CN211818114U - Discharging platform for multi-storey building construction - Google Patents

Discharging platform for multi-storey building construction Download PDF

Info

Publication number
CN211818114U
CN211818114U CN201921857905.5U CN201921857905U CN211818114U CN 211818114 U CN211818114 U CN 211818114U CN 201921857905 U CN201921857905 U CN 201921857905U CN 211818114 U CN211818114 U CN 211818114U
Authority
CN
China
Prior art keywords
platform
unloading
storey
middle level
deck
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921857905.5U
Other languages
Chinese (zh)
Inventor
秦官庆
李文军
韩铁强
许长山
李秀峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201921857905.5U priority Critical patent/CN211818114U/en
Application granted granted Critical
Publication of CN211818114U publication Critical patent/CN211818114U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model belongs to the building engineering field, concretely relates to platform of unloading for multi-storey building construction, including one deck platform of unloading, middle level platform and the top layer platform of unloading, the one deck platform of unloading includes one deck passageway portion and one deck platform portion, the top of one deck passageway portion is provided with a plurality of middle levels platform of unloading, and the middle level platform of unloading includes middle level passageway portion and middle level platform portion, and every middle level platform of unloading all is located its passageway portion top of unloading the platform of one deck down, and the top of the middle level passageway portion of the superiors is provided with the top layer platform of unloading. Use the utility model discloses, can finish at the main structure construction of multi-storey building, begin secondary structure and interior decoration, when needing to transport the material perpendicularly, with the material vertical lifting to the floor height back that needs to use, unload and fall on the platform of unloading, horizontal transportation to the floor in again. The same process arrangement and the same region schedule arrangement can be kept for the secondary structure construction and decoration of the upper and lower floors.

