KR20050109427A - Jointing means of roof for a prefabricated house - Google Patents

Jointing means of roof for a prefabricated house Download PDF

Info

Publication number
KR20050109427A
KR20050109427A KR1020050104403A KR20050104403A KR20050109427A KR 20050109427 A KR20050109427 A KR 20050109427A KR 1020050104403 A KR1020050104403 A KR 1020050104403A KR 20050104403 A KR20050104403 A KR 20050104403A KR 20050109427 A KR20050109427 A KR 20050109427A
Authority
KR
South Korea
Prior art keywords
clip
bolt
sound absorbing
roof
groove
Prior art date
Application number
KR1020050104403A
Other languages
Korean (ko)
Inventor
백종섭
Original Assignee
백종섭
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 백종섭 filed Critical 백종섭
Priority to KR1020050104403A priority Critical patent/KR20050109427A/en
Publication of KR20050109427A publication Critical patent/KR20050109427A/en
Priority to KR1020050118863A priority patent/KR100593462B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D3/00Roof covering by making use of flat or curved slabs or stiff sheets
    • E04D3/36Connecting; Fastening
    • E04D3/361Connecting; Fastening by specially-profiled marginal portions of the slabs or sheets
    • E04D3/362Connecting; Fastening by specially-profiled marginal portions of the slabs or sheets by locking the edge of one slab or sheet within the profiled marginal portion of the adjacent slab or sheet, e.g. using separate connecting elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D3/00Roof covering by making use of flat or curved slabs or stiff sheets
    • E04D3/36Connecting; Fastening
    • E04D3/3608Connecting; Fastening for double roof covering or overroofing
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D3/00Roof covering by making use of flat or curved slabs or stiff sheets
    • E04D3/36Connecting; Fastening
    • E04D3/361Connecting; Fastening by specially-profiled marginal portions of the slabs or sheets
    • E04D3/363Connecting; Fastening by specially-profiled marginal portions of the slabs or sheets with snap action
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D3/00Roof covering by making use of flat or curved slabs or stiff sheets
    • E04D3/36Connecting; Fastening
    • E04D3/361Connecting; Fastening by specially-profiled marginal portions of the slabs or sheets
    • E04D2003/3617Connecting; Fastening by specially-profiled marginal portions of the slabs or sheets with locking or snapping edges located in the thickness of the slab or sheet

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

본 발명은 조립식 건축용 지붕체의 연결부재에 관한 것으로, Z 바 대신에 프레임에 슬라이딩 클립을 요입시키는 별도의 삽입홈이 형성되어져 있으며, 지붕패널 상부로 볼트가 노출되지 않고, 지붕 중도리에 체결되는 볼트리스 공법으로 그 삽입홈의 저면 및 그 삽입홈과 일정거리 이격된 위치에 볼트 위치결정홈이 형성됨으로써 정확한 위치에 슬라이딩 클립과 볼트고정을 배치시킬 수 있고, 누수차단에 안전하며 시공이 용이한 조립식 건축용 지붕체의 연결부재를 제공함에 그 목적이 있다. The present invention relates to a connection member of a prefabricated building roof body, in which a separate insertion groove for inserting a sliding clip into a frame is formed in place of the Z bar, and the bolt is not exposed to the roof panel and is fastened to the roof middle. With the lease method, the bolt positioning groove is formed at the bottom of the insertion groove and at a certain distance away from the insertion groove, so that the sliding clip and the bolt fixing can be arranged at the correct position, and are safe for leakage prevention and easy to install. Its purpose is to provide a connection member for a building roof.

본 발명은 가로 바의 형태로 설치되어 지붕체의 하부 횡방향 지지력을 보강시키기 위한 C형강의 하부지지대와; 그 C형강의 하부지지대의 상면에 안착 조립된 베이스 쉬트과; 상기 베이스 쉬트의 상부에 고정되어 단열 및 흡음 기능을 수행하기 위한 흡음단열재와; 상기 흡음단열재의 중간에 일정 거리가 이격되게 설치되어 상기 흡음단열재의 중간 지지력을 보강하기 위한 Z바와; 상기 Z바의 하부지지대의 상면에 볼트결합되는 슬라이딩 클립과; 상기 슬라이딩 클립에 끼워져 위치결정되며, 고정되는 상부 루프쉬트로 이루어진 지붕체에 있어서, 상기 흡음단열재와 베이스쉬트의 사이에 배치되어, 흡음단열재의 수축력에 대응하고, 흡음단열재를 고정시키면서, 슬라이딩 클립을 그 상면에 형성된 클립삽입홈에 끼워넣어 신속하고 정확하게 슬라이딩 클립의 위치를 결정할 수 있도록 사다리꼴 형상의 클립삽입홈이 형성되어져 있으며, 그 하면 소정부에는 베이스쉬트의 요홈에 대응하는 형태의 삽입리브가 형성되어 베이스쉬트의 요홈 상면에 용이하게 안착되게 된 것을 특징으로 하는 조립식 건축용 지붕체의 연결부재가 제공된다.The present invention is installed in the form of a horizontal bar lower support of the C-shaped steel for reinforcing the lower transverse bearing capacity of the roof body; A base sheet seated and assembled on the upper surface of the lower support of the C-beam; A sound absorbing heat insulating material fixed to an upper portion of the base sheet to perform heat insulation and sound absorption functions; A Z bar for reinforcing an intermediate bearing force of the sound absorbing insulation material by being installed at a predetermined distance from the middle of the sound absorbing insulation material; A sliding clip bolted to an upper surface of the lower support of the Z bar; A roof body composed of an upper roof sheet fitted and positioned to be fixed to the sliding clip, wherein the sliding clip is disposed between the sound absorbing heat insulating material and the base sheet to correspond to the contraction force of the sound absorbing heat insulating material and to fix the sound absorbing heat insulating material. A trapezoidal clip insertion groove is formed so as to be inserted into the clip insertion groove formed on the upper surface thereof so that the position of the sliding clip can be determined quickly and accurately. An insertion rib having a shape corresponding to the groove of the base sheet is formed in a predetermined portion of the lower surface thereof. There is provided a connection member of a prefabricated building roof body, characterized in that it is easily seated on the upper surface of the recess of the base sheet.

