- KR20060013175A KR20060013175A KR1020040062028A KR20040062028A KR20060013175A KR 20060013175 A KR20060013175 A KR 20060013175A KR 1020040062028 A KR1020040062028 A KR 1020040062028A KR 20040062028 A KR20040062028 A KR 20040062028A KR 20060013175 A KR20060013175 A KR 20060013175A
- Authority
- KR
- South Korea
- Prior art keywords
- load
- power
- data
- distribution box
- distribution
- Prior art date
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H1/00—Details of emergency protective circuit arrangements
- H02H1/0038—Details of emergency protective circuit arrangements concerning the connection of the detecting means, e.g. for reducing their number
- H02H1/0053—Means for storing the measured quantities during a predetermined time
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H1/00—Details of emergency protective circuit arrangements
- H02H1/0092—Details of emergency protective circuit arrangements concerning the data processing means, e.g. expert systems, neural networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H3/00—Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection
- H02H3/02—Details
- H02H3/04—Details with warning or supervision in addition to disconnection, e.g. for indicating that protective apparatus has functioned
Abstract
본 발명은 분전함용 부하전력 감시장치 및 그 방법에 관한 것으로서, 이에 의하면 주택 분전함에 있어서 직접 단락, 정전, 과부하 등의 사고에 대한 경보 및 데이터 분석 기능을 구비함으로써 수용가가 즉각적으로 이를 인지하고 사고를 분석할 수 있도록 있게 된다.The present invention relates to a load power monitoring device for a distribution box and a method thereof, and according to the present invention, by providing a warning and data analysis function for an accident such as a short circuit, a power failure, or an overload in a home distribution box, a customer immediately recognizes the accident and detects an accident. To be able to analyze.
본 발명에 의한 분전함용 부하전력 감시장치는 분전함에 설치되며, 입력 측 전력의 전류값을 측정하는 전류 측정부와, 입력 및 부하 측의 전력을 차단하는 차단부와, 입력 및 부하 측의 전력상태를 감지하는 센서부와, 상기의 전류 측정부, 차단부, 센서부로부터 출력된 각각의 데이터를 저장하고, 여러 실제상황에 해당되는 음성 메시지 포맷이 미리 저장되는 데이터베이스와, 상기 데이터를 분석 및 처리하고 방송 멘트를 작성하는 데이터 처리부와, 상기 방송 멘트를 방송하기 위한 방송장비를 포함하여 구성된다.The load power monitoring apparatus for distribution boxes according to the present invention is installed in the distribution box, the current measuring unit for measuring the current value of the input side power, the breaker for cutting off the power of the input and load side, the power state of the input and load side A sensor unit for detecting the data, a database storing the respective data output from the current measuring unit, the blocking unit, and the sensor unit, and pre-stored a voice message format corresponding to various actual situations; and analyzing and processing the data. And a data processor for creating a broadcast comment, and a broadcast equipment for broadcasting the broadcast comment.
분전함, 누전, 정전, 과부하, 부하전력, 감시, 마이크로프로세서, 차단기, 센서, SMPS, D/A변환기, 포트, 데이터베이스, 스피커, 디스플레이, 충전기, 부하전류, 영상전류, 트립Distribution box, leakage, power outage, overload, load power, supervision, microprocessor, breaker, sensor, SMPS, D / A converter, port, database, speaker, display, charger, load current, video current, trip
Description
도 1은 본 발명에 의한 분전함용 부하전력 감시장치의 주요구성을 개략 도시한 블럭도.1 is a block diagram schematically showing the main configuration of a load distribution power monitor for distribution box according to the present invention.
도 2는 본 발명에 의한 분전함용 부하전력 감시장치의 동작을 설명하는 플로우 차트.Figure 2 is a flow chart illustrating the operation of the distribution box load power monitoring apparatus according to the present invention.
도 3은 본 실시예에 의한 분전함용 부하전력 감시장치의 주요구성을 개략 도시한 블럭도.3 is a block diagram schematically showing the main configuration of a load distribution monitoring device for a distribution box according to the present embodiment;
도 4는 본 실시예에 의한 분전함용 부하전력 감시장치의 동작을 설명하는 플로우 차트.4 is a flowchart illustrating the operation of the load distribution monitoring device for distribution boxes according to the present embodiment.
본 발명은 분전함용 부하전력 감시장치 및 그 방법에 관한 것으로, 특히 일반 가정 및 소형 상가 등의 수용가에 설치된 분전함에 있어서 단락, 정전, 과부하 등의 사고에 대한 경보 및 데이터 분석 기능을 구비한 분전함용 부하전력 감시장치 및 그 방법에 관한 것이다.The present invention relates to a load power monitoring device for a distribution box and a method thereof, in particular for distribution boxes equipped with alarms and data analysis functions for accidents such as short circuits, power outages, and overloads in distribution boxes installed in customers such as general homes and small shopping malls. It relates to a load power monitoring device and a method thereof.
