KR20040087603A - A drainage promotion apparatus of subsurface water and its construction method - Google Patents
A drainage promotion apparatus of subsurface water and its construction method Download PDFInfo
- Publication number
- KR20040087603A KR20040087603A KR1020030022048A KR20030022048A KR20040087603A KR 20040087603 A KR20040087603 A KR 20040087603A KR 1020030022048 A KR1020030022048 A KR 1020030022048A KR 20030022048 A KR20030022048 A KR 20030022048A KR 20040087603 A KR20040087603 A KR 20040087603A
- Authority
- KR
- South Korea
- Prior art keywords
- pipe
- groundwater
- spiral
- ground
- hole
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B11/00—Drainage of soil, e.g. for agricultural purposes
- E02B11/005—Drainage conduits
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/028—Laying or reclaiming pipes on land, e.g. above the ground in the ground
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Agronomy & Crop Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
Description
본 발명은 지하수 배수촉진장치 및 그 시공방법에 관한 것으로 보다 상세하게는 쓰레기 매립지나 침투방지공, 수로공, 암거공등의 하부 지하에 지하수 집배수관을 배관함에 있어서, 배관시 관의 매설길이에 대한 제한이 없어 다수개의 관을 연결하지 않고 하나의 관으로 손쉽게 배관할 수 있고, 여과포가 관 외측에 피복되어 있어 각각의 관마다 일일이 자갈을 적층시킨 후 부직포를 덮어 이물질이 관내로 유입되는 것을 방지하는 시공상의 불편함을 해소하고, 또한 관을 매설함으로서 발생됐던 골재구입에 따른 재료비가 절감되고 인력과 장비의 손실을 줄일 수 있는 지하수 배수촉진장치 및 그 시공방법에 관한 것이다.The present invention relates to a groundwater drainage promotion device and a construction method thereof, and more particularly, in the groundwater drainage pipe in the lower basement such as landfills, infiltration prevention holes, waterways, culverts, etc. There is no restriction on the number of pipes, so it can be easily piped into one pipe without connecting multiple pipes.The filter cloth is covered on the outside of the pipe, so that each pipe is laminated with gravel and then covered with a non-woven fabric to prevent foreign substances from entering the pipe. The present invention relates to a groundwater drainage promotion device and a construction method thereof, which can solve the inconvenience of construction and reduce the material cost and loss of manpower and equipment caused by the purchase of aggregates.
일반적으로 지하수를 배수하기 위하여 쓰레기 매립지등의 구조물 하측 지하에 지반의 침하를 방지하기 위하여 상부구조물 보다 넓게 지하수 집수 본관과 지관을 매설하여 지하수를 집배수 하였고, 또한 지하수를 효율적으로 배수하기 위하여 배수관의 구조나 관 연결부의 연결 상태에 대한 많은 연구가 이루어져 왔다.In general, in order to prevent ground subsidence in the ground below the structures such as landfills, in order to prevent ground subsidence, the groundwater collection main and branch pipes are installed more widely than the superstructure, and the groundwater is collected and drained. Much research has been done on the structure and connection of pipe connections.
