KR20060026920A - Ground rod and high strength reduction underground laying construction method by Auger drilling method - Google Patents

Ground rod and high strength reduction underground laying construction method by Auger drilling method Download PDF

Info

Publication number
KR20060026920A
KR20060026920A KR1020060012567A KR20060012567A KR20060026920A KR 20060026920 A KR20060026920 A KR 20060026920A KR 1020060012567 A KR1020060012567 A KR 1020060012567A KR 20060012567 A KR20060012567 A KR 20060012567A KR 20060026920 A KR20060026920 A KR 20060026920A
Authority
KR
South Korea
Prior art keywords
ground
auger
rod
construction
drilling
Prior art date
Application number
KR1020060012567A
Other languages
Korean (ko)
Inventor
서재천
Original Assignee
(주)나우스넷
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)나우스넷 filed Critical (주)나우스넷
Priority to KR1020060012567A priority Critical patent/KR20060026920A/en
Publication of KR20060026920A publication Critical patent/KR20060026920A/en

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D3/00Wind motors with rotation axis substantially perpendicular to the air flow entering the rotor 
    • F03D3/02Wind motors with rotation axis substantially perpendicular to the air flow entering the rotor  having a plurality of rotors
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D3/00Wind motors with rotation axis substantially perpendicular to the air flow entering the rotor 
    • F03D3/06Rotors
    • F03D3/061Rotors characterised by their aerodynamic shape, e.g. aerofoil profiles
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05BINDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
    • F05B2240/00Components
    • F05B2240/20Rotors
    • F05B2240/21Rotors for wind turbines
    • F05B2240/211Rotors for wind turbines with vertical axis
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/74Wind turbines with rotation axis perpendicular to the wind direction

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

본 발명은 신설도로 및 기존도로의 도로설비 건설과정에서 오거천공 공법에 의한 접지동봉 및 고강도 저감재 지중매설 시공방법에 관한 것으로, 기존 고강도접지판 및 고강도접지봉, 일반접지봉을 이용한 시공시 발생되는 민원 문제, 자연훼손, 공사기간 지연 등 시공에 따른 품질 경쟁력을 향상시키기 위한 것이다.

이를 위하여 본 발명에서는 상기 시공방법에 있어서, (1)오거(Auger)천공 크레인 장비로 지하 1M ~ 10M 깊이로 천공을 하는 단계, (2)오거천공 단계 후 접지동봉(1,800mm)을 나동선으로 용접 또는 성단하여 지하에 깊이 묻는 단계, (3)접지동봉을 꼽은 구멍(Hole) 안으로 고강도 저감재를 살포하여 접착면을 확장함과 동시에 대지와의 접착면을 최대한 확대하는 단계, (4)오거천공 작업을 접지동봉간의 간격 1M ~ 10M로 조정하여 천공을 한 후 (2),(3)의 단계를 계속하면서 낮은(목표) 접지저항 이하의 저항 값이 나오도록 연속적으로 연결 작업을 하는 단계, (5)접지동봉과 접지동봉 사이의 땅을 파서 접지 나동선을 연결하고 되메우기를 하는 단계를 거쳐 이루어진다. 이러한 시공방법은 시설면적을 최소화하며, 대지비 저항의 능률을 향상시키고 또한, 경년변화가 거의 없어 반영구적인 접지 효과를 얻을 수 있다.

Figure 112006501175357-PAT00001

오거(Auger)천공 공법, 접지동봉, 고강도 저감재, 대지비저항, 사리도 법면, 나동선, 고강도접지판

The present invention relates to a ground rod and a high-strength reducing material underground construction method by the auger boring method in the construction of road equipment on new roads and existing roads, civil complaints generated when using the existing high strength ground plate, high strength ground rod, general ground rod This is to improve the quality competitiveness due to construction such as problems, natural damage, delay in construction period.

To this end, in the present invention, in the above construction method, (1) auger (Auger) drilling crane equipment to drill the depth of 1M ~ 10M underground, (2) after the auger drilling step the grounding rod (1,800mm) welded with a bare wire Or deeply buried underground and (3) spreading the adhesive surface by spreading the high-strength reducing material into the hole where the ground rod is inserted, and at the same time expanding the adhesive surface with the earth as much as possible, (4) auger drilling Adjust the work to the distance between 1M and 10M between the ground rods, and then carry out the drilling (2) and (3) to continuously connect the wires so that the resistance value is lower than the low (target) ground resistance. 5) Dig the ground between the grounding rod and grounding rod to connect the grounding bare wire and backfill. This construction method minimizes the area of the facility, improves the efficiency of the ground-to-earth resistance, and achieves semi-permanent grounding effect with little change in secular age.

