KR20040065896A - Micro pile and assembly foundation reinforcement structure member and its method for pier - Google Patents

Micro pile and assembly foundation reinforcement structure member and its method for pier Download PDF

Info

Publication number
KR20040065896A
KR20040065896A KR1020030003096A KR20030003096A KR20040065896A KR 20040065896 A KR20040065896 A KR 20040065896A KR 1020030003096 A KR1020030003096 A KR 1020030003096A KR 20030003096 A KR20030003096 A KR 20030003096A KR 20040065896 A KR20040065896 A KR 20040065896A
Authority
KR
South Korea
Prior art keywords
prefabricated
piers
bracket
pier
hole
Prior art date
Application number
KR1020030003096A
Other languages
Korean (ko)
Other versions
KR100493516B1 (en
Inventor
정동면
Original Assignee
정동면
노윤근
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 정동면, 노윤근 filed Critical 정동면
Priority to KR10-2003-0003096A priority Critical patent/KR100493516B1/en
Publication of KR20040065896A publication Critical patent/KR20040065896A/en
Application granted granted Critical
Publication of KR100493516B1 publication Critical patent/KR100493516B1/en

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • C02F3/02Aerobic processes
    • C02F3/12Activated sludge processes
    • C02F3/20Activated sludge processes using diffusers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01FMIXING, e.g. DISSOLVING, EMULSIFYING OR DISPERSING
    • B01F23/00Mixing according to the phases to be mixed, e.g. dispersing or emulsifying
    • B01F23/20Mixing gases with liquids
    • B01F23/23Mixing gases with liquids by introducing gases into liquid media, e.g. for producing aerated liquids
    • B01F23/231Mixing gases with liquids by introducing gases into liquid media, e.g. for producing aerated liquids by bubbling
    • B01F23/23105Arrangement or manipulation of the gas bubbling devices
    • B01F23/2312Diffusers
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/48Treatment of water, waste water, or sewage with magnetic or electric fields

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Organic Chemistry (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Microbiology (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Bridges Or Land Bridges (AREA)
  • Foundations (AREA)

Abstract

PURPOSE: An assembling underpinning structure using a cast-in place micro-pile and an assembling bracket for a pier and a construction method thereof are provided to prevent scour around the pier by mounting the cast-in place micro-pile around the pier and mounting the assembling bracket on the micro-pile, and to stabilize the pier by improving bearing force of soil. CONSTITUTION: An assembling underpinning structure comprises: bores formed symmetrically around a pier(P); a cast-in place micro-pile(30) inserted into the bore and installed under the ground; an anchorage part installed in the upper parts of reinforcing steel bars placed in the cast-in place micro-pile; plural assembling brackets(70) installed around the pier by being formed of the right-angled triangle by using an H-steel, provided with the horizontal plane connected by a bolt and the vertical plane connected by an anchor(40), and installed by connecting L-steels; non-shrinkage mortar poured and cured between the horizontal plane of the assembling bracket and the anchorage part, and the vertical plane of the assembling bracket and the pier; and ripraps(100) placed to prevent scour around the assembling brackets and the pier.

Description

현장 마이크로 파일과 조립식 브라켓을 이용한 교각용 조립식 기초보강 구조체 및 그의 구축방법{Micro pile and assembly foundation reinforcement structure member and its method for pier}Micro pile and assembly foundation reinforcement structure member and its method for pier}

본 발명은 현장 마이크로 파일과 조립식 브라켓을 이용한 교각용 조립식 기초보강 구조체 및 그의 구축방법에 관한 것으로, 교각의 외측 인접부에 현장 마이크로 파일을 지중에 설치하고, 이 현장 마이크로 파일상에 조립식 브라켓을 설치하여 교각 주위의 하상 세굴을 방지하면서 지반의 지내력을 증진시켜 교각의 안정화를 도모하도록 한 현장 마이크로 파일과 조립식 브라켓을 이용한 교각용 조립식 기초보강 구조체 및 그의 구축방법에 관한 것이다.The present invention relates to a prefabricated foundation reinforcement structure for bridge piers using a field micro pile and a prefabricated bracket, and a construction method thereof. The field micro pile is installed in the ground adjacent to the outside of the piers, and a prefab bracket is installed on the field micro pile. The present invention relates to a prefabricated foundation reinforcement structure for bridge piers using on-site micro piles and prefabricated brackets to promote the stabilization of bridges by preventing ground scour around bridge piers.

일반적으로 하천에 설치된 교량의 교각 기초구조물은, 특히 수중 기초부위는 항상 물과 접촉하는 부분이기 때문에 유수의 산도나 알칼리도, 염분 그리고 유수를 타고 이동되는 바위 등과의 충돌 등으로 인하여 교각이 영향을 받아 오랜 세월이 지나면서 교각의 표면이 부식 손상되는 세굴 현상을 일으키게 된다.In general, the bridge foundations of bridges installed in rivers are affected by the impact of acidity, alkalinity, salinity, and collisions of rocks moving through the river because the foundation of the bridge is always in contact with water. Over the years, scour phenomena cause corrosion of the pier's surface.

여기서, 상기한 교각의 세굴현상은 수중에서 서서히 진행되는 것이기 때문에 지상에서는 쉽게 발견되지 않아 오랜 세월이 흐른 후에 교량의 안전을 저해하는 수준으로 발전된다.Here, the scour phenomenon of the bridge is progressed slowly in the water, so it is not easily found on the ground and develops to a level that impairs the safety of the bridge after a long time.

따라서, 이와 같은 교각의 세굴현상을 방지하기 위해 종래에는 교각 저부의 콘크리트 체적을 증가시켜 바닥체적을 크게 함으로써 지내력을 증진시키는 교각용 기초보강방법이 제안되었다.Therefore, in order to prevent the scour phenomenon of the bridge piers, a bridge reinforcement method has been conventionally proposed to increase the bearing capacity by increasing the concrete volume of the bottom of the piers to increase the floor volume.

상기한 종래의 교각용 기초보강방법은 도 1 내지 도 4에 도시된 바와 같이, 먼저 교각(P)의 주변을 따라 시이트 파일(110)을 박고, 지반보강공(120)을 설치하고, 이 지반보강공(120)의 내부를 굴착하며, 버팀보(130)를 설치하며, 교각면의 콘크리트 치핑을 하며, 전단 및 철근 앵커(140)를 설치하며, 1차로 콘크리트를 타설하며, 지반보강공(120)을 철거하며, 2차로 콘크리트를 타설하며, 교각면을 정리하는 순서로 하여 시공함을 특징으로 한다.In the conventional bridge piers reinforcement method as shown in Figs. 1 to 4, first, the sheet pile 110 is driven along the periphery of the pier P, and the ground reinforcement hole 120 is installed. Excavate the inside of the reinforcement 120, install the braces 130, do concrete chipping of the pier, install the shear and reinforcing anchor 140, the first place the concrete, ground reinforcement (120) ), The concrete is laid in the second order, and the construction is performed in the order of arranging the pier surface.

상기한 바와 같이 시공되는 종래의 교각용 기초보강방법은 다음과 같은 문제점이 있다.Conventional reinforcement method for bridge piers constructed as described above has the following problems.

첫째, 종래의 교각용 기초보강방법은 교각주위 지반보강공의 공사 중에 일시적으로 편심재하가 발생되는 문제가 있다.First, the conventional reinforcement method for pier has a problem that the eccentric load is temporarily generated during the construction of the ground reinforcement around the piers.

둘째, 종래의 교각용 기초보강방법은 열차운행중에 교각주위를 전체적으로 굴착함으로 인하여 교각의 전후 및 좌우로 안정성이 결여되는 문제가 있다.Second, the conventional reinforcement method for piers have a problem that the stability around the piers before and after and left and right by digging around the piers as a whole during train operation.

셋째, 종래의 교각용 기초보강방법은 기초보강공사중에 시이트 파일이 지중에 매몰됨으로 인하여 경제적인 손실이 발생되는 문제점이 있다.Third, the conventional bridge reinforcement method has a problem that the economic loss occurs because the sheet pile is buried in the ground during the foundation reinforcement work.

넷째, 종래의 교각용 기초보강방법은 버팀보 및 내부공간의 협소로 인하여 내부굴착에 따른 토공 불리와 철근 조립이 불리한 문제가 있다.Fourth, the conventional reinforcement method for bridge piers have a disadvantage of the earthwork disadvantage and rebar assembly due to the internal excavation due to the narrowing of the brace and the internal space.

다섯째, 종래의 교각용 기초보강방법은 교각의 보강 벽면의 전체에 걸쳐 전단 철근 및 앵커를 설치하는 것이 경제적으로 비효율적인 문제로 지적되고 있다.Fifth, the conventional reinforcement method for piers has been pointed out as a problem that it is economically inefficient to install shear reinforcing bars and anchors throughout the reinforcement wall surface of the piers.

