KR200420148Y1 - The environmental-friendly terraced charnel house - Google Patents

The environmental-friendly terraced charnel house Download PDF

Info

Publication number
KR200420148Y1
KR200420148Y1 KR2020060009889U KR20060009889U KR200420148Y1 KR 200420148 Y1 KR200420148 Y1 KR 200420148Y1 KR 2020060009889 U KR2020060009889 U KR 2020060009889U KR 20060009889 U KR20060009889 U KR 20060009889U KR 200420148 Y1 KR200420148 Y1 KR 200420148Y1
Authority
KR
South Korea
Prior art keywords
lime
foundation
ossuary
soil
stone
Prior art date
Application number
KR2020060009889U
Other languages
Korean (ko)
Inventor
강성택
Original Assignee
강성택
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 강성택 filed Critical 강성택
Priority to KR2020060009889U priority Critical patent/KR200420148Y1/en
Application granted granted Critical
Publication of KR200420148Y1 publication Critical patent/KR200420148Y1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H13/00Monuments; Tombs; Burial vaults; Columbaria
    • E04H13/003Funeral monuments, grave sites curbing or markers not making part of vaults
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H13/00Monuments; Tombs; Burial vaults; Columbaria
    • E04H13/006Columbaria, mausoleum with frontal access to vaults

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Retaining Walls (AREA)

Abstract

본 고안은 환경친화적 계단식 납골묘에 관한 것이다.The present invention relates to an environmentally friendly stepped gravel.

본 고안의 환경친화적 계단식 납골묘는, 경사지에 설치되어 있고, 상면이 지면과 평행하도록 된 다수 개의 단부가 순차적으로 높아지면서 계단 형태로 형성되어 있고, 석회와 흙을 혼합한 후 물을 부어 형성한 석회모르타르를 양생시켜 형성된 석회기초와; 석회기초의 각 단부 위에 설치되어 있고, 저면까지 관통된 다수 개의 유골구멍이 형성되어 석회기초 단부 바닥면과 함께 유골실을 이루고 있으며, 석재로 되어 있는 납골석과; 납골석의 각 유골구멍 상면을 밀폐시키는 비석;으로 구성된다.Environmentally friendly stepped gravel of the present invention is installed on a slope, and a plurality of ends whose upper surfaces are parallel to the ground are sequentially formed in a step shape, and are formed by mixing water with lime and then pouring water. Lime base formed by curing mortar; It is installed on each end of the lime foundation, a plurality of ash holes penetrated to the bottom surface to form a ash chamber together with the bottom surface of the lime foundation, and the ossuary stone is made of stone; It is composed of; a stele to seal the upper surface of each ash hole of the crypt.

본 고안에 의해 화강석과 석회 흙을 주재료로 하여 형성하여 장시간 경과시 폐콘크리트와 같은 산업폐기물이 배출되지 않고, 비용이 저렴한 경사면에 설치할 수 있으면서, 하부에 석회기초가 형성되어 있어 지반침하나 하중에 의해 납골석이 침하되지 않게 되며, 유골실에 유골과 흙이 함께 채워져 악취가 발생되지 않고, 유골이 토양에 자연스럽게 분해되는 납골묘가 제공된다.It is formed by using granite and lime soil as the main material, and industrial waste such as waste concrete is not discharged after a long time, and it can be installed on low-cost slope, and lime foundation is formed at the bottom, so By the ossuary is not settled, the ash chamber and the ashes and the soil is filled together so that no odor is generated, the ossuary grave is provided that the ashes are naturally decomposed into the soil.

납골묘, 계단, 경사지, 석회, 숯 Ossuary, Stairs, Slope, Lime, Charcoal

Description

환경친화적 계단식 납골묘{THE ENVIRONMENTAL-FRIENDLY TERRACED CHARNEL HOUSE}Environmentally Friendly Stepped Cave Sculptures {THE ENVIRONMENTAL-FRIENDLY TERRACED CHARNEL HOUSE}

도 1은 종래의 계단식 납골묘를 나타낸 사시도.1 is a perspective view showing a conventional stepped sternum.

도 2는 본 고안의 계단식 납골묘를 나타낸 부분절단 분해사시도.Figure 2 is an exploded perspective view showing a partially cut staircase gravel of the present invention.

도 3은 본 고안의 또다른 계단식 납골묘를 나타낸 부분절단 분해사시도.Figure 3 is a partially cut away exploded perspective view showing another stepped ossuary gravel of the present invention.

