KR200433270Y1 - The changing tool of a overhead earth wire fix device - Google Patents

The changing tool of a overhead earth wire fix device Download PDF

Info

Publication number
KR200433270Y1
KR200433270Y1 KR2020060025081U KR20060025081U KR200433270Y1 KR 200433270 Y1 KR200433270 Y1 KR 200433270Y1 KR 2020060025081 U KR2020060025081 U KR 2020060025081U KR 20060025081 U KR20060025081 U KR 20060025081U KR 200433270 Y1 KR200433270 Y1 KR 200433270Y1
Authority
KR
South Korea
Prior art keywords
fixing device
processing line
frame
tool
hook
Prior art date
Application number
KR2020060025081U
Other languages
Korean (ko)
Inventor
김덕수
Original Assignee
한전기공주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한전기공주식회사 filed Critical 한전기공주식회사
Priority to KR2020060025081U priority Critical patent/KR200433270Y1/en
Application granted granted Critical
Publication of KR200433270Y1 publication Critical patent/KR200433270Y1/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/05Suspension arrangements or devices for electric cables or lines
    • H02G7/053Suspension clamps and clips for electric overhead lines not suspended to a supporting wire

Abstract

본 고안은 철탑에 설치된 송전선로의 가공지선을 고정하는 현수형 고정장치를 교체할 때 상기 고정장치 대신 가공지선을 잡아주는 가공지선 고정장치 교체공구에 관한 것으로, 보다 상세하게는 프레임과, 이 프레임에 안착 가능하게 설치되는 한 쌍의 걸림고리로 이루어짐으로써 운반 및 설치가 간편하고 간단히 빠른 시간내에 가공지선 고정장치를 교체할 수 있는 가공지선 고정장치 교체공구이다.The present invention relates to a processing line fixing device replacement tool for holding the processing line instead of the fixing device when replacing the suspension type fixing device for fixing the processing line of the transmission line installed in the steel tower, and more specifically the frame and the frame It consists of a pair of hooks that can be installed on the machine. It is easy to carry and install. It is a tool holder fixing tool that can replace the machine tool holder in a short time.

이러한 본 고안은 철탑에 설치된 송전선로의 가공지선을 고정하는 현수형 고정장치를 교체할 때 상기 고정장치 대신 가공지선을 잡아주는 가공지선 고정장치 교체공구에 있어서, The present invention is in the processing line fixing device replacement tool for holding the processing line instead of the fixing device when replacing the suspension type fixing device for fixing the processing line of the transmission line installed in the steel tower,

철탑의 아암에 탑재되고 양단부에 통공이 형성되는 프레임;A frame mounted to the arm of the pylon and having holes formed at both ends thereof;

몸체의 일단에 나사산이 형성되고, 타단에 호형 고리부가 형성되며, 상기 나사산에 체결되는 한 쌍의 너트에 의해 상기 프레임에 안착 가능하게 설치되는 걸림고리;로 이루어지는 것을 특징으로 하는 가공지선 고정장치 교체공구이다.Threaded end is formed on one end of the body, the other end is formed with an arc-shaped ring, the hook hook is installed to be seated on the frame by a pair of nuts fastened to the thread; It is a tool.

철탑, 가공지선, 프레임, 걸림고리, 호스 Pylon, overhead line, frame, hook, hose

Description

가공지선 고정장치의 교체공구{The changing tool of a overhead earth wire fix device}The changing tool of a overhead earth wire fix device

도 1은 종래의 가공지선 고정장치 교체공구이고,1 is a replacement tool for fixing the conventional processing line,

도 2는 본 고안에 따른 가공지선 고정장치 교체공구를 나타낸 분해 사시도이며,Figure 2 is an exploded perspective view showing a tool line fixing device replacement tool according to the present invention,

도 3은 본 고안에 따른 가공지선 고정장치 교체공구를 나타낸 분해 사시도이고,Figure 3 is an exploded perspective view showing a tool line fixing device replacement tool according to the present invention,

도 4는 본 고안에 따른 가공지선 고정장치 교체공구의 걸리고리에 비닐 호스가 설치된 상태를 나타낸 도면이며,Figure 4 is a view showing a state in which the vinyl hose is installed on the hook hook of the processing line fixing device replacement tool according to the present invention,

