Prior art keywords
retaining wall
holes
protrusion
hole
ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
KR1020050104287A
Other languages
Korean (ko)
Inventor
이영우
Original Assignee
(주)원엔지니어링
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)원엔지니어링 filed Critical (주)원엔지니어링
Priority to KR1020050104287A priority Critical patent/KR100592720B1/en
Application granted granted Critical
Publication of KR100592720B1 publication Critical patent/KR100592720B1/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/025Retaining or protecting walls made up of similar modular elements stacked without mortar
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B11/00Drainage of soil, e.g. for agricultural purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0258Retaining or protecting walls characterised by constructional features
    • E02D29/0266Retaining or protecting walls characterised by constructional features made up of preformed elements

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Agronomy & Crop Science (AREA)
  • Mechanical Engineering (AREA)
  • Retaining Walls (AREA)

Abstract

조립형 옹벽이 제공된다. 제공된 옹벽은 상기 절개지와 나란하게 타설되는 콘크리트 본체의 상부면에는 다수의 제 1돌출구가 소정간격을 두고 돌출형성되며 이 제 1돌출구에는 한 조의 고정홀이 상기 본체를 수직관통하도록 천공되고 그 후방면에는 배수부재가 삽입설치되는 배수부재설치홈이 길이방향으로 마련된 기초판과, 상기 기초판의 상부면에 상, 하, 좌, 우 조립식으로 설치되며 그 하부면에는 상기 제 1돌출구가 삽입고정되는 수용홈이 마련되고 그 상부면에는 상기 제 1돌출구와 동일한 구조의 제 2돌출구가 돌출형성되며 상기 수용홈과 상기 제 1돌출구의 사이에는 상기 고정홀과 대응하는 위치에 한 조의 수직관통홀이 천공되고 그 양측면에는 삽입홈과 이 삽입홈과 대응하는 형태의 삽입돌기가 각각 형성되며 그 전방면에는 배수공을 갖는 식재대가 돌출형성됨과 아울러 이 식재대의 직상부에는 배수관이 삽입설치된 경사배수홀이 천공된 다수의 옹벽패널과, 상기 기초판의 고정홀 및 상기 각 옹벽패널의 수직관통홀을 관통한 상태에서 지면에 쐐기형태로 고정되며 그 상부면에는 나사결합공을 갖는 강재원판이 설치된 다수의 쐐기형 지주대와, 상기 강재원판의 나사결합공에 나사결합되는 나사결합구가 그 하부에 마련된 제 1걸림고리와, 상기 제 1걸림고리와 수평된 위치의 상기 절개지면상에 매설되며 그 전방면에는 상기 제 1걸림고리와 대응하는 위치에 다수의 제 2걸림고리가 돌출형성된 매설블록과, 상기 제 1걸림고리와 상기 제 2걸림고리에 걸림고정되는 연결고리가 그 일단과 타단에 마련된 연결와이어로 구성된다.A prefabricated retaining wall is provided. The retaining wall provided has a plurality of first protrusions protruding at a predetermined interval on an upper surface of the concrete body which is placed side by side with the incision, and a set of fixing holes are perforated to vertically penetrate the body and the rear surface thereof. The base plate is provided with a drain member installation groove in the longitudinal direction and the drain member is installed in the longitudinal direction, and is installed in the upper, lower, left, right assembly type on the upper surface of the base plate and the first projection is inserted into the lower surface A receiving groove is provided, and a second projection of the same structure as the first projection is formed on the upper surface thereof, and a set of vertical through holes is drilled at a position corresponding to the fixing hole between the accommodation groove and the first projection. And insert grooves and insertion protrusions corresponding to the insertion grooves are formed on both sides thereof, and planting beds having drainage holes are formed on the front surface thereof. In the upper part of the planting stand, a plurality of retaining wall panels in which the inclined drainage holes with drainage pipes are inserted, and fixed through the fixing holes of the base plate and the vertical through-holes of the retaining wall panels are fixed in a wedge shape to the ground. The upper surface is provided with a plurality of wedge-shaped struts are provided with a steel disc having a screwing hole, a first engaging ring provided in the lower portion of the screw engaging holes for screwing into the screwing holes of the steel disc, and the first locking ring Buried on the cut-out surface in a horizontal position with a front buried block in which a plurality of second catching rings are formed at a position corresponding to the first catching ring, and the first catching ring and the second catching ring. The engaging hook is composed of a connection wire provided at one end and the other end.

Description

도로 조립형 옹벽 구조물{BREAST WALL CONSTRUCTION OF ASSEMBLY TYPE FOR ROAD}BREAST WALL CONSTRUCTION OF ASSEMBLY TYPE FOR ROAD}

도 1은 종래 옹벽의 시공형태의 대표적인 일례로써 도로변에 시공된 옹벽을 설명하기 위한 사시도이다.1 is a perspective view illustrating a retaining wall constructed on a roadside as a typical example of a construction of a conventional retaining wall.

도 2는 본 발명에 따른 조립형 옹벽을 설명하기 위한 분해사시도이다.Figure 2 is an exploded perspective view for explaining the assembled retaining wall according to the present invention.

도 3은 본 발명에 따른 조립형 옹벽의 결합사시도이다.3 is a perspective view of the assembled retaining wall according to the present invention.

도 4는 본 발명에 따른 조립식 옹벽이 절개지에 시공된 상태를 설명하기 위한 측단면도이다.Figure 4 is a side cross-sectional view for explaining the state in which the prefabricated retaining wall constructed in the incision according to the present invention.

도 5a는 본 발명에 따른 조립식 옹벽이 절개지에 시공된 상태에서 제 1걸림고리와 매설블록의 연결상태를 설명하기 위한 요부발췌 측 단면도이다.Figure 5a is a cross-sectional view of the main portion for explaining the connection state of the first hook and the buried block in the prefabricated retaining wall constructed in the incision according to the present invention.

도 5b는 본 발명에 따른 조립식 옹벽이 절개지에 시공된 상태에서 경사배수홀을 통해 우수가 배수되는 상태를 설명하기 위한 요부발췌 측 단면도이다.Figure 5b is an excerpt side cross-sectional view illustrating a state in which rainwater is drained through the inclined drainage hole in the prefabricated retaining wall is constructed in the incision.

