KR200418397Y1 - Moving under water imaginary base ground - Google Patents
Moving under water imaginary base ground Download PDFInfo
- Publication number
- KR200418397Y1 KR200418397Y1 KR2020060006711U KR20060006711U KR200418397Y1 KR 200418397 Y1 KR200418397 Y1 KR 200418397Y1 KR 2020060006711 U KR2020060006711 U KR 2020060006711U KR 20060006711 U KR20060006711 U KR 20060006711U KR 200418397 Y1 KR200418397 Y1 KR 200418397Y1
- Authority
- KR
- South Korea
- Prior art keywords
- ground
- water
- foundation
- construction
- buoyancy
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B17/02—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
- E02B17/021—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto with relative movement between supporting construction and platform
- E02B17/022—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto with relative movement between supporting construction and platform adapted to travel on the bottom
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B2017/0052—Removal or dismantling of offshore structures from their offshore location
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Earth Drilling (AREA)
Abstract
본 고안은 해상 공사를 위한 수상 구조물의 기초지반을 해수의 부력을 이용하여 구축시킬 수 있도록 한 수중 가상기초지반에 관한 것으로, 시공 시 해저면에서의 앵커링 작업이 불필요하여 시공비와 공사기간을 크게 단축시킬 수 있음은 물론 철거 및 이동이 용이하여 다른 해상 영역에서의 재사용이 가능하도록 이동식으로 형성시킨 것이다. The present invention relates to an underwater virtual foundation that allows the foundation of aquatic structures for offshore construction to be built using the buoyancy of seawater, and greatly reduces construction costs and construction periods because there is no need for anchoring work on the sea floor during construction. Of course, it can be easily removed and moved, so that it is formed to be removable to reuse in other sea areas.
또한 수상에서의 가상기초지반 시공 및 철거 작업이 가능하도록 하고, 수상에서 해저면 지질 상태 확인을 위한 샘플링 채취가 가능하도록 한 것이다. In addition, the construction and demolition work of the virtual foundation ground in the water will be possible, and sampling will be made possible to check the seabed geological status in the water.
종래에 수상 구조물의 기초지반 구축을 위한 시공방법은 공사기간의 장기화로 인한 비용부담의 문제점과 한계 수심 이상의 수심에 대한 비안전성의 문제점이 있어, 본 출원인이 실용신안으로 출원하여 등록한 실용 제 266845호에서는 수중에 부력을 이용하여 수상 구조물의 기초지반으로 사용할 수 있도록 한 수중 가상기초지반의 공사 기술이 제안된 바 있다. Conventionally, the construction method for the basic ground construction of the floating structure has problems of cost burden due to prolonged period of construction and non-safety for depths above the limit depth, so that the applicant filed and registered as a utility model in Utility Model No. 266845 Esau has proposed a construction technology for underwater virtual foundations that can be used as a foundation for aquatic structures using buoyancy.
그러나, 이러한 기술은 기초지반의 시공 시 전문 인력과 장비를 동원한 해저면에서의 작업이 요구되기 때문에 공사기간 및 시공비용 면에서 큰 효과를 얻을 수 없었고, 또한 이러한 수중 가상기초지반은 해저면에 고정식으로 시공되어 철거 작업에 소요되는 비용 및 공사기간을 감안하여 수중에 그대로 방치시키는 경우가 많아 해양 폐기물의 원인이 되고 있다. However, these technologies did not have a great effect in terms of construction period and construction cost because they required work on the sea floor using specialized manpower and equipment when constructing the foundation ground, and these underwater virtual foundations were fixed on the sea bottom. In many cases, it is left as it is in the water in consideration of the cost and construction period required for the demolition work.