도 5a 내지 도 5b는 본 고안에 따른 가공지선 고정장치 교체공구의 설치 상태를 나타낸 도면대용 사진이다.5a to 5b is a drawing substitute photograph showing the installation state of the processing line fixing device replacement tool according to the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

10 : 프레임10: frame

20 : 걸림고리20: hook

본 고안은 철탑에 설치된 송전선로의 가공지선을 고정하는 현수형 고정장치를 교체할 때 상기 고정장치 대신 가공지선을 잡아주는 가공지선 고정장치 교체공구에 관한 것으로, 보다 상세하게는 운반 및 설치가 간편하고 간단히 빠른 시간내에 가공지선 고정장치를 교체할 수 있는 가공지선 고정장치 교체공구이다.The present invention relates to a processing line fixing device replacement tool for holding the processing line instead of the fixing device when replacing the suspension type fixing device for fixing the processing line of the transmission line installed in the steel tower, more specifically, easy to carry and install It is a tool holder fixing tool that can replace the tool holder in a short time.

철탑에 설치된 송전선로의 가공지선을 고정하는 현수형 고정장치의 교체할 때 사용되던 종래의 가공지선 고정장치 교체공구는 도 1에 도시한 바와 같이 양측부에 장공(1a)이 형성된 플레이트(1)와, 상면에 형성된 볼트/너트(2a)에 의해 상기 장공(1a)에 착탈 가능하게 설치되는 한 쌍의 클램프(2)와, 상기 클램프(2)가 관통되게 체결 설치되는 이송볼트(3)와, 상기 이송볼트(3)의 양단에 설치되고 상기 클램프(2)를 이송시켜 철탑의 아암을 파지하도록 하는 이송너트(4) 및 상기 플레이트(1)의 상면에 설치된 한 쌍의 측판(5a) 사이에 롤러(5b)가 회전 가능하게 형성되고, 상기 측판(5a)의 일측에 설치됨과 아울러 상기 롤러(5b)와 치합되게 구성되어 작업자의 조작시 롤러(5b)를 회전시키는 핸들(5c)로 이루어진 핸드윈치(5) 및 일측은 상기 핸드위치(5)의 롤러(5b)에 감겨있고 타측은 가공지선과 연결되어 상기 핸드윈치(5)의 작동시 가공지선을 잡아주는 와이어(6)로 구성된다.Conventional overhead line fixing device replacement tool used in the replacement of the suspension-type fixing device for fixing the overhead line of the transmission line installed in the pylon is a plate (1) formed with a long hole (1a) on both sides as shown in FIG. And a pair of clamps (2) detachably installed in the long hole (1a) by bolts / nuts (2a) formed on the upper surface, and a transfer bolt (3) fastened and installed to penetrate the clamps (2). , Between the transfer nut 4 installed at both ends of the transfer bolt 3 to transfer the clamp 2 to grip the arm of the steel tower and the pair of side plates 5a installed on the upper surface of the plate 1. The roller 5b is rotatably formed on the side, and is installed on one side of the side plate 5a, and is configured to be engaged with the roller 5b, so that the handle 5c rotates the roller 5b during the operator's operation. The hand winch 5 and one side are wound on the roller 5b of the hand position 5. The other side is connected to the processing branch line is composed of a wire (6) for holding the processing branch line during the operation of the hand winch (5).

이러한, 종래의 가공지선 고정장치 교체공구는 운반 및 설치가 번거러우며, 와이어를 가공지선에 연결하고 그 후, 핸드윈치를 조작하여 와이어에 장력을 부가 하여 가공지선을 잡아둠으로써 사용이 매우 불편하고 시간이 많이 소요되는 문제점이 있었다.Such a conventional processing line fixing device replacement tool is cumbersome to carry and install, and it is very inconvenient to use the wire by connecting the wire to the processing line and then operating the hand winch to apply tension to the wire to hold the processing line. There was a problem that takes a lot of time.

따라서, 본 고안은 상기한 종래 기술에 따른 제반 문제점을 해결하기 위하여 제안된 것으로서, 본 고안의 목적은 운반 및 설치가 간편하고 간단히 빠른 시간내에 가공지선 고정장치를 교체할 수 있는 교체공구를 제공하는데 있다.Accordingly, the present invention has been proposed to solve the above problems according to the prior art, the object of the present invention is to provide a replacement tool that can be easily replaced and fixed processing line fastening device in a simple time and easy to transport and installation have.