종래의 지하에 설치된 지하수 집배수관의 구조에 대하여 쓰레기 매립지의 지하에 설치된 지하수 배수관을 예를 들어 설명하면 도 1, 도 2 및 도 3에서와 같이 차수벽(2)으로 둘러싸인 쓰레기 매립지(1)의 하부 지하에 침하를 방지하기 위하여 쓰레기 매립지의(1) 중심을 가로지르고 매립지의 크기보다 넓게 지하수 집수 주관(3)을 배관하고, 상기 지하수 집수 주관(3)의 양측으로 다수개가 배열되어 결합되며 연결부(8)에 의해 연장 배관되는 다수개의 홀이 천공된 유공관(4)을 매설한다. 상기 유공관(4)관의 매설시에는 관의 반경정도 깊이로 지면을 굴착한 다음 관을 배관하고 매설 길이가 길어지면 관 끝단에 형성되어 있는 연결부를 통해 다수개의 유공관(4)을 연결하여 배관한 후 상부에 자갈(14)을 적층시키고, 상기 자갈(14)에 부직포(6)를 덮은 후 토사나 점토등으로 완전히 매설한다.For example, the groundwater drainage pipe installed in the basement of the waste landfill will be described with reference to the structure of the groundwater drainage pipe installed in the conventional underground. As shown in FIGS. 1, 2 and 3, the lower part of the waste landfill 1 surrounded by the water barrier wall 2 is shown. In order to prevent subsidence in the basement, the groundwater collecting main pipe 3 is piped across the center of the landfill 1 and wider than the size of the landfill, and a plurality of the groundwater collecting main pipes 3 are arranged and coupled to both sides of the groundwater collecting main pipe 3. The hole hole 4 which perforated the several hole extended by 8) is embedded. When embedding the perforated pipe (4) pipe excavated the ground to the depth of the radius of the pipe and then pipe the pipe and if the length of the buried length is connected by connecting a plurality of perforated pipe (4) through the connection formed at the end of the pipe Later, the gravel 14 is stacked on top, and the gravel 14 is covered with a nonwoven fabric 6 and then completely embedded in soil, clay, or the like.
상술한 바와 같은 종래의 지하수 배수관 매설방법은 유공관(4)의 배관 길이가 길어지면 연결부(8)의 결합을 통해 다수개의 관을 연결하게 되는데, 상기 연결부(8)에 의한 연결방법은 연결부(8)에 작용하는 하중에 의해 연결부(8)가 쉽게 찌그러져 누수가 발생하게 되고, 또한 유공관(4)의 매설시 관 상부에 자갈(14)을 적층시키고 상기 자갈(14)위에 부직포(6)를 덮어 관을 매설함으로서 매설방법이 번거롭고 골재구입에 따른 재료비가 많이 들며 인력과 장비의 소모가 많아 공사비용이많아지는 문제점이 있다.In the conventional groundwater drainage pipe embedding method as described above, when the length of the pipe of the perforated pipe 4 becomes longer, the plurality of pipes are connected through the coupling of the connection part 8, and the connection method by the connection part 8 is the connection part 8. The connection part 8 is easily crushed by a load acting on the cuff, and leakage occurs. Also, when the perforated tube 4 is buried, the gravel 14 is laminated on the upper part of the tube and the nonwoven fabric 6 is covered on the gravel 14. By laying the pipe, the method of laying is cumbersome, the material cost is high due to the purchase of aggregate, and the cost of construction is high due to the high consumption of manpower and equipment.
본 발명은 상기와 같은 종래의 문제점을 해결하기 위하여 창출되는 것으로, 구조물의 하부 지하에 지하수 집수 주관을 매설하고, 상기 지하수 집수 주관의 양측으로 다수개가 결합되어 배관되며 외부면에 나선형의 주름이 형성되어 있고 외측으로 여과포가 피복된 나선형 주름 유공관으로 구성되어 지하수를 흡수하고, 상기 나선형 주름 유공관은 관의 매설 길이에 대한 제한이 없어 필요한 길이에 따라 절단하여 사용하고 배관한 다음 바로 토사등으로 매설할 수 있어서 관의 매설이 쉬워지고 관에 연결부가 없어 연결부의 찌그러짐으로 인한 누수가 발생하지 않는 지하수 배수촉진장치 및 그 시공방법을 제공함을 목적으로 한다.The present invention is created to solve the conventional problems as described above, buried underground water collecting main pipe in the lower basement of the structure, a plurality of pipes are coupled to both sides of the ground water collecting main pipe and spiral wrinkles formed on the outer surface It consists of a spiral corrugated perforated tube coated with a filter cloth on the outside to absorb ground water, and the spiral corrugated perforated tube has no limitation on the length of the buried length of the tube. The purpose of the present invention is to provide a groundwater drainage facilitating device and a construction method thereof in which the pipe can be easily buried and there is no connection part in the pipe so that no leakage occurs due to the crushing of the connection part.