< 도면의 주요부위에 대한 부호의 설명 ><Description of Symbols for Major Parts of Drawings>

1 : 옹벽 2 : 기초판1: retaining wall 2: foundation plate

3, 3' : 옹벽패널 4 : 쐐기형 지주대3, 3 ': Retaining wall panel 4: Wedge-shaped strut

5 : 제 1걸림고리 6 : 매설블록5: first hook 6: buried block

7 : 연결와이어 8 : 체결볼트7: connection wire 8: fastening bolt

10 : 절개지 20 : 관상식물10: incision 20: ornamental plants

21 : 본체 22 : 배수부재21: main body 22: drain member

31, 31' : 수용홈 32 : 제 2돌출구31, 31 ': accommodation groove 32: 2nd exit

33 : 수직관통홀 34 : 삽입홈33: vertical through hole 34: insertion groove

35 : 삽입돌기 36 : 식재대35: insertion protrusion 36: planting table

37 : 경사배수홀 41 : 강재원판37: inclined drainage hole 41: steel disc

51 : 나사결합구 61 : 제 2걸림고리51: screw engaging hole 61: the second locking ring

71, 71' : 연결고리 211 : 제 1돌출구71, 71 ': Linkage 211: first exit

212 : 고정홀 213 : 배수부재설치홈212: fixing hole 213: drainage member mounting groove

221 : 돌출부 341, 351 : 체결홀221: protrusion 341, 351: fastening hole

361 : 배수공 371 : 배수파이프361: drain hole 371: drain pipe

본 발명은 조립형 옹벽에 관한 것이다.The present invention relates to an assembled retaining wall.

일반적으로, 옹벽은 자연적으로 형성된 경사면이나 인위적으로 형성된 경사면, 예컨대 도로 및 철도 공사 등으로 인해 인위적으로 발생한 경사면에 시공된다. 이와 같은 옹벽은 그 설치형태에 따라 성토지 옹벽과 절개지 옹벽으로 분류할 수 있다. 상기 성토지 옹벽은 건축단지에 시공되는 것이고, 상기 절개지 옹벽은 산을 가로지르는 형태로 도로를 건설하거나 산의 일부만을 깎아낼 경우 깎아낸 절토면과 시공기면 사이에 시공되는 것이다.In general, the retaining walls are constructed on naturally inclined surfaces or artificially formed inclined surfaces, such as artificially inclined surfaces due to road and railway construction. Such a retaining wall can be classified into a fill site retaining wall and an incision retaining wall according to its installation form. The fill site retaining wall is constructed in an architectural complex, and the cut site retaining wall is constructed between the cut cut surface and the construction base surface when constructing a road or cutting a part of the mountain in the form of crossing the mountain.

도 1은 종래 옹벽의 시공형태의 대표적인 일례로써 도로변에 시공된 옹벽을 설명하기 위한 사시도이다.1 is a perspective view illustrating a retaining wall constructed on a roadside as a typical example of a construction of a conventional retaining wall.

도 1을 참조하면, 옹벽(100)은 경사진 절개지(200)와 시공기면인 도로(300)의 경계부위에 설치된다. 이와 같은 옹벽(100)은 거푸집을 형성하여 콘크리트를 타설함으로써 절개지(200)의 토압을 지지하는 기능을 수행한다.Referring to FIG. 1, the retaining wall 100 is installed at a boundary between an inclined cutout 200 and a road 300 which is a construction plane. Such a retaining wall 100 forms a formwork to cast concrete to support the earth pressure of the incision 200.

하지만, 기존의 옹벽(100)은 절개지(200)를 따라 비교적 대형의 콘크리트만으로 옹벽(100)을 시공함에 따라 현장으로의 자재운반이 어려운 문제점이 있다. 아울러, 상기한 콘크리트 옹벽(100)은 콘크리트를 타설한 후 충분히 굳어지기 전까지 빗물에 의한 표면유실, 하중이나 충격에 의한 콘크리트의 파손 등이 발생하지 않도록 엄격한 관리가 수행해야하는 번거로움이 있다. 또한, 상기한 콘크리트 옹벽(100)은 그 시공 후에도 시간의 경과에 따른 균열현상을 수시로 점검하여 이에 대한 적절한 보수 작업을 수행해야하므로 그 시공 및 유지관리에 많은 인력과 비용이 소요되는 문제점이 있다. 특히, 상기한 콘크리트 옹벽(100)은 시공할 수 있는 높이에도 제한이 뒤따르기 때문에 절개지의 높이가 높을수록 시공하기가 매우 힘들다는 문제점이 있다.However, the existing retaining wall 100 has a problem in that it is difficult to transport the material to the site as the retaining wall 100 is constructed only with relatively large concrete along the incision 200. In addition, the concrete retaining wall 100 has a hassle that must be carried out strict management so that surface loss due to rainwater, damage to the concrete due to load or impact does not occur until after the concrete is solidified sufficiently. In addition, the concrete retaining wall 100 has a problem that requires a lot of manpower and cost for its construction and maintenance because it is necessary to check the crack phenomenon over time even after the construction from time to time to perform the appropriate repair work. In particular, the concrete retaining wall 100 has a problem that it is very difficult to construct the higher the height of the incision because the restriction is also followed by the height that can be constructed.

한편, 기존의 콘크리트 옹벽(100)은 지지기반을 확보하기 위한 목적으로만 시공되기 때문에 주위의 환경과 전혀 어울리지 않는 문제점이 있다. 다시 말하면 기존의 콘크리트 옹벽(100)은 절개지에 토사의 유실로 인한 변형 및 붕괴를 방지하기 위한 목적에만 알맞은 구조로 시공되기 때문에 주위의 환경과 전혀 어울리지 않 는 문제점이 있는 것이다. On the other hand, since the existing concrete retaining wall 100 is constructed only for the purpose of securing a support base, there is a problem that does not match the surrounding environment at all. In other words, the existing concrete retaining wall 100 has a problem that does not fit at all with the surrounding environment because it is constructed in a structure suitable only for the purpose of preventing deformation and collapse due to the loss of soil in the incision.

이에, 본 발명은 기존의 옹벽, 예컨대 콘크리트로 된 절개지 옹벽이 갖는 제반적인 문제점을 해결하고자 창안된 것으로,Therefore, the present invention was devised to solve the general problems of the existing retaining wall, for example, the cut retaining wall made of concrete,

본 발명이 이루고자 하는 기술적 과제는 옹벽패널을 적층 조립하는 시공구조를 적용하여, 그 시공작업이 용이함은 물론 유지, 보수작업 또한 간편하게 수행할 수 있는 조립형 옹벽을 제공하는 데 있다.The technical problem to be achieved by the present invention is to provide a prefabricated retaining wall that can be easily carried out as well as maintenance, maintenance work by applying a construction structure to laminate the retaining wall panel.

본 발명이 이루고자 하는 다른 기술적 과제는 쐐기형 지주대와 연결와이어 및 매설블록에 의해 옹벽패널이 견고하게 지지되게 함으로써 최초의 시공상태를 유지할 수 있는 조립형 옹벽을 제공하는 데 있다.Another technical problem to be achieved by the present invention is to provide a retaining wall that can maintain the initial construction state by allowing the retaining wall panel to be firmly supported by the wedge-shaped support pole, the connecting wire and the buried block.