최근 주택이나 아파트의 전기시설물에 의한 전기사고는 정전이나 화재, 감전 등으로 입주민들에게 크게는 재산이나 인명피해 등의 돌이킬 수 없는 피해를 가져다 줄 수 있다는 점에서 상당히 위험하다. 더구나 정전사고는 매년 전국적으로 발생하면서 입주민들에게 큰 불편을 주고 있는 사례로 꼽히고 있다.Electrical accidents caused by electrical facilities in houses and apartments are extremely dangerous in that they can cause irreversible damages to property, such as property damage or casualties, due to power outages, fires or electric shocks. In addition, the blackout accidents occur nationwide every year and are considered to be a great inconvenience to residents.
한국전기공사협회(KECA)의 조사에 의하면, 전기시설물 사고유형은 지락, 기기소손, 부동작, 단락, 탄화, 용단, 파손, 붕괴 등의 순으로 나타났으며, 특히 이 중에서도 주택에서 발생하는 전기사고는 단락이나 용단에 의한 경우가 가장 많았다.According to the survey by KECA, the types of accidents of electrical facilities were ground, equipment damage, malfunction, short circuit, carbonization, melting, breakage, collapse, among others. Accidents were most often caused by short circuits or blows.
이러한 전기사고에 의한 피해발생을 방지하기 위하여 종래부터 각 가정에서 사용되어 온 전기 분전함은 배선용 차단기(NFB: No Fuse Breaker)와 누전 차단기(ELCB: Earth Leakage Circuit Breaker)와 같은 간단한 전기 차단기만을 다수 구비한 것으로, 보통 정격값 이상의 지락전류나 누전전류, 또는 과전류를 검출하여 외부로부터의 전력공급을 차단하게 된다.In order to prevent damage caused by such electric accidents, electric distribution boxes which have been conventionally used in each household are provided with only a simple electric breaker such as a No Fuse Breaker (NFB) and an Earth Leakage Circuit Breaker (ELCB). In this case, the ground current, the leakage current, or the overcurrent of the rated value or more is detected to cut off the power supply from the outside.
상기 배선용 차단기는 개폐기구, 트립(Trip) 장치 등을 절연물 용기내에 일체로 조립한 것으로, 통전상태의 전로를 수동 또는 전기 조작에 의해 개폐 가능하며, 과부하 및 단락 등의 발생 시 자동적으로 전류를 차단하는 기능을 한다.The circuit breaker is an assembly of a switchgear, a trip device, and the like in an insulated container. The circuit breaker can be opened or closed by manual or electrical operation, and automatically cuts off the current when an overload or a short circuit occurs. Function.
또한, 상기 누전 차단기는 상기 배선용 차단기와 마찬가지로 구조로 되며, 과부하 및 단락뿐만 아니라 누전발생 시에도 자동적으로 전류를 차단하는 기능을 한다. 특히, 내부 회로에 영상 변류기를 넣어 누전에 의한 가선의 전류차를 검출함으로써 경우에 따라 회로를 자동적으로 차단하여 사고를 방지하게 된다.In addition, the earth leakage breaker has a structure similar to the circuit breaker for the wiring, and functions to automatically cut off the current in the event of a short circuit as well as an overload and a short circuit. In particular, by inserting an image current transformer in the internal circuit to detect the current difference of the wire due to a short circuit, the circuit is automatically cut off in some cases to prevent an accident.
그러나, 종래의 분전함은 단지 회로의 차단기능만을 수행할 뿐, 상기와 같은 전기 차단기의 오동작 여부나 부하측 선로의 과부하 상태 또는 누전 및 정전상태 등을 표시하거나 이를 경보하는 기능이 없었다. 따라서, 수용가로서는 상기와 같은 사고의 발생을 인지하거나 미연에 방지할 수 있는 방법이 없어, 사고에 따른 위험도의 증가뿐만 아니라 사고의 재발우려가 상존하고 있는 실정이다.However, the conventional distribution box only performs a circuit breaking function, and has no function of displaying or alarming the malfunction of the electrical circuit breaker as described above, an overload state of a load-side line, or a short circuit or power failure. Therefore, there is no way for the consumer to recognize or prevent the occurrence of such an accident, and there is a risk of recurrence as well as an increase in the risk of the accident.
이에, 본 발명은 상기와 같은 문제점을 해결하기 위해 창안된 것으로, 본 발명의 목적은 주택 분전함에 있어서 직접 단락, 정전, 과부하 등의 사고에 대한 경보 및 데이터 분석 기능을 구비하여 수용가가 즉각적으로 이를 인지하고 사고를 분석할 수 있도록 하는 분전함용 부하전력 감시장치 및 그 방법을 제공하는데 있다.Accordingly, the present invention was devised to solve the above problems, and an object of the present invention is to provide an alarm and data analysis function for an accident such as a short circuit, a power failure, an overload, etc. in a home distribution box, and a customer immediately receives it. The present invention provides a load power monitoring device for distribution boxes and a method thereof for recognizing and analyzing an accident.
