KR200416629Y1 - Assembly for Support of H-Beam Strut - Google Patents

Assembly for Support of H-Beam Strut Download PDF

Info

Publication number
KR200416629Y1
KR200416629Y1 KR2020060004929U KR20060004929U KR200416629Y1 KR 200416629 Y1 KR200416629 Y1 KR 200416629Y1 KR 2020060004929 U KR2020060004929 U KR 2020060004929U KR 20060004929 U KR20060004929 U KR 20060004929U KR 200416629 Y1 KR200416629 Y1 KR 200416629Y1
Authority
KR
South Korea
Prior art keywords
assembly
support
body portion
retaining wall
fastening
Prior art date
Application number
KR2020060004929U
Other languages
Korean (ko)
Inventor
재 술 나
Original Assignee
재 술 나
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 재 술 나 filed Critical 재 술 나
Priority to KR2020060004929U priority Critical patent/KR200416629Y1/en
Application granted granted Critical
Publication of KR200416629Y1 publication Critical patent/KR200416629Y1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F7/00Devices affording protection against snow, sand drifts, side-wind effects, snowslides, avalanches or falling rocks; Anti-dazzle arrangements ; Sight-screens for roads, e.g. to mask accident site
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F7/00Devices affording protection against snow, sand drifts, side-wind effects, snowslides, avalanches or falling rocks; Anti-dazzle arrangements ; Sight-screens for roads, e.g. to mask accident site
    • E01F7/04Devices affording protection against snowslides, avalanches or falling rocks, e.g. avalanche preventing structures, galleries
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/02Wire fencing, e.g. made of wire mesh
    • E04H17/06Parts for wire fences
    • E04H17/08Anchoring means therefor, e.g. specially-shaped parts entering the ground; Struts or the like

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

본 고안은 에이치빔 지주 지지 조립체에 관한 것으로, 옹벽에 고정되고 낙석 방지를 위한 울타리를 지지하는 에이치빔 지주에 있어서, 상기 에이치빔의 하부 내측면이 밀착 고정되는 몸체부; 상기 몸체부의 좌우측에 소정 간격의 슬롯이 형성되어 에이치빔의 날개부가 지지되는 측벽, 및 상기 몸체부 및 측벽의 상부에 구성되어 에이치빔이 삽입되는 삽입공이 형성된 상부커버가 각각 구성된 제1조립체 및 제2조립체가 상기 옹벽에 매설되되, 에이치빔을 사이에 두고 대응되게 결합되는 것을 특징으로 하고, 이와 같은 에이치빔 지주에 에이치빔 지주 지지 조립체를 결합하여 사면의 콘크리트 옹벽에 고정 설치함으로써 에이치빔 지주의 절곡이나 절단에 의한 복구 작업의 편의 및 복구 시간 및 인력, 그리고 복구비용의 절감을 기대할 수 있는 것이다.The present invention relates to an H beam holding support assembly, H beam holding fixed to the retaining wall and supporting the fence for preventing rockfall, the lower inner surface of the H beam is tightly fixed; The first assembly and the first assembly is formed on the left and right sides of the body portion is formed with a side wall for supporting the wing portion of the H-beam, and the upper cover is formed on the body portion and the upper side of the insertion hole into which the H-beam is inserted The two assemblies are buried in the retaining wall, characterized in that coupled to each other with the H-beam interposed therebetween, by combining the H-beam pillar support assembly to the H-beam pillar fixed installation on the concrete retaining wall of the slope of the H-beam pillar It can be expected to reduce the recovery time and manpower, and the recovery cost of the recovery work by bending or cutting.

옹벽, 에이치빔, 지주, 조립체, 낙석, 울타리 Retaining Wall, H Beam, Shore, Assembly

Description

에이치빔 지주 지지 조립체{Assembly for Support of H-Beam Strut}H-Beam Strut {Assembly for Support of H-Beam Strut}

도 1은 본 고안에 따른 실시예로서, 에이치빔 지주 지지 조립체의 조립전 상태를 나타낸 분리사시도이다.1 is an exploded perspective view showing the pre-assembly state of the H-beam prop support assembly as an embodiment according to the present invention.

도 2는 본 고안에 따른 에이치빔 지주 지지 조립체에 에이치빔 지주가 결합된 상태를 나타낸 사시도이다.Figure 2 is a perspective view showing a state in which the H-beam support is coupled to the H-beam support assembly according to the present invention.

도 3은 본 고안에 따른 에이치빔 지주 지지 조립체의 정면도이다.3 is a front view of an H beam strut support assembly according to the present invention.

도 4은 본 고안에 따른 에이치빔 지주 지지 조립체의 배면도이다.4 is a rear view of the H-beam strut support assembly according to the present invention.

도 5는 본 고안에 따른 에이치빔 지주 지지 조립체에 에이치빔 지주가 결합된 상태를 나타낸 단면도이다.Figure 5 is a cross-sectional view showing a state in which the H-beam support is coupled to the H-beam support assembly according to the present invention.

도 6은 본 고안에 따른 에이치빔 지주 지지 조립체가 콘크리트 옹벽에 고정되고, 조립체에 에이치빔 지주가 결합된 상태를 나타낸 사시도이다.6 is a perspective view showing a state in which the H-beam support assembly according to the present invention is fixed to the concrete retaining wall, and the H-beam support is coupled to the assembly.

도 7은 본 고안의 에이치빔 지주가 콘크리트 옹벽에 설치된 상태에서, 에이치빔 지주에 토류의 유실이나 낙석을 방지하기 위한 망이 설치된 상태를 나타낸 도면이다.7 is a view showing a state in which the net for preventing the loss or falling of the earth is installed on the H-beam pillar in the state of the H-beam pillar of the present invention is installed on the concrete retaining wall.

♣ 도면의 주요부분에 대한 부호의 설명 ♣♣ Explanation of symbols for main part of drawing ♣

10: 지주 20, 22: 조립체10: prop 20, 22: assembly

24: 몸체부 26: 접촉면24: body 26: contact surface

30: 측벽 32, 58: 체결홀더30: side wall 32, 58: fastening holder

34, 60: 체결부재 40: 슬롯34, 60: fastening member 40: slot

42, 43: 지지편 45: 연결편42, 43: support piece 45: connecting piece

50: 상부커버 52: 지지판50: upper cover 52: support plate

53: 삽입공 54: 덮개53: insertion hole 54: cover

55: 측판 56: 연장편55: side plate 56: extension

57: 고정구 57: fixture

본 고안은 에이치(H)빔 지주 지지 조립체에 관한 것으로, 보다 구체적으로는 사면의 붕괴나 낙석을 방지하기 위한 망 등이 설치된 울타리를 지지하는 에이치빔 지주를 콘크리트 옹벽으로부터 용이하게 분리 또는 설치할 수 있는 에이치빔 지주 지지 조립체에 관한 것이다.The present invention relates to an H (beam) support structure assembly, more specifically, it can be easily separated or installed from the concrete retaining wall H beam support for supporting the fence, the fence is installed, such as to prevent the collapse of the slope or falling rock A HB strut support assembly.

일반적으로 낙석 방지를 위한 울타리(또는 방지망 또는 방지책)는 도로나 철로 등을 개설하기 위해 산 등을 깎은 절개 사면의 도로변에 설치되는 것으로, 하절 기나 동절기에 비나 눈 등의 우수가 절개 사면 내로 침수되어 토사의 붕괴로 유실되거나 사면에 포함된 암석이 굴러 떨어지는 것을 방지하기 위하여 설치되는 것이다.In general, fences (or barriers or barriers) to prevent rockfall are installed on the roadsides of incised slopes cut in the mountains to open roads or railroad tracks.In summer or winter, rain or snow floods into the incision slopes. It is installed to prevent the rocks from being lost due to the collapse of the soil or falling on the slope.

이와 같이 낙석 방지를 위한 울타리는 비탈지거나 경사진 사면(斜面) 아래에 소정 높이로 콘크리트 옹벽을 양생하여 설치하고, 상기 콘크리트 옹벽 위에는 소정 간격으로 복수의 에이치빔 지주를 고정 설치하며, 상기 복수의 에이치빔 지주에 와이어로프 등을 가로로 설치하고, 와이어로프에 격자 형태의 낙석 방지를 위한 금속망을 설치한다. 상기 낙석 방지를 위한 금속망 대신에 판재 형상의 토류판 등을 설치하여 낙석이나 토류가 흘러내리는 것을 방지하게 된다.Thus, the fence for preventing rockfall is installed by curing the concrete retaining wall at a predetermined height under a sloped or inclined slope, and fixedly installs a plurality of H beam posts at predetermined intervals on the concrete retaining wall, and the plurality of H A wire rope is installed horizontally on the beam support, and a metal net is installed on the wire rope to prevent falling rocks. Instead of the metal mesh for preventing rockfall to install a plate-like earth plate to prevent the falling of the rock or earth.

종래에 낙석 방지를 위한 울타리는 콘크리트 옹벽 위에 와이어로프 및 금속망이 설치된 에이치빔 지주가 설치되는데, 이러한 울타리에 많은 양의 유실된 토류가 가해지거나 붕괴된 암석에 의해 망실되는 경우가 있었다. 즉 울타리가 견뎌낼 수 없을 정도로 큰 중량의 토류나 암석이 울타리에 가해지면 울타리의 에이치빔 지주는 이를 이겨내지 못하고 휘어져 버린다. 따라서 울타리가 1차적으로 토류나 암석이 도로변으로 떨어지는 것을 막을 수는 있지만, 울타리가 유실된 토류나 암석을 오랜 시간동안 지지할 수 없는 경우에 휘어지는 등의 망실이 발생된다.Conventionally, fences to prevent rockfall are installed on the concrete retaining wall wire beams and H-beam pillars installed with a metal mesh, a large amount of lost earth is applied to these fences are sometimes lost by collapsed rock. In other words, if a heavy earth or rock is applied to the fence so large that the fence cannot endure, the H beam prop of the fence will not be able to overcome it and it will bend. Therefore, the fence can prevent the earth or rock from falling off the road primarily, but if the fence is unable to support the lost earth or rock for a long time, a loss occurs such as bending.

토류나 암석의 유실에 의하여 에이치빔 지주가 휘어지는 등의 망실이 발생되면 망실된 해당 구간은 보수나 재설치 작업을 진행해야 한다. 그리고 에이치빔 지주가 휘어지거나 절단되는 경우에 콘크리트 옹벽에 고정된 에이치빔을 분리해내고 새로운 에이치빔을 고정시켜야 한다. 따라서 에이치빔은 콘크리트 옹벽에 고정 되어 있으므로, 콘크리트 옹벽으로부터 에이치빔을 인출시켜 분리해내기 위해서는 해당 구간의 콘크리트 옹벽을 절단하거나 부셔낸 후에 새로운 에이치빔의 설치를 위한 콘크리트 옹벽을 재설치하여야 한다.If a loss occurs, such as bending of H-beam pillars due to the loss of earth or rock, the lost section must be repaired or reinstalled. If the H beam prop is bent or cut, the H beam fixed to the concrete retaining wall must be separated and the new H beam fixed. Therefore, the H-beam is fixed to the concrete retaining wall. Therefore, in order to extract and separate the H-beam from the concrete retaining wall, the concrete retaining wall for the installation of the new H-beam must be reinstalled after cutting or breaking the concrete retaining wall of the corresponding section.

이와 같이 콘크리트 옹벽에 설치된 에이치빔이 휘어지거나 절단된 경우에는 보수를 위한 작업에 많은 인력 및 시간이 소요된다. 더욱이 자동차나 기차가 다니는 도로나 철도 등에는 단시간에 보수작업이 이루어져야 교통의 단절이나 지체 등을 방지할 수 있을 뿐만 아니라, 계속 진행될 수 있는 토류나 암석의 유실을 막을 수가 있을 것이다.As such, when the H-beam installed in the concrete retaining wall is bent or cut, a lot of manpower and time are required for repair work. Moreover, roads and railways run by cars and trains should be repaired in a short time, not only to prevent traffic interruptions or delays, but also to prevent the loss of earth and rock that can continue.

본 고안은 상기 문제점을 해결하기 위하여, 콘크리트 옹벽에 고정 설치된 에이치빔 지주를 용이하게 분리 및 재설치할 수 있는 에이치빔 지주 지지 조립체를 제공하기 위한 것이 목적이다.In order to solve the above problems, an object of the present invention is to provide an H beam support support assembly capable of easily separating and reinstalling an H beam support fixed to a concrete retaining wall.

또한 본 고안은 콘크리트 옹벽에 매설되는 한 쌍의 조립체를 에이치빔 지주에 체결하여 지지할 수 있는 에이치빔 지주 지지 조립체를 제공하기 위한 것이다.In addition, the present invention is to provide an H beam support support assembly that can be supported by fastening a pair of assemblies embedded in the concrete retaining wall to the H beam support.

본 고안은 상기 목적을 달성하기 위한 수단으로서, 옹벽에 고정되고 낙석 방지를 위한 울타리를 지지하는 에이치빔 지주에 있어서,The present invention as a means for achieving the above object, in the H-beam pillar fixed to the retaining wall and supporting the fence for preventing rockfall,

상기 에이치빔의 하부 내측면이 밀착 고정되는 몸체부;A body portion to which the lower inner surface of the H beam is closely fixed;

상기 몸체부의 좌우측에 소정 간격의 슬롯이 형성되어 에이치빔의 날개부가 지지되는 측벽, 및Sidewalls at which left and right sides of the body portion are formed with slots at predetermined intervals to support the wing portions of H beams, and

상기 몸체부 및 측벽의 상부에 구성되어 에이치빔이 삽입되는 삽입공이 형성된 상부커버가 각각 구성된 제1조립체 및 제2조립체가 상기 옹벽에 매설되되, 에이치빔을 사이에 두고 대응되게 결합되는 에이치빔 지주 지지 조립체를 제공한 것이 특징이다.The first beam assembly and the second assembly, each of which has an upper cover formed on the body portion and the upper side of the side wall, and has an insertion hole into which the H beam is inserted, are embedded in the retaining wall, and the H beam beam is correspondingly coupled with the H beam therebetween. It is characterized by providing a support assembly.

이하, 첨부된 도면을 참조하여 본 고안의 바람직한 실시 예에 따른 음식물 배식대의 구성 및 동작을 상세히 설명한다.Hereinafter, with reference to the accompanying drawings will be described in detail the configuration and operation of the food serving table according to a preferred embodiment of the present invention.

도 1은 본 고안에 따른 실시예로서, 에이치빔 지주 지지 조립체의 조립전 상태를 나타낸 분리사시도이고, 도 3은 조립체의 정면도이며, 도 4는 조립체의 배면도이다.1 is an exploded perspective view showing the pre-assembly state of the H-beam prop support assembly as an embodiment according to the present invention, FIG. 3 is a front view of the assembly, and FIG. 4 is a rear view of the assembly.

먼저, 본 고안의 에이치빔 지주 지지 조립체는 사면의 보호를 위하여 설치되는 토류의 유실이나 낙석 방지를 위한 울타리의 구성요소로서 적용되는 에이치빔 지주를 콘크리트 옹벽에 고정, 분리 및 재설치가 가능하도록 이루어진 것이다.First, the H-beam support assembly of the present invention is made to fix, separate, and reinstall the H-beam support on the concrete retaining wall, which is applied as a component of a fence for preventing loss of earth or falling rocks installed for protecting the slope. .

도면에서, 본 고안의 에이치빔 지주 지지 조립체는 한 쌍의 조립체(20, 22)로서 대응되게 구성되되, 에이치빔 지주(10)의 하부에 조립 및 체결되는 것이다. 한 쌍의 조립체(20, 22)는 에이치빔 지주(10) 하부에 조립 및 체결된 후에 콘크리트 옹벽에 매설된다.In the figure, the H-beam strut support assembly of the present invention is configured to correspond as a pair of assemblies 20 and 22, and is assembled and fastened to the lower part of the H-beam strut 10. The pair of assemblies 20 and 22 are embedded in the concrete retaining wall after being assembled and fastened to the H beam post 10.

상기 한 쌍의 조립체(20, 22)는 대응되게 구성되는 것으로, 제1조립체(20) 및 제2조립체(22)의 구성 및 구조는 동일한 것이다. 이하 동일한 구성에 대해서는 동일한 부호를 사용한다. 다만, 제1조립체(20)와 제2조립체(22)를 에이치빔 지주(10)를 사이에 두고 체결될 때에는 대응되게 조립되므로 대칭의 구조로 직육면체의 형상을 갖는다. 그리고 본 고안의 에이치빔 지주 지지 조립체는 전체적으로 합성수지 재질로 이루어진 것이 바람직하지만, 합성수지 재질을 대체할 수 있는 어떠한 재질을 적용하여도 될 것이다.The pair of assemblies 20 and 22 are configured to correspond to each other, and the structure and structure of the first assembly 20 and the second assembly 22 are the same. Hereinafter, the same reference numerals are used for the same configuration. However, when the first assembly 20 and the second assembly 22 are fastened with the H beam posts 10 interposed therebetween, the first assembly 20 and the second assembly 22 have a shape of a rectangular parallelepiped in a symmetrical structure. And the H-beam prop support assembly of the present invention is preferably made of a synthetic resin as a whole, it may be applied to any material that can replace the synthetic resin material.

몸체부(24)는 상기 에이치빔 지주(10)의 하부 내측면(16)이 밀착 고정되는 것으로, 각 조립체(20, 22)의 몸체부(24)는 양측 날개부(12, 14)를 갖는 에이치빔 지주(10)의 내측면(16)에 각각 밀착된다. 몸체부(24)는 에이치빔 지주(10)의 요홈 형상의 내측면(16)에 접촉면(26)이 밀착되도록 돌출된 형상을 갖는다. 몸체부(24)의 내측 접촉면 및 외측면에는 각각 몸체부(24)의 강성을 도모하기 위하여 하나 이상의 돌기(27)가 세로 또는 가로방향이거나 가로 및 세로방향으로 모두 형성되어 있다.Body portion 24 is that the lower inner surface 16 of the H-beam prop 10 is tightly fixed, the body portion 24 of each assembly 20, 22 has both wing portions 12, 14 The inner surface 16 of the H beam post 10 is in close contact with each other. The body portion 24 has a shape that protrudes such that the contact surface 26 is in close contact with the inner surface 16 of the groove shape of the H beam support 10. At least one projection 27 is formed vertically or horizontally or both horizontally and vertically on the inner contact surface and the outer surface of the body portion 24 to achieve rigidity of the body portion 24, respectively.

측벽(30)은 상기 몸체부(24)의 좌우측에 소정 간격의 슬롯(40)이 형성되어 에이치빔 지주(10)의 날개부(12, 14)를 지지하는 것이다. 상기 슬롯(40)은 몸체부(24)와 측벽(30) 사이에 형성되는 것으로, 에이치빔 지주(10)의 날개부(12, 14)가 각각 삽입되어 고정되는 것이다. 슬롯(40)의 양측면에는 복수의 제1지지편(42) 및 제2지지편(43)이 일정 간격으로 각각 형성되어 있다. 제1지지편(42)은 몸체부(24)의 내부 측면으로부터 외측으로 수평이거나 상향 또는 하향으로 돌출되어 있다. 그리고 제2지지편(43)은 측벽(30)의 내측으로부터 제1지지편(42)과 대향되게 돌출 되되, 수평이거나 상향 또는 하향으로 돌출되어 있다. 상기 제1지지편(42) 및 제2지지편(43)은 동일한 방향이거나 또는 서로 다른 방향으로 돌출되는 것이 바람직하고, 제1지지편(42) 및 제2지지편(43)은 삽입되는 에이치빔 지주(10)의 날개부(12, 14)에 밀착되되, 소정의 간격을 두고 이격 형성되어 있다. 제1지지편(42) 및 제2지지편(43)은 삽입되는 에이치빔 지주(10) 날개부(12, 14)의 지지를 위하여 소정 크기의 강성 및 휨이 이루어질 수 있는 형상과 재질로 이루어진 것이 좋다.The side walls 30 support slots 12 and 14 of the H beam pillar 10 by forming slots 40 at predetermined intervals on the left and right sides of the body portion 24. The slot 40 is formed between the body portion 24 and the side wall 30, and the wing portions 12 and 14 of the H beam support 10 are inserted and fixed, respectively. On both sides of the slot 40, a plurality of first support pieces 42 and second support pieces 43 are formed at regular intervals, respectively. The first support piece 42 protrudes horizontally, upwardly or downwardly from the inner side of the body portion 24 to the outside. The second support piece 43 protrudes from the inner side of the side wall 30 to face the first support piece 42 and protrudes horizontally, upwardly, or downwardly. Preferably, the first support piece 42 and the second support piece 43 protrude in the same direction or in different directions, and the first support piece 42 and the second support piece 43 are inserted into an H. It is in close contact with the wing portions 12 and 14 of the beam support 10, and is spaced apart at a predetermined interval. The first support piece 42 and the second support piece 43 are formed of a shape and a material capable of forming rigidity and bending of a predetermined size to support the H-beam post 10 and the wing portions 12 and 14 to be inserted. It is good.

측벽(30)에는 대응하는 조립체(20, 22)와의 조립 및 체결을 위하여 외측으로 하나 이상의 체결홀더(32) 및/또는 체결부재(34)가 구비된다. 즉 조립체(20, 22)의 어느 한 측벽(30)에는 체결홀더(32)가 구비되고, 다른 측벽(30)에는 체결부재(34)가 구비되어 있다. 체결홀더(32)는 체결공(33)이 형성되고, 체결부재(34)에는 체결공(33)에 삽입이 용이한 경사면(36)을 갖는 걸림돌기(35)가 형성되어 있다. 상기 체결홀더(32) 및 체결부재(34)는 실시예로 나타낸 것으로, 한 쌍의 조립체(20, 22)를 조립 및 체결하기 위한 어떠한 체결구조나 부재 또는 수단이 구비되어도 좋다.The side wall 30 is provided with one or more fastening holders 32 and / or fastening members 34 outward for assembly and fastening with the corresponding assemblies 20, 22. That is, one side wall 30 of the assembly 20, 22 is provided with a fastening holder 32, the other side wall 30 is provided with a fastening member 34. The fastening holder 32 has a fastening hole 33 formed therein, and the fastening member 34 has a locking protrusion 35 having an inclined surface 36 that is easily inserted into the fastening hole 33. The fastening holder 32 and the fastening member 34 are shown as an embodiment, and may be provided with any fastening structure, member or means for assembling and fastening the pair of assemblies 20 and 22.

상기 몸체부(24) 및 측벽(30) 사이의 슬롯(40) 하단부는 에이치빔 지주(10)가 더 이상 삽입되지 않도록 막혀 있는 것이 좋다. 몸체부(24)의 함몰된 형상의 외측면 하단부는 개방된 형상이다.The lower end of the slot 40 between the body 24 and the side wall 30 is preferably blocked so that the H beam post 10 is not inserted anymore. The lower end of the outer surface of the recessed shape of the body portion 24 is an open shape.

상부커버(50)는 상기 몸체부(24) 및 측벽(30)의 상부에 구성되어 에이치빔 지주(10)가 삽입되는 삽입공(53)이 형성된 것으로, 상부커버(50)는 몸체부(24)의 상단에 하나 이상의 연결편(45)으로 하부판(51)이 연결되어 있다.The upper cover 50 is formed in the upper portion of the body portion 24 and the side wall 30 is formed with the insertion hole 53 is inserted into the H-beam support 10, the upper cover 50 is the body portion 24 The lower plate 51 is connected to one or more connecting pieces 45 at the top of the).

그리고 상기 상부커버(50)의 상단은 상기 하부판(51)으로부터 복수의 지지판(52)으로 일정의 이격거리로 이격되는 덮개(54)가 구비되어 있다. 덮개(54)는 외측에서 내측으로 소정의 경사각으로 기울어져 있다. 덮개(54)는 외부의 이물질이 내부로 유입되는 것을 차단하기 위한 것이다. 덮개(54)의 양측에는 에이치빔 지주(10)가 삽입 또는 분리되도록 하는 삽입공(53)이 측판(55) 사이에 형성된다. 삽입공(53)은 다단으로 형성될 수 있다. 그리고 상기 하부판(51)과 덮개(54)를 외측으로 후판(49)이 연결되고, 상부커버(50)는 전체적으로 직육면체의 형상으로 내측에서 외측으로 돌출된 형상이다.In addition, an upper end of the upper cover 50 is provided with a cover 54 spaced apart from the lower plate 51 by a plurality of support plates 52 at a predetermined distance. The lid 54 is inclined at an inclined angle from the outside to the inside. The cover 54 is to block foreign matter from entering the inside. On both sides of the cover 54, insertion holes 53 for inserting or detaching the H beam post 10 are formed between the side plates 55. Insertion hole 53 may be formed in multiple stages. The lower plate 51 and the cover 54 are connected to the rear plate 49 to the outside, and the upper cover 50 has a shape of a rectangular parallelepiped that protrudes from the inside to the outside.

상기 측판(55)은 상기 후판(49)과 덮개(54)에 연결되고 상기 몸체부(24)의 측벽(30) 상단으로 돌출되게 형성된 것으로, 측판(55)의 각 상단으로 연장편(45)이 돌출 형성되고, 상기 연장편(45) 내측으로 고정구(57)가 돌출 형성되어 있다. 고정구(57)는 에이치빔 지주(10)의 날개부(12, 14)에 형성된 고정공(18)에 삽입시켜 걸어 고정할 수 있도록 하는 것이다.The side plate 55 is connected to the rear plate 49 and the cover 54 and is formed to protrude to the upper side of the side wall 30 of the body portion 24, the extension piece 45 to each upper end of the side plate 55 This protrusion is formed, and the fastener 57 is protruded to the inside of the extension piece 45. Fixing device 57 is to be inserted into the fixing hole 18 formed in the wings (12, 14) of the H-beam prop 10 to be fixed by hanging.

상기 측판(55)은 덮개(54)와 같이 외측에서 내측으로 갈수록 경사진 기울기를 갖고 있다.The side plate 55 has an inclination inclined from the outer side to the inner side like the cover 54.

상기 측판(55)의 외측에는 체결공(59)이 형성된 체결홀더(58)와, 경사면(62) 및 걸림돌기(61)가 형성된 체결부재(60)가 구비되어 대응 결합되도록 이루어져 있다. 즉 각 조립체(20, 22)의 상부커버(50)를 조립 및 결합하기 위한 체결홀더(58) 및 체결부재(60)는 각 조립체(20, 22)의 어느 한 측벽(30)에는 체결홀더(58)가 구비되고, 다른 측벽(30)에는 체결부재(60)가 구비되어 있다. 체결홀더(58)는 체결 공(59)이 형성되고, 체결부재(60)에는 체결공(59)에 삽입이 용이한 경사면(62)을 갖는 걸림돌기(61)가 형성되어 있다. 상기 체결홀더(58) 및 체결부재(60)는 실시예로 나타낸 것으로, 한 쌍의 조립체(20, 22)를 조립 및 체결하기 위한 어떠한 체결구조나 부재 또는 수단이 구비되어도 좋다.The outer side of the side plate 55 is provided with a fastening holder 58 having a fastening hole 59 and a fastening member 60 having an inclined surface 62 and a locking protrusion 61 are provided to correspond to each other. That is, the fastening holder 58 and the fastening member 60 for assembling and assembling the upper cover 50 of each assembly 20 and 22 may be fastened to one side wall 30 of each assembly 20 or 22. 58 is provided, and the other side wall 30 is provided with a fastening member 60. The fastening holder 58 has a fastening hole 59 formed therein, and the fastening member 60 has a locking protrusion 61 having an inclined surface 62 that is easily inserted into the fastening hole 59. The fastening holder 58 and the fastening member 60 are shown as an embodiment, and may be provided with any fastening structure, member or means for assembling and fastening the pair of assemblies 20 and 22.

이와 같이 구성된 본 고안의 에이치빔 지주 지지 조립체의 작용을 설명한다.The operation of the H beam prop support assembly of the present invention configured as described above will be described.

도 1에서, 한 쌍의 조립체(20, 22), 즉 제1조립체(20)와 제2조립체(22)를 준비하고, 에이치빔 지주(10)를 사이에 위치시킨다. 에이치빔 지주(10)의 측면으로부터 각각 제1조립체(20) 및 제2조립체(22)를 측면으로부터 각각 삽입하거나 상부커버(50)에 형성된 삽입공(53)을 통하여 삽입하여 에이치빔 지주(10)에 조립한다. 이때 에이치빔 지주(10)의 날개부(12, 14)가 제1조립체(20) 및 제2조립체(22)에 형성된 슬롯(40)에 삽입되도록 가압하여 삽입시킨다. 이는 슬롯(40)의 양측에 형성된 제1지지편(42)과 제2지지편(43)이 에이치빔 지주(10)의 날개부(12, 14)에 밀착되어 고정된다.In FIG. 1, a pair of assemblies 20, 22, that is, a first assembly 20 and a second assembly 22, are prepared, and the H beam post 10 is positioned therebetween. The first beam 20 and the second assembly 22 are respectively inserted from the side surfaces of the H beam pillar 10 or through the insertion holes 53 formed in the upper cover 50, respectively. ) To assemble. At this time, the wing portions 12 and 14 of the H beam pillar 10 are pressed to be inserted into the slots 40 formed in the first assembly 20 and the second assembly 22. The first support piece 42 and the second support piece 43 formed on both sides of the slot 40 are fixed to the wings 12 and 14 of the H beam prop 10.

더욱이 제1조립체(20) 및 제2조립체(22)가 에이치빔 지주(10)의 하부에 삽입되면 제1조립체(20) 및 제2조립체(22)의 측벽(30)에 대응되게 형성된 체결홀더(32) 및 체결부재(34)를 결합시킨다. 즉 체결공(33)이 형성된 체결홀더(32)에 체결부재(34)의 경사면(36)이 형성된 걸림돌기(35)를 삽입하여 체결시킨다. 상기 체결부재(34)의 걸림돌기(335)에 형성된 경사면(36)에 의해 체결홀더(32)의 체결공(33)에 용이하게 삽입되고, 걸림돌기(35)가 체결공(33)에 삽입될 때에 걸림돌기(35)의 경사면(36) 종단에 형성된 단턱에 의하여 체결공(33)으로부터 용이하게 분리되지 않 는다. 그리고 상부커버(50)의 측판(55)에 구비된 체결공(59)이 형성된 체결홀더(58)와 대응되는 측판(55)에 구비된 경사면(62)을 갖는 걸림돌기(35)가 형성된 체결부재(60)도 체결하여 결합시킨다. 또한 측판(55)의 상단에 구비된 연장편(56)에 형성된 고정구(57)를 에이치빔 지주(10)의 날개부(12, 14)에 형성된 고정공(18)에 삽입시켜 고정시킨다. 상기 고정구(57)는 대응하는 에이치빔 지주(10) 날개부(12, 14)에 형성된 고정공(18)에 따라 하나 또는 그 이상으로 삽입시켜 고정시킬 수 있을 것이다. 따라서 제1조립체(20) 및 제2조립체(22)는 에이치빔 지주(10)에 결합된 상태에서는 에이치빔 지주(10)로부터 쉽게 분리되지는 않는다.Furthermore, when the first assembly 20 and the second assembly 22 are inserted below the H beam pillar 10, the fastening holder formed to correspond to the side walls 30 of the first assembly 20 and the second assembly 22. (32) and fastening member 34 is coupled. That is, the fastening hole 33 is formed in the fastening holder 32 is fastened by inserting the engaging projection 35 is formed with the inclined surface 36 of the fastening member 34. It is easily inserted into the fastening hole 33 of the fastening holder 32 by the inclined surface 36 formed on the locking projection 335 of the fastening member 34, the locking projection 35 is inserted into the fastening hole 33. Is not easily separated from the fastening hole 33 by a step formed in the end of the inclined surface 36 of the engaging projection 35. In addition, the fastening protrusion 35 having the inclined surface 62 provided on the side plate 55 corresponding to the fastening holder 58 having the fastening hole 59 provided on the side plate 55 of the upper cover 50 is formed. The member 60 is also fastened and coupled. In addition, the fastener 57 formed on the extension piece 56 provided at the upper end of the side plate 55 is inserted into and fixed to the fixing hole 18 formed in the wings 12 and 14 of the H beam support 10. The fastener 57 may be inserted and fixed in one or more positions according to the fixing holes 18 formed in the corresponding H beam posts 10 and 14. Therefore, the first assembly 20 and the second assembly 22 are not easily separated from the H beam support 10 in a state where they are coupled to the H beam support 10.

