JP3186955B2 - Construction waste unloading device - Google Patents

Construction waste unloading device

Info

Publication number
JP3186955B2
JP3186955B2 JP27125995A JP27125995A JP3186955B2 JP 3186955 B2 JP3186955 B2 JP 3186955B2 JP 27125995 A JP27125995 A JP 27125995A JP 27125995 A JP27125995 A JP 27125995A JP 3186955 B2 JP3186955 B2 JP 3186955B2
Authority
JP
Japan
Prior art keywords
chute
building
construction waste
chutes
unloading device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP27125995A
Other languages
Japanese (ja)
Other versions
JPH09110119A (en
Inventor
建治 木村
晋 谷沢
剛 崎
芳邦 津田
Original Assignee
株式会社淺沼組
木下運動具工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社淺沼組, 木下運動具工業株式会社 filed Critical 株式会社淺沼組
Priority to JP27125995A priority Critical patent/JP3186955B2/en
Publication of JPH09110119A publication Critical patent/JPH09110119A/en
Application granted granted Critical
Publication of JP3186955B2 publication Critical patent/JP3186955B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、建設中の建物の
各階で収集した建設廃棄物を地下まで降すための荷降し
装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an unloading device for lowering construction waste collected at each floor of a building under construction to an underground.

【0002】[0002]

【従来の技術】建設中の建物においては、残材等の建設
廃棄物が発生し、これを処理するため該廃棄物を各階で
袋詰めにした後地上に降す必要がある。
2. Description of the Related Art In a building under construction, construction waste such as residual materials is generated. In order to treat the waste, it is necessary to pack the waste on each floor and then drop it to the ground.

【0003】従来、袋詰めした建設廃棄物を地上まで降
すには、足場にセットされた工事用エレベータを利用し
て搬出するのが主流である。
[0003] Conventionally, in order to lower bagged construction waste to the ground, it is common to carry it out using a construction elevator set on a scaffold.

【0004】[0004]

【発明が解決しようとする課題】しかし、工事用エレベ
ータの利用は、建設廃棄物の積込みと荷降ろし及び搬送
に手間と時間がかかり、特に、高層建物になると搬送に
時間が必要になり、建設廃棄物の搬送中は工事用資材の
荷揚げ作業が遅滞するという問題がある。
However, the use of construction elevators requires time and effort for loading, unloading, and transporting construction waste, especially in high-rise buildings, which requires time for transportation. There is a problem that the unloading work of construction materials is delayed during the transportation of waste.

【0005】また、工事用エレベータの設置位置は固定
化されており、工事用廃棄物の集積場が工事用エレベー
タの近辺に設けられればよいが、そうでない場合には、
荷降した建設廃棄物を集積位置にまで水平運搬しなけれ
ばならないという問題がある。
[0005] Further, the installation position of the construction elevator is fixed, and a construction waste collection site may be provided near the construction elevator.
There is a problem that the unloaded construction waste has to be transported horizontally to the collecting position.

【0006】そこで、この発明の課題は、各階で収集し
た建設廃棄物を極めて簡単に能率よく地上に降ろすこと
ができる建設廃棄物の荷降し装置を提供することにあ
る。
SUMMARY OF THE INVENTION It is an object of the present invention to provide a construction waste unloading apparatus capable of extremely easily and efficiently dropping construction waste collected on each floor onto the ground.

【0007】[0007]

