공 등과 같은 복잡한 사전 작업이 불필요하고 작업공정의 자동화에 따른 홀 가공 형성 작업의 효율성을 향상시킬 수 있는 장점이 있다. As described above, the drill jig for drilling holes according to the present invention forms a hole in a structure while horizontally and vertically moving the drill mounting portion in which the drill is mounted to be positioned at a hole forming point, thereby controlling the spacing and perpendicularity between holes, and preliminary hole processing. There is an advantage in that complicated pre-work such as this is unnecessary and can improve the efficiency of the hole forming work according to the automation of the work process.

또한, 핸들 조작에 의해 드릴 홀 가공 작업이 이루어지기 때문에 작업자는 보다 안정적인 자세에서 작업을 수행할 수 있음에 따라 작업에 따른 피로의 누적이 적고 산업재해의 위험을 최소화시킬 수 있는 장점도 있다.

In addition, since the drill hole processing operation is made by the handle operation, the operator can perform the work in a more stable posture, there is also the advantage of less accumulation of fatigue due to the work and minimize the risk of industrial accidents.

Claims (9)

이격된 상태로 지면과 수직하게 설치된 한 쌍의 수직 프레임;       A pair of vertical frames installed vertically with the ground spaced apart; 상기 수직 프레임을 상호 연결하여 이격된 상태로 유지하는 적어도 하나 이상의 수평 프레임;       At least one horizontal frame interconnecting the vertical frames to keep them spaced apart; 상기 수평 프레임을 따라 수평 이동 가능하게 설치되고 구조물을 클램핑하여 고정시키는 적어도 하나 이상의 수평 이동 클램프;       At least one horizontal moving clamp installed horizontally along the horizontal frame and clamping and fixing the structure; 상기 수평 프레임을 따라 수평 이동 가능하게 설치된 수평 이동바; 및       A horizontal moving bar installed to be horizontally movable along the horizontal frame; And 상기 수평 이동바를 따라 수직 이동 가능하게 설치되고 상기 수평 이동 클램프에 의해 고정된 구조물에 홀 가공을 위한 드릴이 장착되는 드릴 장착부를 포함하는 것을 특징으로 하는 홀 가공용 드릴지그.       Drill drill jig for drilling a hole, characterized in that it comprises a drill mounting portion for mounting the hole in the structure fixed by the horizontal movement clamp and installed vertically movable along the horizontal moving bar. 제 1항에 있어서, 상기 수평 이동 클램프는        The method of claim 1, wherein the horizontal moving clamp 상기 수평 프레임의 일측면에 위치하는 이동 본체;        A moving body positioned on one side of the horizontal frame; 상기 이동 본체의 일측면에 구비되고 상기 수평 프레임과 접촉되는 수평부위에 롤러 베어링이 설치되어 상기 수평 프레임 상에서 수평방향으로 구름 운동하는 수평 롤러부; 및       A horizontal roller unit provided on one side of the moving body and installed in a horizontal portion in contact with the horizontal frame to roll the roller in a horizontal direction on the horizontal frame; And 상기 이동 본체에 구비되어 상기 구조물을 상기 이동 본체의 타측면에 밀착시켜 클램핑하는 클램핑 수단을 포함하는 것을 특징으로 하는 홀 가공용 드릴지그.       And a clamping means provided in the moving body to clamp the structure by closely contacting the structure to the other side of the moving body. 제 2항에 있어서, 상기 클램핑 수단은        The method of claim 2, wherein the clamping means 상기 이동 본체의 타측면에 대향되게 위치하는 밀착판;        An adhesion plate positioned to face the other side of the moving body; 일단이 상기 이동 본체를 관통하여 노출되고 타단에 상기 밀착판이 결합되도록 절곡된 절곡바; 및       A bending bar having one end exposed through the moving body and bent such that the contact plate is coupled to the other end; And 상기 절곡바의 일단에 회전 가능하게 결합되고 회전방향을 선택적으로 조절하여 상기 이동 본체의 타측면과 상기 밀착판의 근접 간격을 조절할 수 있도록 상기 절곡바를 전후 방향으로 이동 가능하게 하는 밀착 조절부를 포함하는 것을 특징으로 하는 홀 가공용 드릴지그.       And a close adjustment unit rotatably coupled to one end of the bending bar and selectively adjusting the rotation direction to move the bending bar in the front and rear directions so as to adjust a close distance between the other side of the moving body and the contact plate. Drill jig for hole processing, characterized in that. 제 1항에 있어서, 상기 수평 이동바는 상기 수평 프레임을 따라 수평 이동 가능하도록 상기 수평 프레임과 접촉되는 수평부위에 롤러 베어링이 장착된 수평 롤러부가 구비된 것을 특징으로 하는 홀 가공용 드릴지그.       