상기한 목적을 달성하기 위한 본 고안에 따른 가공지선 고정장치 교체공구의 특징은, Features of the processing line fixing device replacement tool according to the present invention for achieving the above object,

철탑에 설치된 송전선로의 가공지선을 고정하는 현수형 고정장치를 교체할 때 상기 고정장치 대신 가공지선을 잡아주는 가공지선 고정장치 교체공구에 있어서,In the tool line fixing device replacement tool for holding the processing line instead of the fixing device when replacing the suspension type fixing device for fixing the processing line of the transmission line installed in the pylon,

철탑의 아암에 탑재되고 양단부에 통공이 형성되는 프레임;A frame mounted to the arm of the pylon and having holes formed at both ends thereof;

몸체의 일단에 나사산이 형성되고, 타단에 호형 고리부가 형성되며, 상기 나사산에 체결되는 한 쌍의 너트에 의해 상기 프레임에 안착 가능하게 설치되는 걸림고리;로 구성된다.A thread is formed at one end of the body, and an arc-shaped ring part is formed at the other end, and a hook is installed to be seated on the frame by a pair of nuts fastened to the thread.

이하, 본 고안에 따른 가공지선 고정장치 교체공구의 바람직한 실시 예를 첨 부한 도면을 참조하여 설명하면 다음과 같다.Hereinafter, with reference to the accompanying drawings a preferred embodiment of the processing line fixing device replacement tool according to the present invention is as follows.

도 2는 본 고안에 따른 가공지선 고정장치 교체공구를 나타낸 분해 사시도이며, 도 3은 본 고안에 따른 가공지선 고정장치 교체공구를 나타낸 분해 사시도이고, 도 4는 본 고안에 따른 가공지선 고정장치 교체공구의 걸리고리에 비닐 호스가 설치된 상태를 나타낸 도면이며, 도 5a 내지 도 5b는 본 고안에 따른 가공지선 고정장치 교체공구의 설치 상태를 나타낸 도면대용 사진이다.Figure 2 is an exploded perspective view showing a processing ground fixing device replacement tool according to the present invention, Figure 3 is an exploded perspective view showing a processing ground fixing device replacement tool according to the present invention, Figure 4 is a processing ground fixing device replacement according to the present invention Figure 5 is a view showing a state in which the vinyl hose is installed on the hook of the tool, Figure 5a to 5b is a drawing substitute picture showing the installation state of the processing line fixing device replacement tool according to the present invention.

도 2 내지 도 3에 도시된 바와 같이, 본 고안에 따른 가공지선 고정장치 교체공구는, 크게 철탑의 아암에 탑재되는 프레임(10)과, 상기 프레임(10)에 안착가능하게 설치되며 철탑의 송전선로에 설치된 가공지선을 잡아주는 걸림고리(20)로 이루어진다.As shown in Figures 2 to 3, the processing line fixing device replacement tool according to the present invention, the frame 10 is largely mounted on the arm of the steel tower, and is installed to be seated on the frame 10, the transmission line of the steel tower It consists of a hook 20 to hold the processing branch line installed in the furnace.

상기 프레임(10)은 철탑의 아암에 설치된 정판에 탑재되고 양측부가 상기 정판의 외측에 위치하도록 형성됨과 아울러 상기 양측부에 통공(11)이 형성된다.The frame 10 is mounted on the top plate installed on the arm of the steel tower and is formed such that both sides are located outside the top plate, and the through holes 11 are formed at both sides.

여기서, 상기 정판은 도 5a에 도시된 바와 같이 일정 간격을 두고 설치된 다수개의 볼트에 의해 철탑의 아암에 설치되며, 상기 정판에 탑재되는 프레임(10)은 볼트 사이에 끼워져 흔들리지 않도록 "╋"자형 몸체(12)로 이루어지는 것이 바람직하다.Here, the top plate is installed on the arm of the pylon by a plurality of bolts installed at a predetermined interval as shown in Figure 5a, the frame 10 mounted on the top plate is sandwiched between the bolts "╋" shaped body so as not to shake It is preferable that it consists of (12).