Figure 112006501175357-PAT00001

Auger drilling method, grounding rod, high strength reducing material, earth resistivity, saori road surface, bare copper wire, high strength ground plate

Description

오거(Auger)천공 공법에 의한 접지동봉 및 고강도 저감재 지중매설 시공방법{omitted}Ground rod and high-strength reduction material underground laying method by Auger drilling method

도 1 : 본 발명 공법에 대한 개요도1: Schematic diagram of the process of the present invention

1. 접지동봉1. Grounding rod

2. 고강도 저감재2. High strength reducing material

3. 오거 천공3. Auger Perforation

4. 나동선4. Na Line

도 2 : 기존 고강도 접지판 시공도2: Construction of existing high strength ground plate

5. 고강도 접지판5. High strength ground plate

6. 법면(사리도)6. Law (Sarido)

도 3 : 본 발명 공법에 대한 작업 공정도Figure 3: Work flow diagram for the method of the present invention

(1) 터파기(1) trench

(2) 오거 크레인 설치(2) Auger Crane Installation

(3) 오거 천공 작업(3) Auger drilling work

(4) 접지동봉 및 고강도 저감재 투입(4) Input grounding rod and high strength reducing material

(5) 되메우기(5) backfill

본 발명은 신설도로 및 기존도로의 도로설비 건설과정에서 필요한 접지시공시 도로 법면에 오거천공 공법에 의한 접지동봉 및 고강도 저감재 지중매설 시공방법에 관한 것으로, 기존 현장설비 설치개소는 일반접지봉공법, 고강도접지판공법, 고강도접지봉공법을 기본으로 적용하되, 전 개소에 대해 대지비저항을 측정하여 적용하고 있다. 일반 접지봉을 이용한 시공방법은 접지봉의 머리가 버섯 형태로 되지 않게 하여야 하며, 피막이 되어 있는 경우 피막이 벗겨지지 않도록 조심하여 타입한다.The present invention relates to a ground rod and a high-strength reducing material underground construction method by the auger boring method on the ground surface required in the construction of road equipment on the new road and the existing road, the existing field installation point is a general ground rod method, The high strength ground plate method and the high strength ground rod method are applied as a basis, but the earth resistivity is measured and applied to all places. The construction method using a general ground rod shall not prevent the head of the ground rod from becoming a mushroom type, and if it is a coating, be careful not to peel off the coating.

접지선(연동연선)과 지표와의 간격이 75cm 이상이 되도록 지하에 매설하여야 하며, 통신용 접지시설과 수배전 시설용 지중 매설도체는 최소 10m 이상 격리되어야 한다.It should be buried underground so that the distance between the ground wire (connected twisted pair) and the ground is not less than 75cm, and the grounding conductor for telecommunication grounding facilities and water distribution facilities should be isolated at least 10m.

접지봉을 지하에 매설할 때에는 직경 30cm, 깊이 60cm의 구덩이를 파고 접지봉을 땅에 설치하되 접지봉의 머리가 구덩이의 밑바닥에서 15cm 더 들어가도록 해야하며, 접지봉용 리드선으로 지상에 연결해야 한다.When the ground rod is buried underground, a pit 30cm in diameter and 60cm in depth should be dug and the ground rod should be installed in the ground, but the head of the ground rod should be 15cm further from the bottom of the pit, and the ground rod lead should be connected to the ground.

고강도 접지판을 이용한 시공방법은 도 2에서와 같이 폭 30cm, 깊이 60cm 이상의 터파기를 하며, 현장여건에 따라 폭과 깊이 조정이 가능하다. 주접지용 GV전선과 고강도 접지판의 리드선과의 접지선 연결을 이질금속 슬리브를 사용하여 접속한 후 열수축튜브로 마감 처리한다. 접지공사 시공 후 흙으로 되메우기 작업을 한다.Construction method using a high-strength ground plate, as shown in Figure 2, the width 30cm, more than 60cm deep trench, it is possible to adjust the width and depth according to the site conditions. The ground wire connection between the main grounding GV wire and the lead wire of the high strength ground plate is connected with a heterogeneous metal sleeve and finished with heat shrink tube. After earthing construction, backfill with soil.