본 발명이 이루고자 하는 또 다른 기술적 과제는 옹벽패널에 관상식물이 식생할 수 있는 공간을 포함시켜 시공장소의 주위환경과 적절하게 융화될 수 있도록 한 조립형 옹벽을 제공하는 데 있다. Another technical problem to be achieved by the present invention is to provide a prefabricated retaining wall that includes a space in which the tubular plants can be planted in the retaining wall panel so as to be properly compatible with the surrounding environment of the city factory.

상기한 기술적 과제를 해결하기 위한 본 발명의 구체적인 수단으로는;As a specific means of the present invention for solving the above technical problem;

절개지에 시공되는 옹벽에 있어서,In the retaining wall constructed in the incision site,

상기 절개지와 나란하게 타설되는 콘크리트 본체의 상부면에는 다수의 제 1돌출구가 소정간격을 두고 돌출형성되며, 이 제 1돌출구에는 한 조의 고정홀이 상기 본체를 수직관통하도록 천공되고, 그 후방면에는 배수부재가 삽입설치되는 배수부재설치홈이 길이방향으로 마련된 기초판;A plurality of first projections are formed on the upper surface of the concrete body that is placed side by side with the incision, at a predetermined interval, and a set of fixing holes are drilled in the first projection so as to vertically penetrate the body. A base plate provided with a drainage member installation groove in which the drainage member is installed in the longitudinal direction;

상기 기초판의 상부면에 상, 하, 좌, 우 조립식으로 설치되며, 그 하부면에는 상기 제 1돌출구가 삽입고정되는 수용홈이 마련되고, 그 상부면에는 상기 제 1돌출구와 동일한 구조의 제 2돌출구가 돌출형성되며, 상기 수용홈과 상기 제 1돌출구의 사이에는 상기 고정홀과 대응하는 위치에 한 조의 수직관통홀이 천공되고, 그 양측면에는 삽입홈과 이 삽입홈과 대응하는 형태의 삽입돌기가 각각 형성되며, 그 전방면에는 배수공을 갖는 식재대가 돌출형성됨과 아울러 이 식재대의 직상부에는 배수관이 삽입설치된 경사배수홀이 천공된 다수의 옹벽패널;It is installed in the upper, lower, left, right assembly type on the upper surface of the base plate, the lower surface is provided with a receiving groove into which the first projection is fixed, the upper surface of the first structure having the same structure as the first projection 2 projections are formed to protrude, and a set of vertical through-holes are drilled between the receiving groove and the first projection in a position corresponding to the fixing hole, the insertion groove and the insertion of the shape corresponding to the insertion groove on both sides A plurality of retaining wall panels each having protrusions formed thereon, and a planting stand having drainage holes is formed on the front surface thereof, and an inclined drainage hole in which a drainage pipe is inserted is directly installed on the planting stand;

상기 기초판의 고정홀 및 상기 각 옹벽패널의 수직관통홀을 관통한 상태에서 지면에 쐐기형태로 고정되며, 그 상부면에는 나사결합공을 갖는 강재원판이 설치된 다수의 쐐기형 지주대;A plurality of wedge-shaped support posts fixed in a wedge shape on the ground in a state of penetrating the fixing holes of the base plate and the vertical through-holes of the respective retaining wall panels, and having a steel disc having screw coupling holes on the upper surface thereof;

상기 강재원판의 나사결합공에 나사결합되는 나사결합구가 그 하부에 마련된 제 1걸림고리;A first catching ring provided at a lower portion thereof with a screw engaging hole screwed into a screwing hole of the steel disc;

상기 제 1걸림고리와 수평된 위치의 상기 절개지면상에 매설되며, 그 전방면에는 상기 제 1걸림고리와 대응하는 위치에 다수의 제 2걸림고리가 돌출형성된 매설블록; 및A buried block buried on the cut surface at a position parallel to the first catching ring, the front block having a plurality of second catching rings protruding at a position corresponding to the first catching ring; And

상기 제 1걸림고리와 상기 제 2걸림고리에 걸림고정되는 연결고리가 그 일단과 타단에 마련된 연결와이어; 를 포함하는 조립형 옹벽을 구비한다.A connection wire provided at one end and the other end of the connecting ring which is fixed to the first catching ring and the second catching ring; It has a prefabricated retaining wall comprising a.

바람직한 실시예로써, 상기 삽입홈과 상기 삽입돌기에는 체결볼트를 고정하기 위한 적어도 하나의 체결홀이 상호 대응하는 위치에 천공할 수 있다.As a preferred embodiment, at least one fastening hole for fixing the fastening bolt may be drilled in the insertion groove and the insertion protrusion at a position corresponding to each other.

이하, 본 발명의 바람직한 실시예, 예컨대 절개지에 시공되는 실시예를 첨부 도면에 의거하여 상세히 설명하기로 한다.Hereinafter, preferred embodiments of the present invention, for example, an embodiment constructed on the incision will be described in detail with reference to the accompanying drawings.

도 2는 본 발명에 따른 조립형 옹벽을 설명하기 위한 분해사시도이고, 도 3은 본 발명에 따른 조립형 옹벽의 결합사시도이다.Figure 2 is an exploded perspective view for explaining the assembled retaining wall according to the present invention, Figure 3 is a combined perspective view of the assembled retaining wall according to the present invention.

도 2 및 도 3을 참조하면, 본 발명의 조립형 옹벽(1)은 기초판(2)과, 다수의 옹벽패널(3)과, 쐐기형 지주대(4)와, 제 1걸림고리(5)와, 다수의 제 2걸림고리(61)를 갖는 매설블록(6)과, 연결와이어(7)를 포함하여 구성된다.2 and 3, the assembled retaining wall 1 of the present invention includes a base plate 2, a plurality of retaining wall panels 3, a wedge-shaped support base 4, and a first catching ring 5 ), A buried block (6) having a plurality of second locking rings (61), and a connecting wire (7).

