KR200494042Y1 - Mast fixing device for elevator passage - Google Patents
Mast fixing device for elevator passage Download PDFInfo
- Publication number
- KR200494042Y1 KR200494042Y1 KR2020190003627U KR20190003627U KR200494042Y1 KR 200494042 Y1 KR200494042 Y1 KR 200494042Y1 KR 2020190003627 U KR2020190003627 U KR 2020190003627U KR 20190003627 U KR20190003627 U KR 20190003627U KR 200494042 Y1 KR200494042 Y1 KR 200494042Y1
- Authority
- KR
- South Korea
- Prior art keywords
- mast
- passage
- rail
- hook
- wall
- Prior art date
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B7/00—Other common features of elevators
- B66B7/02—Guideways; Guides
- B66B7/023—Mounting means therefor
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B11/00—Main component parts of lifts in, or associated with, buildings or other structures
- B66B11/0035—Arrangement of driving gear, e.g. location or support
- B66B11/0045—Arrangement of driving gear, e.g. location or support in the hoistway
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B9/00—Kinds or types of lifts in, or associated with, buildings or other structures
- B66B9/16—Mobile or transportable lifts specially adapted to be shifted from one part of a building or other structure to another part or to another building or structure
- B66B9/187—Mobile or transportable lifts specially adapted to be shifted from one part of a building or other structure to another part or to another building or structure with a liftway specially adapted for temporary connection to a building or other structure
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Mechanical Engineering (AREA)
- Transportation (AREA)
- Automation & Control Theory (AREA)
- Types And Forms Of Lifts (AREA)
Abstract
본 고안은 신축건물의 엘리베이터통로에 건설리프트를 설치하기 위하여 마스트를 일반 실외 설치용 마스트의 절반 폭으로 제작하고 마스트의 사용하지 않는 레일기둥과 통로 벽체의 브래킷을 후크로 걸어 연결함으로써, 레일기둥을 손상시키지 않고 마스트를 견고하게 통로에 설치할 수 있는 엘리베이터통로 가설용 마스트 고정장치에 관한 것이다.
이를 위하여 본 고안은 엘리베이터통로에 다단으로 설치되는 리프트용 마스트를 통로의 벽면에 고정하기 위한 고정장치에 있어서, 상기 마스트는 직사각형의 각 모서리에 레일기둥이 놓인 상태에서 가로연결부와 세로연결부를 통하여 각 레일기둥이 트러스 형태로 고정되어서 정사각형의 마스트에 비하여 절반 폭으로 구성되고, 상기 마스트 앞쪽의 가로연결부에 리프트의 피니언이 치합되는 래크가 레일기둥과 같은 높이로 구비되며; 상기 마스트 뒤쪽의 통로 벽면과 대응되는 한쌍의 레일기둥들에는 외주면 일부를 감싸는 후크가 구비되고; 상기 후크의 후방에는 통로 벽면에 앵커볼트로 고정된 브래킷에 체결되는 체결부가 구비되어서 상기 마스트가 다단으로 통로의 벽면에 근접 설치되는 특징이 있다.In order to install a construction lift in the elevator passage of a new building, the present invention makes a mast half the width of a general outdoor installation mast, and connects the unused rail posts of the mast with the brackets of the passage wall with hooks, thereby damaging the rail posts. It relates to a mast fixing device for erecting an elevator passage that can firmly install the mast in the passage without having to do so.
To this end, the present invention provides a fixing device for fixing a mast for a lift installed in multiple stages in an elevator passage to the wall surface of the passage, wherein the mast is each through a horizontal connection part and a vertical connection part in a state where a rail column is placed at each corner of a rectangle. The rail post is fixed in the form of a truss so that it is half the width of a square mast, and a rack to which the pinion of the lift engages is provided at the same height as the rail post at the horizontal connection part in front of the mast; A pair of rail posts corresponding to the passage wall at the rear of the mast is provided with a hook enclosing a part of the outer circumferential surface; A fastening part is provided at the rear of the hook to be fastened to a bracket fixed to the wall of the passage with an anchor bolt, so that the mast is installed close to the wall of the passage in multiple stages.