도 4는 본 고안의 납골묘의 유골실에 흙과 유골이 채워진 상태를 나타낸 부분절단 분해사시도.Figure 4 is an exploded perspective view showing a state in which the ashes of the ossuary gravel of the present invention filled with soil and ashes.

도 5는 본 고안 납골묘에 덮개판이 추가로 설치된 상태를 나타낸 부분절단 분해사시도.Figure 5 is a partially cut away exploded perspective view showing a state in which the cover plate is additionally installed in the present invention ossuary.

도 6은 본 고안 납골묘에 측벽부가 설치된 상태를 나타낸 부분절단 분해사시도.Figure 6 is a partially cut away exploded perspective view showing a state in which the side wall portion is installed in the present invention ossuary.

<도면의 주요 부호에 대한 상세한 설명><Detailed Description of Major Symbols in Drawing>

10 : 석회기초 11 : 단부10: lime base 11: end

20 : 납골석 21 : 유골구멍20: ossuary stone 21: ash hole

22 : 유골실 30 : 비석22: ash chamber 30: headstone

40 : 지지벽 41 : 덮개석40: support wall 41: cover seat

42 : 지지벽기초 43 : 측벽부42: support wall foundation 43: side wall

43a : 측벽부덮개석 43b : 측벽43a: side wall covering seat 43b: side wall

43c : 측벽부기초 50 : 흙43c: side wall foundation 50: soil

60 : 유골 70 : 칸막이석60: ashes 70: partition stone

80 : 경사지 90 : 평지80: slope 90: flat

100 : 보관석 110 : 덮개판100: storage seat 110: cover plate

본 고안은 환경친화적 계단식 납골묘에 관한 것이다.The present invention relates to an environmentally friendly stepped gravel.

일반적으로 납골묘는 사람이 죽은 뒤 시신을 화장하여 그 유골을 일정공간에 안치시키는 것이다.In general, the ossuary is a cremation of a dead body after a person dies and the ashes are placed in a certain space.

최근에는 종래의 봉분형 묘지가 국토의 효율적 이용을 방해하고, 경제적 부담을 가중시키는 문제점 등으로 인해 납골묘의 이용 사례가 늘고 있는데, 이러한 납골묘는 주로 산지를 평평하게 다진 후 설치해야 하는 문제점이 있었다.Recently, the use of crypts is increasing due to problems such as the traditional Bonbun-type cemetery, which hinders the efficient use of the country and adds to the economic burden. Such crypts have a problem that should be installed after flattening the mountain areas.

이러한 문제점을 해소하기 위해 비탈진 경사면에 대단위 묘지와 납골묘를 설치하도록 된 '대단위 집단 묘지 및 납골 시스템'(한국 등록특허공보 10-0272315)가 안출되었다.In order to solve this problem, a 'large-scale cemetery and ossuary system' (Korea Patent Publication No. 10-0272315) has been devised to install large-scale cemeteries and ossuary graves on slopes.

그런데 위와 같은 시스템은 비탈진 경사면에 대단위 콘크리트 구조물을 계단식으로 설치한 후 콘크리트 구조물의 경사면에 다수 개의 납골실을 형성한 것으로 유골함이 콘크리트로 된 납골실에 보관됨으로써 유골의 분해를 저해하는 문제점이 있었다.However, the above system has a problem of inhibiting the decomposition of the ashes by storing a large number of ossuary chambers on the inclined surface of the concrete structure after installing a large-scale concrete structure stepped on the non-degraded slope.

즉, 일정 시간이 경과한 후 조상의 유골이 흙에 의해 분해되는 것을 원하는 정서와 맞지 않는 것이다.In other words, after a certain period of time, the remains of the ancestors do not meet the sentiment of wanting to be broken down by the soil.

또한, 장시간 경과시 콘크리트 구조물이 산업폐기물로 변하게 되는 문제점이 있었다.In addition, there is a problem that the concrete structure is changed to industrial waste after a long time.

이러한 문제점을 일부 해소한 것으로, 별도의 콘크리트 구조물 없이 경사면에 박스형 보관석이 계단식으로 적층되어 형성된 '계단식 납골묘'(한국 실용신안등록 제20-0278390호)가 안출되었다.In order to solve some of these problems, 'stepped crypt' (Korea Utility Model Registration No. 20-0278390) formed by stacking box-shaped storage seats on a slope without a separate concrete structure in a stepwise manner was devised.

그런데, 위와 같은 납골묘는 적층된 보관석(100) 안쪽의 지반이 침하하는 경우 보관석(100)이 침하하게 되어 미관을 흐리게 하는 문제점이 있었다.By the way, when the ossuary gravel as described above when the ground inside the stacked storage stone 100 is settled, the storage stone 100 is settled, there was a problem of blurring the aesthetics.

특히, 상부에 적층된 보관석(100)부터 유골함을 채워 넣을 때 하부로 이동하면서 하부 보관석(100)의 덮개판(110)을 밟게 되는데 이때 역시 덮개판(110)을 밟는 사람의 하중에 의해 유골함이 침하하는 문제점도 있었다.Particularly, when the ashes are filled from the stacked storage seats 100 stacked on the upper part, the cover plate 110 of the lower storage seats 100 is moved while moving downwards, which is also caused by the load of the person stepping on the cover plate 110. There was also a problem that the ashes sink.

또, 보관석(100) 하부의 습기가 안치공을 통해 상부로 유입되어 안치공 벽면에 이끼가 끼는 등 미관을 해치는 문제점도 있었다.In addition, there is a problem that the moisture of the lower storage seat 100 is introduced into the upper through the settling hole to damage the aesthetics, such as moss stuck to the settling wall.

본 고안의 환경친화적 계단식 납골묘는 위와 같은 문제점을 해소하기 위한 것으로, 화강석과 석회 흙을 주재료로 하여 형성하여 장시간 경과시 폐콘크리트와 같은 산업폐기물을 배출하지 않도록 하려는 목적이 있다.Environmentally friendly stepped crypt is to solve the above problems, it is formed with granite and lime soil as the main material is to prevent the discharge of industrial waste, such as waste concrete over time.

또, 토지 비용이 저렴한 경사면에 설치하되 하부에 석회기초가 형성되어 있어 지반침하나 하중에 의해 납골석이 침하되지 않게 함과 동시에 미관을 유지시키려는 목적도 있다.In addition, the land cost is installed on the inclined surface, but the lime base is formed at the bottom, so that the ground osmosis, but also to prevent the settlement of the ossuary stones by the load, and also to maintain aesthetics.

또한, 유골실에 유골과 흙을 함께 넣어 악취를 방지하고 유골이 흙에 의해 자연스럽게 분해되게 하려는 목적도 있다.In addition, there is also the purpose to put the ashes and soil together in the ash chamber to prevent odor and to allow the ashes to be naturally broken down by the soil.

본 고안의 환경친화적 계단식 납골묘는 화강석, 석회, 흙 등의 친환경적 재료로 형성되어 산업폐기물을 배출하지 않게 되어 있다.Environmentally friendly stepped gravel of the present invention is formed of environmentally friendly materials such as granite, lime, and soil, so as not to emit industrial waste.

또, 비용이 저렴한 경사면에 설치할 수 있으면서 석회기초를 이용해 경사면의 지반 침하를 방지하도록 되어 있다.In addition, it is possible to install on a low-cost inclined surface and to prevent ground subsidence of the inclined surface using a lime foundation.

또한, 유골실에 유골과 흙이 함께 채워져 악취가 발생되지 않으며, 유골이 흙에 의해 자연스럽게 분해되게 된다.In addition, the ash chamber is filled with ashes and soil, so no odor is generated, and the ashes are naturally decomposed by the soil.

이를 위해 본 고안의 환경친화적 계단식 납골묘는, 경사지에 설치되어 있고, 상면이 지면과 평행하도록 된 다수 개의 단부가 순차적으로 높아지면서 계단 형태로 형성되어 있고, 석회와 흙을 혼합한 후 물을 부어 형성한 석회모르타르를 양생시켜 형성된 석회기초와; 석회기초의 각 단부 위에 설치되어 있고, 저면까지 관통 된 다수 개의 유골구멍이 형성되어 석회기초 단부 바닥면과 함께 유골실을 이루고 있으며, 석재로 되어 있는 납골석과; 납골석의 각 유골구멍 상면을 밀폐시키는 비석; 으로 구성된다.To this end, the environmentally-friendly staircase gravel of the present invention is installed on a slope, and a plurality of end portions of which the upper surface is parallel to the ground is sequentially formed in a step shape, and is formed by pouring water after mixing lime and soil. A lime foundation formed by curing a lime mortar; It is installed on each end of the lime foundation, and formed a plurality of ash holes penetrated to the bottom to form the ash chamber together with the bottom surface of the lime foundation; A monument to seal the upper surface of each ash hole of the ossuary; It consists of.

본 고안의 또다른 납골묘는, 평지에 설치되어 있고, 상면이 지면과 평행하도록 된 다수 개의 단부가 순차적으로 높아지면서 계단형태로 형성되어 있고, 석회와 흙을 혼합한 후 물을 부어 형성한 석회모르타르를 양생시켜 형성된 석회기초와; 석회기초의 뒷쪽 벽면에 설치되어 있고, 석재로 되어 있는 지지벽과; 석회기초의 각 단부 위에 설치되어 있고, 저면까지 관통된 다수 개의 유골구멍이 형성되어 석회기초 단부 바닥면과 함께 유골실을 이루고 있으며, 석재로 되어 있는 납골석과; 납골석의 각 유골구멍 상면을 밀폐시키는 비석;으로 구성된다.Another ossuary grave of the present invention, which is installed on a flat surface, is formed in a step shape with a plurality of end portions of which the upper surface is parallel to the ground sequentially, and is formed by mixing lime and soil and then pouring water to form lime mortar. Lime base formed by curing; A support wall which is installed on the back wall of the lime foundation and is made of stone; It is installed on each end of the lime foundation, a plurality of ash holes penetrated to the bottom surface to form a ash chamber together with the bottom surface of the lime foundation, and the ossuary stone is made of stone; It is composed of; a stele to seal the upper surface of each ash hole of the crypt.

본 고안의 기술적 사상을 첨부된 도면에 의하여 보다 구체적으로 설명하면 다음과 같다.Hereinafter, the technical idea of the present invention will be described in detail with reference to the accompanying drawings.

그러나 첨부된 도면은 본 고안의 기술적 사상을 보다 구체적으로 설명하기 위한 하나의 예를 도시한 것에 불과하므로 본 고안의 기술적 사상이 첨부된 도면에 한정되는 것은 아니다.However, the accompanying drawings are only one example for illustrating the technical idea of the present invention in more detail, and thus the technical idea of the present invention is not limited to the accompanying drawings.

본 고안의 구성요소인 석회기초(10)는 도면에서 보는 바와 같이 경사지(80)에 설치되어 있고, 상면이 지면과 평행하도록 된 다수 개의 단부(11)가 순차적으로 높아지면서 계단형태로 형성되어 있다.Lime foundation 10, which is a component of the present invention, is installed on the slope 80 as shown in the drawing, and is formed in a stepped shape with a plurality of end portions 11 having an upper surface parallel to the ground. .

또, 석회기초(10)는 석회와 흙을 혼합한 후 물을 부어 형성한 석회모르타르를 양생시켜 형성되어 있다.In addition, the lime foundation 10 is formed by curing lime mortar formed by mixing lime and soil and then pouring water.

석회기초(10)를 설치하는 이유는 일반적으로 비탈진 경사면의 경우 산사태를 방지함과 동시에 부분적으로 지반 침하가 일어날 경우 석회기초(10) 위의 구조물이 침하되는 것을 방지하기 위한 것이다.The reason for installing the lime foundation (10) is generally to prevent landslides in the case of non-degraded slopes and at the same time to prevent the structure on the lime foundation (10) to settle when the ground subsidence occurs.

이때, 본 고안처럼 석회기초(10)를 설치하는 것은 종래의 납골묘에서 콘크리트 기초를 형성하는 것과는 차별화된 것이다.At this time, installing the lime foundation 10 as in the present invention is to be differentiated from forming a concrete foundation in a conventional crypt.

구체적으로, 종래의 콘크리트 기초가 건축 폐기물화 되면 이의 처리에 비용이 들고, 환경을 오염시키는 문제가 있었으나 석회기초(10)를 사용할 경우 일정 시간 동안은 지반 침하와 산사태 등을 방지하고, 장시간 경과시 토양 중에 분해되기 때문에 별도의 폐기물 처리가 필요하지 않게 된다.Specifically, when the conventional concrete foundation becomes a construction waste, there is a problem in its cost and polluting the environment, but when using the lime foundation (10) to prevent ground subsidence and landslides for a predetermined time, Decomposition in the soil eliminates the need for separate waste disposal.

본 고안의 구성요소인 납골석(20)은 도면에서 보는 바와 같이 석회기초(10)의 각 단부(11) 위에 설치되어 있다.As shown in the drawing, the crypts 20 as a component of the present invention are installed on each end 11 of the lime foundation 10.

또, 납골석(20)에는 다수 개의 유골구멍(21)이 형성되어 있는데, 유골구멍(21)은 납골석(20)의 상면으로부터 하부까지 관통된 형태로 형성되어 있다.In addition, a number of ash holes 21 are formed in the ossuary stone 20, and the ashes hole 21 is formed in a form penetrating from the upper surface of the ossuary stone 20 to the lower portion.

즉, 유골구멍(21)과 석회기초(10) 단부(11) 바닥면이 유골실(22)을 이루는 형태를 취하게 되어 있는 것이다.In other words, the ash hole 21 and the bottom surface of the end portion 11 of the lime foundation 10 form the ash chamber 22.

이렇게 형성된 유골실(22)에는 유골을 직접 보관할 수도 있고, 공지되어 있는 다양한 유골함에 유골을 넣어 보관할 수도 있다.In the ash chamber 22 formed as described above, the ashes may be directly stored, or the ashes may be stored in various known ashes.

또, 납골석(20)의 재질은 석재로 되어 있으며, 특히 강도가 높고 구하기 쉬 운 화강암으로 형성하는 것이 바람직하다.In addition, the material of the ossuary stone 20 is made of stone, and in particular, it is preferable to form the granite having high strength and easy to obtain.

이때, 유골실(22)에 유골함을 넣어 유골을 보관하는 것보다 도 4와 같이 유골실(22) 바닥에 흙(50)을 깐 후 그 위에 유골(60)을 넣은 다음 다시 위에 흙(50)을 덮는 것이 바람직하다.At this time, rather than putting the ashes in the ash chamber 22 to store the ashes, as shown in Figure 4, the soil 50 is placed on the bottom of the ash chamber 22, and then the ashes 60 are put thereon, and the soil 50 again on top. It is preferable to cover.

이렇게 유골실(22)에 유골(60)과 흙(50)을 함께 넣게 되면 유골에서 발생되는 악취가 공기중으로 퍼지는 것을 방지할 수 있을 뿐만 아니라 토양 중에서 일어나는 자연스러운 분해 과정을 통해 유골이 분해되게 된다.When the ashes 60 and the soil 50 are put together in the ash chamber 22, the odor generated from the ashes can be prevented from spreading into the air, and the ashes are decomposed through natural decomposition processes occurring in the soil.

본 고안의 구성요소인 비석(30)은 납골석(20)의 각 유골실(22) 상면을 밀폐시키도록 되어 있다.Zeolite 30 as a component of the present invention is to seal the upper surface of each ash chamber 22 of the ossuary stone 20.

비석(30)의 예로, 도면에서 보는 바와 같이 유골구멍(21) 상면에 들어맞게 하부에 턱이 형성되어 있고, 턱 상부는 납골석(20) 위에 얹어지도록 형성하여 유골구멍(21) 상부를 완전히 밀폐시킬 수 있도록 형성하는 것이 바람직하다.As an example of the tombstone 30, as shown in the drawing, a jaw is formed at the lower portion to fit the upper surface of the ash hole 21, and the upper jaw is formed to be placed on the ossuary stone 20 to completely cover the upper portion of the ash hole 21. It is preferable to form so that it may be sealed.

이러한 비석(30)에는 시신에 관한 성명 등의 인적사항이 기재될 수 있다.In the monument 30 may be described personal information such as a statement about the body.

위에서 설명한 것은 경사지(80) 위에 본 고안의 납골묘를 설치한 것으로 평지(90)에도 본 고안의 납골묘를 설치할 수 있다.As described above, the ossuary grave of the present invention is installed on the slope 80, and the ossuary grave of the present invention can be installed on the flat 90.

구체적으로,Specifically,

평지(90)에 설치되어 있고, 상면이 지면과 평행하도록 된 다수 개의 단부(11)가 순차적으로 높아지면서 계단형태로 형성되어 있고, 석회와 흙을 혼합한 후 물을 부어 형성한 석회모르타르를 양생시켜 형성된 석회기초(10)와;It is installed on the flat 90, the upper surface is parallel to the ground, the plurality of end portions 11 are formed in a step shape as they sequentially rise, and cured lime mortar formed by mixing lime and soil and then pouring water. Lime foundation (10) formed by the;

상기 석회기초(10)의 뒷쪽 벽면에 설치되어 있고, 석재로 되어 있는 지지 벽(40)과; A support wall (40) installed on the rear wall of the lime foundation (10) and made of stone;

상기 석회기초(10)의 각 단부(11) 위에 설치되어 있고, 저면까지 관통된 다수 개의 유골구멍(21)이 형성되어 석회기초(10) 단부(11) 바닥면과 함께 유골실(22)을 이루고 있으며, 석재로 되어 있는 납골석(20)과;It is installed on each end 11 of the lime foundation 10, a plurality of ash holes 21 are formed to penetrate to the bottom surface and the ash chamber 22 together with the bottom surface of the lime foundation 10 end 11 Consists of a crypt, 20 is made of stone;

상기 납골석(20)의 각 유골구멍(21) 상면을 밀폐시키는 비석(30);으로 구성된다.It is composed of; a stele 30 for sealing the upper surface of each ash hole 21 of the ossuary stone 20.

위와 같이 평지(90)에 설치할 경우 일측에 석회기초(10)로 된 벽면이 형성되게 되는데, 이를 그냥 방치할 경우 미관을 해치게 된다.When installed on the flat 90 as described above is formed on one side of the wall surface of the lime foundation (10), if left unattended will harm the aesthetics.

따라서, 석회기초(10)의 벽면에 석재로 된 지지벽(40)을 설치하는 것이 바람직하다.Therefore, it is preferable to provide a support wall 40 made of stone on the wall surface of the lime foundation 10.

지지벽(40)을 설치하는 방법은 거푸집을 설치한 후 석회기초(10)를 양생시킨 다음 뒷면에 설치하는 방법과 거푸집 형성시 지지벽(40)을 거푸집의 일부로 형성하여 석회기초(10)를 양생시키는 방법 등이 있다.The method of installing the support wall 40 is to install the formwork, and then to cure the lime foundation (10) and to install on the back and form the form when forming the support wall 40 as a part of the formwork lime foundation (10) There is a method to cure.

아울러, 지지벽(40)을 석회기초(10)에 좀더 견고히 고정시키기 위해 일반 거푸집 형성시 사용되는 고정철물을 사용할 수도 있다.In addition, in order to more firmly fix the support wall 40 to the lime foundation 10, it is also possible to use a fixing iron used in forming a general formwork.

도면에서는 지지벽(40) 상측에 덮개석(41)까지 형성한 것을 나타낸 것으로 덮개석(41)은 필요에 따라 추가할 수 있는 요소이다.The figure shows that the cover seat 41 is formed on the upper side of the support wall 40. The cover seat 41 is an element that can be added as needed.

또한, 지지벽(40)이 석회기초(10)를 지탱하는 지지력을 높이기 위해 도면에서 보는 바와 같이 지지벽기초(42)를 지지벽(40) 하부에 설치하는 것이 바람직하다.In addition, in order to increase the supporting force for the support wall 40 to support the lime foundation 10, it is preferable to install the support wall foundation 42 below the support wall 40 as shown in the drawing.

이때, 지지벽(40)과 덮개석(41)은 친환경적인 구조물을 유지하기 위해 일반적인 화강암 등의 자연석을 사용하는 것이 바람직하다.At this time, the support wall 40 and the cover seat 41, it is preferable to use natural stone, such as general granite in order to maintain an eco-friendly structure.

또, 도 6에서 보는 바와 같이 양 측에 측벽부기초(43c), 측벽(43b), 측벽부덮개석(43a)으로 구성된 측벽부(43)를 형성해 미관을 보다 좋게 할 수도 있다.As shown in Fig. 6, the side walls 43 composed of the side wall base 43c, the side wall 43b, and the side wall cap 43a can be formed on both sides to improve aesthetics.

위와 같이 구성된 납골묘는 각 단부(11)의 폭과 비석(30) 간 거리를 조정해 사람이 통행하도록 거리를 확보할 수 있다.The crypt is configured as described above can be secured to allow a person to pass by adjusting the width of each end 11 and the distance between the headstone 30.

위와 같은 구성에 있어서, 비석(30)으로 유골구멍(21)을 막는 방법 이외에도 별도의 칸막이석(70)을 준비하여 칸막이석(70)을 이용해 유골구멍(21)을 일차적으로 밀폐시키도록 할 수도 있다.In the above configuration, in addition to the method of blocking the ash hole 21 by the headstone 30, a separate partition stone 70 may be prepared to seal the ash hole 21 primarily using the partition stone 70. have.

상기와 같이 구성된 본 고안의 작용을 설명하면 다음과 같다.Referring to the operation of the present invention configured as described above are as follows.

본 고안의 납골묘를 설치하는 과정은, The process of installing the ossuary grave of the present invention,

흙과 석회를 혼합한 후 물을 부어 석회모르타르를 형성한 다음 설치지점에 계단식 단부(11)가 형성되도록 거푸집을 형성하여 거푸집에 석회모르타르를 부어 양생시킨 다음 거푸집을 떼어낸다.After mixing the soil and lime to pour water to form a lime mortar and form a form to form a stepped end (11) at the installation point to pour lime mortar on the formwork to cure and then remove the formwork.

그런 다음 각 단부(11)에 납골석(20)을 설치하는데, 납골석(20)은 유골구멍(21)이 형성되도록 미리 가공한 후 위에서부터 내려오면서 순차적으로 설치한다.Then install the ossuary stone 20 at each end 11, the ossuary stone 20 is processed in advance so that the ash hole 21 is formed, and then installed sequentially from the top down.

