KR20050091605A - A real time inventory management system combined cad system - Google Patents

A real time inventory management system combined cad system Download PDF

Info

Publication number
KR20050091605A
KR20050091605A KR1020040017796A KR20040017796A KR20050091605A KR 20050091605 A KR20050091605 A KR 20050091605A KR 1020040017796 A KR1020040017796 A KR 1020040017796A KR 20040017796 A KR20040017796 A KR 20040017796A KR 20050091605 A KR20050091605 A KR 20050091605A
Authority
KR
South Korea
Prior art keywords
management
cad
cutting
raw materials
materials
Prior art date
Application number
KR1020040017796A
Other languages
Korean (ko)
Inventor
김재현
고진광
정병열
정동현
곽상운
Original Assignee
김재현
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김재현 filed Critical 김재현
Priority to KR1020040017796A priority Critical patent/KR20050091605A/en
Publication of KR20050091605A publication Critical patent/KR20050091605A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F19/00Other details of constructional parts for finishing work on buildings
    • E04F19/02Borders; Finishing strips, e.g. beadings; Light coves
    • E04F19/04Borders; Finishing strips, e.g. beadings; Light coves for use between floor or ceiling and wall, e.g. skirtings
    • E04F19/0495Plinths fixed around wall openings or around corners of walls
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01MCATCHING, TRAPPING OR SCARING OF ANIMALS; APPARATUS FOR THE DESTRUCTION OF NOXIOUS ANIMALS OR NOXIOUS PLANTS
    • A01M1/00Stationary means for catching or killing insects
    • A01M1/20Poisoning, narcotising, or burning insects
    • A01M1/2005Poisoning insects using bait stations
    • A01M1/2011Poisoning insects using bait stations for crawling insects
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F19/00Other details of constructional parts for finishing work on buildings
    • E04F19/02Borders; Finishing strips, e.g. beadings; Light coves
    • E04F19/04Borders; Finishing strips, e.g. beadings; Light coves for use between floor or ceiling and wall, e.g. skirtings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F19/00Other details of constructional parts for finishing work on buildings
    • E04F19/02Borders; Finishing strips, e.g. beadings; Light coves
    • E04F19/04Borders; Finishing strips, e.g. beadings; Light coves for use between floor or ceiling and wall, e.g. skirtings
    • E04F19/0436Borders; Finishing strips, e.g. beadings; Light coves for use between floor or ceiling and wall, e.g. skirtings between ceiling and wall
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W90/00Enabling technologies or technologies with a potential or indirect contribution to greenhouse gas [GHG] emissions mitigation

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Pest Control & Pesticides (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Toxicology (AREA)
  • Insects & Arthropods (AREA)
  • Wood Science & Technology (AREA)
  • Zoology (AREA)
  • Environmental Sciences (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

본 발명은 현재 활용되고 있는 선박관련 자재 및 부품 제조 공정 중의 한 부분인 절단공정에서 원재료를 CAD 시스템을 이용하여 도면에 표시된 치수별로 CNC Gas, Plasma 자동절단기를 이용하여 절단하는데 절단 후 남는 자재들을 효과적으로 활용 할 수 있는 실시간 CAD 통합관리 시스템 구성을 제공하는데 있다.The present invention effectively cuts the materials remaining after cutting to cut the raw materials by using the CNC gas, Plasma automatic cutting machine by the dimensions shown in the drawing using the CAD system in the cutting process, which is part of the ship-related materials and parts manufacturing process currently being utilized It is to provide a real-time CAD integrated management system configuration that can be utilized.

본 발명은 CNC에서 절단 후 남은 자재의 크기와 형태를 CAD 시스템으로부터 얻은 데이터로 재고 자재를 파악하여 신규로 필요 하는 자재 량을 산출해서 불용자재의 재활용 관리의 효율을 높이는 장점이 있다.The present invention has the advantage of increasing the efficiency of recycling management of insoluble materials by grasping the stock material with data obtained from the CAD system to determine the size and shape of the material remaining after cutting in the CNC.

Description

자재 관리를 위한 실시간 CAD 통합관리 시스템 { A Real Time Inventory Management System Combined CAD System }A Real Time Inventory Management System Combined CAD System}

본 발명은 작업장과 관리사무실의 독립적 업무수행에서 벗어나 작업장에서 진행되는 모든 작업을 네트워크를 통해 관리사무실의 컴퓨터에서 실시간 통합 관리를 통하여 원가절감과 공정 단축, 원자재의 불필요한 손실 방지를 위한 CAD 시스템과의 인터페이스 통한 통합DB관리 시스템 구축 기반 기술이다.The present invention provides a CAD system for cost reduction, process shortening, and unnecessary loss of raw materials through real-time integrated management of the management office computer through the network for all the work in the workplace away from independent work of the workplace and management office. Integrated DB management system based interface technology.

