KR20050073397A - Vegetation Block - Google Patents
Vegetation Block Download PDFInfo
- Publication number
- KR20050073397A KR20050073397A KR1020040002103A KR20040002103A KR20050073397A KR 20050073397 A KR20050073397 A KR 20050073397A KR 1020040002103 A KR1020040002103 A KR 1020040002103A KR 20040002103 A KR20040002103 A KR 20040002103A KR 20050073397 A KR20050073397 A KR 20050073397A
- Authority
- KR
- South Korea
- Prior art keywords
- vegetation
- vegetation block
- groove
- construction
- block
- Prior art date
Links
Classifications
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01K—ANIMAL HUSBANDRY; CARE OF BIRDS, FISHES, INSECTS; FISHING; REARING OR BREEDING ANIMALS, NOT OTHERWISE PROVIDED FOR; NEW BREEDS OF ANIMALS
- A01K93/00—Floats for angling, with or without signalling devices
- A01K93/02—Floats for angling, with or without signalling devices with signalling devices
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01K—ANIMAL HUSBANDRY; CARE OF BIRDS, FISHES, INSECTS; FISHING; REARING OR BREEDING ANIMALS, NOT OTHERWISE PROVIDED FOR; NEW BREEDS OF ANIMALS
- A01K91/00—Lines
- A01K91/03—Connecting devices
- A01K91/053—Fishing booms, i.e. connecting devices spreading out the leaders, e.g. to avoid tangling thereof
Abstract
본 발명은 하천 호안 및 절개지 법면의 녹화 시공과 수변의 생태계 보호용으로 시공하는 것으로 시공시 작업자가 미끄러지지 않게 발판홈을 만들고 식생홈에 흙을 쉽게 담고 흘러내리지 않게 함에 특징이 있는 식생블록에 관한 것이다.The present invention relates to a vegetation block characterized in that the construction for the greening construction of the river banks and incisions and protecting the ecosystem of the waterfront to create a scaffold groove so that the worker does not slip during the construction and to easily contain soil in the vegetation groove.
본 발명은 일측면에 와이어 삽입공(2)을 뚫은 식생블록(1)에 있어서, 식생블록(1)의 외둘레 측면(3)에 마른모꼴 요홈(4)과 마른모꼴 철(5)부를 만들고 상단면에는 발판홈(6)을 다수 개 만들고 중앙 상단에는 상단위치표시(7)를 하고 중앙에는 상단면에서 하단면 쪽으로 경사면(8)을 만든 식생공(10)을 형성하여서 된 것이다.In the present invention, in the vegetation block (1) which drilled the wire insertion hole (2) on one side, the dry chamfer groove (4) and dry flake iron (5) in the outer peripheral side surface (3) of the vegetation block (1) The top surface is made by forming a plurality of scaffolding groove (6) and the vegetation hole (10) made the top position display (7) in the center top and the inclined surface (8) toward the bottom surface in the center.
Description
본 발명은 하천 호안 및 절개지 법면의 녹화 시공과 수변의 생태계 보호용으로 시공하는 것으로 시공시 작업자가 미끄러지지 않게 발판홈을 만들고 식생홈에 흙을 쉽게 담고 흘러내리지 않게 함에 특징이 있는 식생블록에 관한 것이다.The present invention relates to a vegetation block characterized in that the construction for the greening construction of the river banks and incisions and protecting the ecosystem of the waterfront to create a scaffold groove so that the worker does not slip during the construction and to easily contain soil in the vegetation groove.
종래에도 하천 호안 이나 절개지 법면의 녹화 시공에 식생블록을 사용하고 있으나 대부분 하나의 블록을 가지고 시공시 여러개로 모자이크 형상으로 맞춰야 하므로 작업시간이 많이 걸리며 각각의 블록의 결속력이 없어 시공한 지반이 연약지반일 경우 하절기의 우기 때 지반이 내려 앉으면 블록이 쉽게 허물어지는 경우가 많이 있어 하자 보수 시공을 다시하는 경우가 많이 있다.Conventionally, vegetation blocks are used for the greening of river shores or incisions, but most of them require one block to be mosaic-shaped in construction, so it takes a lot of work time and there is no binding force of each block. If the ground falls down during the rainy season in summer, the blocks are easily broken down, so there is a lot of repair work.