그 후 유골구멍(21)을 막도록 비석(30)을 설치하면 된다.Thereafter, the monument 30 may be provided so as to close the ash hole 21.

이때, 유골은 최상층의 단부(11)에 설치된 납골석(20)에서부터 아래로 내려오면서 설치하는 것이 바람직하다.At this time, the ashes are preferably installed while descending from the ossuary stone 20 installed at the end 11 of the uppermost layer.

유골(60)을 넣을 때는 위에서 설명한 것처럼 유골실(22) 내부에 흙(50)을 깐 후 유골(60)을 넣고 다시 흙(50)을 덮어 처리하는 것이 바람직하다.When putting the ashes 60, as described above, it is preferable to cover the soil 50 after covering the soil 50 inside the ash chamber 22 and to cover the soil 50 again.

본 고안에 의해, 화강석과 석회 흙을 주재료로 한 채 형성되어 장시간 경과시 폐콘크리트와 같은 산업폐기물이 배출되지 않는다.According to the present invention, it is formed with granite and lime soil as main materials, and industrial waste such as waste concrete is not discharged after a long time.

또, 토지 비용이 저렴한 경사면에 설치할 수 있으면서, 하부에 석회기초가 형성되어 있어 지반침하나 하중에 의해 납골석이 침하되지 않게 된다.In addition, while it can be installed on an inclined surface having a low land cost, lime foundations are formed in the lower portion, so that the ossuary stone does not sink due to ground subsidence or load.

또한, 유골과 흙을 함께 넣어 악취가 외부로 흘러나가지 않게 되며 유골이 토양에 의해 분해된다.In addition, the ashes and soil are put together so that the odor does not flow to the outside and the ashes are decomposed by the soil.

Claims (4)

계단식 납골묘에 있어서,In the terraced gravel, 경사지(80)에 설치되어 있고, 상면이 지면과 평행하도록 된 다수 개의 단부(11)가 순차적으로 높아지면서 계단 형태로 형성되어 있고, 석회와 흙을 혼합한 후 물을 부어 형성한 석회모르타르를 양생시켜 형성된 석회기초(10)와;It is installed on the inclined ground 80, and the plurality of end portions 11 whose upper surfaces are parallel to the ground are sequentially formed in a step shape, and cured lime mortar formed by mixing lime and soil and pouring water. Lime foundation (10) formed by the; 상기 석회기초(10)의 각 단부(11) 위에 설치되어 있고, 저면까지 관통된 다수 개의 유골구멍(21)이 형성되어 석회기초(10) 단부(11) 바닥면과 함께 유골실(22)을 이루고 있으며, 석재로 되어 있는 납골석(20)과;It is installed on each end 11 of the lime foundation 10, a plurality of ash holes 21 are formed to penetrate to the bottom surface and the ash chamber 22 together with the bottom surface of the lime foundation 10 end 11 Consists of a crypt, 20 is made of stone; 상기 납골석(20)의 각 유골구멍(21) 상면을 밀폐시키는 비석(30);을 포함하여 구성된,Consists of; a stele 30 for sealing the upper surface of each ash hole 21 of the ossuary stone 20; 환경친화적 계단식 납골묘.Eco-friendly stepped gravel. 계단식 납골묘에 있어서,In the terraced gravel, 평지(90)에 설치되어 있고, 상면이 지면과 평행하도록 된 다수 개의 단부(11)가 순차적으로 높아지면서 계단형태로 형성되어 있고, 석회와 흙을 혼합한 후 물을 부어 형성한 석회모르타르를 양생시켜 형성된 석회기초(10)와;It is installed on the flat 90, the upper surface is parallel to the ground, the plurality of end portions 11 are formed in a step shape as they sequentially rise, and cured lime mortar formed by mixing lime and soil and then pouring water. Lime foundation (10) formed by the; 상기 석회기초(10)의 뒷쪽 벽면에 설치되어 있고, 석재로 되어 있는 지지벽(40)과; A support wall 40 which is installed on the rear wall surface of the lime foundation 10 and is made of stone; 상기 석회기초(10)의 각 단부(11) 위에 설치되어 있고, 저면까지 관통된 다수 개의 유골구멍(21)이 형성되어 석회기초(10) 단부(11) 바닥면과 함께 유골실(22)을 이루고 있으며, 석재로 되어 있는 납골석(20)과;It is installed on each end 11 of the lime foundation 10, a plurality of ash holes 21 are formed to penetrate to the bottom surface and the ash chamber 22 together with the bottom surface of the lime foundation 10 end 11 Consists of a crypt, 20 is made of stone; 상기 납골석(20)의 각 유골구멍(21) 상면을 밀폐시키는 비석(30);을 포함하여 구성된,Consists of; a stele 30 for sealing the upper surface of each ash hole 21 of the ossuary stone 20; 환경친화적 계단식 납골묘.Eco-friendly stepped gravel. 제 1항 또는 제 2항에 있어서,The method according to claim 1 or 2, 상기 유골실(22) 내부에 흙(50)과 유골(60)이 함께 채워지는 것을 특징으로 하는,Soil 50 and ashes 60 are filled together in the ash chamber 22, 환경친화적 계단식 납골묘.Eco-friendly stepped gravel. 제 1항 또는 제 2항에 있어서,The method according to claim 1 or 2, 상기 각 납골석(20)의 하부 모서리에 걸림턱이 형성되어 있어 인접한 납골석(20)의 상부 모서리가 걸림턱에 걸려 조립되는 것을 특징으로 하는,Hanging jaw is formed at the lower edge of each crypts 20, characterized in that the upper edge of the adjacent crypts 20 is assembled to the hanging jaw, 환경친화적 계단식 납골묘.Eco-friendly stepped gravel.
KR2020060009889U 2006-04-13 2006-04-13 The environmental-friendly terraced charnel house KR200420148Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020060009889U KR200420148Y1 (en) 2006-04-13 2006-04-13 The environmental-friendly terraced charnel house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020060009889U KR200420148Y1 (en) 2006-04-13 2006-04-13 The environmental-friendly terraced charnel house