여섯째, 종래의 교각용 기초보강방법은 교각버팀의 상부에 열차운행으로 인한 진동에 대단히 취약한 문제점이 있다.Sixth, the conventional reinforcement method for pier has a problem that is very vulnerable to vibration due to train operation on the top of the bridge brace.

일곱째, 종래의 교각용 기초보강방법은 교각의 종방향으로 형하공간의 제한으로 인하여 시이트 파일의 항타에 애로점이 있다.Seventh, the conventional reinforcement method for piers has difficulty in driving the sheet pile due to limitation of the geometry space in the longitudinal direction of the piers.

여덟째, 종래의 교각용 기초보강방법은 교각의 보강에 사용한 콘크리트의 부피의 증가로 인하여 유수에 따른 단면이 축소되는 불리한 문제점이 있다.Eighth, the conventional bridge reinforcement method has a disadvantage that the cross section is reduced according to the flow due to the increase in the volume of the concrete used to reinforce the bridge.

아홉째, 종래의 교각용 기초보강방법은 시이트 파일에서 녹발생으로 인하여 교각 주위의 환경오염이 점진적으로 증대되는 문제점이 있다.Ninth, the conventional reinforcement method for piers has a problem that the environmental pollution around the piers gradually increase due to rust generated in the sheet pile.

열째, 종래의 교각용 기초보강방법은 다수의 교각을 일시에 시공하지 못함으로 인하여 시공속도가 지연되는 문제점이 있다.Tenth, the conventional reinforcement method for piers have a problem that the construction speed is delayed due to the failure to construct a plurality of piers at a time.

이에, 본 발명은 상기한 바와 같은 제문제점을 해결하기 위해 안출된 것으로써, 교각의 외측 인접부에 현장 마이크로 파일을 지중에 설치하고, 이 현장 마이크로 파일상에 조립식 브라켓을 설치하여 교각 주위의 하상 세굴을 방지하면서 지반의 지내력을 증진시켜 교각의 안정화를 도모하도록 현장 마이크로 파일과 조립식 브라켓을 이용한 교각용 조립식 기초보강 구조체 및 그의 구축방법을 제공하는데 그 목적이 있다.Accordingly, the present invention has been made to solve the problems described above, the field micropile is installed in the ground adjacent to the outer side of the pier, the prefabricated bracket is installed on the field micropile, The purpose of the present invention is to provide a prefabricated basic reinforcement structure for bridge piers using on-site micro piles and prefabricated brackets to prevent stagnation and to increase the bearing strength of the ground to stabilize the bridges.

상기한 목적을 달성하기 위한 본 발명에 따른 현장 마이크로 파일과 조립식 브라켓을 이용한 교각용 조립식 기초보강 구조체는 트렌치 굴착 후 교각주변 지중에 대칭으로 소정의 직경과 깊이로 천공되는 천공홀과; 상기 천공홀 내로 소정의 깊이만큼 삽입되어 지중에 매설되는 현장 마이크로 파일과; 상기 현장 마이크로 파일내에 설치된 철근의 상부에 설치되는 정착부와; 상기 정착부의 볼트공에 볼트 체결로 상기 조립식 브라켓의 수평면이 연결됨과 동시에 교각의 하단부에 형성된 천공홀에 상기 조립식 브라켓의 수직면을 앵커로 연결하여 전체적으로 직각 삼각형상이 되도록 H형강으로 조립 형성되어 교각 주위에 설치되어 상호 L형강으로 연결 설치되는 다수개의 조립식 브라켓과; 상기 조립식 브라켓과 상기 조립식 브라켓의 수평면과 정착부간의 틈새와 상기 브라켓의 수직면과 교각 사이를 메우기 위하여 타설양생되는 무수축 모르터와; 상기 조립식 브라켓 사이의 잔여토 굴착을 통하여 다양한 크기의 자갈이나 쇄석을 포설하여 교각 주위의 하상이 쇄굴되는 것을 방지하는 것을 특징으로 한다.The prefabricated foundation reinforcement structure for piers using field micro piles and prefabricated brackets according to the present invention for achieving the above object includes a drilled hole drilled symmetrically in a circumferential area around the piers after trenching; A field micro pile inserted into the drilling hole by a predetermined depth and embedded in the ground; A fixing unit installed on an upper part of the reinforcing bar installed in the field micro pile; The horizontal surface of the prefabricated bracket is connected to the bolt hole of the fixing unit at the same time, and the vertical surface of the prefabricated bracket is anchored to the drilling hole formed at the lower end of the piers to be assembled with H-shaped steel so as to form a right triangle overall. A plurality of prefabricated brackets installed and connected to each other by L-shaped steel; A non-shrink mortar that is pour-cured to fill the gap between the prefabricated bracket and the horizontal surface of the prefabricated bracket and the fixing unit, and the vertical surface and the piers of the bracket; Through the excavation of the residual soil between the prefabricated brackets, it is characterized in that the gravel or crushed stone of various sizes to prevent the riverbed around the piers to be crushed.

상기한 목적을 달성하기 위한 본 발명에 따른 현장 마이크로 파일과 조립식 브라켓을 이용한 교각용 조립식 기초보강 구조체 구축방법은 교각마다 주위의 하상을 몇 개 부분적으로 일정한 깊이로 트렌치 굴착 제거하는 단계; 상기 굴착된 지반에 천공홀을 형성하기 위하여 굴착기가 선단에 설치된 케이싱을 삽입 굴진하여 천공홀을 형성하는 단계; 상기 천공홀내에 철근의 간격을 유지하기 위하여 철근의 길이방향으로 중앙에 구멍이 형성된 십자형의 간격제와 다수의 철근 및 주입파이프를 설치하고 그라우팅을 시행한 후 양생하여 현장 마이크로 파일을 설치하는 단계; 상기 현장 마이크로 파일내에 설치된 철근의 상부와 상기 정착부의 하부에 설치된 삽입구에 현장 마이크로 파일내 설치된 철근을 삽입하는 단계; 상기 정착부의 네모서리에 설치된 볼트공에 상기 조립식 브라켓의 수평면과 볼트로 연결함과 동시에 교각의 하부에 형성된 천공홀에 상기 조립식 브라켓의 수직면을 앵커로 연결하여 전체적으로 직각 삼각형상으로 이루어지는 조립식 브라켓을 설치 고정하는 단계; 교각의 주위에 다수개 설치된 상기 조립식 브라켓의 하부를 상호 L형 형강으로 연결하는 단계; 상기 조립식 브라켓과 조립식 브라켓의 수평면과 정착부간의 틈새와 조립식 브라켓의 수직면과 교각간의 틈새와 조립식 브라켓을 상호 연결하는 L형 형강에 무수축 모르터를 타설양생하는 단계; 상기 조립식 브라켓(70) 사이의 잔여토를 굴착 제거하는 단계; 굴착한 부분의 교각 하상표면까지 다양한 크기의 자갈이나 쇄석을 포설하는 단계를 포함하는 것이다.Method for constructing a prefabricated foundation reinforcement structure for piers using a field micro pile and a prefabricated bracket according to the present invention for achieving the above object comprises the steps of removing trench excavation to a part of a certain depth around the piers; Inserting and excavating a casing installed at the tip of the excavator to form a drilled hole in the drilled ground to form a drilled hole; Installing cross-shaped spacers and a plurality of reinforcing bars and injection pipes formed in the center of the reinforcing bars in the longitudinal direction of the reinforcing bars in order to maintain spacing of the reinforcing bars, and curing them after grouting to install field micro piles; Inserting reinforcing bars installed in the field micropile into an insertion hole provided in an upper part of the reinforcing bar installed in the field micropile and a lower part of the fixing unit; The prefabricated bracket made of a right triangle is installed by connecting the vertical surface of the prefabricated bracket with an anchor to the boring hole formed at the bottom of the pier by connecting the bolt with the horizontal surface of the prefabricated bracket to the bolt hole installed at the corners of the fixing unit. Fixing; Connecting lower portions of the prefabricated brackets installed around the piers with L-shaped steels; Pouring a non-shrink mortar into the L-shaped steel interconnecting the clearance between the horizontal surface and the fixing part of the prefabricated bracket and the prefabricated bracket, the gap between the vertical surface and the piers of the prefabricated bracket, and the prefabricated bracket; Excavating and removing residual soil between the prefabricated brackets 70; And laying gravel or crushed stone of various sizes up to the pier bottom surface of the excavated portion.