본 발명은 현재 선박관련 자재 및 부품 제조업체에서 공정 중의 한 부분인 절단공정은 원재료를 CAD 시스템을 이용하여 도면에 표시된 치수별로 자동절단기(CNC)를 이용하여 절단하는데 작업 과정에서 생산비 절감을 저해하는 여러 요인들이 발생하고 있다. 그 예로 절단 후 남는 원자재들은 재활용 가치가 있으나 관리의 부실로 폐기되는 등의 원자재가 낭비되고 있다.The present invention is a cutting process, which is a part of the process in the ship-related materials and parts manufacturers, cutting raw materials by using an automatic cutting machine (CNC) for each dimension indicated in the drawings using a CAD system, which reduces the production cost in the process of working. Factors are occurring. For example, raw materials remaining after cutting are valuable for recycling, but they are wasted due to poor management.

그 이유로는, 현재 원자재를 CAD 시스템으로 절단하고 있으나 절단 후 잔여 원자재에 대한 정보를 수작업으로 처리함으로써 버려 두고 있고, 사무실에서도 자재관리 시스템이 있으나 공장내의 CAD시스템과 인터페이스가 되지 않고 단독으로 수행되고 있어 사용하고 남은 원자재 관리가 온라인으로 통합 자재 관리를 못하고 있는 실정이다. 즉 공장에서 절단공정 프로그램과 사무실에서 자재관리 프로그램이 물리적/논리적으로 통합 관리가 되지 않아 공정개선이나 생산비 절감을 전혀 못하고 있다.For this reason, raw materials are currently being cut by CAD systems, but the information on the remaining raw materials is processed by hand, and discarded by hand.In the office, there is a material management system, but it is performed independently without being interfaced with the CAD system in the factory. The remaining raw material management does not have integrated material management online. In other words, the cutting process program in the factory and the material management program in the office are not physically and logically integrated to manage the process or reduce production costs.

따라서 최적의 생산성과 원가절감을 위해 생산현장과 관리사무실을 근거리 통신망을 통하여 실시간으로 작업공정을 관리하여 공정을 단축할 수 있게 한다. 또한 원활한 자재 수급과 적정 재고 유지로 원가절감을 위한 자재 관리 DB를 구축하고, 원자재의 불필요한 손실을 방지하기 위해 CAD 시스템과 연계한 재활용 자재 DB 구축을 위한 실시간 CAD 통합관리가 가능하다.Therefore, it can shorten the process by managing the work process in real time through the local area network at the production site and the management office for optimal productivity and cost reduction. In addition, it is possible to build a material management DB for cost reduction through smooth supply and demand of materials and maintain real-time CAD integrated management for recyclable material DB linked with CAD system to prevent unnecessary loss of raw materials.

본 발명은 생산현장에서 사용되고 있는 원자재 절단 CAD 시스템과 관리사무실 시스템을 근거리 통신망을 통하여 실시간으로 작업 공정을 관리하는 실시간 CAD 통합관리 시스템의 자료 흐름도(DFD;Data Flow Diagram)는 도 1과 같이 발주관리(1), 입고관리(2), 출고관리(3), 도면관리(4), 시스템관리(5) 등의 항목으로 구성되었으며, 시스템 개발 모듈은 다음과 같다.The present invention is a data flow diagram (DFD; Data Flow Diagram) of a real-time CAD integrated management system that manages the work process in real time through a local area network based on the raw material cutting CAD system and management office system used in the production site is order management as shown in FIG. (1), receipt management (2), goods issue management (3), drawing management (4), system management (5), etc., the system development module is as follows.

1. 자재관리 DB 구축 : 원활한 자재수급과 적정 재고 유지1. Material management DB establishment: smooth supply and demand and proper inventory maintenance

- ORDER 관리 : 진행 ORDER, 소요량관리, 수금관리, 완료 ORDER-ORDER management: progress order, requirements management, collection management, completion order

- 구매 관리(6) : 구매품확인, 지불관리, 구매 청구관리-Purchase management (6): purchase goods confirmation, payment management, purchase billing management

- 수불 관리(7) : 검수관리, 재고관리, 출고관리, 긴급구매 등-Collection management (7): inspection management, inventory management, release management, urgent purchase, etc.

2. 재활용자재 DB 구축 : 원자재의 불필요한 손실을 방지2. Establishment of recycled material DB: prevention of unnecessary loss of raw materials

- CAD 시스템과 InterfaceCAD system and interface

- 크기별, 두께별 관리 (8,9)-Management by size and thickness (8,9)

- 재고관리 (10)-Inventory Management (10)

관리사무실과 생산현장을 Network로 연결, 실시간 통합 관리하여 원가절감과 공정 단축, 원자재의 불필요한 손실을 방지하기 위한 통합관리 시스템을 구현하도록 진행하였다.By connecting the management office and the production site through the network and real-time integrated management, we proceeded to implement an integrated management system to reduce costs, shorten the process, and prevent unnecessary loss of raw materials.