상기 목적을 달성하기 위한 본 발명은 구조물의 하부 지하에 일정깊이를 두고 매립되는 지하수 집수 주관과, 상기 지하수 집수 주관의 양측에 연결되어 일정간격으로 나선형 주름 유공관이 상부 구조물의 크기보다 넓게 배관되어 있는 것으로 구성된 지하수 배수촉진장치 및 그 시공방법을 제공함에 있다.The present invention for achieving the above object is connected to both sides of the groundwater collecting pipe and the groundwater collecting pipe which is buried with a certain depth in the lower basement of the structure, spirally corrugated perforated pipe is piped wider than the size of the upper structure at regular intervals It is to provide a groundwater drainage promoting device and a construction method thereof.
도 1 은 종래의 관 연결 구성도,1 is a conventional pipe connection configuration,
도 2 는 하중을 받아 찌그러진 종래의 유공관 상태도,2 is a state diagram of a conventional hole pipe crushed under load;
도 3 는 종래의 유공관의 사시도 및 측면도,3 is a perspective view and a side view of a conventional perforated tube,
도 4 은 본 발명의 나선형 주름 유공관의 사시도 및 측면도,4 is a perspective view and a side view of the spiral pleated perforated tube of the present invention;
도 5 는 본 발명의 쓰레기 매립지에 설치된 실시예의 사시도,5 is a perspective view of an embodiment installed in a landfill of the present invention,
도 6 은 본 발명의 쓰레기 매립지에 설치된 실시예의 단면도,6 is a cross-sectional view of an embodiment installed in a landfill of the present invention;
도 7 는 본 발명의 침투방지공에 설치된 실시예도,7 is an embodiment installed in the penetration prevention hole of the present invention,
도 8 는 본 발명의 경사면과 수로공에 설치된 실시예도,8 is an embodiment installed on the inclined surface and the waterway of the present invention,
도 9 은 본 발명의 암거공에 설치된 실시예도.Figure 9 is an embodiment installed in the culvert of the present invention.
<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>
(1) : 쓰레기 매립지 (2) : 차수벽(1): landfill (2): water barrier
(3) : 지하수 집수 주관 (4) : 유공관(3): Groundwater collection supervisor (4): Merit pipe
(5) : 나선형 주름 유공관 (6) : 부직포(5): spiral corrugated perforated tube (6): nonwoven fabric
(7) : 토사 (8) : 연결부(7): earth and sand (8): connection
(9) : 여과포 (10) : 집수조(9): filter cloth (10): sump
(11) : 쓰레기 (12) : 침출수 집수 주관(11): Garbage (12): Organizing leachate collection
(13) : 침출수 집수 지관 (14) : 자갈(13): Leachate Collection Branch (14): Gravel
(15) : 수로공 (16) : 암거공(15): water hole (16): culvert
(17) : 침투방지공(17): Penetration prevention ball
상기한 바와 같은 목적을 달성하고 종래의 결점을 제거하기 위한 과제를 수행하는 본 발명의 구성 및 작용을 첨부도면에 연계시켜 상세히 설명하면 다음과 같다.The construction and operation of the present invention to achieve the object as described above and to perform the task for eliminating the conventional drawbacks will be described in detail with reference to the accompanying drawings.
도 4 는 본 발명의 나선형 주름 유공관의 사시도 및 측면도로서, 나선형 주름 유공관(5)은 외부면에 일정간격으로 나선형의 주름이 형성되어 있고, 그 사이사이에 물이 흡수되도록 일정크기의 홀이 천공되어 있으며, 외측으로 여과포(9)가 피복되어 있다.Figure 4 is a perspective view and a side view of the spiral pleated perforated tube of the present invention, the spiral pleated perforated tube 5 is formed on the outer surface of the spiral pleat at regular intervals, the hole of a predetermined size so that water is absorbed therebetween The filter cloth 9 is coated on the outside.