Description
본 고안은 엘리베이터통로 가설용 마스트 고정장치에 관한 것으로서, 더욱 상세하게는 신축건물의 엘리베이터통로에 건설리프트를 설치하기 위하여 마스트를 일반 실외 설치용 마스트의 절반 폭으로 제작하고 마스트의 사용하지 않는 레일기둥과 통로 벽체의 브래킷을 후크로 걸어 연결함으로써, 레일기둥을 손상시키지 않고 마스트를 견고하게 통로에 설치할 수 있는 엘리베이터통로 가설용 마스트 고정장치에 관한 것이다.The present invention relates to a mast fixing device for erecting an elevator passage, and more specifically, in order to install a construction lift in an elevator passage of a new building, the mast is produced with a half width of a general outdoor installation mast, and the mast is not used with rail columns and By hooking the bracket of the passage wall with a hook, it relates to a mast fixing device for erecting an elevator passage that can securely install the mast in the passage without damaging the rail column.
일반적으로 건설 현장에는 작업자나 건설자재 등을 운반하기 위해 리프트 장치가 설치된다. 아파트나 빌딩과 같이 평면상 상,하부가 동일 단면을 가지는 다층(多層) 콘크리트 구조물은 갱폼(gang-form)으로 콘크리트 성형을 위한 틀이 이용되며, 각 층에 공사에 필요한 자재나 인력을 운반할 수 있도록 콘트리트 구조물과 월 타이로 연결된 마스트를 따라 상,하 이동되는 건설리프트가 널리 사용된다.In general, a lift device is installed at a construction site to transport workers or construction materials. A multi-story concrete structure with the same cross section on the top and bottom, such as an apartment or building, is a gang-form, and a frame for forming concrete is used, and the materials and manpower required for construction are transported to each floor. A construction lift that moves up and down along a mast connected by a wall tie to a concrete structure is widely used.
종래 마스트 고정구조는 특허 제916672호에 개시된 바 있다. 이는 월 타이로 콘크리트 구조물의 발코니에 적층된 마스트를 고정하는 방식이다. 이러한 건설리프트는 마스트를 따라 저속이나 중,고속의 속도로 운행하게 되는데, 이때 마스트는 월 타이를 이용하여 콘크리트 구조물의 발코니에 견고하게 고정된다.A conventional mast fixing structure is disclosed in Patent No. 916672. This is a method of fixing the laminated mast to the balcony of the concrete structure with a wall tie. These construction lifts operate at low, medium, and high speeds along the mast, and at this time, the mast is firmly fixed to the balcony of the concrete structure using wall ties.
건물 신축과정에서 골조공사가 마무리되면 마감공사를 위해서 외부에 설치 사용되었던 건설리프트는 해체하는데, 건설리프트가 해체되면 관행적으로 엘리베이터통로에 설치된 신형 엘리베이터를 사용하여 약 4 ∼ 5개월 공사기간은 신형 엘리베이터로 마무리 공사를 하였으나, 신형 엘리베이터를 건설 공사용으로 사용할 경우 무거운 화물을 적재하기 때문에 엘리베이터에 문제가 발생될 수 있으므로 엘리베이터를 건설 공사용으로 사용하지 못하게 법으로 금지하였다.When the frame work is completed in the process of building new construction, the construction lift that was installed and used outside for the finishing work is dismantled. Although the finishing work was done with an elevator, if the new elevator is used for construction work, it is prohibited by law to not use the elevator for construction work because it may cause problems with the elevator because it is loaded with heavy cargo.
상기 마스트는 해체하는데 약 3개월이 소요되는데, 마감공사가 끝난 뒤 철거할 경우 그만큼 준공이 늦어지는 문제점이 발생되므로 마감공사를 하는 동안 상기 마스트는 해체하고, 그 대신 장비의 공백을 해소하여 공기단축 및 막대한 공사비 감축효과를 보기 위하여 상기 엘리베이터통로에 별도의 리프트장치를 설치할 필요성이 발생되었다.It takes about 3 months to dismantle the mast, but if it is dismantled after the finishing work is completed, the construction is delayed by that much. Therefore, the mast is dismantled during the finishing work, and instead of the equipment blank, the construction period is shortened. And there was a need to install a separate lift device in the elevator passage in order to see a huge reduction in construction cost.