상기 걸림고리(20)는 본체(21)의 일측에 나사산(22)이 형성되고, 타단에 호형 고리부(23)가 형성되며, 상기 나사산(22)에 체결되는 너트(24)에 의해 상기 프레임(10)에 안착 가능하게 설치된다.The hook ring 20 has a thread 22 formed on one side of the main body 21, an arc-shaped ring portion 23 is formed at the other end, the frame by the nut 24 is fastened to the thread 22 It is installed to be seated on (10).

이러한, 걸림고리(20)는 가공지선 고정장치의 교체 시 고정장치 대신에 가공지선을 잡아준다.Such, the hook 20 is to hold the processing line instead of the fixing device when replacing the processing line fixing device.

그리고, 상기 걸림고리(20)의 본체(21)는 상기 나사산(22)에 너트(24)가 체결될 수 있도록 원형 파이프로 이루어지는 것이 바람직하다.In addition, the main body 21 of the locking ring 20 is preferably made of a circular pipe so that the nut 24 can be fastened to the thread 22.

그리고, 도 4는 본 고안에 따른 가공지선 고정장치 교체공구의 다른 실시 예를 나타낸 것으로, 가공지선을 걸어주는 걸림고리(20)의 호형 고리부(23) 외주면에 완충부재(25)가 더 설치되어 가공지선의 손상을 방지하는 것을 특징으로 한다.And, Figure 4 shows another embodiment of the processing line fixing device replacement tool according to the present invention, the buffer member 25 is further installed on the outer circumferential surface of the arc ring portion 23 of the hook 20 to hang the processing line It is characterized in that to prevent damage to the processing branch line.

여기서, 상기 완충부재(25)는 고무재 또는 비닐재 호스를 상기 호형 고리부에 끼워넣거나, 고무재 또는 비닐재 밴드를 상기 호형 고리부에 테이핑하여 이루어진다.Here, the buffer member 25 is made by inserting a rubber or vinyl hose to the arc ring portion, or by taping a rubber or vinyl band to the arc ring portion.

이와 같이 구성된 본 고안에 따른 가공지선 고정장치 교체공구의 설치 상태를 도 5a 내지 도5b를 참조하여 설명하면 다음과 같다.Referring to Figure 5a to 5b the installation state of the processing line fixing device replacement tool according to the present invention configured as described as follows.

먼저, 작업자가 프레임(10)과 걸림고리(20)를 소지한 후 작업위치 즉 철탑의 아암에 위치한다.First, the worker carries the frame 10 and the catching ring 20 and is then located in the working position, that is, the arm of the steel tower.

그런 다음에, 상기 아암에 설치된 정판 즉, 상기 정판을 고정하는 다수개의 볼트 사이에 끼워지도록 상기 프레임(10)을 탑재한다.Then, the frame 10 is mounted so as to be sandwiched between a fixed plate provided on the arm, that is, a plurality of bolts fixing the fixed plate.

계속해서, 상기 걸림고리(20)의 나사산(22)이 형성된 걸림고리(20)의 일단부를 상기 프레임(10)의 통공(11)에 관통 삽입한다.Subsequently, one end of the locking ring 20 having the thread 22 of the locking ring 20 is inserted into the through hole 11 of the frame 10.

그리고, 너트(24b)를 걸림고리(20)의 나사산(22)에 체결하여 상기 걸림고리(20)가 상기 프레임(10)에 안착되도록 한다.Then, the nut 24b is fastened to the thread 22 of the hook 20 so that the hook 20 is seated on the frame 10.

이때, 상기 걸림고리(20)의 호형 고리부(23)에 가공지선이 걸리도록 한다.At this time, the processing line is caught by the arc-shaped ring portion 23 of the locking ring (20).

그런 후에, 가공지선을 고정하고 있는 고정장치(예를 들어 현수클램프, 직각크레비스링크, 평형크레비스링크 등등)를 해제한 후, 새로운 고정장치를 부착한다.After that, release the fixing device (e.g., suspension clamp, right angle crevis link, balance crevis link, etc.) fixing the processing ground wire, and then attach a new fixing device.

계속해서, 상기의 역순으로 본 고안에 따른 가공지선 고정장치 교체공구를 해체한다.Subsequently, in the reverse order of the above, the processing branch fixing device replacing tool according to the present invention is dismantled.