이와 같은 목적을 달성하기 위한 본 발명의 특징으로서, 본 발명에 의한 분전함용 부하전력 감시장치는 입력된 전력이 다수의 부하로 배전되는 분전함 내에 설치되어 배전상태를 감시하는 분전함용 부하전력 감시장치에 있어서, 입력 측 전력의 전류값을 측정하는 전류 측정부와, 입력 및 부하 측의 전력을 차단하는 차단부와, 입력 및 부하 측의 전력상태를 감지하는 센서부와, 상기의 전류 측정부, 차단부, 센서부로부터 출력된 각각의 데이터를 저장하고, 여러 실제상황에 해당되는 음성 메시지 포맷이 미리 저장되는 데이터베이스와, 상기 데이터를 분석 및 처리하고 방송 멘트를 작성하는 데이터 처리부와, 상기 방송 멘트를 방송하기 위한 방송장비를 포함하는 것을 특징으로 한다.As a feature of the present invention for achieving the above object, the distribution box load power monitoring device according to the present invention is installed in the distribution box that the input power is distributed to a plurality of loads in the distribution box load power monitoring device for monitoring the distribution state A current measuring unit for measuring the current value of the input side power, a breaker for cutting off the power of the input and load side, a sensor unit for sensing the power state of the input and load side, the current measuring unit, And a database in which each data output from the sensor unit is stored, and a voice message format corresponding to various actual situations is stored in advance, a data processing unit for analyzing and processing the data, and creating a broadcast comment; It characterized in that it comprises a broadcast equipment for broadcasting.
또한, 본 발명의 다른 특징으로서, 상기 전류 측정부는 부하전류를 측정하는 변류기와, 영상전류를 측정하는 차동 증폭기로 구성되는 것을 특징으로 한다.In addition, as another feature of the present invention, the current measuring unit is characterized by comprising a current transformer for measuring the load current, and a differential amplifier for measuring the image current.
또한, 본 발명의 다른 특징으로서, 상기 차단부는 입력 측에 설치되는 누전 차단기와, 부하 측에 설치되는 배선 차단기로 구성되는 것을 특징으로 한다.In addition, as another feature of the present invention, the breaker is characterized by consisting of a circuit breaker provided on the input side and a circuit breaker provided on the load side.
또한, 본 발명의 다른 특징으로서, 상기 센서부는 포토 커플러로 되는 것을 특징으로 한다.In another aspect of the present invention, the sensor unit is characterized in that the photo coupler.
또한, 본 발명의 다른 특징으로서, 상기 데이터 처리부는 상기 데이터를 분석하고, 상기 데이터베이스로부터 각 실제상황에 해당되는 상기 음성 메시지 포맷을 추출하여 이에 상기 데이터를 삽입 및 편집하고 방송 멘트로 편집하는 마이크로 프로세서와, 상기 방송멘트를 아날로그 신호로 변환하는 D/A 변환기로 구성되는 것을 특징으로 한다.In another aspect of the present invention, the data processor analyzes the data, extracts the voice message format corresponding to each actual situation from the database, inserts and edits the data, and edits the broadcast message. And a D / A converter for converting the broadcastment into an analog signal.
또한, 본 발명의 다른 특징으로서, 상기 마이크로 프로세서는 외부 유·무선 통신망과 접속하여 통신하는 것을 특징으로 한다.In another aspect of the present invention, the microprocessor is characterized in that the communication with the external wired and wireless communication network.
또한, 본 발명의 다른 특징으로서, 상기 방송장비는 스피커 또는 디스플레이 장치 중의 적어도 어느 하나 이상을 포함하는 것을 특징으로 한다.In addition, as another feature of the present invention, the broadcast equipment is characterized in that it comprises at least one or more of a speaker or a display device.
또한, 본 발명의 다른 특징으로서, 상기 분전함용 부하전력 감시장치는 자체적으로 충전되는 SMPS(Switching Mode Power Supply)를 더 포함하는 것을 특징으로 한다.In addition, as another feature of the present invention, the distribution box load power monitoring device is characterized in that it further comprises a switching mode power supply (SMPS) that is charged itself.
또한, 본 발명의 다른 특징으로서, 본 발명에 의한 분전함용 부하전력 감시방법은 입력된 전력이 다수의 부하로 배전되는 분전함의 배전상태를 감시하는 분전 함용 부하전력 감시방법에 있어서, 부하전류값과 영상전류값을 측정하고, 이를 마이크로 프로세서에 입력하여 데이터베이스에 저장하는 단계와, 누전 차단기의 차단여부를 감지하여 누전이 발생하였음을 인지하는 단계와, 누전이 발생한 경우, 실시간으로 측정된 부하전류값과 영상전류값 및 차단기의 트립시간 등의 데이터를 마이크로 프로세서에 입력하고 데이터베이스에 저장하는 단계와, 상기 데이터베이스로부터 해당 음성 메시지 포맷을 추출하고 이에 상기 데이터를 삽입 및 편집하여 누전 안내 방송 멘트를 완성하는 단계와, 상기 누전 안내 방송 멘트를 아날로그 음성신호로 변환하고 이를 방송하는 단계를 포함하는 것을 특징으로 한다.In addition, as another feature of the present invention, the distribution box load power monitoring method according to the present invention is a distribution box load power monitoring method for monitoring the distribution state of the distribution box in which the input power is distributed to a plurality of loads, the load current value and Measuring the image current value, inputting it to the microprocessor and storing it in the database, and detecting whether the leakage circuit breaker is cut off to recognize that a short circuit has occurred, and in the case of a short circuit, the load current value measured in real time And inputting data such as an image current value and a circuit breaker trip time into a microprocessor and storing the data in a database, extracting a corresponding voice message format from the database, and inserting and editing the data to complete a short circuit announcement. And converting the ground fault announcement to an analog voice signal. Characterized in that it comprises the step of broadcasting them.
또한, 본 발명의 다른 특징으로서, 본 발명에 의한 분전함용 부하전력 감시방법은 입력된 전력이 다수의 부하로 배전되는 분전함의 배전상태를 감시하는 분전함용 부하전력 감시방법에 있어서, 부하전류값과 영상전류값을 측정하고, 이를 마이크로 프로세서에 입력하여 데이터베이스에 저장하는 단계와, 입력 측 센서의 출력여부를 감지하여 정전이 발생하였음을 인지하는 단계와, 정전이 발생한 경우, 정전시간 등의 데이터를 마이크로 프로세서에 입력하고 데이터베이스에 저장하는 단계와, 상기 데이터베이스로부터 해당 음성 메시지 포맷을 추출하고 이에 상기 데이터를 삽입 및 편집하여 정전 안내 방송 멘트를 완성하는 단계와, 상기 정전 안내 방송 멘트를 아날로그 음성신호로 변환하고 이를 방송하며, 비상램프를 점등하는 단계를 포함하는 것을 특징으로 한다.In addition, as another feature of the present invention, the distribution box load power monitoring method according to the present invention, in the distribution box load power monitoring method for monitoring the distribution state of the distribution box in which the input power is distributed to a plurality of loads, the load current value and Measuring the image current value, and inputting it to the microprocessor and storing it in the database, Recognizing the output of the sensor on the input side to recognize that a power failure has occurred, and in the event of a power failure, data such as power failure time Inputting to a microprocessor and storing in a database, extracting a corresponding voice message format from the database, inserting and editing the data to complete a power outage announcement, and converting the outage announcement into an analog voice signal. Converting and broadcasting the same, lighting the emergency lamp; It is characterized by.
또한, 본 발명의 다른 특징으로서, 본 발명에 의한 분전함용 부하전력 감시방법은 입력된 전력이 다수의 부하로 배전되는 분전함의 배전상태를 감시하는 분전 함용 부하전력 감시방법에 있어서, 부하전류값과 영상전류값을 측정하고, 이를 마이크로 프로세서에 입력하여 데이터베이스에 저장하는 단계와, 부하전류값과 정격전류값의 크기를 비교하여 과부하가 발생하였음을 인지하는 단계와, 과부하가 발생한 경우, 배선 차단기의 차단상태를 센서로 감지하여 차단된 배선 차단기의 번호 및 차단상태 등의 데이터를 마이크로 프로세서에 입력하고 데이터베이스에 저장하는 단계와, 상기 데이터베이스로부터 해당 음성 메시지 포맷을 추출하고 이에 상기 데이터를 삽입 및 편집하여 과부하 안내 방송 멘트를 완성하는 단계와, 상기 과부하 안내 방송 멘트를 아날로그 음성신호로 변환하고 이를 방송하는 단계를 포함하는 것을 특징으로 한다.In addition, as another feature of the present invention, the distribution box load power monitoring method according to the present invention is a distribution box load power monitoring method for monitoring the distribution state of the distribution box in which the input power is distributed to a plurality of loads, the load current value and Measuring the image current value, inputting it to the microprocessor and storing it in a database; comparing the magnitude of the load current value with the rated current value and recognizing that an overload has occurred; Sensing the cutoff state with a sensor and inputting data such as the number and cut-off state of the cut-off circuit breaker into the microprocessor and storing it in a database; extracting the corresponding voice message format from the database, inserting and editing the data; Completing an overload announcement, and the overload announcement. A characterized in that it comprises a step of converting an analog audio signal and broadcast it.
