KR20040105428A - The construction method using a falling-stone prevention net and this - Google Patents
The construction method using a falling-stone prevention net and this Download PDFInfo
- Publication number
- KR20040105428A KR20040105428A KR1020030036803A KR20030036803A KR20040105428A KR 20040105428 A KR20040105428 A KR 20040105428A KR 1020030036803 A KR1020030036803 A KR 1020030036803A KR 20030036803 A KR20030036803 A KR 20030036803A KR 20040105428 A KR20040105428 A KR 20040105428A
- Authority
- KR
- South Korea
- Prior art keywords
- wire rope
- fixture
- installing
- bolt
- slope
- Prior art date
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B02—CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
- B02C—CRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
- B02C1/00—Crushing or disintegrating by reciprocating members
- B02C1/02—Jaw crushers or pulverisers
- B02C1/04—Jaw crushers or pulverisers with single-acting jaws
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B02—CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
- B02C—CRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
- B02C1/00—Crushing or disintegrating by reciprocating members
- B02C1/02—Jaw crushers or pulverisers
- B02C1/10—Shape or construction of jaws
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Food Science & Technology (AREA)
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
Description
본 발명은 낙석 방지망 및 이를 이용한 시공방법에 관한 것으로, 특히 상단 고정구에 도르래를 설치하여 낙석 발생시 발생되는 충격에너지의 배분에 의한 흡수에너지가 증대될 뿐만 아니라 낙석 발생이나 낙석에 의한 파손시 하중의 재분배에 의하여 낙석이 흘러내리는데 따른 시간을 지연시킬 수 있으며, 또한 와이어로프 고정구에 완충장치를 설치하여 낙석에 의한 충격흡수 에너지가 증가될 뿐만 아니라 낙석 발생시 마찰력이 향상되도록 한 낙석 방지망 및 이를 이용한 시공방법에 관한 것이다.The present invention relates to a rockfall prevention network and a construction method using the same, and in particular, by installing a pulley on the upper fixture, the energy absorbed by the distribution of the impact energy generated when the rockfall occurs, as well as the redistribution of the load in the event of a rockfall or a rockfall It is possible to delay the time due to the falling of the falling rocks, and also to install the shock absorbing device in the wire rope fixture to increase the impact absorption energy due to the falling rocks, and to improve the frictional force when the falling rocks and the construction method using the same It is about.
일반적으로 낙석 방지망은 암석 절개 사면이 우수 등으로 인하여 붕괴되거나 낙석이 예상되는 개소에 설치되는 바, 크게 포켓식과 비포켓식 낙석방지망으로 구분된다.In general, the rockfall protection net is installed at a location where the rock cutting slope is collapsed or the rockfall is expected due to excellent rain, and is divided into a pocket type and a non-pocket type rockfall prevention net.
먼저, 상기 포켓식 낙석 방지망은 사면(S)과 낙석 방지망(10)을 일정한 간격으로 유지시켜 낙석 방지망(10)이 낙석에너지를 1차 흡수한 후 낙석을 사면 하단으로 유도시키는 것으로, 도 1에 도시된 바와 같이 암벽의 사면(S)이 우수 등으로 인하여 붕괴되거나 낙석이 예상되는 장소에 설치되는 방지망(10)과; 상기 방지망(10)상에 종횡으로 서로 교차 설치되는 와이어로프(20)와; 상기 와이어로프(20)가 교차된 지점에 설치됨과 동시에 이를 견고히 잡아주도록 설치되는 상단에 설치되는 상단 고정구(30a)와 하단에 설치되는 와이어로프 고정구(30b)로 구성된다.First, the pocket-type rockfall prevention net is to maintain the slope (S) and rockfall prevention net 10 at regular intervals by the rockfall prevention net 10 absorbs the first rockfall energy and then guides the rockfall to the bottom slope, Figure 1 As shown, the slope (S) of the rock wall is prevented due to rain or the like, the prevention net 10 is installed in a place where rockfall is expected; A wire rope 20 intersecting each other vertically and horizontally on the screen 10; At the same time the wire rope 20 is installed at the intersection and at the same time it is composed of a top fastener (30a) is installed on the top is installed to hold firmly and a wire rope fixture (30b) is installed on the bottom.