【課題を解決するための手段】上記のような課題を解決
するため、請求項1の発明は、一方端部の上面と他方端
の下面が開放する直線状のシュートを用い、一定の間
隔で起立する建枠をブレースや足場板で結合して組み立
てることにより建物の外側に仮設した足場に、複数の
記シュートを傾斜状態で上下のシュートの端部が上下に
位置するように、上下で逆傾斜となるように配置してス
ロープを形成するようにした建設廃棄物の荷降し装置で
あって、前記シュートが、建枠の両側縦柱間に納まる幅
と建枠の対向間隔の2スパン間に傾斜状態で納まる長さ
に形成され、このシュートの両端部に建枠の横桟に係止
するフックを固定した構成を採用したものである。請求
項2の発明は、一方端部が閉鎖され、他方端部と上面が
開放する直線状のシュートを用い、一定の間隔で起立す
る建枠をブレースや足場板で結合して組み立てることに
より建物の外側に仮設した足場に、複数の前記シュート
を傾斜状態で上位のシュートの開放端部が下位に位置す
るシュートの真上に臨むように、上下で逆傾斜となるよ
うに配置してスロープを形成するようにした建設廃棄物
の荷降し装置であって、前記シュートが、建枠の両側縦
柱間に納まる幅と建枠の対向間隔の2スパン間に傾斜状
態で納まる長さに形成され、閉鎖された一方端部側の位
置に、建枠の両側縦柱間に固定したパイプに固定するク
ランプが取り付けられている構成を採用したものであ
る。
In order to solve the above-mentioned problems, the invention of claim 1 uses a linear chute having an open upper surface at one end and a lower surface at the other end for a certain period.
Buildings that are erected at an interval are assembled with braces or scaffolds
A plurality of chutes are arranged on a temporary scaffold outside the building so that the ends of the upper and lower chutes are inclined up and down so that the ends of the upper and lower chutes are vertically inclined. A construction waste unloading device that forms a slope
The width that the chute fits between the vertical columns on both sides of the building frame
Length that fits in an inclined state between two spans opposite to each other
Formed on both ends of this chute
In this configuration, a hook is fixed . Claim
In the invention of Item 2, one end is closed, and the other end and the upper surface are closed.
Stand up at regular intervals using open linear chutes
Building frames combined with braces and scaffolds
A plurality of the chutes are mounted on a temporary scaffold outside the building.
With the open end of the upper chute positioned lower
Up and down so that they are just above the shoot
Construction waste arranged to form a slope
The unloading device according to claim 1, wherein the chute is vertically positioned on both sides of the building frame.
Inclined between two spans, the width that fits between pillars and the opposing spacing of building frames
One end side formed and closed to fit
To the pipe fixed between the vertical columns on both sides of the building frame.
It adopts a configuration with a lamp attached.
You.

【0008】ここで、シュートは、断面上向コ字状又は
角筒状、円形パイプに形成され、各シュートが建設廃棄
物の滑動する傾斜角度で上下に折り返し状のスロープと
なるよう順次配置される。
Here, the chutes are formed in a U-shaped cross section, a rectangular cylindrical shape, or a circular pipe, and the chutes are sequentially arranged so as to form a slope that is folded up and down at an inclination angle at which the construction waste slides. You.

【0009】請求項の発明は、平面形状が円弧状と
なるよう形成されたシュートを用い、一定の間隔で起立
する建枠をブレースや足場板で結合して組み立てること
により建物の外側に仮設した足場に、複数の前記シュー
トを上下のシュートが螺旋状に連続するよう配置した
設廃棄物の荷降し装置であって、前記半円弧状のシュー
トは、建枠の両側縦柱間に納まる幅を有し、その両端部
下面に、建枠の横桟に係止するフックを固定した構成を
採用したものである。
[0009] The invention of claim 3, using a chute formed so that the planar shape becomes a semi-arc shape, standing at regular intervals
Frames to be assembled with braces and scaffolds
In this construction, a plurality of chutes are arranged so that the upper and lower chutes are spirally continuous on a temporary scaffold outside the building.
An apparatus for unloading waste, comprising: the semicircular arc shoe
Has a width that fits between the vertical columns on both sides of the building frame.
A configuration is employed in which a hook that locks to a horizontal rail of a building frame is fixed to the lower surface .

【0010】ここで、シュートは、断面上向コ字状又は
角筒状、円形パイプに形成され、シュートは建設廃棄物
が滑動する傾斜角度で上下に順次接続され、螺旋のスロ
ープを形成している。
Here, the chute is formed in a circular pipe with a U-shaped cross section or a rectangular cylindrical shape, and the chute is sequentially connected up and down at an inclination angle at which the construction waste slides to form a spiral slope. I have.

【0011】[0011]

【発明の実施の形態】以下、この発明の実施の形態を図
示例と共に説明する。
Embodiments of the present invention will be described below with reference to the drawings.