상기 나선형 주름 유공관(5)의 외측에 피복된 여과포(9)는 관의 매설 후 관내로 토사나 기타 이물질이 유입되는 것을 막아주며, 종래와 같이 여과포가 피복되지 않는 관에서는 토사나 기타 이물질이 흡입되는 것을 방지하기 위해 관 상부에 일일이 자갈(14)을 적층한 후 부직포(6)를 덮은 다음 토사로 관을 매설해야하는 불편한 작업과정을 거치지 않고, 상기 나선형 주름 유공관(5)은 굴착된 관로를 따라 필요길이 만큼 관을 배관한 후 바로 토사로 매립하기 때문에 관의 매설이 간편하다.The filter cloth (9) coated on the outer side of the spiral pleated perforated tube (5) prevents soil or other foreign matter from flowing into the tube after the tube is buried, and the soil or other foreign matter is sucked in the pipe is not coated with a conventional filter cloth In order to prevent it from being stacked, the spiral corrugated perforated pipe 5 may be stacked along the non-woven fabric 6 and then covered with a non-woven fabric 6 and then buried. It is easy to bury the pipe because the pipe is buried to earth and sand after the required length.
또한 상기 나선형 주름 유공관(5)은 관의 매설 길이에 대한 제한이 없어 관의 매설길이가 길어질 경우 관의 매설 길이에 대한 제한이 있어 관과 관의 연결부(8)가 필요했던 종래의 관과는 다르게 필요길이 만큼 절단하여 배관함으로서 연결부(8)를 통해 연결해야하는 작업이 없어 배관작업이 단순해져 쉬워지고 연결부(8)에 작용하는 하중에 의해 발생되는 연결부(8)의 비틀림이나 파손에 의한 누수가 발생하지 않는다.In addition, the spiral corrugated perforated tube (5) has no restriction on the embedding length of the tube, so if the length of the embedding is long, there is a restriction on the embedding length of the tube. By cutting the pipe to the required length differently, there is no work to be connected through the connection part 8, which simplifies the piping work, and leaks due to twisting or damage of the connection part 8 generated by the load acting on the connection part 8. Does not occur.
도 5 는 본 발명의 쓰레기 매립지에 설치된 실시예의 사시도이고, 도 6 은 본 발명의 쓰레기 매립지에 설치된 실시예의 단면도로서, 차수벽(2)으로 둘러싸인 쓰레기 매립지(1)의 내측에 침출수 집수 주관(12)과 상기 침출수 집수 주관의 양측으로 다수개가 배열되어 결합되는 침출수 집수 지관(13)이 연결되어 있고, 상기 침출수 집수 주관(12)은 차수벽(2) 외측에 축조된 집수조(10)로 연결되어 침출수를 집수조(10)로 배수하고, 상기 쓰레기 매립지(1)의 하측 지하에는 지하수에 의해 지반의 침하로 인한 쓰레기 매립지(1)의 균열이나 파손을 방지하기 위해 지하수를 집배수하는 지하수 집수 주관(3)이 쓰레기 매립지의 중심부를 가로질러 배관되어 있으며, 상기 지하수 집수 주관(3)의 양측으로 다수개가 배열되어 결합되고 필요길이에 맞게 절단되어 매설된 나선형 주름 유공관(5)으로 구성된다.FIG. 5 is a perspective view of an embodiment installed in the landfill of the present invention, and FIG. 6 is a cross-sectional view of an embodiment installed in the landfill of the present invention, wherein the leachate collection pipe 12 is disposed inside the landfill 1 surrounded by the water barrier wall 2. And a leachate collection branch pipe 13 coupled to a plurality of arrayed and coupled to both sides of the leachate collection pipe, and the leachate collection pipe 12 is connected to a collection tank 10 constructed outside the water collection wall 2 to provide leachate. Drainage to the sump (10), the groundwater collecting main (3) to drain the groundwater in the lower basement of the landfill (1) to prevent cracking or damage of the landfill (1) due to subsidence of the ground by groundwater Spirals are piped across the center of the landfill, and a plurality of them are arranged and coupled to both sides of the groundwater collecting pipe 3, and cut and buried to a required length. Consists of a pleated yugonggwan (5).
상기 쓰레기 매립지(1)는 내측에 쓰레기(11)가 일정높이 까지 매립되면 일정두께의 토사(7)를 덮은 다음 다시 쓰레기(11)를 매립하는 작업을 번갈아 가면서 쓰레기를 매립한다.When the waste landfill 1 is filled with the waste 11 to a certain height, the landfill 1 covers landfills 7 having a predetermined thickness and then fills the waste while alternately filling the waste 11.