Description

Discharging platform for multi-storey building construction
Technical Field
The utility model belongs to the building engineering field, concretely relates to platform of unloading for multi-storey building construction.
Background
At present, most of the unloading platforms commonly used in the building engineering are bearing structures which are formed by taking profile steel as a main body and then drawing and tying the profile steel to a building main body structure by using inclined steel wire ropes, and the four steel supporting tops and the unloading platforms are fixed between floors by using upper and lower floor plates without the inclined steel wire ropes.
But to the upper and lower layer simultaneous use platform of unloading of needs to and because of some reason can't disperse lay the platform of unloading of using simultaneously from top to bottom, above two kinds of platforms of unloading all can't satisfy the user demand.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem that the upper and lower storied buildings can not use the discharging platform at the same time, the discharging platform for the multi-story building construction is provided. The utility model discloses can make up and lay in the same region of building, the floor uses simultaneously about satisfying.
The utility model provides a its technical problem realize through following technical scheme:
the utility model provides a platform of unloading for multi-storey building construction, includes that the one deck platform of unloading, middle level platform and the top layer platform of unloading, the one deck platform of unloading include one deck passageway portion and one deck platform portion, the top of one deck passageway portion is provided with a plurality of middle level platforms of unloading, and the middle level platform of unloading includes middle level passageway portion and middle deck platform portion, and every middle level platform of unloading all is located the passageway portion top that the platform was unloaded to its next floor, and the top of the middle level passageway portion of the superiors is provided with the top layer platform of unloading.
Furthermore, the one-layer unloading platform corresponds to any floor of the main structure except the first floor and the top floor, and the middle-layer unloading platform and the top-layer unloading platform respectively correspond to the floors of the main structure above the floors corresponding to the one-layer unloading platform in sequence.
Furthermore, a middle layer discharging platform is arranged above the first layer channel part.
Furthermore, the unloading platform comprises platform frames which are symmetrically arranged, each platform frame comprises vertical rods and horizontal rods, and the horizontal rods are connected between the vertical rods through fasteners; two it is provided with the platform net to correspond fixed the being provided with of major structure floor department between the platform frame, the platform board has been laid on the platform net.
Furthermore, a shear support is arranged outside the platform frame.
Further, the peripheries of the one-layer platform part, the middle-layer platform part and the top-layer unloading platform are provided with guardrails.
The utility model discloses following beneficial effect has:
(1) use the utility model discloses, can finish at the main structure construction of multi-storey building, begin secondary structure and interior decoration, when needing to transport the material perpendicularly, with the material vertical lifting to the floor height back that needs to use, unload and fall on the platform of unloading, horizontal transportation to the floor in again. The same process arrangement and the same area schedule arrangement can be kept for the secondary structure construction and decoration of the upper and lower floors;
(2) the utility model can be arranged in any suitable area, can meet the requirement of simultaneous use of upper and lower floors, generally can meet the requirement of simultaneous use of 3 floors, and is favorable for ensuring the construction period;
(3) the unloading platform is convenient to mount and dismount, and does not need to be matched with hoisting machinery.
Drawings
FIG. 1 is a side view of a discharging platform for multi-story building construction of the present invention;
fig. 2 is a top view of the discharging platform (excluding the platform plate) for multi-story building construction of the present invention;
FIG. 3 is a schematic structural view of a double-steel-pipe upright of the discharging platform for multi-story building construction of the present invention;
fig. 4 is a schematic structural view of the three-steel-pipe vertical rod of the discharging platform for multi-story building construction.
In the attached drawing, 1-one-layer discharging platform, 2-middle-layer discharging platform, 3-top-layer discharging platform, 5-horizontal rod, 6-platform net, 7-platform plate, 8-shear support, 9-guardrail, 10-single vertical rod, 11-double steel pipe vertical rod, 12-three steel pipe vertical rod, 13-rotary fastener and 14-structural plate.
Detailed Description
The present invention will be described in further detail with reference to specific examples, which are provided for illustrative purposes only, and are not intended to be limiting, and the scope of the present invention should not be limited thereby.
The utility model discloses the platform of unloading of multi-storey building construction can make up and lay in the same region of building, and the floor uses simultaneously about satisfying. As shown in fig. 1, the utility model relates to a platform of unloading for multi-storey building construction, including the one deck platform 1 of unloading, middle level platform 2 of unloading and top layer platform 3 of unloading, the one deck platform 1 of unloading includes one deck passageway portion and one deck platform portion, the top of one deck passageway portion is provided with a plurality of middle levels platform 2 of unloading, and the platform of unloading of general this combination is no longer than 3 layers, so preferred, the top of one deck passageway portion is provided with a middle level platform 2 of unloading. The middle layer unloading platform 2 comprises a middle layer channel part and a middle layer platform part, each middle layer unloading platform 2 is positioned above the channel part of the next layer unloading platform, and a top layer unloading platform 3 is arranged above the middle layer channel part of the uppermost layer. The structure can prevent the use of the upper discharging channel from being interfered when the lower discharging channel is used. When two floors need to be constructed simultaneously, the materials are vertically lifted to the height of the floor needing to be used, then are unloaded on the unloading platform, and then are horizontally transported into the floors.