【0012】図1乃至図5は、ストレートのシュートを
用い、折り返し式スロープとした荷降し装置の第1の例
を示し、シュート1は直線状で断面が上向コ字状又は角
筒状となり、長さ方向を所定角度の傾斜状態としたとき
両端は垂直の短尺角筒状となり、上側となる一方端部の
上面と他方端部の下面は、水平状態で共に等しい開口径
の接続口2、3になっている。
FIGS. 1 to 5 show a first example of an unloading device using a straight chute and a folded slope. The chute 1 has a straight shape and an upward U-shaped or rectangular cylindrical cross section. When the longitudinal direction is inclined at a predetermined angle, both ends become a vertical short rectangular tube, and the upper surface of one end and the lower surface of the other end, which are the upper side, have a connection port having the same opening diameter in the horizontal state. Two or three.

【0013】建物Aの外側に仮設された足場Bは、一定
の間隔で対向状に起立する建枠B1をブレースB2 や足
場板で結合すると共に、建枠B1 を上方へ順次上方に接
続することによって構築され、前記シュート1は、例え
ば、図2に示すように建枠B1 内に納まる幅と、図1の
如く、建枠B1 の対向間隔の2スパン間に傾斜状態で納
まる長さに形成され、該シュート1の両端部に建枠B1
の横桟B3 に係止するフック4、4が固定されている。
[0013] scaffolds are temporary outside of the building A B is a Kenwaku B 1 erected on opposite shape at regular intervals with coupling with braces B 2 and scaffolding plate, sequentially upward Kenwaku B 1 upward constructed by connecting, the chute 1, for example, a width falls Kenwaku B 1 as shown in FIG. 2, as in FIG. 1, in an inclined state between two spans of opposed intervals Kenwaku B 1 is formed to a length that fits, Kenwaku B 1 at both ends of the chute 1
Hooks 4,4 which engage the rungs B 3 is fixed.

【0014】従って、シュート1は、図3のように、両
端のフック4、4を建枠B1 の横桟B3 に高さを違えて
係止すると、袋入り建物廃棄物の滑動に必要な傾斜角度
で横桟B3 間に架設されると共に、上下のシュート1は
傾斜方向が逆の配置となるよう上下に折り返し配置すれ
ば、上位シュート1の下端接続口3と下位シュート1の
上端接続口2とは互に連通し、上下にジグザグ状態で連
続するすべり台式の荷降し装置が構成される。
[0014] Thus, the chute 1, as shown in FIG. 3, the locking by Chigae height hook 4, 4 at both ends rungs B 3 of Kenwaku B 1, requires the sliding of the bags building waste while being extended between Do inclination angle rungs B 3, the upper and lower chute 1 when folded arranged vertically so that the inclination directions are reverse arrangement, the upper end of the lower connecting port 3 and the lower chute 1 of the upper chute 1 A slide-type unloading device which communicates with the connection port 2 and is continuous in a zigzag manner up and down is configured.

【0015】前記シュート1を形成する材料は、鋼板、
ステンレス、合成樹脂等を用い、上下接続口2、3の外
周にフランジを設けたり、角筒状や円形パイプの断面構
造とした場合、図4に示すように、下端部の上面に投入
口5を設けてもよく、この投入口5は蓋によって開閉で
きるようにすることもできる。
The material forming the chute 1 is a steel plate,
When stainless steel, synthetic resin, or the like is used and a flange is provided on the outer periphery of the upper and lower connection ports 2 or 3 or a cross-sectional structure of a square tube or a circular pipe is used, as shown in FIG. May be provided, and the input port 5 may be opened and closed by a lid.

【0016】荷降し装置における最下部は、図1と図2
に示すように、最下部シュート1aを足場Bの外方に向
けて突出するように、足場Bに対してワイヤ6等で吊下
げ状に配置し、直下の地面には落下してきた建設廃棄物
を収納するコンテナ7又はステージを設け、ステージの
場合は仕分け後にコンテナへ投入すればよい。
FIGS. 1 and 2 show the lowermost part of the unloading device.
As shown in the figure, the lowermost chute 1a is suspended from the scaffold B with a wire 6 or the like so as to protrude outward from the scaffold B, and the construction waste dropped on the ground immediately below the scaffold B. Is provided, and in the case of a stage, it is sufficient to put it into the container after sorting.

【0017】また、シュート1は、高所に持上げるため
軽量化が望ましく、材質の選択だけでなく、例えば、長
さ方向の中央部で二分割し、フランジ継手とボルトによ
り結合する構造としてもよい。
Further, the chute 1 is desirably reduced in weight because it is lifted to a high place. In addition to the selection of the material, for example, the chute 1 may be divided into two parts at the center in the length direction and connected with a flange joint and a bolt. Good.

【0018】この発明の第1の例は、上記のような構成
であり、建物Aの建設時にその外側に足場Bを設置し、
建設進行に合わせて上方に構築して行く。
A first example of the present invention is configured as described above, and a scaffold B is installed outside a building A when the building A is constructed.
Build upwards as the construction progresses.

【0019】この足場Bに対し、シュート1を傾斜状と
なるよう横桟B3 、B3 間に架設すると共に、上下のシ
ュート1を逆傾斜の配置とすることにより、図1に示す
ように、直線折り返し式のスロープを形成する。
By arranging the chute 1 on the scaffold B between the horizontal rails B 3 and B 3 so as to be inclined, and by arranging the upper and lower chutes 1 in reverse inclination, as shown in FIG. , Forming a straight turn-around slope.

【0020】建物Aにおいて発生した建設廃棄物は、袋
詰めにした状態で、最上部に位置するシュート1の上端
接続口2から該シュート1内に投入すればよく、建設廃
棄物はシュート1内を滑動し、上位のシュートから下位
のシュートへと折り返し状に移動し、最下位シュート1
aの下端接続口3から直下のコンテナ7内に落下収納さ
れる。
The construction waste generated in the building A may be put into the chute 1 from the upper end connection port 2 of the chute 1 located at the uppermost portion in a bagged state. Slides from the top shot to the bottom shot, and returns to the bottom shot 1
a is dropped and stored in the container 7 immediately below the lower end connection port 3 of FIG.

【0021】このように、シュート1内に投入するだけ
で建設廃棄物は滑り落ちることになり、建設廃棄物の地
上への荷降しが簡単に行えると共に、建物Aの階高の上
昇と共に足場Bも上方に継足されるので、その都度上部
の位置にシュート1を架設して行けばよく、スロープを
順次上方へ折り返し状に延ばせばよい。
As described above, the construction waste slides down only by being thrown into the chute 1, and the construction waste can be easily unloaded to the ground. Is also extended upward, so that the chute 1 may be erected at the upper position each time, and the slope may be sequentially folded upward and extended.

【0022】なお、各シュート1において、下端側の上
面に投入口5を設けておけば、連続するスロープの途中
からでも建設廃棄物の投入が可能となり、建物Aのどの
階床からの建設廃棄物の投入が可能になる。
If the chute 1 is provided with a charging port 5 on the upper surface on the lower end side, construction waste can be charged from the middle of a continuous slope, and construction waste from any floor of the building A can be discharged. It becomes possible to input things.

【0023】次に、図6と図7に示す第2の例は、スト
レートのシュートを用いた折り返し式スロープの他の例
を示し、シュート1aは断面上向コ字状のストレートな
樋状となり、傾斜時に上側となる一方端部は端壁8によ
って閉鎖され、上面と他方端部が開放している。
Next, a second example shown in FIGS. 6 and 7 shows another example of a folded slope using a straight chute, in which the chute 1a has a straight gutter shape having an upward U-shaped cross section. One end, which is on the upper side when inclined, is closed by the end wall 8, and the upper surface and the other end are open.

【0024】上記シュート1aは両側の側壁9、9を上
開きの傾斜状とし、積重ね時に順次嵌合し、嵩低い積重
ねが行なえるようになっている。
The chute 1a has side walls 9 and 9 on both sides which are inclined upward and open, and are sequentially fitted at the time of stacking so that a low-volume stacking can be performed.

【0025】このシュート1aを足場Bに取付けてスロ
ープを形成するには、図6の如く、建枠B1 の両側縦柱
間の上部に単管クランプを用いてパイプB4 を架設し、
シュート1aの一方端部を、その下面に取付けた単管ク
ランプ10で上記パイプB4上に固定することにより取
付け、該シュート1aの中間部下面を隣接する建枠B1
の横桟B3 上に載置すれば、シュート1aは足場Bに傾
斜状態で取付けられる。
[0025] The chute 1a to form a slope attached to the scaffold B is as shown in FIG. 6, bridged pipe B 4 using the single pipe clamp on the top between the sides vertical pillars Kenwaku B 1,
One end of the chute 1a, Kenwaku B 1 adjacent the mounting, the intermediate lower surface of the chute 1a by fixing a single pipe clamp 10 attached to its lower surface on the pipe B 4
If placed on the rungs B 3, the chute 1a is mounted in an inclined state to the scaffold B.

【0026】このようにして、足場Bの上下にシュート
1aを、上下で逆方向の傾斜となるように取付ければ、
上位シュートの開放する下端が下位シュートの上端部直
上に臨み、上下のシュート1aが直接接続されない状態
で折り返し状となるスロープが形成され、先の第1の例
と同様に建設廃棄物の荷降しが行なえる。
In this manner, if the chutes 1a are attached to the upper and lower surfaces of the scaffold B so that they are inclined in opposite directions in the upper and lower directions,
The open lower end of the upper chute faces directly above the upper end of the lower chute, and a sloping slope is formed in a state where the upper and lower chutes 1a are not directly connected, and the unloading of construction waste as in the first example. I can do it.

【0027】次に、図8乃至図12に示す第3の例は、
螺旋のスロープを形成する場合であり、シュート11
は、断面上向きコ字状又は角筒状、円形パイプで平面半
円形となり、両端部が開口し、所定の傾斜角度をもたせ
た配置で両端縁は垂直になっている。断面コ字状の場
合、両側壁は上方に外開きとするのが好ましい。
Next, a third example shown in FIGS.
This is the case where a spiral slope is formed,
Is a U-shaped or rectangular cylindrical cross-section, a circular pipe with a plane semicircular shape, an open end at both ends, and a vertical end at a predetermined inclination angle. In the case of a U-shaped cross section, it is preferable that both side walls are open upward.

【0028】上記シュート11の両端部下面にフック1
2が設けられ、図8、図9のように、このフック12を
建枠B1 の横桟B3 に係止することにより、所定の傾斜
状態となるよう足場Bに取り付けられ、上下のシュート
11が連続するよう取り付けていれば、螺旋のスロープ
が形成されることになる。
A hook 1 is provided on the lower surface of both ends of the chute 11.
2 is provided, FIG. 8, as shown in FIG. 9, by engaging the hook 12 to the lateral beam B 3 of Kenwaku B 1, mounted on a scaffold B to be a predetermined inclined state, the upper and lower chutes If 11 are attached so as to be continuous, a spiral slope will be formed.

【0029】なお、最下部のシュート11aは、直線状
とし、足場Bの外部に突出するように設置される。
Note that the lowermost chute 11a is linear and installed so as to protrude outside the scaffold B.

【0030】上記シュート11は、鋼板、ステンレス、
合成樹脂を用いて形成されるが、袋入り建設廃棄物の滑
落が円滑に生じるよう、底面は平滑面に形成され、特に
滑りを良くするため、図12に示すように、シュート1
1の底面を長さ方向に沿う丸軸13を幅方向に並列配置
して形成してもよい。
The chute 11 is made of a steel plate, stainless steel,
Although formed using a synthetic resin, the bottom surface is formed as a smooth surface so that the bagged construction waste can be smoothly slid off. In particular, as shown in FIG.
1 may be formed by arranging round shafts 13 along the length direction in parallel in the width direction.