따라서, 본 고안은 수상 구조물의 기초지반이 되는 상부기초지반 및 상부기초 지반의 고정을 위하여 해저면에 정착되는 하부기초지반을 부력 및 중량의 가감이 가능한 중량함체로 형성시켜 부력 및 중량의 가감에 의한 수중에서의 승하강으로 수상에서의 시공은 물론 철거 및 이동이 가능하도록 한 것이다. Therefore, the present invention forms the upper base ground and the lower ground foundation which is settled on the sea bottom for the fixing of the upper ground ground, which is the foundation ground of the aquatic structure, as a weight enclosure capable of adding and subtracting buoyancy and weight to the addition and subtraction of buoyancy and weight. Construction in the water, as well as demolition and movement by the lifting and lowering in the water is to be possible.
또한 상부기초지반의 상부에 상,하 이동이 가능한 작업대를 구축하여 수상에서의 시공 및 철거가 가능하도록 하였으며, 상부기초지반과 하부기초지반에는 해저면 지질 상태 확인을 위한 샘플링 채취 도구 관통용 공간을 형성시킨 것이다. In addition, by constructing a worktable that can move up and down on the upper base, construction and dismantling is possible in the water. The upper and lower bases provide spaces for penetrating sampling and sampling tools to check the state of the seabed. It is formed.
가상기초지반, 상부기초지반, 하부기초지반, 부력, 중량, 물 Virtual foundation ground, upper foundation ground, lower foundation ground, buoyancy, weight, water
Description
도 1은 본 고안의 시공전 해상에 부상된 상태의 구성도 1 is a configuration of the state injured in the sea before construction of the present invention
도 1a는 본 고안이 수상에 부상된 상태의 평면도. Figure 1a is a plan view of the present invention injured in the water phase.
도 2는 본 고안의 하부기초지반이 해저면에 정착된 상태도 2 is a state in which the lower base of the present invention is settled on the sea floor
도 3은 본 고안의 상부구조물을 상승시킨 상태도 3 is a state diagram raised the upper structure of the present invention
도 4는 본 고안의 상부기초지반이 수중에 침설된 상태도 4 is a state in which the upper base ground of the present invention submerged in water
도 5는 본 고안의 철거를 위하여 하부기초지반이 부상되는 상태도 5 is a state in which the lower base ground is injured for the demolition of the present invention
도 6은 종래의 방식으로 기초지반이 구축된 상태도 6 is a state diagram in which the foundation ground is constructed in a conventional manner;
도 7은 종래의 또 다른 방식으로 기초지반이 구축된 상태도 7 is a state diagram in which the foundation ground is constructed in another conventional manner
도 8은 본 출원인이 등록한 방식으로 가상기초지반이 구축된 상태도 8 is a state diagram in which the virtual foundation is established in the manner in which the applicant has registered
<도면의 주요 부분에 대한 설명>Description of the main parts of the drawing
10: 상부기초지반 11: 물 입출구 10: upper base ground 11: water inlet and outlet
14: 공기 입출구 15: 공간 14: air inlet and outlet 15: space
20: 하부기초지반 20a, 20b : 구획공간 20:
21: 물 입출구 22: 중량체 21: water inlet and outlet 22: weight
23: 미끄럼방지 돌기 24: 공기 입출구 23: anti-skid protrusion 24: air inlet and outlet
25: 공간 25: space
30: 윈치 40: 케이블 30: winch 40: cable
50: 작업대 51: 물 공급 및 배수장치 50: working table 51: water supply and drainage
52: 공기펌프 및 공급장치 53: 발전기 52: air pump and supply 53: generator
54: 지지대 54: support
본 고안은 해상공사를 위하여 수상에 구조물을 축조할 경우 부력을 이용하여 수상구조물의 기초지반을 형성토록 한 수중 가상기초지반에 관한 것으로, 시공 시 해저면에서의 앵커링 작업이 불필요하여 시공비와 공사기간을 크게 단축시킬 수 있음은 물론 철거 및 이동이 용이하여 다른 해상영역에서의 재사용이 가능하도록 이동식으로 형성시킨 것이 특징이다. The present invention relates to an underwater virtual foundation ground where buoyancy is used to form the foundation ground of a floating structure when building a structure in the water for sea works. It can be greatly shortened, as well as easy to dismantle and move is characterized in that it is formed to be removable to reuse in other sea areas.