이러한 기존 공법에 의한 공사시 사리도 법면의 중간대지가 취약해짐에 따라 토사 유실의 위험이 발생한다. 또한 도로 법면부 작업 환경이 협소하여 작업공간을 확보하기가 어렵고 도로의 우수 측구, 암반, 옹벽등의 장애물로 인하여 시공품질 확보에 어려움이 있다. 상기 공법으로 도시 근교 및 도심지역에 도로변 통신설비를 위한 접지 공사시 주변 시설물에 대한 훼손으로 민원이 다발로 발생하여 오히려 공사기간이 장시간 지연되는 문제점이 발생하게 된다.In case of construction by the existing construction method, as the middle ground of Sarido law becomes weak, there is a risk of soil loss. In addition, due to the narrow working environment of the road front part, it is difficult to secure a working space and it is difficult to secure construction quality due to obstacles such as excellent sideways, rocks, and retaining walls. With the above method, when grounding for roadside communication facilities in urban suburbs and downtown areas, the complaints are caused by damage to the surrounding facilities, resulting in a delay in the construction period for a long time.

본 발명은 상기와 같은 기존 시공방법에 대한 문제점을 해소하기 위하여 일반접지봉 또는 고강도접지판을 사용하는 대신 오거천공 공법을 사용하여 천공을 한 후 접지동봉 지중 매설시 고강도 저감재를 병행 사용하여 시공하는 것이다.In order to solve the problems of the existing construction method as described above, instead of using a general ground rod or a high strength ground plate to perform the construction using the auger boring method to construct a ground rod enclosed in the underground buried ground using a high strength reducing material in parallel will be.

본 발명 공법으로 시공하므로서 도시근교 및 도심지역 공사시 접지공사 면적을 최소화하여 민원문제를 차단하고, 도로 법면의 녹지공간을 최소로 훼손하므로 자연 환경을 지킬 수 있다. 또한 안정되고 균일한 접지 품질을 제공하여 대지비저항의 능률을 향상시키고자 한다. 시공품질을 향상시킴과 아울러 접지 공사비를 절감하고, 공사방법을 단순화하여 작업 효율을 향상시켜 시공기간을 단축한다.The construction of the present invention can minimize the ground construction area when constructing urban suburbs and urban areas to block civil affairs problems, and to damage the green space of the road surface to a minimum, thereby protecting the natural environment. It also aims to improve the efficiency of the earth resistivity by providing stable and uniform ground quality. In addition to improving construction quality, it also reduces ground construction costs and simplifies construction methods to improve work efficiency and shorten construction period.

기존의 접지동봉과 함께 고강도 저감재를 첨가하여 대지와 일체화가 쉽고 경년변화가 거의 없어 반영구적인 접지 효과를 얻을 수 있다.By adding a high-strength reduction material with the existing ground rod, it is easy to integrate with the earth and there is almost no secular change, and thus a semi-permanent grounding effect can be obtained.

도 3의 공정도를 단계별로 상세히 설명하면 다음과 같다.Referring to the process of Figure 3 in detail step by step as follows.

(1) 터파기(1) trench

현장설비 설치개소 위치에 오거 크레인이 설치되어 굴착할 수 있도록 설치장소를 폭1m, 깊이 1m로 인력 및 장비로 터파기를 한다. 터파기 할 때 토양의 지질 구조에 영향을 최대한 미치지 않게 굴토하는 부위만 조심해서 작업하여야 한다. 접지봉의 직경(Φ)를 감안하여 최소 Φ150 이상의 드릴피트를 사용하여 굴착하여야 한다.The auger crane is installed at the site installation site, and the installation site is excavated with manpower and equipment with a width of 1m and a depth of 1m. When excavating, care should be taken only at areas that excavate, so as not to affect the geological structure of the soil as much as possible. In view of the diameter of the ground rod, excavation should be made using a drill pit of at least Φ150 or more.

(2) 오거(Auger) 크레인장비 설치(2) Installation of Auger Crane Equipment

터파기한 장소에 오거 크레인을 안전수칙에 따라 설치한다.Install the auger crane in the trenched area according to the safety instructions.

(3) 오거 천공 작업(3) Auger drilling work

오거 크레인장비로 Φ150 이상으로 깊이 1M ~ 10M로 굴착을 한다. 굴착을 할 때 토양의 지질구조에 영향을 최대한 미치지 않게 굴토하는 부위만 조심해서 작업하여야 한다.Excavator with auger crane equipment with depth of 1M ~ 10M above Φ150. When excavating, care should be taken only in areas that excavate, so as not to affect the geological structure of the soil as much as possible.