【0031】この発明の第3の例は上記のような構成で
あり、平面半円形のシュート11を足場Bに下部から上
方へ傾斜状態で順次連続するように取り付ければ、建枠
1の縦柱を巻くようにして螺旋状のスロープが形成で
き、建物Aの階床ごとに発生する建設廃棄物を袋に入
れ、これをシュート11に投入すれば、シュート11に
沿って滑落しながら地上にまで降ろすことができる。
The third example of the present invention is configured as described above, by attaching a semicircular flat plane of the chute 11 to sequentially continuously tilted state upward from the bottom to the scaffold B, vertical Kenwaku B 1 A spiral slope can be formed by winding a pillar, and the construction waste generated for each floor of the building A is put in a bag, and the bag is put into the chute 11. You can drop it down.

【0032】[0032]

【発明の効果】以上のように、この発明によると、建物
の各階床で発生する建設廃棄物の地上への荷降しがシュ
ートに投入するだけで行なえ、工事用エレベータを使用
しないため、工事用資材の荷揚げ作業に影響しない。い
つでも荷降しができ、通常使用する足場に設置できるの
で、特に余分な支柱などのフレームがいらないと共に、
従来の足場の組立、解体作業に合わせて組立や解体がで
きる。
As described above, according to the present invention, the construction waste generated on each floor of the building can be unloaded to the ground only by throwing it into the chute, and the construction elevator is not used. It does not affect the unloading work of materials. It can be unloaded at any time and can be installed on a scaffold that is normally used, so there is no need for a frame such as extra columns,
Assembling and dismantling can be performed according to the conventional scaffold assembling and dismantling work.

【0033】また、動力を使っていないので、故障の心
配がなく、足場のある位置であれば、どこでも設置で
き、荷降し後の水平運搬がほとんどなくなる。
Further, since no power is used, there is no fear of failure, and the apparatus can be installed anywhere as long as there is a scaffold, and there is almost no horizontal transportation after unloading.

【図面の簡単な説明】[Brief description of the drawings]

【図1】折り返し式シュートを用いた荷降し装置の第1
の例を示す正面図
FIG. 1 shows a first example of an unloading device using a folding chute.
Front view showing an example of

【図2】同上の側面図FIG. 2 is a side view of the above.

【図3】同上の要部を拡大した縦断正面図FIG. 3 is a longitudinal sectional front view in which main parts of the above are enlarged.

【図4】シュートの斜視図FIG. 4 is a perspective view of a chute.

【図5】シュートの積み重ね状態を示す正面図FIG. 5 is a front view showing a stacked state of chutes.

【図6】第2の例を示す正面図FIG. 6 is a front view showing a second example.

【図7】同上に用いるシュートの斜視図FIG. 7 is a perspective view of a chute used in the above.

【図8】螺旋式シュートを用いた荷降し側面図の第2の
例を示す正面図
FIG. 8 is a front view showing a second example of the unloading side view using the spiral chute.

【図9】同上の側面図FIG. 9 is a side view of the above.

【図10】同平面図FIG. 10 is a plan view of the same.

【図11】(A)はシュートの平面図、(B)は同斜視
11A is a plan view of a chute, and FIG. 11B is a perspective view of the chute.

【図12】シュートの断面を拡大した断面図FIG. 12 is an enlarged sectional view of a section of the chute.

【符号の説明】[Explanation of symbols]

1、1a、11 シュート 2、3 接続口 4、12 フック 5 投入口 6 ワイヤ 7 コンテナ 8 端壁 9 側壁 10 単管クランプ 13 丸軸 A 建物 B 足場 B1 建枠 B2 ブレース B3 横桟 B4 パイプ1, 1a, 11 Chute 2, 3 Connection port 4, 12 Hook 5 Input port 6 Wire 7 Container 8 End wall 9 Side wall 10 Single pipe clamp 13 Round shaft A Building B Scaffold B 1 Building frame B 2 Brace B 3 Cross beam B 4 pipe