이상에서 상술한 바와 같이 본 고안은 프레임과, 상기 프레임에 안착 가능하게 설치되는 걸림고리로 이루어져 운반 및 설치가 간편한 효과가 있다.As described above, the subject innovation consists of a frame and a hook that is installed to be seated on the frame.

또한, 손쉽고 빠른 시간내에 가공지선 고정장치를 교체할 수 있는 효과가 있다.In addition, there is an effect that can be easily and quickly replace the processing line fixing device.

Claims (2)

철탑에 설치된 송전선로의 가공지선을 고정하는 현수형 고정장치를 교체할 때 상기 고정장치 대신 가공지선을 잡아주는 가공지선 고정장치 교체공구에 있어서,In the tool line fixing device replacement tool for holding the processing line instead of the fixing device when replacing the suspension type fixing device for fixing the processing line of the transmission line installed in the pylon, 철탑의 아암에 탑재되고 양단부에 통공이 형성되는 프레임;A frame mounted to the arm of the pylon and having holes formed at both ends thereof; 몸체의 일단에 나사산이 형성되고, 타단에 호형 고리부가 형성되며, 상기 나사산에 체결되는 한 쌍의 너트에 의해 상기 프레임에 안착 가능하게 설치되는 걸림고리;로 이루어지는 것을 특징으로 하는 가공지선 고정장치 교체공구.Threaded end is formed on one end of the body, the other end is formed with an arc-shaped ring, the hook hook is installed to be seated on the frame by a pair of nuts fastened to the thread; tool. 제 1 항에 있어서,The method of claim 1, 상기 걸림고리의 호형 고리부 외주면에 완충부재가 더 설치되어 가공지선의 손상을 방지하는 것을 특징으로 하는 가공지선 고정장치 교체공구.The processing line fixing device replacement tool, characterized in that the buffer member is further installed on the outer peripheral surface of the arc ring portion of the hook ring to prevent damage to the processing line.
KR2020060025081U 2006-09-18 2006-09-18 The changing tool of a overhead earth wire fix device KR200433270Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020060025081U KR200433270Y1 (en) 2006-09-18 2006-09-18 The changing tool of a overhead earth wire fix device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020060025081U KR200433270Y1 (en) 2006-09-18 2006-09-18 The changing tool of a overhead earth wire fix device

Publications (1)

Publication Number Publication Date
KR200433270Y1 true KR200433270Y1 (en) 2006-12-08

Family

ID=41781606

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020060025081U KR200433270Y1 (en) 2006-09-18 2006-09-18 The changing tool of a overhead earth wire fix device

Country Status (1)

Country Link
KR (1) KR200433270Y1 (en)

Similar Documents

Publication Publication Date Title
US4615656A (en) Cylinder gripping attachment for a fork lift truck
JP4859580B2 (en) Winding binding tool
AU2021201590A1 (en) Wire strainers
JP2013027057A (en) Electric line anchoring system
CN108016984A (en) A kind of mechanical splice building pipeline lifting fixator
KR200433270Y1 (en) The changing tool of a overhead earth wire fix device
CN104682263B (en) Hot-line work operation lever single-lever work head
US6290195B1 (en) Mounting bracket system for supporting accessories on a structure
JP4093560B2 (en) Parent rope support
KR20210149339A (en) A jig apparatus for installing pipes
JP6734811B2 (en) Overhead wire double protection tool
JP2008254902A (en) Mounting tool for supporting cch bobbin with falling prevention function
AU2009251026A1 (en) A Clamping Device
US10663087B2 (en) Power tool cable mount
JP6360945B2 (en) Backhoe grip attachment mounting structure
KR20160045330A (en) Integrated electric wire tensioning device for electric supply
JP2008546418A5 (en)
US7644894B1 (en) Cable management and tie-off apparatus
KR200480191Y1 (en) Device for fixing agricultural crop
KR100342133B1 (en) A Clamp to move the flume tube
JP3196921U (en) Backhoe grip attachment mounting structure
CN211930100U (en) Special clamp for replacing suspension clamp
KR200389353Y1 (en) Fall protector device for pylon
CN209774491U (en) Pipe wrench
CN218503265U (en) Chain dismounting device

Legal Events

Date Code Title Description
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20121116

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20131118

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20141117

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20151116

Year of fee payment: 10

EXPY Expiration of term