The drill jig for drilling holes according to claim 1, wherein the horizontal moving bar has a horizontal roller portion mounted on a horizontal portion in contact with the horizontal frame to move horizontally along the horizontal frame. 제 1항에 있어서, 상기 드릴 장착부는        The method of claim 1, wherein the drill mounting portion 상기 수평 이동바의 일측면에 위치하는 설치 본체;       An installation main body located on one side of the horizontal moving bar; 상기 설치 본체에 구비되고 상기 수평 이동바와 접촉되는 수직부위에 롤러 베어링이 설치되어 상기 수평 이동바 상에서 수직방향으로 구름 운동하는 수직 롤러부;       A vertical roller part provided in the installation main body and provided with a roller bearing at a vertical part in contact with the horizontal moving bar to move in a vertical direction on the horizontal moving bar; 상기 설치 본체에 수직방향으로 장착되어 고정된 축;       A shaft fixed to the installation body in a vertical direction; 상기 축에 외삽되어 설치되고 일측에 드릴이 장착되는 드릴 홀더부;       A drill holder part which is extrapolated to the shaft and installed to one side; 상기 드릴 홀더부를 상기 축 상에서 전후 방향으로 이동 가능하게 동작시키는 핸들부; 및       A handle part configured to move the drill holder part in a forward and backward direction on the axis; And 상기 축 상에 설치되어 상기 핸들부의 전후 복원 동작에 필요한 탄성력을 제공하는 탄성수단을 포함하는 것을 특징으로 하는 홀 가공용 드릴지그.       And a resilient means installed on the shaft to provide an elastic force necessary for the front and rear restoring operation of the handle portion. 제 5항에 있어서, 상기 드릴 홀더부는        The method of claim 5, wherein the drill holder portion 상기 축에 서로 이격되어 순차적으로 외삽된 제 1홀더부시, 제 2홀더부시 및 제 3홀더부시를 서로 연결한 홀더 본체; 및       A holder body connecting the first holder bushes, the second holder bushes, and the third holder bushes sequentially spaced apart from each other on the shaft; And 상기 홀더본체에 결합되고 드릴을 삽입하여 고정하는 드릴 홀더부시가 구비된 드릴 고정대를 포함하는 것을 특징으로 하는 홀 가공용 드릴지그.       Hole drill drill jig characterized in that it comprises a drill holder coupled to the holder body is provided with a drill holder bush for inserting and fixing the drill. 제 6항에 있어서, 상기 핸들부는        The method of claim 6, wherein the handle portion 상기 제 1홀더부시와 상기 제 2홀더부시 사이의 상기 축에 외삽되어 고정된 제 1핸들부시;       A first handle bush that is extrapolated and fixed to the shaft between the first holder bush and the second holder bush; 상기 제 2홀더부시와 상기 제 3홀더부시 사이의 상기 축에 외삽된 제 2핸들부시;       A second handle bush extrapolated to the shaft between the second holder bush and the third holder bush; 일단이 상기 제 1핸들부시에 고정 결합된 제 1링크;       A first link having one end fixedly coupled to the first handle bush; 일단이 상기 제 1링크의 타단에 링크 결합된 제 2링크; 및       A second link having one end linked to the other end of the first link; And 일단이 상기 제 2링크의 타단에 링크 결합되고 중간부위가 상기 제 2핸들부시에 힌지 결합되며 타단에 핸들 손잡이가 구비된 제 3링크를 포함하는 것을 특징 으로 하는 홀 가공용 드릴지그.       And a third link, one end of which is linked to the other end of the second link, the middle part of which is hinged to the second handle bushing, and the third link having a handle handle on the other end thereof. 제 7항에 있어서, 상기 탄성수단은 상기 제 1핸들부시와 상기 제 2홀더부시 사이의 상기 축에 외삽되어 장착된 스프링인 것을 특징으로 하는 홀 가공용 드릴지그.       8. The drill jig according to claim 7, wherein the elastic means is a spring that is extrapolated to the shaft between the first handle bushing and the second holder bushing. 제 1항에 있어서, 상기 수직 프레임의 하부에는 지면과 평행하게 베이스 프레임이 결합되고 상기 베이스 프레임의 하부에는 캐스터가 장착된 것을 특징으로 하는 홀 가공용 드릴 지그.        The drill jig according to claim 1, wherein a base frame is coupled to a lower portion of the vertical frame in parallel with the ground, and a caster is mounted to the lower portion of the base frame.
KR1020040092432A 2004-11-12 2004-11-12 Drill jig for forming hole KR101144605B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020040092432A KR101144605B1 (en) 2004-11-12 2004-11-12 Drill jig for forming hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020040092432A KR101144605B1 (en) 2004-11-12 2004-11-12 Drill jig for forming hole

Publications (2)

Publication Number Publication Date
KR20060046914A true KR20060046914A (en) 2006-05-18
KR101144605B1 KR101144605B1 (en) 2012-05-14

Family

ID=37149548

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020040092432A KR101144605B1 (en) 2004-11-12 2004-11-12 Drill jig for forming hole

Country Status (1)

Country Link
KR (1) KR101144605B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20220010944A (en) * 2020-07-20 2022-01-27 손홍령 Jig device for hand grinder mounting

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR0134615B1 (en) * 1994-12-24 1998-04-23 양재신 Drilling machine fixture
KR19990005763U (en) * 1997-07-21 1999-02-18 박희득 Drilling machine standing unit for aerial steel structures

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20220010944A (en) * 2020-07-20 2022-01-27 손홍령 Jig device for hand grinder mounting

Also Published As

Publication number Publication date
KR101144605B1 (en) 2012-05-14

Similar Documents

Publication Publication Date Title
KR960002878Y1 (en) Working table
KR101294073B1 (en) Mounting device for vehicle door hinge
DE102013113849B4 (en) Supporting jig commonly used for a trunk lid and a tailgate
CN102085539A (en) Hemming device for wheel housing of vehicle
US11331817B2 (en) Maintenance apparatus of robot and maintenance method of robot
CA2497249A1 (en) Saddle for a gantry robot and a gantry robot including the same
EP1647360A2 (en) Highly dynamic lens machining tool and linear drive therefor
KR101144605B1 (en) Drill jig for forming hole
KR101005730B1 (en) Drill jig forming hole
CN210478074U (en) Supporting and assembling tool for printing rubber roller
CN202684503U (en) Novel engine front bracket spilt mounting platform
JP3043940U (en) Operation arm for holding rotating tool
KR101698743B1 (en) Common machine for assembling bush and bracket
CN212384429U (en) Battery tab folding and rolling equipment and battery tab folding and rolling equipment with double stations
CN212824917U (en) Clamp for machine manufacturing
JPH10249455A (en) Device and method for hemming
KR19990016364A (en) Gantry welding system
US20010008099A1 (en) Punching apparatus and the punching unit thereof
CN113751895A (en) Laser plate cutting machine
KR101246302B1 (en) Apparatus for setting the welding feeder
CN218082436U (en) Double-bracket type front tube assembling jig
CN215430976U (en) Section bar bending device
CN218518022U (en) Fixing clamp
CN219173825U (en) Installation-free color code bracket device capable of being adjusted in three directions
CN210922677U (en) Sensor mounting bracket with adjustable multi freedom

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20160405

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20170411

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20180406

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20190503

Year of fee payment: 8