또한 수상에서의 가상기초지반 시공 및 철거 작업이 가능하도록 하고, 수상에서의 해저면 지질 상태 확인을 위한 샘플링 채취가 가능하도록 한 것이다. In addition, the construction and demolition work of virtual foundations in the water will be possible, and sampling will be made possible to check the seabed geological status in the water.
통상 해상공사를 위하여 수상에 구조물을 축조할 경우에는 수중에 수상 구조물의 기초구조물을 선행 축조하여야 하는 것으로, 이러한 기초구조물의 축조를 위한 종래의 방식은 도 6에 도시된 바와 같이 해저면에 토석(100)을 대량 투하하여 수중의 일정 높이까지 쌓아지도록 함으로서 기초지반을 구축토록 하거나 또는, 도 7에 도시된 바와 같이 해저면에 수중의 일정 높이까지 말뚝(200)을 박고 그 상부에 기초지반(300)을 고정시켜 시공하는 방식으로 구축토록 하였던 것이었다. In general, when constructing a structure in the water phase for sea works, the basic structure of the water structure should be pre-constructed in water, and the conventional method for constructing such a foundation structure is shown in FIG. 6. 100) by dropping a large amount to be piled up to a certain height of the ground to build the foundation ground, or as shown in Figure 7 to pile the
그러나, 이러한 종래의 기초지반 축조 방식은 모두 해저면에서 시공이 이루어지기 때문에 해저면 공사를 위한 전문 인력과 많은 장비들의 투입은 물론 공사기간의 장기화로 인한 비용부담이 가중되어 비경제적인 문제점이 있고 또한, 한계 수심 이상의 수심에 대해서는 안전성이 확보되지 못한 문제점이 있는 것이다. However, since all of the conventional basic ground construction methods are constructed at the bottom of the sea, there is an uneconomical problem due to the burden of prolonged construction period as well as the input of a large number of equipments and experts for the bottom construction. However, there is a problem that safety is not secured for depths above the limit depth.
따라서, 본 출원인이 2001년에 실용신안으로 출원하여 등록한 실용 제 266845호에서는 수중에 부력을 이용한 가상기초지반을 인위적으로 조성하고, 이를 수상 구조물의 기초지반으로 활용함으로서 하부 기초공사의 단순화 및 구조의 최소화로 공사기간을 단축시킬 수 있는 보다 경제적인 기초지반 공사를 실시할 수 있도록 한 기술을 제안한 바 있다. Therefore, in Utility No. 266845, filed by the applicant as a utility model in 2001, the present inventors artificially construct a virtual foundation ground using buoyancy in water and utilize it as the foundation ground of the floating structure to simplify the construction of the lower foundation work. We have proposed a technology that enables more economical foundation work to minimize construction time.
즉, 이 때 축조되는 수중 가상기초지반은 도 8에 도시된 바와 같이 수상 구조물의 기초지반이 되는 부력함(400)이 고정물(500)에 의하여 해저면의 일정 위치에 정박된 상태에서 부력의 증감에 의하여 원하는 수심의 위치로 침설토록 되는 것으로, 이 때 고정물(500)은 자체적으로는 해저면에 정착이 어렵기 때문에 별도의 앵커(600)를 사용하여 해저면 깊숙이 앵커링시킴으로서 정착토록 되는 것이다. That is, in this case, the underwater virtual foundation ground constructed is the
따라서, 이러한 고정물의 앵커링 작업 역시 해저면에서 전문 인력과 장비를 동원하여 작업이 이루어지기 때문에 구조상으로는 종래의 기초지반 공사의 경우보다 어느 정도의 공사기간과 시공비용을 단축시킬 수는 있으나, 전체 해상공사에 소요되는 공사기간과 시공비용을 고려해 볼 때는 미미한 것이다. Therefore, the anchoring work of such a fixture is also performed by mobilizing specialized personnel and equipment on the sea floor, so that the construction period and construction cost can be shortened to some extent than in the case of the conventional ground foundation construction, Considering the construction period and construction cost required for construction, it is insignificant.
또한, 이러한 수중 가상기초지반은 고정물이 해저면에 앵커링되어 고정되기 때문에 해상 공사의 완료 후에는 철거 작업이 이루어져야 하는 것으로 이 때에는 해 저면에 앵커링된 고정물을 인력과 장비를 동원하여 분리시켜야 철거가 가능하기 때문에 이에 소요되는 비용 및 공사기간을 감안하여 수중에 그대로 방치시키는 경우가 많아 해양 폐기물의 원인이 되고 있는 실정이다. In addition, these underwater virtual foundations are to be anchored on the bottom of the sea, so the demolition work should be done after the completion of the sea work.In this case, the anchored anchor on the sea bottom should be separated by manpower and equipment. Therefore, in consideration of the cost and construction period required for this, it is often left as it is in the water is a situation that causes the marine waste.
따라서, 본 고안은 해저면 공사를 위한 전문 인력이나 장비의 구축 없이도 해상공사가 착수되는 작업 현장에서 바로 시공이 가능하도록 함으로서 해상공사의 전체 공사기간과 경제성을 크게 단축시킬 수 있음은 물론, 이와 동시에 시공된 가상기초지반은 해상공사 완료 후 바로 철수하여 다른 해상 영역으로 이동시켜 반복 사용할 수 있도록 함으로서 상기한 종래의 모든 문제점을 해결할 수 있는 수중 가상기초지반을 제공하고자 함이다. Therefore, the present invention enables the construction at the work site where the sea works are undertaken without the construction of specialized personnel or equipment for the sea floor work, thereby greatly reducing the overall construction period and economic efficiency of the sea works, and at the same time, The constructed virtual foundation ground is to provide an underwater virtual foundation ground that can solve all the above-mentioned problems by retreating immediately after completion of the sea construction and moving to another sea area.
이를 위하여 본 고안은 수상 구조물의 기초지반이 되는 상부기초지반 및 상부기초지반의 고정을 위하여 해저면에 정착되는 하부기초지반을 부력 및 중량의 가감이 가능한 중량함체로 형성시켜 부력 및 중량의 가감에 의한 수중에서의 승하강으로 수상에서의 시공은 물론 철거 및 이동이 가능하도록 한 것이다. To this end, the present invention forms an upper foundation ground that is the foundation ground of an aquatic structure and a lower foundation ground that is settled on the sea bottom for fixing the buoyancy and weight to a weight enclosure capable of adding and subtracting buoyancy and weight. Construction in the water, as well as demolition and movement by the lifting and lowering in the water is to be possible.
또한 상부기초지반의 상부에 수상에서의 시공 및 철거를 위하여 지지대의 상,하측으로 이동이 가능한 작업대를 구축하였으며, 상부기초지반과 하부기초지반에 는 해저면 지질 상태 확인을 위한 샘플링 채취 도구를 관통시킬 수 있는 공간을 형성시킨 것이다. In addition, a work platform that can be moved to the upper and lower sides of the support for the construction and removal of water from the upper base is constructed. The upper base and the lower base are penetrated through sampling and sampling tools to check the seabed geological status. It is a space that can be made.
이하에서는 본 고안의 구성에 대해 첨부 도면을 참조하여 보다 상세히 설명하 기로 한다. Hereinafter, with reference to the accompanying drawings for the configuration of the present invention will be described in more detail.
도 1에 도시된 바와 같이 본 고안은 수상 구조물의 기초지반이 되는 상부기초지반(10) 및 상부기초지반(10)의 위치 고정을 위하여 해저면에 정착되는 하부기초지반(20)을 물 입출구(11)(21)와 공기 입출구(14)(24)에 의해 부력 및 중량의 가감이 가능한 중량함체로 구성하여 수중에서의 승하강으로 수상에서의 시공 및 철거가 가능하도록 한 것이다. As shown in FIG. 1, the present invention provides a water inlet and outlet for a
이 때, 상기 하부기초지반(20)은 부력의 회복시에도 상부기초지반(10)의 부력보다 작게 됨으로서 부상된 상태에서 항시 상부기초지반(10)의 하부에 위치되는 것이고, 부력의 상실과 동시에 중량감이 부가되어 해저면에 정착될 수 있도록 상부기초지반(10)의 부력보다 큰 자중을 갖을 수 있도록 중량체 수용공간을 갖는 중량함체로 이루어지는 것이다. At this time, the
이를 위하여, 상기 하부기초지반(20)은 측면보다 바닥면이 넓은 형태의 함체로 이루어지고, 상·하로 구획된 2개의 구획공간(20a)(20b)을 마련하여 하부 구획공간(20b)에는 쇄석, 자갈, 모래 등 비중이 크고 해상에 전혀 해가 없는 해상자원을 중량체(22)로 채워 무게감이 있도록 하는 것이고, 상부 구획공간(20a)은 물 입출구(21) 및 공기 입출구(24)를 통한 물과 공기의 입출로 부력 및 중량의 가감이 가능하도록 빈 공간으로 이루어지는 것이다. To this end, the
이 때, 상기 상부기초지반(10) 및 하부기초지반(20)에 대한 물 입출작업은 다음과 같다. At this time, the water input and output operations for the
우선, 상부기초지반(10)에 대한 물 입출작업은 물 공급 및 배수장치(51)를 이 용하여 물 입출구(11)를 통해 물을 주입하며, 배수시에는 물 입출구(11)를 열어두고 공기 공급장치(52)를 이용하여 공기 입출구(14)를 통해 공기를 불어 넣어줌으로 인해 내부의 물이 물 입출구(11)과 물 공급 및 배수장치(51)를 통해 수상에서 외부로 배수되는 것이다. First, the water inlet and outlet operations for the upper base ground (10) injects water through the water inlet and outlet (11) using the water supply and drainage device (51), the water supply outlet while opening the water inlet and outlet (11) By blowing air through the air inlet and
이때, 상기 물 공급 및 배수장치(51)와 공기 공급장치(52)는 상부기초지반(10)의 상측에 작업대(50)를 구비하여 작업대(50)에 장착시켜 물 입출작업이 가능하도록 함으로서 수상에서 본 고안의 가상기초지반 시공 작업이 가능하도록 하는 것이다. At this time, the water supply and
이때 상기 작업대(50)는 상부기초지반(10)의 상측면 양측으로 소정 높이를 갖는 지지대(54)를 고정시켜 이 지지대(54)가 작업대(50)의 양측을 관통하여 결착토록 함으로서 상부기초지반(10)에 구비되도록 하는 것이고, 지지대(54)에 결착된 작업대(50)는 본 고안 가상기초지반의 시공 및 철거 작업에 따른 상부기초지반(10)의 침수 또는 부상에 따른 위치의 변화가 요구되기 때문에 지지대(54)의 상,하측으로 다양한 공지의 이동수단을 이용하여 이동이 가능하도록 되는 것이다. At this time, the work table 50 is fixed to the
또한, 상기 하부기초지반(20)에 대한 물 입출작업은 작업대(50)에 위치한 물 공급 및 배수장치(51)에 부착된 물 입출구(21)의 자동개폐장치를 이용하여 수중에서 수중에서 자동으로 물이 채워지도록 하며, 배수시에는 공기 공급장치(52)를 이용하여 공기 입출구(24)를 통해 공기를 불어 넣어줌으로 인해 내부에 가득찬 물이 자동으로 물 입출구(21)를 통해 수중에서 외부로 배수되는 것이다. In addition, the water input and output operation for the
또한, 상기 하부기초지반(20)의 하부 구획공간(20b)은 수용되는 중량체(22)의 무게를 고려하여 중량체(22)가 채워진 상태에서도 어느 정도의 부력이 작용될 수 있을 정도의 내부 공간이 마련되도록 하여야 하는 것이고, 상부 구획공간(20a)은 물을 주입할 경우 부력의 완전한 상실로 부력보다 큰 중량감이 작용되어 해저면에 정착이 가능할 정도의 물 수용공간을 갖도록 마련되어야 하는 것이다. In addition, in consideration of the weight of the
이때, 하부기초지반(20)을 해저면에 정착시키기 위하여 주입되어야 하는 물의 양은 이미 공지되어 있는 계산식을 통하여 쉽게 구할 수 있는 것이고, 이와 같이 계산된 물의 양을 고려하여 하부기초지반(20)의 물 수용공간 제공을 위한 상부 구획공간(20a)을 설계할 수 있는 것이다. At this time, the amount of water to be injected in order to fix the
이때 하부기초지반(20)의 해저면 정착을 위하여 필요한 물의 양은 시공하고자 하는 해저면의 수심과 파랑 등의 주변 여건에 의한 변수의 작용을 고려하여 계산치로 산정된 물의 양보다 많아야 하기 때문에 계산된 물 수용공간 이상의 수용공간으로 설계되어야 하는 것이고, 다른 해상 영역에서의 재 사용을 위하여 사용하고자 하는 해저면의 최고 수심 높이를 고려하여 설계되어야 하는 것이다. At this time, the amount of water required for the settlement of the seabed of the
또한, 상기 하부기초지반(20)의 하단부에는 해저면에의 정착을 위한 하강 시 하강되는 힘에 의하여 해저면에서의 활동을 방지할 수 있도록 하단부가 뾰족한 미끄럼방지 돌기(23)를 장착시킴으로서 보다 우수한 고정력을 갖을 수 있도록 할 수 있는 것이다. In addition, the lower base of the
또한 상기 상부기초지반(10)과 하부기초지반(20) 사이에는 하부기초지반(20)의 승강에 따라 감겨지거나 풀려지도록 된 케이블(40)이 연결되는 것이고, 이 때 케이블(40)은 상부기초지반(10)에 형성된 윈치(30)의 작동에 의하여 풀려져 하부기초지 반(20)이 해저면에 정착되는 것이고, 하부기초지반(20)이 정착된 상태에서 케이블(40)의 당김 및 상부기초지반(10)의 물 입출구(11)를 통한 부력의 감소에 의하여 상부기초지반(10)을 수중의 원하는 수심위치에 침설토록 하는 것이다. In addition, between the
한편, 작업대(50)을 이용한 수상에서의 시공 작업은 발전기(53)를 이용한 자가 전원을 이용함으로서 가능한 것이다. On the other hand, construction work in the water phase using the
또한 상기 상부기초지반(10)과 하부기초지반(20)의 중앙부에는 해저면 지질 상태 확인을 위한 샘플링 채취 도구가 관통할 수 있도록 상,하부가 통공된 공간(15)(25)이 확보되어 해상에서의 시추작업이 가능하도록 하는 것이다. In addition, in the center of the
따라서, 상기와 같이 구성된 본 고안의 수중 가상기초지반은 도 1에 도시된 바와 같이 가상기초지반을 설치하고자 하는 해상 영역의 위치까지 예인선을 이용하여 상부기초지반(10)과 하부기초지반(20)을 예인하여 위치를 고정시키면 부력에 의하여 상부기초지반(10)과 하부기초지반(20)이 적층된 상태로 수면에 떠 있게 되는 것으로, 이 상태에서 하부기초지반(20)에 물을 주입시키면 도 2에 도시된 바와 같이 하부기초지반(20)의 부력이 상실되면서 점차로 주입되는 물의 중량감 때문에 해저면으로 하강되어 하부기초지반(20)이 해저면에 정착되게 되는 것이고, 상부기초지반(10)을 설계부력이 발휘될 수 있는 적정 수심에 위치하기 전 단계에 작업대(50)를 도 3에 도시된 바와 같이 지지대(54)의 원하는 높이까지 상승시킨 후, 하부기초지반(20)이 하강됨에 따라 풀려진 케이블(40)을 윈치(30)를 작동하여 당겨 올리면 하부기초지반(20)의 자중이 상부기초지반(10)의 부력보다 크기 때문에 도 4에 도시된 바와 같이 상부기초지반(10)을 원하는 수심의 위치에 침설토록 함으로서 시 공이 완료되는 것이다. Accordingly, the underwater virtual foundation ground of the present invention configured as described above uses the tugboat to the position of the marine area where the virtual foundation ground is to be installed, as shown in FIG. 1, by using the
만일 이때, 하부기초지반(20)의 중력이 상부기초지반(10)의 부력보다 작을 경우는, 상부기초지반(10)에 물을 주입하여 부력을 감소시키는 방법으로 시공하면 되는 것이다. In this case, if the gravity of the
따라서, 해저면에서의 앵커링 작업 없이 수상에서 가상기초지반의 시공이 가능하게 되는 것이다. Therefore, it is possible to construct a virtual foundation in the water without anchoring work on the sea floor.
또한, 해저공사의 완료 후에는 해저면에 정착되어 있던 하부기초지반(20)으로부터 물 입출구(21)를 통하여 물을 빼내고 공기 입출구(24)를 통해 공기를 불어 넣으면, 도 5에 되시된 바와 같이 하부기초지반(20)의 부력이 회복되어 수면 위로 상승토록 됨으로서 해저면에서의 앵커링 해체 작업 없이 수상에서 가상기초지반의 철거가 가능하게 되는 것이다. In addition, after completion of the seabed construction, if water is drawn out through the water inlet and
따라서, 수상으로 부상된 가상기초지반은 견인선을 이용한 다른 해상 영역으로의 이동이 가능하게 되는 것이다. Therefore, the virtual foundation ground floating in the water will be able to move to another sea area using the traction ship.
또한 해상 공사 시 구비되어야 할 장비들을 작업대(50)에 장착시킬 수 있어 가상기초지반의 시공 및 철거 작업이 수상에서 편리하게 이루어질 수 있음은 물론 시추 작업에 필요한 장비들까지도 작업대(50)에 장착시킬 수 있어 도 4에 도시된 바와 같이 상부기초지반(10) 및 하부기초지반(20)의 중앙부에 형성된 공간(15)(25)을 통하여 해저면 지질 상태 확인을 위한 샘플링 채취 도구(60)를 관통시킬 수 있어 해상에서의 시추작업이 가능하게 되는 것이다. In addition, the equipment to be provided at the offshore construction can be mounted on the
상술한 바와 같이 본 고안의 가상기초지반은 부력 및 중량의 가감을 통한 하부기초지반의 해저면 정착 및 부상으로 수상에서의 간편한 시공 및 철거가 가능하여 해저면에서의 시공 및 철거 작업이 불필요하게 됨으로서 종래의 가상기초지반의 시공 및 철거 작업에 소요되는 비용 및 공사기간을 대폭 축소시킬 수 있고, 또한 이러한 구조의 가상기초지반은 철거된 상태로 수상 경로를 이용하여 다른 해상 작업 영역으로의 이동이 가능하여 재차 반복 사용에 따른 전체 해상 공사에 소요되는 비용을 절감할 수 있는 우수한 경제성을 갖는 특장점이 있는 것이다. As described above, the virtual foundation ground of the present invention can be easily installed and dismantled in the water surface by fixing and floating the bottom surface of the lower foundation ground by adding or subtracting buoyancy and weight, so that construction and demolition work on the bottom surface is unnecessary. The cost and construction time required for the construction and demolition work of the conventional virtual foundation ground can be greatly reduced, and the virtual foundation ground of such a structure can be moved to another offshore work area by using the waterborne path while being removed. Therefore, there is a feature that has excellent economical efficiency that can reduce the cost of the entire offshore construction by repeated use.