───────────────────────────────────────────────────── フロントページの続き (72)発明者 崎 剛 和泉市伏屋町86番地の2 B−610 (72)発明者 津田 芳邦 大阪狭山市西山台5丁目2番22−404号 (56)参考文献 特開 昭52−7167(JP,A) 特開 昭50−160993(JP,A) 実開 昭63−106845(JP,U) 実開 昭60−43608(JP,U) 実開 平1−88609(JP,U) 実公 昭47−38036(JP,Y1) (58)調査した分野(Int.Cl.7,DB名) B65G 11/00 - 11/20 E04G 21/00 E04F 17/12 ──────────────────────────────────────────────────続 き Continued on the front page (72) Inventor Tsuyoshi Saki 86-2, Fushiya-cho, Izumi-shi 2B-610 (72) Inventor Yoshikuni Tsuda 5-2-24-2404 Nishiyamadai, Osaka Sayama-shi (56) References Special JP-A 52-7167 (JP, A) JP-A 50-161093 (JP, A) JP-A 63-106845 (JP, U) JP-A 60-43608 (JP, U) JP-A 1-88609 (JP, A) JP, U) Jikken 47-38036 (JP, Y1) (58) Fields investigated (Int. Cl. 7 , DB name) B65G 11/00-11/20 E04G 21/00 E04F 17/12

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 一方端部の上面と他方端部の下面が開放
する直線状のシュートを用い、一定の間隔で起立する建
枠をブレースや足場板で結合して組み立てることにより
建物の外側に仮設した足場に、複数の前記シュートを傾
斜状態で上下のシュートの端部が上下に位置するよう
に、上下で逆傾斜となるように配置してスロープを形成
するようにした建設廃棄物の荷降し装置であって、前記
シュートが、建枠の両側縦柱間に納まる幅と建枠の対向
間隔の2スパン間に傾斜状態で納まる長さに形成され、
このシュートの両端部に建枠の横桟に係止するフックを
固定したことを特徴とする建設廃棄物の荷降し装置。
1. A building that stands up at regular intervals using a linear chute having an open upper surface at one end and a lower surface at the other end.
The scaffolds temporary outside the <br/> building by assembling by combining the frame with braces and scaffolding plates, so that the end portion of the chute of the upper and lower multiple of the chute in an inclined state is positioned vertically, with the upper and lower A construction waste unloading device arranged to form a slope by being arranged to have a reverse slope ,
The width of the chute that fits between the vertical columns on both sides of the frame and the opposing frame
It is formed to a length that fits in an inclined state between two spans of the interval,
At both ends of this chute, hooks that lock to the
An unloading device for construction waste, which is fixed.
【請求項2】 一方端部が閉鎖され、他方端部と上面が
開放する直線状のシュートを用い、一定の間隔で起立す
る建枠をブレースや足場板で結合して組み立てることに
より建物の外側に仮設した足場に、複数の前記シュート
を傾斜状態で上位のシュートの開放端部が下位に位置す
るシュートの真上に臨むように、上下で逆傾斜となるよ
うに配置してスロープを形成するようにした建設廃棄物
の荷降し装置であって、前記シュートが、建枠の両側縦
柱間に納まる幅と建枠の対向間隔の2スパン間に傾斜状
態で納まる長さに形成され、閉鎖された一方端部側の位
置に、建枠の両側縦柱間に固定したパイプに固定するク
ランプが取り付けられていることを特徴とする建設廃棄
物の荷降し装置。
2. The outside of a building by using a linear chute having one end closed and open at the other end and the upper surface, and assembling the building frames standing at regular intervals by connecting them with braces or scaffolding boards. The slope is formed by arranging a plurality of the chutes on the temporary scaffolding so that the open ends of the upper chutes face directly above the lower chutes in an inclined state, so that the chutes are vertically inclined in reverse. The construction waste unloading device as described above, wherein the chute is formed to have a width that fits between the vertical columns on both sides of the building frame and a length that fits in an inclined state between two spans opposite to each other of the building frame, An unloading device for construction waste, characterized in that a clamp fixed to a pipe fixed between the vertical columns on both sides of the building frame is attached at a position on one closed end side.
【請求項3】 平面形状が半円弧状となるよう形成され
たシュートを用い、一定の間隔で起立する建枠をブレー
スや足場板で結合して組み立てることにより建物の外側
に仮設した足場に、複数の前記シュートを上下のシュー
トが螺旋状に連続するよう配置した建設廃棄物の荷降し
装置であって、前記半円弧状のシュートは、建枠の両側
縦柱間に納まる幅を有し、その両端部下面に、建枠の横
桟に係止するフックを固定したことを特徴とする建設廃
棄物の荷降し装置。
3. A scaffold temporarily provided outside of a building by assembling by using a chute formed to have a semi-circular planar shape, and assembling and assembling building frames standing up at a fixed interval with a brace or a scaffold plate. A construction waste unloading device in which a plurality of chutes are arranged so that upper and lower chutes are spirally continuous, wherein the semi-circular chutes have a width that fits between vertical columns on both sides of a building frame. A construction waste unloading device, wherein a hook for locking to a horizontal rail of a building frame is fixed to a lower surface of both ends thereof.
JP27125995A 1995-10-19 1995-10-19 Construction waste unloading device Expired - Fee Related JP3186955B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP27125995A JP3186955B2 (en) 1995-10-19 1995-10-19 Construction waste unloading device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP27125995A JP3186955B2 (en) 1995-10-19 1995-10-19 Construction waste unloading device

