CN105217442A - A kind of pressure ram suspender - Google Patents

A kind of pressure ram suspender Download PDF

Info

Publication number
CN105217442A
CN105217442A CN201510789553.4A CN201510789553A CN105217442A CN 105217442 A CN105217442 A CN 105217442A CN 201510789553 A CN201510789553 A CN 201510789553A CN 105217442 A CN105217442 A CN 105217442A
Authority
CN
China
Prior art keywords
hold assembly
pressure ram
suspender
vertical portion
fastener
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510789553.4A
Other languages
Chinese (zh)
Inventor
唐燕林
唐波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUXI WEITE MACHINERY CO Ltd
Original Assignee
WUXI WEITE MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUXI WEITE MACHINERY CO Ltd filed Critical WUXI WEITE MACHINERY CO Ltd
Priority to CN201510789553.4A priority Critical patent/CN105217442A/en
Publication of CN105217442A publication Critical patent/CN105217442A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a kind of pressure ram suspender, described suspender comprises installs cross-bar body (1), the midway location of described installation cross-bar body (1) is provided with suspension ring (2), the two ends of described installation cross-bar body (1) are separately installed with head rod (9) and the second pipe link (4), the lower end of described head rod (9) is provided with the first hold assembly (7), the lower end of described second pipe link (4) is provided with the second hold assembly (8), be grasping part (6) between described first hold assembly (7) and the second hold assembly (8), described first hold assembly (7) is connected by fastener with the upper end of the second hold assembly (8), described first hold assembly (7) is connected by fastener with the lower end of the second hold assembly (8).The invention enables pressure ram hang get very convenient.

Description

A kind of pressure ram suspender
Technical field:
The present invention relates to mounting hanger technical field, be used for hanging more specifically to one and get pressure ram suspender.
Background technology:
In the middle of the equipment of extrusion forming, indispensable a kind of parts are pressure ram, by the action of pressure ram, and the mould to match with pressure ram carrys out the part of the shaping needs of crimp, in prior art, need to change pressure ram or install carrying out different forming parts, because the weight of pressure ram is very large, therefore the carrying out be difficult to manually removes, and be generally stub end due to the front end of pressure ram, therefore the weight of general one end of pressure ram is larger, and the weight of the other end is less, be difficult to find its center of gravity make its hang get in can reach balance, therefore suspender of the prior art has been difficult to hang the work of getting.
Summary of the invention:
Object of the present invention is just to provide a kind of pressure ram suspender, it make pressure ram hang get very convenient.
For achieving the above object, a kind of pressure ram suspender of the present invention, described suspender comprises installation cross-bar body, the midway location of described installation cross-bar body is provided with suspension ring, the two ends of described installation cross-bar body are separately installed with head rod and the second pipe link, the lower end of described head rod is provided with the first hold assembly, the lower end of described second pipe link is provided with the second hold assembly, be grasping part between described first hold assembly and the second hold assembly, described first hold assembly is connected by fastener with the upper end of the second hold assembly, described first hold assembly is connected by fastener with the lower end of the second hold assembly.
Preferred as technique scheme, described first hold assembly and the second hold assembly have holding part body, described holding part body has vertical portion, the upper end of described vertical portion is provided with oblique top, the lower end of described vertical portion is provided with oblique bottom, and described vertical portion, oblique top and oblique bottom surround into the trapezoid space of front openings.
Preferred as technique scheme, described first hold assembly and the second hold assembly are symmetrical set.
Preferred as technique scheme, described first hold assembly and the second hold assembly is respectively arranged with the handle portion that outside extends.
Preferred as technique scheme, described handle portion is fixed on described vertical portion by welding manner.
Preferred as technique scheme, described suspension ring are U-shaped suspension ring.
Preferred as technique scheme, described fastener is double end stud, described double end stud is located on the first hold assembly and the second hold assembly, the two ends of described double end stud are threaded respectively and are provided with nut, and the nut at two ends acts on the first hold assembly and the second hold assembly respectively.
Beneficial effect of the present invention is: the invention enables pressure ram hang get very convenient.
Accompanying drawing illustrates:
Below in conjunction with accompanying drawing, the present invention is described further:
Fig. 1 is the structural representation of the embodiment of the present invention
Fig. 2 is the structural representation of the first hold assembly and the second hold assembly in the embodiment of the present invention
Fig. 3 is the installation site schematic diagram in the embodiment of the present invention
Fig. 4 is the left view of Fig. 3.
In figure: 1, cross-bar body is installed; 2, suspension ring; 3, fastener; 4, the second pipe link; 5, handle portion; 6, grasping part; 7, the first hold assembly; 8, the second hold assembly; 9, head rod; 100, pressure ram suspender; 200, pressure ram; 101, oblique top; 102, vertical portion; 103, oblique bottom
Detailed description of the invention:
The following stated is only the preferred embodiment embodying the principle of the invention, does not therefore limit protection scope of the present invention
Embodiment: as Fig. 1, 2 embodiments being depicted as a kind of pressure ram suspender of the present invention, described suspender comprises installs cross-bar body 1, the midway location of described installation cross-bar body 1 is provided with suspension ring 2, the two ends of described installation cross-bar body 1 are separately installed with head rod 9 and the second pipe link 4, the lower end of described head rod 9 is provided with the first hold assembly 7, the lower end of described second pipe link 4 is provided with the second hold assembly 8, be grasping part 6 between described first hold assembly 7 and the second hold assembly 8, described first hold assembly 7 is connected by fastener 3 with the upper end of the second hold assembly 8, described first hold assembly 7 is connected by fastener 3 with the lower end of the second hold assembly 8.
First hold assembly 7 and the second hold assembly 8 have holding part body, described holding part body has vertical portion 102, the upper end of described vertical portion 102 is provided with oblique top 101, the lower end of described vertical portion 102 is provided with oblique bottom 103, and described vertical portion 102, oblique top 101 and oblique bottom 103 surround into the trapezoid space of front openings.
First hold assembly 7 and the second hold assembly 8 are symmetrical set.
First hold assembly 7 and the second hold assembly 8 are respectively arranged with the handle portion 5 that outside extends.
Handle portion 5 is fixed on described vertical portion 102 by welding manner, and handle portion 5 can handled easily person regulate suspender.
Suspension ring 2 are U-shaped suspension ring.
Fastener is double end stud, and described double end stud is located on the first hold assembly 7 and the second hold assembly 8, and the two ends of described double end stud are threaded respectively and are provided with nut, and the nut at two ends acts on the first hold assembly 7 and the second hold assembly 8 respectively.
Position view on the pressure ram 200 that pressure ram suspender 100 in the present embodiment is installed as shown in Figure 3 and Figure 4, first the nut of double end stud is unclamped when installing, pressure ram 200 is placed in grasping part 6, first hold assembly 7 contacts with pressure ram 200 with oblique bottom 103 with the oblique top 101 of the second hold assembly 8, and pressure ram 200 is clamped, then realizes lifting by suspension ring 2.
Specific embodiment described herein is only to the explanation for example of the present invention's spirit.Those skilled in the art can make various amendment or supplement or adopt similar mode to substitute to described specific embodiment, but can't depart from spirit of the present invention or surmount the scope that appended claims defines.

Claims (7)

1. a pressure ram suspender, described suspender comprises installs cross-bar body (1), it is characterized in that, the midway location of described installation cross-bar body (1) is provided with suspension ring (2), the two ends of described installation cross-bar body (1) are separately installed with head rod (9) and the second pipe link (4), the lower end of described head rod (9) is provided with the first hold assembly (7), the lower end of described second pipe link (4) is provided with the second hold assembly (8), be grasping part (6) between described first hold assembly (7) and the second hold assembly (8), described first hold assembly (7) is connected by fastener with the upper end of the second hold assembly (8), described first hold assembly (7) is connected by fastener with the lower end of the second hold assembly (8).
2. a kind of pressure ram suspender according to claim 1, it is characterized in that, described first hold assembly (7) and the second hold assembly (8) have holding part body, described holding part body has vertical portion (102), the upper end of described vertical portion (102) is provided with oblique top (101), the lower end of described vertical portion (102) is provided with oblique bottom (103), and described vertical portion (102), oblique top (101) and oblique bottom (103) surround into the trapezoid space of front openings.
3. a kind of pressure ram suspender according to claim 2, is characterized in that, described first hold assembly (7) and the second hold assembly (8) are symmetrical set.
4. a kind of pressure ram suspender according to claim 3, is characterized in that, described first hold assembly (7) and the second hold assembly (8) is respectively arranged with the handle portion (5) that outside extends.
5. a kind of pressure ram suspender according to claim 4, is characterized in that, described handle portion (5) is fixed on described vertical portion (102) by welding manner.
6. a kind of pressure ram suspender according to claim 5, is characterized in that, described suspension ring (2) are U-shaped suspension ring.
7. a kind of pressure ram suspender according to claim 6, it is characterized in that, described fastener is double end stud, described double end stud is located on the first hold assembly (7) and the second hold assembly (8), the two ends of described double end stud are threaded respectively and are provided with nut, and the nut at two ends acts on the first hold assembly (7) and the second hold assembly (8) respectively.
CN201510789553.4A 2015-11-17 2015-11-17 A kind of pressure ram suspender Pending CN105217442A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510789553.4A CN105217442A (en) 2015-11-17 2015-11-17 A kind of pressure ram suspender

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510789553.4A CN105217442A (en) 2015-11-17 2015-11-17 A kind of pressure ram suspender

Publications (1)

Publication Number Publication Date
CN105217442A true CN105217442A (en) 2016-01-06

Family

ID=54986809

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510789553.4A Pending CN105217442A (en) 2015-11-17 2015-11-17 A kind of pressure ram suspender

Country Status (1)

Country Link
CN (1) CN105217442A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108016984A (en) * 2017-12-26 2018-05-11 四川建筑职业技术学院 A kind of mechanical splice building pipeline lifting fixator

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009113879A (en) * 2007-11-01 2009-05-28 Shunan Chiiki Jiba Sangyo Shinko Center Hoisting tool of pipe body
CN201834656U (en) * 2010-09-01 2011-05-18 合肥香馨水泥预制品有限公司 Cement pipe-prefabricating outer mold hoist
CN205204632U (en) * 2015-11-17 2016-05-04 无锡市威特机械有限公司 Pressure ram hoist

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009113879A (en) * 2007-11-01 2009-05-28 Shunan Chiiki Jiba Sangyo Shinko Center Hoisting tool of pipe body
CN201834656U (en) * 2010-09-01 2011-05-18 合肥香馨水泥预制品有限公司 Cement pipe-prefabricating outer mold hoist
CN205204632U (en) * 2015-11-17 2016-05-04 无锡市威特机械有限公司 Pressure ram hoist

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108016984A (en) * 2017-12-26 2018-05-11 四川建筑职业技术学院 A kind of mechanical splice building pipeline lifting fixator

Similar Documents

Publication Publication Date Title
WO2018183184A3 (en) Rod and casing handler
CN205204632U (en) Pressure ram hoist
CN105217442A (en) A kind of pressure ram suspender
CN203333152U (en) Lifting tool for clamping porcelain bushing blank
CN105526425B (en) A kind of simple conduit clip
CN104089008A (en) Manhole cover opening device
CN204897175U (en) Novel anticreep couple
CN205200206U (en) Pull -rod nut hoist
CN202732064U (en) Automobile exhaust pipe hanging lifting hook
MX2017014790A (en) Link assembly for longitudinal arm vehicle suspension.
CN202451534U (en) Connecting piece applicable to aluminum alloy pipes
CN105345705B (en) A kind of outside buckles into that formula automobile machine is left back to put support card holder
CN203783721U (en) Water pump base
CN205296683U (en) Even power stores pylon of dismantlement formula fast
CN205147165U (en) Safety protection baffle for punch press
CN204213478U (en) A kind of arch pipe clamp
CN204075864U (en) A kind of machining feed arrangement of engine gudgeon pin
CN204416908U (en) Shells of High Voltage Switches transfer seat
EP3115290A3 (en) Rear arm, straddled vehicle and manufacture method
CN207584219U (en) A kind of gas-tpe fitting being easily installed
CN204828266U (en) Shoemaking machine connecting rod connecting piece
CN201703967U (en) Adjustable suspending support frame
CN206873023U (en) Broadening formation grabs pipe cap
CN207258996U (en) A kind of novel and multifunctional suspender
CN205075250U (en) Micropore mould

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160106