상기 기초판(2)은 절개지가 조성된 도로변 또는 철로변 등에 시공되며, 절개지와 나란하게 콘크리트를 타설함으로써 구성된다. 이와 같은 기초판(2)은 콘크리트 본체(21)의 상부면에 다수의 제 1돌출구(211)가 소정간격을 두고 돌출형성되고, 이 제 1돌출구(211)에는 한 조의 고정홀(212)이 상기 본체(21)를 수직관통하도록 천공되고, 그 후방면에는 배수부재(22)가 삽입설치되는 배수부재설치홈(213)이 길이방향으로 마련된다. 이때, 상기 제 1돌출구(211), 한 조의 고정홀(212) 및 배수부재설치홈(213)은 상기 기초판(2)의 양생과정에서 형성하는 것이 바람직하다. 아울러, 상기 배수부재설치홈(213)에 설치되는 배수부재(22)는 그 일측에 상기 배수부재설치홈(213)과 대응하는 돌출부(221)가 마련되어 상기 배수부재설치홈(213)에 끼움방식으로 설치되는데, 이러한 배수부재(22)는 흡수력이 우수한 스티로폼 등을 적용함이 바람직하다.The base plate 2 is constructed on the roadside or railroad side where the cutout is formed, and is constructed by pouring concrete in parallel with the cutout. In the base plate 2, a plurality of first protrusions 211 protrude from the upper surface of the concrete body 21 at predetermined intervals, and a set of fixing holes 212 are formed in the first protrusions 211. The main body 21 is drilled to vertically penetrate the rear surface thereof, and a drain member mounting groove 213 into which the drain member 22 is inserted is provided in the longitudinal direction. At this time, the first protrusion 211, a set of fixing holes 212 and the drain member installation groove 213 is preferably formed during the curing process of the base plate (2). In addition, the drain member 22 installed in the drain member installation groove 213 is provided with a protrusion 221 corresponding to the drain member installation groove 213 on one side thereof is fitted into the drain member installation groove 213. Is installed as, such a drain member 22 is preferably applied to the styrofoam excellent absorption.

상기 옹벽패널(3)은 콘크리트 또는 합성수지재를 그 구성재질로써 적용할 수 있으며, 상기 각 제 1돌출구(211)의 상부에 상, 하, 좌, 우 방향으로 조립될 수 있도록 직사각패널형태로 제조된다. 이와 같은 옹벽패널(3)은 그 하부면에 상기 제 1 돌출구(211)가 삽입고정되는 수용홈(31)이 마련되고, 그 상부면에는 상기 제 1돌출구(211)와 동일한 구조의 제 2돌출구(32)가 돌출형성된다. 이때, 상기 수용홈(31)과 상기 제 1돌출구(211)의 사이에는 상기 고정홀(212)과 대응하는 위치에 한 조의 수직관통홀(33)이 천공된다. 또한, 상기 옹벽패널(3)의 양측면에는 삽입홈(34), 예컨대 "ㄷ"자홈 형태의 삽입홈(34)과 이 삽입홈(34)과 대응하는 형태의 삽입돌기(35)가 각각 형성되는데, 이와 같은 구성에 따르면, 여러 개의 옹벽패널(3)을 좌, 우 방향으로 연결할 때, 삽입홈(34)에 삽입돌기(35)를 끼워서 고정하는 방식으로 연결할 수 있다. 아울러, 상기 삽입홈(34)과 상기 삽입돌기(35)에는 적어도 하나의 체결홀(341,351)을 상호 대응하는 위치에 천공함이 바람직한데, 이와 같은 체결홀(341,351)을 통해 체결볼트(8)를 고정함으로써 더욱 견고한 결합상태를 유지할 수 있다. 한편, 상기 옹벽패널(3)의 전면에는 식재대(36), 예컨대 관상식물을 식재하기 위해 충분한 깊이가 부여되며 배수공(361)이 마련된 식재대(36)가 돌출된 형태로 구성된다. 또한, 상기 식재대(36)의 직상부에는 옹벽패널(3)을 관통하는 형태로 경사배수홀(37)이 천공되는데, 이와 같은 경사배수홀(37)은 옹벽패널(3)의 후면에서 전면으로 갈수록 하향 경사진 형태로 천공되며, 이러한 경사배수홀(37)에는 배수파이프(371), 예컨대 상기 옹벽패널(3)의 후면에 돌출된 일부분이 절개지에 매설되는 배수파이프(371)가 삽입설치된다. 여기서, 상기와 같은 옹벽패널(3)은 전술한 바와 같이 콘크리트 또는 합성수지재를 적용하여 제조됨에 따라서, 이러한 옹벽패널(3)에 형성되는 구성요소들은 옹벽패널(3)의 양생과정 또는 성형과정에서 형성함이 바람직하다.The retaining wall panel 3 may be applied to concrete or synthetic resin material as its constituent material, and manufactured in the form of a rectangular panel so that the retaining wall panel 3 may be assembled in the upper, lower, left, and right directions on the first protrusions 211. do. The retaining wall panel 3 has a receiving groove 31 into which the first protrusion 211 is inserted and fixed to a lower surface thereof, and a second protrusion having the same structure as the first protrusion 211 on the upper surface thereof. 32 is protruded. In this case, a set of vertical through holes 33 are drilled between the receiving grooves 31 and the first protrusions 211 at positions corresponding to the fixing holes 212. In addition, on both sides of the retaining wall panel 3, insertion grooves 34, for example, an insertion groove 34 in the form of a "c" groove and an insertion protrusion 35 corresponding to the insertion groove 34 are formed, respectively. According to such a configuration, when connecting the plurality of retaining wall panels 3 in the left and right directions, the insertion protrusions 35 may be inserted into the insertion grooves 34 to be fixed. In addition, it is preferable to drill at least one fastening hole (341, 351) in the position corresponding to each other in the insertion groove (34) and the insertion protrusion (35), through the fastening holes (341, 351) fastening bolt (8) It is possible to maintain a more tightly coupled state by fixing the. On the other hand, the front surface of the retaining wall panel 3 is provided with a planting stand 36, for example, a sufficient depth for planting the tubular plant and the planting stand 36 provided with a drain hole 361 protrudes. In addition, the inclined drainage hole 37 is drilled in the form of penetrating the retaining wall panel 3 in the upper portion of the planting stand 36, and the inclined drainage hole 37 is the front of the rear wall of the retaining wall panel 3. It is drilled in a downwardly inclined form, and the inclined drainage hole 37 has a drainage pipe 371, for example, a drainage pipe 371 in which a part of the rear wall of the retaining wall panel 3 is embedded in the incision is inserted and installed. do. Here, as the retaining wall panel 3 is manufactured by applying concrete or synthetic resin as described above, the components formed in the retaining wall panel (3) in the curing process or molding process of the retaining wall panel (3) It is preferable to form.

