KR200449490Y1 - Skim pile having oil bucket for level adjustment - Google Patents
Skim pile having oil bucket for level adjustment Download PDFInfo
- Publication number
- KR200449490Y1 KR200449490Y1 KR2020080004636U KR20080004636U KR200449490Y1 KR 200449490 Y1 KR200449490 Y1 KR 200449490Y1 KR 2020080004636 U KR2020080004636 U KR 2020080004636U KR 20080004636 U KR20080004636 U KR 20080004636U KR 200449490 Y1 KR200449490 Y1 KR 200449490Y1
- Authority
- KR
- South Korea
- Prior art keywords
- oil
- pile
- scheme
- height
- oil bucket
- Prior art date
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B29/00—Accommodation for crew or passengers not otherwise provided for
- B63B29/16—Soil water discharges
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B63B35/44—Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
- B63B35/4413—Floating drilling platforms, e.g. carrying water-oil separating devices
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63J—AUXILIARIES ON VESSELS
- B63J4/00—Arrangements of installations for treating ballast water, waste water, sewage, sludge, or refuse, or for preventing environmental pollution not otherwise provided for
- B63J4/006—Arrangements of installations for treating ballast water, waste water, sewage, sludge, or refuse, or for preventing environmental pollution not otherwise provided for for treating waste water or sewage
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B17/04—Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction
- E02B17/08—Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for raising or lowering
- E02B17/0827—Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for raising or lowering with screws and nuts mechanism
Abstract
본 고안은 레벨조절용 오일 버켓이 구비된 스킴 파일에 관한 것으로서, 해양구조물을 구축하는 자켓으로부터 높이 조절 가능하게 설치되어 상부데크에서 발생하는 폐수 중에서 물과 오일을 분리하는 스킴 파일(10)에 있어서, 상기 스킴 파일(10) 내부에는 수직되는 고정프레임(21)의 길이방향에 높이 조절공(21a)이 다수개 배열 형성된 지지대(20)가 상호 대응되게 설치되고, 상부가 개방된 통 형상으로, 외측둘레 상,하부에 상기 고정프레임(21)의 양측에 위치되어 보울트(B)와 너트(N)로서 체결되도록 결합공(31a)을 갖는 한 쌍의 고정편(31)이 다수개 형성된 오일 버켓(30)이 높이 조절가능하게 설치된 것을 특징으로 하는바, 스킴 파일의 내부에 높이 조정가능하게 설치된 오일 버켓은 해저지형에 따라 해양구조물의 상부를 구축하는 자켓의 높이가 바뀌게 되어 스킴 파일은 그대로 두고 오일 버켓의 위치만을 상기 지지대로부터 높이 조절하여 세팅하도록 함으로써, 해양구조물을 구축하는 시간, 해양구조물의 상부 데크(Deck)설비, 데크를 통해 작업하는 각종 시추공사, 유전탐사 등의 각종 작업시간 등을 대폭 줄일 수 있는 효과가 있다.The present invention relates to a scheme pile provided with an oil bucket for adjusting the level, in the scheme pile (10) for separating the water and oil in the wastewater generated from the upper deck is installed so that the height adjustable from the jacket for constructing the marine structure, The support pile 20 formed with a plurality of height adjusting holes 21a arranged in the longitudinal direction of the vertical fixing frame 21 is installed in the scheme pile 10 so as to correspond to each other. Oil buckets having a plurality of pairs of fixing pieces 31 having coupling holes 31a positioned at both sides of the fixing frame 21 at upper and lower circumferences thereof to be fastened as bolts B and nuts N ( 30) is characterized in that the height adjustable bar, the oil bucket is installed height adjustable inside the scheme pile is the height of the jacket to build the top of the offshore structure is changed according to the seabed topography. By leaving the Kim pile as it is, the position of the oil bucket is adjusted by setting the height from the support, so that the time to construct the offshore structure, the upper deck equipment of the offshore structure, various drilling works working through the deck, oil field exploration, etc. Various working hours can be greatly reduced.