또한 식생공에 투입하는 흙은 식생공이 식생블록에서 수직으로 만들어져 절개지 법면의 경사각에 따라 시공 할 경우 식생공에 흙이 모두 채워지지 않거나 쉽게 흘러내러 식생률이 떨어져 잔디나 잡풀등의 식생에 많은 기간이 소요되거나 식생이 잘되지 않는 경우가 대부분이다.In addition, the soil put into the vegetation ball is made vertically from the vegetation block, and when it is constructed according to the inclination angle of the incision site, all the soil is not filled in the vegetation hole or it flows easily, so the vegetation rate drops and many periods of vegetation such as grass or grass Most of the time it takes or the vegetation is not good.
본 발명은 이러한 문제점을 해결하고자 개발한 것으로 식생블록 몸체의 외주연에 마른모형 요홈과 철 부를 만들고 상단면에는 발판홈을 만들고 경사면으로 된 식생공을 형성하여 된 것으로 발판홈을 집고 작업자가 쉽게 이동할 수 있으며 식생공에 흙을 모두 채울 수 있도록 한 것으로 이를 첨부도면에 의거 상세히 설명하면 다음과 같다.The present invention has been developed to solve these problems to make a dry model groove and iron on the outer periphery of the vegetation block body and to form a vegetation hole made of slopes and vegetation holes on the top surface to pick up the scaffold grooves and the worker can move easily It is possible to fill all the soil in the vegetation hole, which will be described in detail according to the accompanying drawings as follows.
본 발명은 일측면에 와이어 삽입공(2)을 뚫은 식생블록(1)에 있어서, 식생블록(1)의 외둘레 측면(3)에 마른모꼴 요홈(4)과 마른모꼴 철(5)부를 만들고 상단면에는 발판홈(6)을 다수 개 만들고 중앙 상단에는 상단위치표시(7)를 하고 중앙에는 상단면에서 하단면 쪽으로 경사면(8)을 만든 식생공(10)을 형성하여 된 것이다.In the present invention, in the vegetation block (1) which drilled the wire insertion hole (2) on one side, the dry chamfer groove (4) and dry flake iron (5) in the outer peripheral side surface (3) of the vegetation block (1) The top surface is to form a plurality of scaffolding groove (6) and the top position display (7) in the center and the vegetation hole (10) made the inclined surface (8) from the top surface to the bottom surface in the center.
상기의 식생블록(1)으로 호안이나 도로변의 절개지에 시공하고자 하면 먼저 절개지의 평탄 작업을 마친후 부직포(20)를 펼친 다음 그 위에 식생블록(1)을 시공하는 것으로 식생블록(1)을 절개지의 하단부분 부터 시공한다.If you want to install in the incision of the shore or roadside with the vegetation block (1) above, first finish the flat work of the incision and then expand the nonwoven fabric (20) and then cut the vegetation block (1) by constructing the vegetation block (1) thereon. Construct from the lower part of.
이렇게 시공하는 작업에 있어 식생블록(1)의 상단면에 표시한 상단위치표시(7)부분이 위쪽 방향으로 향하게 일정하게 시공한다,In the construction work like this, the construction of the upper position indicator (7) displayed on the upper surface of the vegetation block (1) is uniformly directed upward,
이때 식생블록(1) 식생공(10)의 경사면(8)이 위쪽을 향하게 시공된다.At this time, the inclined surface (8) of the vegetation block (1) vegetation hole 10 is constructed upward.
하나의 식생블록(1)을 절개지에 놓은 다음, 다른 식생블록(1)을 맞춰 시공할 때 다시 식생블록(1)의 상단면에 표시한 상단위치표시(7)부분이 위쪽 방향으로 향하게 한 상태에서 외둘레 측면(3)에 형성된 마른모 꼴 요홈(4)과 마른모 꼴 철(5) 부분을 맞추어 시공한다.When one vegetation block (1) is placed in the incision, and when the other vegetation block (1) is installed in accordance with the construction, the upper position indication (7) portion displayed on the upper surface of the vegetation block (1) is facing upward In the outer circumferential side (3) formed in the dry furrow grooves (4) and dry iron to fit the portion (5) construction.
상기에서 외둘레 측면(3)에 형성된 마른모 꼴 요홈(4)과 마른모 꼴 철(5)부분을 맞출 때는 절개지의 시공이 왼쪽에서 하거나 혹은 오른쪽에서 먼저 시공하느냐에 따라 결합 순서가 바뀔 수 있다.When fitting the dry furrow groove (4) and the dry iron iron (5) portion formed on the outer circumferential side (3) in the above, the coupling sequence may be changed depending on whether the construction of the incision is performed on the left side or on the right side.