도 1은 종래의 교각용 기초보강 구조체를 도시한 평면도1,1 is a plan view 1 showing a conventional foundation reinforcement structure for piers;

도 2는 종래의 교각용 기초보강 구조체를 도시한 단면도1,2 is a cross-sectional view 1 showing a conventional reinforcement structure for piers;

도 3은 종래의 교각용 기초보강 구조체를 도시한 평면도2,Figure 3 is a plan view showing a conventional foundation reinforcement structure for piers 2,

도 4는 종래의 교각용 기초보강 구조체를 도시한 단면도2,Figure 4 is a cross-sectional view 2 showing a conventional foundation reinforcement structure for piers

도 5는 본 발명에 따른 현장 마이크로 파일과 조립식 브라켓을 이용한5 is a field micro pile and a prefabricated bracket according to the present invention

교각용 조립식 기초보강 구조체를 도시한 정면도,Front view showing a prefabricated foundation reinforcement structure for piers,

도 6은 본 발명에 따른 현장 마이크로 파일과 조립식 브라켓을 이용한Figure 6 using the field micro pile and prefabricated bracket according to the invention

교각용 조립식 기초보강 구조체를 도시한 평면도,Floor plan showing a prefabricated foundation reinforcement structure for piers,

도 7은 본 발명에 따른 현장 마이크로 파일과 조립식 브라켓을 이용한Figure 7 is using the field micro pile and prefabricated bracket according to the present invention

교각용 조립식 기초보강 구조체를 도시한 측면도,Side view showing a prefabricated foundation reinforcement structure for piers,

도 8은 본 발명에 따른 현장 마이크로 파일과 조립식 브라켓을 이용한8 is a field micro pile and a prefabricated bracket according to the present invention

교각용 조립식 기초보강 구조체의 현장 마이크로 파일을 도시한 평면도,Floor plan showing in-situ micro pile of prefabricated foundation reinforcement structure for piers,

도 9는 본 발명에 따른 현장 마이크로 파일과 조립식 브라켓을 이용한Figure 9 using the field micro pile and prefabricated bracket according to the present invention

교각용 조립식 기초보강 구조체의 현장 마이크로 파일을 도시한 측면도,Side view showing an in-situ micropile of a prefabricated foundation reinforcement structure for piers,

도 10은 본 발명에 따른 현장 마이크로 파일과 조립식 브라켓을 이용한10 is a field micro pile and a prefabricated bracket according to the present invention

교각용 조립식 기초보강 구조체의 정착부를 도시한 평면도,Plan view showing the fixing part of the prefabricated foundation reinforcement structure for piers,

도 11은 본 발명에 따른 현장 마이크로 파일과 조립식 브라켓을 이용한11 is a field micro pile and a prefabricated bracket according to the present invention.

교각용 조립식 기초보강 구조체의 브라켓을 도시한 사시도,Perspective view of a bracket of a prefabricated foundation reinforcement structure for piers,

도 12의 (a)∼(h)은 본 발명에 따른 현장 마이크로 파일과 조립식 브라켓을12 (a) to 12 (h) illustrate the field micro pile and the assembled bracket according to the present invention.

이용한 교각용 조립식 기초보강 구조체의 시공상태를 도시한 시공 단계도.Construction step diagram showing the construction state of the prefabricated foundation reinforcement structure for pier using.

-도면의 주요부분에 대한 부호의 설명-Explanation of symbols on the main parts of the drawing

10 : 천공홀 20 : 케이싱10: drilling hole 20: casing

30 : 현장 마이크로 파일 33 : 구멍30: Scene Micro File 33: Hole

34 : 간격제 35 : 결속선34: Spacer 35: Binding Line

36 : 연결구 37 : 주입파이프36: connector 37: injection pipe

38 : 철근 40 : 앵커38: rebar 40: anchor

50 : 그라우팅제 60 : 정착부50: grouting agent 60: fixing unit

62 : 볼트공 70 : 조립식 브라켓62: bolt hole 70: prefabricated bracket

80 : L형강 90 : 무수축 모르터80: L-shaped steel 90: Non-shrink mortar

100 : 사석100: dead stone

110 : 시이트 파일 120 : 지반보강공110: sheet file 120: ground reinforcement

130 : 버팀보 140 : 앵커130: brace 140: anchor

P : 교각 T : 굴착부위P: Pier T: Excavation site

이하, 본 발명을 첨부한 예시도면을 참조하여 상세히 설명한다.Hereinafter, with reference to the accompanying drawings, the present invention will be described in detail.

도 5는 본 발명에 따른 현장 마이크로 파일과 조립식 브라켓을 이용한 교각용 조립식 기초보강 구조체를 도시한 정면도이며, 도 6은 본 발명에 따른 현장 마이크로 파일과 조립식 브라켓을 이용한 교각용 조립식 기초보강 구조체를 도시한 평면도이며, 도 7은 본 발명에 따른 현장 마이크로 파일과 조립식 브라켓을 이용한 교각용 조립식 기초보강 구조체를 도시한 측면도이다.5 is a front view showing a prefabricated foundation reinforcement structure for piers using a field micro pile and a prefabricated bracket according to the present invention, Figure 6 is a prefabricated foundation reinforcement structure for a piers using a field micro pile and a prefabricated bracket according to the present invention. One is a plan view, Figure 7 is a side view showing a prefabricated foundation reinforcement structure for piers using a field micro pile and a prefabricated bracket according to the present invention.

이들 도면에 도시된 바와 같이, 본 발명에 따른 현장 마이크로 파일과 조립식 브라켓을 이용한 교각용 조립식 기초보강 구조체는 교각(P)의 주변에 대칭으로 지중에 소정의 직경과 깊이로 천공되는 천공홀(10)과; 상기 천공홀(10) 내로 소정의 깊이만큼 삽입되어 지중에 매설되는 현장 마이크로 파일(30)과; 상기 현장 마이크로 파일(30)내에 설치된 철근(38)의 상부에 설치되는 정착부(60)와;As shown in these drawings, the prefabricated foundation reinforcement structure for the piers using the field micro pile and the prefabricated bracket according to the present invention is a symmetrical periphery of the piers (P) to be drilled to a predetermined diameter and depth in the ground (10) )and; A field micro pile 30 inserted into the drilling hole 10 by a predetermined depth and embedded in the ground; A fixing unit 60 installed on an upper portion of the reinforcing bar 38 installed in the field micro pile 30;

상기 정착부(60)의 볼트공(62)에 볼트 체결로 상기 조립식 브라켓(70)의 수평면이 연결됨과 동시에 교각(P)의 하단부에 형성된 천공홀에 상기 조립식 브라켓(70)의 수직면을 앵커(40)로 연결하며 전체적으로 직각 삼각형상이 되도록 H형강으로 조립 형성되어 교각(P) 주위에 설치되어 상호 L형강(80)으로 연결 설치되는 다수개의 조립식 브라켓(70)과;The horizontal surface of the prefabricated bracket 70 is connected to the bolt hole 62 of the fixing unit 60 and the vertical surface of the prefabricated bracket 70 is anchored to a drilling hole formed at the lower end of the pier P. A plurality of prefabricated brackets 70 connected to each other and installed as H-shaped steels so as to be generally triangular in shape and installed around the piers P and connected to each other by L-shaped steels 80;

상기 조립식 브라켓(70)과 상기 조립식 브라켓(70)의 수평면과 정착부(60)간의 틈새와 상기 브라켓(70)의 수직면과 교각(P) 사이를 메우기 위하여 타설양생되는 무수축 모르터(90)와;The non-shrink mortar 90 is pour-cured to fill the gap between the horizontal surface of the prefabricated bracket 70 and the prefabricated bracket 70 and the fixing unit 60 and between the vertical surface of the bracket 70 and the piers P. ;

상기 조립식 브라켓(70)과의 사이 및 교각(P)의 주위에 다양한 크기의 자갈이나 쇄석 등의 사석(100)을 포설하여 교각(P) 주위의 하상이 쇄굴되는 것을 방지하는 것이다.Between the prefabricated bracket 70 and around the piers (P) to install a sandstone 100, such as gravel or crushed stone of various sizes to prevent the lower bed around the piers (P) to be crushed.

여기서, 상기 현장 마이크로 파일(30)은 소정의 직경 및 길이로 이루어지는 천공홀(10)내에 다수개의 철근(38)과 주입파이프(37) 및 철근(38)의 간격이 일정하게 유지될 수 있도록 일정한 간격을 두고 설치되는 간격제(34)와; 철근(38)이 서로 고정되도록 하기 위하여 일정한 간격으로 묶은 결속선(35)과; 철근(38)을 상호 연결하기 위하여 설치되는 연결구(36)로 이루어져 설치된 천공홀(10)내에 그라우팅제(50)를 타설 양생하는 것이다.Here, the field micro pile 30 is fixed so that the spacing of the plurality of reinforcing bars 38 and the injection pipe 37 and the reinforcing bars 38 in the drilling hole 10 having a predetermined diameter and length can be kept constant. A spacer 34 spaced apart from each other; A binding line 35 tied at regular intervals so that the reinforcing bars 38 are fixed to each other; It is to pour the grouting agent 50 in the drilling hole 10 is composed of a connector (36) installed to interconnect the reinforcing bars (38).