상기 쐐기형 지주대(4)는 원통형체로 구성되며, 그 상부면에 강재원판(41)이 설치된다. 이와 같은 쐐기형 지주대(4)는 그 몸체가 콘크리트로 구성되며, 상기 강재원판(41)은 쐐기형 지주대(4)의 양생과정에서 매설된다. 이때, 상기 쐐기형 지주대(4)는 상기 기초판(2)의 고정홀(212) 및 상, 하 적층조립되는 상기 각 옹벽패널(3)들의 수직관통홀(33)을 관통한 상태에서 지면에 쐐기형태로 고정됨과 아울러 그 상부가 옹벽패널(3)의 상부에 돌출되도록 충분한 길이를 부여함과 아울러 그 직경또한 상기 고정홀(212) 및 상기 수직관통홀(33)과 대응하도록 제조함이 바람직하다. 또한, 상기 강재원판(41)은 상기 쐐기형 지주대(4)를 별도의 해머장치에 의해 타격식으로 지면에 박을 때 해머장치의 타격력에 의해 상기 쐐기형 지주대(4)가 파손되는 것을 방지하는 기능을 수행하는데, 이러한 강재원판(41)의 내경은 나사결합공(411), 예컨대 암나사산이 형성된 나사결합공(411)으로 구성함이 바람직하다.The wedge-shaped support stand 4 is composed of a cylindrical body, the steel disc 41 is installed on the upper surface. Such wedge-shaped support post 4 is the body is made of concrete, the steel disc 41 is embedded in the curing process of the wedge-shaped support post (4). In this case, the wedge-shaped support stand 4 is grounded in the state passing through the fixing hole 212 of the base plate 2 and the vertical through-hole 33 of the retaining wall panel (3) laminated and assembled up and down It is fixed in a wedge shape and provided with a sufficient length so that its upper portion protrudes above the retaining wall panel 3, and its diameter also corresponds to the fixing hole 212 and the vertical through hole 33. desirable. In addition, the steel disc 41 is that the wedge-shaped support base 4 is damaged by the hammering force of the hammer device when the wedge-shaped support base 4 is hitting the ground by a separate hammer device To prevent the function, the inner diameter of the steel disc 41 is preferably composed of a screw coupling hole 411, for example, a screw coupling hole 411 formed with a female thread.

상기 제 1걸림고리(5)는 후크형태로 구성된다. 이와 같은 제 1걸림고리(5)의 하부에는 상기 강재원판(41)의 나사결합공(411)에 나사결합되는 나사결합구(51), 즉 수나사산이 형성된 나사결합구(51)가 마련된다.The first catching ring 5 is configured in the form of a hook. The lower portion of the first catching ring 5 is provided with a screw coupling hole 51, ie, a screw coupling hole 51 formed with a male thread, which is screwed into the screw coupling hole 411 of the steel disc 41. .

상기 매설블록(6)은 콘크리트로 제조된다. 이와 같은 매설블록(6)의 매설위치는 상기 제 1걸림고리(5)와 수평된 위치의 절개지에 매설되는데, 상기 제 1걸림고리(5)와 마주보는 전방면에는 상기 제 1걸림고리(5)와 대응하는 위치에 다수의 제 2걸림고리(61)가 돌출형성된다. 이때, 각 제 2걸림고리(61)는 상기 매설블록(6)의 양생과정에서 매설식으로 배열설치함이 바람직하다.The embedding block 6 is made of concrete. The buried position of the buried block 6 is buried in the incision of the position parallel to the first catching ring 5, the first catching ring (5) on the front surface facing the first catching ring (5) A plurality of second catching rings 61 are formed at positions corresponding to the protrusions. At this time, each second hook ring 61 is preferably installed in a buried manner in the curing process of the buried block (6).

상기 연결와이어(7)는 철재와이어를 적용하되, 적어도 상기 제 1걸림고리(5) 와 상기 제 2걸림고리(61)를 연결할 수 있는 길이가 부여된다. 이와 같은 연결와이어(7)는 그 일단과 타단에 연결고리(71, 71')가 마련된다. 이에 따라서, 상기 연결와이어(7)는 상기 각 연결고리(71, 71')를 상기 제 1걸림고리(5)와 상기 제 2걸림고리(61)에 걸림고정함으로써 상기 쐐기형 지주대(4)와 상기 매설블록(6)을 연결하게 된다.The connection wire 7 is applied to the steel wire, it is given a length that can connect at least the first hook 5 and the second hook (61). The connecting wire 7 is provided with connecting rings 71 and 71 'at one end and the other end thereof. Accordingly, the connection wire 7 is secured to the wedge-shaped support base (4) by locking each of the connecting rings (71, 71 ') to the first catching ring (5) and the second catching ring (61) And the buried block 6 is connected.

이에, 상기와 같은 구성을 갖는 본 발명에 따른 조립형 옹벽의 설치상태 및 이에 따른 각 구성요소 간의 작용상태에 대하여 살펴보기로 한다.Thus, the installation state of the assembled retaining wall according to the present invention having the configuration as described above and the operation state between each component accordingly will be described.

도 4는 본 발명에 따른 조립식 옹벽이 절개지에 시공된 상태를 설명하기 위한 측단면도이고, 도 5a는 본 발명에 따른 조립식 옹벽이 절개지에 시공된 상태에서 제 1걸림고리와 매설블록의 연결상태를 설명하기 위한 요부발췌 측 단면도이며, 도 5b는 본 발명에 따른 조립식 옹벽이 절개지에 시공된 상태에서 경사배수홀을 통해 우수가 배수되는 상태를 설명하기 위한 요부발췌 측 단면도이다.Figure 4 is a side cross-sectional view for explaining a state in which the prefabricated retaining wall is constructed in the incision according to the invention, Figure 5a is a connection state of the first hook and the buried block in the prefabricated retaining wall constructed in the incision Figure 5b is a sectional view of the excerpt side, Figure 5b is a sectional view of the excavation side sectional view for explaining the state in which rainwater is drained through the inclined drainage hole in the prefabricated retaining wall is constructed in the incision.

도 4를 참조하면, 본 발명의 옹벽(1)은 절재지(10)와 나란하게 콘크리트를 타설하여 기초판(2)을 시공하되, 이 기초판(2)의 후방면에는 배수부재설치홈(213)에 배수부재(22)를 끼움식으로 설치하고, 이러한 기초판(2)의 제 1돌출구(211)에 천공된 각 고정홀(212)을 통해 쐐기형 지주대(4)를 지면에 박아 고정한다. 이후, 옹벽패널(3)의 수직관통홀(33)에 쐐기형 지주대(4)를 삽입하는 방식으로 다수의 옹벽패널(3)을 상,하 적층식으로 조립하는데, 이때에는 옹벽패널(3)의 수용홈(31)에 기초판(2)의 제 1돌출구(211)를 삽입고정하고, 이러한 옹벽패널(3)의 상부에 적층되는 또 다른 옹벽패널(3')은 그 하부에 위치한 옹벽패널(3)의 제 2돌출구(32)를 수용홈(31')에 삽입하는 방식으로 적층 설치한다. 또한, 각 옹벽패널(3,3')을 좌, 우방향으로 연결하는 작업은 전술한 바와 같이 좌, 우 이웃하는 옹벽패널의 삽입홈(34)에 삽입돌기(35)를 끼워서 고정하는 방식으로 연결함으로써 수행되는데, 이때에는 각 삽입홈(34)과 삽입돌기(35)에 마련된 체결홀(351)을 통해 체결볼트(8)를 고정설치함으로써 견고하게 조립할 수 있다. 한편, 상기와 같이 옹벽패널(3,3')의 상, 하, 좌, 우 조립이 완성되면, 각 쐐기형 지주대(4)의 강재원판(41)에 제 1걸림돌기(5)를 나사고정하고, 이러한 제 1걸림돌기(5)의 위치와 대응하는 절개지(10)에는 도 5a에 확대 도시된 바와 같이 매설블록(6)을 매설한 상태에서 제 1걸림돌기(5)와 매설블록(6)의 제 2걸림돌기(61)를 연결와이어(7)에 의해 연결함으로써 옹벽의 시공이 완성된다. 이후에는 각 옹벽패널(3)의 식재대(36)에 토사를 소정두께로 담은 후 관상식물(20)을 식재한다. Referring to FIG. 4, the retaining wall 1 of the present invention constructs the foundation plate 2 by pouring concrete in parallel with the cutting paper 10, and the drainage member installing groove ( 213 is fitted into the drain member 22, and the wedge-shaped strut 4 is driven to the ground through each fixing hole 212 drilled in the first protrusion 211 of the base plate 2. Fix it. Subsequently, the plurality of retaining wall panels 3 are assembled in a vertical stacking manner by inserting the wedge-shaped support posts 4 into the vertical through holes 33 of the retaining wall panels 3, in which case the retaining wall panels 3 The first projection 211 of the base plate 2 is inserted into the receiving groove 31 of the crankshaft and another retaining wall panel 3 'laminated on the retaining wall panel 3 is retained at its lower portion. The second protrusions 32 of the panel 3 are laminated in such a manner as to be inserted into the receiving grooves 31 '. In addition, the operation of connecting the retaining wall panels 3 and 3 'in the left and right directions may be performed by inserting the insertion protrusion 35 into the insertion groove 34 of the left and right neighboring retaining wall panels as described above. It is performed by connecting, in this case it can be firmly assembled by fixing the fastening bolt (8) through the fastening hole 351 provided in each insertion groove 34 and the insertion projection (35). On the other hand, when the top, bottom, left and right assembly of the retaining wall panels 3 and 3 'is completed as described above, the first locking projection 5 is screwed to the steel disc 41 of each of the wedge-shaped support posts 4. The first locking protrusion 5 and the embedded block are fixed to the incision 10 corresponding to the position of the first locking protrusion 5 in a state in which the embedding block 6 is embedded as shown in FIG. 5A. The construction of the retaining wall is completed by connecting the second catching projection 61 of 6) by the connecting wire 7. Subsequently, the soil is placed in the planting stand 36 of each retaining wall panel 3 to a predetermined thickness, and then the tubular plant 20 is planted.

따라서, 상기와 같이 시공된 본 발명의 조립형 옹벽(1)은 각 옹벽패널(3)이 별도의 제조과정을 거친 후 시공장소에 완제품으로 조달할 수 있어 단순조립과정을 통해 시공작업을 수행할 수 있다. 아울러, 본 발명에서는 각 옹벽패널(3)을 적층하여 옹벽(1)을 시공함에 따라 옹벽패널(3)이 파손된 경우 그 파손부위만을 교체할 수 있기 때문에 유지, 보수가 용이한 장점이 있다. 아울러, 쐐기형 지주대(4)는 제 1걸림돌기(5)와 연결와이어(7)에 의해 매설블록(6)에 연결되어 지지됨에 따라서 견고한 시공상태를 유지할 수 있다. Therefore, the prefabricated retaining wall 1 of the present invention constructed as described above can be procured as a finished product in each factory after each retaining wall panel 3 undergoes a separate manufacturing process to perform a construction work through a simple assembly process. Can be. In addition, in the present invention, when the retaining wall panel 3 is damaged by stacking each retaining wall panel 3, only the damaged part thereof can be replaced, so that maintenance and repair are easy. In addition, the wedge-shaped support stand 4 can be maintained in a solid construction state as it is connected to and supported by the buried block 6 by the first locking projection 5 and the connection wire 7.

또한, 옹벽패널(3)의 전방에 마련된 식재대(36)에 관상식물(20)을 식재함에 따라서 주위환경과 어울리는 친환경적인 옹벽을 제공할 수 있는 것이다. In addition, by planting the tubular plant 20 in the planting table 36 provided in front of the retaining wall panel 3 can provide an environmentally friendly retaining wall that matches the surrounding environment.

한편, 기초판(2)에 설치된 배수부재(22)는 우천시 절개지(10)에 스며든 우수를 흡수하여 지중으로 배수하는 기능을 수행하며, 이와 아울러 옹벽패널(3)의 경사배수홀(37)에 삽입설치된 배수파이프(371)를 통해서도 절개지(10)에 스며든 우수를 배수하게 된다. 이때, 경사배수홀(37)은 도 5b에서와 같이 식재대(36)의 직상부에 위치됨에 따라서 배수파이프(371)를 통해 배수되는 우수는 식재대(36)에 낙하되어 관상식물의 식생용도로 사용된다.On the other hand, the drain member 22 installed on the base plate 2 absorbs rainwater that has soaked in the incision 10 when raining and performs drainage to the ground, and at the same time, the inclined drainage hole 37 of the retaining wall panel 3. The rainwater penetrating into the incision 10 is also drained through the drain pipe 371 inserted into the incision 10. At this time, as the inclined drainage hole 37 is located directly above the planting stand 36 as shown in FIG. 5B, the rainwater drained through the drainage pipe 371 falls on the planting stand 36 and is used for vegetation of the tubular plant. Used as

이상과 같이 본 발명에 따른 조립형 옹벽은 각 옹벽패널을 쐐기형 지주대에 의해 상, 하, 좌, 우로 적층 조립하여 시공됨에 따라서 그 시공작업이 용이함은 물론 유지, 보수작업 또한 간편하게 수행할 수 있다. 또한, 제 1걸림고리와 연결와이어 및 매설블록에 의해 쐐기형 지주대를 지지함에 따라서 결과적으로 볼 때 옹벽패널을 견고하게 지지할 수 있어서 최초의 시공상태를 지속적으로 유지할 수 있는 효과가 있다. 아울러, 각 옹벽패널의 전면에 관상식물이 식생할 수 있는 식재홈을 두어 시공장소의 주위환경과 적절하게 융화될 수 있는 장점이 있다.As described above, the assembled retaining wall according to the present invention is constructed by stacking each retaining wall panel in the up, down, left, and right directions by a wedge-shaped support stand, so that the construction work is easy and maintenance and repair work can be performed easily. have. In addition, by supporting the wedge-shaped strut by the first catching ring, the connecting wire and the buried block, the retaining wall panel can be firmly supported as a result, thereby maintaining the initial construction state continuously. In addition, there is an advantage that can be appropriately harmonized with the surrounding environment of the city plant by placing a planting groove for the tubular plants to vegetation on the front of each retaining wall panel.