The first layer of unloading platform 1 corresponds to any floor of the main structure except the first floor and the top floor, and the middle layer of unloading platform 2 and the top layer of unloading platform 3 correspond to the floors of the main structure above the floors corresponding to the first layer of unloading platform in sequence. The unloading platform comprises platform frames which are symmetrically arranged, each platform frame comprises vertical rods and horizontal rods 5, and the horizontal rods 5 are connected between the vertical rods through fasteners; the platform frame is provided with the shear brace 8 outward, has further strengthened the intensity of platform frame. The periphery of one deck platform portion, middle level platform portion and top layer platform 3 of unloading all is provided with guardrail 9, operation safety when having guaranteed to unload. As shown in fig. 2, a platform net 6 is fixedly arranged between the two platform frames corresponding to the floor of the main body structure, and the platform net 6 is composed of criss-cross scaffold steel pipes, square wood, square steel pipes or section steel; wherein, a vertical rod support is arranged below the bottommost platform net 6; the platform plate 7 is laid on the platform net 6, so that the materials can be conveniently conveyed in the conveying channel. The platform frame, the platform net 6 and the platform plate 7 are all fixed in a convenient mounting and dismounting mode, so that the discharging cost is saved.
During construction, firstly, a layer of unloading platform 1 is set up, the layer of unloading platform 1 comprises a layer of unloading platform part and a layer of channel part, and the layer of unloading platform can correspond to any layer of the main structure except the first layer and the top layer. Then, a second layer or a second layer and a third layer of unloading platforms are continuously erected on the unloading platform of the layer and correspond to 1 layer or 2 layers of main structure floors above the floors corresponding to the unloading platform of the layer. Except for the top-most discharging platform, the discharging platform of each layer below the discharging platform consists of a discharging platform part and a channel part.
Example (b):
as shown in fig. 1-2, a platform of unloading for multi-storey building construction sets up in the structural slab 14 outside, including one deck platform 1 of unloading, middle level platform 2 of unloading and top layer platform 3 of unloading, one deck platform 1 of unloading includes one deck passageway portion and one deck platform portion, the top of one deck passageway portion is provided with 1 middle level platform 2 of unloading, and middle level platform 2 of unloading includes middle level passageway portion and middle deck platform portion. The first layer of unloading platform 1 corresponds to any floor of the main structure except the first layer and the top layer, and the middle layer of unloading platform 2 and the top layer of unloading platform 3 correspond to the floors of the main structure above the floors corresponding to the first layer of unloading platform in sequence. The unloading platform comprises platform frames which are symmetrically arranged, each platform frame comprises vertical rods and horizontal rods 5, and the horizontal rods 5 are connected between the vertical rods through fasteners; a platform net 6 is fixedly arranged between the two platform frames corresponding to the main structure floor, and in the embodiment, the platform net 6 is composed of criss-cross scaffold steel pipes; a platform plate 7 is laid on the platform net 6. And a shear support 8 is arranged outside the platform frame. In addition, the peripheries of the one-layer platform part, the middle-layer platform part and the top-layer discharging platform 3 are all provided with guardrails 9.
The construction steps of the discharging platform are as follows:
(1) according to the stress checking calculation, determining the longitudinal and transverse spacing of the vertical rods, the step pitch of the horizontal rods and the width of the platform frame body; determining the length of the unloading platform according to the use requirement;
(2) the upright posts are divided into single upright posts 10, double-steel-pipe upright posts 11 and three-steel-pipe upright posts 12 according to different corresponding areas, wherein the single upright posts 10 correspond to the platform part of the one-layer unloading platform 1, the double-steel-pipe upright posts 11 correspond to the platform part of the middle-layer unloading platform 2, and the three-steel-pipe upright posts 12 correspond to the platform part of the top-layer unloading platform 3; the double-steel-pipe upright rods 11 comprise upright rods for supporting the platform net 6 of the one-layer discharging platform 1 and upright rods for supporting the platform net 6 of the middle-layer discharging platform 2; the three-steel-pipe upright 12 comprises an upright for supporting the platform net 6 of the one-layer discharging platform 1, an upright for supporting the platform net 6 of the middle-layer discharging platform 2 and an upright for supporting the platform net 6 of the top-layer discharging platform 3. The top ends of the single vertical rod 10, the double-steel-pipe vertical rod 11 and the three-steel-pipe vertical rod 12 are respectively provided with a U-shaped support, and a support plate of each U-shaped support can only accommodate a single scaffold steel pipe and is used for supporting the scaffold steel pipes of the platform net 6, wherein the scaffold steel pipes are perpendicular to the transportation direction; the adjacent upright poles in the double-steel-pipe upright pole 11 and the three-steel-pipe upright pole 12 are connected by a rotary fastener 14;
(3) a layer of unloading platform 1 is set up, the layer of unloading platform consists of a layer of unloading platform part and a layer of channel part, and the layer of unloading platform can correspond to any layer of the main structure except the first layer and the top layer;
(4) the vertical rod and the horizontal rod 5 or a single longitudinal scaffold steel pipe are locked by a right-angle fastener;
(5) the opening direction of the supporting plate is vertical to the material transportation direction, a single scaffold steel pipe is arranged in the supporting plate, and then the scaffold steel pipe (or square timber) is laid on the scaffold steel pipe and locked by a fastener; the platform net 6 is formed, the scaffold steel pipes and the scaffold steel pipes (or square wood) laid on the scaffold steel pipes can be replaced by square steel pipes or section steel, and the fixing modes of the scaffold steel pipes and the square steel pipes are changed correspondingly;
(6) then laying a platform plate 7 on the platform net 6 and reliably fixing;
(7) at the channel, at least 3 rows of upright rods are required to be kept outside the channel;
(8) arranging a cross brace 8 outside the platform frame according to the standard requirement;
(9) and a middle-layer unloading platform 2, a middle-layer unloading platform 2 and a top-layer unloading platform 3 are continuously erected on the first-layer unloading platform 1 and correspond to the upper 1-layer or 2-layer main structure floors. Except the top discharging platform 3, the discharging platform of the next layer consists of a discharging platform part and a channel part.
While one embodiment of the present invention has been described in detail, the description is only a preferred embodiment of the present invention, and should not be considered as limiting the scope of the present invention. All the equivalent changes and improvements made according to the application scope of the present invention should still fall within the patent coverage of the present invention.