레벨, 스킴 파일, 오일 버켓, 지지대, 고정편 Level, Scheme Pile, Oil Bucket, Support, Fixing Piece
Description
본 고안은 레벨조절용 오일 버켓이 구비된 스킴 파일에 관한 것으로서, 좀더 상세하게는 해양구조물(Offshore Platform)의 하부구조물 자켓(jacket)에 설치되어 상부데크에서 발생하는 폐수 중에서 물과 오일을 분리하는 스킴 파일(Skim pile)에 있어, 그 내부에 높이 조절하여 설치가능한 오일 버켓을 구비하여 해저 조건에 따라 설치되는 자켓 높이의 변화에 대처하여 해양구조물의 구축 및 구축에 따른 일정, 임무기간 등을 단축할 수 있도록 한 것이다. The present invention relates to a scheme pile provided with an oil bucket for level adjustment, and more particularly, a scheme for separating water and oil from wastewater generated from an upper deck installed in a jacket of an offshore platform. In the pile, the oil bucket is installed inside the pile to adjust the height of the jacket to cope with the change of the height of the jacket installed according to the seabed condition, and to shorten the schedule and mission period according to the construction and construction of the offshore structure. I would have to.
일반적으로 해양유전탐사 또는 시추용 해양구조물에 있어, 자켓식 구조물은 해저면에 타설되어 있는 파일에 의해서 고정되는 것으로, 특히 고정식 해양시추구조물(Fixed Platform)은 석유시추용 구조물의 한 형태로 해저에 연결된 자켓(Jacket)에 의해 상부갑판구조물(Deck)이 지지되는 고정식 외에도 중력식, 연착저식 등의 형상이 있으며 설치공법도 여러 가지가 있다. In general, for offshore oil exploration or drilling offshore structures, the jacketed structure is fixed by piles placed on the sea floor. In particular, a fixed offshore platform (Fixed Platform) is a type of oil drilling structure. In addition to the fixed type that the upper deck structure (Deck) is supported by the jacket connected (gravity), there are also the shape of the gravity type, soft bottom type, etc. There are various installation methods.
상기와 같은 자켓형식의 고정식 구조물은 현재 수심 460M까지 설치된 예가 알려져 있지만 수심 200M이내의 대륙붕 지역에 설치된다.The jacket-type fixed structure as described above is currently known to be installed up to a depth of 460M, but is installed in the continental shelf area within a depth of 200M.
자켓식 구조물은 해저면에 타설되어 있는 파일에 의해서 고정되는바, 여기에 설치되는 스킴 파일(Skim pile)은 해양유전을 탐사하는 구조물에서 발생하는 폐수 처리장치로 폐수에 섞여있는 오일을 최종적으로 비중의 차에 의해 분리해 내기 위한 장비로서 설치된다.Jacketed structures are fixed by piles placed on the bottom of the seam.Skim piles installed here are wastewater treatment devices generated from structures that explore marine oil fields. It is installed as equipment to separate by car.
통상 오일(Oil)을 비중 차에 의해 분리될 수 있도록 일정구간의 유체를 가두어 놓아야 하는 곳을 필요로 하는바, 종래에는 상기한 바와 같이 오일을 별도로 가두어 놓는 시설이 구비되어 있지 않아 스킴 파일이 설치되는 자켓 하부의 해저 지형상태에 따라 자켓이 초기 설계된 위치와 다를 경우, 스킴 파일의 높낮이를 조정하여 컨트롤 레벨(Control level)을 결정해야 하는 번거로움이 있었다.In general, it is necessary to place a portion of the fluid to be confined to separate the oil (Oil) by the difference in specific gravity bar, conventionally there is no facility for confining the oil as described above, the scheme pile is installed If the jacket differs from the initial designed position according to the seabed topography under the jacket, there is a need to adjust the height of the scheme file to determine the control level.
더욱이 상기와 같이 스킴파일의 높낮이를 조정하는 작업은 해양구조물에서 이루어지기 때문에 상부 데크(Deck)의 탑재가 지연되는 등, 해양구조물의 일정에 차질을 주는 문제점이 있었다.In addition, the operation of adjusting the height of the scheme pile as described above is performed in the offshore structure, such that there is a problem that the schedule of the offshore structure, such as delayed mounting of the upper deck (Decks).
본 고안은 상기와 같이 제반되는 종래의 문제점을 해결하기 위하여 안출된 것으로서, 해양구조물(Offshore Platform)의 하부구조물 자켓(Jacket)에 설치되어 상부데크에서 발생하는 폐수 중에서 물과 오일을 분리하는 스킴 파일(Skim pile)에 있어, 그 내부에 높이 조절하여 설치가능한 오일 버켓을 구비하여 해저 조건에 따라 설치되는 자켓 높이의 변화에 대처하여 해양구조물의 구축 및 구축에 따른 일정, 임무기간 등을 단축할 수 있도록 하는데 그 목적이 있다.The present invention has been devised to solve the conventional problems as described above, a scheme file for separating water and oil from wastewater generated in the upper deck is installed in the jacket of the lower structure of the offshore platform (Offshore Platform) (Skim pile) is equipped with an oil bucket that can be installed to adjust the height of the inside, it is possible to shorten the schedule, mission period, etc. according to the construction and construction of offshore structures by coping with the change in the height of the jacket installed according to the seabed conditions The purpose is to make it.
상기 목적을 달성하기 위한 본 고안에 의하면, According to the present invention for achieving the above object,
해양구조물을 구축하는 자켓(Jacket)으로부터 높이 조절 가능하게 설치되어 상부데크에서 발생하는 폐수 중에서 물과 오일을 분리하는 스킴 파일에 있어서,In the scheme pile to install a height adjustable from the jacket to build the offshore structure to separate water and oil from the wastewater generated from the upper deck,
상기 스킴 파일 내부에는 수직되는 고정프레임의 길이방향에 높이 조절공이 다수개 배열 형성된 지지대가 상호 대응되게 설치되고, 상부가 개방된 통 형상으로, 외측둘레 상,하부에 상기 고정프레임의 양측에 위치되어 보울트와 너트로서 체결되도록 결합공을 갖는 한 쌍의 고정편이 다수개 형성된 오일버켓이 높이 조절가능하게 설치된 것을 특징으로 한다.In the scheme file, a plurality of height adjustment holes arranged in the longitudinal direction of the vertical fixing frame are installed to correspond to each other, and the upper part is opened in a cylindrical shape, and is positioned on both sides of the fixing frame on the upper and lower sides of the outer side. It is characterized in that the oil bucket is formed so that the height is adjustable a plurality of pairs of fixing pieces having a coupling hole to be fastened as a bolt and a nut.
본 고안은 스킴 파일의 내부에 높이 조정가능하게 설치된 오일 버켓은 해저지형에 따라 해양구조물의 상부를 구축하는 자켓의 높이 변위설치에 있어, 스킴 파일은 그대로 두고 오일 버켓의 위치만을 상기 지지대로부터 높이 조절하여 세팅하도록 함으로써, 해양구조물을 구축하는 시간, 해양구조물의 상부 데크(Deck)설비, 데크를 통해 작업하는 각종 시추공사, 유전탐사 등의 각종 작업시간 등을 대폭 줄 일 수 있는 효과가 있다.According to the present invention, the oil bucket installed in the height of the scheme pile is installed in the height displacement of the jacket for constructing the upper part of the offshore structure according to the seabed topography. By setting it up, it is possible to drastically reduce the time for constructing offshore structures, the upper deck equipment of offshore structures, various drilling times for working through the deck, and various work hours such as oil field exploration.
이하, 본 고안에 따라 첨부된 도 1 내지 도 4를 참조하여 더욱 상세히 설명하면 다음과 같다. Hereinafter, with reference to the accompanying Figures 1 to 4 according to the present invention in more detail.