또한, 상기 현장 마이크로 파일(30)내에 설치되는 철근(38)의 간격을 유지하기 위하여 일정한 간격으로 설치되는 간격제(34)는 일정한 두께를 가지는 십자형상으로서 십자형상의 사이에 철근(38)이 설치되도록 하고, 중앙에 형성된 구멍(33)을 이용하여 주입파이프(37)를 설치하고, 그라우팅제(50)를 타설할 수 있게 하는 것이다.In addition, the spacer 34 is installed at regular intervals in order to maintain the spacing of the reinforcing bars 38 installed in the field micro pile 30 is a cross shape having a certain thickness of the reinforcing bar 38 is installed between the cross shape. The injection pipe 37 is installed using the hole 33 formed in the center, and the grouting agent 50 can be poured.

그리고, 상기 정착부(60)는 상기 천공홀(10)의 상부로 일정길이 연장된 철근(38)에 설치되기 위한 것으로서 일정한 크기의 사각형상의 철판의 네모서리에볼트공(62)이 형성되고 철판의 하부에 상기 철근(38)이 삽입될 수 있게 다수개의 삽입구가 설치되는 것이다.In addition, the fixing unit 60 is to be installed in the reinforcing bar 38 extending a predetermined length to the upper portion of the drilling hole 10, the square hole of the square iron plate of a certain size of the ball hole 62 is formed and The lower portion of the reinforcing bar 38 is to be inserted so that a plurality of insertion holes are installed.

또한, 상기 조립식 브라켓(70)은 교각(P) 주위에 설치되되 하상의 표면에서 일정한 깊이에 설치되어 그 위에 자갈 또는 쇄석으로 이루어진 사석(100)이 설치되어 지는 것이다.In addition, the prefabricated bracket 70 is installed around the piers (P) is installed at a constant depth on the surface of the lower bed is to be installed on the sandstone 100 made of gravel or crushed stone thereon.

즉, 본 발명에 따른 현장 마이크로 파일과 조립식 브라켓을 이용한 교각용 조립식 기초보강 구조체는 천공홀(10), 현장 마이크로 파일(30), 정착부(60), 앵커(40), 브라켓(70), 무수축 모르터(90), 앵글(80) 및 사석(100)이 유기적으로 결합되어 이루어진 구조로, 교각(P)의 안정화를 도모함을 특징으로 한다.That is, the prefabricated foundation reinforcement structure for piers using the field micro pile and the prefabricated bracket according to the present invention includes a drill hole 10, a field micro pile 30, a fixing unit 60, an anchor 40, a bracket 70, The non-shrink mortar 90, the angle 80 and the dead stone 100 is organically coupled structure, characterized in that to stabilize the piers (P).

여기서, 상기 현장 마이크로 파일(30)은 천공홀(10)내에 철근(38)이 다수개가 설치되며, 이러한 철근(38)의 외측으로 직경이 일정한 십자형 평판으로 이루어진 간격제(34)가 설치되며, 이 간격제의 정중앙부에는 구멍(33)이 형성되고, 이 구멍(33)에 주입파이프(37)를 설치하며, 천공홀(10)내에 그라우팅제(50)를 타설하여 양생한 것이다.Here, the field micro pile 30 is provided with a plurality of reinforcing bars 38 in the drilling hole 10, the spacer 34 made of a cross-shaped flat plate with a constant diameter outside the reinforcing bars 38 is installed, A hole 33 is formed in the central portion of the spacer, an injection pipe 37 is provided in the hole 33, and the grouting agent 50 is poured into the hole 10 to cure.

즉, 상기 현장 마이크로 파일(30)내에 설치되는 철근(38)의 간격을 유지하기 위하여 일정한 간격으로 설치되는 간격제(34)는 일정한 두께를 가지는 십자형상으로서 십자형상의 사이에 철근(38)이 설치되고, 이러한 철근(38)을 결속선(35)으로 묶게 되며, 중앙에 형성된 구멍(33)이 형성되고, 철근(38)을 상호 연결하기 위하여 설치되는 연결구(36)로 이루어져 설치된 천공홀(10)내에 그라우팅제(50)를 타설 양생하는 것이다.That is, the spacing agent 34 installed at regular intervals to maintain the spacing of the reinforcing bars 38 installed in the field micro pile 30 is a cross shape having a predetermined thickness, and the reinforcing bars 38 are installed between the cross shapes. In addition, the reinforcing bar (38) is bundled with a binding line (35), a hole (33) formed in the center is formed, and the drilling hole (10) consisting of a connector (36) installed to interconnect the reinforcing bars (38). The curing process is carried out by pouring the grouting agent 50 into the inside.

특히, 상기 간격제(34)는 전체적으로 열십자 형상으로 이루어짐과 동시에 두꺼운 평판으로 이루어지며, 정중앙부에는 소정의 크기로 하여 구멍(33)이 형성되어, 그라우팅제(50)의 주입을 용이하게 하고, 상기 간격제의 네 모퉁이에는 소정의 곡율을 가지도록 둥글게 모따기가 형성된다.In particular, the spacer 34 is made of a crisscross shape as a whole and at the same time made of a thick flat plate, and the hole 33 is formed at a predetermined size in the central portion to facilitate the injection of the grouting agent 50. In the four corners of the spacer, a chamfer is formed to have a predetermined curvature.

이는 상기 간격제(34)의 네 모퉁이에 위치되어 고정되는 철근(38)과의 결합을 용이하게 하기 위함으로 철근(38)의 환상형상과 이를 감싸는 단면 형상인 내측으로 둥근 형상으로 모따기를 하여 철근(38)의 위치고정을 원활하게 하기 위함이다.This is to facilitate the coupling with the reinforcing bar 38 is located at the four corners of the spacer 34 to facilitate the reinforcement by chamfering in the inner round shape of the annular shape of the reinforcement 38 and the cross-sectional shape surrounding it This is to facilitate the position fixing of (38).

또한, 상기 정착부(60)는 상기 천공홀(10)의 상부로 일정길이 연장된 철근(38)에 설치되기 위한 것으로, 일정한 크기의 사각형상의 철판의 네모서리에 볼트공(62)이 형성되고 철판의 하부에 상기 철근(38)이 삽입될 수 있게 다수개의 삽입구가 설치되는 것이다.In addition, the fixing unit 60 is to be installed in the reinforcing bar 38 extending a predetermined length to the upper portion of the drilling hole 10, the bolt hole 62 is formed in the four corners of the iron plate of a certain size A plurality of insertion holes are installed to allow the reinforcing bar 38 to be inserted into the lower part of the iron plate.

이와 같이 상기 정착부(60)를 현장 마이크로 파일(30)에 설치하는 이유는 현장 마이크로 파일(30)에 직접 조립식 브라켓(70)을 설치하는 것보다 정착부(60)상에 조립식 브라켓(70)을 설치하는 것이 부착면적이 확대되어 용이하게 조립식 브라켓(70)을 설치할 수 있기 때문이다.The reason for installing the fixing unit 60 in the field micropile 30 as described above is that the prefabricated bracket 70 on the fixing unit 60 rather than installing the prefabricated bracket 70 directly in the field micropile 30. This is because it is easy to install the prefabricated bracket 70 is enlarged the attachment area.

한편, 상기 조립식 브라켓(70)은 전체적으로 직각 삼각형상으로 H형강으로 형성되며, 그 내측에 콘크리트와의 부착력을 좋게 하기 위하여 스터드가 설치되고, 콘크리트를 타설하여 형성된 것으로, 정착부(60)상에 조립식 브라켓(70)의 수평면이 볼트 체결로 고정 설치되며, 앵커(40)에 조립식 브라켓(70)의 수직면이 체결되어 고정 설치된다.On the other hand, the prefabricated bracket (70) is formed as a H-shaped steel in a right triangle shape as a whole, a stud is installed to improve the adhesion with concrete therein, formed by pouring concrete, on the fixing unit 60 The horizontal surface of the prefabricated bracket 70 is fixedly installed by bolt fastening, and the vertical surface of the prefabricated bracket 70 is fastened to the anchor 40 to be fixedly installed.

이와 같이, 상기한 조립식 브라켓(70)을 교각(P)에 설치하는 이유는 교각(P)의 노후화와 세굴 및 활하중 증가에 따른 교각의 안정화를 목적으로 한 지내력을 증진시키기 위함이다.As such, the reason why the prefabricated bracket 70 is installed in the piers P is to increase the bearing capacity for the purpose of stabilizing the piers according to the aging of the piers P and the scour and the increase of the live load.

상기한 바와 같은 구조로 이루어진 본 발명에 따른 현장 마이크로 파일과 조립식 브라켓을 이용한 교각용 조립식 기초보강 구조체의 구축방법을 설명한다.It describes a method of building a prefabricated foundation reinforcement structure for piers using a field micro pile and a prefabricated bracket according to the present invention made of a structure as described above.

도 12의 (a)∼(h)은 본 발명에 따른 현장 마이크로 파일과 조립식 브라켓을 이용한 교각용 조립식 기초보강 구조체의 시공상태를 도시한 시공 단계도이다.12 (a) to (h) is a construction step diagram showing the construction state of the prefabricated foundation reinforcement structure for piers using the field micro pile and the assembly bracket according to the present invention.