한편, 비포켓식 낙석방지망은 도 2에 도시된 바와 같이, 방지망(10)과 사면(S)과의 마찰 및 방지망(10)의 장력으로 사면(S)과 결합력을 상실한 암석을 구속하는 것으로, 와이어로프(20)의 각 교점마다 와이어로프 고정구(64)를 설치한 구조이다.On the other hand, the non-pocket type rock fall prevention net, as shown in Figure 2, by restraining the rock lost the slope (S) and the bonding force by the friction of the prevention net 10 and the slope (S) and the tension net 10, The wire rope fixture 64 is provided at each intersection of the wire rope 20.
그러나, 상기한 바와 같은 포켓식이나 비포켓식 낙석방지망은 와이어로프(20)에 고정구(30a, 30b, 64)를 고정 설치하여 낙석의 충격에 따른 충격에너지의 배분에 의한 흡수에너지를 흡수하려고 하나 와이어로프(20)와 고정구(30a, 30b, 64)간에 별다른 완충장치가 없으므로 낙석의 충격에 따른 충격에너지의 배분에 의한 흡수에너지 흡수능력이 저하되어 안전성 및 경제성이 저하되는 문제점이 있다.However, the pocket or non-pocket rockfall prevention net as described above is to fix the fixed fixtures (30a, 30b, 64) to the wire rope 20 to absorb the absorbed energy by the distribution of impact energy due to the impact of the rockfall Since there is no special buffer device between the wire rope 20 and the fixtures 30a, 30b, and 64, there is a problem in that the absorbed energy absorption capacity is reduced due to the distribution of impact energy due to the impact of falling rocks, thereby degrading safety and economic efficiency.
또한, 상기 와이어로프(20)와 고정구(30a, 30b, 64)의 고정시 낙석 발생시나 낙석 발생에 의해 파손시에는 하중을 별도로 분배하는 수단이 없기 때문에, 낙석이발생되면 낙석이 사면(S)의 하단방향으로 즉각적으로 하중이 작용하여 즉시 하단으로 흘러내려가는 문제점도 있다.In addition, since there is no means for separately distributing the load when the wire rope 20 and the fasteners 30a, 30b, and 64 are fixed when the rock is generated or when the rock is broken, the rock is sloped when the rock is generated. There is also a problem that the load acts immediately in the lower direction of the flow to the bottom immediately.
이에, 본 발명은 상기한 바와 같은 제문제점을 해결하기 위해 안출된 것으로써, 상단 고정구에 도르래를 설치하여 낙석 발생시 발생되는 충격에너지의 배분에 의한 흡수에너지가 증대될 뿐만 아니라 낙석 발생이나 낙석에 의한 파손시 하중의 재분배에 의하여 낙석이 흘러내리는데 따른 시간을 지연시킬 수 있으며, 또한 와이어로프 고정구에 완충장치를 설치하여 낙석에 의한 충격흡수 에너지가 증가될 뿐만 아니라 낙석 발생시 마찰력이 향상되도록 한 낙석 방지망 및 이를 이용한 시공방법을 제공하는데 그 목적이 있다.Thus, the present invention is devised to solve the problems described above, by installing a pulley on the upper fixture to increase the absorbed energy due to the distribution of impact energy generated when a rockfall occurs, as well as due to rockfall or rockfall It can delay the time of falling rock due to redistribution of load in case of damage, and also install a shock absorber on the wire rope fixture to increase the energy of absorbing impact caused by falling rock, and to improve the frictional force in case of falling rock. The purpose is to provide a construction method using the same.
도 1은 종래의 포켓식 낙석 방지망을 도시한 예시도,1 is an exemplary view showing a conventional pocket rockfall prevention net,
도 2는 종래의 비포켓식 낙석 방지망을 도시한 예시도,Figure 2 is an illustration showing a conventional non-pocket rockfall prevention net,
도 3은 본 발명에 따른 낙석 방지망을 도시한 평면도,3 is a plan view showing a rockfall protection net according to the present invention,
도 4는 본 발명에 따른 낙석 방지망을 도시한 측면도,Figure 4 is a side view showing a rockfall prevention net according to the invention,
도 5는 본 발명에 따른 낙석방지망의 와이어로프 고정구를 도시한 사시도,Figure 5 is a perspective view of the wire rope fixture of the rockfall prevention network according to the present invention,
도 6은 본 발명에 따른 낙석 방지망의 완충장치를 도시한 상세도.Figure 6 is a detailed view showing a shock absorber of the rockfall protection net according to the present invention.
-도면의 주요부분에 대한 부호의 설명-Explanation of symbols on the main parts of the drawing
10 : 방지망 20 : 와이어로프10: protection net 20: wire rope
30 : 와이어로프 고정구 30a : 상단 고정구30: wire rope fixture 30a: upper fixture
30b : 와이어로프 고정구 34 : 볼트홈30b: wire rope fixture 34: bolt groove
40 : 완충장치 42 : 천공부40: shock absorber 42: perforation
44 : 고정구볼트 46 : 주입재44: fastener bolt 46: injection material
47 : 플레이트 48 : 스프링47: plate 48: spring
49 : 너트 50 : 도르래49: nut 50: pulley
60 : 지주부 62 : 플레이트60: holding part 62: plate
64 : 와이어로프 고정구 64a : 록볼트64: wire rope fixture 64a: rock bolt
66 : 받침대 68 : H빔66: pedestal 68: H beam
69 : 힌지 70 : 고리69: hinge 70: ring
72 : 후크 74 : 간격재72: hook 74: spacer
S : 사면S: slope
상기한 목적을 달성하기 위한 본 발명에 따른 낙석 방지망은 암벽의 사면이 우수 등으로 인하여 붕괴되거나 낙석이 예상되는 장소에 설치되는 방지망과; 상기 방지망상에 종횡으로 서로 교차 설치되는 와이어로프와; 상기 와이어로프가 교차된 지점에 설치됨과 동시에 이를 견고히 잡아주도록 설치되는 와이어로프 고정구로 구성되는 통상의 낙석 방지망에 있어서, 상기 와이어로프 고정구에 관통 삽입됨과 동시에 와이어로프에 가해지는 충격을 흡수 완화시키는 완충장치와; 상기 고정구의 일측에 고정 설치됨과 동시에 와이어로프가 걸리는 도르래로 구성됨을 특징으로 한다.Rockfall protection net according to the present invention for achieving the above object is a barrier that is installed in the place where the rock slope is collapsed or due to excellent rock slope; A wire rope installed crosswise with each other vertically and horizontally on the screen; In the conventional rockfall prevention net consisting of a wire rope fastener is installed to hold at the same time as the wire rope intersected at the same time, the buffer is inserted into the wire rope fastener and at the same time absorbing and cushioning the shock applied to the wire rope An apparatus; It is characterized by consisting of a pulley that is fixed to one side of the fixture and at the same time the wire rope is caught.
또한, 상기한 목적을 달성하기 위한 본 발명에 따른 낙석 방지망을 이용한 시공방법은 암벽의 사면이 우수 등으로 인하여 붕괴되거나 낙석이 예상되는 지점에 낙석 방지망을 설치하는 방법에 있어서, 사면을 정리하는 단계; 상기 사면의 상단에 지주부를 설치하는 단계; 상기 지주부의 일측에 도르래를 설치하는 단계; 상기 사면에 방지망을 설치하는 단계; 상기 도르래에 와이어로프를 설치하는 단계; 상기 방지망과 와이어로프에 걸쳐 와이어로프 고정구를 설치하는 단계; 상기 와이어로프 고정구에 완충장치를 설치하는 단계로 이루어짐을 특징으로 한다.In addition, the construction method using the rockfall prevention net according to the present invention for achieving the above object in the method of installing the rockfall prevention net at the point where the rock slope is collapsed or the rockfall is expected due to the excellent slope, the step of arranging the slope ; Installing a support on an upper end of the slope; Installing a pulley on one side of the support; Installing a protection net on the slope; Installing a wire rope on the pulley; Installing a wire rope fixture over the screen and wire rope; Characterized in that the step of installing a shock absorber in the wire rope fixture.
이하, 본 발명을 첨부한 예시도면을 참조하여 상세히 설명한다.Hereinafter, with reference to the accompanying drawings, the present invention will be described in detail.