또한 작업대의 구비로 수상에서의 가상기초지반 시공 및 철거 작업이 용이하고, 수상에서의 해저면 지질 상태 확인을 위한 샘플링 작업을 통한 해상에서의 시추작업이 가능한 장점이 있는 것이다. In addition, it is easy to construct and dismantle the virtual foundation ground in the water because of the work table, and it is possible to perform drilling at sea through sampling to check the seabed geological state in the water.
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2020060006711U KR200418397Y1 (en) | 2006-03-13 | 2006-03-13 | Moving under water imaginary base ground |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2020060006711U KR200418397Y1 (en) | 2006-03-13 | 2006-03-13 | Moving under water imaginary base ground |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020060023180A Division KR100746854B1 (en) | 2006-03-13 | 2006-03-13 | Moving under water imaginary base ground |
Publications (1)
Publication Number | Publication Date |
---|---|
KR200418397Y1 true KR200418397Y1 (en) | 2006-06-14 |
Family
ID=41767827
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR2020060006711U KR200418397Y1 (en) | 2006-03-13 | 2006-03-13 | Moving under water imaginary base ground |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR200418397Y1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114542397A (en) * | 2022-03-28 | 2022-05-27 | 中国华能集团清洁能源技术研究院有限公司 | Floating foundation, offshore wind power system and offshore culture platform |
-
2006
- 2006-03-13 KR KR2020060006711U patent/KR200418397Y1/en not_active IP Right Cessation
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114542397A (en) * | 2022-03-28 | 2022-05-27 | 中国华能集团清洁能源技术研究院有限公司 | Floating foundation, offshore wind power system and offshore culture platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2386747C2 (en) | Improved self-lifting drilling rig and similar drilling platforms | |
RU2719516C1 (en) | Bottom-based platform and method of creating drilling terminal for drilling in shallow-water shelf | |
KR101354383B1 (en) | Working platform for underwater explosion work using small barges | |
US3783626A (en) | Structure, and method and apparatus for founding a structure | |
KR100746854B1 (en) | Moving under water imaginary base ground | |
CN102888847A (en) | Construction method free from lowering water level for local deep foundation pit of elevator shaft | |
KR200418397Y1 (en) | Moving under water imaginary base ground | |
CN105604061B (en) | A kind of surface unit and its construction method entering rock installation for steel-pipe pile in water | |
KR100733082B1 (en) | Device of Bridge Pier Mould Construction and methed thereof | |
US4360291A (en) | Subsea foundation | |
KR101031571B1 (en) | Method for constructing seperating type caisson | |
KR101159193B1 (en) | Fundation gravel sinking apparatus of sea-bottom for harbor fabric construction | |
JPS58143023A (en) | Caisson for pile supporting type breakwater | |
KR101117927B1 (en) | Construction method of marine structure | |
KR101134025B1 (en) | Method for constructing a foundation using a open caisson | |
JP2016196791A (en) | Seabed cutting/banking system and method, and loading box body and work ship used therewith | |
CN112160303A (en) | Offshore wind power booster station platform based on self-installation concept and installation method thereof | |
CN101768968A (en) | Diving pile driver | |
US2750750A (en) | Deep water well drilling system | |
US4525282A (en) | Method of loading and/or transferring environmentally harmful materials in shallow-water and mudland regions and artificial islands suitable therefor | |
US3897639A (en) | Vehicle for underwater excavation beneath a structure | |
CN106194025B (en) | Marine rock drilling construction technology and equipment | |
KR200252103Y1 (en) | Structure of the pontoon type barge for grauting work in the bottom of the sea | |
KR101859613B1 (en) | Mooring apparatus | |
US3965688A (en) | Underwater structures, in particular for underwater drilling operations |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
U107 | Dual application of utility model | ||
REGI | Registration of establishment | ||
FPAY | Annual fee payment |
Payment date: 20070529 Year of fee payment: 3 |
|
EXTG | Extinguishment |