또한, 본 발명의 다른 특징으로서, 상기 분전함용 부하전력 감시방법은 상기 완성된 방송 멘트를 디스플레이 장치에 시각적으로 표시하는 단계를 더 포함하는 것을 특징으로 한다.In addition, as another feature of the present invention, the load distribution monitoring method for the distribution box is characterized in that it further comprises the step of visually displaying the completed broadcast on the display device.
이하, 본 발명의 구성을 첨부된 도면을 참조하여 상세히 설명한다.Hereinafter, the configuration of the present invention will be described in detail with reference to the accompanying drawings.
본 발명에 의한 분전함용 부하전력 감시장치는 일반 주택이나 아파트, 또는 소형 상가의 분전함에 있어서 입력 전원과, 부하 측 전압 및 전류를 실시간으로 측정하여 부하 측의 단락사고 또는 입력 측의 정전사고, 과부하 등의 데이터를 저장 및 분석하고, 동시에 이를 음성메시지로 수용가에게 송출, 방송한다.The load power monitoring apparatus for distribution boxes according to the present invention measures input power, load side voltage and current in real time in a distribution box of a general house or apartment, or a small mall, and a short circuit accident on the load side or an electrostatic accident on the input side, and an overload Data is stored and analyzed, and at the same time, the voice message is transmitted and broadcasted to the customer.
도 1은 본 발명에 의한 분전함용 부하전력 감시장치의 주요구성을 개략 도시한 블럭도이다.1 is a block diagram schematically showing the main configuration of a load distribution monitoring device for a distribution box according to the present invention.
본 발명에 의한 분전함용 부하전력 감시장치(1)는 입력단에 접속된 전력선에 흐르는 전류의 값을 측정하는 전류 측정기(2)와, 누전 시 전력을 차단하는 누전 차단기(3)와, 과부하 시 각 부하(7)로의 전력배선을 차단하는 배선용 차단기(4)와, 입력 측과 부하 측의 차단상태를 감지하는 센서(5, 6)와, SMPS(Switching Mode Power Supply: 9) 등을 포함하며, 이들이 출력하는 데이터를 입력받아 분석, 해당 음성 메시지 송출 등의 제반 작업을 관리, 수행하는 마이크로 프로세서(8) 및 데이터베이스(12), 방송을 위한 D/A 변환기(13) 및 방송앰프(14)와 스피커(15) 등을 포함한다. 이 때, SMPS(9)는 전력이 차단되었을 때 사용되는 전원장치이며, 평상 시에는 충전기(10)로써 충전을 하고, 전력이 차단되었을 때에는 비상전원으로서 사용된다.Distribution load monitoring device 1 for distribution boxes according to the present invention is a current measuring device (2) for measuring the value of the current flowing in the power line connected to the input terminal, a leakage circuit breaker (3) for cutting off the power in the case of a short-circuit, overload time A circuit breaker 4 for interrupting power wiring to the load 7,
또한, 분전함용 부하전력 감시장치(1)는 외부와의 유·무선 통신을 위한 I/O 포트(11)와, 각 상황의 데이터 등을 표시하는 디스플레이 장치(16)를 더 포함한다.The distribution box load power monitoring device 1 further includes an I /
도 2는 본 발명에 의한 분전함용 부하전력 감시장치(1)의 동작을 설명하는 플로우 차트이다.2 is a flowchart illustrating the operation of the load distribution monitoring device 1 for distribution boxes according to the present invention.
먼저 전력이 입력되면, 상기 전류 측정기(2)는 입력된 전력의 부하전류값과 영상전류값 등의 데이터를 실시간으로 측정하여 이를 마이크로 프로세서(8)로 입력하고, 마이크로 프로세서(8)는 상기 데이터를 이에 부속된 데이터베이스(12)에 저장한다(S201). 이 때, 상기 부하전류값 및 영상전류값은 통상의 방법으로 측정하며, 바람직하기로는 상기 부하전류값은 변류기(CT)를 사용하여 측정하고, 상기 영상전류값은 상기 변류기에서 각각 측정한 전류값의 차이를 차동증폭기 등을 사용하여 측정한다.First, when power is input, the
누전 시 누전 차단기(3)가 차단되면(S202), 이 때의 부하전류값 및 영상전류값, 트립(Trip) 시간 등의 데이터를 마이크로 프로세서(8)에 입력하여 데이터베이스(12)에 저장한다(S203). 그리고, 마이크로 프로세서(8)는 상기 데이터베이스(12)에 미리 저장되어있는 누전용 음성 메시지 포맷을 추출하고, 이에 상기 데이터를 입력·편집하여 방송멘트를 완성한 후(S204), 이를 D/A 변환기(13)를 통하여 아날로그 신호로 변환하고 방송앰프(14)로 증폭하여, 스피커(15)로 누전 안내방송을 하게 된다(S205).When the
즉, 상기 누전을 포함한 기타 정전, 과부하 등의 여러 상황에 적합한 음성 메시지 포맷은 WAV 파일 등으로 상기 데이터베이스(12)에 미리 저장되며, 마이크로 프로세서(8)에 의하여 상기와 같이 실제 상황에 적합한 음성 메시지 포맷이 추출되어진다. 마이크로 프로세서(8)에 입력되는 여러 데이터는 텍스트 음성 합성장치(TTS: Text to Speech System) 등을 이용하여 음성 데이터로 변환되고, 이는 앞서 추출한 상기 WAV 파일에 삽입ㆍ편집됨으로써 방송멘트가 완성되어진다.That is, a voice message format suitable for various situations such as a power failure and an overload, such as a short circuit, is pre-stored in the
또한, 정전 시에는 입력 측의 센서(5)가 이를 감지하여(S206), 정전시간 등의 데이터를 마이크로 프로세서(8)에 입력하여 데이터베이스(12)에 저장하고(S207), 앞서와 마찬가지의 과정으로 정전 안내방송을 하게 되며, 동시에 비상 램프를 점등한다(S208, S209). 상기 센서(5)로는 발광소자와 수광소자의 조합으로 이루어진 광 커플러를 사용함이 바람직하다.In addition, during a power failure, the
과부하 시에는 전류값 측정기(2)에서 실시간으로 측정한 부하전류값이 정격전류값보다 크게 흐르는 경우이며(S210), 부하 측 배선용 차단기(4)의 차단상태를 부하측의 센서(6)로 감지한 후(S211), 특히 트립된 부하 측 배선용 차단기(4)의 번호 및 차단상태 등의 데이터를 마이크로 프로세서(8)에 입력하여 데이터베이스(12)에 저장하고(S212), 앞서와 마찬가지의 과정으로 과부하 안내방송을 한다(S213, S214). 상기 센서(6)로는 광 커플러가 바람직하다.In case of overload, the load current value measured by the current
상기와 같이 데이터베이스(12)에 저장된 모든 데이터는 I/O 포트(11)를 이용한 유·무선 통신망으로 외부 콘솔이나 외부 컴퓨터 등에 제공되어 본 장치의 테스트 또는 정격 파라미터의 설정, 사고분석 등에 이용되며, 또한 반대로 외부 콘솔이나 외부 컴퓨터로부터 필요한 관련 데이터를 업로드받을 수 있게 된다.As described above, all data stored in the
또한, 상기와 같이 각각의 누전 및 정전, 과부하 안내 방송을 음성으로 함과 동시에 디스플레이 장치(16)에 방송 멘트를 시각적으로 표시할 수도 있다.In addition, as described above, the announcements, power failures, and overload guide broadcasts may be visually displayed on the
이하, 본 발명의 바람직한 실시예를 첨부한 도면을 참조하여 더욱 상세히 설명한다. 다만, 본 발명이 하술하는 실시예는 본 발명의 전반적인 이해를 돕기 위하여 제공되는 것이며, 본 발명은 하기 실시예로만 한정되는 것은 아니다.Hereinafter, with reference to the accompanying drawings, preferred embodiments of the present invention will be described in more detail. However, the examples described below are provided to help the overall understanding of the present invention, and the present invention is not limited only to the following examples.
[실시예]EXAMPLE
도 3은 본 실시예에 의한 분전함용 부하전력 감시장치(20)의 주요구성을 개략 도시한 블럭도이다.3 is a block diagram schematically showing the main configuration of the load
본 실시예에서 구현된 분전함용 부하전력 감시장치(20)는 변류기(CT1, CT2: 21)를 사용하여 부하전류를 측정하며, 상기 CT1 및 CT2의 전류 차이를 차동 증폭기(U1: 24)로써 영상전류를 측정한다. 또한, 데이터베이스(12)로서 플레쉬 메모리(Flash Memory: 31)와 EEPROM(Electrically Erasable Programmable Read Only Memory: 32)를 사용하고, 플레쉬 메모리(31)에는 각각 실시간으로 측정된 부하전류값 및 영상전류값, 누전 시 트립(Trip) 시간, 정전 시의 정전시간, 과부하 시의 트립된 부하 측 배선용 차단기(4)의 번호 및 차단상태 등의 데이터가 저장되며, EEPROM(32)에는 음성 메시지 포맷의 데이터가 갱신되어 저장된다. 또한, RTC(Real Time Clock: 33)가 마이크로 프로세서(29)와 인터페이스로 연결되어 실시간으로 트립 및 정전 시간 등을 체크하며, I/O 포트로서 RS-485 통신포트(30)를 사용하여 유·무선 통신망으로 외부콘솔이나 외부 컴퓨터와 연결된다. 또한, SMPS(23)는 자체 충전기(37)에 의하여 충전되며, 정전 시 비상전원으로서 사용된다.The load