Claims (2)

다수개의 배수홀이 형성된 옹벽 패널과, 그 옹벽 패널을 수직하게 관통하여 전도를 예방하도록 설치되는 지주대를 포함하고, 옹벽 패널의 전면에 돌출설치되는 식재대가 형성되어 식물 식재가 가능하고, 각각의 옹벽 패널에 형성된 돌기와 홈이 상호 계합되어 결합되는 구조로 절개지에 시공되는 옹벽에 있어서,A retaining wall panel having a plurality of drainage holes formed therein, and a support stand installed to vertically penetrate the retaining wall panel to prevent falling, and a planting stand protruding from the front surface of the retaining wall panel is formed to allow planting. In the retaining wall constructed in the incision in the structure in which the protrusions and the grooves formed in the retaining wall panel are engaged with each other, 상기 절개지와 나란하게 타설되는 콘크리트 본체의 상부면에 설치되는 기초판은, 다수의 제 1돌출구가 소정간격을 두고 돌출형성되며, 이 제 1돌출구에는 한 조의 고정홀이 상기 본체를 수직관통하도록 천공되고, 그 후방면에는 배수부재가 삽입설치되는 배수부재설치홈이 길이방향으로 마련되고, The base plate is installed on the upper surface of the concrete body to be placed in parallel with the incision, a plurality of first projections are formed to protrude at a predetermined interval, in which a set of fixing holes are perforated to vertically penetrate the body The rear surface is provided with a drainage member installation groove in which the drainage member is installed in the longitudinal direction, 상기 기초판의 상부면에 상, 하, 좌, 우 조립식으로 설치되는 다수개의 옹벽패널은, 그 하부면에 상기 제 1돌출구가 삽입고정되는 수용홈이 마련되고, 그 상부면에 상기 제 1돌출구와 동일한 구조의 제 2돌출구가 돌출형성되며, 상기 수용홈과 상기 제 1돌출구의 사이에는 상기 고정홀과 대응하는 위치에 한 조의 수직관통홀이 천공되고, 그 양측면에 삽입홈과 이 삽입홈과 대응하는 형태의 삽입돌기가 각각 형성되며, 식재대가 돌출형성된 직상부에 배수관이 삽입설치된 경사배수홀이 천공되며, A plurality of retaining wall panels are installed on the upper surface of the base plate in a top, bottom, left, and right assembly manner, and a receiving groove is provided in the lower surface of which the first protrusion is fixed, and the first protrusion is provided on the upper surface thereof. A second protrusion of the same structure as the protrusion is formed, and a set of vertical through holes are drilled in a position corresponding to the fixing hole between the receiving groove and the first protrusion, the insertion groove and the insertion groove and Insertion protrusions of a corresponding shape are formed respectively, and an inclined drainage hole in which a drainage pipe is inserted is drilled in an upper portion of the planting stand. 상기 기초판의 고정홀 및 상기 각 옹벽패널의 수직관통홀을 관통한 상태에서 지면에 쐐기형태로 고정되는 쐐기형 지주대는, 그 상부면에 나사결합공을 갖는 강재원판이 설치되며, Wedge-shaped struts fixed in the form of wedges on the ground in the state of penetrating the fixing holes of the base plate and the vertical through-holes of the respective retaining wall panels are provided with a steel disc having screwing holes on the upper surface thereof. 상기 강재원판의 나사결합공에 나사결합되는 제1걸림고리는, 나사결합구가 그 하부에 마련되며, The first catching ring screwed to the screwing hole of the steel disc, the screw engaging hole is provided below, 상기 제 1걸림고리와 수평된 위치의 상기 절개지면상에 매설되는 매설블록은, 그 전방면에 상기 제 1걸림고리와 대응하는 위치에 다수의 제 2걸림고리가 돌출형성되며, In the buried block embedded in the cut surface in a position parallel to the first catching ring, a plurality of second catching rings protrude from a position corresponding to the first catching ring on the front surface thereof. 상기 제 1걸림고리와 상기 제 2걸림고리에 걸림고정되는 연결와이어는 연결고리가 그 일단과 타단에 마련되는 것을 특징으로 하는 조립형 옹벽.The connecting wire is fixed to the first hook and the second hook ring is assembled retaining wall, characterized in that the connecting ring is provided at one end and the other end. 제 1항에 있어서,The method of claim 1, 상기 삽입홈과 상기 삽입돌기에는 체결볼트를 고정하기 위한 적어도 하나의 체결홀이 상호 대응하는 위치에 천공된 것을 특징으로 하는 조립형 옹벽.And the at least one fastening hole for fixing the fastening bolt is drilled at a position corresponding to each other in the insertion groove and the insertion protrusion.
KR1020050104287A 2005-11-02 2005-11-02 Road Retaining Retaining Wall Structure Expired - Fee Related KR100592720B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050104287A KR100592720B1 (en) 2005-11-02 2005-11-02 Road Retaining Retaining Wall Structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050104287A KR100592720B1 (en) 2005-11-02 2005-11-02 Road Retaining Retaining Wall Structure

Publications (1)

Publication Number Publication Date
KR100592720B1 true KR100592720B1 (en) 2006-06-28

Family

ID=37183143

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050104287A Expired - Fee Related KR100592720B1 (en) 2005-11-02 2005-11-02 Road Retaining Retaining Wall Structure

Country Status (1)

Country Link
KR (1) KR100592720B1 (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100774020B1 (en) * 2006-09-30 2007-11-08 김근수 Exposed concrete wall
KR100794203B1 (en) 2007-09-21 2008-01-11 주식회사 창미이엔지 Retaining wall structure
KR101019265B1 (en) * 2010-08-19 2011-03-07 (주)부광엔지니어링 Concrete retaining wall blocks for roads
KR101019294B1 (en) * 2010-08-19 2011-03-07 (주)부광엔지니어링 Road retaining wall module
CN106192884A (en) * 2016-09-07 2016-12-07 蒋安美 A kind of retaining wall for hydraulic engineering
KR101706919B1 (en) 2015-09-03 2017-02-15 자연 김 Panel retaining walls with displacement forecasting and its construction method
KR101728480B1 (en) * 2016-03-08 2017-05-31 (주)지아이건설 Retaining wall and construction method thereof
KR101775008B1 (en) * 2017-02-03 2017-09-04 강문기 Block for revetment construction
KR20190122294A (en) * 2018-04-20 2019-10-30 주식회사동림이엔지 Precast panel retaining wall