Claims (6)

1. The utility model provides a platform of unloading for multi-storey building construction, its characterized in that unloads platform (1), middle level platform (2) and top layer platform (3) of unloading including the one deck, platform (1) of unloading includes one deck passageway portion and one deck platform portion, the top of one deck passageway portion is provided with a plurality of platform (2) are unloaded to the middle level, platform (2) are unloaded to the middle level includes middle level passageway portion and middle level platform portion, every platform (2) are unloaded to the middle level all is located the passageway portion top of the platform of unloading of its lower floor, and the top of the middle level passageway portion of the superiors is provided with platform (3) is unloaded to the top layer.
2. The discharging platform for the multi-storey building construction according to claim 1, wherein the one-storey discharging platform (1) corresponds to any one storey of the main structure except the first storey and the top storey, and the middle-storey discharging platform (2) and the top-storey discharging platform (3) respectively correspond to the main structure storey above the storey corresponding to the one-storey discharging platform in sequence.
3. A platform for discharging multi-storey building construction according to claim 1 wherein one of the intermediate discharge platforms (2) is provided above the one-storey channel section.
4. The platform of claim 1, wherein the platform comprises symmetrically arranged platform frames, each platform frame comprises an upright rod and a horizontal rod (5), and the horizontal rods (5) are connected between the upright rods through fasteners; two it is provided with platform net (6) to correspond fixed being provided with of major structure floor department between the platform frame, platform board (7) are laid on platform net (6).
5. A platform for discharging of multistory building constructions according to claim 4 wherein shear braces (8) are provided externally of the platform frame.
6. The platform of claim 1, wherein the outer peripheries of the first, middle and top decks (3) are provided with guardrails (9).
CN201921857905.5U 2019-10-31 2019-10-31 Discharging platform for multi-storey building construction Active CN211818114U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921857905.5U CN211818114U (en) 2019-10-31 2019-10-31 Discharging platform for multi-storey building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921857905.5U CN211818114U (en) 2019-10-31 2019-10-31 Discharging platform for multi-storey building construction

Publications (1)

Publication Number Publication Date
CN211818114U true CN211818114U (en) 2020-10-30

Family

ID=73146988

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921857905.5U Active CN211818114U (en) 2019-10-31 2019-10-31 Discharging platform for multi-storey building construction

Country Status (1)

Country Link
CN (1) CN211818114U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110792269A (en) * 2019-10-31 2020-02-14 中冶天工集团有限公司 Discharging platform for multi-storey building construction and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110792269A (en) * 2019-10-31 2020-02-14 中冶天工集团有限公司 Discharging platform for multi-storey building construction and construction method thereof

Similar Documents

Publication Publication Date Title
US5333426A (en) Wood frame construction system with prefabricated components
CN202324571U (en) Overhanging type double-row scaffold
CN211818114U (en) Discharging platform for multi-storey building construction
EP3140460A2 (en) Modular support frame
CN110792269A (en) Discharging platform for multi-storey building construction and construction method thereof
AU2019316713A1 (en) Method of erecting a multi-storey structure and facade
US3732655A (en) Suspended building construction
US2966718A (en) Method for the installation of reinforced concrete floors in multistoried buildings
CN115306137B (en) Operation platform structure for installing suspended ceiling at bottom of high-altitude corridor and construction method thereof
CN110905204A (en) Method for transferring formwork supporting materials of wood formwork of building outer frame column
CN111677259B (en) High-rise Bailey truss cantilever construction method
CN101250946A (en) Construction method and construction technique for wide cross section beam formwork supporting system
CN210217190U (en) Special console mode platform of unloading of factory building
CN107035037A (en) High building top layer curtain wall frame and its installation method
CN107975144A (en) A kind of assembled industrialization house
CN108442678A (en) Slope roof type skin repair crosshead and its construction method
CN219825896U (en) Temporary steel ramp structure of frame structure basement
CN217326382U (en) Lifting elevator derrick suitable for elevator shaft with side wall
JP2008536030A (en) Ring beam structure and wooden beam method
KR200494042Y1 (en) Mast fixing device for elevator passage
CN211647403U (en) Steel gallery integral lifting high-altitude translation installation safety protection structure
JP3186955B2 (en) Construction waste unloading device
JP5972113B2 (en) Construction method of multistory parking lot
CN218622611U (en) Core barrel elevator shaft frame serving as core barrel construction channel
US2072699A (en) Metallic storage rack for barrels

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant