CN108016984A - A kind of mechanical splice building pipeline lifting fixator - Google Patents
A kind of mechanical splice building pipeline lifting fixator Download PDFInfo
- Publication number
- CN108016984A CN108016984A CN201711435789.3A CN201711435789A CN108016984A CN 108016984 A CN108016984 A CN 108016984A CN 201711435789 A CN201711435789 A CN 201711435789A CN 108016984 A CN108016984 A CN 108016984A
- Authority
- CN
- China
- Prior art keywords
- pipe fitting
- clamping
- clamping device
- building pipeline
- mechanical splice
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000007246 mechanism Effects 0.000 claims abstract description 38
- 229920001971 elastomer Polymers 0.000 claims description 9
- 239000005060 rubber Substances 0.000 claims description 9
- 230000003014 reinforcing effect Effects 0.000 claims description 7
- 239000003381 stabilizer Substances 0.000 claims description 4
- 229910001220 stainless steel Inorganic materials 0.000 claims description 2
- 239000010935 stainless steel Substances 0.000 claims description 2
- 238000009434 installation Methods 0.000 abstract description 14
- 230000000694 effects Effects 0.000 abstract description 5
- 230000008859 change Effects 0.000 abstract description 3
- 238000000034 method Methods 0.000 description 7
- 230000008569 process Effects 0.000 description 7
- 238000005516 engineering process Methods 0.000 description 6
- 238000010276 construction Methods 0.000 description 5
- 229910000831 Steel Inorganic materials 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 239000013536 elastomeric material Substances 0.000 description 2
- 230000005484 gravity Effects 0.000 description 2
- 238000011900 installation process Methods 0.000 description 2
- 239000002184 metal Substances 0.000 description 2
- 238000005457 optimization Methods 0.000 description 2
- 238000012797 qualification Methods 0.000 description 2
- 235000001674 Agaricus brunnescens Nutrition 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000027455 binding Effects 0.000 description 1
- 238000009739 binding Methods 0.000 description 1
- 239000004566 building material Substances 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 239000003562 lightweight material Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 239000004033 plastic Substances 0.000 description 1
- 238000009428 plumbing Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/42—Gripping members engaging only the external or internal surfaces of the articles
- B66C1/44—Gripping members engaging only the external or internal surfaces of the articles and applying frictional forces
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/12—Slings comprising chains, wires, ropes, or bands; Nets
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
- B66C13/04—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
- B66C13/08—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a kind of mechanical splice building pipeline lifting fixator, including the clamping device for clamping building pipeline pipe fitting, the bindiny mechanism being connected with the clamping device, it is used to support the bindiny mechanism and transmits the transverse arm of driving force to bindiny mechanism and be fixedly connected with the hanging mechanism for being connected hoisting machine with the transverse arm, the clamping device includes the connecting plate being connected with the bindiny mechanism, and be symmetrical set two pieces of grip blocks being connected with the connecting plate, the grasping part for being used for clamping pipe fitting is formed between the grip block, the locking unit for adjusting effectively clamping spacing is additionally provided with the grip block.The present invention can adapt to the pipe fitting clamping lifting of different-diameter size, from the shape, size and weight of pipe fitting, change the posture of pipe fitting lifting by varying the position of clamping device and quantity, there is more easily installation effect and more firm fastening effect.
Description
Technical field
The present invention relates to building pipe fitting lifting ancillary equipment field, more particularly to the quality used in construction site are larger
The lifting clamping field of fixation devices of metal tube, is a kind of mechanical splice building pipeline lifting fixator specifically.
Background technology
In recent years, as the emergence of real estate is with fast-developing, building throughout the country is like the mushrooms after rain
Rise sheer from level ground.During building, either because scaffold builds pipe fitting installation indispensable in still building, all
It can be related to the lifting problem of pipe fitting or cylindrical component.
The lifting of existing pipe fitting be typically without fixation fixture either setting tool typically using canvas or Buddhist nun
Imperial line is bundled the pipe fitting for needing to lift, and then the pipe fitting bundled is suspended on hoisting machine, carries out lifting transport.This
Kind of mode is lifting some pipe fittings than lighter weight, such as the lightweight material such as the water pipe of plastic material or PVC, PE is
Can with;But when lifting the larger metal tube or column building materials of some quality, the mode bundled using rope is hung
Dress then can easily slide, especially the smooth pipe fitting in surface, once crank occurs in hoisting process, tilt
Situation, easily slide, cause falling object from high altitude, or even lead to security incident.
In the following, the schematic illustration existing patent document that once several applicants related with this case retrieve:
The prior art 1:Chinese invention patent application, application number:201510883884.4 the applying date:2015-12-01, publication number
105382597A, the patent application disclose pipe fitting clamping device, which includes:Upper grip block (21), lower folder
Plate (22) and telescopic cylinder (23) are held, the upper grip block (21) is engaged to form a clamping sky with the lower grip block (22)
Gap accommodates part to be held, and the telescopic cylinder (23) is arranged on the upper grip block (21), and the telescopic cylinder (23)
Piston rod is fixed in the lower grip block (22), and the telescopic cylinder (23) is arranged at the outside in clamping gap.The pipe fitting clamps
Device, which overcomes pipe fitting of the prior art, to be stablized the problem of fixed, realize gripping for pipe fitting.
The prior art 2:Chinese invention patent application, application number:201310574267.7 the applying date:2013-11-16, it is public
The number of opening 103586801A, the patent application have specifically attacked pipe-fitting holder next, including base, and the middle part of base, which has, to be used to accommodate
The opening of pipe fitting, is arranged with clamping jaw on the base for the both sides that are open, and clamping jaw is fixedly supported on axis pin, and the both ends of axis pin respectively can
It is rotationally supported at support plate, on connecting plate, support plate and connecting plate are located at the both sides of opening respectively, and axis pin is stretched out on the part of support plate
Equipped with radial opening pin, the length of split pin exceeds mounting hole of the axis pin on support plate, and the opposite side of axis pin stretches out connecting plate simultaneously
Extend laterally;Clamping jaw is sector structure, and the arch section of clamping jaw is concave arc portion, and along clamping jaw in concave arc portion
The length direction of the arch section is equipped with multiple teeth.The present invention can either effectively clamp identical caliber, and can be to not
Pipe fitting with caliber is effectively clamped.
The prior art 3:Chinese invention patent application, application number:201410183586.X the applying date:2014-05-04, it is public
The number of opening 103949906A, the disclosure of the invention a kind of pipe fitting clamping device, the pipe fitting clamping device include a connector drum,
The top of the connector drum is equipped with a connection column cap, the bottom of the connector drum be equipped with a shoe first clamping piece and
The second intermediate plate of one shoe, the second intermediate plate are removably connected with the first clamping piece.The tube clip of the present invention
Two folders can be adjusted using the second intermediate plate and first clamping piece being removably connected, user using elongated slot is adjusted by holding device
Relative position between piece, so as to change the clamping dimension of the clamping device, greatly expands being applicable in for the pipe fitting clamping device
Scope, of simple structure and strong practicability.
The content of the invention
It is an object of the invention to provide a kind of mechanical splice building pipeline lifting fixator, for solving in the prior art
It is fixed in pipe fitting pipeline fixation hoisting process is carried out using modes such as bindings, easily occurs to slide or fall, exist
The problem of serious security risk;Smooth especially for surface, the larger pipeline component of quality is more prominent.
The present invention is achieved through the following technical solutions:
A kind of mechanical splice building pipeline lifting fixator, including for clamp building pipeline pipe fitting clamping device, with it is described
Clamping device connection bindiny mechanism, be used to support the bindiny mechanism and to bindiny mechanism transmit driving force transverse arm and with institute
State transverse arm and be fixedly connected with hanging mechanism for connecting hoisting machine, the clamping device includes the company being connected with the bindiny mechanism
Fishplate bar, and be symmetrical set two pieces of grip blocks being connected with the connecting plate, form between the grip block and are used to clamp
The grasping part of pipe fitting, the locking unit for adjusting effectively clamping spacing is additionally provided with the grip block.
Operation principle:
When the clamping that pipe fitting pipeline is carried out using the present invention is lifted, firstly, it is necessary to the clamping device is totally released, will
Clamping device is installed on the pipe fitting for needing to lift, and is gripped.Then in the same way by another clamping machine
Structure fixed clamp is in the another location of pipe fitting for needing to lift, it should be noted that the mounted clamping device of above-mentioned two it
Between midpoint should try one's best and overlapped with the pipe fitting midpoint for needing to lift or focus point, then using bindiny mechanism by above-mentioned two
Two terminations of clamping device and the transverse arm are reliably connected;Bindiny mechanism in this case can use be welded to each other transverse arm with
Cable on clamping device;Or the steel wire rope being fixedly connected, can also use other intensity qualification rope,.This case
Focus on prominent clamping device the locking unit set, can be adjusted according to the diameter difference of the pipe fitting actually clamped
Section, adaptability are clamped fixation;So effectively avoid pipe fitting and clamp unstable problem;Simultaneously for two clampings
The installation site requirement of mechanism, is in order to avoid in hoisting process the problem of run-off the straight;Really, due to clamping device and lock
The effect of tight unit, during using this technology, even if will not fall there occurs inclination.
Finally, hanging mechanism snapping is either suspended on the tower crane in construction site or the hook of loop wheel machine and pipe fitting is carried out
Lifting.When needing to remove pipe fitting, it is only necessary to removed according to the reverse order of installation.This programme can also solve
Certainly in the prior art, the technology that can not solve to carry out installing big quality pipe fitting in vertical hoisting process using cluster lifting is asked
Topic.
Particularly, due to needing the pipe fitting of big quality switching to vertical position, smooth pipe fitting from horizontal position
It would generally slide;This is breakneck, and existing building site safety standard construction do not allow.It is but if unfavorable
Big quality pipe fitting is got up vertically with loop wheel machine, it is manually it is difficult to which big quality pipe fitting is vertically-mounted to depend merely on.Use this case can be with
One of clamping device is unclamped, due to only having a clamping device to act on pipe fitting, under gravity, pipe fitting
Nature can be in vertical state or the position near vertical state, and at this moment, in installation process, installation personnel only needs pair
Quasi- pipe fitting installation site, ensures the stable problem of pipe fitting without applying to pipe fitting compared with noticeable effort.This point is existing skill
It is insurmountable in art.
In order to preferably realize the present invention, it is preferable that especially using following structure settings:The locking unit includes and institute
The tie down screw of grip block threaded connection is stated, one end termination that the tie down screw stretches into the grasping part is fixedly connected with ball
Shape part, the spherical parts are connected with the cone rubber for buffer non-skid, and the end face of the cone rubber is provided with a plurality of anti-skidding
Groove.The both ends of two pieces of grip blocks are both provided with connecting hole, are penetrated through in the connecting hole and are provided with adjusting bolt.
The operation principle of this preferred solution:
What deserves to be explained is due in order to preferably adapt to the pipe fitting of different-diameter, and form firm blessing power, the adjusting
Bolt is stay bolt, and length can carry out selecting choosing or configuration according to most of pipe fitting diameter demand in actual building site, this is right
For those skilled in the art, no matter it is possible to using customization processing or tender buying, therefore, is not just done in detail
It is thin to discuss.
When being clamped, it is necessary first to tie down screw returned to maximum grip space, dismantles upper end and/or lower end
Adjusting bolt, then will need fixed pipe fitting to clamp, then adjusting bolt is carried out installation fastening.Finally adjusting locking screw
Bar, in order to be more uniformly stressed pipe fitting, should simultaneously or sequentially be adjusted the tie down screw of both sides, avoid stress not
, the problem of or stress is eccentric.The cone rubber made at the same time of elastomeric material contacts not with the pipe fitting of any material
Pipe fitting can be caused to damage, while by setting non-slip groove, using the teaching of the invention it is possible to provide preferable fastening force and parcel degree, have preferable
Non-skid property.
In order to preferably realize the present invention, it is preferable that especially using following structure settings:The connecting plate is in circular arc chamfering
Triangle tabular, and two base angles position is provided with the first through hole for accommodating the adjusting bolt;The triangle
Corner position is provided with the second through hole for connecting the connection structure.
In order to preferably realize the present invention, it is preferable that especially using following structure settings:The bindiny mechanism includes fixing
The reinforcing ring being connected on the transverse arm, and the load-bearing ring being fixedly connected with the transverse arm and reinforcing ring, the load-bearing ring connect
The hanging ring of multiple interconnections is connected to, the end of the hanging ring is connected with the connecting plate.
In order to preferably realize the present invention, it is preferable that especially using following structure settings:The transverse arm is included by stainless steel
Manufactured casing, is telescopically connected the telescopic cross bar in described sleeve pipe, and described sleeve pipe side wall is provided with use by the position of proximal head
In fixed described sleeve pipe and the positioning screw of telescopic cross bar.
In order to preferably realize the present invention, it is preferable that especially using following structure settings:Hanging mechanism connects including lifting
Mouthful, the connecting pole being fixedly connected with lifting interface, the other end of the connecting pole is fixedly connected with described sleeve pipe, the connecting pole
Upper end and two terminations of described sleeve pipe be welded with stabiliser bar.
Compared with prior art, the present invention haing the following advantages and beneficial effect:
The present invention can adapt to the pipe fitting clamping lifting of different-diameter size, from the shape, size and weight of pipe fitting;Energy
Enough plumbing dimensions lifted as needed select different clamping devices;At the same time can be in hoisting process, by varying clamping
The position of mechanism and quantity change the posture of pipe fitting lifting, with more easily installation effect and more firm fastening are imitated
Fruit.
Brief description of the drawings
Fig. 1 is the left view of the present invention;
Fig. 2 is the front view of the present invention;
Fig. 3 is the three-dimensional structure diagram of the present invention;
Fig. 4 is clamping device structure chart;
Fig. 5 is the schematic enlarged-scale view of bindiny mechanism;
Fig. 6 is the top view of Fig. 2;
Fig. 7 is the structure installation diagram of grip block and tie down screw;
Wherein 1- clamping devices;11- connecting plates;12- adjusting bolts;13- grip blocks;14- tie down screws;15- locking screw holes;
16- spherical parts;17- cone rubbers;18- non-slip grooves;2- bindiny mechanisms;21- reinforcing rings;22- load-bearing rings;23- hanging rings;3- is horizontal
Arm;31- telescopic cross bars;32- positioning screws;4- hanging mechanisms;41- lifts interface;42- connecting poles;43- stabiliser bars.
Embodiment
The present invention is described in further detail with reference to embodiment, but the implementation of the present invention is not limited to this.
Embodiment 1:
With reference to shown in attached drawing 2-3, a kind of mechanical splice building pipeline lifting fixator, including for clamping building pipeline pipe fitting
Clamping device 1, the bindiny mechanism 2 being connected with the clamping device 1, be used to support the bindiny mechanism 2 and passed to bindiny mechanism 2
Pass the transverse arm 3 of driving force and be fixedly connected with the hanging mechanism 4 for being connected hoisting machine with the transverse arm 3, the clamping device 1 wraps
The connecting plate 11 being connected with the bindiny mechanism 2 is included, and be symmetrical set two pieces of clampings being connected with the connecting plate 11
Plate 13, forms the grasping part for being used for clamping pipe fitting between the grip block 13, is additionally provided with the grip block 13 for adjusting
The locking unit of section effectively clamping spacing.
Operation principle:
When the clamping that pipe fitting pipeline is carried out using the present invention is lifted, firstly, it is necessary to the clamping device 1 is totally released,
Clamping device 1 is installed on the pipe fitting for needing to lift, and is gripped.Then another is clamped in the same way
1 fixed clamp of mechanism is in the another location for the pipe fitting for needing to lift, it should be noted that the mounted clamping device of above-mentioned two
Midpoint between 1 should try one's best to be overlapped with the pipe fitting midpoint for needing to lift or focus point, then will be above-mentioned using bindiny mechanism 2
Two terminations of two clamping devices 1 and the transverse arm 3 are reliably connected;Bindiny mechanism in this case, which can use, to be welded to each other
Transverse arm 3 and the cable on clamping device 1;Or the steel wire rope being fixedly connected, can also use other intensity qualification rope,
Can.This case focuses on prominent clamping device the locking unit set, can be according to the diameter difference of the pipe fitting actually clamped
It is adjusted, adaptability is clamped fixation;So effectively avoid pipe fitting and clamp unstable problem;Simultaneously for two
The installation site requirement of a clamping device 1, is in order to avoid in hoisting process the problem of run-off the straight;Really, due to clamping
The effect of mechanism 1 and locking unit, during using this technology, even if will not fall there occurs inclination.
Finally, by 4 snapping of hanging mechanism be either suspended on the tower crane in construction site or the hook of loop wheel machine to pipe fitting into
Row lifting.When needing to remove pipe fitting, it is only necessary to removed according to the reverse order of installation.This programme can also
Solve in the prior art, the technology that can not solve to carry out installing big quality pipe fitting in vertical hoisting process using cluster lifting is asked
Topic.
Particularly, due to needing the pipe fitting of big quality switching to vertical position, smooth pipe fitting from horizontal position
It would generally slide;This is breakneck, and existing building site safety standard construction do not allow.It is but if unfavorable
Big quality pipe fitting is got up vertically with loop wheel machine, it is manually it is difficult to which big quality pipe fitting is vertically-mounted to depend merely on.Use this case can be with
One of clamping device 1 is unclamped, due to only having a clamping device 1 to act on pipe fitting, under gravity, pipe
Part can be in vertical state or the position near vertical state naturally, and at this moment, in installation process, installation personnel only needs
Pipe fitting installation site is directed at, ensures the stable problem of pipe fitting compared with noticeable effort without applying to pipe fitting.This point is existing
It is insurmountable in technology.
Embodiment 2:
In order to preferably realize the present invention, on the basis of the structure and operation principle of embodiment 1, the present embodiment carries out structure
Further optimization, specifically with reference to shown in attached drawing 1-5:The locking unit includes the locking screw being threadedly coupled with the grip block 13
Bar 14, one end termination that the tie down screw 14 stretches into the grasping part are fixedly connected with spherical parts 16, the spherical parts 16
The cone rubber 17 for buffer non-skid is connected with, the end face of the cone rubber 17 is provided with a plurality of non-slip groove 18.It is described
The both ends of two pieces of grip blocks 13 are both provided with connecting hole, are penetrated through in the connecting hole and are provided with adjusting bolt 12.
The operation principle of this preferred solution:
What deserves to be explained is due in order to preferably adapt to the pipe fitting of different-diameter, and form firm blessing power, the adjusting
Bolt 12 is stay bolt, and length can carry out selecting choosing or configuration according to most of pipe fitting diameter demand in actual building site, this
To those skilled in the art, no matter it is possible to using customization processing or tender buying, therefore, is not just done
It is discussed in detail.
When being clamped, it is necessary first to tie down screw 14 is returned to maximum grip space, dismantles upper end and/or lower end
Adjusting bolt 12, then fixed pipe fitting will be needed to clamp, then adjusting bolt 12 is carried out installation fastening.Finally adjusting lock
Tight screw rod 14, in order to be more uniformly stressed pipe fitting, should simultaneously or sequentially be adjusted the tie down screw 14 of both sides, keep away
Exempt from unbalance stress, or the problem of stress is eccentric.At the same time using the cone rubber 17 that elastomeric material makes and the pipe of any material
Part contact causes to damage all without to pipe fitting, while by setting non-slip groove 18, using the teaching of the invention it is possible to provide preferable fastening force and parcel
Degree, has preferable non-skid property.
Embodiment 3:
In order to preferably realize the present invention, on the basis of embodiment 2, following optimization structure combination sides are further also provided
Case:As shown in figs. 1-7:The connecting plate 11 is in the triangle tabular of circular arc chamfering, and two base angles position is provided with for holding
Receive the first through hole of the adjusting bolt 12;The corner position of the triangle is provided with for connecting the connection structure 2
Second through hole.
In order to preferably realize the present invention, it is preferable that especially using following structure settings:The bindiny mechanism 2 includes solid
Surely the reinforcing ring 21 being connected on the transverse arm 3, and the load-bearing ring 22 being fixedly connected with the transverse arm 3 and reinforcing ring 21, institute
The hanging ring 23 that load-bearing ring 22 is connected with multiple interconnections is stated, the end of the hanging ring 23 is connected with the connecting plate 11.
In order to preferably realize the present invention, it is preferable that especially using following structure settings:The transverse arm 3 is included by stainless
Casing made of steel, is telescopically connected the telescopic cross bar 31 in described sleeve pipe, and described sleeve pipe side wall is set by the position of proximal head
It is useful for fixed described sleeve pipe and the positioning screw of telescopic cross bar 31.
In order to preferably realize the present invention, it is preferable that especially using following structure settings:Hanging mechanism 4 connects including lifting
Mouth 41, the connecting pole 42 being fixedly connected with lifting interface 41, the other end of the connecting pole 42 are fixedly connected with described sleeve pipe, institute
State the upper end of connecting pole 42 and two terminations of described sleeve pipe are welded with stabiliser bar 43.
The above, is only presently preferred embodiments of the present invention, not does limitation in any form to the present invention, it is every according to
Any simply modification, the equivalent variations made according to the technical spirit of the present invention to above example, each fall within the protection of the present invention
Within the scope of.
Claims (7)
1. a kind of mechanical splice building pipeline lifting fixator, including for clamping the clamping device of building pipeline pipe fitting(1)And
The clamping device(1)The bindiny mechanism of connection(2), be used to support the bindiny mechanism(2)And to bindiny mechanism(2)Transmit and drive
The transverse arm of power(3)With with the transverse arm(3)It is fixedly connected with the hanging mechanism for connecting hoisting machine(4), it is characterised in that:Institute
State clamping device(1)Including with the bindiny mechanism(2)The connecting plate of connection(11), and with the connecting plate(11)Connection
Two pieces of grip blocks being symmetrical set(13), the grip block(13)Between formed and be used to clamp the grasping part of pipe fitting, it is described
Grip block(13)On be additionally provided with for adjust effectively clamping spacing locking unit.
A kind of 2. mechanical splice building pipeline lifting fixator according to claim 1, it is characterised in that:The locking is single
Member includes and the grip block(13)The tie down screw of threaded connection(14), the tie down screw(14)Stretch into the grasping part
One end termination be fixedly connected with spherical parts(16), the spherical parts(16)It is connected with the cone rubber for buffer non-skid
(17), the cone rubber(17)End face be provided with a plurality of non-slip groove(18).
A kind of 3. mechanical splice building pipeline lifting fixator according to claim 1 or 2, it is characterised in that:Described two
Block grip block(13)Both ends be both provided with connecting hole, in the connecting hole perforation adjusting bolt is installed(12).
A kind of 4. mechanical splice building pipeline lifting fixator according to claim 3, it is characterised in that:The connecting plate
(11)In the triangle tabular of circular arc chamfering, and two base angles position is provided with for accommodating the adjusting bolt(12)First
Through hole;The corner position of the triangle is provided with for connecting the connection structure(2)The second through hole.
A kind of 5. mechanical splice building pipeline lifting fixator according to claim 1, it is characterised in that:The connection machine
Structure(2)Including being fixedly connected on the transverse arm(3)On reinforcing ring(21), and with the transverse arm(3)And reinforcing ring(21)Gu
Surely the load-bearing ring connected(22), the load-bearing ring(22)It is connected with the hanging ring of multiple interconnections(23), the hanging ring(23)'s
End and the connecting plate(11)Connection.
A kind of 6. mechanical splice building pipeline lifting fixator according to claim 1, it is characterised in that:The transverse arm
(3)Including the casing being made of stainless steel, the telescopic cross bar in described sleeve pipe is telescopically connected(31), described sleeve pipe side wall is close
The position of termination is provided with for fixing described sleeve pipe and telescopic cross bar(31)Positioning screw.
A kind of 7. mechanical splice building pipeline lifting fixator according to claim 6, it is characterised in that:Hanging mechanism
(4)Including lifting interface(41), with lifting interface(41)The connecting pole being fixedly connected(42), the connecting pole(42)The other end
It is fixedly connected with described sleeve pipe, the connecting pole(42)Upper end and two terminations of described sleeve pipe be welded with stabiliser bar
(43).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711435789.3A CN108016984A (en) | 2017-12-26 | 2017-12-26 | A kind of mechanical splice building pipeline lifting fixator |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711435789.3A CN108016984A (en) | 2017-12-26 | 2017-12-26 | A kind of mechanical splice building pipeline lifting fixator |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108016984A true CN108016984A (en) | 2018-05-11 |
Family
ID=62071432
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711435789.3A Pending CN108016984A (en) | 2017-12-26 | 2017-12-26 | A kind of mechanical splice building pipeline lifting fixator |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108016984A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108910690A (en) * | 2018-09-30 | 2018-11-30 | 陈浩 | A kind of aluminium bar handling apparatus |
CN109019304A (en) * | 2018-09-25 | 2018-12-18 | 胡新军 | A kind of Steel plate hoist |
CN112555515A (en) * | 2020-12-29 | 2021-03-26 | 北京市金龙腾装饰股份有限公司 | Indoor pipeline hoisting structure and construction process thereof |
CN112723146A (en) * | 2020-12-29 | 2021-04-30 | 中国水利水电第九工程局有限公司 | Application installation equipment and construction method of corrugated pipe in gravel system |
CN113357436A (en) * | 2021-05-31 | 2021-09-07 | 魏嘉晟 | Batch formula pipeline laying of adjustable distribution clearance is with gallows |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2765283Y (en) * | 2005-02-18 | 2006-03-15 | 胡俊刚 | Antiskid musical instrument base |
CN201272964Y (en) * | 2008-09-19 | 2009-07-15 | 长葛市新世纪机电有限公司 | Shock-absorbing block and plate compactor using the same |
CN201276666Y (en) * | 2008-09-27 | 2009-07-22 | 中铁一局集团有限公司 | Rail panel hoisting apparatus |
CN201525694U (en) * | 2009-08-25 | 2010-07-14 | 广西玉柴机器股份有限公司 | Lifting appliance for engine |
CN204917661U (en) * | 2015-07-14 | 2015-12-30 | 天津金盛德钢管制造有限公司 | Steel pipe hoisting machine constructs |
CN105217442A (en) * | 2015-11-17 | 2016-01-06 | 无锡市威特机械有限公司 | A kind of pressure ram suspender |
CN207632338U (en) * | 2017-12-26 | 2018-07-20 | 四川建筑职业技术学院 | A kind of mechanical splice building pipeline lifting fixator |
-
2017
- 2017-12-26 CN CN201711435789.3A patent/CN108016984A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2765283Y (en) * | 2005-02-18 | 2006-03-15 | 胡俊刚 | Antiskid musical instrument base |
CN201272964Y (en) * | 2008-09-19 | 2009-07-15 | 长葛市新世纪机电有限公司 | Shock-absorbing block and plate compactor using the same |
CN201276666Y (en) * | 2008-09-27 | 2009-07-22 | 中铁一局集团有限公司 | Rail panel hoisting apparatus |
CN201525694U (en) * | 2009-08-25 | 2010-07-14 | 广西玉柴机器股份有限公司 | Lifting appliance for engine |
CN204917661U (en) * | 2015-07-14 | 2015-12-30 | 天津金盛德钢管制造有限公司 | Steel pipe hoisting machine constructs |
CN105217442A (en) * | 2015-11-17 | 2016-01-06 | 无锡市威特机械有限公司 | A kind of pressure ram suspender |
CN207632338U (en) * | 2017-12-26 | 2018-07-20 | 四川建筑职业技术学院 | A kind of mechanical splice building pipeline lifting fixator |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109019304A (en) * | 2018-09-25 | 2018-12-18 | 胡新军 | A kind of Steel plate hoist |
CN108910690A (en) * | 2018-09-30 | 2018-11-30 | 陈浩 | A kind of aluminium bar handling apparatus |
CN108910690B (en) * | 2018-09-30 | 2019-09-27 | 绍兴市梓昂新材料有限公司 | A kind of aluminium bar handling apparatus |
CN112555515A (en) * | 2020-12-29 | 2021-03-26 | 北京市金龙腾装饰股份有限公司 | Indoor pipeline hoisting structure and construction process thereof |
CN112723146A (en) * | 2020-12-29 | 2021-04-30 | 中国水利水电第九工程局有限公司 | Application installation equipment and construction method of corrugated pipe in gravel system |
CN112555515B (en) * | 2020-12-29 | 2021-08-10 | 北京市金龙腾装饰股份有限公司 | Indoor pipeline hoisting structure and construction process thereof |
CN112723146B (en) * | 2020-12-29 | 2022-06-28 | 中国水利水电第九工程局有限公司 | Application installation equipment and construction method of corrugated pipe in gravel system |
CN113357436A (en) * | 2021-05-31 | 2021-09-07 | 魏嘉晟 | Batch formula pipeline laying of adjustable distribution clearance is with gallows |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108016984A (en) | A kind of mechanical splice building pipeline lifting fixator | |
US12012769B2 (en) | Safety net and safety net components for multi-storey building construction | |
US20070284559A1 (en) | Conduit attachment system for a cable puller | |
CN207632338U (en) | A kind of mechanical splice building pipeline lifting fixator | |
JP2008182795A (en) | Auxiliary arm for overhead wire ladder and overhead wire ladder | |
CN202190018U (en) | Overhead ground wire ratchet wrench wire-lifting tool | |
CN203754331U (en) | Hoisting device applied to telegraph pole top end | |
CN206511645U (en) | A kind of hydraulic clamping device for hollow brick | |
EP0338142B1 (en) | Stanchion or post | |
CN108708544B (en) | Intelligent multi-use architecture hanging flower basket for construction | |
CN110106928B (en) | Adjustable support arranged on shaft mouth guard rail | |
CN215600922U (en) | High unwrapping wire coaster of security that electric power was used | |
EP1953111A2 (en) | Hoisting clamp and hoisting mechanism provided therewith | |
CN111056422B (en) | Lifting appliance for mounting large flywheel and using method thereof | |
CN101997281B (en) | Tower ground wire universal lifting mechanism | |
CN213868301U (en) | Steel structure connecting piece with quick-release function | |
CN114284932A (en) | Bypass cable suspension operating lever | |
CN210342016U (en) | Adjustable support arranged on vertical shaft mouth guard rail | |
GB2478965A (en) | A scaffold tube clamp for lifting scaffold pipes | |
SE513756C2 (en) | Method and apparatus for mounting cables, especially optical ground cables, on suspended high voltage lines | |
CN205330578U (en) | Unload pole ware subassembly | |
CN218503265U (en) | Chain dismounting device | |
CN218145361U (en) | Gallows structure is used in building engineering construction | |
CN217398223U (en) | Safe portable scaffold pipe lifting device | |
CN103437540A (en) | Adjustable inclined pipe type hanging basket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180511 |