본 발명을 적용하면, 프레임 자체가 흡음단열재의 수축에 대응하며, 그 상면 소정부에 클립부재를 삽입하는 삽입홈이 형성되어져 있으므로 현장 시공시 정확한 클립부재의 위치가 결정되어 있으며 그 삽입홈에 슬라이딩 클립을 끼우면 되므로 신속하고 정확한 시공이 가능하다는 잇점이 있으며, 볼트위치를 결정하는 볼트결정홈이 몸체의 소정부에 다수개 형성되어져 있으므로 지붕체의 내구력을 증대시킬 수 있고, 상면에 상부 판재의 적층시 볼트헤드가 노출되지 않아 프레임과 상부 판재와의 공극이 발생되지 않는 장점이 있으며, 연결부재의 양측면에 각각 결합공과 결합돌기가 형성되어져 있으므로 다수의 연결부재를 횡방향으로 간단하게 연결하여 사용할 수 있다는 잇점이 있다.Applying the present invention, the frame itself corresponds to the shrinkage of the sound-absorbing heat insulating material, the insertion groove for inserting the clip member is formed in the predetermined portion of the upper surface, so the exact position of the clip member is determined at the time of construction site, and sliding in the insertion groove Since the clips can be inserted quickly and accurately, they can be quickly and precisely constructed. Since a plurality of bolt decision grooves for determining the bolt position are formed in the predetermined part of the body, the durability of the roof body can be increased, and the upper plate is laminated on the upper surface. When the bolt head is not exposed at the time, the gap between the frame and the upper plate does not occur, and the coupling holes and the coupling protrusions are formed on both sides of the connection member, so that a plurality of connection members can be simply connected in the lateral direction. There is an advantage.

Description

조립식 건축용 지붕체의 연결부재{JOINTING MEANS OF ROOF FOR A PREFABRICATED HOUSE }JOINTING MEANS OF ROOF FOR A PREFABRICATED HOUSE}

본 발명은 조립식 건축용 지붕체의 연결부재에 관한 것으로, 보다 상세하게 Z 바 대신에 슬라이딩 클립을 요입시키는 별도의 삽입홈이 형성되어져 있으며, 지붕패널 상부로 볼트가 노출되지 않고, 지붕 중도리에 체결되는 볼트리스 공법으로 그 삽입홈의 저면 및 그 삽입홈과 일정거리 이격된 위치에 볼트 위치 결정홈이 형성됨으로써 정확한 위치에 슬라이딩 클립과 볼트고정을 배치시킬 수 있고, 누수차단에 안전하며 시공이 용이한 조립식 건축용 지붕체의 연결부재에 관한 것이다.The present invention relates to a connection member of a prefabricated building roof body, in which a separate insertion groove for inserting a sliding clip is formed in place of the Z bar, and the bolt is not exposed to the roof panel and fastened to the roof core. With boltless method, the bolt positioning groove is formed at the bottom of the insertion groove and at a certain distance away from the insertion groove, so that the sliding clip and the bolt fixing can be arranged at the correct position, and it is safe to prevent leakage and easy to install. It relates to a connecting member of a prefabricated building roof.

주지된 바와 같이, 종래의 지붕체는 크게 단열과 흡음, 누수 차단 및 지지력을 높일 수 있는 몇 가지 요소에 중점을 두어 구조화되어 있는 바, 단열성과 흡음성을 높이기 위한 재료는 폴리에스터울 또는 무기단열재인 글라스울을 주로 사용하고 있으나, 수축력이 커서 자체 지지력이 매우 취약하다. As is well known, the conventional roof body is structured with a focus on several factors that can greatly insulate, absorb, leak, and support the bar, and the material for improving the insulation and sound absorption is polyester wool or an inorganic insulation material. The glass wool is mainly used, but the contraction force is large and its own supporting strength is very weak.

따라서 이러한 흡음판재가 내부에 구성되기 위해서는 지붕체(2) 자체가 충분한 지지력을 갖도록 설계되어야 한다.Therefore, in order for the sound absorbing plate to be configured therein, the roof body 2 itself must be designed to have sufficient supporting force.

이하, 종래의 건축용 지붕체(2)에 대해 도 1, 2a, 2b, 2c를 참조하여 상세하게 기술한다.Hereinafter, the conventional building roof body 2 is described in detail with reference to FIG. 1, 2A, 2B, 2C.

도 1은 종래의 실시예에 따른 조립식 건축용 지붕체의 연결부재를 도시한 일부 절개 사시도이며, 도 2a, 2b, 2c는 종래의 실시예에 따른 조립식 건축용 지붕체의 연결부재를 도시한 도면이다.1 is a partial cutaway perspective view showing a connecting member of a prefabricated building roof body according to a conventional embodiment, Figures 2a, 2b, 2c is a view showing a connecting member of a prefabricated building roof body according to a conventional embodiment.

이를 참조하면, 종래의 실시예에 따른 조립식 건축용 지붕체(2)는 가로 바(bar)의 형태로 설치되어 지붕체(2)의 하부 횡방향 지지력을 보강시키기 위한 강구조 건물자체 구조체인 C형강의 하부지지대(5)가 구성되어져 있으며, 그 C형강의 하부지지대(5)의 상부에는 칼라 철판으로 성형작업되어져 있으며, 상기 C형강의 하부지지대(5)의 상면에 안착 조립된 베이스 쉬트(4)이 구성되어져 있다.Referring to this, the prefabricated building roof body 2 according to the conventional embodiment is installed in the form of a horizontal bar (bar) of the C-shaped steel structure itself as a steel structure building itself structure for reinforcing the lower transverse bearing capacity of the roof body (2) The lower support 5 is formed, and the base sheet 4 which is formed on the upper surface of the lower support 5 of the C-shaped steel is formed by a color steel plate and is seated and assembled on the upper surface of the lower support 5 of the C-shaped steel. It is made up.

또한, 상기 베이스 쉬트(4)의 상부에는 단열 및 흡음 기능을 수행하기 위해 폴리에스터 울 또는 글라스울로 구성된 흡음단열재(8)가 부착되어져 있으며, 상기 흡음단열재(8)의 중간에는 일정 거리가 이격되게 설치되어 상기 흡음단열재(8)의 중간 지지력을 보강하기 위한 Z바(6)가 상기 C형강의 하부지지대(5)와 수평으로 설치되어져 있다.In addition, the upper portion of the base sheet 4 is attached to the sound-absorbing heat insulating material 8 made of polyester wool or glass wool to perform the heat insulating and sound-absorbing function, a predetermined distance in the middle of the sound-absorbing heat insulating material (8). It is installed so that the Z bar 6 for reinforcing the intermediate bearing force of the sound-absorbing heat insulating material (8) is installed horizontally with the lower support (5) of the C-shaped steel.