이들 도면에 도시된 바와 같이, 본 발명에 따른 현장 마이크로 파일과 조립식 브라켓을 이용한 교각용 조립식 기초보강 구조체 구축방법은 교각(P)마다 주위의 하상을 몇 개 부분적으로 일정한 깊이로 트렌치 굴착 제거하는 단계;As shown in these drawings, the method of building a prefabricated foundation reinforcement structure for piers using the field micro pile and the prefabricated bracket according to the present invention comprises the steps of removing trench excavation to a part of a certain depth of the surrounding bed for each pier P. ;

상기 굴착된 지반에 천공홀(10)을 형성하기 위하여 굴착기가 선단에 설치된 케이싱(20)을 삽입 굴진하여 천공홀(10)을 형성하는 단계;Inserting and drilling a casing 20 provided at an end of the excavator to form the drilling hole 10 in the drilled ground to form the drilling hole 10;

상기 천공홀(10)내에 다수개의 철근(38)과 주입파이프(37) 및 철근(38)의 간격을 유지하기 위하여 철근(38)의 길이방향으로 중앙에 구멍(33)이 형성된 십자형의 간격제(34)와 상기 간격제(34)의 전후 철근(38)을 결속선(35)으로 묶어 설치하고, 그라우팅제(50)를 타설양생하여 현장 마이크로 파일(30)을 설치하는 단계;A cross-shaped spacer having a hole 33 formed in the center of the reinforcing bar 38 in the longitudinal direction of the reinforcing bar 38 in order to maintain a distance between the plurality of reinforcing bars 38, the injection pipe 37, and the reinforcing bars 38 in the drilling hole 10. (34) and the front and rear reinforcement (38) of the spacer 34 is tied to the binding line 35 and installed, and pouring the grouting agent 50 to install the field micro pile (30);

상기 현장 마이크로 파일(30)내에 설치된 철근(38)의 상부와 상기 정착부(60)의 하부에 설치된 삽입구에 정착부(60)를 삽입하는 단계;Inserting a fixing unit (60) into an insertion hole provided in an upper portion of the reinforcing bar (38) installed in the field micro pile (30) and a lower portion of the fixing unit (60);

상기 정착부(60)의 네모서리에 설치된 볼트공(62)에 상기 조립식 브라켓(70)의 수평면과 볼트로 연결함과 동시에 교각(P)의 하부에 형성된 천공홀에 상기 조립식 브라켓(70)의 수직면을 앵커(40)로 연결하며 전체적으로 직각 삼각형상으로 이루어지는 조립식 브라켓(70)을 설치 고정하는 단계;The prefabricated bracket 70 is connected to the horizontal hole of the prefabricated bracket 70 at the bolt hole 62 installed at the four corners of the fixing unit 60 at the same time as the bolt. Installing and fixing a prefabricated bracket 70 consisting of a right triangle and connecting a vertical surface with an anchor 40 as a whole;

교각(P)의 주위에 다수개 설치된 상기 조립식 브라켓(70)의 하부를 상호 L형 형강(80)으로 연결하는 단계;Connecting lower portions of the prefabricated brackets 70 installed around the piers P with L-shaped steels 80;

상기 조립식 브라켓(70)과 조립식 브라켓(70)의 수평면과 정착부(60)간의 틈새와 조립식 브라켓(70)의 수직면과 교각(P)간의 틈새와 조립식 브라켓(70을 상호 연결하는 L형 형강(80)에 무수축 모르터(90)를 타설양생하는 단계;L-shaped steel connecting the clearance between the horizontal surface of the prefabricated bracket 70 and the prefabricated bracket 70 and the fixing unit 60 and the vertical surface of the prefabricated bracket 70 and the piers P and the prefabricated bracket 70. Pouring the non-contraction mortar 90 into 80;

상기 조립식 브라켓(70) 사이 잔여토를 굴착 제거하는 단계;Excavating and removing residual soil between the prefabricated brackets 70;

상기 굴착된 부분의 교각(P) 하상표면까지 다양한 크기의 자갈이나 쇄석 등의 사석(100)을 포설하는 단계를 포함하는 것이다.It includes the step of laying a sandstone 100, such as gravel or crushed stone of various sizes to the lower surface of the piers (P) of the excavated portion.

즉, 본 발명에 따른 현장 마이크로 파일과 조립식 브라켓을 이용한 교각용 조립식 기초보강 구조체 구축방법은 도 12의 (a) 내지 (h)에 도시된 바와 같이, 트렌치 굴착 제거단계, 천공홀 형성단계, 현장 마이크로 파일 설치단계, 철근 삽입단계, 조립식 브라켓 설치단계, L형강 연결단계; 무수축 모르터 타설양생 단계; 잔여토 굴착단계, 사석 채움단계를 순차적으로 시행하여 교각의 지내력 증진 및 세굴방지용 구조체를 구축하는 것이다.That is, the method for constructing a prefabricated foundation reinforcement structure for piers using a field micro pile and a prefabricated bracket according to the present invention, as shown in Figure 12 (a) to (h), trench excavation removal step, drilling hole forming step, site Micro pile installation step, rebar insertion step, prefabricated bracket installation step, L-shaped steel connection step; Non-contraction mortar curing step; The remaining soil excavation step and the filling step of the sandstone are carried out sequentially to build the structure for improving the bearing capacity of the piers and preventing scour.

여기서, 상기 트렌치 굴착 제거단계는 교각(P)마다 주위의 하상을 몇 개 부분적으로 일정한 깊이로 굴착 제거하는 단계로, 교각(P)의 인접부위를 백호 서브를 이용하여 교각(P)의 기초부위를 만들기 위하여 하상을 일정한 깊이로 굴착함과 동시에 굴착부위(T)를 수평한 상태로 유지토록 하는 단계이다.Here, the trench excavation removing step is to excavate and remove a portion of the surrounding lower bed at a certain depth for each pier P, and the base portion of the pier P using the backhoe sub to the adjacent portion of the pier P. At the same time to excavate the bed to a certain depth to make a step to maintain the excavation site (T) in a horizontal state.

이어서, 상기 천공홀 형성단계는 굴착된 굴착부위(T)에 천공홀(10)을 형성하기 위하여 크롤러 드릴과 같은 굴착기를 이용하여 선단에 설치된 케이싱(20)을 삽입 굴진하여 천공홀(10)을 형성하는 단계로, 천공홀(10)을 형성한 측벽이 무너져 내리는 것을 케이싱(20)으로 방지토록 하는 단계이다.Subsequently, the drilling hole forming step inserts and drills the casing 20 installed at the tip by using an excavator such as a crawler drill to form the drilling hole 10 at the excavated drilling site T. In the forming step, the casing 20 prevents the side wall on which the perforation hole 10 is formed from collapsing.

그 후, 상기 정착부 설치단계는 현장 마이크로 파일(30)내에 설치된 철근(38)의 상부에 정착부(60)의 삽입공을 끼워서 정착부(60)를 설치하는 단계이다.Thereafter, the fixing unit installation step is to install the fixing unit 60 by inserting the insertion hole of the fixing unit 60 in the upper portion of the reinforcing bar 38 installed in the field micro pile 30.

이와 같이 현장 마이크로 파일(30)상에 정착부(60)를 설치하는 이유는 상기 정착부(60)상에 설치되는 조립식 브라켓(70)과의 부착면을 넓히도록 하기 위함으로, 현장 마이크로 파일(30)에 직접적으로 조립식 브라켓(70)을 부착하는 것보다 정착부(60)를 이용하여 조립식 브라켓(70)을 설치하는 것이 훨씬 더 부착면적이 확대되어 용이하게 조립식 브라켓(70)을 설치토록 하기 위함이다.The reason for installing the fixing unit 60 on the field micro pile 30 as described above is to widen the attachment surface with the prefabricated bracket 70 installed on the fixing unit 60. It is much easier to install the prefabricated bracket 70 by using the fixing unit 60 than to attach the prefabricated bracket 70 directly to 30, so that the mounting area can be easily expanded so that the prefabricated bracket 70 can be easily installed. For sake.

이어서, 상기 조립식 브라켓(70) 설치단계는 전체적으로 직각 삼각형상으로 이루어지도록 H형강으로 이뤄지며, 그 내측에 콘크리트와 부착력을 좋게 하기 위하여 스터드가 설치되고, 콘크리트가 타설된 조립식 브라켓(70)을 정착부(60)의 볼트공(62)에 볼트 체결로 상기 조립식 브라켓(70)의 수평면이 연결됨과 동시에 교각의 하단부에 형성된 천공홀에 상기 조립식 브라켓(70)의 수직면을 앵커(40)로 연결하여, 교각(P)의 지내력을 증진토록 하는 단계이다.Subsequently, the installation step of the prefabricated bracket 70 is made of H-shaped steel so as to be made in a right triangle shape as a whole, and a stud is installed in order to improve adhesion with concrete therein, and the prefabricated bracket 70 in which concrete is poured is fixed to the fixing part. The horizontal surface of the prefabricated bracket 70 is connected to the bolt hole 62 of the bolt 60 and at the same time, the vertical surface of the prefabricated bracket 70 is connected to the boring hole formed at the lower end of the pier by the anchor 40. This step is to increase the bearing capacity of the piers (P).