도 3은 본 발명에 따른 낙석 방지망을 도시한 평면도이며, 도 4는 본 발명에 따른 낙석 방지망을 도시한 측면도이며, 도 5는 본 발명에 따른 낙석방지망의 와이어로프 고정구를 도시한 사시도이며, 도 6은 본 발명에 따른 낙석 방지망의 완충장치를 도시한 상세도이다.Figure 3 is a plan view showing a rockfall prevention net according to the present invention, Figure 4 is a side view showing a rockfall prevention net according to the present invention, Figure 5 is a perspective view showing a wire rope fixture of the rockfall prevention net according to the invention, 6 is a detailed view showing a shock absorber of the rockfall protection net according to the present invention.
이들 도면에 도시된 바와 같이, 본 발명에 따른 낙석 방지망은 암벽의 사면(S)이 우수 등으로 인하여 붕괴되거나 낙석이 예상되는 장소에 설치되는 방지망(10)과; 상기 방지망(10)상에 종횡으로 서로 교차 설치되는 와이어로프(20)와; 상기 와이어로프(20)가 교차된 지점에 설치됨과 동시에 이를 견고히 잡아주도록 설치되는 고정구(30a, 30b, 64)로 구성되는 통상의 낙석 방지망에 있어서는 종래와 기술적 개념을 같이 한다.As shown in these figures, the rockfall prevention net according to the present invention is a barrier net 10 is installed in the place where the slope (S) of the rock wall collapsed due to the excellent or the like, rockfall is expected; A wire rope 20 intersecting each other vertically and horizontally on the screen 10; In the conventional rockfall prevention net consisting of fasteners (30a, 30b, 64) are installed to hold at the same time as the wire rope 20 is crossed at the same time, the same as the conventional concept.
단, 본 발명에 따른 낙석 방지망은 도 3 내지 도 5에 도시된 바와 같이, 상기 고정구(30)에 관통 삽입됨과 동시에 와이어로프(20)에 가해지는 충격을 흡수 완화시키는 완충장치(40)와; 상기 와이어로프 고정구(30)의 일측에 고정 설치됨과 동시에 와이어로프(20)가 걸리는 도르래(50)로 구성됨을 기술적 구성상의 특징으로 한다.However, the rockfall prevention net according to the present invention, as shown in Figures 3 to 5, and is inserted through the fixture 30 and at the same time the shock absorber 40 to absorb and mitigate the shock applied to the wire rope 20; It is characterized in that the technical configuration consists of a pulley 50 is fixed to one side of the wire rope fixture 30 and at the same time the wire rope 20 is caught.
즉, 본 발명에 따른 낙석 방지망은 크게 방지망(10), 와이어로프(20), 상단 와이어로프 고정구(30), 완충장치(40) 및 도르래(50)가 유기적으로 결합되어 이루어진 구조이다.That is, the rock fall prevention net according to the present invention is largely a structure consisting of the prevention net 10, the wire rope 20, the upper wire rope fixture 30, the shock absorber 40 and the pulley 50 is organically coupled.
여기서, 상기 완충장치(40)는 와이어로프 고정구(30)의 볼트홈(34)에 관통 삽입하되, 상기 와이어로프 고정구(30)의 하단 사면을 천공하여 형성된 천공부(42)와; 상기 와이어로프 고정구(30)의 볼트홈(34)에 관통 삽입함과 동시에 천공부(42)에 끼워지는 고정구볼트(44)와; 상기 천공부(42)에 끼워진 고정구볼트(44)의 유동을 방지하기 위해 고정구볼트(44)와 천공부(42)간에 주입되는 주입재(46)와; 상기 고정구볼트(44)와 와이어로프 고정구(30)간에 설치되는 스프링(48)과; 상기 고정구볼트(44)의 상단 외측에서 나사 결합되는 너트(49)와; 상기 스프링(48)과 너트(49)간에 개재되는 플레이트(47)로 구성된다.Here, the shock absorber 40 is inserted into the bolt groove 34 of the wire rope fixture 30, the punching portion 42 formed by drilling the lower slope of the wire rope fixture 30; A fastener bolt (44) inserted into the bolt groove (34) of the wire rope fixing member (30) and fitted into the drilling part (42); An injection material 46 injected between the fixture bolt 44 and the perforation part 42 to prevent the flow of the fixture bolt 44 fitted to the perforation part 42; A spring 48 installed between the fixture bolt 44 and the wire rope fixture 30; A nut 49 screwed outward from the upper end of the fixture bolt 44; It consists of a plate 47 interposed between the spring 48 and the nut 49.
이와 같이 완충장치(40)를 와이어로프(20)와 와이어로프 고정구(30)간에 설치하는 이유는 완충장치(40)의 설치시 일부 하중을 도입함에 의해 와이어로프(20)와 사면(S) 사이의 마찰력을 증가시켜 낙석 발생을 감소시키고, 또한 완충장치(40)의 스프링(48)에 의하여 낙석에 의한 충격하중 작용시 스프링(48)에서 충격을 완화시켜 낙석 흡수에너지가 향상될 뿐만 아니라 낙석에 의한 정하중 작용시 힘의 배분에 의한 마찰력이 향상되기 때문이다.The reason why the shock absorber 40 is installed between the wire rope 20 and the wire rope fixture 30 is that between the wire rope 20 and the slope S by introducing a partial load when the shock absorber 40 is installed. To reduce the occurrence of rockfall by increasing the frictional force of the shock absorber 40 and also to reduce the impact of the rockfall on the spring 48 during the impact load caused by the rockfall by the spring 48 of the shock absorber 40 to improve the absorption of rockfall as well as This is because the frictional force due to the force distribution during the static load action is improved.
또한, 상기 도르래(50)는 방지망(10)의 상부와 양측면 중 취약부쪽에 최소 2개씩 설치하고, 그 이외의 부분은 방지망(10)을 고정토록 한다.In addition, the pulley 50 is installed at least two at the weak side of the upper side and both sides of the guard net 10, the other parts to fix the guard net (10).
이는, 만일 도르래(50)가 없을 경우에는 사면(S)의 취약지형에서는 낙석 및 토사가 흘러내려 방지망(10)에 걸릴 때 방지망(10)의 어느 한쪽으로 힘이 치우치게 되므로, 이점을 방지하기 위하여 지형상 취약부분에 도르래(50)를 설치하여, 상기한 힘의 편중을 방지하여 균일하게 힘의 균형을 유지토록 하고, 주변 와이어로프(20)가 일체로 낙석을 제어하도록 하기 위함이다.This is because, if there is no pulley 50, in the weak terrain of the slope (S), rockfall and earth and sand flows down to either side of the guard net 10 when caught by the guard net 10, in order to prevent the advantage By installing the pulley 50 in the weak part of the terrain, to prevent the bias of the force to maintain the balance of force uniformly, and to allow the surrounding wire rope 20 to control the rockfall integrally.
이하, 상기한 바와 같은 구성으로 이루어진 본 발명에 따른 낙석 방지망의 시공에 대해서 설명한다.Hereinafter, the construction of the rockfall prevention net according to the present invention having the configuration as described above will be described.
먼저, 포켓식 낙석 방지망을 이용한 시공방법은 암벽의 사면(S)이 우수 등으로 인하여 붕괴되거나 낙석이 예상되는 지점에 낙석 방지망을 설치하는 방법에 있어서, 사면(S)을 정리하는 단계; 상기 사면(S)의 상단에 지주부(60)를 설치하는 단계; 상기 지주부(60)의 일측에 도르래(50)를 설치하는 단계; 상기 사면(S)에 방지망(10)을 설치하는 단계; 상기 도르래(50)에 와이어로프(20)를 설치하는 단계; 상기 방지망(10)과 와이어로프(20)에 걸쳐 와이어로프 고정구(30)를 설치하는 단계; 상기 와이어로프 고정구(30)에 완충장치(40)를 설치하는 단계로 이루어진다.First, the construction method using a pocket type rockfall prevention net is a method of installing a rockfall prevention net at a point where the rock slope (S) is collapsed due to the excellent or the like, the rockfall prevention step, arranging the slope (S); Installing a holding unit 60 on the top of the slope (S); Installing a pulley (50) on one side of the support (60); Installing a safety net (10) on the slope (S); Installing a wire rope (20) on the pulley (50); Installing a wire rope fixture (30) over the barrier net (10) and the wire rope (20); Comprising the step of installing the shock absorber 40 to the wire rope fixture (30).
여기서, 상기 상단 지주부(60) 설치단계는 사면(S)에 플레이트(62)를 배치하고, 상기 플레이트(62)를 록볼트(64a)로 관통 삽입하여 고정하며, 상기 플레이트(62)상에 받침대(66)를 용접 결합하며, 상기 받침대(66)상에 H빔(68)을 힌지(69)로 결합하여 설치한다.Here, in the step of installing the upper support 60, the plate 62 is disposed on the slope S, and the plate 62 is inserted and fixed through the lock bolt 64a to fix the plate 62 on the plate 62. The pedestal 66 is welded to each other, and the H beam 68 is installed by the hinge 69 on the pedestal 66.
또한, 상기 완충장치(40) 설치단계는 와이어로프 고정구(30)의 하단 사면(S)을 천공하여 천공부(42)를 형성하고, 상기 천공부(42)에 소정의 길이의 고정구볼트(44)를 삽입하며, 상기 천공부(42)와 고정구볼트(44)간에 주입재(46)를 주입하여 경화시키며, 상기 고정구볼트(44)의 상단에 와이어로프 고정구(30)의 볼트홈(34)을 끼워서 와이어로프 고정구(30)를 삽입하며, 상기 와이어로프 고정구(30)상의 고정구볼트(44)의 외주면에 스프링(48)을 삽입하며, 상기 스프링(48)상에 플레이트(47)을 끼우며, 상기 플레이트(47)의 상단과 고정구볼트(44)의 상단을 너트(49)로 고정한다.In addition, in the installing step of the shock absorber 40, the bottom slope S of the wire rope fixture 30 is drilled to form the perforated part 42, and the fastener bolt 44 having a predetermined length in the perforated part 42. ) And insert the injection material 46 between the perforations 42 and the fastener bolts 44 to harden the bolt grooves 34 of the wire rope fixtures 30 on the upper ends of the fastener bolts 44. Inserting the wire rope fixture 30, inserting the spring 48 on the outer circumferential surface of the fixture bolt 44 on the wire rope fixture 30, and inserting the plate 47 on the spring 48, The upper end of the plate 47 and the upper end of the fastener bolts 44 are fixed with a nut 49.
한편, 상기한 바와 같은 포켓식 낙석 방지망을 이용한 시공 외에 비포켓식 낙석 방지망을 이용한 시공방법은 암벽의 사면(S)이 우수 등으로 인하여 붕괴되거나 낙석이 예상되는 지점에 낙석 방지망을 설치하는 방법에 있어서, 사면(S)에 방지망(10)을 헬기나 중장비를 이용하여 설치하는 단계; 상기 방지망(10)의 외측에 종횡으로 와이어로프(20)를 설치하는 단계; 상기 와이어로프(20)가 교차되는 부분에 와이어로프 고정구(30)를 설치하는 단계; 상기 와이어로프 고정구(30)에 완충장치(40)를 설치하는 단계; 상기 와이어로프 고정구(30)의 상단에 도르래(50)를 설치하는 단계로 이루어진다.On the other hand, the construction method using the non-pocket rockfall prevention net in addition to the construction using the pocket rockfall prevention net as described above in the method of installing the rockfall prevention net at the point where the rock slope or collapsed due to the excellent slope (S) of the rock wall In the step (S) to install the protection net 10 by using a helicopter or heavy equipment; Installing a wire rope (20) vertically and horizontally on the outside of the protection net (10); Installing a wire rope fixture (30) at a portion where the wire rope (20) intersects; Installing a shock absorber (40) on the wire rope fixture (30); Comprising the step of installing the pulley (50) on the top of the wire rope fixture (30).
여기서, 상기 완충장치(40) 설치단계는 와이어로프 고정구(30)의 하단 사면(S)을 천공하여 천공부(42)를 형성하고, 상기 천공부(42)에 소정의 길이의 고정구볼트(44)를 삽입하며, 상기 천공부(42)와 고정구볼트(44)간에 주입재(46)를 주입하여 양생하며, 상기 고정구볼트(44)의 상단에 와이어로프 고정구(30)를 끼워 삽입하며, 상기 와이어로프 고정구(30)상 고정구볼트(44)의 외주면에 스프링(48)를 삽입하며, 상기 스프링(48)상에 플레이트(47)을 끼우며, 상기 플레이트(47)의 상단과 고정구볼트(44)의 상단을 너트(49)로 함께 고정한다.Here, in the step of installing the shock absorber 40, the bottom slope S of the wire rope fixture 30 is formed to form the perforated portion 42, and the fastener bolt 44 having a predetermined length in the perforated portion 42. ) And inserting and curing the injection material 46 between the perforations 42 and the fixture bolts 44, inserting the wire rope fixtures 30 into the upper ends of the fixture bolts 44, and inserting the wires. The spring 48 is inserted into the outer circumferential surface of the fastener bolt 44 on the rope fastener 30, and the plate 47 is inserted on the spring 48, and the upper end of the plate 47 and the fastener bolt 44 are inserted into the spring 48. Secure the top of the nut together with a nut (49).
또한, 상기 도르래(50) 설치단계는 와이어로프 고정구(30) 상부와 양측면에 2개씩 각각 설치함과 동시에 방지망(10)을 고정한다.In addition, in the installation step of the pulley 50, the wire rope fixture 30 is installed on each of the upper and both sides and at the same time to fix the guard net (10).
이상에서 설명한 바와 같이, 본 발명에 따른 낙석 방지망 및 이를 이용한 시공방법은 다음과 같은 효과가 있다.As described above, the rockfall prevention net and the construction method using the same according to the present invention has the following effects.
첫째, 본 발명에 따른 낙석 방지망 및 이를 이용한 시공방법은 낙석에 따른 흡수 에너지를 향상시켜 와이어로프와 낙석 방지망의 파단을 감소시키는 이점이 있다.First, the rockfall protection net and the construction method using the same according to the present invention has the advantage of reducing the breakage of the wire rope and rockfall prevention net by improving the absorption energy due to rockfall.
둘째, 본 발명에 따른 낙석 방지망 및 이를 이용한 시공방법은 고정구볼트에 가해지는 하중을 경감시켜 안전성을 향상시키는 효과가 있다.Second, the rockfall prevention net and the construction method using the same according to the present invention has the effect of improving the safety by reducing the load applied to the fastener bolts.
셋째, 본 발명에 따른 낙석 방지망 및 이를 이용한 시공방법은 낙석 발생시 낙석의 포집 시간 및 낙석으로 인한 파괴시간을 지연시켜 안전성을 향상시키는 효과가 있다.Third, the rockfall prevention network and the construction method using the same according to the present invention has the effect of delaying the collection time of the rockfall and the destruction time due to the rockfall when the rockfall occurs, thereby improving safety.
넷째, 본 발명에 따른 낙석 방지망 및 이를 이용한 시공방법은 와이어로프의 간격을 증대시킬 뿐만 아니라 고정구볼트의 개수가 절감되며, 고정구볼트의 설치깊이의 저감으로 인하여 경제성이 향상되는 이점이 있다.Fourth, the rockfall prevention net and the construction method using the same according to the present invention has the advantage of increasing the spacing of the wire rope as well as the number of fastener bolts, economic efficiency due to the reduction of the installation depth of the fastener bolts.
다섯째, 본 발명에 따른 낙석 방지망 및 이를 이용한 시공방법은 와이어로프의 파단시 교체가 편리할 뿐만 아니라 유지보수가 편리한 이점이 있다.Fifth, the rockfall prevention net and the construction method using the same according to the present invention has the advantage that it is easy to replace when breaking the wire rope, as well as convenient maintenance.
여섯째, 본 발명에 따른 낙석 방지망 및 이를 이용한 시공방법은 사면의 경사가 증가되는 장소나 불량지역의 개발 등에 사용되는 이점이 있다.Sixth, the rockfall prevention net and the construction method using the same according to the present invention has the advantage of being used in the development of a place or a bad area where the slope of the slope is increased.