첨부된 도 1은 본 고안인 오일 버켓이 적용된 스킴 파일을 도시한 측면도이고, 도 2는 본 고안에 따른 오일 버켓이 적용된 스킴 파일을 횡으로 절개하여 도시한 횡단면도이며, 도 3은 본 고안에 따른 오일 버켓이 스킴 파일 내부에 설치된 지지대로부터 세팅된 상태를 도시한 정면도이고, 도 4는 본 고안에 따른 오일 버켓을 도시한 정면도이며, 도 5는 본 고안에 따른 오일 버켓의 연결부분을 확대하여 도시한 평면도이다.Attached Figure 1 is a side view showing a scheme pile is applied to the oil bucket of the present invention, Figure 2 is a cross-sectional view showing the oil filed with a bucket according to the present invention transversely, Figure 3 is in accordance with the present invention 4 is a front view showing a state in which an oil bucket is set from a support installed inside the scheme pile, FIG. 4 is a front view showing an oil bucket according to the present invention, and FIG. 5 is an enlarged view of the connection portion of the oil bucket according to the present invention. One floor plan.
본 고안은, 해양구조물을 구축하는 자켓(Jacket)으로부터 높이 조절 가능하게 설치되어 상부데크에서 발생하는 폐수 중에서 물과 오일을 분리하는 스킴 파일(10)에 있어서,The present invention, in the scheme pile (10) for separating the water and oil in the wastewater generated in the upper deck is installed so that the height adjustable from the jacket (Jacket) for constructing the marine structure,
상기 스킴 파일(10) 내부에는 수직되는 고정프레임(21)의 길이방향에 높이 조절공(21a)이 다수개 배열 형성된 지지대(20)가 상호 대응되게 설치된다.In the
상기 지지대(20)로부터는 폐수와 오일을 비중차이에서 분리하기 이한 오일 버켓(30)이 설치되는 한편, 상기 오일 버켓(30)은 상부가 개방된 통 형상으로 형성되며, 외측둘레 상,하부에 상기 고정프레임(21)의 양측에 위치되어 보울트(B)와 너트(N)로서 체결되도록 결합공(31a)을 갖는 한 쌍의 고정편(31)이 다수개 형성된 구 조로서 제공된다.From the
참고로, 상기 스킴 파일(10) 내에는 오일을 배출하기 위한 오일배출구(12)가 설치된다.For reference, an
이와 같이 구성된 본 고안에 따른 스킴 파일에 적용된 오일 버켓에 대한 작용을 설명하면 다음과 같다.The operation of the oil bucket applied to the scheme pile according to the present invention configured as described above is as follows.
먼저, 스킴 파일(10)의 내부 측벽에 상호 대응되게 부착 설치된 지지대(20)측 고정프레임(21)으로부터 오일 버켓(30)을 적정 높이에 설치하도록 하여 스킴 파일(10) 내부에 발생되는 폐수와 오일을 분리 배출하여 처리하도록 운영한다.First, the
상기와 같이 설치되어 운영되는 오일 버켓(30)은 스킴 파일(10)을 그대로 둔 상태에서 자켓의 높이변위에 따라 변경 설치로서 스킴 파일(10)의 내부 지지대(20)측 고정프레임(21)으로부터 그 위치를 이동시켜 재고정 설치함으로써 오일과 폐수를 처리를 계속 운영할 수 있게 된다.The
상기 오일 버켓(30)의 외부 양측 상,하부에 하나 이상 마련된 고정편(31)은 첨부된 도 4 및 도 5에서 도시되어 있는 바와 같이, 지지대(20)의 고정프레임(21)을 사이에 두고, 높이 조절공(21a)과 상기 고정편(31)에 마련된 결합공(31a)을 일치시켜 제공되는 볼트(B)와 너트(N)로서 오일 버켓(30)의 위치를 세팅할 수 있게 된다.At least one
상기 고정프레임(21)은 오일 버켓(30)의 고정편(31)이 전,후측에 위치되어 상기 볼트(B)와 너트(B)로 견고히 고정되기 때문에, 전후 유동 없이 안정적으로 오일 버켓을 고정할 수 있게 된다.The
상기와 같이 스킴 파일(10) 내부에서 높이 조정가능하게 설치된 오일 버켓(30)은 폐수와 오일을 설치된 높이에서 비중차로 인해 분리하여 오일배출구(12)를 통해 오일만을 별도로 처리할 수 있도록 한 것으로서, 이는 해저지형에 따라 해양구조물의 상부를 구축하는 자켓의 높이 변위설치에 적절하게 스킴 파일의 높낮이를 조정하지 않고, 오일 버켓의 위치만을 상기 지지대로부터 높이 조절하여 세팅하도록 함으로써, 해양구조물을 구축하는 시간, 해양구조물의 상부 데크(Deck)설비, 데크를 통해 작업하는 각종 시추공사, 유전탐사 등의 각종 작업시간 등을 대폭 줄일 수 있게 된다.As described above, the
결국, 본 고안은 오일 버켓의 높이를 조정 가능하도록 한 간단한 구조를 스킴 파일내에 적용 실시함으로써, 통상 종래 자켓의 변위설치에 따라 스킴 파일의 레벨조정이 감행되기 위해 해상으로부터 대형 바지크레인과 및 특수장비의 제공에 따른 설비 막대한 지출을 생략할 수 있는 이점이 있다.As a result, the present invention applies a simple structure to the height of the oil bucket in the scheme pile, so that the level of the scheme pile can be adjusted according to the displacement installation of the conventional jacket. There is an advantage that can omit the huge expenditure of equipment according to the provision of.
아울러 상기와 같은 관점은 그만큼 해양구조물의 구축시간이 빨라지기 때문에 각종 공기를 단축할 수 있는 이점이 따르게 된다.In addition, as described above, the construction time of the offshore structure is increased accordingly, and thus, various types of air can be shortened.
도 1은 본 고안인 오일 버켓이 적용된 스킴 파일을 도시한 측면도,Figure 1 is a side view showing a scheme pile applied oil bucket of the present invention,
도 2는 본 고안에 따른 오일 버켓이 적용된 스킴 파일을 횡으로 절개하여 도시한 횡단면도,Figure 2 is a cross-sectional view showing a cross-section cut scheme scheme is applied oil bucket according to the present invention,
도 3은 본 고안에 따른 오일 버켓이 스킴 파일 내부에 설치된 지지대로부터 세팅된 상태를 도시한 정면도,3 is a front view showing a state in which the oil bucket according to the present invention is set from the support installed in the scheme pile,
도 4는 본 고안에 따른 오일 버켓을 도시한 정면도,4 is a front view showing an oil bucket according to the present invention,
도 5는 본 고안에 따른 오일 버켓의 연결부분을 확대하여 도시한 평면도.Figure 5 is an enlarged plan view of the connection portion of the oil bucket according to the present invention.