이어서, 상기 조립식 브라켓(70)간을 L형강(80)을 이용하여 그 하부를 연결토록 한다.Subsequently, the prefabricated brackets 70 are connected to their lower parts using the L-shaped steel 80.

여기서, 상기 조립식 브라켓(70)은 공장이나 현장에서 제작한 것을 사용함으로 전반적인 시공속도가 향상되는 작용효과가 있다.Here, the prefabricated bracket 70 has the effect of improving the overall construction speed by using the manufactured in the factory or the field.

그 후, 상기 무수축 모르터(90) 타설양생 단계는 상기 조립식 브라켓(70)과 조립식 브라켓(70)의 수평면과 정착부(60)간의 틈새와 조립식 브라켓(70)의 수직면과 교각(P)간의 틈새와 조립식 브라켓(70)과 L형 형강(80)간에 무수축 모르터(90)를 타설양생하여 틈새 및 연결부위를 메우는 단계이다.Thereafter, the non-shrinkage mortar pouring step is a gap between the horizontal surface of the prefabricated bracket 70 and the prefabricated bracket 70 and the fixing unit 60 and between the vertical surface of the prefabricated bracket 70 and the piers P. Filling the gap and the connection part by pouring the non-shrink mortar 90 between the gap and the prefabricated bracket 70 and the L-shaped steel (80).

즉, 상기 조립식 브라켓(70)이 연결된 부분에 연결된 각종 볼트, 너트 및 앵커(40)로 구성되는 철물은 그대로 수중에 노출시 물에 의해 녹이 슬어 궁극적으로 끊어지기 때문에 이들 연결부위에 무수축 모르터(90)를 타설함과 동시에 일정기간 양생시킨다.That is, the hardware consisting of a variety of bolts, nuts and anchors 40 connected to the prefabricated bracket 70 is connected to the non-shrink mortar at these connections because it is ultimately broken by water when exposed to water intact ( 90) and cure for a certain period of time.

따라서, 상기와 같이 철물의 표면이 무수축 모르터(90)로 피복되기 때문에 물의 영향으로부터 철물이 녹스는 것을 방지할 뿐만 아니라 녹이 슬더라도 외부로 녹이 드러나지 않음으로 인하여 철물이 녹슬어 하천이 오염되는 것을 사전에 방지토록 하는 작용효과가 있다.Therefore, since the surface of the iron is covered with the non-shrink mortar 90 as described above, not only does it prevent the hardware from rusting from the influence of water, but the steel is rusted and contaminated the river because the rust is not exposed to the outside even if it is rusted. It has the effect of preventing it.

이어서, 잔여토 굴착단계는 상기 조립식 브라켓(70) 사이의 잔여토를 굴착제거하는 단계이다.Subsequently, the residual soil excavation step is a step of excavating and removing the residual soil between the prefabricated brackets 70.

마지막으로 사석 포설단계는 조립식 브라켓(70)과 교각(P)의 하상표면까지 사석(100)으로 채우되, 교각(P)의 기초를 보강한 후 교각(P)의 주위 등을 여분으로 판 굴착부위(T)에 다양한 크기의 자갈이나 잡석, 모르터 등의 사석(100)을 채워서,브라켓(70)의 흔들림이나 세굴의 영향이 없도록 굴착부위(T)를 복구하는 단계이다.Lastly, the sandstone laying step is filled with the sandstone 100 to the lower surface of the prefabricated bracket 70 and the piers P. After reinforcing the foundation of the piers P, plate excavation around the piers P is spared. Filling the sand (100), such as gravel or rubble, mortar of various sizes in the site (T), is a step of recovering the excavation site (T) so that the impact of shaking or scouring of the bracket (70).

상기한 바와 같은 구성 및 시공으로 이루어진 본 발명에 따른 현장 마이크로 파일과 조립식 브라켓을 이용한 교각용 조립식 기초보강 구조체 및 그의 구축방법은 열차운행중에 교각(P)의 전면 터파기를 가급적 축소 지향함으로써, 교각(P)의 전후 및 좌우로 안정성을 도모할 수 있으며, 교각(P)의 기초보강으로 인하여 유수 단면적이 감소 및 축소되는 점을 굴착부위(T)를 형성한 후 이를 되메우는 방법으로 해결할 수 있으며, 하천공사의 계절적 특성을 고려하여 시공속도를 향상시킬 수 있으며, 교각(P)의 종방향으로 상부구조로 인한 형하공간의 제약해소로 장비의 효율적인 운영을 도모할 수 있으며, 내진에 적합한 현장 마이크로 파일(30)을 채택함으로써 중력식 교각(P) 기초구조의 단점을 보완할 수 있는 작용효과가 있다.The prefabricated foundation reinforcement structure for the piers using the field micro pile and the prefabricated bracket according to the present invention having the configuration and construction as described above, and the construction method thereof, are oriented by reducing the front trench of the piers P during train operation. Stability can be achieved in front, rear, left and right of P), and the water flow cross-sectional area decreases and decreases due to the foundation reinforcement of the piers (P), and can be solved by backfilling the excavation site (T). The construction speed can be improved in consideration of the seasonal characteristics of the river construction, and the efficient operation of the equipment can be achieved by eliminating the restriction of the geometry space due to the superstructure in the longitudinal direction of the piers (P). By adopting (30), there is an effect that can compensate for the shortcomings of the gravitational piers (P) foundation.

이상에서 설명한 바와 같이, 본 발명에 따른 현장 마이크로 파일과 조립식 브라켓을 이용한 교각용 조립식 기초보강 구조체 및 그의 구축방법은 다음과 같은 효과가 있다.As described above, the prefabricated foundation reinforcement structure for bridge piers using the field micro pile and the prefabricated bracket according to the present invention and the construction method thereof have the following effects.

첫째, 본 발명에 따른 현장 마이크로 파일과 조립식 브라켓을 이용한 교각용 조립식 기초보강 구조체는 교각의 외측 인접부에 현장 마이크로 파일을 지중에 설치하고, 이 현장 마이크로 파일상에 조립식 브라켓을 설치하여, 교각주변의 세굴을 방지하고, 지반의 지내력을 증진시켜 교각의 안정화를 도모할 수 있는 이점이 있다.First, the prefabricated foundation reinforcement structure for piers using the field micro pile and the prefabricated bracket according to the present invention installs the field micro pile in the ground adjacent to the outside of the piers, and installs the prefabricated bracket on the field micro pile, Prevents scour, and improves the bearing strength of the ground, which has the advantage of stabilizing the pier.

둘째, 본 발명에 따른 현장 마이크로 파일과 조립식 브라켓을 이용한 교각용조립식 기초보강 구조체는 철근을 이용한 현장 마이크로 파일과 이 현장 마이크로 파일에 타설되는 그라우팅제로 인하여 지반내의 지내력을 증진시킬 수 있다.Second, the prefabricated foundation reinforcement structure for bridge piers using the field micro pile and the prefabricated bracket according to the present invention can improve the bearing strength in the ground due to the field micro-pile using reinforcing bars and the grouting agent placed on the field micro-pile.

셋째, 본 발명에 따른 현장 마이크로 파일과 조립식 브라켓을 이용한 교각용 조립식 기초보강 구조체는 공장이나 현장에서 제작된 조립식 브라켓을 이용하여 시공함으로 인하여 기초보강의 시공속도가 향상되며, 안정성 및 경제성이 증진되는 이점이 있다.Third, the prefabricated basic reinforcement structure for piers using the field micro pile and the prefabricated bracket according to the present invention is improved by using the prefabricated bracket manufactured in the factory or the field, thereby improving the construction speed of the base reinforcement, and improving stability and economic efficiency. There is an advantage.

즉, 별도로 공장이나 현장에서 제작된 브라켓을 현장 마이크로 파일상에 설치하기 때문에, 교각 기초보강의 시공속도가 빨라 굴착 후 시공지연으로 기존구조물의 변위발생을 억제하는 이점이 있다.That is, because the brackets manufactured in the factory or the field is installed on the field micro pile separately, the construction speed of the foundation reinforcement of the piers is fast, and there is an advantage of suppressing displacement of the existing structure due to construction delay after excavation.

넷째, 본 발명에 따른 현장 마이크로 파일과 조립식 브라켓을 이용한 교각용 조립식 기초보강 구조체는 교각의 필요한 개소에 앵커설치로 인하여 효율성을 증대시킬 수 있는 이점이 있다.Fourth, the prefabricated foundation reinforcement structure for piers using the field micro pile and the prefabricated bracket according to the present invention has the advantage that can increase the efficiency due to the anchor installation in the required location of the piers.