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6058647U (en) 1983-09-26 1985-04-24 千代田技研工業株式会社 Foundation blocks for wall construction
JPH0542331U (en) * 1991-11-19 1993-06-08 隆幸 堀口 Buttress type retaining wall basic block
JPH10152848A (en) 1996-11-21 1998-06-09 Modern Mateiriaru:Kk Retaining wall block
KR20040038440A (en) * 2002-11-01 2004-05-08 이정수 A Facing panel for reinforced earth wall and its construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6058647U (en) 1983-09-26 1985-04-24 千代田技研工業株式会社 Foundation blocks for wall construction
JPH0542331U (en) * 1991-11-19 1993-06-08 隆幸 堀口 Buttress type retaining wall basic block
JPH10152848A (en) 1996-11-21 1998-06-09 Modern Mateiriaru:Kk Retaining wall block
KR20040038440A (en) * 2002-11-01 2004-05-08 이정수 A Facing panel for reinforced earth wall and its construction method

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100774020B1 (en) * 2006-09-30 2007-11-08 김근수 Exposed concrete wall
KR100794203B1 (en) 2007-09-21 2008-01-11 주식회사 창미이엔지 Retaining wall structure
KR101019265B1 (en) * 2010-08-19 2011-03-07 (주)부광엔지니어링 Concrete retaining wall blocks for roads
KR101019294B1 (en) * 2010-08-19 2011-03-07 (주)부광엔지니어링 Road retaining wall module
KR101706919B1 (en) 2015-09-03 2017-02-15 자연 김 Panel retaining walls with displacement forecasting and its construction method
KR101728480B1 (en) * 2016-03-08 2017-05-31 (주)지아이건설 Retaining wall and construction method thereof
CN106192884A (en) * 2016-09-07 2016-12-07 蒋安美 A kind of retaining wall for hydraulic engineering
KR101775008B1 (en) * 2017-02-03 2017-09-04 강문기 Block for revetment construction
KR20190122294A (en) * 2018-04-20 2019-10-30 주식회사동림이엔지 Precast panel retaining wall
KR102155824B1 (en) * 2018-04-20 2020-09-14 주식회사동림이엔지 Precast panel retaining wall

Similar Documents

Publication Publication Date Title
KR101378793B1 (en) Retaining wall system for planting and the construction method
KR100592720B1 (en) Road Retaining Retaining Wall Structure
KR100795084B1 (en) Shareholder Base
KR101707170B1 (en) Structure for connecting support
KR20100053270A (en) Retaining wall and its construction method using tensioning anchor, pre-cast panel and pre-cast reinforcing panel
KR100902293B1 (en) Inorganic Freestanding Iron Bar
CA2804702C (en) A fence post assembly
KR200473276Y1 (en) Basic concrete for wood pillar
KR101401730B1 (en) Reinforcing method of bearing power for soft ground and reinforcing apparatus used in the same method
KR100481160B1 (en) The retaining wall for a block
KR102413915B1 (en) Noise barrier construction system using block module
KR20090063386A (en) Fence fall prevention structure
KR100560350B1 (en) Road Retaining Retaining Wall Structure
KR100568120B1 (en) Retaining wall structure using planting box
KR100587222B1 (en) Building prefab fence
KR20110042410A (en) Vegetation block, anchor for fixing vegetation block, vegetation retaining wall using the same, and construction method of the retaining wall
KR20200061555A (en) anchor block for a street lamp
KR100659134B1 (en) Slope reinforcement device and its method for permanent vegetation block
KR102123666B1 (en) Implant pile installer in architecture foundation system and a universal implant pile method
KR102100590B1 (en) Cut slope wall comprized of vegetation panel
KR102452899B1 (en) Method of manufacturing fence grounding stone and fence grounding stone manufactured thereby
KR100873183B1 (en) Post
KR20210000098A (en) Base structure for soundproof wall of roadway
KR100627403B1 (en) Earth plate structure for construction workers using rubber tube
KR100593187B1 (en) Eco-friendly slope protection facility

Legal Events

Date Code Title Description
A201 Request for examination
PA0109 Patent application

St.27 status event code: A-0-1-A10-A12-nap-PA0109

PA0201 Request for examination

St.27 status event code: A-1-2-D10-D11-exm-PA0201

N231 Notification of change of applicant
PN2301 Change of applicant

St.27 status event code: A-3-3-R10-R13-asn-PN2301

St.27 status event code: A-3-3-R10-R11-asn-PN2301

A302 Request for accelerated examination
PA0302 Request for accelerated examination

St.27 status event code: A-1-2-D10-D17-exm-PA0302

St.27 status event code: A-1-2-D10-D16-exm-PA0302

N231 Notification of change of applicant
PN2301 Change of applicant

St.27 status event code: A-3-3-R10-R13-asn-PN2301

St.27 status event code: A-3-3-R10-R11-asn-PN2301

P11-X000 Amendment of application requested

St.27 status event code: A-2-2-P10-P11-nap-X000

P13-X000 Application amended

St.27 status event code: A-2-2-P10-P13-nap-X000

R15-X000 Change to inventor requested

St.27 status event code: A-3-3-R10-R15-oth-X000

R16-X000 Change to inventor recorded

St.27 status event code: A-3-3-R10-R16-oth-X000

D13-X000 Search requested

St.27 status event code: A-1-2-D10-D13-srh-X000

D14-X000 Search report completed

St.27 status event code: A-1-2-D10-D14-srh-X000

E902 Notification of reason for refusal
PE0902 Notice of grounds for rejection

St.27 status event code: A-1-2-D10-D21-exm-PE0902

P11-X000 Amendment of application requested

St.27 status event code: A-2-2-P10-P11-nap-X000

P13-X000 Application amended

St.27 status event code: A-2-2-P10-P13-nap-X000

E701 Decision to grant or registration of patent right
PE0701 Decision of registration

St.27 status event code: A-1-2-D10-D22-exm-PE0701

GRNT Written decision to grant
PR0701 Registration of establishment

St.27 status event code: A-2-4-F10-F11-exm-PR0701

PR1002 Payment of registration fee

St.27 status event code: A-2-2-U10-U11-oth-PR1002

Fee payment year number: 1

PG1601 Publication of registration

St.27 status event code: A-4-4-Q10-Q13-nap-PG1601

PN2301 Change of applicant

St.27 status event code: A-5-5-R10-R13-asn-PN2301

St.27 status event code: A-5-5-R10-R11-asn-PN2301

PN2301 Change of applicant

St.27 status event code: A-5-5-R10-R13-asn-PN2301

St.27 status event code: A-5-5-R10-R11-asn-PN2301

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 4

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 5

FPAY Annual fee payment

Payment date: 20110615

Year of fee payment: 6

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 6

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

LAPS Lapse due to unpaid annual fee
PC1903 Unpaid annual fee

St.27 status event code: A-4-4-U10-U13-oth-PC1903

Not in force date: 20120617

Payment event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE

PC1903 Unpaid annual fee

St.27 status event code: N-4-6-H10-H13-oth-PC1903

Ip right cessation event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE

Not in force date: 20120617

P22-X000 Classification modified

St.27 status event code: A-4-4-P10-P22-nap-X000

P22-X000 Classification modified

St.27 status event code: A-4-4-P10-P22-nap-X000