더욱이 본 고안의 에이치빔 지주 지지 조립체의 제1조립체(20) 및 제2조립체(22)를 먼저 조립 및 결합한 상태에서 에이치빔 지주(10)를 상부커버(50)의 삽입공(53)을 통해 삽입시킨 후에 결합시킬 수도 있을 것이다. 이는 작업 현장의 조건에 따라 선택적으로 결합시킬 수 있을 것이다.Furthermore, the H beam support 10 is inserted through the insertion hole 53 of the upper cover 50 in a state in which the first assembly 20 and the second assembly 22 of the H beam support support assembly of the present invention are assembled and combined first. It may be combined after insertion. This may be selectively combined depending on the conditions of the work site.

도 2는 에이치빔 지주(10) 지지 조립체(20, 22)에 에이치빔 지주(10)가 결합된 상태를 나타낸 사시도이다.2 is a perspective view illustrating a state in which the H beam prop 10 is coupled to the H beam prop 10 support assemblies 20 and 22.

도 2와 같이, 에이치빔 지주(10)의 하부에 제1조립체(20) 및 제2조립체(22)를 조립하여 결합한 후에 도 5의 설치 단면도 및 도 6의 에이치빔 지주 지지 조립체가 옹벽에 고정되고, 조립체에 에이치빔 지주가 결합된 상태를 나타낸 사시도와 같이 사면의 콘크리트 옹벽(1)에 에이치빔 지주(10)를 매설하여 고정시킨다. 더욱이 도 5 및 도 6을 참조하면, 사면에 콘크리트 옹벽(1)을 형성시키기 위하여 거푸집이 설치된 다음에 제1조립체(20) 및 제2조립체(22)가 결합된 에이치빔 지주(10) 를 일정 간격으로 위치시킨다. 그리고 거푸집에 콘크리트로 그라우팅시킨 후에 양생시키면, 에이치빔 지주(10)는 양생되는 콘크리트 옹벽(1)에 고정 설치된다. 이때 콘크리트 옹벽(1)의 수평면에 제1조립체(20) 및 제2조립체(22) 상부커버(50)의 덮개(54)가 드러나도록 하는 것이 바람직하다.As shown in FIG. 2, after assembling and combining the first assembly 20 and the second assembly 22 to the lower portion of the H beam post 10, the installation cross-sectional view of FIG. 5 and the H beam support support assembly of FIG. 6 are fixed to the retaining wall. Then, the H beam pillar 10 is embedded and fixed in the concrete retaining wall 1 on the slope as shown in the perspective view showing the state in which the H beam pillar is coupled to the assembly. 5 and 6, after the formwork is installed to form the concrete retaining wall 1 on the slope, the H beam post 10 to which the first assembly 20 and the second assembly 22 are coupled is fixed. Place at intervals. And after curing after grouting the formwork with concrete, the H-beam post 10 is fixed to the concrete retaining wall (1) to be cured. In this case, the cover 54 of the first assembly 20 and the second assembly 22 and the upper cover 50 may be exposed on the horizontal surface of the concrete retaining wall 1.

상부커버(50)의 덮개(54)는 외측에서 에이치빔 지주(10)의 내측면(16)을 향하여 상승하는 기울기를 가지므로 조립체 내측으로 콘크리트나 이물질이 유입되지 않게 된다.The cover 54 of the upper cover 50 has a slope that rises from the outside toward the inner surface 16 of the H beam support 10 so that concrete or foreign matter does not flow into the assembly.

더욱이 에이치빔 지주(10)에 제1조립체(20) 및 제2조립체(22)를 결합시키기 않고, 제1조립체(20) 및 제2조립체(22) 만을 결합시킨 상태에서 콘크리트 옹벽(1)에 미리 매설하여 고정시킨 후에 에이치빔 지주(10)를 상부커버(50)의 삽입공(53)을 통하여 삽입시켜 고정시킬 수도 있을 것이다.Furthermore, without coupling the first assembly 20 and the second assembly 22 to the H beam pillar 10, only the first assembly 20 and the second assembly 22 are coupled to the concrete retaining wall 1. After embedding and fixing in advance, the H beam post 10 may be inserted and fixed through the insertion hole 53 of the upper cover 50.

도 6에서는 콘크리트 옹벽(1)에 매설된 조립체(20, 22)로부터 및 에이치빔 지주(10)를 삽입 또는 분리가 가능할 것이다.In FIG. 6 it may be possible to insert or remove the H-beam post 10 and from the assemblies 20, 22 embedded in the concrete retaining wall 1.

도 7은 본 고안의 에이치빔 지주가 콘크리트 옹벽에 설치된 상태에서, 에이치빔 지주에 토류의 유실이나 낙석을 방지하기 위한 망이 설치된 상태를 나타낸 것으로, 사면(2)으로부터 토류의 유실이나 낙석을 방지할 수 있도록 와이어로프(3) 및 망(4)이 에이치빔 지주(10)에 설치된다.FIG. 7 shows a state in which H beam props of the present invention are installed on a concrete retaining wall, and a net is installed on H beam props to prevent loss or falling of earth, and prevents loss or falling of earth from slope 2. The wire rope 3 and the net 4 are installed in the H beam prop 10 so as to be possible.

한편, 도 7과 같이 설치된 상태에서 사면으로부터 토류나 암석 등이 유실되어 망(4)을 통해 지속적인 압력이 가해지거나 큰 암석덩어리나 사면의 토사가 갑자기 붕괴되었을 경우에 콘크리트 옹벽(1)에 설치된 에이치빔 지주(10), 와이어로프 (3) 및 망(4)이 1차적인 토류나 암석 등의 가압력을 견디면서 도로나 철로로 토류나 암석이 유실되는 것을 방지하지만, 일정한 시간이 경과하거나 갑작스러운 가압력에 의하여 와이어로프(3) 및 망(4)이 절단되거나 또는 에이치빔 지주(10)가 휘어지거나 절단될 수 있다.On the other hand, when the earth or rock is lost from the slope in the state installed as shown in Figure 7, the continuous pressure is applied through the net (4) or a large rock mass or the slope of the slope of the soil is suddenly collapsed in the H Although the beam support 10, the wire rope 3, and the net 4 withstand the primary pressures such as the earth and rock, they prevent the loss of the earth and the rock on the road or the railroad, but after a certain period of time or sudden The wire rope 3 and the net 4 may be cut by the pressing force, or the H beam post 10 may be bent or cut.

따라서 토류나 암석 등의 유실에 의하여 해당 구간의 에이치빔 지주(10)가 망실되는 경우에 망실된 에이치빔 지주(10)를 콘크리트 옹벽(1)에 매설된 조립체(20, 22)로부터 인출시켜 분리시킬 수 있다. 이는 조립체(20, 22)가 콘크리트 옹벽(1)에 매설되면서 상부커버(50)는 옹벽(1)의 표면으로 돌출된 상태이므로 에이치빔 지주(10)를 인출시켜 분리시킬 수 있는 것이다. 더욱이 에이치빔 지주(10)가 인출되어 분리된 조립체(20, 22)에 새로운 에이치빔 지주(10)를 상부커버(50)의 삽입공(53)을 통해 삽입하여 고정시키면 된다. 그리고 와이어로프(3) 및 망(4) 등을 에이치빔 지주(10)에 재설치하면 된다.Therefore, when the H-beam post 10 of the corresponding section is lost due to the loss of earth or rock, the H-beam post 10 which has been lost is withdrawn from the assemblies 20 and 22 embedded in the concrete retaining wall 1. You can. This is because the assembly (20, 22) is embedded in the concrete retaining wall (1), the upper cover 50 is protruded to the surface of the retaining wall (1), so that it can be separated by withdrawing the H beam pillar (10). Furthermore, the H-beam post 10 may be drawn out to insert and fix the new H-beam post 10 through the insertion hole 53 of the upper cover 50 to the separated assemblies 20 and 22. The wire rope 3 and the net 4 may be reinstalled to the H beam prop 10.

이상의 설명에서 본 고안은 특정의 실시 예와 관련하여 도시 및 설명하였지만, 실용신안등록청구범위에 의해 나타난 고안의 사상 및 영역으로부터 벗어나지 않는 한도 내에서 다양한 개조 및 변화가 가능하다는 것을 당 업계에서 통상의 지식을 가진 자라면 누구나 쉽게 알 수 있을 것이다.Although the present invention in the above description has been shown and described with respect to specific embodiments, it is common in the art that various modifications and changes can be made without departing from the spirit and scope of the invention as indicated by the utility model registration claims. Anyone with knowledge will know it easily.

상술한 바와 같이, 본 고안의 에이치빔 지주 지지 조립체는 콘크리트 옹벽에 매설되고, 조립체에 에이치빔 지주가 용이하게 인출 분리 및 삽입 고정시킬 수 있도록 이루어진 것으로, 사면으로부터 토류나 암석의 유실에 의한 압력으로 에이치빔 지주가 휘어지거나 절단되는 경우에 에이치빔 지주를 보다 신속하게 재설치할 수 있으므로 낙석 방지망 등이 설치된 도로나 철로의 복구 작업이 신속하게 이루어질 뿐만 아니라, 복구 작업에 소요되는 비용, 시간 및 인력의 절감과, 연속되는 토류나 암석의 유실을 방지할 수 있는 등, 다양한 효과를 기대할 수 있는 것이다.As described above, the H-beam strut support assembly of the present invention is embedded in the concrete retaining wall, and the H-beam strut can be easily pulled out and inserted and fixed to the assembly, and the pressure is caused by the loss of earth or rock from the slope. H-beam pillars can be reinstalled more quickly if the H-beam pillars are bent or cut, so that the road or railroad with the rockfall protection net can be quickly repaired, and the cost, time and manpower Various effects can be expected, such as saving and preventing the loss of continuous earth and rock.

Claims (7)

옹벽에 고정되고 낙석 방지를 위한 울타리를 지지하는 에이치(H)빔 지주에 있어서,In the H beam support fixed to the retaining wall and supporting the fence to prevent rockfall, 상기 에이치빔의 하부 내측면이 밀착 고정되는 몸체부;A body portion to which the lower inner surface of the H beam is closely fixed; 상기 몸체부의 좌우측에 소정 간격의 슬롯이 형성되어 에이치빔의 날개부가 지지되는 측벽, 및Sidewalls at which left and right sides of the body portion are formed with slots at predetermined intervals to support the wing portions of H beams, and 상기 몸체부 및 측벽의 상부에 구성되어 에이치빔이 삽입되는 삽입공이 형성된 상부커버가 각각 구성된 제1조립체 및 제2조립체가 상기 옹벽에 매설되되, 에이치빔을 사이에 두고 대응되게 결합되는 것을 특징으로 하는 에이치빔 지주 지지 조립체.The first assembly and the second assembly are formed on the retaining wall, respectively, the upper cover is formed on the body portion and the upper side of the side wall formed with the insertion hole is inserted into the H-beam, the H-beam interposed therebetween H beam prop support assembly. 제1항에 있어서,The method of claim 1, 상기 제1조립체 및 제2조립체의 측벽에는 각각 조립체가 대응되게 체결이 이루어지도록 체결공이 형성된 체결홀더와 걸림돌기가 형성된 체결부재가 구비된 것을 특징으로 하는 에이치빔 지주 지지 조립체.H-beam holding support assembly, characterized in that the side wall of the first assembly and the second assembly is provided with a fastening holder formed with a fastening hole and a fastening member formed with a locking projection to correspond to the assembly corresponding to each assembly. 제1항에 있어서,The method of claim 1, 상기 몸체부는 외측에서 내측으로 함몰된 직육면체 형상으로 외측면과 내측 접촉면에는 강성돌기가 하나 이상으로 형성된 것을 특징으로 하는 에이치빔 지주 지지 조립체.The body portion has a rectangular parallelepiped shape that is recessed from the outside to the outside surface and the inner side contact surface H-beam holding support assembly, characterized in that formed with one or more rigid projections. 제1항 또는 제3항에 있어서,The method according to claim 1 or 3, 상기 몸체부와 측벽의 내측이 마주하는 슬롯 사이에는 에이치빔의 날개부를 지지하기 위한 제1지지편 및 제2지지편이 각각 복수로 형성된 것을 특징으로 하는 에이치빔 지주 지지 조립체.And a plurality of first support pieces and second support pieces for supporting the wing portions of the H-beams, respectively, between the body portions and the slots facing the inner sides of the H-beams. 제1항에 있어서,The method of claim 1, 상기 상부커버는 몸체부의 상단에 복수의 연결편으로 연결된 하부판과,The upper cover and the lower plate connected to the upper end of the body portion by a plurality of connecting pieces, 상기 하부판으로부터 일정 높이로 지지판으로 이격되도록 구비된 덮개와,A cover provided to be spaced apart from the lower plate by a support plate at a predetermined height; 상기 하부판과 덮개를 외측으로 이어주는 후판과,A rear plate connecting the lower plate and the cover to the outside; 상기 후판과 덮개에 연결되고 상기 몸체부의 측벽 상단으로 돌출되게 형성된 측판과,A side plate connected to the rear plate and the cover and protruding to an upper end of the side wall of the body part; 상기 측판의 상단으로 돌출 형성된 연장편과,An extension piece protruding to an upper end of the side plate, 상기 연장편 내측으로 돌출 형성된 고정구가 구비된 것을 특징으로 하는 에이치빔 지주 지지 조립체.H beam holding support assembly, characterized in that provided with a fixture formed protruding into the extension. 제5항에 있어서,The method of claim 5, 상기 덮개 및 측판은 외측에서 내측으로 갈수록 경사진 기울기를 갖는 것을 특징으로 하는 에이치빔 지주 지지 조립체.And the shroud and side plates have an inclined slope from the outside to the inside. 제5항 또는 제6항에 있어서,The method according to claim 5 or 6, 상기 측판에는 체결공이 형성된 체결홀더와 걸림돌기가 형성된 체결부재가 구비되어 대응 결합되도록 이루어진 것을 특징으로 하는 에이치빔 지주 지지 조립체.The side plate is provided with a fastening hole formed with a fastening hole and a fastening member formed with a locking projection is H-beam prop support assembly, characterized in that made to be correspondingly coupled.
KR2020060004929U 2006-02-22 2006-02-22 Assembly for Support of H-Beam Strut KR200416629Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020060004929U KR200416629Y1 (en) 2006-02-22 2006-02-22 Assembly for Support of H-Beam Strut

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020060004929U KR200416629Y1 (en) 2006-02-22 2006-02-22 Assembly for Support of H-Beam Strut

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1020060017414A Division KR100690072B1 (en) 2006-02-22 2006-02-22 Assembly for support of h-beam strut

Publications (1)

Publication Number Publication Date
KR200416629Y1 true KR200416629Y1 (en) 2006-05-23

Family

ID=41766094

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020060004929U KR200416629Y1 (en) 2006-02-22 2006-02-22 Assembly for Support of H-Beam Strut

Country Status (1)

Country Link
KR (1) KR200416629Y1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200458707Y1 (en) * 2011-11-11 2012-03-15 재광티앤에스(주) pillar fixing apparatus for road facilities
KR101947965B1 (en) * 2018-08-08 2019-02-13 이용 Fixing structure of post for falling rock prevention fence
TWI670028B (en) * 2018-02-28 2019-09-01 南韓商普來絲可維婷實驗室公司 Electronic mask pack set

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200458707Y1 (en) * 2011-11-11 2012-03-15 재광티앤에스(주) pillar fixing apparatus for road facilities
TWI670028B (en) * 2018-02-28 2019-09-01 南韓商普來絲可維婷實驗室公司 Electronic mask pack set
KR101947965B1 (en) * 2018-08-08 2019-02-13 이용 Fixing structure of post for falling rock prevention fence

Similar Documents

Publication Publication Date Title
CA1210981A (en) Drainage channel
KR101103382B1 (en) A tunnel type soundproofing walls
KR100952610B1 (en) Extension footpath for a bridge
KR102114961B1 (en) Soundproof walls that facilitate installation and replacement of soundproofing plates
KR100990232B1 (en) Wall surface block
KR100635384B1 (en) Transparency noise barrier and construction method using the same
KR100592720B1 (en) Breast wall construction of assembly type for road
KR102239510B1 (en) Sound and earthquake proofed tunnel with drain-proof function and construction method of the same
KR200416629Y1 (en) Assembly for Support of H-Beam Strut
KR101286982B1 (en) A divisional strip of traffic lane
KR101707170B1 (en) Structure for connecting support
KR100690072B1 (en) Assembly for support of h-beam strut
KR100604339B1 (en) The pence install structure of a road pence
KR100736852B1 (en) Precast concrete retaining wall, conwall
KR200420490Y1 (en) Soundproof Panel for Prevention of Noise
KR102102118B1 (en) Separate type lane separator
KR20200061555A (en) anchor block for a street lamp
JP6445254B2 (en) Attaching method of independent structure and gap plugging material
US20230349117A1 (en) System, apparatus and method for installation of street furniture
JP2015214802A (en) Column support block
KR200387013Y1 (en) Falling rock prevention pence
KR102413915B1 (en) Noise barrier construction system using block module
KR101609760B1 (en) Construction method for a sidewalk enlargement installation
KR100649455B1 (en) Device for absorbing noise on road
KR102139094B1 (en) Pillar and handrail fixing structure of design fence

Legal Events

Date Code Title Description
U107 Dual application of utility model
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T701 Written decision to grant on technology evaluation
EXTG Extinguishment