도 4는 본 실시예에 의한 분전함용 부하전력 감시장치(20)의 동작을 설명하는 플로우 차트이며, 이는 앞서 설명하였던 도 2의 플로우 차트와 유사하다.4 is a flowchart illustrating the operation of the load
먼저 전력이 입력되면, 부하전류 및 영상전류를 각각 변류기(CT1, CT2: 21)와 차동 증폭기(U1: 24)로 측정하고, 이를 마이크로 프로세서(29)에 입력하여 플레쉬 메모리(31)에 저장한다(S401). 또한, 입력 측 포토 커플러(26)로써 부하 측의 전원인가 여부를 모니터링하여 이를 마이크로 프로세서(29)에 입력한다(S402).First, when power is input, the load current and the image current are respectively measured by the current transformers CT1 and CT2: 21 and the differential amplifiers U1: 24, and are input to the
만일 누전 차단기(ELCB: 21)가 차단되었다면(S403), 변류기(CT1, CT2: 21)와 차동 증폭기(U1: 24)로 측정된 부하전류값 및 영상전류값과, RTC(33)에서 측정된 트립시간 등의 데이터를 마이크로 프로세서(29)에 입력하고, 이를 플레쉬 메모리(31)에 저장한다(S404). 그리고, EEPROM(32)로부터 실제 상황에 해당되는 누전용 음성 메시지 포맷을 추출하고 이에 상기 데이터를 입력 및 편집함으로써 방송멘트를 완성한 후, 이를 D/A 변환기(34) 및 방송앰프(35)로 전송하여 각각 아날로 그 신호 변환 및 증폭하고 스피커(SP: 36)로 누전안내 방송을 송출한다(S405).If the earth leakage breaker (ELCB: 21) is cut off (S403), the load current value and the image current value measured by the current transformers (CT1, CT2: 21) and the differential amplifier (U1: 24), and the RTC (33) Data such as a trip time is input to the
만일 입력 측의 포토 커플러(26)가 소등되었다면(S406), 실시간으로 측정된 정전시간 등의 데이터를 마이크로 프로세서(29)에 입력하여 플레쉬 메모리(31)에 저장한 후(S407), SMPS(23)를 비상전원으로 사용하여 앞서와 마찬가지 방법으로 정전안내 방송을 하고 비상램프를 점등한다(S408).If the
만일 변류기(CT1, CT2: 21)의 전류 측정값이 설정된 정격전류 값보다 크다고 마이크로 프로세서(29)에 의해 판단되면(S409), 트립된 부하 측 배선용 차단기(NFB1~7: 28)의 번호 및 차단상태 등을 부하 측 포토 커플러(27)로 감지하여 이를 마이크로 프로세서(29)에 입력하여 플레쉬 메모리(31)에 저장한 후(S410), 앞서와 마찬가지 방법으로 과부하 안내 방송을 한다(S411).If it is determined by the
이상에서 설명한 바와 같이, 본 발명에 의하면, 일반 가정 및 소형 상가 등의 수용가에 설치된 분전함에서 직접 입력 및 부하 측의 전압, 전류 등의 데이터를 실시간으로 측정하여 단락, 정전, 과부하 등의 사고를 해당 음성 메시지로 안내방송을 하므로, 수용가에서는 상기와 같은 사고의 발생을 손쉽게 인지할 수 있어 이에 대한 대책을 세울 수 있게 된다.As described above, according to the present invention, in a distribution box installed in a consumer such as a general home and a small shopping mall, data such as voltage and current of the input and the load side are measured in real time to deal with an accident such as a short circuit, a power failure, or an overload. Since the announcement is made by voice message, the consumer can easily recognize the occurrence of the above-mentioned accident and can take countermeasures.
또한, 본 발명에서는 사고 전류 및 고장 시간 등의 제반 데이터를 마이크로 프로세서에 실시간으로 입력하고 데이터베이스에 저장하여 두므로, 차후 언제든지 외부 콘솔 또는 외부 컴퓨터를 인터페이스로 연결하여 정확한 사고원인을 분석할 수 있다. In addition, in the present invention, since various data such as an accident current and a failure time are input to the microprocessor in real time and stored in a database, an accurate accident cause can be analyzed at any time by connecting an external console or an external computer to an interface.
아울러 본 발명의 바람직한 실시예는 예시의 목적을 위해 개시된 것이며, 해당 분야에서 통상의 지식을 가진 자라면 누구나 본 발명의 사상과 범위 안에서 다양한 수정, 변경, 부가 등이 가능할 것이고, 이러한 수정, 변경, 부가 등은 특허청구범위에 속하는 것으로 보아야 한다.In addition, the preferred embodiment of the present invention is disclosed for the purpose of illustration, anyone of ordinary skill in the art will be possible to various modifications, changes, additions, etc. within the spirit and scope of the present invention, such modifications, changes, Additions and the like should be considered to be within the scope of the claims.