식생블록(1)의 상단위치표시(7)부분이 일률적으로 위쪽을 향하게 작업을 하게되면 식생블록(1)의 식생공(10) 경사면(8)은 절개지의 경사각에 의해 수직 방향으로 향하게 된다.When the upper position display (7) portion of the vegetation block (1) to work uniformly upwards, the vegetation hole 10 slope surface 8 of the vegetation block (1) is directed in the vertical direction by the inclination angle of the incision.
이렇게 식생공(10)의 경사면(8)이 절개지의 경사각에서 수직으로 향하면 식생공(10)에 투입하는 흙은 식생공(10) 내에 모두 채울 수 있다.When the inclined surface 8 of the vegetation hole 10 is vertically oriented at the inclination angle of the incision, the soil introduced into the vegetation hole 10 may be filled in the vegetation hole 10.
상기의 식생블록(1) 상단면에 만든 다수개의 발판홈(6)은 식생블록(1)을 절개지 하단부위 부터 시공하여 올라가면 절개지의 경사각에 따라 식생블록(1)이 경사지게 놓여질 경우 작업자가 미끄러지는 것을 방지하기 위해 만든것으로 작업자가 쉽게 발판홈(6)을 집고 올라가면서 미끄러지지 않고 작업 할 수 있도록 한 것이다.The plurality of scaffolding grooves 6 made on the upper surface of the vegetation block 1 are constructed when the vegetation block 1 is raised from the lower portion of the incision site and the worker slides when the vegetation block 1 is inclined according to the inclination angle of the incision site. It is made to prevent the worker to pick up the scaffolding groove (6), so that it can work without slipping.
이와 같이 절개지 전체에 식생블록이 놓여지면 식생블록(1)의 와이어 삽입공(2)을 통해 와이어를 하단부터 상단까지 끼워서 엮어 결합하게 되는 것이다.When the vegetation block is placed on the entire incision as described above, the wire is inserted through the wire insertion hole (2) of the vegetation block (1) from the bottom to the upper end to be coupled.
이와 같이된 본 발명은 식생블록의 식생공 경사각이 절개지 법면의 경사각 보다 위쪽을 향하게 되어 식생공에 투입하는 흙이 식생공에 모두 채워지게 되며 우기에 빗물에 의해서도 쉽게 흘러내러 가지 않아 식생률이 높아 빠른 기간내에 식생이 이루어지게 되는 것이다.In the present invention as described above, the vegetation hole inclination angle of the vegetation block is turned upward than the inclination angle of the incision surface so that all the soil input to the vegetation hole is filled in the vegetation hole and the vegetation rate is high because it does not flow easily even by rain water in the rainy season. Vegetation takes place in a short time.
도 1은 본 발명의 사시도1 is a perspective view of the present invention
도 2는 본 발명의 단면도2 is a cross-sectional view of the present invention
도 3은 본 발명의 설치 일부단면도Figure 3 is a partial sectional view of the installation of the present invention
도면의 주요부분에대한 부호설명Explanation of Signs of Major Parts of Drawings
1: 식생블록 2: 와이어 삽입공1: vegetation block 2: wire insertion hole
3: 외둘레 측면 4: 마른모꼴 요홈3: circumference side 4: dry groove
5: 마른모꼴 철 6: 발판홈5: dry iron 6: scaffold groove
7: 상단위치표시 8: 경사면7: Top position indication 8: Slope
10: 식생공10: vegetation ball
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020040002103A KR20050073397A (en) | 2004-01-08 | 2004-01-08 | Vegetation Block |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020040002103A KR20050073397A (en) | 2004-01-08 | 2004-01-08 | Vegetation Block |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR20-2004-0015905U Division KR200361592Y1 (en) | 2004-06-02 | 2004-06-02 | Vegetation Block |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20050073397A true KR20050073397A (en) | 2005-07-13 |
Family
ID=37262514
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020040002103A KR20050073397A (en) | 2004-01-08 | 2004-01-08 | Vegetation Block |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20050073397A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102252075B1 (en) * | 2020-07-27 | 2021-05-17 | 정도산업 주식회사 | Fence |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0187615A1 (en) * | 1985-01-11 | 1986-07-16 | Rolf Scheiwiller | Set of elements for composite constructions |
KR910003023Y1 (en) * | 1986-05-17 | 1991-05-09 | 교와 콘크리도 고교 가부시기가이샤 | Block for revetment |
JPH04118427A (en) * | 1990-09-06 | 1992-04-20 | Yamatomi Sangyo Kk | Block for construction |
KR200221900Y1 (en) * | 2000-11-07 | 2001-04-16 | 한림에코텍주식회사 | Block for plants |
KR200284981Y1 (en) * | 2002-04-08 | 2002-08-10 | 코리콤주식회사 | Protection block for the slant side and/or river side enabling plant propagation with structure consistency |
KR20030067440A (en) * | 2002-02-26 | 2003-08-14 | 강남 | Announcement combination plant life embankment block |
KR20030073611A (en) * | 2002-03-12 | 2003-09-19 | 이근희 | Ecological block and Method for constructing ecological vegetation bank protection and vegetation retaining wall using the same |
KR20030079391A (en) * | 2002-04-04 | 2003-10-10 | 코리콤주식회사 | Protection block for the slant side and/or river side enabling plant propagation with structure consistency |
-
2004
- 2004-01-08 KR KR1020040002103A patent/KR20050073397A/en not_active Application Discontinuation
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0187615A1 (en) * | 1985-01-11 | 1986-07-16 | Rolf Scheiwiller | Set of elements for composite constructions |
KR910003023Y1 (en) * | 1986-05-17 | 1991-05-09 | 교와 콘크리도 고교 가부시기가이샤 | Block for revetment |
JPH04118427A (en) * | 1990-09-06 | 1992-04-20 | Yamatomi Sangyo Kk | Block for construction |
KR200221900Y1 (en) * | 2000-11-07 | 2001-04-16 | 한림에코텍주식회사 | Block for plants |
KR20030067440A (en) * | 2002-02-26 | 2003-08-14 | 강남 | Announcement combination plant life embankment block |
KR20030073611A (en) * | 2002-03-12 | 2003-09-19 | 이근희 | Ecological block and Method for constructing ecological vegetation bank protection and vegetation retaining wall using the same |
KR20030079391A (en) * | 2002-04-04 | 2003-10-10 | 코리콤주식회사 | Protection block for the slant side and/or river side enabling plant propagation with structure consistency |
KR200284981Y1 (en) * | 2002-04-08 | 2002-08-10 | 코리콤주식회사 | Protection block for the slant side and/or river side enabling plant propagation with structure consistency |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102252075B1 (en) * | 2020-07-27 | 2021-05-17 | 정도산업 주식회사 | Fence |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104294829A (en) | Rock slope combined type protective structure and method | |
KR101055635B1 (en) | The bio-stone structure for protecting slope and the construction method thereof | |
KR100868986B1 (en) | Sidewalk block that have function keeping water | |
CN210712735U (en) | Protective structure for preventing channel from being eroded | |
KR200361592Y1 (en) | Vegetation Block | |
KR20050073397A (en) | Vegetation Block | |
CN110485370A (en) | A kind of safeguard structure for preventing channel to be etched and its construction method | |
CN108914950B (en) | Slope greening protection method and protection device | |
KR100523965B1 (en) | Landscape block | |
KR101628201B1 (en) | Ecological block structure | |
KR101277662B1 (en) | The variant protect tree safeguard and method | |
CN201109895Y (en) | Fixer for pedestrian paving tile | |
KR20020090781A (en) | The Landscape Block With Receiving Rainwater And Construction Method Within Retaining Wall | |
KR200340941Y1 (en) | The block which provides the space where the retaining wall block and the fish live | |
CN207537964U (en) | A kind of hydraulic engineering ecological protection slope | |
KR100872371B1 (en) | The earth-and-sand collapse prevention institution of construction and river | |
KR100720928B1 (en) | Prefabricated prevet construction | |
KR100562225B1 (en) | Slope construction of building | |
KR100697637B1 (en) | Retaining wall structure for pleasant environment | |
KR200370304Y1 (en) | Permeable Sidewalk Block with Non-slip Protrusion | |
KR200418550Y1 (en) | The Plant life pipe | |
KR100590403B1 (en) | The parent environment breast institution thing which touched the construction housing complex | |
CN218436872U (en) | A ecological slope protection structure for channel renovation | |
KR100882186B1 (en) | The earth-and-sand collapse prevention institution of river | |
JP2005213735A (en) | Method of laying step block on slope, and monolithic step block on slope |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
N231 | Notification of change of applicant | ||
E902 | Notification of reason for refusal | ||
E601 | Decision to refuse application | ||
E601 | Decision to refuse application |