또, 상기 흡음단열재(8)의 상부이며, 상기 Z 바(6)의 상면에는 슬라이딩 클립(10)이 볼트결합되어져 있으며, 그 슬라이딩 클립(10)의 상면에는 결합편(11)이 구성되어져 있는 바, 그 슬라이딩 클립(10)은 상기 방수부재(9)의 상면에 결합되는 최상단 상부 루프쉬트(12)의 일단에 형성된 결합부(12a, 12b)를 그 상부 및 내부에 삽입시켜 거멀접기 함으로써 일정한 위치와 높이를 유지하면서 고정시키기 위한 수단이다.Moreover, the upper part of the said sound-absorbing heat insulating material 8, the sliding clip 10 is bolted to the upper surface of the said Z bar 6, The coupling piece 11 is comprised in the upper surface of the sliding clip 10. Bar, the sliding clip 10 is fixed by inserting the engaging portions (12a, 12b) formed at one end of the uppermost upper roof sheet 12 coupled to the upper surface of the waterproof member 9 to the top and the inside, and then folds. It is a means for fixing while maintaining the position and height.

즉, 상기 상부 루프쉬트(12)의 결합부(12a, 12b)는 상부 루프쉬트(12)의 일측면에 절곡되어져 요홈을 형성하게 되며, 그 요홈을 상기 슬라이딩 클립(10)의 상부에 끼워 결합시키면 자연스럽게 상기 상부 루프쉬트(12)가 일정한 위치에 정렬된 상태로 고정되게 된다. 이를 위해, 상기 슬라이딩 클립(10)은 도 2b에 도시된 바와 같이 각각 정확한 위치에 고정되어야 하며, 각 슬라이딩 클립(10)을 연장한 연장선이 상기 Z바(6)와 정확하게 수직으로 배치되어져야만 한다.That is, the coupling parts 12a and 12b of the upper roof sheet 12 are bent to one side of the upper roof sheet 12 to form a recess, and the recess is fitted to the upper portion of the sliding clip 10. In this case, the upper roof sheet 12 is naturally fixed in an aligned position. To this end, the sliding clips 10 must be fixed at the correct positions, respectively, as shown in Fig. 2b, and an extension line extending from each of the sliding clips 10 must be disposed exactly vertically with the Z bar 6. .

하지만, 지붕에서 현장 시공중에 작업자가 Z 바(6)를 정확히 수평으로 고정시키기도 쉽지 않으며, 그 상부에 상기 슬라이딩 클립(10)을 정확한 위치에 고정시키기는 어려우므로, 수많은 슬라이딩 클립(10)의 연장선이 상기 Z바(6) 위에서 정확하게 직선도가 일치되게 배치시키기가 매우 어렵다. However, it is not easy for the worker to fix the Z bar 6 exactly horizontally during the site construction on the roof, and it is difficult to fix the sliding clip 10 at the correct position on the upper part, so that the extension lines of the numerous sliding clips 10 are It is very difficult to arrange the linearity exactly on this Z-bar 6.

따라서 각 슬라이딩 클립(10)의 수직 연장선이 상기 Z바(6)와 정확하게 수직되지 않게 되면, 그 슬라이딩 클립(10)에 결합되는 상부 루프쉬트(12) 역시도 정확하게 결합되지 않고 상부 루프쉬트 접합부 사이에 들뜸 현상 및 이격이 발생될 가능성이 매우 높아 그 접합 취약부가 누수되며 강풍 피해의 원인이 되었다. Therefore, when the vertical extension line of each sliding clip 10 is not exactly perpendicular to the Z bar 6, the upper roof sheet 12 coupled to the sliding clip 10 is also not accurately coupled, and is connected between the upper loop sheet joints. The possibility of lifting and separation is very high, causing the joint weakness to leak and cause high wind damage.

또한 누수차단을 위해 단열재와 Z 바의 상단으로 지붕체 면적 전체로 방수부재를 배치하였지만 역시 접합 취약문제가 해소되지 않았다. In addition, the waterproof member was placed over the roof area to the top of the insulation and the Z bar to prevent leakage, but also the problem of joint weakness was not solved.

또한, 슬라이딩 클립(10)을 Z바(6)에 고정시키기 위한 지붕체의 수많은 볼트(10a)의 구멍사이로 빗물 등의 유입되는 구조이므로 부식이 쉽다는 문제점이 있었으며, 도 2c와 같이 상기 Z 바(6)의 측부에 각각 흡음단열재(8)를 끼워 넣게 되면 Z 바(6)의 두께로 인해 Z 바(6)와 흡음단열재(8)의 사이에는 상하부의 갭(??1, ??2)이 형성되게 되므로 결합성이 용이하지 못하다는 문제점이 있었다.In addition, there is a problem in that corrosion is easy since rainwater flows in between the holes of the numerous bolts 10a of the roof for fixing the sliding clip 10 to the Z bar 6, and the Z bar as shown in FIG. 2C. in the upper and lower gaps between the (6) When the respective tucked into the sound-absorbing insulating material (8) on the side bar Z 6, Z bar (6) with sound-absorbing insulation material (8) due to the thickness of (?? 1, ?? 2 ) Was formed, there was a problem that the bondability is not easy.

본 발명은 상기한 종래 기술의 사정을 감안하여 이루어진 것으로, Z 바 대신에 프레임에 슬라이딩 클립을 요입시키는 별도의 삽입홈이 형성되어져 있으며, 지붕패널 상부로 볼트가 노출되지 않고, 지붕 중도리에 체결되는 볼트리스 공법으로 그 삽입홈의 저면 및 그 삽입홈과 일정거리 이격된 위치에 볼트 위치결정홈이 형성됨으로써 정확한 위치에 슬라이딩 클립과 볼트고정을 배치시킬 수 있고, 누수차단에 안전하며 시공이 용이한 조립식 건축용 지붕체의 연결부재를 제공함에 그 목적이 있다.The present invention has been made in view of the above-described prior art, and a separate insertion groove for inserting a sliding clip into the frame is formed in place of the Z bar, and the bolt is not exposed to the roof panel, and is fastened to the roof purlin. With boltless method, the bolt positioning groove is formed at the bottom of the insertion groove and at a certain distance from the insertion groove, so that the sliding clip and the bolt fixing can be arranged at the correct position. The object is to provide a connection member of a prefabricated building roof.