< 도면의 주요부부에 대한 부호설명><Explanation of Signs of Major Parts of Drawings>
10: 스킴 파일 20: 지지대10: scheme file 20: support
21: 고정프레임 21a: 높이 조절공21:
30: 오일 버켓 31: 고정편30: oil bucket 31: fixing piece
31a: 결합공31a: engagement hole
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2020080004636U KR200449490Y1 (en) | 2008-04-08 | 2008-04-08 | Skim pile having oil bucket for level adjustment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2020080004636U KR200449490Y1 (en) | 2008-04-08 | 2008-04-08 | Skim pile having oil bucket for level adjustment |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20090010375U KR20090010375U (en) | 2009-10-13 |
KR200449490Y1 true KR200449490Y1 (en) | 2010-07-14 |
Family
ID=41537466
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR2020080004636U KR200449490Y1 (en) | 2008-04-08 | 2008-04-08 | Skim pile having oil bucket for level adjustment |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR200449490Y1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20170019658A (en) | 2015-08-12 | 2017-02-22 | 대우조선해양 주식회사 | Bubble-type skim pile |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4198300A (en) | 1977-11-07 | 1980-04-15 | Exxon Production Research Company | Apparatus for removing suspended oil droplets from water |
US4235726A (en) | 1979-03-12 | 1980-11-25 | Baker-Waldeck Associates | Automatic grease separating apparatus |
JPH10113505A (en) | 1996-10-08 | 1998-05-06 | Ito Seisakusho:Kk | Method for discharging separated water in precipitate dewatering-discharging apparatus |
JP2000000410A (en) | 1998-06-17 | 2000-01-07 | Honda Motor Co Ltd | Filter device of cutting oil |
-
2008
- 2008-04-08 KR KR2020080004636U patent/KR200449490Y1/en not_active IP Right Cessation
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4198300A (en) | 1977-11-07 | 1980-04-15 | Exxon Production Research Company | Apparatus for removing suspended oil droplets from water |
US4235726A (en) | 1979-03-12 | 1980-11-25 | Baker-Waldeck Associates | Automatic grease separating apparatus |
JPH10113505A (en) | 1996-10-08 | 1998-05-06 | Ito Seisakusho:Kk | Method for discharging separated water in precipitate dewatering-discharging apparatus |
JP2000000410A (en) | 1998-06-17 | 2000-01-07 | Honda Motor Co Ltd | Filter device of cutting oil |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20170019658A (en) | 2015-08-12 | 2017-02-22 | 대우조선해양 주식회사 | Bubble-type skim pile |
Also Published As
Publication number | Publication date |
---|---|
KR20090010375U (en) | 2009-10-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101440566B1 (en) | Housing bracket for constructing foundation of pier in the water and construction method of foundation of pier using the same | |
RU2013105264A (en) | SEMI-SUBMERSIBLE FLOATING BASIS AND METHOD OF ITS OPERATION | |
JP2018188799A (en) | Water discharge sump and sump water discharge method | |
KR101354383B1 (en) | Working platform for underwater explosion work using small barges | |
JP4413170B2 (en) | Separation channel module, suspension separation unit and suspension separation ship | |
KR102248621B1 (en) | Floating transfer ocean structure and construction method thereof | |
JP2010001615A (en) | Installation method for water cut-off box and water cut-off box | |
KR101113208B1 (en) | assembly type dredger and assemblying method therefore | |
KR200449490Y1 (en) | Skim pile having oil bucket for level adjustment | |
CN109797768B (en) | Turbulent flow energy consumption anti-scouring open caisson and construction method | |
KR20140119893A (en) | Spud can of floating structure | |
NL8200488A (en) | SLIDING TOWER WITH TENSIONED LEGS. | |
JP2003049439A (en) | Jacket structure | |
JP2012077578A (en) | Work scaffolding and method for constructing the same | |
KR20150021611A (en) | Vertical pontoon type semi-rig | |
KR101064749B1 (en) | Floating fountain | |
FI119778B (en) | Pile group repair equipment for water structures | |
JP2007177571A (en) | Grating and receiving frame | |
SE458519B (en) | FORCE STRENGTH OF SHIPPING FOR OFF-SHORE WORK | |
KR101064748B1 (en) | Floating fountain | |
KR20140036491A (en) | Offshore fixed platform wellbay conductor install structure and riser guide system thereof | |
US20200011143A1 (en) | Semi-submersible drilling vessel with a mud treatment and circulation system | |
KR20140086200A (en) | Assembling and deassembling heave motion reduction apparatus for semi-submersible structure | |
KR20120071007A (en) | Apparatus and method for supporting oversea aerogenerator | |
KR20060094406A (en) | Multi-division sluice |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
REGI | Registration of establishment | ||
FPAY | Annual fee payment |
Payment date: 20130701 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20140701 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20150624 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20160630 Year of fee payment: 7 |
|
LAPS | Lapse due to unpaid annual fee |