다섯째, 본 발명에 따른 현장 마이크로 파일과 조립식 브라켓을 이용한 교각용 조립식 기초보강 구조체는 교각의 종방향으로 형하공간의 제약에 따른 영향이 발생되지 않는 이점이 있다.Fifth, the prefabricated foundation reinforcement structure for piers using the field micro pile and the prefabricated bracket according to the present invention has the advantage that the influence of the limitation of the geometry space in the longitudinal direction of the piers does not occur.

여섯째, 본 발명에 따른 현장 마이크로 파일과 조립식 브라켓을 이용한 교각용 조립식 기초보강 구조체는 교각의 하부면 기초보강시 별도로 단면이 증설되지 않기 때문에, 기존의 유수의 흐름과 동일한 유수의 흐름을 유지함으로 인하여 유수의 통수에 유리한 이점이 있다.Sixth, since the prefabricated foundation reinforcement structure for piers using the field micro pile and the prefabricated bracket according to the present invention do not have a separate cross section when the foundation of the lower surface of the piers is reinforced, it maintains the same flow of the existing flow. There is an advantage to running water.

즉, 교각의 인접부를 트렌치 굴착하고, 굴착부위에 현장 마이크로 파일과 브라켓을 설치한 후, 브라켓 사이를 굴착하여 사석으로 채움으로써, 교각의 부피가 더 커지거나 하는 교각의 단면상 증설이 필요없기 때문에, 교각의 기초보강공사 전후의 유수의 흐름상 변화가 거의 없는 이점이 있다.That is, since trench excavation of the adjacent part of the piers, field micro piles and brackets are installed at the excavation sites, and the excavation between the brackets is filled with sandstones, the volume of the piers is not increased, so the cross section of the piers is not necessary. There is little advantage in the flow of the flowing water before and after the foundation reinforcement work of the bridge.

일곱째, 본 발명에 따른 현장 마이크로 파일과 조립식 브라켓을 이용한 교각용 조립식 기초보강 구조체는 지중으로 현장 마이크로 파일이 삽입되기 때문에 외부로 녹발생이 거의 없어, 하천을 오염시키지 않으므로 환경 친화적인 이점이 있다.Seventh, the prefabricated foundation reinforcement structure for piers using the field micro pile and the prefabricated bracket according to the present invention has little rust to the outside because the field micro pile is inserted into the ground, so it does not pollute the river has an environmentally friendly advantage.

여덟째, 본 발명에 따른 현장 마이크로 파일과 조립식 브라켓을 이용한 교각용 조립식 기초보강 구조체는 다수의 교각을 대칭으로 굴착함과 동시에 시공이 가능함으로 인하여 기초보강의 시공속도가 향상되는 이점이 있다.Eighth, the prefabricated foundation reinforcement structure for piers using the field micro pile and the prefabricated bracket according to the present invention has the advantage that the construction speed of the foundation reinforcement can be improved by simultaneously drilling a plurality of piers symmetrically.

아홉째, 본 발명에 따른 현장 마이크로 파일과 조립식 브라켓을 이용한 교각용 조립식 기초보강 구조체는 브라켓간의 하부에 형강을 설치하고, 상기 브라켓 및 교각의 굴착부위를 사석으로 채우기 때문에 브라켓이 외부의 영향으로 흔들림이 발생되거나 교각의 하부가 세굴되는 현상이 발생되지 않는 이점이 있다.Ninth, the prefabricated foundation reinforcement structure for piers using the field micro pile and the prefabricated bracket according to the present invention is installed in the lower section between the brackets, because the brackets and excavation of the piers filled with sandstone, the bracket shakes due to external influences There is an advantage that does not occur phenomenon that occurs or the lower part of the piers.

열째, 본 발명에 따른 현장 마이크로 파일과 조립식 브라켓을 이용한 교각용 조립식 기초보강 구조체는 교각의 기초보강 공사중에 교각의 상부에 열차운행으로 인하여 발생되는 진동과는 무관하게 기초보강공사를 수행할 수 있는 이점이 있다.Tenth, the prefabricated foundation reinforcement structure for bridge piers using the field micro pile and the prefabricated bracket according to the present invention can perform the foundation reinforcement work irrespective of the vibration generated by the train operation on the upper part of the bridge during the foundation reinforcement work of the piers There is an advantage.

Claims (6)

교각의 주변에 대칭으로 지중에 소정의 직경과 깊이로 천공되는 천공홀과;A perforation hole symmetrically around the piers with a predetermined diameter and depth in the ground; 상기 천공홀 내로 소정의 깊이만큼 삽입되어 지중에 매설되는 현장 마이크로 파일과;A field micro pile inserted into the drilling hole by a predetermined depth and embedded in the ground; 상기 현장 마이크로 파일내에 설치된 철근의 상부에 설치되는 정착부와;A fixing unit installed on an upper part of the reinforcing bar installed in the field micro pile; 상기 정착부의 볼트공에 볼트 체결로 상기 조립식 브라켓의 수평면이 연결됨과 동시에 교각의 하단부에 형성된 천공홀에 상기 조립식 브라켓의 수직면이 앵커로 연결되며 전체적으로 직각 삼각형상이 되도록 H형강으로 조립형성되어 교각 주위에 설치되어 상호 L형강으로 연결설치되는 다수개의 조립식 브라켓과;The horizontal surface of the prefabricated bracket is connected to the bolt hole of the fixing unit at the same time, and the vertical surface of the prefabricated bracket is connected to the anchor at the perforated hole formed at the lower end of the piers. A plurality of prefabricated brackets installed and connected to each other by L-shaped steel; 상기 조립식 브라켓과 상기 조립식 브라켓의 수평면과 정착부간의 틈새와 상기 브라켓의 수직면과 교각 사이를 메우기 위하여 타설양생되는 무수축 모르터와;A non-shrink mortar that is pour-cured to fill the gap between the prefabricated bracket and the horizontal surface of the prefabricated bracket and the fixing unit, and the vertical surface and the piers of the bracket; 상기 조립식 브라켓과의 사이 및 교각의 주위에 다양한 크기의 자갈이나 쇄석을 포설하여 교각 주위의 하상이 쇄굴되는 것을 방지하는 것을 특징으로 하는 현장 마이크로 파일과 조립식 브라켓을 이용한 교각용 조립식 기초보강 구조체.A prefabricated prefabricated structure for piers using on-site micro piles and prefabricated brackets, by installing gravel or crushed stone of various sizes between the prefabricated brackets and around the piers to prevent crushing of the riverbed around the piers. 제 1항에 있어서, 상기 현장 마이크로 파일은 소정의 직경 및 길이로 이루어지는 천공홀내에 다수개의 철근과 주입파이프 및 철근의 간격이 일정하게 유지될 수 있도록 일정한 간격을 두고 설치되는 간격제와; 철근이 서로 고정되도록 하기위하여 일정한 간격으로 묶은 결속선과 철근을 상호 연결하기 위하여 설치되는 연결구로 이루어져 설치된 천공홀내에 그라우팅제를 타설 양생하는 것을 특징으로 하는 현장 마이크로 파일과 조립식 브라켓을 이용한 교각용 조립식 기초보강 구조체.The method of claim 1, wherein the field micro pile is a spacing agent installed at regular intervals so that the spacing of the plurality of reinforcing bars and the injection pipe and the reinforcement in the drill hole made of a predetermined diameter and length; Prefabricated foundation for piers using on-site micro piles and prefabricated brackets, characterized in that the grouting agent is poured into the drilled hole, which consists of connecting wires tied at regular intervals to connect the reinforcing bars with each other. Reinforcement structure. 제 1항 및 제 2항에 있어서,The method according to claim 1 and 2, 상기 현장 마이크로 파일내에 설치되는 철근의 간격을 유지하기 위하여 일정한 간격으로 설치되는 간격제는 일정한 두께를 가지는 십자형상으로서 십자형상의 사이에 철근이 설치되도록 하고, 중앙에 형성된 구멍에 주입파이프를 설치하고, 이 주입파이프를 이용하여 그라우팅제를 타설할 수 있게 하는 것을 특징으로 하는 현장 마이크로 파일과 조립식 브라켓을 이용한 교각용 조립식 기초보강 구조체.Spacers installed at regular intervals in order to maintain the spacing of the reinforcing bars installed in the field micro pile as a cross shape having a certain thickness so that the reinforcing bars are installed between the cross shape, install an injection pipe in the hole formed in the center, A prefabricated foundation reinforcement structure for piers using field micro piles and a prefabricated bracket, characterized in that the grouting agent can be poured using the injection pipe. 제 1항에 있어서,The method of claim 1, 상기 정착부는 상기 천공홀의 상부로 일정길이 연장된 철근에 설치되기 위한 것으로서 일정한 크기의 사각형상 철판 네모서리에 볼트공이 형성되고 철판의 하부에 상기 철근이 삽입될 수 있게 다수개의 삽입구가 설치되는 것을 특징으로 하는 현장 마이크로 파일과 조립식 브라켓을 이용한 교각용 조립식 기초보강 구조체.The fixing unit is to be installed in the reinforcing bars extending a predetermined length to the upper portion of the drilling hole, characterized in that a bolt hole is formed in a square iron plate square of a predetermined size and a plurality of insertion holes are installed so that the reinforcing bars can be inserted in the lower portion of the iron plate. Prefabricated reinforcement structure for piers using field micro piles and prefabricated brackets. 제 1항에 있어서,The method of claim 1, 상기 조립식 브라켓은 교각 주위에 설치하되 하상의 표면에서 일정한 깊이에 설치되어 그 위에 자갈 또는 쇄석이 설치되어 지는 것을 특징으로 하는 현장 마이크로 파일과 조립식 브라켓을 이용한 교각용 조립식 기초보강 구조체.The prefabricated bracket is installed around the piers, but is installed at a constant depth from the surface of the lower bed, the gravel or crushed stone is installed on it, the prefabricated foundation reinforcement structure for the piers using the prefabricated brackets and field micro piles. 교각의 주위의 하상을 일정한 깊이로 트렌치 굴착 제거하는 단계;Trench excavating the bottom bed around the pier to a constant depth; 상기 굴착된 지반에 천공홀을 형성하기 위하여 굴착기가 선단에 설치된 케이싱을 삽입 굴진하여 천공홀을 형성하는 단계;Inserting and excavating a casing installed at the tip of the excavator to form a drilled hole in the drilled ground to form a drilled hole; 상기 천공홀내에 다수개의 철근과 주입파이프 및 철근의 간격을 유지하기 위하여 철근의 길이방향으로 중앙에 구멍이 형성된 십자형의 간격제와 간격제 전후 철근을 결속선으로 묶어 설치하고 그라우팅제를 타설양생하여 현장 마이크로 파일을 설치하는 단계;In order to maintain the spacing of a plurality of reinforcing bars and injection pipes and reinforcing bars in the perforation holes, cross-shaped spacers formed with holes in the center of the reinforcing bars in the center and reinforcing bars before and after the spacers are installed by tying the binding lines and curing Installing an on-site micro file; 상기 현장 마이크로 파일내에 설치된 철근의 상부와 상기 정착부의 하부에 설치된 삽입구에 정착부를 설치하는 단계;Installing a fixing unit in an insertion hole provided in an upper part of the reinforcing bar installed in the field micro pile and a lower part of the fixing unit; 상기 정착부의 네모서리에 설치된 볼트공에 상기 조립식 브라켓의 수평면과 볼트로 연결함과 동시에 교각의 하부에 형성된 천공홀에 상기 조립식 브라켓의 수직면을 앵커로 연결하여 전체적으로 직각 삼각형상으로 이루어지는 조립식 브라켓을 설치고정하는 단계;The prefabricated bracket made of a right triangle is installed by connecting the vertical surface of the prefabricated bracket with an anchor to the boring hole formed at the bottom of the pier by connecting the bolt with the horizontal surface of the prefabricated bracket to the bolt hole installed at the four corners of the fixing unit. Fixing; 교각의 주위에 다수개 설치된 상기 조립식 브라켓의 하부를 상호 L형 형강로 연결하는 단계;Connecting the lower parts of the prefabricated brackets installed around the piers with L-shaped steels; 상기 조립식 브라켓과 조립식 브라켓의 수평면과 정착부간의 틈새와 조립식 브라켓의 수직면과 교각간의 틈새와 조립식 브라켓을 상호 연결하는 L형 형강에 무수축 모르터를 타설양생하는 단계;Pouring a non-shrink mortar into the L-shaped steel interconnecting the clearance between the horizontal surface and the fixing part of the prefabricated bracket and the prefabricated bracket, the gap between the vertical surface and the piers of the prefabricated bracket, and the prefabricated bracket; 상기 조립식 브라켓 사이의 잔여토를 굴착 제거하는 단계;Excavating and removing residual soil between the prefabricated brackets; 상기 굴착한 부분의 교각 하상표면까지 다양한 크기의 자갈이나 쇄석으로 이루어진 사석을 포설하는 단계를 포함하는 것을 특징으로 하는 현장 마이크로 파일과 조립식 브라켓을 이용한 교각용 조립식 기초보강 구조체 구축방법.Method of building a prefabricated foundation reinforcement structure for piers using on-site micro piles and prefabricated brackets comprising the step of laying a sandstone made of gravel or crushed stone of various sizes up to the pier bottom surface of the excavated portion.
KR10-2003-0003096A 2003-01-16 2003-01-16 Micro pile and assembly foundation reinforcement structure member and its method for pier KR100493516B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2003-0003096A KR100493516B1 (en) 2003-01-16 2003-01-16 Micro pile and assembly foundation reinforcement structure member and its method for pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2003-0003096A KR100493516B1 (en) 2003-01-16 2003-01-16 Micro pile and assembly foundation reinforcement structure member and its method for pier