(4) 접지동봉 설치 및 고강도 저감재 투입(4) Installation of ground rod and input of high strength reducing material

접지동봉을 나동선으로 용접 또는 성단하여 지하에 깊이 묻는다. 접지동봉을 넣은 구멍(Hole) 안으로 고강도 저감재를 살포하여 접착면을 확장함과 동시에 대지와의 접착면을 최대한 확대하도록 한다.Weld or starch ground bar with bare copper wire and bury it deep underground. Spread the high-strength reducing material into the hole in which the grounding rod is inserted to expand the bonding surface and to maximize the bonding surface with the earth.

(5) 접지동봉간의 간격을 오거천공 깊이에 따라 1M ~ 10M로 조정하여 (3),(4)의 작업을 반복하면서 낮은(목표) 접지 이하의 저항값이 나오도록 연속적으로 연결작업을 한다.(5) Adjust the distance between earthing rods to 1M ~ 10M according to the depth of auger drilling, and repeat the work of (3) and (4), and connect them continuously so that the resistance value below the low (target) ground is obtained.

(6) 되메우기(6) backfill

접지동봉과 접지동봉 사이의 땅을 깊이 60cm로 굴착하여 나동선을 연결하고 되메우기를 한다.Excavate the ground between the ground bar and the ground bar to a depth of 60cm to connect the bare copper wires and backfill.

본 발명의 시공방법은 기존 일반 접지봉 및 고강도 접지판공법에 비해 다음과 같은 효과를 얻을 수 있다.The construction method of the present invention can obtain the following effects compared to the conventional general ground rod and high strength ground plate method.

(1) 도심지역 민원 방지(1) Prevention of civil complaints in urban areas

가) 좁은 공간에서도 접지공사가 가능하므로 민원발생을 사전에 예방할 수 있다.A) Grounding work is possible even in a narrow space, so civil complaints can be prevented in advance.

나) 접지공사 작업을 한정된 공간에서 가능하므로 주변 시설물에 피해가 없다.B) Grounding work is possible in a limited space, so there is no damage to surrounding facilities.

다) 사전에 지장물 현황을 파악하여 시공하므로 도심지에서 작업하기가 용이하다.C) It is easy to work in the downtown area by understanding the construction of obstacles in advance.

(2) 자연환경 보호(2) Natural environment protection

도로 법면의 훼손을 최소화하므로 법면 잔디를 보호할 수 있음에 따라 자연환경 훼손을 줄일 수 있다.By minimizing the damage to the road surface, it is possible to protect the lawn so that damage to the natural environment can be reduced.

(3) 공사기간 단축(3) shortening construction period

가) 새로운 공법으로 중장비를 집중 활용하므로 단기에 설치 공사가 가능하다.A) The new construction method makes heavy use of heavy equipment, which enables installation in the short term.

나) 공법을 표준화하여 작업능률을 향상시키므로 시공업무 효율이 증가할 수 있다.B) The construction work efficiency can be increased by improving the work efficiency by standardizing the construction method.

(4) 유지 보수 용이성(4) ease of maintenance

가) 경년변화에 따른 추가의 보강 공사가 필요없으므로 유지보수가 편리하다.A) Maintenance is convenient because no additional reinforcement work is needed due to secular variation.

나) 접지 저항값의 변동이 적어 낙뢰, 지락등에 대하여 장비보호가 용이하다.B) It is easy to protect the equipment against lightning and ground fault due to the small variation of the ground resistance value.

(5) 기존 공법과의 비교(5) Comparison with existing construction methods

Figure 112006501175357-PAT00007
Figure 112006501175357-PAT00007

Claims (1)