도 7 은 본 발명의 침투방지공에 설치된 실시예도로서, 침투방지공(17)은 지하에 물이 침투되지 않도록 하는 공법으로서, 연못의 밑을 전부 피복하여 밑으로 물이 누수되는 것을 방지하게 되는데, 상기 침투방지공(17)의 하부 지하에 지하수 집수 주관(3)을 매설하고, 상기 지하수 집수 주관(3)의 양측으로 필요길이 맞게 절단된 나선형 주름 유공관(5)을 매설하여 지하수를 집배수 함으로서 지반침하로 인한 연못하부에 피복된 차수벽의 균열을 방지한다.Figure 7 is an embodiment installed in the penetration prevention hole of the present invention, the penetration prevention hole 17 is a method for preventing the water from penetrating the basement, it is to cover the bottom of the pond to prevent the water leakage to the bottom , Buried the groundwater collecting main pipe 3 in the lower basement of the penetration prevention hole 17, and burying the spiral corrugated perforated pipe 5 cut to the required length on both sides of the groundwater collecting main pipe 3 to collect and drain the groundwater. This prevents cracks in the order wall covering the bottom of the pond due to ground subsidence.
도 8 은 본 발명의 경사면과 수로공에 설치된 실시예도로서, 수로공(15)은 경사면에서 내린 빗물을 신속히 모아서 경사면 밖으로 빨리 배제하는 공법으로서, 수로공(15)하부 지하에 지하수 집수 주관(3)을 중심을 가로질러 배관하고, 상기 지하수 집수 주관(3)의 양측으로 나선형 주름 유공관(5) 다수개를 필요길이에 맞게절단하여 결합해 지하수를 집배수 함으로서 지반의 침하에 의한 상부구조의 균열이나 파손을 방지한다.8 is an exemplary view installed on the slope and the waterway hole of the present invention, the waterway hole 15 is a method of quickly collecting rainwater from the slope to quickly remove the slope out of the slope, the groundwater collecting pipe (3) below the waterway hole 15 ) Pipes across the center, and cut and join a plurality of spiral corrugated perforated pipes (5) to both sides of the groundwater collecting main pipe (3) to the required length to collect and drain the groundwater to crack the upper structure by settlement of the ground. Or damage.
그리고 경사면에 횡보링을 실시하여 상기 횡보링에 의해 천공된 공벽의 내부에 나선형 주름 유공관(5)을 삽입하여 공벽을 유지하고 상기 나선형 주름 유공관(5)의 내부로 지하수가 집수되어 경사면 외측에 시공된 수로공으로 흘려보내 경사면의 사방사태를 방지한다.In addition, the lateral boring is performed on the inclined surface to insert the spiral corrugated perforated tube 5 into the hollow wall perforated by the lateral boring to maintain the empty wall, and groundwater is collected into the spiral corrugated perforated tube 5 to be installed outside the inclined surface. It flows to the old waterway to prevent all sides of the slope.
도 9 는 본 발명의 암거공에 설치된 실시예도로서, 암거공(16)은 침투된 지표수가 표토층을 통과할 때 암거로 집수되어 비탈면의 밖으로 배제시키는 공법으로서, 상기 암거공(16)의 지하에 지하수 집수 주관(3)을 중심을 가로질러 배관하고, 상기 지하수 집수 주관(3)의 양측으로 나선형 주름 유공관(5) 다수개를 필요길이에 맞게 절단하여 결합해 지하수를 집배수 함으로서 지반의 침하에 의한 상부구조의 균열이나 파손을 방지한다.9 is an exemplary embodiment installed in the culvert hole of the present invention, the culvert hole 16 is a method of collecting the culvert when the surface water penetrated through the topsoil layer to exclude the outside of the slope surface, the basement of the culvert hole 16 Piping the groundwater collecting main pipe (3) across the center and cutting and combining a plurality of spiral corrugated perforated pipes (5) to both sides of the groundwater collecting main pipe (3) to the required length to collect and drain the groundwater to ground subsidence Prevents cracking or breakage of the superstructure.
상기와 같은 구성에 의한 본 발명의 시공방법을 설명하면 다음과 같다.Referring to the construction method of the present invention by the above configuration as follows.
쓰레기 매립장(1)이나, 암거공(16), 수로공(15), 침투방지공(17), 등의 상부구조 크기만큼 지면을 굴착하는 단계와,Excavating the ground by the size of the superstructure such as a landfill site 1, a culvert hole 16, a waterway hole 15, a penetration prevention hole 17, and the like,
상기 굴착된 지면에 관을 매설할 수 있도록 관로를 굴착하는 단계와,Digging a conduit to bury the pipe on the excavated ground;
상기 굴착된 관로에 지하수 집수 주관(3)을 배관하는 단계와,Plumbing the groundwater collecting pipe 3 to the excavated pipeline;
상기 지하수 집수 주관(3)의 양측으로 다수개가 배열되어 결합되며 외주면으로 나선형의 주름이 형성되어 있고, 상기 주름 사이를 따라 다수개의 홀이 천공되어 있으며 외측으로 여과포(9)가 피복되어 있는 나선형 주름 유공관(5)을 배관하여 매립하는 단계로 구성된다.A plurality of helical pleats are formed on both sides of the groundwater collecting main pipe 3 and are coupled to each other, and spiral pleats are formed on the outer circumferential surface, and a plurality of holes are perforated along the pleats, and the filter cloth 9 is coated to the outside. It consists of the step of burying the perforated pipe (5).
상기와 같은 과정에서 나선형 주름 유공관(5)은 외부면에 나선형의 주름이 형성되어 있고, 그 사이사이에 물이 흡수되도록 일정크기의 홀이 천공되어 있으며, 외측으로 여과포(9)가 피복되어 굴착된 관로를 따라 배관한 후 바로 매설함으로서 종래의 관의 매설 방법과 같이 굴착된 관로를 따라 관을 배관한 관의 상부에 자갈(14)을 적층시키고 상기 자갈(14)에 부직포(6)를 덮은 다음 매설하는 종래의 방법에 비해 매설방법이 단순하고 간단하며, 또한 관의 매설 길이에 대한 제한이 없어 매설길이가 길어졌을 경우 관을 연결해주는 연결부(8)가 필요치 않고, 필요한 배관 길이까지 절단하여 배관함으로서 연결부(8)의 파손이나 찌그러짐으로 인한 누수를 방지할 수 있다.In the process as described above, the spiral pleated perforated tube 5 is formed with a spiral pleat on the outer surface, a hole of a certain size is perforated to absorb water therebetween, the filter cloth (9) is coated on the outside and excavated By laying the pipes immediately after the pipes were laid, the gravel 14 was laminated on top of the pipe piped along the excavated pipe line as in the conventional pipe laying method, and the nonwoven fabric 6 was covered on the gravel 14. The method of embedding is simpler and simpler than the conventional method of embedding the next, and there is no restriction on the length of embedding of the pipe. Therefore, when the embedding length is long, the connection part 8 for connecting the pipe is not necessary. By piping, it is possible to prevent leakage due to breakage or crushing of the connecting portion 8.
본 발명은 상술한 특정의 바람직한 실시예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형실시가 가능한 것은 물론이고, 그와 같은 변경은 청구범위 기재의 범위 내에 있게 된다.The present invention is not limited to the above-described specific preferred embodiments, and various modifications can be made by any person having ordinary skill in the art without departing from the gist of the present invention claimed in the claims. Of course, such changes will fall within the scope of the claims.
상기와 같은 구성 및 작용에 의해 기대할 수 있는 본 발명의 효과는 관거의 제한이 없이 하나의 관으로 길게 배관할 수 있어 관의 배관시 연결부가 필요치 않게 되어 연결부를 통해 연결된 관에 발생되는 연결부의 찌그러짐에 의한 누수현상을 막을 수 있고, 관의 매설시 관 주위에 자갈과 부직포를 덮지 않고 나선형 주름 유공관을 관로를 따라 바로 배관하고 매설하기 때문에 관의 매설이 간편하여 공사비용을 절약할 수 있는 매우 유용한 발명이다.The effect of the present invention, which can be expected by the configuration and action as described above can be long piped into one tube without restriction of the conduit so that the connection part is not necessary when the pipe of the pipe is crushed in the connection generated in the pipe connected through the connection It is very useful to save the construction cost because it is easy to bury the pipe because it can prevent the leakage phenomenon by the pipe and bury the spiral corrugated perforated pipe along the pipeline without covering the gravel and nonwoven fabric around the pipe. Invention.
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020030022048A KR20040087603A (en) | 2003-04-08 | 2003-04-08 | A drainage promotion apparatus of subsurface water and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020030022048A KR20040087603A (en) | 2003-04-08 | 2003-04-08 | A drainage promotion apparatus of subsurface water and its construction method |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR20-2003-0010671U Division KR200322969Y1 (en) | 2003-04-08 | 2003-04-08 | A drainage promotion apparatus of subsurface water |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20040087603A true KR20040087603A (en) | 2004-10-14 |
Family
ID=37369714
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020030022048A KR20040087603A (en) | 2003-04-08 | 2003-04-08 | A drainage promotion apparatus of subsurface water and its construction method |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20040087603A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100774446B1 (en) * | 2006-07-19 | 2007-11-08 | 주식회사 토탈페이브시스템 | Repair method for pavement structure |
WO2015108212A1 (en) * | 2014-01-16 | 2015-07-23 | 이예순 | Prefabricated centrifugal drain pipe and construction method using same |
-
2003
- 2003-04-08 KR KR1020030022048A patent/KR20040087603A/en not_active Application Discontinuation
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100774446B1 (en) * | 2006-07-19 | 2007-11-08 | 주식회사 토탈페이브시스템 | Repair method for pavement structure |
WO2015108212A1 (en) * | 2014-01-16 | 2015-07-23 | 이예순 | Prefabricated centrifugal drain pipe and construction method using same |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7909535B2 (en) | Soil drainage system | |
KR100290288B1 (en) | Leachate Block System and Method Using Submersible Reflux Tank | |
CN110029690B (en) | Percolate leakage detection and collection structure and construction method thereof | |
KR100721225B1 (en) | Drainage structure for soft ground treatment and dehydration method | |
KR100616123B1 (en) | Device for drain underground water and method for construction the same | |
KR100896707B1 (en) | The stucture for exclude leachate of waste reclaimed land | |
KR200322969Y1 (en) | A drainage promotion apparatus of subsurface water | |
CN217325442U (en) | Foundation pit shallow drainage system | |
KR20040087603A (en) | A drainage promotion apparatus of subsurface water and its construction method | |
KR100641069B1 (en) | Apparatus for Channelling Groundwater and The Method Therefor | |
CN215057564U (en) | Visual and maintainable type anti-clogging drainage system for highway tunnel | |
CN114775699A (en) | Post-cast strip structure and construction method thereof | |
CN114737589A (en) | Foundation pit shallow layer drainage method | |
CN210086317U (en) | Leachate leakage detection collection structure | |
CN114703805A (en) | Combined seepage-proofing and sewage-intercepting system and method for adjusting plain reservoir | |
CN210529888U (en) | Bottom drainage facility for channel type slag yard | |
JP3047228B2 (en) | Leachate storage method at waste disposal site | |
KR20020000318A (en) | Method of horizontal drainage for pore water pumping of soft ground improvement | |
CN221167881U (en) | Foundation pit hydrophobic structure suitable for under rich water stratum condition | |
RU2743226C1 (en) | Hydraulic protection system for the underground part of the building | |
KR101577187B1 (en) | Water and sewage pipelines to prevent subsidence structure | |
JPH0529272Y2 (en) | ||
CN212153647U (en) | Drainage facility suitable for water source area protection district excavation highway section | |
CN220035481U (en) | Recoverable reuse combined type drainage system of building foundation ditch | |
JP3709633B2 (en) | Impervious structure in waste disposal site |