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR20-2003-0001395U Division KR200315293Y1 (en) 2003-01-16 2003-01-16 Micro pile and assembly foundation reinforcement structure member for pier

Publications (2)

Publication Number Publication Date
KR20040065896A true KR20040065896A (en) 2004-07-23
KR100493516B1 KR100493516B1 (en) 2005-06-07

Family

ID=37355967

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2003-0003096A KR100493516B1 (en) 2003-01-16 2003-01-16 Micro pile and assembly foundation reinforcement structure member and its method for pier

Country Status (1)

Country Link
KR (1) KR100493516B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101899907A (en) * 2010-04-08 2010-12-01 台州建筑安装工程公司 Reinforced concrete column replacing and reinforcing method and device for unloading load of reinforced concrete column
CN103603267A (en) * 2013-11-21 2014-02-26 同济大学 Protective device with height-variable sacrificing piles against local scours to bridge pier foundation
CN108411770A (en) * 2018-03-02 2018-08-17 中国市政工程西北设计研究院有限公司 The lateral anchor bolts of modularization precast pier construct and its construction method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101099692B1 (en) 2009-05-08 2011-12-28 주식회사동일케미칼 Construction method for bollard

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101899907A (en) * 2010-04-08 2010-12-01 台州建筑安装工程公司 Reinforced concrete column replacing and reinforcing method and device for unloading load of reinforced concrete column
CN101899907B (en) * 2010-04-08 2015-02-11 台州建筑安装工程公司 Reinforced concrete column replacing and reinforcing method and device for unloading load of reinforced concrete column
CN103603267A (en) * 2013-11-21 2014-02-26 同济大学 Protective device with height-variable sacrificing piles against local scours to bridge pier foundation
CN108411770A (en) * 2018-03-02 2018-08-17 中国市政工程西北设计研究院有限公司 The lateral anchor bolts of modularization precast pier construct and its construction method
CN108411770B (en) * 2018-03-02 2023-12-08 中国市政工程西北设计研究院有限公司 Transverse anchor bolt connection structure of modularized precast pier and construction method thereof

Also Published As

Publication number Publication date
KR100493516B1 (en) 2005-06-07

Similar Documents

Publication Publication Date Title
JP6166264B2 (en) How to build a retaining wall
US20110142550A1 (en) Method for constructing a chair-type, self-supported earth retaining wall
US5551810A (en) Retaining wall with an outer face and method of forming the same
US20130136538A1 (en) System and method for increasing roadway width incorporating a reverse oriented retaining wall and soil nail suppports
JP4190360B2 (en) Masonry wall reinforcement structure and method
KR101021915B1 (en) A method for constructing cut-off temporary structure for sheathing work
KR20050082986A (en) Method of enlarging road width and preventing falling stone
JP2007211408A (en) Seismic strengthening construction method for existing concrete bridge pier
KR100313721B1 (en) Method for designing synthetic underground retaining wall by temporary soil protection structure and working process of underground retaining wall of structure
CN110258600B (en) Vertical cofferdam construction method suitable for deepwater area
JP3486602B2 (en) Pier foundation method and pier foundation structure
KR100493516B1 (en) Micro pile and assembly foundation reinforcement structure member and its method for pier
KR20120122024A (en) Uniting Method of Temporary earth wall with basement exterior Wall using Couplers and Bolts.
KR102150531B1 (en) Retaining wall structure using vertical underground insert and its construction method
JP3768220B2 (en) Pier structure and pier
KR200315293Y1 (en) Micro pile and assembly foundation reinforcement structure member for pier
CN210712916U (en) Combined anchoring road shoulder retaining wall
KR20130073336A (en) Pile structure and construction methods
US10077539B1 (en) Wall and retaining members and fluidizing installation of retaining members
KR101020217B1 (en) rock construction structure of using anchor and method thereof
JP3832845B2 (en) Steel sheet pile combined direct foundation and construction method of steel sheet pile combined direct foundation
KR100327547B1 (en) Composite retaining wall construction method
KR100429283B1 (en) Construction Method using Precast Concrete for Diaphragm Wall
KR20210047481A (en) Core wall structure of composite cassion for offshore runway
KR200240016Y1 (en) Structure of reclamation type's for dection soil

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee