KR20060033697A - Construction typemanhole - Google Patents

Construction typemanhole Download PDF

Info

Publication number
KR20060033697A
KR20060033697A KR1020050037717A KR20050037717A KR20060033697A KR 20060033697 A KR20060033697 A KR 20060033697A KR 1020050037717 A KR1020050037717 A KR 1020050037717A KR 20050037717 A KR20050037717 A KR 20050037717A KR 20060033697 A KR20060033697 A KR 20060033697A
Authority
KR
South Korea
Prior art keywords
sphere
manhole
locking jaw
vertical
packing
Prior art date
Application number
KR1020050037717A
Other languages
Korean (ko)
Other versions
KR100639359B1 (en
Inventor
김병주
Original Assignee
김병주
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김병주 filed Critical 김병주
Priority to KR1020050037717A priority Critical patent/KR100639359B1/en
Publication of KR20060033697A publication Critical patent/KR20060033697A/en
Application granted granted Critical
Publication of KR100639359B1 publication Critical patent/KR100639359B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/121Manhole shafts; Other inspection or access chambers; Accessories therefor characterised by the connection between shaft elements, e.g. of rings forming said shaft
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/14Covers for manholes or the like; Frames for covers
    • E02D29/149Annular gaskets
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements
    • EFIXED CONSTRUCTIONS
    • E05LOCKS; KEYS; WINDOW OR DOOR FITTINGS; SAFES
    • E05YINDEXING SCHEME RELATING TO HINGES OR OTHER SUSPENSION DEVICES FOR DOORS, WINDOWS OR WINGS AND DEVICES FOR MOVING WINGS INTO OPEN OR CLOSED POSITION, CHECKS FOR WINGS AND WING FITTINGS NOT OTHERWISE PROVIDED FOR, CONCERNED WITH THE FUNCTIONING OF THE WING
    • E05Y2900/00Application of doors, windows, wings or fittings thereof
    • E05Y2900/60Application of doors, windows, wings or fittings thereof for other use
    • E05Y2900/612Application of doors, windows, wings or fittings thereof for other use for manhole covers

Abstract

본 발명은 조립식 맨홀에 관한 것으로, 보다 상세하게는 내부가 원형으로 관통된 몸체의 상단에 걸림돌기가 형성되어 조립식으로 적층시켜 고정볼트로 결합되는 일반적인 조립식 맨홀에 있어서, 상기 고정볼트의 길이를 일정하게 규격화시키고, 간편하게 결합할 수 있도록 하여 설치 작업을 용이하게 한 조립식 맨홀에 관한 것이다.The present invention relates to a prefabricated manhole, and more particularly, in the general prefabricated manhole which is formed in the upper end of the body through a circular circular through the prefabricated stacking is coupled to the fixed bolt, the length of the fixed bolt is constant The present invention relates to a prefabricated manhole that can be standardized and easily combined to facilitate installation.

본 발명은 하부구체와 연직구체 및 상부구체로 조립할 수 있는 일반적인 맨홀에 있어서,The present invention is a general manhole that can be assembled into a lower sphere and a vertical sphere and an upper sphere,

상단에 패킹이 삽입될 수 있도록 패킹삽입부가 형성된 걸림턱이 형성되고, 외주연에는 다수개의 너트가 삽입된 하부구체와; 상기 하부구체의 너트와 동일한 위치에 볼트삽입홀과 고정너트조임홀이 형성된 연직구체와; 상기 연직구체의 너트와 동일한 위치에 볼트삽입홀이 형성된 상부구체로 구성된 것을 특징으로 한다.A locking jaw having a packing insertion portion formed therein so that a packing can be inserted at an upper end thereof, and a lower sphere having a plurality of nuts inserted into an outer circumference thereof; A vertical sphere having a bolt insertion hole and a fixed nut tightening hole formed at the same position as the nut of the lower sphere; Characterized in that the upper sphere formed with a bolt insertion hole in the same position as the nut of the vertical sphere.

본 발명에 의한 조립식 맨홀에 의하면, 볼트를 규격화하여 생산하므로 생산이 편리하고, 한단계씩 죄면서 작업하여 작업이 용이할뿐만 아니라, 패킹의 위치를 고정시킬 수 있어서 누수가 발생하지 않는 효과가 있다.According to the prefabricated manhole according to the present invention, since the bolt is standardized and produced, the production is convenient, and the work is easy by working step by step, as well as the position of the packing can be fixed, there is an effect that no leakage occurs.

맨홀, 조립식, 패킹, 고정볼트, 고정너트조임홀, 'O'자형작업볼트 Manhole, Assembly, Packing, Fixing bolt, Fixing nut tightening hole, 'O' shaped work bolt

Description

조립식 맨홀{CONSTRUCTION TYPEMANHOLE}Prefabricated manholes {CONSTRUCTION TYPEMANHOLE}

도 1은 종래의 조립식 맨홀의 분리 사시도.1 is an exploded perspective view of a conventional prefabricated manhole.

도 2는 본 발명의 실시예로 형성된 조립식 맨홀의 사시도.2 is a perspective view of a prefabricated manhole formed by an embodiment of the present invention.

도 3은 본 발명의 실시예로 형성된 조립식 맨홀의 분리사시도.Figure 3 is an exploded perspective view of the prefabricated manhole formed by an embodiment of the present invention.

도 4는 본 발명의 실시예로 형성된 조립식 맨홀의 A-A단면도.Figure 4 is a cross-sectional view A-A of the prefabricated manhole formed by an embodiment of the present invention.

도 5는 본 발명의 실시예로 형성된 조립식 맨홀의 설치 상태도.Figure 5 is an installation state of the prefabricated manhole formed by an embodiment of the present invention.

**<도면의 주요부분에 대한 부호의 설명>**** <Description of the symbols for the main parts of the drawings> **

100 : 조립식 맨홀 110 : 패킹100: prefabricated manhole 110: packing

120 : 맨홀뚜껑 140 : 고정볼트120: manhole cover 140: fixing bolt

150 : 고정너트 200 : 하부구체150: fixing nut 200: lower sphere

210 : 관삽입부 230, 330 : 걸림턱210: pipe insertion portion 230, 330: locking jaw

240, 340 : 패킹삽입부 270, 370 : 너트240, 340: Packing insert 270, 370: Nut

300 : 연직구체 350, 450 : 하부걸림턱300: vertical sphere 350, 450: lower locking jaw

360, 460 : 볼트삽입홀 380 : 고정너트조임홀360, 460: Bolt insertion hole 380: Fixing nut tightening hole

400 : 상부구체 430 : 작업홀400: upper sphere 430: work hall

480 : 'O'자형작업볼트 500 : 크레인480: 'O' shaped work bolt 500: crane

본 발명은 조립식 맨홀에 관한 것으로, 보다 상세하게는 내부가 원형으로 관통된 몸체의 상단에 걸림돌기가 형성되어 조립식으로 적층시켜 고정볼트로 결합되는 일반적인 조립식 맨홀에 있어서, 상기 고정볼트의 길이를 일정하게 규격화시키고, 간편하게 결합할 수 있도록 하여 설치 작업을 용이하게 한 조립식 맨홀에 관한 것이다.The present invention relates to a prefabricated manhole, and more particularly, in the general prefabricated manhole which is formed in the upper end of the body through a circular circular through the prefabricated stacking is coupled to the fixed bolt, the length of the fixed bolt is constant The present invention relates to a prefabricated manhole that can be standardized and easily combined to facilitate installation.

일반적으로 맨홀은 지하에 설치된 각종 관로의 유지 및 보수를 위하여 사람이 출입할 수 있도록 한 시설을 가리키는 총칭이며, 이러한 맨홀은 각종 하수나 생활 및 공업용수를 공급하기 위한 수로 또는 각종 전기통신을 위한 관로의 중간에 일정한 간격으로 설치하는 것이다. In general, a manhole is a general term for a facility that allows people to enter and exit for maintenance and repair of various pipelines installed underground. Such a manhole is a channel for supplying various sewage, living and industrial water, or a pipeline for various telecommunications. It will be installed at regular intervals in the middle.

종래의 맨홀은 거푸집을 형성하고 시멘트를 직접 시공하는 방법과 KS에 의하여 규격화된 각 구성품을 조립하여 시공하는 두 가지의 방법으로 크게 나눌 수 있지만, 공사 기간과 그에 따른 소요비용으로 인해 KS규격에 맞춘 기성제품을 설치되는 장소에 따라 하부구체 위로 연직구체 및 상부구체를 올려놓는 방식으로 설치하고 있다.Conventional manholes can be largely divided into two methods: forming formwork and constructing cement directly, and assembling and constructing each component standardized by KS. Depending on the place where the ready-made product is installed, the vertical sphere and the upper sphere are placed on the lower sphere.

그러나, 상기 맨홀은 하부구체와 다수개의 연직구체 및 상부구체로 각각 나뉘어져 있으므로, 연결부분이 발생하게 되고 이러한 연결부분은 지반의 침하 또는 물에 의한 부력 때문에 누수가 발생하는 문제점이 있었다.However, since the manhole is divided into a lower sphere and a plurality of vertical spheres and an upper sphere, respectively, a connection part is generated, and this connection part has a problem of leakage due to ground subsidence or buoyancy due to water.

상기한 문제점을 해결하기 위해서, 본원 출원인은 "인버터가 형성된 조립식 맨홀"을 대한민국특허청에 출원하여 실용신안 제0371890호로 등록한 바 있다.In order to solve the above problems, the applicant of the present application has applied for the "prefabricated manhole formed with inverter" to the Korean Patent Office and registered as Utility Model No. 0371890.

상기 실용신안 제0371890호에 개시된 "인버터가 형성된 조립식 맨홀"은 도 1에서와 같이, 상단에 걸림턱(23)이 형성되고, 상부가 개봉된 원통형으로 내부가 형성되며, 측면에는 하나 이상의 관삽입부(21)가 형성된 하부구체(20)와; 상기 하부구체(20)의 상단의 걸림턱(33)에 안착되는 연직구체(30)와; 상기 연직구체(30)의 상부에 안착되고, 편심되어 관통되는 작업홀이 형성되며, 상기 작업홀의 상단에 맨홀뚜껑(12)이 안착되는 상부구체(40)로 형성되는 일반적인 맨홀에 있어서, As described in Utility Model No. 0371890, "Prefabricated Manhole with Inverter", as shown in Fig. 1, a locking jaw 23 is formed at the top, and the inside is formed in an open cylindrical shape, and at least one tube is inserted into the side. A lower sphere 20 in which a portion 21 is formed; A vertical sphere 30 seated on the locking jaw 33 at the upper end of the lower sphere 20; In the general manhole formed on the upper portion of the vertical sphere 30, the work hole penetrated eccentrically is formed, the upper sphere 40 on which the manhole cover 12 is seated on the top of the work hole,

상기 하부구체(20)의 내부하단에는 상기 관삽입부(21)와 연장되고, 반원형상으로 타측의 관삽입부(21)까지 파진 인버터가 형성되며, 측면내부에는 볼트(14)가 삽입될 수 있도록 다수개의 볼트삽입홀(22)이 형성되고,An inner lower end of the lower sphere 20 extends with the tube inserting portion 21, and a crushed inverter is formed to a tube inserting portion 21 on the other side in a semicircular shape, and a bolt 14 may be inserted into the side surface. A plurality of bolt insertion holes 22 are formed so that

상기 연직구체(30)와 상부구체(40)는 하단에 하부걸림턱이 형성되고, 측면내부에는 다수개의 볼트삽입홀(32,42)이 형성된다.The vertical sphere 30 and the upper sphere 40 has a lower locking jaw is formed at the bottom, a plurality of bolt insertion holes (32, 42) are formed in the side.

상기 인버터가 형성된 조립식 맨홀은 하부구체의 상단 외주연에 형성된 4개의 너트에 매설되는 깊이에 따라 일정깊이의 볼트가 각각 결합되고, 이후에 다수개의 연직구체가 차례대로 상기 각각의 볼트를 볼트삽입홀에 통과시켜서 결합시키며, 최종적으로 상부구체를 결합시킨 후 너트로 고정하여 설치한다.Prefabricated manholes in which the inverter is formed are bolted to a predetermined depth according to the depths embedded in four nuts formed on the upper outer periphery of the lower sphere, and then a plurality of vertical spheres are sequentially inserted into the bolt insertion holes. Pass through and combine, and finally fix the upper sphere and install with nut.

그러나, 상기와 같이 다수개의 연직구체를 하부구체의 상단에 올려 놓을때 하부구체의 상단에 고정된 각각의 볼트를 연직구체의 각각의 볼트삽입홀로 삽입하는 작업이 매우 어려워서 시간이 많이 소요되는 문제점이 있었고, 볼트를 매설되는 깊이에 따라 각각 다른 길이로 생산해야 하는 문제점이 있었다. However, when placing a plurality of vertical spheres on the top of the lower sphere as described above, it is very difficult to insert each bolt fixed to the top of the lower sphere into the respective bolt insertion hole of the vertical sphere, which takes a lot of time. There was a problem that the bolts must be produced in different lengths depending on the depth of embedding.

또한, 하부구체와 연직구체 및 상부구체의 상단 표면에는 크레인 등으로 들어 올리기 위해서 'O'자형작업볼트를 결합할 수 있는 너트가 각각 형성되어야 하기때문에 생산공정이 많아지는 문제점이 있었다.In addition, the upper surface of the lower sphere and the vertical sphere and the upper sphere has a problem that the production process is increased because the nuts that can be coupled to the 'O' shaped work bolts to be lifted by a crane or the like, respectively.

상기한 문제점을 해결하기 위해서, 본 발명은 맨홀에 매설되는 깊이가 달라져도 일정길이의 볼트를 일률적으로 사용할 수 있도록 하여, 볼트의 생산을 용이하게 한 조립식 맨홀을 제공함에 목적이 있고, 맨홀이 매설되는 깊이에 따라 하부구체의 상단에 올려지는 연직구체를 단계적으로 죄면서 손쉽게 결합할 수 있는 조립식 맨홀을 제공함에 목적이 있다.In order to solve the above problems, the present invention is to provide a prefabricated manhole that facilitates the production of bolts by uniformly using a bolt of a certain length even if the depth to be buried in the manhole is different, the manhole is embedded It is an object of the present invention to provide a prefabricated manhole that can be easily combined while gradually tightening the vertical sphere mounted on the upper portion of the lower sphere according to the depth.

또한, 하부구체와 연직구체 및 상부구체 사이에 삽입되어 누수가 발생되지 않도록 하는 패킹의 위치를 단단하게 고정할 수 있어서 누수가 발생하지 않는 조립식 맨홀을 제공함에 목적이 있다.In addition, it is an object to provide a prefabricated manhole that can be tightly fixed to the position of the packing is inserted between the lower sphere and the vertical sphere and the upper sphere so that no leakage occurs.

상기한 목적을 달성하기 위해서 본 발명의 조립식 맨홀은 하부구체와 다수개의 연직구체 및 상부구체를 조립하여 형성하되, 각각 걸림턱과 하부걸림턱에 의해서 조립할 수 있도록 형성된 조립식 맨홀에 있어서,In order to achieve the above object, the prefabricated manhole of the present invention is formed by assembling a lower sphere, a plurality of vertical spheres and an upper sphere, respectively, in the prefabricated manhole formed to be assembled by a locking jaw and a lower locking jaw,

상단에 패킹이 삽입될 수 있도록 패킹삽입부가 형성된 걸림턱이 형성되고, 상단 외주연에는 다수개의 너트가 삽입되며, 내부 하단에는 외부 양측으로 관통된 관삽입부와 연결되는 반원형태의 인버터가 형성된 하부구체와; 상기 하부구체의 걸림턱에 결합될 수 있도록 하단에 하부걸림턱이 형성되고, 외부측면에는 하부구체의 상단에 형성된 각각의 너트와 수직되는 위치에 볼트삽입홀과 고정너트조임홀이 각각 형성되며, 상단에 상기 하부구체의 걸림턱과 너트의 형태와 동일하게 걸림턱과 너트가 형성된 연직구체와; 상기 연직구체의 걸림턱에 결합될 수 있도록 하단에 하부걸림턱이 형성되고, 상단에는 상기 연직구체의 각각의 너트와 수직되는 위치에 볼트삽입홀이 각각 형성되며, 편심되어 관통되는 작업홀이 형성되고, 상기 작업홀의 상단에 맨홀뚜껑이 안착되는 상부구체로 형성된 것을 특징으로 한다.A locking jaw formed with a packing insertion portion is formed at the top so that the packing can be inserted therein, and a plurality of nuts are inserted at the outer circumference of the upper end, and a lower portion having a semicircular inverter connected to the pipe insertion portion penetrated at both sides of the outer bottom. Spheres; A lower locking jaw is formed at a lower end to be coupled to the locking jaw of the lower sphere, and a bolt insertion hole and a fixing nut tightening hole are formed at positions perpendicular to the respective nuts formed at the upper end of the lower sphere, respectively. A vertical sphere having a locking jaw and a nut formed in the same shape as that of the locking jaw and the nut of the lower sphere; A lower locking jaw is formed at the bottom to be coupled to the locking jaw of the vertical sphere, and bolt insertion holes are formed at positions perpendicular to the respective nuts of the vertical sphere at the top thereof, and work holes penetrated eccentrically are formed. And, characterized in that formed on the upper end of the manhole cover is seated on the top of the working hole.

이하, 본 발명을 바람직한 실시예와 첨부된 도면을 참조하여 상세하게 설명하면 다음과 같다.Hereinafter, described in detail with reference to the preferred embodiments and the accompanying drawings as follows.

도 2내지 도 4에서와 같이 하부구체(200)와 다수개의 연직구체(300) 및 상부구체(400)를 조립하여 형성하되, 각각 걸림턱(230,330)과 하부걸림턱(350,450)에 의해서 조립할 수 있도록 형성된 조립식 맨홀(100)에 있어서,As shown in Figures 2 to 4, the lower sphere 200, and the plurality of vertical spheres 300 and the upper sphere 400 is formed by assembling, can be assembled by the locking jaw (230,330) and the lower locking jaw (350,450), respectively. In the prefabricated manhole 100 formed so that,

상단에 패킹(110)이 삽입될 수 있도록 패킹삽입부(240)가 형성된 걸림턱(230)이 형성되고, 상단 외주연에는 다수개의 너트(270)가 삽입되며, 내부 하단에는 외부 양측으로 관통된 관삽입부(210)와 연결되는 반원형태의 인버터(211)가 형성된 하부구체(200)와; 상기 하부구체(200)의 걸림턱(230)에 결합될 수 있도록 하단에 하부걸림턱(350)이 형성되고, 외부측면에는 하부구체(200)의 상단에 형성된 각각의 너트(270)와 수직되는 위치에 볼트삽입홀(360)과 고정너트조임홀(380)이 각각 형성되며, 상단에 상기 하부구체(200)의 걸림턱(230)과 너트(270)의 형태와 동일하게 걸림턱(330)과 너트(370)가 형성된 연직구체(300)와; 상기 연직구체(300)의 걸림턱(330)에 결합될 수 있도록 하단에 하부걸림턱(450)이 형성되고, 상단에는 상 기 연직구체(300)의 각각의 너트(370)와 수직되는 위치에 볼트삽입홀(460)이 각각 형성되며, 편심되어 관통되는 작업홀(430)이 형성되고, 상기 작업홀(430)의 상단에 맨홀뚜껑(120)이 안착되는 상부구체(400)로 형성된다.A hooking jaw 230 having a packing inserting portion 240 is formed to allow the packing 110 to be inserted into the upper end, and a plurality of nuts 270 are inserted into the upper outer circumference, and the inner lower end penetrates to both outer sides. A lower sphere 200 formed with a semicircular inverter 211 connected to the tube insertion unit 210; The lower locking jaw 350 is formed at the bottom to be coupled to the locking jaw 230 of the lower sphere 200, and the outer side surface is perpendicular to each nut 270 formed at the upper end of the lower sphere 200. A bolt insertion hole 360 and a fixing nut tightening hole 380 are formed at positions, respectively, and the locking jaw 330 is formed in the same manner as that of the locking jaw 230 and the nut 270 of the lower sphere 200. A vertical sphere 300 having a nut 370 formed therein; A lower locking jaw 450 is formed at a lower end thereof so as to be coupled to the locking jaw 330 of the vertical sphere 300, and at a position perpendicular to each nut 370 of the vertical sphere 300. The bolt insertion holes 460 are formed, respectively, and work holes 430 are formed to be eccentrically penetrated, and the upper holes 400 are formed on the top of the work holes 430 and the manhole cover 120 is seated.

상기 하부구체(200)의 상단 외주연에는 다수개의 너트(270)가 형성되는데, 상기 너트(270)에는 갈고리 형상의 철근이 용접되어 상기 하부구체(200)와 일체로 형성된다.A plurality of nuts 270 are formed on the outer circumferential edge of the lower sphere 200, and the nut 270 is integrally formed with the lower sphere 200 by welding a reinforcing bar shaped bar.

상기 걸림턱(230)은 관통된 내측에 연장되어 외측으로 돌출되고, 비스듬하게 경사지게 형성되며, 상단에는 일정깊이만큼 파져 패킹(110)이 삽입될 수 있도록 패킹삽입부(340)가 형성된다.The latching jaw 230 extends through the inner side and protrudes outwardly, and is formed to be inclined obliquely, and a packing inserting portion 340 is formed at the top thereof so that the packing 110 can be inserted into a predetermined depth.

상기 연직구체(300)의 외부측면에는 하부구체(200)의 상단에 형성된 각각의 너트(270)와 수직되는 위치에 볼트삽입홀(360)이 형성되고, 하단에는 상기 볼트삽입홀(380)을 통과한 고정볼트(140)가 일정높이 돌출되어 고정너트(150)를 채울 수 있도록 각각 고정너트조임홀(380)이 형성된다.A bolt insertion hole 360 is formed at a position perpendicular to each nut 270 formed at an upper end of the lower sphere 200 on the outer side surface of the vertical sphere 300, and the bolt insertion hole 380 is formed at a lower end thereof. Fixing bolts 140 passing through a predetermined height protrudes to the fixed nut 150 is fixed fixing nut tightening holes 380 are formed, respectively.

상기 고정너트조임홀(380)은 직사각 형상으로 파져 형성되되, 상단이 내부로 갈수록 좁아지도록 경사져서 형성된다.The fixing nut tightening hole 380 is formed by digging in a rectangular shape, the upper end is formed to be inclined to become narrower toward the inside.

상기 연직구체(300)의 하단에는 하부걸림턱(350)이 형성되는데, 상기 하부구체(200)의 상단에 형성된 걸림턱(230)의 형상과 대응되도록 형성된다.The lower locking jaw 350 is formed at the lower end of the vertical sphere 300, and is formed to correspond to the shape of the locking jaw 230 formed at the upper end of the lower sphere 200.

상기 연직구체(300)는 맨홀(100)이 매설되는 깊이에 따라서 설치하지 않거나 다수개의 연직구체(300)가 형성되는데, 상기와 같이 걸림턱(330)이 하부걸림턱(350)에 안착되어 연속적으로 결합된다.The vertical sphere 300 is not installed according to the depth in which the manhole 100 is embedded or a plurality of vertical spheres 300 are formed. As described above, the locking jaw 330 is seated on the lower locking jaw 350 and continuously. Are combined.

상기 상부구체(400)는 맨홀(100)의 제일 상단에 위치하는 것으로 매설되는 깊이에 맞게 연직구체(300)를 설치하고, 그 상단에 상기 연직구체(300)의 상단의 걸림턱(330)으로 안착될 수 있도록 대응되게 하부걸림턱(450)이 형성되고, 상단에는 다수개의 볼트삽입홀(460)이 형성된다.The upper sphere 400 is installed at the top of the manhole 100 to install a vertical sphere 300 to the depth of the buried, the upper end of the vertical sphere 300 to the locking jaw 330 The lower catching jaw 450 is formed to correspond to the seat, and a plurality of bolt insertion holes 460 are formed at the top thereof.

상기 상부구체(400)의 볼트삽입홀(460)과 이격되게 'O'자형작업볼트(480)가 고정될 수 있도록 'O'자형너트(440)가 형성된다.An 'O' shaped nut 440 is formed to allow the 'O' shaped work bolt 480 to be spaced apart from the bolt insertion hole 460 of the upper sphere 400.

상기 'O'자형작업볼트(480)는 하부구체(200)와 연직구체(300) 및 상부구체(400)를 크레인(500)등으로 들어올릴 때 사용하는 것으로 하부구체(200)와 연직구체(400)의 상단에는 너트(270,370)가 형성되어 있으므로, 상기 너트(270,370)에 결합해서 사용한 후에 빼내면 되기 때문에 하부구체(200)와 연직구체(300)의 상단에는 별도의 'O'자형너트(440)가 없는 것이다.The 'O' shaped work bolt 480 is used to lift the lower sphere 200 and the vertical sphere 300 and the upper sphere 400 to the crane 500, such as the lower sphere 200 and the vertical sphere ( Since the nuts 270 and 370 are formed at the upper end of the 400, the nut 270 and 370 may be removed after being combined with the nuts 270 and 370 so that the upper and lower spherical nuts 200 and the vertical sphere 300 have separate 'O' nuts ( 440) is missing.

이하, 본 발명의 바람직한 실시예로 형성된 조립식 맨홀(100)의 설치과정을 설명하면 다음과 같다.Hereinafter, the installation process of the prefabricated manhole 100 formed by the preferred embodiment of the present invention.

일정한 깊이로 땅을 파고, 기초작업을 마친 후 상기 하부구체(200)의 상단에 형성된 너트(270)에 'O'자형작업볼트(480)를 결합하고, 크레인(500)을 사용하여 바닥에 고정시키게 되면 상기 'O'자형작업볼트(480)를 제거한다.Digging the ground to a certain depth, after completion of the foundation work combines the 'O' shaped working bolt 480 to the nut 270 formed on the top of the lower sphere 200, fixed to the floor using a crane 500 When the 'O' shaped working bolt 480 is removed.

상기 하부구체(200)의 관삽입부(210)로 연결관(800)을 삽입시킨 후, 시멘트로 몰딩(moulding)하고 상단 외주연에 형성된 다수개의 너트(270)에 고정볼트(140)를 삽입한다.After inserting the connecting pipe 800 into the pipe inserting portion 210 of the lower sphere 200, molding (moulding) with cement and inserting the fixing bolt 140 to a plurality of nuts 270 formed on the upper outer periphery do.

상기와 같이 준비된 하부구체(200)의 상단에 걸림턱(230)의 패킹삽입부(240) 로 패킹(110)을 삽입한 후, 연직구체(300)의 너트(370)에 'O'자형작업볼트(480)를 결합하여 크레인(500)을 사용하여 상기 하부구체(200)의 상단에 안착시킨다. 이때 상기 고정볼트(140)가 연직구체(300)의 외주연으로 형성된 볼트삽입홀(360)을 통과할 수 있도록 하여 고정너트조임홀(380)의 내부로 고정너트(150)를 삽입하여 죈다. 이러한 방법으로 높이에 따라서 다수개의 연직구체(300)를 안착시킨다. 상기 패킹(110)은 고무나 실리콘 재질로 형성된다. After inserting the packing 110 into the packing inserting part 240 of the locking projection 230 on the upper end of the prepared lower sphere 200, 'O' shaped work on the nut 370 of the vertical sphere 300 The bolt 480 is coupled to the upper surface of the lower sphere 200 using the crane 500. At this time, the fixing bolt 140 passes through the bolt insertion hole 360 formed at the outer circumference of the vertical sphere 300 to insert the fixing nut 150 into the fixing nut tightening hole 380. In this way a plurality of vertical spheres 300 are seated according to the height. The packing 110 is formed of rubber or silicon material.

상기 맨 위의 연직구체(300)의 상단에는 상부구체(400)를 안착시키는데, 상기 연직구체(300)의 상단에 형성된 너트(370)에 고정볼트(140)를 고정한 후, 상기 상부구체(400)의 상단에 형성된 'O'자형너트(440)에 'O'자형작업볼트(480)를 결합시켜 크레인(500)을 사용하여 안착시키고, 상기 볼트삽입홀(420)을 관통하여 돌출된 고정볼트(140)를 고정너트(150)로 단단하게 고정시킨다.The upper sphere 400 is seated on the upper end of the upper vertical sphere 300, after fixing the fixing bolt 140 to the nut 370 formed on the upper end of the vertical sphere 300, the upper sphere 400 The 'O' shaped work bolt 480 is coupled to the 'O' shaped nut 440 formed at the top of the seat) to be seated using the crane 500, and the fixing bolt protrudes through the bolt insertion hole 420. Fasten the 140 to the fixing nut 150.

상기 상부구체(400)의 상단의 작업홀(430) 주변으로는 기초볼트를 사용하여 맨홀뚜껑(120)을 설치하면 설치작업이 완성된다.When the manhole cover 120 is installed using a foundation bolt around the work hole 430 at the upper end of the upper sphere 400, the installation work is completed.

상기한 것과 같이 본 발명에 의한 조립식 맨홀에 의하면, 볼트를 규격화하여 생산하므로 생산이 편리하고, 한단계씩 죄면서 작업하여 작업이 용이할뿐만 아니라, 패킹의 위치를 고정시킬 수 있어서 누수가 발생하지 않는 효과가 있다.According to the prefabricated manhole according to the present invention as described above, since the bolt is standardized and produced, the production is convenient, not only work is easy to work by tightening step by step, but also can fix the position of the packing so that no leakage occurs It works.

Claims (5)

하부구체와 다수개의 연직구체 및 상부구체를 조립하여 형성하되, 각각 걸림턱과 하부걸림턱에 의해서 조립할 수 있도록 형성된 조립식 맨홀에 있어서,In the prefabricated manhole formed by assembling the lower sphere and a plurality of vertical spheres and the upper sphere, respectively, by the engaging jaw and the lower engaging jaw, 상단에 패킹이 삽입될 수 있도록 패킹삽입부가 형성된 걸림턱이 형성되고, 상단 외주연에는 다수개의 너트가 삽입되며, 내부 하단에는 외부 양측으로 관통된 관삽입부와 연결되는 반원형태의 인버터가 형성된 하부구체와; 상기 하부구체의 걸림턱에 결합될 수 있도록 하단에 하부걸림턱이 형성되고, 외부측면에는 하부구체의 상단에 형성된 각각의 너트와 수직되는 위치에 볼트삽입홀과 고정너트조임홀이 각각 형성되며, 상단에 상기 하부구체의 걸림턱과 너트의 형태와 동일하게 걸림턱과 너트가 형성된 연직구체와; 상기 연직구체의 걸림턱에 결합될 수 있도록 하단에 하부걸림턱이 형성되고, 상단에는 상기 연직구체의 각각의 너트와 수직되는 위치에 볼트삽입홀이 각각 형성되며, 편심되어 관통되는 작업홀이 형성되고, 상기 작업홀의 상단에 맨홀뚜껑이 안착되는 상부구체로 형성된 것을 특징으로 하는 조립식 맨홀.A locking jaw formed with a packing insertion portion is formed at the top so that the packing can be inserted therein, and a plurality of nuts are inserted at the outer circumference of the upper end, and a lower portion having a semicircular inverter connected to the pipe insertion portion penetrated at both sides of the outer bottom. Spheres; A lower locking jaw is formed at a lower end to be coupled to the locking jaw of the lower sphere, and a bolt insertion hole and a fixing nut tightening hole are formed at positions perpendicular to the respective nuts formed at the upper end of the lower sphere, respectively. A vertical sphere having a locking jaw and a nut formed in the same shape as that of the locking jaw and the nut of the lower sphere; A lower locking jaw is formed at the bottom to be coupled to the locking jaw of the vertical sphere, and bolt insertion holes are formed at positions perpendicular to the respective nuts of the vertical sphere at the top thereof, and work holes penetrated eccentrically are formed. And, prefabricated manholes characterized in that formed on the upper end of the manhole cover is seated on the upper sphere. 제 1항에 있어서,The method of claim 1, 상기 걸림턱은 관통된 내측에 연장되어 외측으로 돌출되고, 비스듬하게 경사지게 형성되며, 상단에는 일정깊이만큼 파진 패킹삽입부가 형성된 것을 특징으로 하는 조립식 맨홀.The catching jaw extends through the inner side and protrudes outwardly, and is formed obliquely inclined, and the prefabricated manhole characterized in that the upper end is formed with a packing packing by a predetermined depth. 제 1항에 있어서,The method of claim 1, 상기 연직구체의 고정너트조임홀은 직사각 형상으로 일정깊이 파져 형성되되, 상단은 내부로 갈수록 비스듬하게 좁아지도록 형성된 것을 특징으로 하는 조립식 맨홀.The fixing nut tightening hole of the vertical sphere is formed in a rectangular shape to a predetermined depth, the upper end is a prefabricated manhole characterized in that it is formed to be narrowed obliquely toward the inside. 제 1항 또는 3항에 있어서,The method of claim 1 or 3, 상기 고정너트조임홀의 갯수는 3~5개인 것을 특징으로 하는 조립식 맨홀.Prefabricated manhole, characterized in that the number of the fixing nut tightening hole is 3 to 5. 제 1항에 있어서,The method of claim 1, 상기 하부구체와 연직구체 및 'O'자형너트가 별도로 구성되지 않는 것을 특징으로 하는 조립식 맨홀.Prefabricated manhole, characterized in that the lower sphere and the vertical sphere and the 'O' shaped nut is not configured separately.
KR1020050037717A 2005-05-04 2005-05-04 Construction typemanhole KR100639359B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050037717A KR100639359B1 (en) 2005-05-04 2005-05-04 Construction typemanhole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050037717A KR100639359B1 (en) 2005-05-04 2005-05-04 Construction typemanhole

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR20-2005-0012647U Division KR200391463Y1 (en) 2005-05-04 2005-05-04 Construction type manhole

Publications (2)

Publication Number Publication Date
KR20060033697A true KR20060033697A (en) 2006-04-19
KR100639359B1 KR100639359B1 (en) 2006-10-30

Family

ID=37142794

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050037717A KR100639359B1 (en) 2005-05-04 2005-05-04 Construction typemanhole

Country Status (1)

Country Link
KR (1) KR100639359B1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100851638B1 (en) * 2007-10-08 2008-08-13 건영건설 주식회사 A prefabricated manhole which is easy to regulate the location and construction
KR100856716B1 (en) * 2008-01-07 2008-09-04 (주) 대화레이져 Combine structure for a sectional manhole
KR100877322B1 (en) * 2008-09-19 2009-01-07 주식회사 퍼팩트 Method for manufacturing a assembly type manhole with complex function and assembly type manhole with complex function using the same
KR100919283B1 (en) * 2007-08-22 2009-09-30 주식회사 태성 Manhole fastening apparatus
US11390717B2 (en) 2016-11-04 2022-07-19 Lg Chem, Ltd. Coating composition

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100665267B1 (en) 2006-08-29 2007-01-09 화평산업(주) Manhole structure and manufacturing method of the same
KR102030351B1 (en) 2019-06-25 2019-11-08 동양특수콘크리트 (주) Structure connection top and bottom of manhole
CN111021418A (en) * 2019-11-21 2020-04-17 江苏永联精筑建设集团有限公司 Inspection well cover seat mounting process

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100919283B1 (en) * 2007-08-22 2009-09-30 주식회사 태성 Manhole fastening apparatus
KR100851638B1 (en) * 2007-10-08 2008-08-13 건영건설 주식회사 A prefabricated manhole which is easy to regulate the location and construction
KR100856716B1 (en) * 2008-01-07 2008-09-04 (주) 대화레이져 Combine structure for a sectional manhole
KR100877322B1 (en) * 2008-09-19 2009-01-07 주식회사 퍼팩트 Method for manufacturing a assembly type manhole with complex function and assembly type manhole with complex function using the same
US11390717B2 (en) 2016-11-04 2022-07-19 Lg Chem, Ltd. Coating composition

Also Published As

Publication number Publication date
KR100639359B1 (en) 2006-10-30

Similar Documents

Publication Publication Date Title
KR100639359B1 (en) Construction typemanhole
KR200391463Y1 (en) Construction type manhole
KR100892593B1 (en) Assembly manhole
KR100701324B1 (en) Assembly type manhole
KR100982819B1 (en) A prefabricated drain-road
KR200423070Y1 (en) the structure of united prefabricated manhole
KR20100131680A (en) A manhole be prefabrication laminated solidarity construction
KR100415965B1 (en) Built-up Mold for Preventing Pollution, and Manhole and Retaining Wall by Using the Same, and Method for Construction the Manhole and Retaining Wall
KR20070076560A (en) Sectional manhole
KR100665210B1 (en) Concrete mold for manhole manufacture
KR20100121206A (en) Manhole apparatus and method for constructing the same
CA2742262C (en) Interlocking ballast block
KR100677709B1 (en) Producing machine for assembly method manhole
KR200371890Y1 (en) assembly method manhole and production machine therefore
KR200394012Y1 (en) Prefabricated manhole
KR100549238B1 (en) Construction type manhole for sewerage
KR101715132B1 (en) Assembling Construction Method Using Divided Manhole For Water Supply And Drainage
KR20150002706U (en) Reinforcement type of body connection part pc manhole
JP3714801B2 (en) Aquarium
KR200342265Y1 (en) Hume concrete pipe connection structure
KR20210051130A (en) Fixing well cover of underground water
KR200192083Y1 (en) Sectional manhole
CN219604556U (en) Vertical bridge direct-buried piece device
KR101081034B1 (en) The culvert unit with the coupler which being installed in the rear side and construction method using it
KR100749580B1 (en) Lining concrete manhole blocks, manufacturing method and installation method of the chemical resin lining manhole blocks which uses the installation structure and this liner of the chemical resin liner

Legal Events

Date Code Title Description
A201 Request for examination
G15R Request for early opening
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
J204 Invalidation trial for patent
J121 Written withdrawal of request for trial
FPAY Annual fee payment

Payment date: 20121018

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20131017

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20141015

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20151019

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20161020

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20171020

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20181120

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20191113

Year of fee payment: 14