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2003-0036803A KR100533117B1 (en) | 2003-06-09 | 2003-06-09 | The construction method using a falling-stone prevention net and this |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2003-0036803A KR100533117B1 (en) | 2003-06-09 | 2003-06-09 | The construction method using a falling-stone prevention net and this |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR20-2003-0018001U Division KR200326748Y1 (en) | 2003-06-09 | 2003-06-09 | falling-stone prevention net |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20040105428A true KR20040105428A (en) | 2004-12-16 |
KR100533117B1 KR100533117B1 (en) | 2005-12-05 |
Family
ID=37380486
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR10-2003-0036803A KR100533117B1 (en) | 2003-06-09 | 2003-06-09 | The construction method using a falling-stone prevention net and this |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100533117B1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100717664B1 (en) * | 2005-07-05 | 2007-05-11 | 심석래 | A Wire Rope Fixing Device for Falling Rock Prevention |
KR100859209B1 (en) * | 2008-04-02 | 2008-09-18 | 하리기술이십이 주식회사 | Net for rreventing falling rock |
KR200483991Y1 (en) * | 2016-06-07 | 2017-07-17 | 주식회사 성화휀스 | Anchor protection type prevention structure for falling stone |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100836630B1 (en) | 2007-12-28 | 2008-06-11 | 주식회사 엔에이건설 | A falling stone preventing net |
KR101337324B1 (en) | 2011-11-23 | 2013-12-06 | 한국건설기술연구원 | Tension and compression type rockfall protection net, and constructing method for the same |
-
2003
- 2003-06-09 KR KR10-2003-0036803A patent/KR100533117B1/en not_active IP Right Cessation
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100717664B1 (en) * | 2005-07-05 | 2007-05-11 | 심석래 | A Wire Rope Fixing Device for Falling Rock Prevention |
KR100859209B1 (en) * | 2008-04-02 | 2008-09-18 | 하리기술이십이 주식회사 | Net for rreventing falling rock |
KR200483991Y1 (en) * | 2016-06-07 | 2017-07-17 | 주식회사 성화휀스 | Anchor protection type prevention structure for falling stone |
Also Published As
Publication number | Publication date |
---|---|
KR100533117B1 (en) | 2005-12-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4758922B2 (en) | Receiving fence for avalanche, fallen rock or fallen tree | |
KR101682624B1 (en) | Shock absorption and pressure type prevention net for falling stone and construction method | |
CN102587395B (en) | Flexible initiative protective screen system of slope domatic antidetonation | |
KR20190090188A (en) | Tunnel type rockfall protection structure having variable pole part for shock absorbing | |
KR101905473B1 (en) | Net structure for preventing falling rock using shock-absorbing wire rope locking device | |
KR101572505B1 (en) | Fence for protecting from rocks falling on slope | |
KR101174619B1 (en) | Rockfall protection fence for distributing and absorbing impect energy | |
KR100976269B1 (en) | Bracket of wire lope for rockslide preventing net and constructing method of rockslide preventing net using this | |
KR100533117B1 (en) | The construction method using a falling-stone prevention net and this | |
KR101530081B1 (en) | A bumper unit include slot and method for constructing rockfall protection facilities using this same | |
KR101207714B1 (en) | Rockfall protection fence for distributing and absorbing impect energy | |
JP2007077672A (en) | Shock absorbing fence | |
KR200326748Y1 (en) | falling-stone prevention net | |
JP5414555B2 (en) | Protective fence | |
KR101121688B1 (en) | A wire fixing apparatus and construction method | |
JP3593609B2 (en) | Shock absorbing fence | |
KR102143454B1 (en) | Wirenet assembly for reinforcing slopes | |
KR101174355B1 (en) | Fixing device for bridge decoration material installation and construction method of decoration material using thereof | |
KR200287832Y1 (en) | wire rope a distance maintenance structure for rockfall protection fence | |
KR100659377B1 (en) | A wire rope buffer, the falling-stone prevention net using this, and the construction method of this | |
JP2003003425A (en) | Shock-absorbing guard fence | |
KR100888627B1 (en) | Guardrail structure for greening and increase of supporting force | |
JP3842399B2 (en) | Girder fall prevention device for bridge | |
JP3842400B2 (en) | Girder fall prevention device for bridge | |
KR100249648B1 (en) | Erection method of pretection wall against falling stones |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
N231 | Notification of change of applicant | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20081030 Year of fee payment: 6 |
|
LAPS | Lapse due to unpaid annual fee |