상기한 목적을 달성하기 위해, 본 발명의 바람직한 실시예에 따르면 가로 바의 형태로 설치되어 지붕체의 하부 횡방향 지지력을 보강시키기 위한 C형강의 하부지지대와; 그 C형강의 하부지지대의 상면에 안착 조립된 베이스 쉬트과; 상기 베이스 쉬트의 상부에 고정되어 단열 및 흡음 기능을 수행하기 위한 흡음단열재와; 상기 흡음단열재의 중간에 일정 거리가 이격되게 설치되어 상기 흡음단열재의 중간 지지력을 보강하기 위한 Z바와; 상기 Z바의 하부지지대의 상면에 볼트결합되는 슬라이딩 클립과; 상기 슬라이딩 클립에 끼워져 위치결정되며, 고정되는 상부 상부 루프쉬트로 이루어진 지붕체에 있어서, 상기 흡음단열재와 베이스쉬트의 사이에 배치되어, 흡음단열재의 수축력에 대응하고, 흡음단열재을 고정시키면서, 슬라이딩 클립을 그 상면에 형성된 클립삽입홈에 끼워 넣어 신속하고 정확하게 슬라이딩 클립의 위치를 결정할 수 있도록 사다리꼴 형상의 클립삽입홈이 형성되어져 있으며, 그 하면 소정부에는 베이스쉬트의 요홈에 대응하는 형태의 삽입리브가 형성되어 베이스쉬트의 요홈 상면에 용이하게 안착되게 된 것을 특징으로 하는 조립식 건축용 지붕체의 연결부재가 제공된다.In order to achieve the above object, according to a preferred embodiment of the present invention is installed in the form of a horizontal bar lower support of the C-shaped steel for reinforcing the lower transverse bearing capacity of the roof body; A base sheet seated and assembled on the upper surface of the lower support of the C-beam; A sound absorbing heat insulating material fixed to an upper portion of the base sheet to perform heat insulation and sound absorption functions; A Z bar for reinforcing an intermediate bearing force of the sound absorbing insulation material by being installed at a predetermined distance from the middle of the sound absorbing insulation material; A sliding clip bolted to an upper surface of the lower support of the Z bar; A roof body composed of an upper upper roof sheet fitted and positioned to be fixed to the sliding clip, wherein the sliding clip is disposed between the sound absorbing insulation material and the base sheet to correspond to the contraction force of the sound absorbing insulation material, and to fix the sound absorbing insulation material. A trapezoidal clip insertion groove is formed so as to be inserted into the clip insertion groove formed on the upper surface thereof to quickly and accurately determine the position of the sliding clip. An insertion rib of a shape corresponding to the groove of the base sheet is formed in a predetermined portion of the lower surface thereof. There is provided a connection member of a prefabricated building roof body, characterized in that it is easily seated on the upper surface of the recess of the base sheet.

바람직하게, 상기 연결부재는 그 상면 소정부에 볼트가 위치되는 볼트결정홈이 형성되어져 있으며, 그 볼트결정홈의 저면에는 볼트 체결공이 형성된 것을 특징으로 하는 조립식 건축용 지붕체의 연결부재가 제공된다.Preferably, the connection member is provided with a bolt crystal groove in which the bolt is located in a predetermined portion of the upper surface, the connection member of the prefabricated building roofing body is characterized in that the bolt fastening hole is formed on the bottom of the bolt crystal groove.

바람직하게, 상기 클립삽입홈의 저면에는 볼트가 위치되는 볼트결정홈이 형성되어져 있으며, 그 볼트결정홈의 저면에는 볼트 체결공이 형성된 것을 특징으로 하는 조립식 건축용 지붕체의 연결부재가 제공된다.Preferably, the bottom surface of the clip insertion groove is formed with a bolt crystal groove in which the bolt is located, the connection member of the prefabricated building roof body is characterized in that the bolt fastening hole is formed on the bottom surface of the bolt crystal groove.

바람직하게, 상기 연결부재의 일측면에는 폭방향으로 결합공이 형성되어져 있으며, 그 타측면에는 그 결합공에 삽입되는 결합돌기가 형성됨으로써 이웃하는 다른 연결부재와 횡방향으로 연장될 수 있게 구성된 것을 특징으로 하는 조립식 건축용 지붕체의 연결부재가 제공된다.Preferably, one side of the connecting member is formed with a coupling hole in the width direction, the other side is characterized in that the coupling projection is inserted into the coupling hole is formed so as to extend in the transverse direction with the other connection member neighboring A connecting member of a prefabricated building roof body is provided.

바람직하게, 상기 연결부재의 전면 및 후면의 상하단에는 각각 전방으로 일정길이 돌출된 받침턱이 연장되게 형성되어져 그 상하단 받침턱의 사이에 흡음단열재를 끼워넣게 된 것을 특징으로 하는 조립식 건축용 지붕체의 연결부재가 제공된다.Preferably, the upper and lower ends of the front and rear of the connecting member is formed to extend the support jaw protruding a predetermined length forward, respectively, the connection of the prefabricated building roofing body, characterized in that the sound-absorbing insulation is sandwiched between the upper and lower support jaws. The member is provided.

바람직하게, 상기 슬라이딩 클립은 상기 클립삽입홈의 형상에 대응하여 사다리꼴 형상으로 이루어진 클립삽입돌기가 구성되며, 그 클립삽입돌기의 상단에 연장되며 상부 루프쉬트와 결합되는 결합부가 형성된 것을 특징으로 하는 조립식 건축용 지붕체의 연결부재가 제공된다.Preferably, the sliding clip is composed of a clip insertion protrusion consisting of a trapezoidal shape corresponding to the shape of the clip insertion groove, extending to the upper end of the clip insertion protrusion, characterized in that the coupling portion is formed to be coupled to the upper roof sheet A connecting member of a building roof is provided.

이하, 본 발명에 대해 도면을 참조하여 상세하게 설명한다.EMBODIMENT OF THE INVENTION Hereinafter, this invention is demonstrated in detail with reference to drawings.

도 3은 본 발명의 일실시예에 따른 조립식 건축용 지붕체의 연결부재를 도시한 사시도이며, 도 4는 본 발명의 일실시예에 따른 조립식 건축용 지붕체의 연결부재를 도시한 정단면도, 도 5는 본 발명의 일실시예에 따른 조립식 건축용 지붕체의 연결부재를 도시한 측단면도이다.Figure 3 is a perspective view showing a connecting member of the prefabricated building roof body according to an embodiment of the present invention, Figure 4 is a front sectional view showing a connecting member of the prefabricated building roof body according to an embodiment of the present invention, Figure 5 Is a side cross-sectional view showing a connecting member of the prefabricated building roof body according to an embodiment of the present invention.

이를 참조하면, 본 발명의 일실시예에 따른 조립식 건축용 지붕체의 연결부재(6')는 Z 바 대신에 슬라이딩 클립을 요입시키는 별도의 삽입홈이 형성되어져 있으며, 지붕패널 상부로 볼트가 노출되지 않고, 지붕 중도리에 체결되는 볼트리스 공법으로 그 삽입홈의 저면 및 그 삽입홈과 일정거리 이격된 위치에 볼트 위치결정홈이 형성됨으로써 정확한 위치에 슬라이딩 클립과 볼트고정을 배치시킬 수 있고, 누수차단에 안전하며 시공이 용이하도록 한 부재이다.Referring to this, the connection member 6 'of the prefabricated building roof body according to the embodiment of the present invention is formed with a separate insertion groove for inserting a sliding clip instead of the Z bar, the bolt is not exposed to the roof panel The bolt positioning method is formed on the bottom surface of the insertion groove and a position spaced apart from the insertion groove by a boltless method that is fastened to the middle of the roof, so that the sliding clip and the bolt fixing can be arranged at the correct position. It is a member that is safe and easy to install.

보다 상세하게, 본 발명의 일실시예에 따른 조립식 건축용 지붕체의 연결부재(6')는 종래의 Z 바(6)의 위치와 마찬가지로 베이스 쉬트(4)의 상면에 그 베이스쉬트(4)와 수직상태로 설치되면서, 그 상부에 슬라이딩 클립(10)이 정확한 위치에 배치되도록 한 부재이다. 또한, 본 발명의 일실시예에 따른 조립식 건축용 지붕체의 연결부재(6')는 다른 다수의 연결부재(6')가 횡방향으로 연결될 수 있는 구조로 이루어져 있다.In more detail, the connection member 6 'of the prefabricated building roofing body according to the embodiment of the present invention has the base sheet 4 and the upper surface of the base sheet 4 in the same manner as the position of the conventional Z bar 6. While being installed in a vertical state, the sliding clip 10 on the upper portion is a member that is arranged in the correct position. In addition, the connection member 6 'of the prefabricated building roof body according to the embodiment of the present invention is configured in such a way that a plurality of other connection members 6' may be connected in the transverse direction.

따라서, 본 발명의 일실시예에 따른 조립식 건축용 지붕체의 연결부재(6')는 일정 금형을 통해 형상이 주물방식으로 제조되는 몸체(64)로 이루어져 있으며, 그 몸체(64)의 일측면에는 결합공(66)이 형성되어져 있으며, 몸체(64)의 타측면에는 상기 결합공(66)과 대응되는 결합돌기(68)가 형성되어져 있다. Therefore, the connecting member 6 'of the prefabricated building roofing body according to the embodiment of the present invention is composed of a body 64 formed in a casting method through a predetermined mold, and on one side of the body 64 The coupling hole 66 is formed, and the coupling protrusion 68 corresponding to the coupling hole 66 is formed at the other side of the body 64.

따라서, 본 발명의 일실시예에 따른 조립식 건축용 지붕체의 연결부재(6')는 이웃하는 다른 연결부재(6')와 횡방향으로 결합되어 연결할 수 있다.Therefore, the connecting member 6 'of the prefabricated building roofing body according to the embodiment of the present invention may be coupled to the other connecting member 6' neighboring in the lateral direction.

또한, 본 발명의 일실시예에 따른 조립식 건축용 지붕체의 연결부재(6')는 그 몸체(64)의 상면 소정부에 볼트(일명, 스테이 볼트)의 위치를 결정하는 볼트결정홈(70)이 형성되어져 있으며, 상기 몸체(64) 상면이면서, 상기 볼트결정홈(70)과 일정거리 이격된 위치에 클립부재(60)를 삽입하는 클립삽입홈(72)이 형성되어져 있다.In addition, the connection member (6 ') of the prefabricated building roof body according to an embodiment of the present invention bolt determination groove 70 for determining the position of the bolt (aka, stay bolt) on the upper surface of the body 64 Is formed, the upper surface of the body 64, the clip insertion groove 72 for inserting the clip member 60 in a position spaced apart from the bolt determination groove 70 by a predetermined distance is formed.

이때, 상기 클립삽입홈(72)은 상기 클립부재(60)를 전방이나 후방에서 끼워넣을 수 있도록 그 홈의 형상이 사다리꼴 형상으로 이루어져 있으며, 그 바닥면에 별도의 볼트결정홈(74)이 형성되어져 있고, 그 볼트결정홈(74)의 바닥에는 볼트를 체결하는 체결공(76)이 형성되어져 있다.At this time, the clip insertion groove 72 is formed in a trapezoidal shape of the groove so that the clip member 60 can be inserted from the front or rear, a separate bolt crystal groove 74 is formed on the bottom surface In the bottom of the bolt crystal groove 74, a fastening hole 76 for fastening the bolt is formed.

따라서, 상기 클립부재(60)는 상기 클립삽입홈(72)에 대응되도록 그 하단이 사다리꼴 형상으로 이루어진 클립삽입돌기(62)가 구성되며, 그 클립삽입돌기(62)의 상단에는 종래의 슬라이딩 클립(6)과 동일한 형상으로 이루어진 결합부(10')가 형성되어져 있다. Therefore, the clip member 60 has a clip insertion protrusion 62 formed at a lower end thereof in a trapezoidal shape so as to correspond to the clip insertion groove 72, and a conventional sliding clip at the top of the clip insertion protrusion 62. Coupling portion 10 'having the same shape as (6) is formed.

상기 클립삽입돌기(62)는 클립삽입홈(72)에 끼워지게 되며, 상기 결합부(10')는 연결부재(6')의 상면으로 노출되게 되어 그 결합부(10')에 상부 루프쉬트(12)의 측면을 끼워넣어 상부 루프쉬트(12)의 위치를 결정하게 되며, 고정시키게 된다. The clip insertion protrusion 62 is fitted into the clip insertion groove 72, and the coupling portion 10 ′ is exposed to the upper surface of the connecting member 6 ′ so that the upper loop sheet is coupled to the coupling portion 10 ′. The side of the (12) is inserted to determine the position of the upper roof sheet 12, it is fixed.

또한, 본 발명의 일실시예에 따른 조립식 건축용 지붕체의 연결부재(6')의 몸체(64) 하단에는 상기 베이스 쉬트(4)의 요부와 대응되게 형성되어 그 요부에 안착되는 삽입리브(77a,77b)가 일정거리 이격되게 형성되어져 있으며, 그 몸체(64)에는 자중을 줄이기 위한 타공이 다수개 형성되어져 있다.In addition, the bottom of the body 64 of the connection member 6 'of the prefabricated building roofing body according to the embodiment of the present invention is formed to correspond to the recessed portion of the base sheet 4 and is inserted into the rib 77a (77b) is formed to be spaced apart a certain distance, the body 64 is formed with a plurality of perforations for reducing the weight.

한편, 본 발명의 일실시예에 따른 조립식 건축용 지붕체의 연결부재(6')의 몸체(64) 전면 및 후면의 상하단에는 각각 전방으로 일정길이 돌출된 받침턱(80a, 80b)이 연장되게 형성되는 바, 그 받침턱(80a,80b)의 사이에는 흡음단열재(8)을 끼워넣게 되어 단차없이 흡음단열재(8)를 고정시킬 수 있다.On the other hand, the upper and lower ends of the front and rear of the body 64 of the connecting member 6 'of the prefabricated building roofing body according to the embodiment of the present invention is formed to extend the support jaw (80a, 80b) protruding a certain length forward As a result, the sound absorbing heat insulating material 8 is interposed between the supporting jaw 80a and 80b, so that the sound absorbing heat insulating material 8 can be fixed without a step.

따라서, 본 발명의 일실시예에 따른 조립식 건축용 지붕체의 연결부재(6')는 이웃하는 다른 연결부재(6')를 그 측면에 각각 형성된 결합공(66)과 결합돌기(68)의 연결을 통해 측방으로 연장시켜 설치하게 되며, 그 하면에 이격되게 형성된 삽입리브(77a,77b)를 베이스쉬트(4)의 요홈에 안착시킴으로써 안정된 연결부재(6')의 고정이 이루어지게 된다.Therefore, the connection member 6 'of the prefabricated building roofing body according to the embodiment of the present invention connects the coupling hole 66 and the coupling protrusion 68 formed at each side of the neighboring other connection member 6'. It is installed to extend laterally through, and the fixing ribs (77a, 77b) formed to be spaced apart on the lower surface is secured to the stable connection member 6 'by seating in the groove of the base sheet (4).

또한, 본 발명의 일실시예에 따른 조립식 건축용 지붕체의 연결부재(6')의 상면 소정부에 각각 형성된 볼트결정홈(70,74)에 각설된 체결공(76)에 볼트(82)를 체결하고, 베이스쉬트(4)의 하부끼지 볼트(82)를 체결함으로써 연결부재(6)와 베이스쉬트(4)를 고정시킬 때 현장에서 신속하고 정확한 체결이 가능하게 된다. 또한, 볼트결정홈(70,74)은 상면으로부터 요부로 각설되어져 있으므로 볼트헤드가 노출되지 않으므로 그 상면에 부착되는 다른 부재가 방해받지 않게 되며, 볼트결정홈(70,74)으로 수분이 유입되는 것을 방지하게 된다.In addition, the bolt 82 to the fastening hole 76 in each of the bolt determination groove (70, 74) formed in the predetermined portion of the upper surface of the connecting member (6 ') of the prefabricated building roofing body according to an embodiment of the present invention. By fastening and fastening the lower clamping bolt 82 of the base sheet 4, when fastening the connection member 6 and the base sheet 4, it is possible to fast and accurate fastening in the field. In addition, since the bolt crystal grooves 70 and 74 are angled from the top surface, the bolt head is not exposed so that other members attached to the upper surface of the bolt crystal grooves 70 and 74 are not disturbed, and moisture is introduced into the bolt crystal grooves 70 and 74. Will be prevented.

한편, 본 발명의 일실시예에 따른 조립식 건축용 지붕체의 연결부재(6')의 상면 소정부에는 상기 클립부재(60)가 삽입되는 클립삽입홈(72)이 형성되어져 있으므로 현장 시공시 별도로 클립부재(60)의 위치를 결정하기 위한 시간이 필요치 않으며, 미리 형성된 클립삽입홈(72)에 클립부재(60)를 끼워 넣기만 하면 클립부재(60)의 위치결정이 이루어지게 되므로 정확하게 클립부재(60)의 위치를 결정할 수 있게 된다.On the other hand, the predetermined portion of the upper surface of the connection member (6 ') of the prefabricated building roofing body according to an embodiment of the present invention is provided with a clip insertion groove 72 into which the clip member 60 is inserted, the clip separately during the construction site No time is required to determine the position of the member 60, and simply inserting the clip member 60 into the pre-formed clip insertion groove 72 results in the positioning of the clip member 60 so that the clip member ( 60) can be determined.

또한, 본 발명의 일실시예에 따른 조립식 건축용 지붕체의 연결부재(6')는 그 전후면의 상단 및 하단에 흡음단열재(8)를 끼워 넣기 위한 받침턱(80a,80b)이 각각 형성되어져 있으므로 단차 없이 흡음단열재(8)를 고정시킬 수 있다.In addition, the connecting member 6 'of the prefabricated building roofing body according to the embodiment of the present invention is formed with the support jaw (80a, 80b) for inserting the sound-absorbing insulation (8) at the upper and lower ends of the front and rear surfaces, respectively. Therefore, the sound absorbing heat insulating material 8 can be fixed without a step.

한편, 본 발명의 실시예에 따른 조립식 건축용 지붕체의 연결부재는 단지 상기한 실시예에 한정되는 것이 아니라 그 기술적 요지를 이탈하지 않는 범위내에서 다양한 변경이 가능하다. On the other hand, the connection member of the prefabricated building roofing body according to an embodiment of the present invention is not limited to the above embodiments, but various modifications can be made without departing from the technical gist thereof.

상기한 바와 같이, 본 발명에 따른 조립식 건축용 지붕체의 연결부재는 몸체 자체의 공간유지로 지붕체에 내재된 단열재의 침하를 방지할 수 있음을 기본으로 하여, 그 상면 소정부에 클립부재를 삽입하는 삽입홈이 형성되어져 있으므로 현장 시공시 숙련공이 아니더라도 신속하고 정확하게 클립부재의 위치를 결정할 수 있고 고정할 수 있기에 시공 오차로 인한 하자요인을 근원적으로 제거할 수 있고, 몸체 상면에 다른 부재의 적층이 용이하도록 고정볼트 헤드가 노출되지 않으며, 볼트 위치를 결정하는 볼트결정홈이 몸체 소정부에 다수개 형성되어져 있으며, 볼트 고정홀이 프레임 내부로 관통되어 볼트를 수직으로 정확하게 고정할 수 있어 몸체의 강도를 증대시킬 수 있으므로 지붕체의 내구력을 향상시킬 수 있다는 잇점이 있다.As described above, the connection member of the prefabricated building roofing body according to the present invention is based on the fact that it is possible to prevent the settlement of the heat insulating material in the roof body by maintaining the space of the body itself, inserting the clip member in the predetermined portion of the upper surface Since the insertion groove is formed, it is possible to quickly and accurately determine the position of the clip member and fix it even if it is not a skilled worker in the field construction, so that the defects caused by the construction error can be fundamentally eliminated, and the stacking of other members on the upper surface of the body The fixing bolt head is not exposed to facilitate, and a plurality of bolt decision grooves for determining the bolt position are formed in the predetermined part of the body, and the bolt fixing hole penetrates into the frame to fix the bolt vertically and accurately, thereby increasing the strength of the body. Since it can increase the durability of the roof body has the advantage.

도 1은 종래의 실시예에 따른 조립식 건축용 지붕체의 연결부재를 도시한 일부 절개 사시도,1 is a partial cutaway perspective view showing a connection member of a prefabricated building roof body according to a conventional embodiment,

도 2a, 2b, 2c는 종래의 실시예에 따른 조립식 건축용 지붕체의 연결부재를 도시한 도면,Figure 2a, 2b, 2c is a view showing a connecting member of the prefabricated building roof body according to a conventional embodiment,

도 3은 본 발명의 일실시예에 따른 조립식 건축용 지붕체의 연결부재를 도시한 사시도,Figure 3 is a perspective view showing a connecting member of the prefabricated building roof body according to an embodiment of the present invention,

도 4는 본 발명의 일실시예에 따른 조립식 건축용 지붕체의 연결부재를 도시한 정단면도,Figure 4 is a front sectional view showing a connecting member of the prefabricated building roof body according to an embodiment of the present invention,

도 5는 본 발명의 일실시예에 따른 조립식 건축용 지붕체의 연결부재를 도시한 측단면도이다.Figure 5 is a side cross-sectional view showing a connecting member of the prefabricated building roof body according to an embodiment of the present invention.

*도면의 주요부분에 대한 부호의 설명** Description of the symbols for the main parts of the drawings *

2:지붕체, 4:베이스쉬트,2: roof body, 4: base sheet,

6:Z 바, 6':연결부재,6: Z bar, 6 ': connecting member,

8:흡음단열재, 10:슬라이딩 클립,8: sound-absorbing insulation, 10: sliding clip,

12:상부 루프쉬트, 60:클립부재,12: upper roof sheet, 60: clip member,

62:클립삽입돌기, 64:몸체,62: clip insertion protrusion, 64: body,

66:결합공, 68:결합돌기,66: binding hole, 68: binding protrusion,

70:볼트결정홈, 72:클립삽입홈,70: bolt crystal groove, 72: clip insertion groove,

74:볼트결정홈, 76:체결공,74: bolt decision groove, 76: fastener,

77a,77b:삽입리브, 80a,80b:받침턱.77a, 77b: Insertion rib, 80a, 80b: Supporting jaw.

Claims (6)

가로 바의 형태로 설치되어 지붕체의 하부 횡방향 지지력을 보강시키기 위한 C형강의 하부지지대와; 그 C형강의 하부지지대의 상면에 안착 조립된 베이스 쉬트과; 상기 베이스 쉬트의 상부에 고정되어 단열 및 흡음 기능을 수행하기 위한 흡음단열재와; 상기 흡음단열재의 중간에 일정 거리가 이격되게 설치되어 상기 흡음단열재의 중간 지지력을 보강하기 위한 Z바와; 상기 Z바의 하부지지대의 상면에 볼트결합되는 슬라이딩 클립과; 상기 슬라이딩 클립에 끼워져 위치 결정되며, 고정되는 상부 상부 루프쉬트로 이루어진 지붕체에 있어서, A lower support of the C-shaped steel installed in the form of a horizontal bar to reinforce the lower transverse bearing force of the roof body; A base sheet seated and assembled on the upper surface of the lower support of the C-beam; A sound absorbing heat insulating material fixed to an upper portion of the base sheet to perform heat insulation and sound absorption functions; A Z bar for reinforcing an intermediate bearing force of the sound absorbing insulation material by being installed at a predetermined distance from the middle of the sound absorbing insulation material; A sliding clip bolted to an upper surface of the lower support of the Z bar; In the roof body composed of the upper upper roof sheet is positioned, fixed to the sliding clip, 상기 흡음단열재와 베이스쉬트의 사이에 배치되어, 흡음단열재의 수축력에 대응하고, 흡음단열재를 고정시키면서, 슬라이딩 클립을 그 상면에 형성된 클립삽입홈에 끼워 넣어 신속하고 정확하게 슬라이딩 클립의 위치를 결정할 수 있도록 사다리꼴 형상의 클립삽입홈이 형성되어져 있으며, 그 하면 소정부에는 베이스쉬트의 요홈에 대응하는 형태의 삽입리브가 형성되어 베이스쉬트의 요홈 상면에 용이하게 안착되게 된 것을 특징으로 하는 조립식 건축용 지붕체의 연결부재.It is disposed between the sound absorbing insulation and the base sheet, so as to correspond to the contraction force of the sound absorbing insulation, while fixing the sound absorbing insulation, the sliding clip is inserted into the clip insertion groove formed on the upper surface to determine the position of the sliding clip quickly and accurately A trapezoidal clip insertion groove is formed, and a predetermined portion thereof has an insertion rib formed in a shape corresponding to the groove of the base sheet so as to be easily seated on the upper surface of the groove of the base sheet. absence. 제 1 항에 있어서, 상기 연결부재는 그 상면 소정부에 볼트가 위치되는 볼트결정홈이 형성되어져 있으며, 그 볼트결정홈의 저면에는 볼트 체결공이 형성된 것을 특징으로 하는 조립식 건축용 지붕체의 연결부재.The connecting member of claim 1, wherein the connection member is formed with a bolt decision groove in which a bolt is positioned at a predetermined upper surface thereof, and a bolt fastening hole is formed at a bottom of the bolt decision groove. 제 1 항에 있어서, 상기 클립삽입홈의 저면에는 볼트가 위치되는 볼트결정홈이 형성되어져 있으며, 그 볼트결정홈의 저면에는 볼트 체결공이 형성된 것을 특징으로 하는 조립식 건축용 지붕체의 연결부재.The connecting member of the prefabricated building roofing body according to claim 1, wherein a bolt determination groove in which the bolt is positioned is formed in a bottom of the clip insertion groove, and a bolt fastening hole is formed in a bottom of the bolt determination groove. 제 1 항에 있어서, 상기 연결부재의 일측면에는 폭방향으로 결합공이 형성되어져 있으며, 그 타측면에는 그 결합공에 삽입되는 결합돌기가 형성됨으로써 이웃하는 다른 연결부재와 횡방향으로 연장될 수 있게 구성된 것을 특징으로 하는 조립식 건축용 지붕체의 연결부재.According to claim 1, wherein one side of the connecting member is formed with a coupling hole in the width direction, the other side is formed so that the engaging projection is inserted into the coupling hole so that it can extend in the transverse direction with other neighboring connecting members. Connection member of the prefabricated building roof body, characterized in that configured. 제 1 항에 있어서, 상기 연결부재의 전면 및 후면의 상하단에는 각각 전방으로 일정길이 돌출된 받침턱이 연장되게 형성되어져 그 상하단 받침턱의 사이에 흡음단열재를 끼워 넣게 된 것을 특징으로 하는 조립식 건축용 지붕체의 연결부재. The prefabricated building roof according to claim 1, wherein the upper and lower ends of the front and rear surfaces of the connection member are formed to protrude a predetermined length toward the front, respectively, to sandwich the sound absorbing insulation material between the upper and lower end jaws. Connecting member of sieve. 제 1 항에 있어서, 상기 슬라이딩 클립은 상기 클립삽입홈의 형상에 대응하여 사다리꼴 형상으로 이루어진 클립삽입돌기가 구성되며, 그 클립삽입돌기의 상단에 연장되며 상부 루프쉬트와 결합되는 결합부가 형성된 것을 특징으로 하는 조립식 건축용 지붕체의 연결부재. According to claim 1, The sliding clip is a clip insertion protrusion consisting of a trapezoidal shape corresponding to the shape of the clip insertion groove is formed, extending to the upper end of the clip insertion protrusion is characterized in that the coupling portion is coupled to the upper roof sheet is formed. Connecting member of prefabricated building roof body.
KR1020050104403A 2005-11-02 2005-11-02 Jointing means of roof for a prefabricated house KR20050109427A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
KR1020050104403A KR20050109427A (en) 2005-11-02 2005-11-02 Jointing means of roof for a prefabricated house
KR1020050118863A KR100593462B1 (en) 2005-11-02 2005-12-07 Connecting member of prefabricated building roof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050104403A KR20050109427A (en) 2005-11-02 2005-11-02 Jointing means of roof for a prefabricated house

Publications (1)

Publication Number Publication Date
KR20050109427A true KR20050109427A (en) 2005-11-21

Family

ID=37104942

Family Applications (2)

Application Number Title Priority Date Filing Date
KR1020050104403A KR20050109427A (en) 2005-11-02 2005-11-02 Jointing means of roof for a prefabricated house
KR1020050118863A KR100593462B1 (en) 2005-11-02 2005-12-07 Connecting member of prefabricated building roof

Family Applications After (1)

Application Number Title Priority Date Filing Date
KR1020050118863A KR100593462B1 (en) 2005-11-02 2005-12-07 Connecting member of prefabricated building roof

Country Status (1)

Country Link
KR (2) KR20050109427A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015190757A1 (en) * 2014-06-13 2015-12-17 이상엽 Elevating stand for exhibiting automobile show window

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101001214B1 (en) * 2010-07-07 2010-12-15 주식회사 스틸콘 Fixing apparatus roof panels in assembly buildings
KR101005191B1 (en) * 2010-07-12 2011-01-03 조권제 Jointing means of roof for a prefabricated house
KR200467825Y1 (en) * 2011-08-29 2013-07-05 주식회사 에스와이테크 Roof structure with solar cell module panel
KR102560181B1 (en) 2022-11-29 2023-07-27 주식회사 스틸콘 System panel with fire proof function and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015190757A1 (en) * 2014-06-13 2015-12-17 이상엽 Elevating stand for exhibiting automobile show window

Also Published As

Publication number Publication date
KR100593462B1 (en) 2006-06-30
KR20060001889A (en) 2006-01-06

Similar Documents

Publication Publication Date Title
KR20050109427A (en) Jointing means of roof for a prefabricated house
KR101975774B1 (en) Composite Girder Structure integrated with Cover Plate, Temporary Bridge using such Structure, and Constructing Method of such Temporary Bridge
KR100953279B1 (en) A panel fabrication device
KR101947077B1 (en) Functional deck system
KR200409831Y1 (en) Jointing means of roof for a prefabricated house
KR200416147Y1 (en) Jointing means of roof for a prefabricated house
KR20170089239A (en) Spacer module and stripping deck having the same
KR101458875B1 (en) Slim Floor System Using Built-up Type Steel Beam Made of Plate and Box-pipe
JP4650255B2 (en) Steel slab reinforcement structure and existing steel slab reinforcement method
KR101670843B1 (en) Assembled structure of aluminium curtain wall
JP3526562B2 (en) Exterior wall formation method and metal fittings used in reinforced concrete exterior thermal insulation building
KR200467322Y1 (en) Connecting apparatus for roof structure
JP4602789B2 (en) Vertical stacking method of extruded cement board and its structure
KR200418073Y1 (en) Panel for mold
KR100477856B1 (en) A soundproofing plate connecting structure for soundproofed wall
JP2007056485A (en) Heat insulating panel for interior finish, and construction method of ceiling using the same
JP6917865B2 (en) Soundproof wall unit
KR101203395B1 (en) Improved boltless roof structure means and constructing method
KR100672071B1 (en) A devce for holding the stone pannel in open joint method
KR100225536B1 (en) Expansion joint and its execution method
CN213951930U (en) Bridge expansion joint device
KR100957039B1 (en) Refraction-type expansion and construction joint apparatus for a bridge
JP4812441B2 (en) Roof structure and construction method
KR100650510B1 (en) Fixing structure for construction panel
KR200210947Y1 (en) A fastener for fixing curtain wall

Legal Events

Date Code Title Description
A201 Request for examination