Claims (12)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020040062028A KR20060013175A (en) | 2004-08-06 | 2004-08-06 | Load power supervising system for a distribution board and the method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020040062028A KR20060013175A (en) | 2004-08-06 | 2004-08-06 | Load power supervising system for a distribution board and the method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20060013175A true KR20060013175A (en) | 2006-02-09 |
Family
ID=37122637
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020040062028A KR20060013175A (en) | 2004-08-06 | 2004-08-06 | Load power supervising system for a distribution board and the method thereof |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20060013175A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100816984B1 (en) * | 2007-02-26 | 2008-03-26 | 손석환 | Switching fire watch control unit |
KR100866523B1 (en) * | 2007-06-28 | 2008-11-05 | 한국통신인터넷기술 주식회사 | Apparatus for calculating power of at least one of server rack |
WO2009110762A2 (en) * | 2008-03-07 | 2009-09-11 | (주)한빛테크 | Automatic digital circuit breaker |
KR101110298B1 (en) * | 2011-10-11 | 2012-02-15 | (주) 엔디엔텍 | Power supply with the real-time sensor monitoring function |
KR101249310B1 (en) * | 2012-11-15 | 2013-04-02 | 손석환 | Switching fire watch control unit |
KR101437372B1 (en) * | 2014-03-10 | 2014-09-15 | 대한민국 | power distributor monitoring apparatus |
-
2004
- 2004-08-06 KR KR1020040062028A patent/KR20060013175A/en active IP Right Grant
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100816984B1 (en) * | 2007-02-26 | 2008-03-26 | 손석환 | Switching fire watch control unit |
KR100866523B1 (en) * | 2007-06-28 | 2008-11-05 | 한국통신인터넷기술 주식회사 | Apparatus for calculating power of at least one of server rack |
WO2009110762A2 (en) * | 2008-03-07 | 2009-09-11 | (주)한빛테크 | Automatic digital circuit breaker |
WO2009110762A3 (en) * | 2008-03-07 | 2009-12-30 | (주)한빛테크 | Automatic digital circuit breaker |
KR101110298B1 (en) * | 2011-10-11 | 2012-02-15 | (주) 엔디엔텍 | Power supply with the real-time sensor monitoring function |
KR101249310B1 (en) * | 2012-11-15 | 2013-04-02 | 손석환 | Switching fire watch control unit |
KR101437372B1 (en) * | 2014-03-10 | 2014-09-15 | 대한민국 | power distributor monitoring apparatus |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101336317B1 (en) | A u-city integration electrical safety management system including real time management and operation of the electrical installation of the large cities like u-city | |
KR101717775B1 (en) | System for Analysising and Predicting Electric Fire using Intelligent Pre-signal Analysis | |
KR101412711B1 (en) | The method and equipment of public address broadcasting system for abnormal load analysis and processing | |
KR101336571B1 (en) | A monitoring system for operating electrical safety management system of vulnerable area to electrical disasters | |
KR101021628B1 (en) | The electric-safety monitoring system managing state of the local leakage curcuit breaker and distributing board | |
KR102057494B1 (en) | Smart electrical accident prevention and energy management system | |
KR101708005B1 (en) | Dc overload and combined arc interruption device | |
KR100900273B1 (en) | Electronic watt hour meter having arc detection function | |
KR20130101472A (en) | Electric installation maintenance method and device | |
JP2020092569A (en) | Abnormal current sign detection system and abnormal current sign detection method | |
KR101713076B1 (en) | Measuring value and operating state indicating system for protection function of protective relay | |
KR101917664B1 (en) | Distribution board having a detecting function of arc type and arc position | |
KR101868433B1 (en) | Photovoltaic power generation system with string block device for preventing solar module string accident | |
CN104777398A (en) | Method and device for insulation monitoring including alarm diagnosis display | |
US20060052956A1 (en) | Power breaking apparatus for prevention of electrical shock | |
KR20060013175A (en) | Load power supervising system for a distribution board and the method thereof | |
KR20190128908A (en) | Apparatus for diagnosing an operation status of a protective equipment for distribution line | |
JP6509029B2 (en) | Distribution board | |
KR20230013231A (en) | Load power monitoring device for distribution box and method therefor | |
KR102036311B1 (en) | Apparatus and method for monitoring gas pressure of gis(gas insulated switchgear) in substation | |
US7684940B2 (en) | Method and system to identify grounding concerns in an electric power system | |
CN112162179B (en) | Power distribution network line fault positioning method and system | |
KR200366993Y1 (en) | Load power supervising system for a distribution board | |
KR102128744B1 (en) | Apparatus for power monitoring of electric power equipment | |
KR102579941B1 (en) | Incoming panels for power facility protection that can detect and block phase loss remotely using a smart wave power remote controller |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||