작업장과 관리사무실의 독립적 업무수행에서 벗어나 작업장에서 진행되는 모든 작업을 네트워크를 통해 관리사무실의 컴퓨터에서 실시간 통합 관리를 통하여 원가절감과 공정 단축, 원자재의 불필요한 손실 방지를 위한 CAD 시스템과의 인터페이스 통한 통합 DB관리 시스템 구축 기반 기술이다.Apart from the independent work of the workplace and the management office, all the work in the workplace is managed through the network in real time from the management office computer through the interface with the CAD system for cost reduction, process reduction, and prevention of unnecessary loss of raw materials. DB management system construction base technology.

실시간 CAD 통합관리 시스템은 작업장의 작업 진행 상태를 실시간으로 파악할 수 있을 뿐만 아니라 CAD 시스템과 인터페이스(14)를 통하여 원자재의 불필요한 손실을 방지할 수 있어 생산 원가절감과 공정의 단축, 여분 원자재를 재활용할 수 있다.The real-time CAD integrated management system can not only understand the work progress of the workplace in real time, but also prevent unnecessary loss of raw materials through the CAD system and interface (14) to reduce production costs, shorten the process, and recycle extra raw materials. Can be.

도 1. 자료 흐름도Figure 1. Data Flowchart

도 2. 시스템 실행 흐름도Figure 2. System Execution Flowchart

도 3. 시스템 인터페이스Figure 3. System Interface

도 4. CAD도면 확인Figure 4. CAD drawing check

Claims (2)

실시간 CAD 시스템과의 인터페이스를 통하여 원자재의 불필요한 손실을 방지하고, 생산 원가절감과 공정의 단축, 불용자재를 재활용하는 방법.How to prevent unnecessary loss of raw materials, reduce production costs, shorten processes, and recycle unused materials through interface with real-time CAD system. 네트워크(LAN)를 통해 1차 가공된 원자재의 잔량을 파악하는데 있어 CAD 도면 데이터를 검출(14)하여 재고 자재의 크기 및 모양을 확인 방법.A method of identifying the size and shape of stock material by detecting CAD drawing data (14) in determining the remaining amount of primary processed raw materials via a network (LAN).
KR1020040017796A 2004-03-12 2004-03-12 A real time inventory management system combined cad system KR20050091605A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020040017796A KR20050091605A (en) 2004-03-12 2004-03-12 A real time inventory management system combined cad system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020040017796A KR20050091605A (en) 2004-03-12 2004-03-12 A real time inventory management system combined cad system

Publications (1)

Publication Number Publication Date
KR20050091605A true KR20050091605A (en) 2005-09-15

Family

ID=37273270

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020040017796A KR20050091605A (en) 2004-03-12 2004-03-12 A real time inventory management system combined cad system

Country Status (1)

Country Link
KR (1) KR20050091605A (en)

Similar Documents

Publication Publication Date Title
CN110580026A (en) intelligent manufacturing MES system
Wang et al. An integrated method for assessing the energy efficiency of machining workshop
CN110599103A (en) Production management subsystem based on intelligent manufacturing MES system
US10101735B2 (en) Modular system for real-time evaluation and monitoring of a machining production-line overall performances calculated from each given workpiece, tool and machine
CN103076764A (en) RFID (Radio Frequency Identification Device) technology-based dynamic tool management method of Siemens 840D numerical control system
CN109074047A (en) For controlling the method and machine system of industrial operation
CN103286634A (en) Tool and workpiece matching verification system and machining and controlling method of numerically-controlled machine tool
CN103559578A (en) Cutter intelligent management method based on RFID technology
CN104647050A (en) Efficient metal plate forming method and flexible production line for forming metal plates
CN103543711B (en) A kind of steel plate clout method for supervising and system
CN112070378B (en) Production scheduling management method based on logic priority principle by using computer
CN101216909A (en) An ERP production planning management based on process analysis
CN108229820A (en) Machine shop parts manufacturing management method
CN101183257A (en) CAM software processing technology
CN108389009A (en) A kind of door and window workshop fact monitoring system
KR20050091605A (en) A real time inventory management system combined cad system
Zebedin et al. A new strategy for a flexible semi-automatic disassembling cell of printed circuit boards
Fardhosseini et al. Automating the digital fabrication of concrete formwork in building projects: Workflow and case example
CN110989511A (en) Tool life visual early warning method
Chougule et al. Relating product manufacturing decisions to environmental and cost performance using CAPP
CN115032956A (en) New industry MES system control method based on industrial internet identification analysis
KR20200041531A (en) Reuse method of materials
Subrahmanyam et al. Development of a tool database management system
KR20140087455A (en) Remote Manufacturing Method for Reinforcing Bar
Ho et al. Analytical analysis for material efficiency practice: an exploratory study of Malaysia manufacturing cases

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application