본 발명은 신설도로 및 기존도로의 도로설비 건설과정에서 필요한 접지시공시 도로법면에 오거천공 공법에 의한 접지동봉 및 고강도 저감재 지중매설 시공방법에 관한 것으로, 기존 현장설비 설치개소에 (1)오거(Auger)천공 크레인 장비로 지하 1M~10M 깊이로 천공을 하는 단계, (2)천공단계 후 접지동봉(1,800mm)을 나동선으로 용접 또는 성단하여 지하에 깊이 묻는 단계, (3) 접지동봉을 꼽은 구멍(Hole) 안으로 고강도 저감재를 살포하여 접착면을 확장함과 동시에 대지와의 접착면을 최대한 확대하는 단계, (4) 천공작업을 접지동봉간의 간격이 1M~10M로 조정하여 천공을 한 후 (2),(3)의 단계를 계속하면서 낮은(목표) 접지 이하의 저항 값이 나오도록 연속적으로 연결 작업을 하는 단계, (5) 접지동봉과 접지동봉 사이의 땅을 깊이 60cm 파서 접지 나동선을 연결하고 되메우기를 하는 단계를 거쳐 접지설비를 시공하는 방법.The present invention relates to a method for laying ground rods and high-strength materials in underground construction by the auger boring method in the ground method required for the construction of road equipment on new roads and existing roads. (Auger) Drilling to the depth of 1M ~ 10M underground with the drilling crane equipment, (2) After the drilling step, weld or starch the grounding rod (1,800mm) with bare copper wire and bury it deeply, and (3) Select the grounding rod. Spread the high strength reducing material into the hole to expand the bonding surface and expand the bonding surface with the earth as much as possible. (4) After drilling by adjusting the distance between the ground rods to 1M ~ 10M Continue connecting (2) and (3) to make the resistance value below the lower (target) ground, and (5) digging the ground between the grounding rod and the grounding rod 60cm deep, Connect Method for construction the ground equipment after the step of the backfilling.
KR1020060012567A 2006-02-09 2006-02-09 Ground rod and high strength reduction underground laying construction method by Auger drilling method KR20060026920A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020060012567A KR20060026920A (en) 2006-02-09 2006-02-09 Ground rod and high strength reduction underground laying construction method by Auger drilling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020060012567A KR20060026920A (en) 2006-02-09 2006-02-09 Ground rod and high strength reduction underground laying construction method by Auger drilling method

Publications (1)

Publication Number Publication Date
KR20060026920A true KR20060026920A (en) 2006-03-24

Family

ID=37138119

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020060012567A KR20060026920A (en) 2006-02-09 2006-02-09 Ground rod and high strength reduction underground laying construction method by Auger drilling method

Country Status (1)

Country Link
KR (1) KR20060026920A (en)

Similar Documents

Publication Publication Date Title
US7600947B2 (en) Method for installing an arch-type underbracing on a utility pole for an overhead line by using extendable excavating unit for auger crane
CN108867692A (en) The protection of city big cross section open trench tunnel Nearby Structure and tunnel foundation pit method for digging
CN111555051A (en) Graphite-based grounding electrode for low-voltage power distribution, grounding device and construction method of grounding device
CN108242604B (en) A kind of electric power line pole tower horizontal grounding resistance-reducing device and construction method
KR102195203B1 (en) Soil blocking method using horizontal Strut and slope Strut
AU2021107346A4 (en) Method for Installing an Earthing System
CN211472506U (en) Do benefit to injection concrete structure of drainage
CN217923610U (en) Deep foundation pit supporting device
KR20060026920A (en) Ground rod and high strength reduction underground laying construction method by Auger drilling method
CN115013004A (en) Supporting structure for shallow-buried bias tunnel to enter hole and construction method
CN212742565U (en) Building foundation pit supporting structure
JP4463867B2 (en) Mechanized construction method for branch line root and extended excavation unit for auger crane for this purpose
KR100740013B1 (en) Method for constructing overhead line pole using extendable excavating unit for auger crane
CN105098389B (en) A kind of method and structure reducing ground resistance using Equipment Foundations
CN109944597B (en) Tunnel entering construction method based on protection of natural vegetation on side and up slopes
CN110277661B (en) Lightning protection grounding construction method capable of continuously maintaining without secondary groove digging
CN103337719B (en) High-frequency Interference protection earth electrode and method for embedding thereof
CN104805825B (en) Pretreatment method adopted before subway tunnel being excavated
CN105113511A (en) Comprehensive foundation pit support construction method for sandstone combined soil layer
CN107119658A (en) Fill out and dig the horizontal deviational survey wire installation and construction method that combine settlement of subgrade
CN108086086A (en) A kind of method repaired structure and exploration coring bituminous paving is repaired using it that drills
CN215008605U (en) Grounding structure suitable for DCS system of rock zone
KR102625776B1 (en) Construction method of CIP retaining wall with improved water protection and ground subsidence prevention function
KR102479045B1 (en) Tunnel construction method using upper earth pressure support steel plate for installation of structures for excavation of unexcavated underground tunnels
KR20070100550A (en) Mechanized counstruction method of earth wire under-bracing using backhoe

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application