Publications (2)

Publication Number Publication Date
JPH09110119A JPH09110119A (en) 1997-04-28
JP3186955B2 true JP3186955B2 (en) 2001-07-11

Family

ID=17497589

Family Applications (1)

Application Number Title Priority Date Filing Date
JP27125995A Expired - Fee Related JP3186955B2 (en) 1995-10-19 1995-10-19 Construction waste unloading device

Country Status (1)

Country Link
JP (1) JP3186955B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101921647B1 (en) 2017-04-04 2018-11-26 주식회사 파인솔루션 electromotive cylinder type open and close device for top lid

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2007295879A1 (en) * 2006-09-15 2008-03-20 John Clement Preston Refuse chute
CN104724438A (en) * 2015-01-14 2015-06-24 天津市华帅制药机械有限公司 Conveyor line equipment for vertically conveying filled plastic infusion bottle
CN106586364B (en) * 2017-01-23 2022-05-06 新火炬科技有限公司 Clip-shaped descending conveying device sliding by self gravity

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101921647B1 (en) 2017-04-04 2018-11-26 주식회사 파인솔루션 electromotive cylinder type open and close device for top lid

Also Published As

Publication number Publication date
JPH09110119A (en) 1997-04-28

Similar Documents

Publication Publication Date Title
US10843718B1 (en) Construction safety railing assemblies, components, and methods for storage, transport, and installation
US7971408B2 (en) Stairtower and method for erecting the same
US5145153A (en) Portable handrail counter-weight system
WO2008031173A1 (en) Refuse chute
US5018629A (en) Scaffolding rack
CN208220149U (en) Dismountable bilayer faces do-nothing operation platform
US7387470B2 (en) Stackable concrete forming apparatus components
JP3186955B2 (en) Construction waste unloading device
US3707814A (en) Pre-fabricated stairway
WO2018143828A1 (en) Scaffold system
EP0185484B1 (en) Self-containing package system for storage and transportation of prefabricated portions of a building structure and the assembly thereof
US7472779B2 (en) Chute transition frame and chute system incorporating the same
US20090242553A1 (en) Construction waste removal container
EP0611856A1 (en) Frame assembly for a temporary stairway
CN211818114U (en) Discharging platform for multi-storey building construction
AU748602B2 (en) Transportable podium
JP3568167B2 (en) Temporary hanging stairs
AU2018387475A1 (en) Chute system
CN110792269A (en) Discharging platform for multi-storey building construction and construction method thereof
EP1497515A1 (en) Module based building system
WO2009120938A2 (en) Construction waste removal container
CN111056144A (en) Pipe stacking device for building
EP1227203A1 (en) Method and device for building up a scaffold, in particular for construction and maintenance
US6694677B2 (en) Transportable podium
JP2558742Y2 (en) Curing device for floor openings

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090511

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090511

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100511

Year of fee payment: 9

LAPS Cancellation because of no payment of annual fees