본 고안은 종래의 문제점을 감안하여 개발한 것으로서, 본 고안의 목적은 신축건물의 엘리베이터통로에 건설리프트를 설치하기 위하여 마스트를 일반 실외 설치용 마스트의 절반 폭으로 제작하고 마스트의 사용하지 않는 레일기둥과 통로 벽체의 브래킷을 후크로 걸어 연결함으로써, 레일기둥을 손상시키지 않고 마스트를 견고하게 통로에 설치할 수 있는 엘리베이터통로 가설용 마스트 고정장치를 제공함에 있다.The present invention was developed in consideration of the problems of the prior art, and the purpose of the present invention is to produce a mast with half the width of a general outdoor installation mast in order to install a construction lift in an elevator passage of a new building, It is to provide a mast fixing device for erecting an elevator passage that can be securely installed in the passage without damaging the rail column by hooking the bracket of the passage wall with a hook.
이를 위하여 본 고안은 엘리베이터통로에 다단으로 설치되는 리프트용 마스트를 통로의 벽면에 고정하기 위한 고정장치에 있어서, 상기 마스트는 직사각형의 각 모서리에 레일기둥이 놓인 상태에서 가로연결부와 세로연결부를 통하여 각 레일기둥이 트러스 형태로 고정되어서 정사각형의 마스트에 비하여 절반 폭으로 구성되고, 상기 마스트 앞쪽의 가로연결부에 리프트의 피니언이 치합되는 래크가 레일기둥과 같은 높이로 구비되며; 상기 마스트 뒤쪽의 통로 벽면과 대응되는 한쌍의 레일기둥들에는 외주면 일부를 감싸는 후크가 구비되고; 상기 후크의 후방에는 통로 벽면에 앵커볼트로 고정된 브래킷에 체결되는 체결부가 구비되어서 상기 마스트가 다단으로 통로의 벽면에 근접 설치되는 특징이 있다.To this end, the present invention is a fixing device for fixing a mast for a lift installed in multiple stages in an elevator passage to a wall surface of the passage, wherein the mast is each through a horizontal connection part and a vertical connection part in a state in which a rail column is placed at each corner of a rectangle. The rail post is fixed in the form of a truss so that it is half the width of a square mast, and a rack to which the pinion of the lift engages is provided at the same height as the rail post at the horizontal connection part in front of the mast; A pair of rail posts corresponding to the passage wall at the rear of the mast is provided with a hook enclosing a part of the outer circumferential surface; A fastening part is provided at the rear of the hook to be fastened to a bracket fixed to the wall of the passage with an anchor bolt, so that the mast is installed close to the wall of the passage in multiple stages.
본 고안에 따르면 정육면체의 일반 마스트 절반 폭으로 마스트가 제작되므로 좁은 엘리베이터통로에서 마스트를 다단으로 적층 하는데 편리하다. 마스트에서 사용하지 않는 레일기둥과 벽면에 고정된 브래킷을 후크로 연결할 경우 마스트가 벽면에서 많이 돌출되지 않으므로 리프트 설치공간이 확보되며, 특히 후크는 레일기둥에 걸어주는 방식으로써 체결자국이 남지 않으므로 레일기둥이 손상되지 않는 이점이 있다. 또한 마스트가 일반 마스트의 절반 폭으로 제작되므로 재료비를 절감할 수 있는 등의 이점이 있다.According to the present invention, the mast is manufactured with half the width of the regular mast of a cube, so it is convenient to stack the mast in multiple stages in a narrow elevator passage. When connecting an unused rail post and a bracket fixed to the wall with a hook, the mast does not protrude much from the wall, so space for the lift installation is secured. In particular, the hook is hung on the rail post so that no fastening marks are left, so the rail post This has the advantage of not being compromised. In addition, since the mast is made with half the width of a general mast, there are advantages such as reducing material cost.
도 1은 본 고안 한 실시예의 고정장치 사시도
도 2는 본 고안 한 실시예의 마스트가 설치된 엘리베이터통로의 평면도
도 3은 도 2의 확대도
도 4는 본 고안 한 실시예의 마스트 설치상태 측면도1 is a perspective view of a fixing device according to an embodiment of the present invention;
Figure 2 is a plan view of the elevator passage in which the mast of the devised embodiment is installed;
3 is an enlarged view of FIG. 2
Figure 4 is a side view of the mast installation state of the embodiment of the present invention;
도 1 내지 도 4에서 본 고안 한 실시예의 마스트는 다단으로 적층되어 수직으로 연속되는 다수의 레일기둥(10)이 구비된다. 상기 레일기둥(10)은 단면이 원형인 중공상의 파이프로 구성되는데, 사각파이로 구성할 수도 있다.1 to 4, the mast of the devised embodiment is provided with a plurality of vertically
본 고안 한 실시예의 마스트는 상기 레일기둥(10) 4개가 한조로 구성되어 직사각형의 각 모서리에 배치되며, 가로방향으로 대응되는 각 레일기둥(10)은 세로방향으로 대응되는 각 레일기둥(10)보다 더 떨어져 배치된다. 그리고 가로방향의 레일기둥(10)은 다단으로 구비된 "L"형강의 가로연결부(11)를 통하여 서로 연결되고, 세로방향의 레일기둥(10)은 다단으로 구비된 "L"형강의 세로연결부(12)를 통하여 서로 연결된다.The mast of one embodiment of the present invention consists of a set of four
또한 상기 앞쪽 가로연결부(11)들은 수직면이 전면으로 향한 상태에서 이들 수직면에 상기 레일기둥(10)과 같은 높이의 래크(14)가 구비된다. 따라서 상기 다수의 마스트가 수직으로 연결되면 레일기둥(10)과 래크(14)가 수직으로 연속된다.In addition, the front horizontal connecting
엘리베이터가 승강되는 통로(20)의 벽면에는 상기 마스트의 가로방향 레일기둥(10)과 대응되는 폭으로 "ㄷ"형 브래킷(40)이 구비된다. 상기 브래킷(40)은 통로(20)의 벽면에 앵커볼트로 체결되는 수직부(41)가 구비되고, 위쪽 수평부(42)는 후크(50)가 체결된다. 상기 후크(50)는 상기 마스트의 뒤쪽 레일기둥(10)의 외주면 일부를 감싸는 원호형으로 구성되며, 후방에는 상기 수평부(42)에 볼트 체결되는 체결부(51)가 구비된다.A "C"-
또한 상기 후크(50)는 합성고무 재질의 피복부(52)로 코팅되어 상기 후크(50)가 레일기둥(10)과 직접 접촉되지 않도록 구성하는 것이 바람직하다. 그리고 상기 가로연결부(11) 및 세로연결부(12)의 사이에는 환봉 형태의 보강파이프(13)가 사선으로 구비되어 트러스(truss)형태로 보강된다.In addition, it is preferable that the
이처럼 구성된 본 고안 한 실시예의 마스트는 일반 마스트의 절반 폭으로 제작되어서 통로(20)에서 차지하는 비중이 크지 않은 특징을 갖는다. 이를 위하여 상기 마스트는 리프트(30)의 롤러(31)가 주행되는 가로방향 레일기둥(10)은 일반 마스트와 같은 폭으로 구성되고 세로방향 레일기둥(10)은 가로방향 레일기둥(10) 보다 절반 폭으로 구성된 특징을 갖는다.The mast of one embodiment of the present invention configured as described above is manufactured to have a half width of a general mast, and thus has a characteristic that does not occupy a large proportion in the
상기 마스트의 설치과정은 다음과 같다. 먼저 통로(20)의 벽면에 상기 브래킷(40)의 수직부(41)에 천공된 볼트구멍과 대응되는 구멍을 천공하고 이 구멍에 앵커를 설치한 뒤 앵커볼트를 이용하여 수직부(41)를 벽면에 고정시킨다. 상기 브래킷(40)은 마스트 1개당 상하측으로 1개씩 2개를 배치하는 것이 바람직하며, 브래킷(40)이 벽면에 고정되면 후크(50)를 뒤쪽에 배치된 가로방향 레일기둥(10)들에 걸어주고 후방의 체결부(51)를 브래킷(40)의 수평부(42)에 위치시켜 볼트로 체결한다.The installation process of the mast is as follows. First, in the wall of the
마스트는 래크(14)가 설치된 앞쪽의 각 레일기둥(10)에 리프트(30)의 롤러(31)가 양측에서 체결되며, 래크(14)에는 피니언(32)이 맞물린다. 그리고 통로(20)의 벽면 쪽으로 향하는 뒤쪽의 각 레일기둥(10)은 상기 후크(50)가 서로 대응되게 체결되는데, 상기 후크(50)는 원호형으로 구성되어 단면이 원형인 레일기둥(10)의 외주면을 감싸는 형태이다. 상기 후크(50)는 후방의 체결부(51)가 브래킷(40)의 수평부(42)에 볼트로 체결되면 고정된 상태에서 상기 레일기둥(10)이 움직이지 않으므로 마스트가 수직으로 세워진다.In the mast, the
상기 후크(50)는 합성고무의 피복부(52)가 코팅되어 있으므로 금속끼리 접촉되지 않아서 충격소음이 발생되지 않으며 레일기둥(10)의 표면을 손상시키지 않는다. 상기 리프트(30)에 구비된 다수의 롤러(31)가 상기 앞쪽의 레일기둥(10)에 구름접촉된 상태에서 구동부(33)로 회전되는 피니언(32)이 래크(14)와 치합되므로 리프트(30)가 다단의 마스트를 따라 통로(20)에서 승강된다.Since the
이처럼 설치되면 리프트(30)의 출구가 통로(20)의 출입구(21)와 대응되는데, 상기 마스트는 일반 마스트의 절반 폭으로 구성되어 통로(20)의 벽면에서 많이 돌출되지 않으며, 또한 브래킷(40)과 후크(50)를 통하여 벽면에 직접 체결되므로 월타이로 고정할 때 보다 벽면에서 돌출되지 않는 등의 특징이 있다.When installed in this way, the exit of the
10 : 레일기둥 11 : 가로연결부
12 : 세로연결부 13 : 보강파이프
14 : 래크 20 : 통로
30 : 리프트 40 : 브래킷
41 : 수직부 42 : 수평부
50 : 후크 51 : 체결부
52 : 피복부10: rail column 11: horizontal connection part
12: vertical connection part 13: reinforcement pipe
14: rack 20: passage
30: lift 40: bracket
41: vertical part 42: horizontal part
50: hook 51: fastening part
52: covering part
Claims (3)
상기 브래킷은 "ㄷ"형으로 구성되어서 통로 벽면에 체결되는 수직부와 상기 후크의 체결부가 결합되는 수평부로 구성되고;
상기 후크는 합성고무의 피복부가 코팅되어서 상기 레일기둥과 직접 닿지 않도록 한 것을 특징으로 하는 엘리베이터통로 가설용 마스트 고정장치.The lift mast installed in multiple stages in the elevator passage is fixed in the form of a truss through a horizontal connection part and a vertical connection part in a state where the rail pillars are placed at each corner of the rectangle. A rack to which the pinion of the lift is engaged is provided in the horizontal connection part in front of the mast at the same height as the rail column; A pair of rail posts corresponding to the passage wall at the rear of the mast is provided with a hook enclosing a part of the outer circumferential surface; In the mast fixing device for erecting an elevator passage, the hook is provided with a fastening part fastened to a bracket fixed to the passage wall with an anchor bolt at the rear of the hook so that the mast is installed close to the wall surface of the passage in multiple stages,
The bracket is configured in a "C" shape and is composed of a vertical part fastened to the passage wall and a horizontal part coupled to the fastening part of the hook;
The hook is an elevator passage construction mast fixing device, characterized in that the synthetic rubber coating is coated so that it does not come into direct contact with the rail column.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2020190003627U KR200494042Y1 (en) | 2019-09-02 | 2019-09-02 | Mast fixing device for elevator passage |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2020190003627U KR200494042Y1 (en) | 2019-09-02 | 2019-09-02 | Mast fixing device for elevator passage |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20210000572U KR20210000572U (en) | 2021-03-10 |
KR200494042Y1 true KR200494042Y1 (en) | 2021-07-19 |
Family
ID=74871039
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR2020190003627U KR200494042Y1 (en) | 2019-09-02 | 2019-09-02 | Mast fixing device for elevator passage |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR200494042Y1 (en) |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005200917A (en) * | 2004-01-15 | 2005-07-28 | Sanoyas Hishino Meisho Corp | Work elevator installing structure for aboveground base isolation building structure |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3503258B2 (en) * | 1995-03-28 | 2004-03-02 | アラコ株式会社 | Vehicle luggage shelf |
KR20180066712A (en) * | 2016-12-09 | 2018-06-19 | 대영공업 주식회사 | Fixing hook for euro-form support pipe type |
-
2019
- 2019-09-02 KR KR2020190003627U patent/KR200494042Y1/en active IP Right Grant
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005200917A (en) * | 2004-01-15 | 2005-07-28 | Sanoyas Hishino Meisho Corp | Work elevator installing structure for aboveground base isolation building structure |
Also Published As
Publication number | Publication date |
---|---|
KR20210000572U (en) | 2021-03-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107100358B (en) | Cantilever bracket and bracket body special for unloading-free industrialized safety protection and construction method of cantilever bracket and bracket body | |
US9016025B2 (en) | Constructing method for concrete cylinder of construction steel bar of high-rise steel structure | |
CN108625483B (en) | Equipment for jacking construction of assembled additional elevator shaft structure | |
CN111779248A (en) | High formwork system and construction method thereof | |
CN206233639U (en) | movable shed | |
KR200494042Y1 (en) | Mast fixing device for elevator passage | |
US3726053A (en) | Method and apparatus for erecting modular high-rise building | |
CN106437261B (en) | A kind of concrete frame seismic reinforcing structure using expanded metal lath | |
CN115306137B (en) | Operation platform structure for installing suspended ceiling at bottom of high-altitude corridor and construction method thereof | |
CN214329960U (en) | Unitized curtain wall loading platform | |
CN115627912A (en) | Construction method of assembled externally-mounted flower basket type overhanging scaffold | |
CN115095118A (en) | Method for constructing coke quenching tower by suspended integrally-installed support | |
CN215670929U (en) | Shear force wall elevator shaft assembled operation platform | |
CN211818114U (en) | Discharging platform for multi-storey building construction | |
JP5166055B2 (en) | Construction method of multistory parking lot | |
CN202209051U (en) | Discharging platform for high-rise building construction | |
KR20210020258A (en) | Mast for elevator passage installation | |
US3435583A (en) | Method of forming buildings | |
KR100901016B1 (en) | Safety bracket to external wall scaffolding for a structure | |
CN212642232U (en) | Combined supporting device for entrance and exit of warehouse | |
CN219732015U (en) | Single-side formwork supporting device for outer wall of foundation pit adjacent to building enclosure | |
CN216552527U (en) | Heat preservation and decoration integrated module wall and house based on heat preservation and decoration integrated module wall | |
CN110593411B (en) | Construction method of high-rise high-altitude suspended large-span beam | |
CN114263349B (en) | Construction method of wall-attached-free combined scaffold | |
CN219114032U (en) | Go up people's wallboard storage rack |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
E701 | Decision to grant or registration of patent right | ||
REGI | Registration of establishment |