Publications (1)

Publication Number Publication Date
KR200420148Y1 true KR200420148Y1 (en) 2006-07-03

Family

ID=41768939

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020060009889U KR200420148Y1 (en) 2006-04-13 2006-04-13 The environmental-friendly terraced charnel house

Country Status (1)

Country Link
KR (1) KR200420148Y1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101439256B1 (en) 2013-06-14 2014-09-11 일심석재건설(주) Friendly envorionmental garden step
KR101596309B1 (en) 2015-02-16 2016-02-22 일심석재건설(주) The environmental-friendly terraced charnel house
KR20160149951A (en) 2015-06-20 2016-12-28 일심석재건설(주) The environmental-friendly terraced charnel house

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101439256B1 (en) 2013-06-14 2014-09-11 일심석재건설(주) Friendly envorionmental garden step
KR101596309B1 (en) 2015-02-16 2016-02-22 일심석재건설(주) The environmental-friendly terraced charnel house
KR20160149951A (en) 2015-06-20 2016-12-28 일심석재건설(주) The environmental-friendly terraced charnel house

Similar Documents

Publication Publication Date Title
KR200420148Y1 (en) The environmental-friendly terraced charnel house
KR200383820Y1 (en) The environmental-friendly terraced charnel house
KR200404191Y1 (en) The environmental-friendly graveyard and charnel house
KR101245252B1 (en) Masonry construction methods and construction stone units
JP3638680B2 (en) Wall tomb
KR20060082370A (en) Slope Reinforcement Block for Landscaping
KR100272315B1 (en) Collective buial-cast system for relocation of unclaimed burials and niche cluster system for cremated remains utilizing retaining wall
KR101596309B1 (en) The environmental-friendly terraced charnel house
KR101421119B1 (en) Friendly envorionmental charnel tomb
KR200383940Y1 (en) The environmental-friendly charnel house
KR970075155A (en) Bonbun Cavity Cemetery
KR100403566B1 (en) Reinforced earth revetment established irregular natural stones on its skin
KR200350416Y1 (en) The environmental-friendly charnel house
JP3145535U (en) Water tank structure
KR200386256Y1 (en) The environmental-friendly cemetery
US20220170286A1 (en) Ossuaries - new burial paradigm
KR100688339B1 (en) The changeable cemetery
JP5067762B2 (en) Rainwater storage facilities and infiltration facilities
KR20160149951A (en) The environmental-friendly terraced charnel house
KR100412276B1 (en) The family burial ground and the method thereof
JP3055381U (en) Double-layered osseous chamber structure in a tomb
JPH10252313A (en) Graveyard, block for preparation of graveyard, and preparation work for graveyard
KR200411722Y1 (en) The environmental-friendly circumference stone charnel house
KR200350382Y1 (en) The environmental-friendly charnel house
KR200304480Y1 (en) A charnel

Legal Events

Date Code Title Description
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20130620

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20140611

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20150722

Year of fee payment: 10

EXPY Expiration of term